Horizontal stabilizer trim actuator test bench

By designing a horizontal stabilizer trim actuator test bench containing multiple units, the problem that existing equipment cannot quickly identify faults and realize automatic electrical control is solved, and the rapid fault identification and electrical identification of horizontal stabilizer trim actuator is achieved. Automatic control improves testing efficiency and accuracy.

CN115535291BActive Publication Date: 2024-11-12WUHAN HANGDA AERO SCI & TECH DEV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210960512.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-11
Publication Date
2024-11-12
Estimated Expiration
2042-08-11

AI Technical Summary

Technical Problem

The existing horizontal stability surface trimming actuator test equipment cannot quickly identify faults, and it is difficult to achieve automatic electrical control and real-time data display of the aircraft horizontal stability surface trimming actuator, which affects the performance testing efficiency and accuracy of the aircraft.

Method used

A horizontal surface leveling actuator test bench including a testing mechanism, a mechanical input unit, a lifting control unit, a center distance measurement unit, a dynamic loading unit, a hydraulic test unit and a measurement and control system unit were designed to realize automatic control and real-time control through computers. Display relevant parameters and store test data to quickly identify faults.

Benefits of technology

It realizes rapid fault identification and electrical automatic control of horizontal stability surface trimming actuators, improves testing efficiency and accuracy, and meets the requirements of performance testing of aircraft horizontal stability surface trimming actuators.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115535291B_ABST
    Figure CN115535291B_ABST
Patent Text Reader

Abstract

The invention discloses a horizontal stabilizer trim actuator test bench. It includes a test mechanism, a mechanical input unit, a lifting control unit, a center distance measuring unit, a dynamic loading unit, a hydraulic test unit, a measurement and control system unit and a static loading unit; the mechanical input unit and the lifting control unit are installed on the test mechanism; the center distance measuring unit is connected to the horizontal stabilizer trim actuator and then installed on the test mechanism; the dynamic loading unit is connected to the horizontal stabilizer trim actuator through a fixture and installed on the test mechanism; the static loading unit is connected to the horizontal stabilizer trim actuator through a fixture and installed on the test mechanism; the hydraulic test unit is connected to the horizontal stabilizer trim actuator through a hydraulic hose; the measurement and control system unit is connected to the horizontal stabilizer trim actuator and the hydraulic test unit. The invention has the advantages of being able to test the horizontal stabilizer trim actuator and quickly find out the fault of the horizontal stabilizer trim actuator.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a horizontal stabilizer trim actuator test bench, more specifically, it is an aircraft horizontal stabilizer trim actuator test system.

[0002] The invention is used for the performance test of the horizontal stabilizer trim actuator, and is mainly applicable to the aircraft models of PN: 47145 and PN: 47172. Background Art

[0003] The horizontal stabilizer trim actuator (THSA) controls the longitudinal pitch trim of the aircraft by operating the horizontal stabilizer trim. It is located in the unpressurized rear part of the fuselage and provides a fail-safe structural connection between the horizontal stabilizer trim and the fuselage. The fuselage is fixed to the tow cable assembly and the nut is fixed to the horizontal stabilizer trim.

[0004] The THSA mechanically controls the horizontal stabilizer deflection through a servo system. The input signals to the servo system are electrical signal position commands transmitted by the elevator aileron computer (ELAC) and the spoiler elevator computer (SEC) to the triple pitch trim controller (PTA). The PTA is part of the THSA and drives the control loop gear train.

[0005] A conventional mechanical input linkage, connected to the control circuit gear train through an override mechanism, enables the pilot to override the (ELAC) and (SEC) signals. In the event of loss of hydraulic power or no control signal, the THSA ensures that the horizontal stabilizer trim device is absolutely fixed.

[0006] THSA is mainly composed of the following parts: a screw ball nut assembly, a gear box assembly, two hydraulic valve groups, two hydraulic brake assemblies, two hydraulic motors, two sets of position sensors, and a trim controller (PTA);

[0007] The two hydraulic systems have independent oil supplies. The output of the hydraulic motor is transmitted to the screw shaft through the power differential and reduction gear. The dual control circuit gear transmits the input and reset signals to the valve block. The comparison chain device ensures that the THSA is fixed in the event that one control valve of the control device circuit is stuck.

[0008] In normal operating mode, pitch trim requests are automatically or electrically signaled by the flight computer to one of the three motors in the horizontal stabilizer trim actuator, which drives a dual control gear loop.

[0009] A mechanical input linkage is connected to the dual control gear circuit via an override mechanism, enabling the pilot to override the electrical control signals (emergency mode).

[0010] Before the horizontal stabilizer trim actuator is installed or after it fails, it is necessary to analyze the cause of the failure and find out the faulty component before replacing it with a new one or repairing it. It can only be put into use after passing the test.

[0011] Therefore, it is necessary to develop a horizontal stabilizer trim actuator test equipment that can test the horizontal stabilizer trim actuator and quickly find out the fault of the horizontal stabilizer trim actuator. Summary of the invention

[0012] The purpose of the present invention is to provide a horizontal stabilizer trim actuator test bench, which is a test system that meets the performance characteristic test requirements of the aircraft horizontal stabilizer trim actuator and can realize the electrical automatic control and test of the aircraft horizontal stabilizer trim actuator, and realizes automatic control and real-time display of relevant parameters and storage of test data through a computer; the present invention can test the horizontal stabilizer trim actuator and quickly find out the fault of the horizontal stabilizer trim actuator.

[0013] In order to achieve the above-mentioned object, the technical solution of the present invention is: a horizontal stabilizer trim actuator test bench, characterized in that: it is used for testing the performance of the horizontal stabilizer trim actuator;

[0014] The horizontal stabilizer trim actuator test bench includes a test mechanism, a mechanical input unit, a lifting control unit, a center distance measurement unit, a dynamic loading unit, a hydraulic test unit, a measurement and control system unit and a static loading unit;

[0015] The mechanical input unit is installed on the test mechanism and connected to the mechanical input shaft of the horizontal stabilizer trim actuator through a universal joint to control and load the mechanical input end of the horizontal stabilizer trim actuator;

[0016] The lifting control unit is installed on the test mechanism to facilitate the disassembly and assembly of the horizontal stabilizer trim actuator;

[0017] The center distance measurement unit is connected to the horizontal stabilizer trim actuator through a fixture and then installed on the test mechanism to achieve accurate measurement and control of the horizontal stabilizer trim actuator position;

[0018] The dynamic loading unit is connected to the horizontal stabilizer trim actuator through a fixture and then installed on the test mechanism to realize the function of light load dynamic test of the horizontal stabilizer trim actuator;

[0019] The static loading unit is connected to the horizontal stabilizer trim actuator through a fixture and then installed on the test mechanism to realize the function of super-heavy load back-drive test of the horizontal stabilizer trim actuator;

[0020] The hydraulic test unit is connected to the horizontal stabilizer trim actuator through a hydraulic hose to provide a power source for the horizontal stabilizer trim actuator to achieve hydraulic control and leakage testing;

[0021] The measurement and control system unit is connected to the horizontal stabilizer trim actuator through cables and electrical connectors, realizing electrical control and electrical measurement of the horizontal stabilizer trim actuator. At the same time, it is connected to the hydraulic test unit through cables and electrical connectors to measure and monitor the parameters of the hydraulic test unit.

[0022] In the above technical solution, the test mechanism includes a test bench, a first table and a second table arranged on the top of the test bench, and a third table and a fourth table arranged on the bottom surface of the inside of the test bench;

[0023] The mechanical input unit is mounted on the first table;

[0024] The lifting control unit is installed on the first table; the horizontal stabilizer trim actuator is installed on the second table through a manual hoist, a safety rope, eye screws and a clamp;

[0025] The dynamic loading unit is connected to the horizontal stabilizer trim actuator through a fixture and then installed on the third table;

[0026] The static loading unit is connected to the horizontal stabilizer trim actuator through a fixture and then installed on the fourth table.

[0027] In the above technical solution, the mechanical input unit includes a servo motor, a planetary reducer, a first coupling, a clutch, a second coupling, a torque meter, a third coupling, an encoder and a constant velocity universal coupling;

[0028] The planetary reducer is installed on the servo motor; the planetary reducer and the servo motor are installed through the shaft and flange;

[0029] The planetary reducer is connected to the clutch via a first coupling;

[0030] The clutch is connected to the torque meter via a second coupling;

[0031] The torque meter is connected to the universal coupling via a third coupling;

[0032] The encoder is installed between the torque meter and the drive shaft and between the third coupling and the universal joint; the encoder monitors the angle and speed of rotation of the mechanical input shaft of the horizontal stabilizer trim actuator;

[0033] The universal joint is connected to the mechanical input shaft of the horizontal stabilizer trim actuator through a clamp.

[0034] In the above technical solution, the hydraulic test unit includes a first oil supply circuit, a second oil supply circuit, a first oil return circuit, a second oil return circuit and a leakage test circuit;

[0035] The first oil supply control valve group and the second oil supply control valve group are both composed of a cartridge pressure regulating valve, an oil supply pressure gauge, a cartridge flow regulating valve and an integrated valve block;

[0036] The first oil supply control valve group and the second oil supply control valve group are respectively connected in series between the pneumatic ball valves of the first oil supply circuit and the second oil supply circuit and the first turbine flow sensor;

[0037] The first back pressure regulating valve group and the second back pressure regulating valve group are both composed of a back pressure regulating valve, a two-position two-way solenoid reversing valve and an integrated valve block;

[0038] The first back pressure regulating valve group and the second back pressure regulating valve group are respectively connected in series behind the pressure gauges of the first oil return circuit and the second oil return circuit;

[0039] The first oil supply circuit or the second oil supply circuit is connected in sequence to the pneumatic ball valve, the first oil supply control valve group or the second oil supply control valve group, the first turbine flow sensor, the temperature sensor, the oil supply pressure sensor and the quick connector, and finally connected to the oil inlet on the horizontal stabilizer trim actuator through the hydraulic hose;

[0040] The first oil return circuit or the second oil return circuit is connected in sequence to the one-way valve, the pressure gauge, and the first back pressure regulating valve group or the second back pressure regulating valve group, and finally connected to the oil return port on the horizontal stabilizer trim actuator through a hydraulic hose;

[0041] Between the first oil supply circuit and the first oil return circuit, an electromagnetic overflow valve group and a bypass needle valve are respectively connected in parallel before and after the first oil supply control valve group and after the first back pressure regulating valve group; between the second oil supply circuit and the second oil return circuit, an electromagnetic overflow valve group and a bypass needle valve are respectively connected in parallel before and after the second oil supply control valve group and after the second back pressure regulating valve group;

[0042] The leakage test circuit is formed by connecting the second turbine flow sensor and the third turbine flow sensor in parallel, and the oil return port of the leakage test circuit is merged into the first back pressure regulating valve group in the first oil return circuit.

[0043] In the above technical solution, the dynamic loading unit includes a standard cylinder, a linear bearing, a spherical bearing, a rotating pin, a first ear fork, a first weighing sensor, a slider, a second ear fork, a lever coupling, a lever yoke shaft and a guide shaft.

[0044] The filter pressure reducing valve, the proportional regulating valve, the air supply pressure sensor, the three-position five-way electromagnetic reversing valve, the air-controlled one-way valve and the one-way throttle valve are connected to the standard cylinder in sequence through the hose;

[0045] The standard cylinders on both sides are connected to the screw nuts of the horizontal stabilizer trim actuator through the lever yoke shaft, and the standard cylinders are connected to the first weighing sensor through the joint bearing and the rotating pin, and the first weighing sensor is installed on the slide block;

[0046] The guide shafts are connected to both sides of the standard cylinder. The guide shafts are connected to the bearing sliders through a straight line and installed on the test bench. The lever yoke shaft is installed on the horizontal stabilizer trim actuator and connected to the lever coupling. The lever yoke shaft is connected to the screw nut of the horizontal stabilizer trim actuator through the second ear fork.

[0047] In the above technical solution, the static loading unit includes a lever rotating bracket assembly, a heavy-load ear fork, a second weighing sensor, an adapter, a heavy-load hydraulic cylinder, a latch, a rotating ear fork and a fulcrum ear fork;

[0048] The lower part of the second load cell is connected to the heavy-duty hydraulic cylinder through an adapter, and the upper part of the second load cell is connected to the lever rotating bracket assembly through a heavy-duty ear fork and a latch pin;

[0049] The middle part of the lever rotating bracket assembly is connected to the test bench through the fulcrum ear fork and the latch pin, and rotates with the fulcrum ear fork as the fulcrum;

[0050] The rotating ear fork is installed on the right side of the lever rotating bracket assembly and is connected to the lever coupling through a pin; the lever coupling is connected to the screw nut of the horizontal stabilizer trim actuator through the lever yoke shaft.

[0051] The heavy-duty hydraulic cylinder is connected to two hydraulically controlled one-way valves, a three-position four-way electromagnetic reversing valve and a gas booster unit in sequence through pipelines;

[0052] An overflow valve is installed in parallel on the pipeline between the three-position four-way electromagnetic reversing valve and the gas booster unit.

[0053] In the above technical scheme, the lifting control unit includes a pulley block, a safety rope, a manual hoist, a lifting eye screw and a lifting support; the pulley block can move on the slide rail of the lifting support, the pulley block and the lifting eye screw are connected through the manual hoist, and the safety rope is connected to the manual hoist through the lifting eye screw.

[0054] In the above technical solution, the center distance measuring unit includes an upper rotating connecting shaft, a grating ruler, an intermediate rotating connecting shaft, a zero point positioning adjustment component and a lower auxiliary measurement balancing component);

[0055] The upper end of the grating scale is connected to the mounting position on the horizontal stabilizer trim actuator through the upper rotating coupling shaft; the slider of the grating scale is connected to the screw nut of the horizontal stabilizer trim actuator through the intermediate rotating coupling shaft; the lower end of the grating scale is connected to the screw end of the horizontal stabilizer trim actuator through the auxiliary measuring balance assembly; the zero point positioning adjustment assembly is connected to the auxiliary measuring balance assembly to adjust the position of the screw of the horizontal stabilizer trim actuator.

[0056] In the above technical solution, the measurement and control system unit includes an electric drive unit, a sensor unit, a signal conversion unit, a UUT, a NI data acquisition system board, a HD-T553 horizontal stabilizer actuator test equipment measurement and control cabinet and supporting software;

[0057] The measurement and control cabinet of HD-T553 horizontal stabilizer actuator test equipment includes a computer system and a signal conversion unit;

[0058] The electrical drive unit is connected to the NI data acquisition system board of the UUT and the computer system respectively;

[0059] The sensor conversion unit is connected to the signal unit; the signal unit is bidirectionally connected to the NI data acquisition system board and the UUT respectively;

[0060] NI data acquisition system board is connected to UUT;

[0061] The control process of the measurement and control system unit is as follows: manually input the work instructions through the NI data acquisition system software of the computer system, the horizontal stabilizer trim actuator starts to work, and transmits the position signal to the signal conversion unit through the sensor unit; the signal conversion unit transmits the converted signal to the NI data acquisition system board of the computer system and the UUT (horizontal stabilizer trim actuator) respectively; the internal sensor of the UUT (horizontal stabilizer trim actuator) simultaneously feeds back the signal to the NI data acquisition system board of the computer system; the NI data acquisition system board of the computer system transmits the signal to the electric drive unit, and the electric drive unit feeds back the signal to the UUT (horizontal stabilizer trim actuator), thus forming a closed-loop control to accurately control the movement of the horizontal stabilizer trim actuator.

[0062] The horizontal stabilizer trim actuator performance test system of the present invention has the following advantages:

[0063] (1) The present invention uses a constant velocity universal joint to connect the mechanical input unit with the input shaft of the horizontal stabilizer trim actuator, which not only ensures stable and reliable power transmission, but also ensures the installation of different horizontal stabilizer trim actuators;

[0064] (2) The hydraulic test oil return circuit of the present invention provides the horizontal stabilizer trim actuator with the required back pressure regulation, which can simulate load loading;

[0065] (3) The dynamic loading unit of the present invention realizes bidirectional dynamic loading of the horizontal stabilizer trim actuator, and at the same time utilizes the compressibility of gas to realize the function of protecting the horizontal stabilizer trim actuator, and utilizes the lever principle to eliminate the influence of the asynchronous problem of two double-acting cylinders on loading;

[0066] (4) The static loading unit of the present invention utilizes the lever principle to load the horizontal stabilizer trim actuator in both tension and compression directions, while saving overall space. By utilizing the characteristics of liquid static pressure, it plays a protective role when the horizontal stabilizer trim actuator is back-driven;

[0067] (5) The center distance measurement unit of the present invention directly mounts the grating ruler on the horizontal stabilizer trim actuator through a fixture, and moves along with the screw nut of the horizontal stabilizer trim actuator, thereby reducing intermediate transfer links and installation errors, more intuitively and realistically reflecting the entire movement process of the ball nut of the horizontal stabilizer trim actuator, and more directly monitoring the position of the ball nut of the horizontal stabilizer trim actuator in real time;

[0068] (6) The zero-position fixture of the present invention directly measures the initial position of the ball nut of the horizontal stabilizer trim actuator by modifying the standard vernier caliper;

[0069] (7) The measurement and control system unit of the present invention can not only realize closed-loop control and state monitoring of the electric motor of the horizontal stabilizer trim actuator, but also realize the measurement of electrical parameters of the electric motor of the horizontal stabilizer trim actuator when it is working;

[0070] (8) The present invention takes into account the large size and heavy weight of the horizontal stabilizer trim actuator, adds a lifting control unit to its installation, and adopts a manual hoist and a safety rope for lifting, which facilitates disassembly and ensures safety.

[0071] The present invention forms a whole by integrating a load loading unit, a dynamic loading unit and a static loading unit. The present invention integrates multiple functions such as load loading, dynamic loading and static loading into one, and multiple functions can be used separately, or multiple functions can be used in combination according to actual needs (for example, when only load loading or dynamic loading or static loading or center distance measurement is required, only the load loading unit or the dynamic loading unit or the static loading unit or the center distance measurement unit is started; when load loading and / or dynamic loading and / or static loading and / or center distance measurement is required, the load loading unit and / or the dynamic loading unit and / or the static loading unit and / or the center distance measurement unit is started), to meet various usage requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0072] Figure 1 It is a schematic diagram of the overall connection structure of the testing mechanism in the present invention.

[0073] Figure 2 Schematic diagram of the front and top views of the mechanical input unit in the present invention.

[0074] Figure 3 It is a schematic diagram of the connection structure of the lifting control unit in the present invention.

[0075] Figure 4It is a schematic structural diagram of the center distance measurement unit in the present invention.

[0076] Figure 5 It is a schematic diagram of the local structure of the dynamic loading unit in the present invention.

[0077] Figure 6 It is a schematic diagram of the overall structure of the dynamic loading unit in the present invention.

[0078] Figure 7 It is a schematic diagram of the three-dimensional structure of the static loading unit in the present invention.

[0079] Figure 8 It is a schematic diagram of the main structure of the static loading unit in the present invention.

[0080] Fig. 9 It is a schematic diagram of the control structure of the measurement and control system unit in the present invention.

[0081] Fig.10 It is a schematic diagram of the hydraulic control unit of the horizontal stabilizer trim actuator in the present invention.

[0082] exist Figure 3 In the figure, F1 indicates a slide rail.

[0083] exist Figure 6 In the figure, F2 indicates a hose.

[0084] exist Figure 7 In the figure, F3 represents the connection between the static loading unit and the test bench.

[0085] exist Figure 8 In the figure, F4 indicates a heavy-duty hydraulic cylinder.

[0086] exist Fig.10 In the figure, 13a indicates the oil inlet; 13b indicates the oil return port;

[0087] F5 indicates leakage test circuit; F6 indicates the first oil return circuit; F7 indicates the first back pressure regulating valve group; F8 indicates the first oil supply control valve group; F9 indicates the first oil supply circuit; F10 indicates the second oil supply control valve group; F11 indicates the second oil supply circuit; F12 indicates the second oil return circuit; F13 indicates the second back pressure regulating valve group.

[0088] In the figure, 1-test bench, 2-first table, 3-mechanical input unit, 3-1-servo motor, 3-2-planetary reducer, 3-3-first coupling, 3-4-clutch, 3-5-second coupling, 3-6-torque meter, 3-7-third coupling, 3-8-encoder, 3-9-constant velocity universal coupling, 4-lifting control unit, 4-1-pulley block, 4-2-safety rope, 4-3-manual hoist, 4-4-eye screw, 4-5-lifting support, 5-second table, 6-center distance measurement unit, 6-1-grating ruler, 6-2-auxiliary measurement plane Scale fixture, 6-3-zero point positioning fixture, 6-4-zero point positioning adjustment assembly, 6-5-lower auxiliary measurement balance assembly, 7-third table, 8-dynamic loading unit, 8-1-guide shaft, 8-2-slider, 8-3-first weighing sensor, 8-4-ear fork, 8-5-rotating pin, 8-6-spherical bearing, 8-7-linear bearing, 8-8-standard cylinder, 8-9-pin shaft, 8-10-lever coupling, 8-11-lever yoke shaft, 8-12-one-way throttle valve, 8-13-pneumatic one-way valve, 8-14-three-position five-way electromagnetic reversing valve, 8-15- Air pressure sensor, 8-16-proportional control valve, 8-17-filter pressure reducing valve, 9-hydraulic test unit, 9-1-pneumatic ball valve, 9-2-electromagnetic overflow valve group, 9-3-cartridge pressure regulating valve, 9-4-oil supply pressure gauge, 9-5-cartridge flow control valve, 9-6-bypass needle valve, 9-7-first turbine flow sensor, 9-8-temperature sensor, 9-9-oil supply pressure sensor, 9-10-two-position two-way electromagnetic reversing valve, 9-11-back pressure regulating valve, 9-12-quick connector, 9-13-check valve, 9-14-return oil pressure gauge, 9-15-The second turbine flow sensor, 9-16-The third turbine flow sensor, 10-Measurement and control system unit, 11-Static loading unit, 11-1-Lever rotating bracket assembly, 11-2-Heavy-load ear fork, 11-3-The second weighing sensor, 11-4-Adapter, 11-5-Heavy-load hydraulic cylinder, 11-7-Rotating ear fork, 11-8-Latch, 11-9-Hydraulic control one-way valve, 11-10-Three-position four-way solenoid reversing valve, 11-11-Overflow valve, 11-12-Gas booster unit, 12-Fourth table, 13-Horizontal stabilizer trim actuator. DETAILED DESCRIPTION

[0089] The following is a detailed description of the implementation of the present invention in conjunction with the accompanying drawings, but they do not constitute a limitation of the present invention and are only used as examples. At the same time, the advantages of the present invention are made clearer and easier to understand through the description.

[0090] Referring to the attached drawings, it can be seen that: the horizontal stabilizer trim actuator test bench is used for the performance test of the horizontal stabilizer trim actuator;

[0091] The horizontal stabilizer trim actuator test bench includes a test mechanism, a mechanical input unit 3, a lifting control unit 4, a center distance measurement unit 6, a dynamic loading unit 8, a hydraulic test unit 9, a measurement and control system unit 10 and a static loading unit 11;

[0092] The mechanical input unit 3 is installed on the test mechanism and connected to the mechanical input shaft of the horizontal stabilizer trim actuator through a universal coupling to control and load the mechanical input end of the horizontal stabilizer trim actuator;

[0093] The lifting control unit 4 is installed on the test mechanism to facilitate the disassembly and assembly of the horizontal stabilizer trim actuator 13;

[0094] The center distance measuring unit 6 is connected to the horizontal stabilizer trim actuator 13 through a fixture and then installed on the test mechanism to achieve accurate measurement and control of the position of the horizontal stabilizer trim actuator 13;

[0095] The dynamic loading unit 8 is connected to the horizontal stabilizer trim actuator 13 through a fixture and then installed on the test mechanism to realize the function of light load dynamic test of the horizontal stabilizer trim actuator;

[0096] After the static loading unit 11 is connected to the horizontal stabilizer trim actuator 13 through a fixture, it is installed on the test mechanism to realize the function of the super-heavy load back-drive test of the horizontal stabilizer trim actuator;

[0097] After the hydraulic test unit 9 is connected to the horizontal stabilizer trim actuator 13 through a hydraulic hose, it provides a power source for the horizontal stabilizer trim actuator 13 to achieve hydraulic control and leakage testing;

[0098] The measurement and control system unit 10 is connected to the horizontal stabilizer trim actuator 13 through cables and electrical connectors, thereby realizing electrical control and electrical measurement of the horizontal stabilizer trim actuator 13. At the same time, it is connected to the hydraulic test unit 9 through cables and electrical connectors to measure and monitor the parameters of the hydraulic test unit. The present invention is a special performance test bench for the horizontal stabilizer trim actuator, which not only realizes high-precision measurement and control thereof, but also has the advantages of complete functions and high modularization.

[0099] Further, the test mechanism includes a test bench 1, a first table 2 and a second table 5 arranged on the top of the test bench, and a third table 7 and 12 arranged on the bottom surface of the inner part of the test bench;

[0100] The mechanical input unit 3 is installed on the first table 2;

[0101] The lifting control unit 4 is installed on the first table 2; the horizontal stabilizer trim actuator is installed on the second table 5 through a manual hoist, a safety rope, a lifting eye screw and a clamp;

[0102] The dynamic loading unit 8 is connected to the horizontal stabilizer trim actuator 13 through a fixture and then installed on the third table 7;

[0103] The static loading unit 11 is connected to the horizontal stabilizer trim actuator 13 through a clamp and then installed on the fourth table 12 .

[0104] Further, the mechanical input unit 3 includes a servo motor 3-1, a planetary reducer 3-2, a first coupling 3-3, a clutch 3-4, a second coupling 3-5, a torque meter 3-6, a third coupling 3-7, an encoder 3-8 and a constant velocity universal coupling 3-9;

[0105] The planetary reducer 3-2 is installed on the servo motor 3-1;

[0106] The planetary reducer 3-2 is connected to the clutch 3-4 via a first coupling 3-3;

[0107] The clutch 3-4 is connected to the torque meter 3-6 via a second coupling 3-5;

[0108] The torque meter 3-6 is connected to the universal coupling 3-9 via a third coupling 3-7;

[0109] The encoder 3-8 is installed between the torque meter 3-6 and the transmission shaft, and between the third coupling 3-7 and the universal coupling 3-9;

[0110] The universal joint 3-9 is connected to the mechanical input shaft of the horizontal stabilizer trim actuator through a clamp.

[0111] Further, the hydraulic test unit 9 includes a first oil supply circuit, a second oil supply circuit, a first oil return circuit, a second oil return circuit and a leakage test circuit;

[0112] The first oil supply control valve group and the second oil supply control valve group are both composed of a cartridge pressure regulating valve 9-3, an oil supply pressure gauge 9-4, a cartridge flow regulating valve 9-5 and an integrated valve block;

[0113] The first oil supply control valve group and the second oil supply control valve group are respectively connected in series between the pneumatic ball valve 9-1 of the first oil supply circuit and the second oil supply circuit and the first turbine flow sensor 9-7 through pipelines and accessories;

[0114] The first back pressure regulating valve group and the second back pressure regulating valve group are both composed of a back pressure regulating valve 9-11, a two-position two-way solenoid reversing valve 9-10 and an integrated valve block;

[0115] The first back-pressure regulating valve group and the second back-pressure regulating valve group are respectively connected in series behind the pressure gauges 9-14 of the first oil return circuit and the second oil return circuit through pipelines and accessories; the first oil supply circuit, the second oil supply circuit, the first oil return circuit and the second oil return circuit are used independently without interfering with each other.

[0116] The first oil supply circuit or the second oil supply circuit is connected in sequence through pipelines and fittings to the pneumatic ball valve 9-1, the first oil supply control valve group or the second oil supply control valve group, the first turbine flow sensor 9-7, the temperature sensor 9-8, the oil supply pressure sensor 9-9 and the quick connector 9-12, and finally connected to the oil inlet on the horizontal stabilizer trim actuator 13 through a hydraulic hose;

[0117] The first oil return circuit or the second oil return circuit is connected to the one-way valve 9-13, the pressure gauge 9-14, and the first back pressure regulating valve group or the second back pressure regulating valve group in sequence through pipelines and accessories, and finally connected to the oil return port on the horizontal stabilizer trim actuator 13 through a hydraulic hose;

[0118] Between the first oil supply circuit and the first oil return circuit, an electromagnetic overflow valve group 9-2 and a bypass needle valve 9-6 are respectively connected in parallel before and after the first oil supply control valve group and after the first back pressure regulating valve group; between the second oil supply circuit and the second oil return circuit, an electromagnetic overflow valve group 9-2 and a bypass needle valve 9-6 are respectively connected in parallel before and after the second oil supply control valve group and after the second back pressure regulating valve group;

[0119] The leakage test circuit is formed by connecting the second turbine flow sensor 9-15 and the third turbine flow sensor 9-16 in parallel through pipelines and accessories, and the oil return port of the leakage test circuit is incorporated into the first back pressure regulating valve group in the first oil return circuit.

[0120] Furthermore, the dynamic loading unit 8 includes a standard cylinder 8-8, a linear bearing 8-7, a spherical bearing 8-6, a rotating pin 8-5, a first ear fork 8-4, a first weighing sensor 8-3, a slider 8-2, a second ear fork 8-9, a lever coupling 8-10, a lever yoke shaft 8-11 and a guide shaft 8-1

[0121] The filter pressure reducing valve 8-17, the proportional regulating valve 8-16, the air supply pressure sensor 8-15, the three-position five-way electromagnetic reversing valve 8-14, the air-controlled one-way valve 8-13 and the one-way throttle valve 8-12 are connected to the standard cylinder 8-8 in sequence through the hose;

[0122] The standard cylinders 8-8 on both sides are connected to the screw nuts of the horizontal stabilizer trim actuator through the lever yoke shaft 8-11. The standard cylinders 8-8 are connected to the first weighing sensor 8-3 through the joint bearing 8-6 and the rotating pin 8-5. The first weighing sensor 8-3 is installed on the slider 8-2.

[0123] The two sides of the standard cylinder 8-8 are respectively connected to the guide shaft 8-1, the guide shaft 8-1 is connected to the slider 8-2 through the linear bearing 8-7, and is installed on the test bench 1; the lever yoke shaft 8-11 is installed on the horizontal stabilizer trim actuator and connected to the lever coupling 8-10, and the device is connected to the screw nut of the horizontal stabilizer trim actuator through the second ear fork 8-9.

[0124] Further, the static loading unit 11 includes a lever rotating bracket assembly 11-1, a heavy-load ear fork 11-2, a second weighing sensor 11-3, an adapter 11-4, a heavy-load hydraulic cylinder 11-5, a latch 11-8, a rotating ear fork 11-7 and a fulcrum ear fork 11-6.

[0125] The lower part of the second weighing sensor 11-3 is connected to the heavy-duty hydraulic cylinder 11-5 through the adapter 11-4, and the upper part of the second weighing sensor 11-3 is connected to the lever rotating bracket assembly 11-1 through the heavy-duty ear fork 11-2 and the latch 11-8;

[0126] The middle part of the lever rotating bracket assembly 11-1 is connected to the test bench 1 through the fulcrum ear fork 11-6 and the latch pin 11-8, and rotates with the fulcrum ear fork 11-6 as the fulcrum;

[0127] The rotating ear fork 11-7 is installed on the right side of the lever rotating bracket assembly 11-1, and is connected to the lever coupling 8-10 through the pin 11-8; the lever coupling 8-10 is connected to the screw nut of the horizontal stabilizer balancing actuator through the lever yoke shaft 8-11.

[0128] The heavy-duty hydraulic cylinder 11-5 is connected to two hydraulically controlled one-way valves 11-9, a three-position four-way electromagnetic reversing valve 11-10 and a gas booster unit 11-12 in sequence through pipelines;

[0129] A relief valve 11 - 11 is connected in parallel on the pipeline between the three-position four-way electromagnetic reversing valve 11 - 10 and the gas booster unit 11 - 12;

[0130] The heavy-duty hydraulic cylinder 11-5 and the lever rotating bracket assembly 11-1 are connected through a weighing sensor 11-3 and an adapter 11-4, and the lever rotating bracket assembly 11-1 is connected to a screw nut of a horizontal stabilizer trim actuator through a latch 11-8.

[0131] In the above technical scheme, the lifting control unit 4 includes a pulley block 4-1, a safety rope 4-2, a manual hoist 4-3, a lifting eye screw 4-4 and a lifting support 4-5; the pulley block 4-1 can move on the slide rail of the lifting support 4-5, the pulley block 4-1 and the lifting eye screw 4-4 are connected through the manual hoist 4-3, and the safety rope 4-2 is connected to the manual hoist 4-3 through the lifting eye screw 4-4.

[0132] Further, the center distance measuring unit 6 includes an upper rotating connecting shaft 6-1, a grating ruler 6-2, an intermediate rotating connecting shaft 6-3, a zero point positioning adjustment component 6-4 and a lower auxiliary measurement balancing component 6-5;

[0133] The upper end of the grating ruler 6-2 is connected to the mounting position on the horizontal stabilizer trim actuator through the upper rotating connecting shaft 6-1; the slider of the grating ruler 6-2 is connected to the screw nut of the horizontal stabilizer trim actuator through the intermediate rotating connecting shaft 6-3; the lower end of the grating ruler 6-2 is connected to the screw end of the horizontal stabilizer trim actuator through the auxiliary measuring balance component 6-5; the zero point positioning adjustment component 6-4 is connected to the auxiliary measuring balance component 6-5, and is used to adjust the position of the screw of the horizontal stabilizer trim actuator; the intermediate transfer links are reduced, the installation error is reduced, and the entire movement process of the ball nut of the horizontal stabilizer trim actuator is reflected most intuitively and realistically; the zero position positioning fixture 6-3 accurately measures and verifies the zero position of the ball nut of the horizontal stabilizer trim actuator, and the ball nut balancing fixture of the horizontal stabilizer trim actuator not only prevents the measurement failure caused by the rotation of the ball nut of the horizontal stabilizer trim actuator, but also limits the degree of freedom of the horizontal stabilizer trim actuator, thereby improving the accuracy of the measurement.

[0134] Further, the measurement and control system unit 10 includes an electrical drive unit, a sensor unit, a signal conversion unit, a UUT, a NI data acquisition system board, a HD-T553 horizontal stabilizer actuator test equipment measurement and control cabinet, and supporting software;

[0135] The measurement and control cabinet of HD-T553 horizontal stabilizer actuator test equipment includes a computer system and a signal conversion unit;

[0136] The electrical drive unit is connected to the NI data acquisition system board of the UUT and the computer system respectively;

[0137] The sensor conversion unit is connected to the signal unit; the signal unit is bidirectionally connected to the NI data acquisition system board and the UUT respectively;

[0138] NI data acquisition system board is connected to UUT;

[0139] The control process of the measurement and control system unit 10 is as follows: manually inputting a work instruction through the NI data acquisition system software of the computer system, the horizontal stabilizer trim actuator starts to work, and transmits the position signal to the signal conversion unit through the sensor unit; the signal conversion unit transmits the converted signal to the NI data acquisition system board and UUT (horizontal stabilizer trim actuator) of the computer system respectively; the internal sensor of the UUT (horizontal stabilizer trim actuator) feeds back the signal to the NI data acquisition system board of the computer system at the same time; the NI data acquisition system board of the computer system transmits the signal to the electric drive unit, and the electric drive unit feeds back the signal to the UUT (horizontal stabilizer trim actuator), thus forming a closed-loop control to accurately control the movement of the horizontal stabilizer trim actuator.

[0140] The measurement and control system unit is mainly used to energize the horizontal stabilizer trim actuator electric motor, provide input instructions, and observe the closed and open states of the three override mechanism micro switches of the horizontal stabilizer trim actuator through indicator lights; it can automatically complete the test of the three electronic modules of PTA, and determine whether the tests of the three modules are qualified by observing the indicator lights. Through closed-loop control, it can control the horizontal stabilizer trim actuator electric motor by setting the input angle instruction, for example: the input signal is 0.5°THS (1.28°RVDT), and the control accuracy is 0±0.07°T HS (0±0..18°RVDT); use XY recorder to record the signals and curves of the product's COM and MON position sensors; measure the voltage change of the horizontal stabilizer trim actuator motor VA≤29mV (equivalent to 0.049°THS, 0.127°RVDT); can measure the voltages V1 and V2 of the six-position RVDT; when the UUT is in cyclic action, it can measure the working current of the electric motor, the current of the electromagnetic clutch of the horizontal stabilizer trim actuator, and the current of the servo motor of the horizontal stabilizer trim actuator under load and no-load conditions.

[0141] The horizontal stabilizer trim actuator test bench of the present invention is safe and reliable and can be widely used for the whole performance test of the horizontal stabilizer trim actuator. Practice has proved that the test bench has a maximum pressure of 206.9 bar, a maximum static load of 26 tons, a maximum dynamic load of 1.5 kN, a maximum center displacement of 1.2 m, and a maximum RVDT accuracy of 0.001, and can operate safely and stably.

[0142] The present invention can realize mechanical input and / or lifting control and / or center distance measurement and / or dynamic loading and / or hydraulic testing and / or measurement and control and / or static loading unit 11 by opening and closing the mechanical input unit 3, the lifting control unit 4, the center distance measurement unit 6, the dynamic loading unit 8, the hydraulic testing unit 9, the measurement and control system unit 10 and the static loading unit 11.

[0143] The horizontal stabilizer trim actuator UUT test should be checked as follows:

[0144] (1) Visually inspect the UUT related connection parts according to the CMM manual requirements to check for cracks, damage, etc.;

[0145] (2) Use a feeler gauge to check the gap between the secondary nut trunnion and the joint plate. The gap is required to be ≥ 0.6 mm.

[0146] (3) The relevant inspection and settings without PTA and position detection components are as follows:

[0147] (a) Check and set the UUT control valve group: After injecting lubricating oil, adjust the synchronization of the two UUT valves (11-250) according to the manual steps;

[0148] (b) Shut-off valve command device (2-001) setting: Set the two eccentric wheels (2-170) according to the manual steps and tighten them with screws;

[0149] (c) Stroke check: pressurize to 206 bar, load to 150 daN, use the mechanical input rod to move the product to a position with a center distance of 427 mm (L0, +4°) m, remove the mechanical input assembly, adjust it to the corresponding end stop, and reinstall it, then check the distance from the ball nut to the end stop of the screw (≥8 mm); run the UUT to 0° (L1), adjust the position of the pin bracket (8-70), and check the center distance (545±2 mm); run the UUT to the end stop (-13.5°, L2), check the center distance (937~942 mm) and the distance from the ball nut to the end stop (≥8 mm), and install and fix the manual control device;

[0150] (d) Add oil and check the oil level according to the CMM manual;

[0151] (e) Adjustment of the output finger end of the reduction gear of the position detector: Set to 0°, use tool M (0U190816) to set the position of the output finger end of the reduction gear (3-290, 23-330) respectively, and install the two sets of sensors that have been set according to sub-assembly test 6. (3);

[0152] (4) Related checks with PTA and position detector assembly: Install the PTA that has been set according to sub-assembly test 6. (4), connect it to the HD-T533 control cabinet, manually set it to 0°, turn on the controller, do not provide any instructions to the servo motor, and slowly rotate the mechanical input rod (first CW and then CCW). It is required that before the main screw rotates, the three micro switches are energized, the mechanical input rod is released, and the micro switches are de-energized.

[0153] Performance Testing

[0154] (1) Mechanical inspection

[0155] (a) POB static torque check: Use a 1 / 2in socket and torque wrench to check that the 15-40 slip torque is ≥ 72N·m;

[0156] (b) Check the control valve stopper: Fix the mechanical input shaft and slowly increase its torque until the UUT input end control is disengaged, and record the rotation angle and torque of the UUT mechanical input end at this time;

[0157] (2) Hydraulic module pressure test

[0158] (a) High-pressure oil supply port 206 bar, return oil pressure 0 bar, maintain for 5 minutes, check for external leakage;

[0159] (b) High pressure oil supply port 62 bar, oil return line pressure 62 bar, maintain for 5 minutes, check for external leakage.

[0160] (3) Internal leakage test

[0161] The high-pressure oil supply port is 180 bar, the return oil line pressure is 0 bar, the screw moves to the 0.5THS (1.28°RVDT) position, and the internal leakage of the return oil pipe is measured.

[0162] (4) Brake assembly release pressure measurement

[0163] Install tool 0U190929 to POB piston (12-280), high pressure oil supply port 80 bar, use dial indicator to measure piston stroke.

[0164] (5) Stroke inspection

[0165] The high-pressure oil supply port is 206 bar. Through the mechanical input device, it is moved to two stop ends in succession to measure the stroke of the UUT mechanical input and the screw stroke.

[0166] (6) Override mechanism performance inspection

[0167] (a) Mechanical input control torque check: supply 206 bar of high pressure oil to one of the control valve blocks, connect the UUT controller to energize the servo motor, rotate the mechanical input device by at least 30° (CW and CCW respectively), energize the micro switch, and record the maximum input torque;

[0168] (b) Check the input control torque in mechanical mode: the UUT electromagnetic clutch is powered off (the servo motor is powered off), the pressure difference is 206 bar (the high pressure oil supply pressure is 206 bar, and the return oil pressure is 0 bar) to the two control valve blocks, and the mechanical input is slowly turned (CW and CCW respectively) until the UUT screw rod rotates, requiring the micro switch not to be actuated, that is, any of the three "motor fault" indicator lights is not on, and the maximum control torque is recorded;

[0169] (c) Check the stroke of the micro switch: cut off the hydraulic power source and the power supply of the UUT clutch and servo motor, turn the mechanical input clockwise to make the control valve reach the stop end, continue to turn the mechanical input until the three micro switches are actuated, that is, the three "motor fault" indicators are on, record the angle of continued rotation, slowly release the mechanical input rod until the micro switch loses power, that is, the three "motor fault" indicators are off, and record the return angle;

[0170] (d) Mechanical input drive torque check: slowly increase the mechanical input load to 2-2.5 N·m, and observe whether the mechanical input rod and lead screw rotate smoothly in the electronic control mode;

[0171] (e) Override function check: Connect a servo motor in the electric control mode and provide a small input signal (≥2mA). Observe whether the screw runs slowly and smoothly. Fix the mechanical input end. The micro switch is actuated and the UUT screw stops. Release the mechanical input end and the UUT screw starts to run again.

[0172] (7) Interference inspection

[0173] (a) Mechanical mode check: Supply 206 bar pressure to the two control valve blocks, use tooling D to fix the output shaft (10-320), and stop the screw through the mechanical input device. It can be observed that the mechanical input torque will increase. Record the maximum torque value before the screw stops;

[0174] (b) Induction of the jam detection device (electrical mode): In the electric control mode, specify a position, use the tool 0U145426 to slowly rotate the control valve input shaft, and record the maximum flow rate in the return oil line before the jam protection device is activated;

[0175] (c) "In the electronic control mode, specify the position of -6°, use tooling D to fix the control valve input shaft, and observe whether the jam protection device is activated;

[0176] (d) Self-centering check of the primary stopper: Use an XY recorder to record the command position sensor and monitoring position sensor signals, supply oil at high pressures of 180 bar and 100 bar respectively, and move the screw from 0° to 1.5° and then to 0°, and compare the curves and the center distance difference between the two positions under the two pressures;

[0177] (8) Performance inspection of pressure supply device

[0178] (a) Supply a differential pressure of 140 bar to a control valve block, turn on the controller, turn the mechanical input to make the screw run at the fastest speed, and record the speed;

[0179] (b) Repeat the above steps, adjust the oil supply pressure to 100 bar, and record the relevant data and readings;

[0180] (9) Limit check

[0181] (a) Resolution check: Supply pressure of 206 bar, turn on the electric control, move the lead screw from 0° to 0.5°, record the voltage of the input signal at this time, increase the input signal until the lead screw starts to rotate, and record the voltage increment during this process;

[0182] (b) Hysteresis check: Reverse the input signal until the lead screw starts to rotate in the opposite direction and record the voltage increment;

[0183] (10) Accuracy check

[0184] (a) 0° position accuracy check: Turn on the electronic control, supply 206 bar pressure to the two control valve blocks, manually drive to 0°, measure the center distance and the secondary winding voltages V1 and V2 of the six position sensors, and calculate (V1-V2) / (V1+V2);

[0185] (b) Additional inspection of the monitoring position sensor: Unplug the command sensor (COM) and connect it to the monitoring sensor (MON). Drive the lead screw to +1°THS and -1°THS respectively and observe whether the lead screw can reach the specified position.

[0186] (c) -13.3° position accuracy check: manually drive to -13.3°, measure the center distance and the secondary winding voltages V1 and V2 of the six position sensors, and calculate (V1-V2) / (V1+V2);

[0187] (11) Cycle test and power consumption test

[0188] Run 10 cycles at the maximum allowable speed (+4°→-13.5°THS), requiring smooth operation and no external leakage, and record the current values ​​of the three servo motors;

[0189] (12) Maximum speed measurement

[0190] (a) Maximum speed in mechanical mode: Connect the electronic control, supply a pressure difference of 180 bar to a control valve block, use the mechanical input to fully open the control valve (11-250), and measure the screw speed;

[0191] (b) Maximum speed in electronic control mode: Supply a pressure difference of 180 bar to the two control valve blocks, turn on the electronic control to make the servo motor reach the maximum speed, and measure the maximum speed of the screw;

[0192] (13) Irreversibility check

[0193] (a) Release a POB using tool Q, apply 5000daN tensile / compressive loads respectively, and observe whether the screw rotates;

[0194] (b) Release a POB using tool Q, remove the corresponding hydraulic motor, install tool 0U191241, apply a tensile / compressive load of 2000 daN respectively, and observe whether the screw rotates.

[0195] Other parts not described belong to the prior art.

Claims

1. Horizontal stabilizer trim actuator test bench, characterized by: Used for horizontal stability trim actuator performance test; The horizontal stabilizer trim actuator test bench comprises a test mechanism, a mechanical input unit (3), a lifting control unit (4), a center distance measurement unit (6), a dynamic loading unit (8), a hydraulic test unit (9), a measurement and control system unit (10) and a static loading unit (11); The mechanical input unit (3) is installed on the test mechanism and connected to the mechanical input shaft of the horizontal stabilizer trim actuator through a universal joint, so as to control and load the mechanical input end of the horizontal stabilizer trim actuator; The lifting control unit (4) is installed on the test mechanism to facilitate the disassembly and assembly of the horizontal stabilizer trim actuator (13); The center distance measuring unit (6) is connected to the horizontal stabilizer trim actuator (13) through a fixture and then installed on the test mechanism, so as to achieve accurate measurement and control of the position of the horizontal stabilizer trim actuator (13); The dynamic loading unit (8) is connected to the horizontal stabilizer trim actuator (13) through a fixture and then installed on the test mechanism to achieve the function of light-load dynamic testing of the horizontal stabilizer trim actuator; After the static loading unit (11) is connected to the horizontal stabilizer trim actuator (13) through a fixture, it is installed on the test mechanism to realize the function of super-heavy load back-drive test of the horizontal stabilizer trim actuator (13); The hydraulic test unit (9) is connected to the horizontal stabilizer trim actuator (13) through a hydraulic hose, providing a power source for the horizontal stabilizer trim actuator (13) to achieve hydraulic control and leakage testing; The measurement and control system unit (10) is connected to the horizontal stabilizer trim actuator (13) through cables and electrical connectors, thereby realizing electrical control and electrical measurement of the horizontal stabilizer trim actuator (13). At the same time, the measurement and control system unit (10) is connected to the hydraulic test unit (9) through cables and electrical connectors, thereby measuring and monitoring the parameters of the hydraulic test unit. The testing mechanism comprises a testing bench (1), a first table top (2) and a second table top (5) arranged on the top of the testing bench, and a third table top (7) and a fourth table top (12) arranged on the bottom surface of the inside of the testing bench; The mechanical input unit (3) is installed on the first table top (2); The lifting control unit (4) is installed on the first table (2); the horizontal stabilizer trim actuator is installed on the second table (5) through a manual hoist, a safety rope, a lifting eye screw and a clamp; The dynamic loading unit (8) is connected to the horizontal stabilizer trim actuator (13) through a clamp and then installed on the third table (7); The static loading unit (11) is connected to the horizontal stabilizer trim actuator (13) through a clamp and then installed on the fourth table (12).

2. The horizontal stabilizer trim actuator test bench according to claim 1, characterized in that: The mechanical input unit (3) includes a servo motor (3-1), a planetary reducer (3-2), a first coupling (3-3), a clutch (3-4), a second coupling (3-5), a torque meter (3-6), a third coupling (3-7), an encoder (3-8) and a constant velocity universal joint (3-9); The planetary reducer (3-2) is installed on the servo motor (3-1); The planetary reducer (3-2) and the clutch (3-4) are connected via a first coupling (3-3); The clutch (3-4) is connected to the torque meter (3-6) via a second coupling (3-5); The torque meter (3-6) and the universal joint (3-9) are connected via a third coupling (3-7); The encoder (3-8) is installed between the torque meter (3-6) and the transmission shaft, and is located between the third coupling (3-7) and the universal coupling (3-9); The universal joint (3-9) is connected to the mechanical input shaft of the horizontal stabilizer trim actuator through a clamp.

3. The horizontal stabilizer trim actuator test bench according to claim 2, characterized in that: The hydraulic test unit (9) comprises a first oil supply circuit, a second oil supply circuit, a first oil return circuit, a second oil return circuit and a leakage test circuit; The first oil supply control valve group and the second oil supply control valve group are both composed of a plug-in pressure regulating valve (9-3), an oil supply pressure gauge (9-4), a plug-in flow regulating valve (9-5) and an integrated valve block; The first oil supply control valve group and the second oil supply control valve group are respectively connected in series between the pneumatic ball valve (9-1) of the first oil supply circuit and the second oil supply circuit and the first turbine flow sensor (9-7); The first back pressure regulating valve group and the second back pressure regulating valve group are both composed of a back pressure regulating valve (9-11), a two-position two-way electromagnetic reversing valve (9-10) and an integrated valve block; The first back pressure regulating valve group and the second back pressure regulating valve group are respectively connected in series behind the pressure gauges (9-14) of the first oil return circuit and the second oil return circuit; The first oil supply circuit or the second oil supply circuit is sequentially connected to the pneumatic ball valve (9-1), the first oil supply control valve group or the second oil supply control valve group, the first turbine flow sensor (9-7), the temperature sensor (9-8), the oil supply pressure sensor (9-9) and the quick connector (9-12), and finally connected to the oil inlet on the horizontal stabilizer trim actuator (13) through a hydraulic hose; The first oil return circuit or the second oil return circuit is sequentially connected to a one-way valve (9-13), a pressure gauge (9-14), and a first back pressure regulating valve group or a second back pressure regulating valve group, and finally connected to an oil return port on a horizontal stabilizer trim actuator (13) through a hydraulic hose; Between the first oil supply circuit and the first oil return circuit, an electromagnetic overflow valve group (9-2) and a bypass needle valve (9-6) are respectively connected in parallel before and after the first oil supply control valve group and after the first back pressure regulating valve group; between the second oil supply circuit and the second oil return circuit, an electromagnetic overflow valve group (9-2) and a bypass needle valve (9-6) are respectively connected in parallel before and after the second oil supply control valve group and after the second back pressure regulating valve group; The leakage test circuit is formed by connecting the second turbine flow sensor (9-15) and the third turbine flow sensor (9-16) in parallel, and the oil return port of the leakage test circuit is connected after the first back pressure regulating valve group in the first oil return circuit.

4. The horizontal stabilizer trim actuator test bench according to claim 3, characterized in that: The dynamic loading unit (8) comprises a standard cylinder (8-8), a linear bearing (8-7), a spherical bearing (8-6), a rotating pin (8-5), a first ear fork (8-4), a first weighing sensor (8-3), a slider (8-2), a second ear fork (8-9), a lever coupling (8-10), a lever yoke shaft (8-11) and a guide shaft (8-1); The filter pressure reducing valve (8-17), the proportional regulating valve (8-16), the air supply pressure sensor (8-15), the three-position five-way electromagnetic reversing valve (8-14), the air-controlled one-way valve (8-13) and the one-way throttle valve (8-12) are sequentially connected to the standard cylinder (8-8) through a hose; The standard cylinders (8-8) on both sides are connected to the screw nuts of the horizontal stabilizer trim actuator through the lever yoke shaft (8-11), the standard cylinder (8-8) is connected to the first weighing sensor (8-3) through the joint bearing (8-6) and the rotating pin (8-5), and the first weighing sensor (8-3) is installed on the slider (8-2); The two sides of the standard cylinder (8-8) are respectively connected to the guide shaft (8-1), the guide shaft (8-1) is connected to the slider (8-2) through a linear bearing (8-7), and is installed on the test bench (1); the lever yoke shaft (8-11) is installed on the horizontal stabilizer trim actuator and connected to the lever coupling (8-10), and the lever yoke shaft (8-11) is connected to the screw nut of the horizontal stabilizer trim actuator through a second ear fork (8-9).

5. The horizontal stabilizer trim actuator test bench according to claim 4, characterized in that: The static loading unit (11) comprises a lever rotating bracket assembly (11-1), a heavy-load ear fork (11-2), a second weighing sensor (11-3), an adapter (11-4), a heavy-load hydraulic cylinder (11-5), a latch (11-8), a rotating ear fork (11-7) and a fulcrum ear fork (11-6); The second weighing sensor (11-3) is connected to the heavy-duty hydraulic cylinder (11-5) through an adapter (11-4) at the bottom, and is connected to the lever rotating bracket assembly (11-1) at the top through a heavy-duty ear fork (11-2) and a latch (11-8); The middle part of the lever rotating bracket assembly (11-1) is connected to the test bench (1) through the fulcrum ear fork (11-6) and the latch pin (11-8), and rotates with the fulcrum ear fork (11-6) as the fulcrum; The rotating ear fork (11-7) is installed on the right side of the lever rotating bracket assembly (11-1) and is connected to the lever coupling (8-10) through a latch pin (11-8); the lever coupling (8-10) is connected to the screw nut of the horizontal stabilizer trim actuator through a lever yoke shaft (8-11); The heavy-duty hydraulic cylinder (11-5) is connected in sequence to two hydraulically controlled one-way valves (11-9), a three-position four-way electromagnetic reversing valve (11-10) and a gas booster unit (11-12) through pipelines; A relief valve (11-11) is installed in parallel on the pipeline between the three-position four-way electromagnetic reversing valve (11-10) and the gas boosting unit (11-12).

6. The horizontal stabilizer trim actuator test bench according to claim 5, characterized in that: The lifting control unit (4) comprises a pulley block (4-1), a safety rope (4-2), a manual hoist (4-3), a lifting eye screw (4-4) and a lifting support (4-5); the pulley block (4-1) moves on a slide rail of the lifting support (4-5), the pulley block (4-1) and the lifting eye screw (4-4) are connected via the manual hoist (4-3), and the safety rope (4-2) is connected to the manual hoist (4-3) via the lifting eye screw (4-4).

7. The horizontal stabilizer trim actuator test bench according to claim 6, characterized in that: The center distance measuring unit (6) comprises an upper rotating connecting shaft (6-1), a grating ruler (6-2), an intermediate rotating connecting shaft (6-3), a zero point positioning adjustment component (6-4) and a lower auxiliary measurement balancing component (6-5); The upper end of the grating ruler (6-2) is connected to the mounting position on the horizontal stabilizer trim actuator via an upper rotating connecting shaft (6-1); the slider of the grating ruler (6-2) is connected to the screw nut of the horizontal stabilizer trim actuator via an intermediate rotating connecting shaft (6-3); the lower end of the grating ruler (6-2) is connected to the screw end of the horizontal stabilizer trim actuator via an auxiliary measuring balance component (6-5); the zero point positioning adjustment component (6-4) is connected to the auxiliary measuring balance component (6-5) for adjusting the position of the screw of the horizontal stabilizer trim actuator.

8. The horizontal stabilizer trim actuator test bench according to claim 7, characterized in that: The measurement and control system unit (10) includes an electric drive unit, a sensor unit, a signal conversion unit, a UUT, a NI data acquisition system board, a HD-T553 horizontal stabilizer actuator test equipment measurement and control cabinet and supporting software; The measurement and control cabinet of HD-T553 horizontal stabilizer actuator test equipment includes a computer system and a signal conversion unit; The electrical drive unit is connected to the NI data acquisition system board of the UUT and the computer system respectively; The sensor conversion unit is connected to the signal unit; the signal unit is bidirectionally connected to the NI data acquisition system board and the UUT respectively; NI data acquisition system board is connected to UUT; The control process of the measurement and control system unit (10) is as follows: manually inputting a working instruction through the NI data acquisition system software of the computer system, the horizontal stabilizer trim actuator starts to work, and transmits a position signal to the signal conversion unit through the sensor unit; the signal conversion unit transmits the converted signal to the NI data acquisition system board of the computer system and the horizontal stabilizer trim actuator UUT respectively; the internal sensor of the UUT feeds back the signal to the NI data acquisition system board of the computer system at the same time; the NI data acquisition system board of the computer system transmits the signal to the electric drive unit, and the electric drive unit feeds back the signal to the UUT, thus forming a closed-loop control to accurately control the movement of the horizontal stabilizer trim actuator.