A method for preventing seepage and deterioration of surrounding rock by compressed gas energy storage in abandoned shafts and tunnels
By arranging borehole grouting and segmented area treatment in the elastic core area of the surrounding rock of the abandoned mine and tunnel, the problem of preventing penetration and deterioration of the surrounding rock in the utilization of compressed air energy storage in the space of the abandoned tunnel is solved, and the improvement of the surrounding rock of the tunnel is realized. Improved stability and airtightness extend service life and reduce resource loss.
Patent Information
- Application Number
- CN202211276561.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-10-19
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-10-19
AI Technical Summary
In the existing technology, the anti-penetration and anti-deterioration methods for surrounding rock management and utilization of compressed air energy storage in abandoned tunnels have not yet formed a complete construction method, and the existing methods can easily lead to cracking and damage of closed walls when faced with changes in air pressure and temperature. , and the economic benefits are not high.
Through detection, the elastic-plastic zone range of the surrounding rock of the abandoned mine tunnel was determined, grouting boreholes were set up and grouting was performed to form a reinforcement layer around the tunnel, and segmented areas and grout retaining walls were arranged inside the tunnel to ensure air tightness and flexibility. , to avoid the decrease in the effectiveness of drilling reinforcement.
It enhances the stability and tightness of the surrounding rock of the tunnel, extends the service life, reduces resource loss, and improves economic benefits.
Smart Images

Figure CN115680557B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mine surrounding rock treatment, and in particular to a method for utilizing compressed gas energy storage in abandoned shaft and tunnel space to treat surrounding rock for anti-seepage and deterioration. Background Art
[0002] New energy (such as solar energy and wind energy) is clean, environmentally friendly and renewable, and is a hot topic in the energy field. However, wind power and photovoltaic power usually have certain safety risks due to their intermittent and volatile nature. For example, large-scale wind power grid connection usually has an impact on the stable operation of the power grid. Compressed air energy storage technology can better solve the intermittent and instability problems of clean energy generation. By using its dual regulation function, it can better enhance the peak-shaving capacity of the power grid. The use of compressed air energy storage technology in mines can be an effective means of regulating power supply and reusing abandoned mines.
[0003] As coal mines gradually reduce production, a large number of abandoned shafts and tunnels are left behind. How to make rational use of these underground spaces is an important issue. Using abandoned shafts and tunnels for compressed air energy storage can effectively utilize a large amount of abandoned underground space; in addition, compressed air energy storage technology is also of great significance to promoting the development of renewable energy. Among them, abandoned shafts and tunnels, as storage containers for high-pressure air, play an important role in the operation of compressed air energy storage power stations, and the key issue in their construction is the sealing of abandoned shafts and tunnels and the stability of surrounding rocks. In particular, the problems of anti-seepage and anti-deterioration of surrounding rocks for compressed air energy storage in abandoned shaft and tunnel spaces are addressed.
[0004] In the prior art, the method for preventing the seepage of abandoned shafts and tunnels is generally to arrange closed walls. However, the method of arranging closed walls for anti-seepage is one of the important methods for preventing seepage in underground shafts and tunnels. This method is arranged in the cross-section of underground shafts and tunnels to achieve a sealing function. The present invention proposes a method for preventing the seepage and degradation of surrounding rocks for compressed gas energy storage in abandoned shafts and tunnels. The method for preventing the seepage and degradation of surrounding rocks for compressed gas energy storage in abandoned shafts and tunnels is still in its infancy in my country. No scholar has studied the method for preventing the seepage and degradation of surrounding rocks for compressed gas energy storage in abandoned shafts and tunnels. Only a part of scholars have studied the method for preventing the seepage of surrounding rocks for compressed gas energy storage in abandoned shafts and tunnels. The specific methods used are also different. Therefore, a complete construction method for preventing the seepage and degradation of surrounding rocks for compressed gas energy storage in abandoned shafts and tunnels has not yet been formed.
[0005] Chinese patent CN207795304U discloses a closed wall in a coal mine. The method uses steel bars to be fixed vertically between the top plate and the bottom plate, a metal mesh plate to be fixed on the steel bars, and a wind tube cloth to be fixed on the metal mesh plate, thereby building the outer walls on both sides of the closed wall, and the foaming material is integrally foamed and filled between the outer walls on both sides to form an inner wall, thereby completing the arrangement of the closed wall; however, the closed anti-seepage device provided by the method does not take into account the impact of changes in pressure and temperature inside the tunnel on the closed wall, and long-term exposure to changing air pressure and temperature can easily lead to cracking and damage of the airtight wall. Therefore, this method is only applicable to the interior of the shaft and tunnel with stable pressure state, and is not applicable to abandoned shafts and tunnels used for compressed gas energy storage. At the same time, the method only considers arranging the closed wall on both sides of the tunnel, and does not consider the top plate and the bottom plate, and the cost of paving the inside of the tunnel with the closed wall is high, and the economic benefit is not high, so it is not feasible.
[0006] Chinese patent CN203867252U discloses a compressed gas energy storage cavern composed of polymer materials and reinforced concrete. The high-pressure gas inside the cavern is sealed by pouring a reinforced concrete structure on the inner wall of the underground cavern and laying the polymer material on the inner wall of the reinforced concrete structure. Although this method provides a feasible method for sealing compressed gas energy storage tunnels, abandoned tunnels generally have larger spaces, and more materials are required to fully lay them to meet the sealing requirements. In addition, due to the use of polymer materials, the sealing cost of the tunnel will be greatly increased, and it will also consume a lot of manpower and time, and the economic benefits are low, so the feasibility of this method is low.
[0007] The existing technology has realized the use of compressed air energy storage technology, which can well reuse abandoned shafts and tunnels to avoid a large amount of underground space being wasted. The surrounding rock management and anti-seepage and anti-deterioration of the abandoned shaft and tunnel space compressed air energy storage plays an important role in it. Therefore, we propose a method for the surrounding rock management and anti-seepage and anti-deterioration of the abandoned shaft and tunnel space compressed air energy storage, and carry out research on it. Summary of the invention
[0008] In order to reduce the damage to the surrounding rock of the tunnel, enhance the stability of the surrounding rock of the tunnel, avoid the problem of reduced effectiveness of drilling and grouting reinforcement when the tunnel is too long, and enhance the airtightness of the tunnel, the present invention provides a method for compressed gas energy storage in abandoned shaft and tunnel space to utilize surrounding rock to control seepage and deterioration. The specific technical scheme is as follows.
[0009] A method for compressed gas energy storage in abandoned shafts and tunnels to treat seepage and deterioration of surrounding rocks, the steps include:
[0010] S1. Detect and determine the elastic-plastic zone range of the surrounding rock of the abandoned mine tunnel and shaft;
[0011] S2. Set a grouting borehole at a distance of 1.3 times the wellbore radius from the wellbore center, arrange the wellbore grouting boreholes at intervals and inject grout, the distance between the centers of adjacent wellbore grouting boreholes is 1.3 times the wellbore grouting borehole diameter, and construct the middle wellbore borehole and inject grout after the wellbore grouting solidifies;
[0012] S3. Set up segmented areas in the tunnel, set up slurry retaining walls at both ends of each segmented area, and install ventilation pipes to connect the adjacent tunnels at both ends of the segmented area;
[0013] S4. Widen the tunnel section within the segmented area;
[0014] S5. Determine the radius of the grouting boreholes from the center of the tunnel. Arrange the tunnel grouting boreholes at intervals. The distance between the centers of adjacent tunnel grouting boreholes is 1.3 times the diameter of the tunnel grouting boreholes. After the tunnel drilling grouting solidifies, construct the middle tunnel drilling holes and grouting.
[0015] Preferably, the detection is a geophysical detection method, including gravity exploration and magnetic exploration methods, to measure the elastic-plastic zone range of the abandoned shaft and tunnel surrounding rock and the wellbore surrounding rock; the drilling method is used to survey and determine the elastic-plastic zone range of the abandoned shaft and tunnel surrounding rock, and determine that the maximum distance from the center of the tunnel to the boundary line of the elastic-plastic zone of the tunnel is a, and the maximum distance from the center of the wellbore to the boundary line of the elastic-plastic zone of the wellbore surrounding rock is b.
[0016] Preferably, after the detection is completed, the drilled hole is sealed and filled with waterproof grouting material.
[0017] It is also preferred that the grouting process includes setting a grouting cover at the hole mouth of the grouting drilled hole in the wellbore, fixing the grouting cover on the surrounding rock, applying sealing material in the gap between the grouting cover and the surrounding rock, installing a grouting valve in the grouting hole of the grouting cover, and closing the grouting valve after grouting is completed.
[0018] It is also preferred that grouting is performed in the surrounding rock of the shaft to form a closed wall, and grouting is performed in the surrounding rock of the shaft and tunnel to form a closed wall, and the closed walls are connected to form a grouting closed whole.
[0019] It is also preferred that the diameter of the slurry blocking cover is larger than the diameter of the wellbore grouting borehole, and the diameter of the slurry blocking cover is also larger than the diameter of the tunnel grouting borehole; the slurry blocking cover is fixed to the surrounding rock by expansion screws.
[0020] It is also preferred that a 5m segmented area is set every 50m in the tunnel, and the outline of the widened tunnel is greater than 1.5a from the center of the tunnel; ventilation holes are set on the slurry retaining wall, and sealing material is applied to the connection between the ventilation pipe and the slurry retaining wall.
[0021] The method for utilizing surrounding rock to prevent permeability and deterioration in abandoned shaft and tunnel space compressed gas energy storage provided by the present invention has the following beneficial effects: (1) By arranging a borehole around the abandoned tunnel in the elastic core area of the surrounding rock of the abandoned tunnel and injecting grout into the borehole, a reinforcement layer around the abandoned tunnel can be formed, which reduces the damage to the surrounding rock of the tunnel and enhances the stability of the surrounding rock of the tunnel. (2) By arranging a closed wall on the inner side of the abandoned tunnel, gas penetration is prevented and the airtightness of the tunnel is enhanced. (3) The method implements segmented treatment on the abandoned shaft and tunnel used for compressed gas energy storage, establishes segmented areas, and the tunnel is closed by a slurry retaining wall at the segmented area to prevent gas leakage. At the same time, the tunnels on both sides of the segmented area are connected to each other by air pipes, which can ensure smooth air flow between adjacent tunnels. Such an arrangement makes the surrounding rock reinforcement better, avoids the problem of reduced effectiveness of drilling and grouting reinforcement when the tunnel is too long, and also enhances flexibility, which is more convenient when adding or reducing the tunnel capacity in the later stage, and is also easier to maintain, thereby increasing the service life and reducing resource loss. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the initial grouting of the surrounding rock of the wellbore;
[0023] Figure 2 It is a schematic diagram of secondary grouting of the surrounding rock of the wellbore;
[0024] Figure 3 It is a schematic diagram of the tunnel segment layout;
[0025] Figure 4 This is a schematic diagram of the initial grouting of the surrounding rock of the roadway;
[0026] Figure 5 This is a schematic diagram of secondary grouting of surrounding rock in the tunnel;
[0027] In the figure: 1—wellbore, 2—wellbore sealing layer, 3—junction of elastic-plastic zone of wellbore surrounding rock, 4—wellbore grouting holes arranged at intervals, 5—surrounding rock, 6—middle wellbore borehole, 7—tunnel, 8—closed wall, 9—junction of elastic-plastic zone of tunnel surrounding rock, 10—tunnel grouting holes arranged at intervals, 11—middle tunnel borehole, 12—wellbore surrounding rock borehole after grouting, 13—tunnel surrounding rock borehole after grouting, 14—segmented area, 15—slurry retaining wall, 16—ventilation pipe. DETAILED DESCRIPTION
[0028] Combination Figures 1 to 5 As shown, a specific implementation method of a method for compressed gas energy storage in abandoned shaft and tunnel space using surrounding rock to control anti-seepage and degradation provided by the present invention is described.
[0029] Compressed gas energy storage in abandoned shafts and tunnels utilizes a method of preventing seepage and deterioration of surrounding rocks. This method arranges drilling and grouting in the elastic core area of the surrounding rock to form a grouting layer around the abandoned tunnel. At the same time, a closed wall is arranged on the inner wall of the tunnel so that the two work together to prevent gas penetration, reduce damage to the tunnel surrounding rock, and enhance the stability of the tunnel surrounding rock.
[0030] The specific steps include:
[0031] S1. Detect and determine the elastic-plastic zone range of the surrounding rock of the abandoned mine tunnel and shaft;
[0032] The detection is a geophysical detection method, including gravity exploration and magnetic exploration methods, to measure the elastic-plastic zone range of abandoned shafts and tunnels and the surrounding rock of the shaft; the drilling method is used to survey and determine the elastic-plastic zone range of abandoned shafts and tunnels, and the maximum distance from the center of the tunnel to the boundary line of the elastic-plastic zone of the tunnel is determined to be a, and the maximum distance from the center of the shaft to the boundary line of the elastic-plastic zone of the shaft surrounding rock is determined to be b. After the detection is completed, the parameters such as the elastic-plastic zone of the tunnel surrounding rock are obtained, the drilled holes are blocked, and filled with waterproof grouting materials to avoid affecting the anti-seepage management of the tunnel surrounding rock.
[0033] S2. Set up grouting holes at a distance of 1.3 times the wellbore radius from the wellbore center, arrange the wellbore grouting holes at intervals and inject grouting to reinforce the surrounding rock. Then, the distance between the centers of adjacent wellbore grouting holes is 1.3 times the wellbore grouting hole diameter. After the wellbore grouting solidifies, construct the intermediate wellbore holes and inject grouting.
[0034] The wellbore grouting holes arranged at intervals are arranged in a circle around the wellbore surrounding rock, but an intermediate wellbore hole is left between the holes. After the wellbore grouting holes arranged at intervals are drilled, grouting is carried out. The grouting process includes setting a grouting cover at the hole of the wellbore grouting hole, fixing the grouting cover on the surrounding rock, applying sealing material in the gap between the grouting cover and the surrounding rock, and installing a grouting valve in the grouting hole of the grouting cover, wherein the diameter of the grouting cover is larger than the diameter of the wellbore grouting hole, and the diameter of the grouting cover is also larger than the diameter of the wellbore grouting hole; the grouting cover is fixed to the surrounding rock by expansion screws. After the grouting is completed, the valve is closed and the surrounding rock reinforcement is waited for stabilization.
[0035] After the initial reinforcement of the surrounding rock by grouting, the intermediate shaft is drilled and grouting is carried out. The grouting process includes: setting a grouting cover at the hole of the grouting hole in the intermediate shaft, fixing the grouting cover on the surrounding rock, applying sealing material to the gap between the grouting cover and the surrounding rock, installing a grouting valve in the grouting hole of the grouting cover, closing the grouting valve after grouting is completed, and waiting for the surrounding rock reinforcement to stabilize.
[0036] S3. Set up segmented areas in the tunnel, set up slurry retaining walls at both ends of each segmented area, and install ventilation pipes to connect the adjacent tunnels at both ends of the segmented area;
[0037] S4. Widen the tunnel section within the segmented area;
[0038] A 5m segmented area is set every 50m in the tunnel, and the outline of the widened tunnel is more than 1.5a away from the tunnel center; vent holes are set on the slurry retaining wall, and the vent pipes are connected to the vent holes, and sealing materials are applied at the joints of the vent pipes and the slurry retaining wall.
[0039] S5. Determine the radius of the grouting drilling holes from the center of the tunnel. Arrange the tunnel grouting drilling holes at intervals first. The distance between the centers of adjacent tunnel grouting drilling holes is 1.3 times the diameter of the tunnel grouting drilling holes, that is, 1.3b away from the center of the tunnel. After the tunnel drilling grouting solidifies, construct the middle tunnel drilling holes and grouting.
[0040] The tunnel grouting holes arranged at intervals are arranged in a circle around the tunnel surrounding rock, but an intermediate tunnel hole is left between the holes. After the tunnel grouting holes arranged at intervals are drilled, grouting is carried out. The grouting process includes setting a grouting cover at the hole of the tunnel grouting hole, fixing the grouting cover on the surrounding rock, applying sealing material in the gap between the grouting cover and the surrounding rock, installing a grouting valve in the grouting hole of the grouting cover, and the diameter of the grouting cover is also larger than the diameter of the tunnel grouting hole; the grouting cover is fixed to the surrounding rock by expansion screws. After the grouting is completed, the valve is closed and the surrounding rock reinforcement is waited for stabilization.
[0041] After the initial reinforcement of the surrounding rock by grouting, the middle tunnel is drilled and grouting is carried out. The grouting process includes: setting a grouting cover at the hole mouth of the grouting hole in the middle tunnel, fixing the grouting cover on the surrounding rock, applying sealing material to the gap between the grouting cover and the surrounding rock, installing a grouting valve in the grouting hole of the grouting cover, closing the grouting valve after grouting is completed, and waiting for the surrounding rock reinforcement to stabilize.
[0042] Grouting in the surrounding rock of the shaft forms a closed wall, and grouting in the surrounding rock of the shaft and tunnel also forms a closed wall. The closed walls are connected to form a grouting closed whole.
[0043] The method arranges boreholes around the abandoned tunnel in the elastic core area of the surrounding rock of the abandoned tunnel and injects grout into the boreholes, so as to form a reinforcement layer around the abandoned tunnel, reduce the damage to the surrounding rock of the tunnel and enhance the stability of the surrounding rock of the tunnel; arranges a closed wall on the inner side of the abandoned tunnel to prevent gas penetration and enhance the airtightness of the tunnel; implements segmented treatment on the abandoned shafts and tunnels used for compressed gas energy storage, establishes segmented areas, and closes the tunnels at the segmented areas by slurry retaining walls to prevent gas leakage. At the same time, the tunnels on both sides of the segmented areas are connected to each other by air pipes to ensure smooth airflow between adjacent tunnels; such an arrangement enables better reinforcement of the surrounding rock, avoids the problem of reduced effectiveness of drilling and grouting reinforcement when the tunnel is too long, and also enhances flexibility, making it more convenient and easier to maintain when increasing or reducing the tunnel capacity in the later stage, thereby increasing the service life and reducing resource loss.
[0044] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the essential scope of the present invention should also fall within the protection scope of the present invention.
Claims
1. A method for compressed gas energy storage in abandoned shafts and tunnels to utilize surrounding rock for anti-seepage and deterioration treatment, characterized in that the steps include: S1. Detect and determine the elastic-plastic zone range of the surrounding rock of the abandoned mine tunnel and shaft; S2. Set a grouting borehole at a distance of 1.3 times the wellbore radius from the wellbore center, arrange the wellbore grouting boreholes at intervals and inject grout, the distance between the centers of adjacent wellbore grouting boreholes is 1.3 times the wellbore grouting borehole diameter, and construct the middle wellbore borehole and inject grout after the wellbore grouting solidifies; S3. Set up segmented areas in the tunnel, set up slurry retaining walls at both ends of each segmented area, and install ventilation pipes to connect the adjacent tunnels at both ends of the segmented area; S4. Widen the tunnel section within the segmented area; S5. Determine the radius of the grouting boreholes from the center of the roadway, first arrange the roadway grouting boreholes at intervals, the distance between the centers of adjacent roadway grouting boreholes is 1.3 times the diameter of the roadway grouting boreholes, and after the roadway grouting solidifies, construct the middle roadway drilling and grouting; The grouting process in step S2 and step S5 includes setting a grouting cover at the opening of the wellbore grouting borehole, fixing the grouting cover on the surrounding rock, applying a sealing material to the gap between the grouting cover and the surrounding rock, installing a grouting valve on the grouting hole of the grouting cover, and closing the grouting valve after the grouting is completed; Grouting is performed in the surrounding rock of the shaft to form a closed wall, and grouting is performed in the surrounding rock of the shaft and tunnel to form a closed wall, and the closed walls are connected to form a grouting closed whole; The segmented areas are set at 5m intervals every 50m in the tunnel, and the outline of the widened tunnel is greater than 1.5a from the tunnel center; ventilation holes are set on the slurry retaining wall, and sealing materials are applied at the connection between the ventilation pipe and the slurry retaining wall.
2. The method for compressed gas energy storage in abandoned shaft and tunnel space using surrounding rock to treat anti-seepage and deterioration according to claim 1 is characterized in that: The detection is a geophysical detection method, including gravity exploration and magnetic exploration methods, to measure the elastic-plastic zone range of abandoned shaft and tunnel surrounding rock and wellbore surrounding rock; the drilling method is used to survey and determine the elastic-plastic zone range of abandoned shaft and tunnel surrounding rock, and determine that the maximum distance from the center of the tunnel to the boundary line of the elastic-plastic zone of the tunnel is a, and the maximum distance from the center of the wellbore to the boundary line of the elastic-plastic zone of the wellbore surrounding rock is b.
3. The method for utilizing surrounding rock to treat anti-seepage and deterioration of abandoned shaft and tunnel space compressed gas energy storage according to claim 2 is characterized in that: After the detection is completed, the drilled hole is sealed and filled with waterproof grouting material.
4. The method for compressed gas energy storage in abandoned shaft and tunnel space using surrounding rock to treat anti-seepage and deterioration according to claim 1, characterized in that: The diameter of the slurry blocking cover is larger than the diameter of the wellbore grouting borehole, and the diameter of the slurry blocking cover is also larger than the diameter of the tunnel grouting borehole; the slurry blocking cover is fixed on the surrounding rock by expansion screws.