A transfer station collaborative control method based on rail transit comprehensive monitoring software

Through the coordinated control method of transfer stations based on rail transit comprehensive monitoring software, the MODBUS protocol and real-time data governance technology is used to realize the coordinated control of different line equipment, solving the problem of linkage control between different lines in the rail transit system, and improving operations Efficiency and safety.

CN115723818BActive Publication Date: 2024-11-22ZHEJIANG SUPCON INFORMATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211032795.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-26
Publication Date
2024-11-22
Estimated Expiration
2042-08-26

AI Technical Summary

Technical Problem

The existing rail transit system lacks linkage control technology between different lines, making it difficult to achieve coordinated control of cross-line equipment, especially in daily operations and fire scenarios, resulting in low operational efficiency and increased safety risks.

Method used

Adopt the transfer station collaborative control method based on rail transit comprehensive monitoring software, data docking and real-time data management are carried out through the MODBUS protocol, the status information of each line is obtained, and control commands are issued through the human-machine interface to realize the coordination of the transfer station in the entire station Control processing.

Benefits of technology

It improves the overall operation efficiency of the transfer station, realizes unified linkage and coordinated control of equipment on different lines, reduces hardware costs, meets the application needs of multiple scenarios, and enhances the corporate image of the operating unit.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115723818B_ABST
    Figure CN115723818B_ABST
Patent Text Reader

Abstract

The present invention discloses a transfer station collaborative control method based on rail transit integrated monitoring software, including: the integrated monitoring system of each line of the transfer station obtains subsystem data through interface software; the integrated monitoring system of each line of the transfer station adopts MODBUS protocol for application layer data docking; the integrated monitoring system of the line of the transfer station sends all subsystem data to the real-time processing software of the integrated monitoring of the line through the interface software; the man-machine interface of the integrated monitoring system of the line of the transfer station displays all data obtained by the real-time processing software of the integrated monitoring of the line, and performs single-point control and linkage control on each line of the transfer station through the man-machine interface. The present invention obtains the equipment status information of each line of the transfer station through the software interface of the integrated monitoring system of each line of the transfer station, and sends the system equipment control commands of each line of the transfer station through the man-machine interface of the integrated monitoring system of the line according to different operation scenarios, so as to coordinate the collaborative control processing of the whole transfer station.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of rail transit, and in particular to a transfer station collaborative control method based on rail transit comprehensive monitoring software. Background Art

[0002] With the expansion of urban development, the operation of a single rail transit line is far from meeting the growing public travel needs. Line network operation is an inevitable trend in the development of urban rail transit. At the same time, in order to meet the needs of passengers to take trains across different lines of the line network without leaving the station payment area or purchasing tickets separately, transfers have become an indispensable part of the operation. Traditional rail transit transfer stations only use hard-wired mutual transmission of fire information points between the two sides to link the equipment within the jurisdiction of the station. Although this technology considers the mode linkage under the fire scenario, it cannot link other interconnected systems in this scenario. At the same time, this technology cannot perform centralized monitoring of equipment outside the line in the daily operation environment, and it is difficult to achieve collaborative control in various scenarios. Secondly, considering that the hardware reservation of the fire alarm and environmental control modules of each station and the cable laying between the interconnected modules that this technology needs to rely on, its construction and hardware costs will be a considerable expense.

[0003] The "System linkage method after equipment failure in rail transit" disclosed in the Chinese patent literature has a publication number of CN101927777A and a publication date of 2010-12-29, which includes: coupling the professional systems set in the station, section and control center, the above professional systems include: control center comprehensive monitoring system, station comprehensive monitoring system, electromechanical equipment monitoring system, power monitoring system, closed-circuit television system, broadcasting system, passenger information system, screen door system and train automatic monitoring system; monitoring the operating status of the above professional systems, and selecting: station-level linkage failure mode or central-level failure linkage mode according to the fault information. The advantages of the present invention are: establishing a set of rapid response plans in the event of equipment failure, so as to improve the degree of automation of rail transit line operation, realize the functions of optimizing management, saving staff and increasing efficiency, and reducing manual misoperation, improve the comprehensive response speed of various rail transit systems, and ensure personal and equipment safety. However, this technology is only a linkage method for a single station and stations on the same line, and does not have corresponding technology for linkage control between different lines in the rail transit operation network. Summary of the invention

[0004] The present invention aims to overcome the problem of lack of linkage control technology between different lines of the rail transit system in the prior art, and provides a transfer station collaborative control method based on rail transit comprehensive monitoring software. Through the software interface of the comprehensive monitoring system of each line in the transfer station, the equipment status information of each line in the transfer station is obtained, and according to different operating scenarios, the system equipment control commands of each line in the transfer station are issued through the human-machine interface of the comprehensive monitoring system of this line, thereby coordinating the collaborative control processing of the entire transfer station.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions:

[0006] A transfer station coordinated control method based on rail transit integrated monitoring software, comprising:

[0007] S1. The integrated monitoring system of each line in the transfer station obtains the subsystem data of each line through the interface software;

[0008] S2. The integrated monitoring systems of each line in the transfer station use the MODBUS protocol for application layer data connection and mutual data transmission;

[0009] S3. The integrated monitoring system of the transfer station sends all subsystem data acquired to the integrated monitoring real-time processing software of the line through the interface software;

[0010] S4. The human-machine interface of the integrated monitoring system of the transfer station displays all data acquired by the real-time processing software of the integrated monitoring of the line, and performs single-point control and linkage control on each line of the transfer station through the human-machine interface.

[0011] In the present invention, firstly, the data information of each line equipment of the transfer station is obtained by using the software interface driver, and the data is extracted, converted and loaded to unify the data type format; secondly, the real-time data management technology is used to verify the legitimacy of the data, and the unqualified data is cleaned, selected and filtered to retain the valid data; finally, the converted data is loaded into the real-time database and incorporated into the comprehensive monitoring system of the transfer station for management; the human-machine interface of the comprehensive monitoring system of this line synchronously monitors the equipment information of each line of the transfer station, and at the same time, it can coordinately control other line equipment of the transfer station according to the user's daily operation, emergency, emergency repair and other scenarios, and cooperate with the linkage of various scenarios of the transfer station; the subsystems connected in the present invention include monitoring subsystems that need to be monitored and also have control functions and monitoring subsystems that only monitor but have no control functions.

[0012] Preferably, the integrated monitoring system of each line in the transfer station includes two integrated monitoring front-end machines. The integrated monitoring front-end machines IPa and IPb of the line in the transfer station respectively establish connections with the integrated monitoring front-end machines IP1 and IP2 of other lines in the transfer station at the same time and transmit data; IPa and IP1 are configured as different IP addresses in the same network segment, and IPb and IP2 are configured as different IP addresses in the same network segment.

[0013] The present invention connects the comprehensive monitoring front-end machines of each line through ordinary Category 5e shielded network cables to realize the interconnection of the entire transfer station system; in emergency scenarios, it can not only realize the linkage of the equipment of the transfer station's own line, but also the broadcasting system, passenger information system, environmental control and other systems of other lines of the transfer station, thereby realizing coordinated measures for the entire transfer station; at the same time, the present invention can also monitor the status of equipment such as air-conditioning units and ticket vending machines of other lines of the transfer station, adjust the temperature and humidity of the entire transfer station in real time, adjust the ticket vending machine mode according to the passenger flow density of the entire station, meet the sensory experience of passengers, and enhance the corporate image of the operating unit.

[0014] Preferably, in S2, the step of transmitting data from other lines of the transfer station to the line of the transfer station comprises:

[0015] The integrated monitoring system of other lines in the transfer station obtains subsystem data through its internal interface software;

[0016] The integrated monitoring system of the transfer station obtains data of other lines of the transfer station through the interface software and performs protocol conversion;

[0017] The integrated monitoring system of the transfer station verifies the legitimacy of the data through real-time data management technology, retains the valid data and then loads it into the real-time database;

[0018] The data information of other lines of the transfer station in the real-time database is displayed on the human-computer interface.

[0019] In the present invention, the integrated monitoring system of each line in the transfer station adopts the MODBUS protocol based on TCP / IP for application layer data docking, including the integrated monitoring system of the line in the transfer station as the server to send data outward, and other lines as clients requesting data; the integrated monitoring system of the line in the transfer station as the client requesting data, and other lines as the server providing data; the acquired subsystem data includes the data of the monitoring subsystem and the surveillance subsystem; in addition, the http protocol can also be used for data transmission, and the data format adopts JSON.

[0020] Preferably, the single-point control of the transfer station line in S4 includes:

[0021] The human-machine interface sends control commands to the comprehensive monitoring real-time processing software;

[0022] The internal service of the real-time database verifies and judges the control commands, and sends the control commands that pass the verification to the interface software of the integrated monitoring system;

[0023] Through the protocol conversion of the interface software, the control command is sent to the subsystem of this line.

[0024] In the single-point control process of the transfer station line in the present invention, the line subsystem to which the control command is issued is a monitoring subsystem that needs to be monitored and also has a control function; the single-point control process of the line can be used as a part of the linkage control process.

[0025] Preferably, the single-point control of other lines of the transfer station in S4 includes:

[0026] The human-machine interface of the transfer station sends control commands to the comprehensive monitoring and real-time processing software of the line;

[0027] The internal service of the real-time database verifies and judges the control commands, sends the verified control commands to the interface software of the integrated monitoring system of the line, and performs protocol conversion;

[0028] Output the converted control commands to the interface software of the integrated monitoring system of other lines in the transfer station and convert them into control commands recognizable by other lines;

[0029] After other lines in the transfer station confirm the control command, the control command will be sent to the subsystems of other lines.

[0030] In the single-point control process of other lines in the transfer station of the present invention, the other line subsystems to which the control commands are issued are monitoring subsystems that need to be monitored and also have control functions; the single-point control process of other lines can be used as part of the linkage control process.

[0031] Preferably, the linkage control of each line of the transfer station in S4 includes:

[0032] The integrated monitoring system of the transfer station monitors the triggering of various event scenarios through real-time monitoring;

[0033] After the event scene is triggered, the transfer station confirms the on-site situation. If no event occurs, the event handling process ends. If the event is confirmed to have occurred, linkage control is started.

[0034] The integrated monitoring system of the transfer station automatically links the corresponding subsystem of the line according to the event scenario, and transmits the linkage control command to the subsystems of other lines of the transfer station through the interface software;

[0035] Each line in the transfer station monitors the linkage status of all subsystem equipment in the entire station through its own integrated monitoring system and handles events;

[0036] After the incident is handled, the equipment under the jurisdiction of each line in the transfer station will be reset through the comprehensive monitoring system of the transfer station line.

[0037] The linkage control of each line of the transfer station in the present invention is a combination of several different single-point controls; the data of other lines of the transfer station are accessed through the underlying hardware interface of the software platform, and the access data is isolated by using the hardware port isolation mechanism to ensure the security of the software platform of this line; the data collection of the subsystem is realized based on the internal interface software of the comprehensive monitoring system of the line of the transfer station, and the internal real-time data processing mechanism is used to verify the legality of external data, retain valid data, and load it into the implementation database of this line; based on the human-machine interface monitoring and control function of the comprehensive monitoring system of the line of the transfer station, automatic linkage is carried out in the corresponding scenario, thereby forming a unified whole-station collaborative disposal measure.

[0038] The present invention has the following beneficial effects: through the software interface of the integrated monitoring system of each line in the transfer station, the equipment status information of each line in the transfer station is obtained; according to different operation scenarios, the system equipment control commands of each line in the transfer station are issued through the human-machine interface of the integrated monitoring system of this line, thereby coordinating the coordinated control processing of the entire transfer station and improving the overall operation efficiency of the transfer station; accessing external system data through the underlying hardware interface avoids the cost increase caused by purchasing corresponding modules and copper core cables during hard wire access; can meet the application needs of multiple scenarios of the operating unit, including whole-station equipment monitoring under daily operation and unified linkage of various line systems under fire emergency scenarios; can manage all system equipment of the entire transfer station on the human-machine interface of the single-line integrated monitoring system of the transfer station; abandon the traditional hard-wired interconnection method and use the software application layer interface instead to realize the visualization of industrial data and accelerate the integration of rail transit and informatization. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 It is a schematic diagram of the software interconnection of the integrated monitoring system of the transfer station of the present invention;

[0040] Figure 2 It is a physical connection diagram of the integrated monitoring system of the transfer station of the present invention;

[0041] Figure 3 is a flow chart of the transfer station collaborative control method of the present invention;

[0042] Figure 4 Schematic diagram of Ethernet connection in an embodiment of the present invention. DETAILED DESCRIPTION

[0043] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments.

[0044] In the present invention, the comprehensive monitoring system refers to a highly integrated comprehensive automated monitoring system that realizes the centralized monitoring and management functions of subway equipment; the transfer station refers to a subway station where passengers can take trains across different lines without leaving the paid area of ​​the station or purchasing tickets separately; the collaborative control refers to the mutual transmission and identification of equipment information through software to perform single-point or linkage control of equipment in corresponding scenarios; the transfer station's main line refers to the subway transfer station under the jurisdiction of the current line; the transfer station's other lines refers to the subway transfer station under the jurisdiction of other lines in the same building as the current line.

[0045] like Figure 1 , Figure 2 and Figure 3 As shown, a transfer station coordinated control method based on rail transit integrated monitoring software includes:

[0046] S1. The integrated monitoring system of each line in the transfer station obtains the subsystem data of each line through the interface software.

[0047] S2. The integrated monitoring systems of various lines in the transfer station use the MODBUS protocol for application layer data docking and mutual data transmission; the steps for transmitting data from other lines in the transfer station to the line of the transfer station include: the integrated monitoring system of other lines in the transfer station obtains subsystem data through its internal interface software; the integrated monitoring system of the line of the transfer station obtains data of other lines in the transfer station through the interface software and performs protocol conversion; the integrated monitoring system of the line of the transfer station verifies the legitimacy of the data through real-time data governance technology, retains valid data and then loads it into the real-time database; and displays data information of other lines in the transfer station in the real-time database on the human-machine interface.

[0048] S3. The integrated monitoring system of the transfer station sends all acquired subsystem data to the integrated monitoring real-time processing software of the line through the interface software.

[0049] S4. The human-machine interface of the integrated monitoring system of the transfer station displays all the data acquired by the real-time processing software of the integrated monitoring of the line, and performs single-point control and linkage control of each line of the transfer station through the human-machine interface of the line.

[0050] The single-point control of this line at the transfer station includes: the human-machine interface sends control commands to the comprehensive monitoring real-time processing software; the internal service of the real-time database verifies and judges the control commands, and sends the verified control commands to the interface software of the comprehensive monitoring system; through the protocol conversion of the interface software, the control commands are sent to the subsystem of this line.

[0051] The single-point control of other lines at the transfer station includes: the human-machine interface of the line at the transfer station sends control commands to the real-time processing software for comprehensive monitoring of the line; the internal service of the real-time database verifies and judges the control commands, sends the control commands that pass the verification to the interface software of the comprehensive monitoring system of the line, and performs protocol conversion; the converted control commands are output to the interface software of the comprehensive monitoring system of other lines at the transfer station, and converted into control commands that can be recognized by other lines; after the control commands are confirmed by other lines at the transfer station, the control commands are sent to the subsystems of other lines.

[0052] The linkage control of each line in the transfer station includes: the integrated monitoring system of the transfer station line monitors the triggering of each event scenario through real-time monitoring; after the event scenario is triggered, the transfer station line confirms the on-site situation, if no event occurs, the event handling process is terminated, if the event is confirmed to have occurred, the linkage control is started; the integrated monitoring system of the transfer station line automatically links the corresponding subsystem of the line according to the event scenario, and transmits the linkage control command to the subsystems of other lines of the transfer station through the interface software; each line of the transfer station monitors the linkage status of all subsystem equipment in the entire station through its own integrated monitoring system, and handles the event; after the event is handled, the equipment under the jurisdiction of each line of the transfer station is reset through the integrated monitoring system of the transfer station line.

[0053] The integrated monitoring system of each line in the transfer station includes two integrated monitoring front-end machines. The integrated monitoring front-end machines IPa and IPb of the transfer station's own line respectively establish connections with the integrated monitoring front-end machines IP1 and IP2 of other lines in the transfer station and transmit data; IPa and IP1 are configured as different IP addresses in the same network segment, and IPb and IP2 are configured as different IP addresses in the same network segment.

[0054] In the present invention, the software interface driver is first used to obtain the data information of each line equipment of the transfer station, and the data is extracted, converted and loaded to unify the data type format; secondly, the real-time data management technology is used to verify the legality of the data, clean the unqualified data, select and filter the data, and retain the valid data; finally, the converted data is loaded into the real-time database and incorporated into the integrated monitoring system of the transfer station for management; the human-machine interface of the integrated monitoring system of this line synchronously monitors the equipment information of each line of the transfer station, and can also coordinate the control of other line equipment of the transfer station according to the user's daily operation, emergency, repair and other scenarios, and cooperate with the linkage of various scenarios of the transfer station; the subsystems connected in the present invention include a monitoring subsystem that needs to be monitored and has control functions and a monitoring subsystem that only monitors but has no control functions. The monitoring subsystem can only see graphics and data on the human-machine interface; the monitoring subsystem can not only see graphics and data, but also operate the change of control data.

[0055] The present invention connects the comprehensive monitoring front-end machines of each line through ordinary Category 5e shielded network cables to realize the interconnection of the entire transfer station system; in emergency scenarios, it can not only realize the linkage of the equipment of the transfer station's own line, but also the broadcasting system, passenger information system, environmental control and other systems of other lines of the transfer station, thereby realizing coordinated measures for the entire transfer station; at the same time, the present invention can also monitor the status of equipment such as air-conditioning units and ticket vending machines of other lines of the transfer station, adjust the temperature and humidity of the entire transfer station in real time, adjust the ticket vending machine mode according to the passenger flow density of the entire station, meet the sensory experience of passengers, and enhance the corporate image of the operating unit.

[0056] In the present invention, the integrated monitoring system of each line in the transfer station adopts the MODBUS protocol based on TCP / IP for application layer data docking, including the integrated monitoring system of the line in the transfer station as the server to send data outward, and other lines as clients requesting data; the integrated monitoring system of the line in the transfer station as the client requesting data, and other lines as the server providing data; the acquired subsystem data includes the data of the monitoring subsystem and the surveillance subsystem; in addition, the http protocol can also be used for data transmission, and the data format adopts JSON.

[0057] The advantages of using the MODBUS protocol are as follows: 1. As an industrial protocol, the MODBUS protocol has mature standard specifications and is widely used by both systems, avoiding re-development. 2. Using the MODBUS protocol, the other party can be included in the management and control as a subsystem; at the same time, it supports the data transmission method of the master-slave server and client. 3. It is easy to understand and reduces the configuration workload; using the MODBUS protocol, the data acquisition configuration template can be imported using EXCEL, and using the JSON format requires configuration of each data point.

[0058] In the single-point control process of the transfer station line in the present invention, the subsystem of the line to which the control command is issued is a monitoring subsystem that needs to be monitored and also has control functions; in the single-point control process of other lines in the transfer station, the subsystems of other lines to which the control command is issued are monitoring subsystems that need to be monitored and also have control functions; the single-point control process of this line and other lines can be used as part of the linkage control process.

[0059] The linkage control of each line of the transfer station in the present invention is a combination of several different single-point controls; the data of other lines of the transfer station are accessed through the underlying hardware interface of the software platform, and the access data is isolated by using the hardware port isolation mechanism to ensure the security of the software platform of this line; the data collection of the subsystem is realized based on the internal interface software of the comprehensive monitoring system of the line of the transfer station, and the internal real-time data processing mechanism is used to verify the legality of external data, retain valid data, and load it into the implementation database of this line; based on the human-machine interface monitoring and control function of the comprehensive monitoring system of the line of the transfer station, automatic linkage is carried out in the corresponding scenario, thereby forming a unified whole-station collaborative disposal measure.

[0060] In an embodiment of the present invention, Figure 1 As shown, the integrated monitoring system of each line in the transfer station obtains the subsystem data of each line through the interface software; the subsystem needs to be distinguished between the monitoring subsystem that needs to be monitored and also has the control function and the monitoring subsystem that only monitors but has no control function; the integrated monitoring system of each line in the transfer station adopts the MODBUS protocol based on TCP / IP for application layer data docking and mutual data transmission; the integrated monitoring system of the line in the transfer station sends all the acquired subsystem data to the integrated monitoring real-time processing software of the line through the interface software; the human-machine interface of the integrated monitoring system of the line in the transfer station displays all the data acquired by the integrated monitoring real-time processing software of the line, and for the monitoring subsystem with control function, the single-point control and linkage control of each line in the transfer station are performed through the human-machine interface of the line.

[0061] like Figure 2 The figure shows the physical connection diagram of the integrated monitoring system of the transfer station. To meet the redundancy function, each line is equipped with two integrated monitoring front-end machines. Each integrated monitoring front-end machine provides an RJ45 Ethernet interface, which is used for the physical connection of the two redundant front-end machines of each line. The RJ45 form is a 100 / 1000M adaptive Ethernet interface, which complies with the IEEE 802.3u100Base T standard and uses an RJ45 connector.

[0062] Its signal definition is as follows:

[0063] Number Signal Definition Line pair color 1 TX+ Orange White 2 TX- orange 3 RX+ Green and White 4 Not used blue 5 Not used Blue and White 6 RX- green 7 Not used Brown and white 8 Not used Brown

[0064] Ethernet connection such as Figure 4 As shown, at the same time, the two integrated monitoring front-end machines of both lines are configured with two different IP addresses of the same network segment, that is, IPa and IP1 are different IP addresses of the same network segment, and IPb and IP2 are different IP addresses of the same network segment. The integrated monitoring front-end machines IPa and IPb of the transfer station establish connections with the integrated monitoring front-end machines IP1 and IP2 of other lines of the transfer station at the same time and transmit data; the real-time server of this line selects the main path data to enter the real-time database according to the main and backup status of the two links.

[0065] The front-end processor is a machine used to collect data and perform protocol conversion; the integrated monitoring system includes at least two front-end processors. These two front-end processors can be interconnected with any two front-end processors of other line integrated monitoring systems.

[0066] In this embodiment, the human-machine interface graphic module configuration process of the transfer station integrated monitoring system includes:

[0067] Step 1. Unify and classify the data monitoring point information of the integrated monitoring interface subsystems of each line of the transfer station: retrieve the device belonging system, data point description, and data type in the point table; based on the device belonging system as the first condition, filter out the simulation, status, and control type points of the equipment. Compare with the points of the configured system within the integrated monitoring system of this line, and compare the universality of the point information description and point data type; if the same, use the internally configured system equipment; if different, re-establish the data class template. Retrieve the number of system equipment objects in the point table.

[0068] Step 2. Establish a system data class template, specify the number of monitoring equipment objects and create an object list: Establish the model code and name of the access; the code shall be in uppercase English without special characters, and the model code in the current system must be unique and cannot be reused. Establish the point information code and name; the point information code shall be in uppercase English without special characters, and the code in the current model must be unique. Establish the data type; configure the upper and lower limits of the simulation point; configure the 0, 1 data bit description for the status point, and the 0, 1 control bit description for the control point. According to the number of equipment objects retrieved in step 1, classify them under each system data model and generate an object list.

[0069] Step 3. Use the graphic model tool of the integrated monitoring software to draw the equipment template element and generate the element symbol set: According to the status point type information of the equipment data template, confirm the element status layering. According to the point information description of alarm, fault, normal, etc., confirm the upper, middle and lower priorities of the layer. Use the graphic model tool to draw each layer, and combine all layers into one page element. Add all equipment data template elements to the system, generate each element symbol and bind it to the equipment data template.

[0070] Step 4. Use the integrated monitoring software graphic tool to associate the data point displacement animation effects of the integrated monitoring equipment template: extract a single graphic element in the graphic element library to the graphic configuration tool according to the equipment data template. According to the equipment template state point expression @{device}==0 or 1, bind the graphic element layer to hide / show, and add the rotation and flashing animation effects of the layer device.

[0071] Step 5. Use the graphics tool of the integrated monitoring software to draw a scenario flow chart and associate the device objects: extract the drawn graphics to the flowchart of the graphics tool, add other non-graphic lines, etc. to draw the scene. Bind each device in the system according to the TAG number of the principle of "belonging transfer station + belonging system + model code + device object list serial number". Add the scenario flow chart of the bound device to the configuration release library.

[0072] The steps for transmitting data from other lines of the transfer station to the current line of the transfer station include:

[0073] Step 1. The integrated monitoring system for other lines of the transfer station obtains subsystem data through its internal interface protocol: The front-end of the integrated monitoring system for other lines of the transfer station establishes a physical connection with its line subsystem through the RJ45 network port. Through the driver developed with the subsystem definition interface protocol, the subsystem data is converted into data points that can be identified by its internal real-time database for data access.

[0074] Step 2: The integrated monitoring system of the transfer station establishes a physical connection with the front-end processors of the integrated monitoring systems of other lines in the transfer station through the front-end processor RJ45 network port, and accesses the data information of the corresponding subsystems.

[0075] Step 3. The integrated monitoring system of the transfer station performs protocol conversion on the acquired data through the interface software deployed on the front-end: The integrated monitoring system of the transfer station deploys the MODBUS protocol driver on the front-end. As the client, the integrated monitoring system of this line requests data from the integrated monitoring systems of other lines according to the read input register function code, register address, and register bit address agreed by both parties. The integrated monitoring systems of other lines act as the server and return the corresponding data value according to the requested function code, register address, and register bit address. The interface software obtains the above return value, parses it into internal identification point information, and uploads it to the comprehensive monitoring real-time database.

[0076] Step 4: The integrated monitoring system in the transfer station uses real-time data management technology to verify the legitimacy of the data, clean, select and filter the unqualified data, retain the valid data, and finally load the converted data into the real-time database: the real-time data service matches the TAG bit number according to the "belonging transfer station + belonging system + model code + equipment object list serial number + point information code". The data with matching bit numbers are verified according to the simulation, state, and string types pre-configured with the same bit number in the real-time database, and the values ​​with mismatched data format types are discarded, while the values ​​with the same data format type are retained, and the data update timestamp is recorded. The real-time data service checks whether the TAG bit number is a virtual point. If it is a virtual point, the data service verifies the secondary calculation lua expression, and performs internal calculations after passing, and outputs the results. The real-time data service checks whether the TAG bit number needs to be processed. If necessary, the data is enlarged / reduced by a proportional factor or added / subtracted, and the result is output. The real-time data service loads all processed data values ​​into the real-time database.

[0077] Step 5: Provide data sources for internal services of the integrated monitoring system through the basic information of the real-time database: The real-time data service loads data into the real-time database to provide basic data information for other internal services such as alarm services, real-time data subscription services, equipment status calculation services, linkage services, etc. for calculation.

[0078] Step 6. The integrated monitoring system obtains data information of other line subsystems of the transfer station in the real-time database through the data proxy and displays it on the human-computer interface: The integrated monitoring user clicks on the graphic element through the software to initiate a data request. At this time, the integrated monitoring system obtains the graphic element TAG position number of the scene flow chart through the client data proxy. The data proxy service requests the TAG position number data value through the internal interface of the real-time data subscription service. The real-time data subscription service obtains the same TAG position number data value in the basic data information and returns it to the data proxy service. Through the data proxy, the data information of other line subsystems of the transfer station is displayed on the human-computer interface of the integrated monitoring system.

[0079] The single-point control process for this line at the transfer station includes:

[0080] Step 1. The human-machine interface of the integrated monitoring system sends control commands to the real-time processing software of the integrated monitoring of this line: The integrated monitoring user clicks on the graphic element device panel through the human-machine interface to initiate a data control command. At this time, the integrated monitoring system obtains the graphic element TAG number of the scene flow chart through the client data agent. The data agent service sends the TAG number control value through the internal interface with the real-time control service.

[0081] Step 2: Process and calculate the control command through the internal service of the real-time database: the real-time control service writes the control value to the real-time database and matches the TAG bit number. The real-time data service verifies the data type of the pre-configured control value with the same bit number in the real-time database to determine the legitimacy of the data. If the data is legal, proceed to step 3. If the data verification fails, the verification failure is returned and the control delivery fails.

[0082] Step 3: The internal service interface sends the control command to the interface software of the integrated monitoring system: The real-time data service sends the control TAG bit number and control value to the interface software of the front-end.

[0083] Step 4: After the interface software protocol conversion, the control command is finally sent to each subsystem: The interface software deployed by the front-end receives the control command and control value sent by the real-time data service. As the client, this line integrated monitoring system parses and converts the TAG bit control command according to the write input register function code and register address agreed in the MODBUS protocol, and writes the control value to the corresponding register. Each subsystem controls the system equipment according to the control value sent by the MODBUS driver.

[0084] The single-point control process for other lines at the transfer station includes:

[0085] Step 1. The human-machine interface of the integrated monitoring system of the transfer station sends a control command to the real-time processing software of the integrated monitoring of the line: The integrated monitoring user clicks on the graphic element device panel through the unified human-machine interface of the line to initiate a data control command. At this time, the integrated monitoring system obtains the TAG position number of other line equipment graphic elements of the transfer station in the scene flow chart through the client data proxy. The data proxy service of the line sends the TAG position number control value through the internal interface with the real-time control service.

[0086] Step 2: Process and calculate the control command through the internal service of the real-time database of the transfer station: the real-time control service of the line writes the control value to the real-time database and matches the TAG control bit number. The real-time data service of the line verifies the data type of the pre-configured control value with the same bit number in the real-time database to determine the legality of the data. If the data is legal, proceed to step 3. If the data verification fails, the verification failure is returned and the control fails to be sent.

[0087] Step 3: The internal service interface of the integrated monitoring system of the transfer station sends the control command to the interface software of the integrated monitoring system: The real-time data service of the line sends the control TAG number and control value to the interface software of the front-end machine of the line.

[0088] Step 4. After the interface software protocol conversion, the control command is output to the integrated monitoring interface software of other lines in the transfer station: The interface software deployed by the front-end processor of this line receives the control command and control value issued by the real-time data service. As the client, the integrated monitoring system of this line parses and converts the TAG bit number control command according to the MODBUS protocol agreement to write multiple register function codes and register addresses, and writes the control value to the corresponding register. The interface software deployed by the front-end processor of the integrated monitoring system of other lines in the transfer station receives the control value issued by the driver according to the MODBUS protocol.

[0089] Step 5: The interface software of the integrated monitoring system of other lines converts the control command protocol into control information that can be recognized within the system. This control information is compared and processed by its real-time data service and the internal TAG bit number to determine the device's belonging system, device type, device serial number, and control information code. The real-time control service of the integrated monitoring system of other lines in the transfer station interfaces with its real-time data service internally to obtain the control value.

[0090] Step 6. The human-machine interface of the integrated monitoring system of other lines automatically pushes the pop-up window of "Confirm the issuance of control commands": The real-time control service of the integrated monitoring system of other lines in the transfer station sends the control information to the human-machine interface client. The human-machine interface device data proxy service obtains the control data source and control content, and automatically pushes the pop-up window of "Confirm the issuance of control commands" to display the control request.

[0091] Step 7: After the other line operators confirm and issue this control command, the other line subsystem control command output is completed through the internal control processing mechanism of the other line integrated monitoring system. If the other line operators cancel the control request or do not take corresponding actions within the effective time of the control request pop-up window, the other line subsystem control command output will not be made.

[0092] The linkage control process of each line at the transfer station includes:

[0093] Step 1. The integrated monitoring system of the transfer station monitors the triggering of each event scenario through real-time monitoring: The integrated monitoring system of the transfer station deploys the MODBUS protocol driver on the front-end machine. As the client, the integrated monitoring system of this line requests data from each access subsystem according to the read input register function code, register address, and register bit address agreed upon by both parties. Other subsystems, as the server, return the corresponding data value according to the request. The interface software obtains the above return value and converts it into point information recognized by the real-time database for uploading. The real-time database of the integrated monitoring system matches the TAG bit number according to the point information. If the TAG bit number point information value of the returned information is the same as the pre-configured event scenario trigger value, the event alarm and linkage trigger will be triggered immediately.

[0094] Step 2: After the event scenario is automatically triggered, the operator of the line at the transfer station confirms the situation on site, and the integrated monitoring system of the line automatically pushes the event to the human-machine interface: After the event scenario is automatically triggered, the operator of the line at the transfer station confirms the equipment action on site. The information TAG bit number point requested by the human-machine interface data proxy service of the integrated monitoring system of the line matches the event trigger TAG bit number information returned by the real-time data subscription service in the basic data information, and the device interface bound to the TAG bit number information point is automatically pushed.

[0095] Step 3: If it is confirmed on-site that no incident has occurred, the incident collaborative handling process ends; if it is confirmed on-site that an incident has occurred, the event linkage is initiated.

[0096] Step 4. The line integrated monitoring system starts issuing equipment control for this line and other line subsystems respectively: The integrated monitoring system of this line at the transfer station automatically links the corresponding subsystems of the event scenario according to the single-point control process of this line at the transfer station. The subsystems of other lines at the transfer station need to issue linkage control commands to the integrated monitoring systems of other lines through the human-machine interface of the integrated monitoring system of this line according to the single-point control process of other lines at the transfer station. The operators of other lines at this transfer station click "Confirm the issuance of control command" in the control request pop-up window to perform collaborative control simultaneously.

[0097] Step 5: Operators of each line at the transfer station monitor the linkage status of all subsystem equipment in the entire station through their respective integrated monitoring systems according to the data transmission process of other lines at the transfer station.

[0098] Step 6: The on-site commander of the incident handling coordinates the equipment and human resources of the entire transfer station to handle the emergency incident.

[0099] Step 7. After the event is handled, reset all system equipment through the integrated monitoring system of this line: After the event is handled, reset the equipment under the jurisdiction of the integrated monitoring system of the transfer station according to the single-point control process of the transfer station. After the event is handled, reset the equipment under the jurisdiction of the integrated monitoring system of other lines of the transfer station according to the single-point control process of other lines of the transfer station.

[0100] The above embodiments are further elaborations and illustrations of the present invention for ease of understanding, and are not limitations of the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A transfer station collaborative control method based on rail transit integrated monitoring software, characterized in that: include: S1. The integrated monitoring system of each line in the transfer station obtains the subsystem data of each line through the interface software; S2. The integrated monitoring systems of each line in the transfer station use the MODBUS protocol for application layer data connection and mutual data transmission; Verify the legitimacy of external data through real-time data governance technology; Match the TAG number; For the data with matching bit numbers, check it according to the pre-configured data format type with the same bit number in the real-time database, retain the value of the matching data format type, and record the data update timestamp; Whether the TAG position number is a virtual point, if so, check the secondary calculation Lua expression, and if it passes, perform internal calculation and output the result; Whether the TAG bit number needs to be processed, if necessary, the data is processed and the result is output; Load all processed data values ​​into the real-time database; S3. The integrated monitoring system of the transfer station sends all subsystem data acquired to the integrated monitoring real-time processing software of the line through the interface software; S4. The human-machine interface of the integrated monitoring system of the transfer station displays all data acquired by the real-time processing software of the integrated monitoring of the line, and performs single-point control and linkage control on each line of the transfer station through the human-machine interface.

2. A transfer station collaborative control method based on rail transit integrated monitoring software according to claim 1, characterized in that: The integrated monitoring system of each line in the transfer station includes two integrated monitoring front-end machines. The integrated monitoring front-end machines IPa and IPb of the transfer station's own line respectively establish connections with the integrated monitoring front-end machines IP1 and IP2 of other lines in the transfer station and transmit data; IPa and IP1 are configured as different IP addresses in the same network segment, and IPb and IP2 are configured as different IP addresses in the same network segment.

3. A transfer station collaborative control method based on rail transit integrated monitoring software according to claim 1 or 2, characterized in that: In S2, the step of transmitting data from other lines of the transfer station to the current line of the transfer station includes: The integrated monitoring system for other lines at the transfer station obtains subsystem data through its internal interface software; The integrated monitoring system of the transfer station obtains data of other lines of the transfer station through the interface software and performs protocol conversion; The integrated monitoring system of the transfer station verifies the legitimacy of the data through real-time data management technology, retains the valid data and then loads it into the real-time database; The data information of other lines of the transfer station in the real-time database is displayed on the human-computer interface.

4. The transfer station coordinated control method based on rail transit integrated monitoring software according to claim 3 is characterized in that: The real-time data governance technology also includes: The TAG bit number is matched according to the transfer station, system, model code, equipment object list sequence number and point information code.

5. The transfer station collaborative control method based on rail transit integrated monitoring software according to claim 1 is characterized in that: The single-point control of the transfer station line in S4 includes: The human-machine interface sends control commands to the comprehensive monitoring real-time processing software; The internal service of the real-time database verifies and judges the control commands, and sends the control commands that pass the verification to the interface software of the integrated monitoring system; Through the protocol conversion of the interface software, the control command is sent to the subsystem of this line.

6. The transfer station coordinated control method based on rail transit integrated monitoring software according to claim 1 is characterized in that: The single-point control of other lines of the transfer station in S4 includes: The human-machine interface of the transfer station sends control commands to the comprehensive monitoring and real-time processing software of the line; The internal service of the real-time database verifies and judges the control commands, sends the verified control commands to the interface software of the integrated monitoring system of the line, and performs protocol conversion; Output the converted control commands to the interface software of the integrated monitoring system of other lines in the transfer station and convert them into control commands recognizable by other lines; After other lines in the transfer station confirm the control command, the control command will be sent to the subsystems of other lines.

7. A transfer station collaborative control method based on rail transit integrated monitoring software according to claim 1 or 2 or 4 or 5 or 6, characterized in that: The linkage control of each line of the transfer station in S4 includes: The integrated monitoring system of the transfer station monitors the triggering of various event scenarios through real-time monitoring; After the event scene is triggered, the transfer station confirms the on-site situation. If no event occurs, the event handling process ends. If the event is confirmed to have occurred, linkage control is started. The integrated monitoring system of the transfer station automatically links the corresponding subsystem of the line according to the event scenario, and transmits the linkage control command to the subsystems of other lines of the transfer station through the interface software; Each line in the transfer station monitors the linkage status of all subsystem equipment in the entire station through its own integrated monitoring system and handles events; After the incident is handled, the equipment under the jurisdiction of each line in the transfer station will be reset through the comprehensive monitoring system of the transfer station line.