Method and system for thermal power unit coupling gas turbine to respond to grid regulation demand

Through the design of the thermal power unit coupled gas turbine system, the exhaust of the gas turbine drives the temperature of the combustion furnace and gasifier, the problem of insufficient peak shaving and moment of inertia of the thermal power unit after the new energy grid is connected, and the rapid response to grid demand and system stability is achieved. Sexual and economical.

CN115506888BActive Publication Date: 2024-11-12ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER COMPANY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211323357.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-27
Publication Date
2024-11-12
Estimated Expiration
2042-10-27

AI Technical Summary

Technical Problem

The intermittentity of new energy power generation and the peak-to-valley difference on the load side impact on traditional power systems, resulting in a decrease in the ability of thermal power units in peak shaving and providing moment of inertia, and poor operating economy and stability.

Method used

A thermal power unit coupled gas turbine system is designed, and the combustion system and gas system are flexibly adjusted under different load conditions. The exhaust gas of the gas turbine drives the combustion furnace and gasifier temperatures, quickly respond to the demands of the power grid, and without peak adjustments are required. run independently to save costs.

Benefits of technology

The thermal power unit can quickly respond to grid scheduling needs, improve the system's regulation capability and stability, reduce operating costs, and provide the necessary moment of inertia, enhancing the safety and stability of the power system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115506888B_ABST
    Figure CN115506888B_ABST
Patent Text Reader

Abstract

The present invention provides a system and method for coupling a thermal power unit with a gas turbine to respond to the regulation needs of a power grid. When the thermal power unit is required to undertake peak-shaving tasks, have a certain rotational inertia, and be able to quickly increase the load to respond to the dispatching needs of the power grid, the combustion system and the gas system can be coupled; when the power grid requires the thermal power unit to quickly provide electricity, the combustion system is isolated from the gas system, the furnace temperature rises in a short time, and the entire combustion system is driven to quickly reach a high load to support the dispatching needs of the power grid.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of flexible interaction between coal-fired power generation units and power grids, and specifically relates to a method and system for coupling a thermal power generation unit with a gas turbine to respond to power grid regulation requirements. Background Art

[0002] It is estimated that by 2030, the installed capacity of wind power and photovoltaic power will exceed 1.6 billion kilowatts, and the installed capacity will increase from 24% in 2020 to about 47%. The power generation of new energy will be about 3.5 trillion kWh, and the proportion will increase from 13% in 2020 to 30%. After 2030, the construction of traditional non-fossil energy such as hydropower and nuclear power will gradually slow down due to resource and site constraints, and the development of new energy will further accelerate. It is estimated that by 2060, the installed capacity of wind power and photovoltaic power will exceed 5 billion kilowatts, and the installed capacity will exceed 80%. The power generation of new energy will exceed 9.6 trillion kWh, accounting for more than 60%, becoming an important support for the power system.

[0003] Renewable energy has typical intermittent characteristics, and its output is highly random and volatile. The randomness of the power generation side and the increase in the peak-to-valley difference on the load side will have a greater impact on the traditional power system. In addition, after the new energy is connected to the grid, it has caused insufficient system inertia to a certain extent. Photovoltaic power generation uses the photoelectric effect of semiconductors to convert light energy into electrical energy, and has no inertia. Wind power generation also has a serious lack of inertia. Therefore, when a large number of new energy units in the power system replace conventional power sources, the system frequency regulation capability will be significantly reduced.

[0004] As the main resource for peak load regulation of power grid, thermal power units are of great significance to the safe and stable operation of power system. At the same time, they can also provide the necessary rotational inertia for power system. When thermal power units are operated at low load to participate in peak load regulation, their load adjustment speed and space will be affected, and they cannot eliminate the unfavorable factors such as random disturbance and inertia reduction caused by the connection of new energy to the grid through flexible adjustment technology. At the same time, the economic efficiency and stability of the unit operation are poor. Summary of the invention

[0005] Based on the above problems, the present invention proposes a method and system for coupling a thermal power unit with a gas turbine to respond to grid regulation requirements.

[0006] The present invention is achieved through the following technical solutions:

[0007] A system for coupling a thermal power unit with a gas turbine to respond to grid regulation requirements, comprising a coupled combustion system and a gas system, wherein the combustion system comprises a combustion furnace (1), a steam turbine (2), and a steam cycle generator (3) connected in sequence, and the gas system comprises a gasifier (4), a gas turbine (5), and a gas cycle generator (7) connected in sequence; the gas turbine (5) is connected to the furnace of the combustion furnace (1) for conveying exhaust gas from the gas turbine (5) to the combustion furnace (1), and the combustion furnace (1) is connected to the furnace of the gasifier (4) for conveying exhaust gas from the combustion furnace (1) to the furnace of the gasifier (4).

[0008] Preferably, the system further comprises a waste heat boiler (6) connected to the gas turbine (5) and used for storing part of the exhaust gas of the gas turbine (5).

[0009] The present invention also discloses a method based on the above system, comprising the steps of:

[0010] S01. When the thermal power unit is required to undertake the peak load regulation task, have a certain rotational inertia, and can quickly increase the load to respond to the grid dispatching needs, the combustion system is coupled with the gas system;

[0011] S02. When the power grid needs the thermal power unit to quickly provide electricity, the combustion system is isolated from the gas system. At this time, the temperature in the furnace is high, and the atmosphere in the furnace is replaced by air and coal is added. The furnace temperature rises in a short time, driving the entire combustion system to quickly reach high load to support the grid dispatching needs;

[0012] Step S01 specifically includes the following steps:

[0013] S011. Combustion furnace (1) Stop feeding coal into the furnace;

[0014] S012. The combustible gas produced by coal gasification in the gasifier (4) enters the gas turbine (5), is compressed and burned, and then discharged into the furnace of the combustion furnace (1);

[0015] S013. The gas turbine (5) system load is adjusted to a low load, driving the gas cycle generator (7) to generate electricity and provide power for the factory;

[0016] S014. After the exhaust gas of the gas turbine (5) enters the furnace of the combustion furnace (1), it is heat-exchanged in the furnace and the tail flue and then enters the furnace of the gasifier (4) as gasification auxiliary gas;

[0017] S015. The furnace of the combustion furnace (1) relies on the exhaust gas of the gas turbine (5) to maintain the furnace temperature. After the exhaust gas is heat exchanged and purified in the combustion furnace (1), it re-enters the furnace of the gasification furnace (4) to participate in the gasification reaction;

[0018] S016. The steam generated by the combustion furnace (1) enters the steam turbine (2) to drive the turbine blades to rotate, providing rotational inertia for the system. The power generated by the steam cycle generator (3) is also used to provide factory electricity.

[0019] Preferably, the combustible gas generated by the gasifier (4) enters the gas turbine (5), is compressed and combusted, and then a portion of the combustible gas enters the waste heat boiler (6) and a portion of the combustor (1) furnace.

[0020] Preferably, the combustible gas generated by the gasifier (4) enters the gas turbine (5) for compression and combustion, and then enters the furnace of the combustion furnace (1) to ensure that the furnace temperature of the combustion furnace is maintained at 600-700°C.

[0021] The advantages of the present invention are: by setting the gas turbine coupled to the thermal power unit, when there is no need to undertake the peak-shaving task and provide rotational inertia for the power grid, the combustion system and the gas system can operate independently without interfering with each other; when the thermal power unit is required to undertake the peak-shaving task, have a certain rotational inertia, and can quickly increase the load to respond to the power grid dispatching needs, the combustion system is coupled with the gas system; when the power grid requires the thermal power unit to quickly provide electricity, the combustion system is quickly isolated from the gas system, and coal is quickly supplied to the combustion furnace. The furnace temperature can be raised to about 1000°C in a short time, driving the entire combustion system to quickly bring it to high load and support the power grid dispatching needs. The present invention enables the entire system to flexibly respond to the power grid needs, not only saving costs, but also improving the system's regulation ability and strong stability. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 This is a schematic diagram of the system structure of Example 1 of the present invention. DETAILED DESCRIPTION

[0023] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0024] Please refer to the attached Figure 1 The present invention discloses a system for coupling a thermal power unit with a gas turbine to respond to grid regulation requirements, including a waste heat boiler 6 and a combustion system and a gas system coupled to each other, wherein the combustion system includes a combustion furnace 1, a steam turbine 2, and a steam cycle generator 3 connected in sequence, and the gas system includes a gasifier 4, a gas turbine 5, and a gas cycle generator 7 connected in sequence. The gas turbine 5 is connected to the furnace of the combustion furnace 1 to transport the exhaust gas of the gas turbine 5 to the combustion furnace 1, and the combustion furnace 1 is connected to the furnace of the gasifier 4 to transport the exhaust gas of the combustion furnace 1 to the furnace of the gasifier 4. The waste heat boiler is connected to the gas turbine 5.

[0025] When the thermal power unit is required to undertake the peak load regulation task, have a certain rotational inertia, and be able to quickly increase the load to respond to the grid dispatching needs, the combustion system is coupled with the gas system:

[0026] Step 1: Stop feeding coal into the furnace of combustion furnace 1;

[0027] Step 2: The combustible gas (CO, CH4, H2, etc.) produced by coal gasification in the gasifier 4 enters the gas turbine 5, is compressed, burned and discharged, a part of it enters the waste heat boiler 6, and the other part enters the furnace of the combustion furnace 1, and the furnace temperature of the combustion furnace 1 is maintained at 600-700°C;

[0028] Step 3: The gas turbine system load is adjusted to a low load, driving the generator 7 to generate electricity, and the electricity is mainly used for factory power;

[0029] Step 4: The exhaust gas from the gas turbine entering the combustion furnace 1 is heat exchanged in the furnace and the tail flue before entering the gasification furnace 4 as auxiliary gas for gasification;

[0030] Step 5: At this time, the entire system is low-carbon emission. The coal supply to the combustion furnace 1 in the combustion system is stopped, and the furnace temperature is maintained by exhaust gas from the gas turbine 5. Most of the exhaust gas in the gas system re-enters the gasifier furnace 4 to participate in the gasification reaction after heat exchange and purification.

[0031] Step 6: In the combustion system, the steam generated by the combustion furnace 1 enters the steam turbine 2 to drive the turbine blades to rotate, providing a certain rotational inertia for the power grid system. The power generated by the steam cycle generator 3 is relatively small and is also mainly used for factory electricity.

[0032] When the power grid needs the thermal power unit to quickly provide electricity, the combustion system is quickly isolated from the gas system. At this time, the temperature in the furnace is high. After the atmosphere in the furnace is replaced by air, coal is quickly added. The furnace temperature rises to about 1000℃ in a short time, driving the entire combustion system to quickly reach high load and supporting the grid dispatching needs.

[0033] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for coupling a thermal power unit with a gas turbine to respond to grid regulation requirements, characterized in that: Includes steps: S01. When the thermal power unit is required to undertake the peak load regulation task, have a certain rotational inertia, and can quickly increase the load to respond to the grid dispatching needs, the combustion system is coupled with the gas system; S02. When the power grid needs the thermal power unit to quickly provide electricity, the combustion system is isolated from the gas system. At this time, the temperature in the furnace is high, and the atmosphere in the furnace is replaced by air and coal is added. The furnace temperature rises in a short time, driving the entire combustion system to quickly reach high load to support the grid dispatching needs; The step S01 specifically includes the following steps: S011. Combustion furnace (1) Stop feeding coal into the furnace; S012. The combustible gas produced by coal gasification in the gasifier (4) enters the gas turbine (5), is compressed and burned, and then discharged into the furnace of the combustion furnace (1); S013. The gas turbine (5) system load is adjusted to a low load, driving the gas cycle generator (7) to generate electricity and provide power for the factory; S014. After the exhaust gas of the gas turbine (5) enters the furnace of the combustion furnace (1), it is heat-exchanged in the furnace and the tail flue and then enters the furnace of the gasifier (4) as gasification auxiliary gas; S015. The furnace of the combustion furnace (1) relies on the exhaust gas of the gas turbine (5) to maintain the furnace temperature. After the exhaust gas is heat exchanged and purified in the combustion furnace (1), it re-enters the furnace of the gasification furnace (4) to participate in the gasification reaction; S016. The steam generated by the combustion furnace (1) enters the steam turbine (2) to drive the turbine blades to rotate, providing rotational inertia for the system, and the power generated by the steam cycle generator (3) is also used to provide power for the factory; The method for coupling a thermal power unit with a gas turbine to respond to grid regulation requirements is implemented by means of a coupled combustion system and a gas system. The combustion system comprises a combustion furnace (1), a steam turbine (2), and a steam cycle generator (3) connected in sequence. The gas system comprises a gasifier (4), a gas turbine (5), and a gas cycle generator (7) connected in sequence. The gas turbine (5) is connected to the furnace of the combustion furnace (1) for conveying exhaust gas from the gas turbine (5) to the combustion furnace (1). The combustion furnace (1) is connected to the furnace of the gasifier (4) for conveying exhaust gas from the combustion furnace (1) to the furnace of the gasifier (4).

2. The method for coupling a thermal power unit with a gas turbine to respond to grid regulation requirements according to claim 1, characterized in that: The coupled combustion system and gas system further comprises a waste heat boiler (6) connected to the gas turbine (5) and used for storing part of the exhaust gas of the gas turbine (5).

3. The method for coupling a thermal power unit with a gas turbine to respond to grid regulation requirements according to claim 1, characterized in that: The combustible gas generated by the gasifier (4) enters the gas turbine (5) for compression and combustion, and then a portion of the combustible gas enters the waste heat boiler (6) and a portion of the combustible gas enters the furnace of the combustion furnace (1).

4. The method for coupling a thermal power unit with a gas turbine to respond to grid regulation requirements according to claim 3, characterized in that: The combustible gas generated by the gasifier (4) enters the gas turbine (5), is compressed and combusted, and then enters the furnace of the combustion furnace (1) to ensure that the furnace temperature of the combustion furnace is maintained at 600-700°C.