Train operation diagram conflict resolution method, device, equipment and storage medium

By modeling and solving the feasibility of adjusting the train operation diagram and automatically adjusting the train operation diagram, the problem of low efficiency and poor effect of traditional methods that rely on experience is solved, and more efficient conflict resolution and driving safety are achieved.

CN115743244BActive Publication Date: 2024-10-15TRAFFIC CONTROL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211387500.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-11-07
Publication Date
2024-10-15
Estimated Expiration
2042-11-07

AI Technical Summary

Technical Problem

Traditional train schedule conflict resolution relies on the dispatcher's personal experience, which is inefficient and unsatisfactory. Especially in large-scale conflict scenarios, it requires multiple adjustment methods, which takes a long time to solve and has poor results.

Method used

By modeling the feasibility of adjusting the conflicting train schedule, a train schedule adjustment model is constructed, using the minimum arrival interval time, the minimum departure interval time, no crossing, the minimum turnaround time and the minimum stop time as constraints to solve various problems. The adjustment information of the trains can be used to update the planned time and automatically adjust the operation chart.

Benefits of technology

It improves the efficiency and effectiveness of conflict resolution, reduces the dispatcher's work difficulty and load, and ensures driving safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115743244B_ABST
    Figure CN115743244B_ABST
Patent Text Reader

Abstract

This disclosure provides a train timetable conflict resolution method, apparatus, device, and storage medium. The method includes: performing a feasibility modeling for adjusting the conflicting train timetable to obtain a train timetable adjustment model; solving the train timetable adjustment model to obtain adjustment information for each train in the train timetable; and adjusting the train timetable based on the adjustment information for each train. In this way, subsequent adjustments to conflicting train timetables can be abstracted into an adjustment model. By quickly solving this model, the adjustment information for each train can be accurately obtained, and the train timetable can then be adaptively adjusted based on this information to resolve the conflict, greatly improving the efficiency and effectiveness of conflict resolution.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of rail transit technology, and in particular to a train operation diagram conflict resolution method, device, equipment and storage medium. Background Art

[0002] The train operation diagram is the basis of traffic organization. Under normal circumstances, trains on the line run in an orderly manner according to the pre-compiled train operation diagram. In some abnormal situations (such as equipment failure, train failure, large passenger flow, etc.), the dispatcher needs to adjust the train operation diagram to meet the current traffic organization requirements.

[0003] At present, after adjusting the train timetable and causing a timetable conflict, dispatchers often use methods such as platform detention, slowing down the section, changing the connection, taking the train offline, and putting the spare car online to resolve the timetable conflict. In a large-scale train timetable conflict scenario, many trains are affected, and a variety of adjustment methods are needed to resolve the timetable conflict. Dispatchers can only decompose the conflict scope into multiple small-scale conflicts based on their own work experience and gradually resolve the conflicts. It can be seen that the traditional train timetable conflict resolution method relies on the dispatcher's personal experience, is highly subjective, takes a long time to resolve conflicts, and has unsatisfactory resolution results. Summary of the invention

[0004] The present disclosure provides a train operation diagram conflict resolution method, device, equipment and storage medium, which can improve the conflict resolution efficiency and effect.

[0005] In a first aspect, an embodiment of the present disclosure provides a method for solving a train operation diagram conflict, the method comprising:

[0006] Conducting adjustment feasibility modeling for the conflicting train operation diagram to obtain a train operation diagram adjustment model of the train operation diagram;

[0007] Solve the train operation diagram adjustment model to obtain the adjustment information of each train number in the train operation diagram;

[0008] Adjust the train operation diagram based on the adjustment information of each train.

[0009] In some implementations of the first aspect, the performing adjustment feasibility modeling on the conflicting train operation diagram to obtain a train operation diagram adjustment model of the train operation diagram includes:

[0010] The model solving objective is to minimize the sum of the arrival and departure time adjustment variables of each train, and the minimum arrival interval time constraint, the minimum departure interval time constraint, the prohibition of overtaking constraint, the minimum return time constraint, and the minimum stop time constraint are used as model constraints to construct a train timetable adjustment model of the train timetable.

[0011] In some implementable embodiments of the first aspect, the minimization of the sum of the arrival and departure time adjustment variables of each train number is used as the model solution objective, and the minimum arrival interval time constraint, the minimum departure interval time constraint, the prohibition of overtaking constraint, the minimum return time constraint, and the minimum stop time constraint are used as model constraints to construct a train operation diagram adjustment model of the train operation diagram, including:

[0012] Constructing information nodes of each parking area corresponding to each train number, wherein the parking area is a platform or a return track, and the information nodes include: an arrival information node and a departure information node;

[0013] The arrival information nodes and departure information nodes of each vehicle number in each parking area corresponding to each vehicle number are divided into an ordered occupancy list corresponding to each parking area, wherein the ordered occupancy list of the parking area includes: the arrival information nodes and departure information nodes of each vehicle number passing through the parking area arranged in the order of the vehicle number;

[0014] According to the arrival information nodes and departure information nodes of each train number at each corresponding station, the arrival information nodes and departure information nodes of each train number at each corresponding section are determined, and the arrival information nodes and departure information nodes of each train number at each corresponding section are divided into an orderly occupancy list corresponding to each section, and the orderly occupancy list of the section includes: the arrival information nodes and departure information nodes of each train number passing through the section arranged in the order of the train number;

[0015] Based on the ordered occupancy lists corresponding to each parking area and the ordered occupancy lists corresponding to each section, the model solving objective is to minimize the sum of the arrival and departure time adjustment variables of each train, and the minimum arrival interval time constraint, the minimum departure interval time constraint, the no-overtaking constraint, the minimum return time constraint, and the minimum stop time constraint are used as model constraints to construct a train timetable adjustment model of the train timetable.

[0016] In some implementations of the first aspect, the arrival and departure time adjustment variable is a cumulative value of the sum of the arrival time adjustment variable and the departure time adjustment variable of the vehicle number in each corresponding parking area.

[0017] In some implementations of the first aspect, before performing adjustment feasibility modeling on the conflicting train operation diagram, the method further includes:

[0018] Conduct conflict judgment on the adjusted train operation diagram;

[0019] If there is a conflict in the adjusted train operation diagram, the feasibility of adjustment will be modeled.

[0020] In some implementations of the first aspect, before performing adjustment feasibility modeling on the conflicting train operation diagram, the method further includes:

[0021] If the conflict in the train operation diagram includes an overtaking conflict, the train operation diagram is preprocessed;

[0022] Preprocessing includes:

[0023] Correct the order of each train number corresponding to the overtaking conflict in the train operation diagram.

[0024] In some implementations of the first aspect, adjusting the train operation diagram according to the adjustment information of each train number includes:

[0025] According to the adjustment information of each train, the target arrival time and target departure time of each train in its corresponding parking area are calculated;

[0026] According to the calculated target arrival time and target departure time of each train in its corresponding parking area, the planned arrival time and planned departure time of each train in its corresponding parking area in the train operation diagram are updated.

[0027] In a second aspect, an embodiment of the present disclosure provides a train operation diagram conflict resolution device, the device comprising:

[0028] A modeling module, used for modeling the feasibility of adjusting the conflicting train operation diagram to obtain a train operation diagram adjustment model of the train operation diagram;

[0029] A solution module is used to solve the train operation diagram adjustment model to obtain the adjustment information of each train number in the train operation diagram;

[0030] The adjustment module is used to adjust the train operation diagram according to the adjustment information of each train.

[0031] In a third aspect, an embodiment of the present disclosure provides an electronic device, comprising: at least one processor; and a memory communicatively connected to the at least one processor; the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to execute the method described above.

[0032] In a fourth aspect, an embodiment of the present disclosure provides a non-transitory computer-readable storage medium storing computer instructions, where the computer instructions are used to cause a computer to execute the method described above.

[0033] In the present disclosure, the subsequent adjustment of the train timetable where conflicts occur can be abstracted into an adjustment model. By quickly solving the model, the adjustment information of each train can be accurately obtained, and then the train timetable can be adaptively adjusted according to the information to resolve the conflict, which greatly improves the efficiency and effect of conflict resolution. At the same time, it can effectively reduce the work difficulty and workload of dispatchers and ensure driving safety.

[0034] It should be understood that the contents described in the summary of the invention are not intended to limit the key or important features of the embodiments of the present disclosure, nor are they intended to limit the scope of the present disclosure. Other features of the present disclosure will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] The above and other features, advantages and aspects of the embodiments of the present disclosure will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. The accompanying drawings are used to better understand the present solution and do not constitute a limitation of the present disclosure. In the accompanying drawings, the same or similar reference numerals represent the same or similar elements, among which:

[0036] Figure 1 A flow chart of a train operation diagram conflict resolution method provided by an embodiment of the present disclosure is shown;

[0037] Figure 2 A train operation diagram before conflict resolution provided by an embodiment of the present disclosure is shown;

[0038] Figure 3 A train operation diagram after conflict resolution provided by an embodiment of the present disclosure is shown;

[0039] Figure 4 A structural diagram of a train operation diagram conflict resolution device provided by an embodiment of the present disclosure is shown;

[0040] Figure 5 A structural diagram of an exemplary electronic device capable of implementing an embodiment of the present disclosure is shown. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solution and advantages of the embodiments of the present disclosure clearer, the technical solution in the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings in the embodiments of the present disclosure. Obviously, the described embodiments are part of the embodiments of the present disclosure, not all of the embodiments. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present disclosure.

[0042] In addition, the term "and / or" in this article is only a description of the association relationship between the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0043] In view of the problems in the background technology, the embodiments of the present disclosure provide a method, device, equipment and storage medium for solving the conflict of train operation diagram. Specifically, the adjustment feasibility model of the train operation diagram in which the conflict occurs can be modeled to obtain the train operation diagram adjustment model of the train operation diagram; the train operation diagram adjustment model can be solved to obtain the adjustment information of each train number in the train operation diagram; and the train operation diagram can be adjusted according to the adjustment information of each train number.

[0044] In this way, the subsequent adjustment of the train timetable where conflicts occur can be abstracted into an adjustment model. By quickly solving the model, the adjustment information of each train can be accurately obtained, and then the train timetable can be adaptively adjusted according to the information to resolve the conflict, which greatly improves the efficiency and effectiveness of conflict resolution. At the same time, it can effectively reduce the work difficulty and workload of dispatchers and ensure driving safety.

[0045] In conjunction with the accompanying drawings, the train operation diagram conflict resolution method, device, equipment and storage medium provided by the embodiments of the present disclosure are described in detail below through specific embodiments.

[0046] Figure 1 A flow chart of a train operation diagram conflict resolution method provided by an embodiment of the present disclosure is shown. Figure 1 As shown, the train diagram conflict resolution method 100 may include the following steps:

[0047] S110, performing adjustment feasibility modeling on the conflicting train operation diagram to obtain a train operation diagram adjustment model of the train operation diagram.

[0048] In some embodiments, a conflict judgment can be performed on the adjusted train operation diagram to determine whether there is a conflict in the adjusted train operation diagram (for example, a conflict of insufficient interval time between arrival and departure in the parking area, a conflict of overtaking, a conflict of insufficient interval time for interval tracking, etc.); if there is a conflict in the adjusted train operation diagram, an adjustment feasibility model is performed for it to obtain a train operation diagram adjustment model; if there is no conflict in the adjusted train operation diagram, no processing is performed.

[0049] In this way, by performing conflict judgment on the adjusted train operation diagram, it is possible to quickly determine whether there is a conflict, which facilitates subsequent conflict adjustment of the adjusted and conflicting train operation diagram.

[0050] Furthermore, if the conflict occurring in the train operation diagram includes an overtaking conflict, the train operation diagram may be pre-processed before the feasibility modeling of the adjustment of the train operation diagram is performed; if the conflict occurring in the train operation diagram does not include an overtaking conflict, no processing is performed.

[0051] Among them, preprocessing may include:

[0052] In the train operation diagram, the order of each train corresponding to the overtaking conflict is corrected to ensure the consistency of the train order, which is convenient for subsequent modeling and solving.

[0053] Specifically, by adjusting the stop time and interval running time of the rear vehicle before the overtaking conflict (that is, the front vehicle after the overtaking conflict), it is ensured that its arrival and departure time is always after the front vehicle before the overtaking conflict (that is, the rear vehicle after the overtaking conflict), thereby restoring the train order before the overtaking conflict.

[0054] In some embodiments, in order to ensure adjustment efficiency and adjustment safety, the minimum sum of the arrival and departure time adjustment variables of each train can be used as the model solution objective, and the minimum arrival interval time constraint, minimum departure interval time constraint, no overtaking constraint, minimum return time constraint, and minimum stop time constraint can be used as model constraints to construct a train timetable adjustment model of the train timetable.

[0055] The arrival and departure time adjustment variable is the cumulative value of the sum of the arrival time adjustment variable and the departure time adjustment variable of each parking area (platform or return track) corresponding to the train. It should be noted that the arrival time adjustment variable and the departure time adjustment variable of the parking area are relative time adjustment variables after considering the arrival time and / or departure time adjustment of the previous parking area;

[0056] The minimum arrival interval time constraint is that the arrival interval time between two consecutive vehicles arriving at the parking area is greater than or equal to the minimum arrival interval time corresponding to the parking area;

[0057] The minimum departure interval constraint is that the departure interval between two consecutive departures from the parking area is greater than or equal to the minimum departure interval corresponding to the parking area;

[0058] The prohibition of overtaking is that the train cannot overtake other trains when running in the interval (the area between two adjacent stations), that is, the planned running lines do not cross;

[0059] The minimum turnaround time constraint is that the time required for the train to perform a turnaround operation on the turnaround track is greater than or equal to the minimum turnaround time corresponding to the turnaround track;

[0060] The minimum stop time constraint requires that the stop time of the train at the platform is greater than or equal to the minimum stop time corresponding to the platform.

[0061] As an example, the modeling process can be as follows:

[0062] For each train number in the train operation diagram, construct an information node Node for each train number in its corresponding parking area.

[0063] Among them, the structure of the information node Node can be as follows:

[0064] 1) Train Number: It is the unique identification number of the train.

[0065] 2) Arrival or departure flag IsArrive, Boolean value true or false, IsArrive is true, indicating that this node is an arrival information node (that is, the start of occupation information node) StartNode, IsArrive is false, indicating that this node is a departure information node (that is, the end of occupation information node) EndNode.

[0066] 3) Parking area serial number n, which is the nth parking area passed by the vehicle.

[0067] 4) Planned time T. When IsArrive is true, T is the planned arrival time of the train. When IsArrive is false, T is the planned departure time of the train.

[0068] 5) Adjust variable X later t,n,a , when IsArrive is true, X t,n,a is the arrival delay adjustment variable of train number t at the nth parking area, that is, the arrival delay adjustment variable at the nth parking area after considering the adjustment of the previous parking area (a kind of arrival time adjustment variable). When IsArrive is false, X t,n,a is the departure delay adjustment variable (a type of departure time adjustment variable) of train number t in the nth parking area, that is, the departure delay time adjustment variable in the nth parking area after considering the adjustment of the previous parking area. For example, X t,n,a A value of 10 means that train number t is 10 minutes late at the nth parking area.

[0069] 6) Adjust variable Y early t,n,a , when IsArrive is true, X t,n,a is the early arrival adjustment variable (a type of arrival time adjustment variable) of train number t at the nth parking area, that is, the early arrival adjustment variable at the nth parking area after considering the adjustment of the previous parking area. When IsArrive is false, X t,n,a Y is the early departure adjustment variable (a type of departure time adjustment variable) for train number t in the nth parking area, that is, the early departure time adjustment variable in the nth parking area after considering the adjustment of the previous parking area. t,n,a A value of 10 means that the train t arrives at the nth parking area 10 minutes early.

[0070] 7) The linear expression of the target time of the vehicle in parking area n after adjustment:

[0071] Expr=T+∑(X t,i,a -Y t,i,a ),i∈(1-n) (1)

[0072] When IsArrive is true, the expression is a linear expression of the target arrival time of the adjusted train in parking area n. When IsArrive is false, the expression is a linear expression of the target departure time of the adjusted train in parking area n.

[0073] Obviously, a vehicle has two nodes in a parking area, namely StartNode and EndNode, which respectively represent the arrival and departure of the vehicle at the parking area, that is, the start and end occupancy of the parking area.

[0074] For each parking area, in order to indicate the occupancy status of each parking area, the StartNode and EndNode of each vehicle in its corresponding parking area can be divided into an ordered occupancy list corresponding to each parking area. The ordered occupancy list of the parking area includes the StartNode and EndNode of each vehicle passing through the parking area arranged in order of the vehicle number.

[0075] For each section, in order to indicate the occupancy of each section, the StartNode and EndNode of each train number in each corresponding section can be determined according to the StartNode and EndNode of each train number in each corresponding platform. Specifically, for any train number, the EndNode of the train number in the previous platform is used as the StartNode of the section to which the two adjacent platforms belong, and the StartNode of the train number in the next platform is used as the EndNode of the section to which the two adjacent platforms belong, so as to quickly determine the StartNode and EndNode of each train number in each corresponding section. The StartNode and EndNode of each train number in each corresponding section are divided into an ordered occupancy list corresponding to each section. The ordered occupancy list of the section includes the StartNode and EndNode of each train number passing through the section arranged in the order of the train number.

[0076] It should be noted that the information in the ordered occupancy list of the parking area and the ordered occupancy list of the interval is defined as occupancy information Occ. For example, Occ may be as follows:

[0077] 1) Train Number: the train number that occupies the parking area or section.

[0078] 2) Occupied object, parking area or section.

[0079] 3)StartNode.

[0080] 4)EndNode.

[0081] On the basis of the ordered occupancy list of each parking area and the ordered occupancy list of each section, the model solution objective is to minimize the sum of the arrival and departure time adjustment variables of each train, and the minimum arrival interval time constraint, minimum departure interval time constraint, no overtaking constraint, minimum return time constraint, and minimum stop time constraint are used as model constraints to construct a train timetable adjustment model.

[0082] The minimum sum of the arrival and departure time adjustment variables of each train can be as follows:

[0083] Objective=Min(∑(X t,i,a +Y t,i,a )) (2)

[0084] The minimum arrival interval time constraint and the minimum departure interval time constraint can be shown as the following pseudo code:

[0085] For object in all parking areas

[0086] For occ in parking area corresponding to the ordered occupancy list

[0087] PreOcc is the previous occupancy information, and NextOcc is the next occupancy information.

[0088] NextOcc.StartNode.Expr–PreOcc.StartNode.Expr>=T a min

[0089] NextOcc.EndNode.Expr–PreOcc.EndNode.Expr>=T a min

[0090] Among them, T a min It indicates the minimum arrival interval time corresponding to the parking area, and also indicates the minimum departure interval time corresponding to the parking area.

[0091] The no crossing constraint can be shown as the following pseudo code:

[0092] For object in all intervals

[0093] For occ in interval corresponding to the ordered occupancy list

[0094] PreOcc is the previous occupancy information, and NextOcc is the next occupancy information.

[0095] NextOcc.StartNode.Expr–PreOcc.EndNode.Expr>=0

[0096] The minimum return time constraint and the minimum stop time constraint can be shown as the following pseudo code:

[0097] For object in all return tracks

[0098] For occ in the ordered occupancy list corresponding to the return track

[0099] occ.EndNode.Expr–occ.StartNode.Expr>=T r

[0100] For object in all stations

[0101] For occ in platform corresponding to the ordered occupancy list

[0102] occ.EndNode.Expr–occ.StartNode.Expr>=T s

[0103] Among them, T r represents the minimum return time corresponding to the return track, T s Indicates the minimum stop time corresponding to the platform.

[0104] In this way, information nodes can be used as basic units in modeling to truly represent the occupancy of parking areas by trains. Based on the division of information nodes, the occupancy of each parking area and each section can be represented, and modeling can be carried out on this basis, ensuring the authenticity and rationality of the train operation diagram adjustment model.

[0105] S120, solving the train operation diagram adjustment model to obtain adjustment information of each train number in the train operation diagram.

[0106] For example, in order to improve the solution efficiency, a linear programming solver (such as the linear programming solver in the third-party open source plug-in Google-ortools) can be used to quickly solve the train operation diagram adjustment model to obtain the adjustment information of each train.

[0107] Referring to S110, the adjustment information may include the arrival time adjustment variables of the train number at each corresponding parking area (ie, the X in StartNode). t,i,a or Y t,i,a ) and the departure time adjustment variable (that is, X in EndNode t,i,a or Yt,i,a ).

[0108] S130, adjusting the train operation diagram according to the adjustment information of each train number.

[0109] In some embodiments, the target arrival time and target departure time of each vehicle at each corresponding parking area may be calculated based on the adjustment information of each vehicle.

[0110] Referring to S120, for any train number, the target arrival time and target departure time of the train number in each corresponding parking area can be calculated based on the planned arrival time and planned departure time of the train number in each corresponding parking area, as well as the arrival time adjustment variable and departure time adjustment variable of the train number in each corresponding parking area in the corresponding adjustment information, combined with formula (1).

[0111] For example, train 001 needs to pass through parking areas 1-3. The planned arrival time of train 001 at parking area 1 is 9:00, the planned arrival time at parking area 2 is 10:00, and the planned arrival time at parking area 3 is 11:00. The adjustment variable for the arrival time at parking area 1 in the adjustment information corresponding to train 001 is Y 001,1,a =10, which means 10 minutes earlier, and the arrival time adjustment variable at parking area 2 is Y 001,2,a =20, that is, 20 minutes earlier, the arrival time adjustment variable at parking area c is X 001,3,a =40, which means a delay of 40 minutes. According to formula (1), the target arrival time of the train at parking area 1 is 8:50, the target arrival time at parking area 2 is 9:30, and the target arrival time at parking area 3 is 11:10. Similarly, the target departure time is calculated in the same way.

[0112] According to the calculated target arrival time and target departure time of each train in its corresponding parking area, the planned arrival time and planned departure time of each train in its corresponding parking area in the train operation diagram are updated to achieve minimum adjustment to the train operation diagram and improve adjustment efficiency.

[0113] In the disclosed embodiment, the subsequent adjustment of the train timetable where a conflict occurs can be abstracted into an adjustment model. By quickly solving the model, the adjustment information of each train can be accurately obtained, and then the train timetable can be adaptively adjusted based on the information to resolve the conflict, which greatly improves the efficiency and effectiveness of conflict resolution. At the same time, it can effectively reduce the work difficulty and workload of dispatchers and ensure driving safety.

[0114] The following is a detailed description of the train operation diagram conflict resolution method provided by the embodiment of the present disclosure in conjunction with a specific embodiment, as follows:

[0115] (1) performing conflict judgment on the adjusted train operation diagram to determine whether the adjusted train operation diagram has a conflict. If the adjusted train operation diagram has a conflict, executing step (2), otherwise no processing is performed;

[0116] (2) determining whether the conflict occurring in the train operation diagram includes an overtaking conflict. If the conflict occurring in the train operation diagram includes an overtaking conflict, executing step (3); otherwise, executing step (4);

[0117] (3) Correcting the order of the train numbers corresponding to the overtaking conflict in the train operation diagram, and then executing step (4);

[0118] (4) Conduct adjustment feasibility modeling on the train operation diagram to obtain a train operation diagram adjustment model.

[0119] (5) A linear programming solver is used to quickly solve the train operation diagram adjustment model to obtain the adjustment information of each train.

[0120] (6) Adjust the train operation diagram based on the adjustment information of each train number to quickly resolve conflicts.

[0121] Combination Figure 2-3 It can be clearly seen that the beneficial effect brought by adopting the train timetable conflict resolution method provided by the embodiment of the present disclosure to resolve the train timetable conflict is that for complex train timetables, no manual intervention is required, which can effectively reduce the dispatcher's work difficulty and workload.

[0122] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all described as a series of action combinations, but those skilled in the art should be aware that the present disclosure is not limited by the order of the actions described, because according to the present disclosure, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all optional embodiments, and the actions and modules involved are not necessarily required by the present disclosure.

[0123] The above is an introduction to the method embodiment. The following is a further explanation of the scheme disclosed in the present invention through an apparatus embodiment.

[0124] Figure 4 A structural diagram of a train operation diagram conflict resolution device provided according to an embodiment of the present disclosure is shown, Figure 4 As shown, the train operation diagram conflict resolution device 400 may include:

[0125] The modeling module 410 is used to perform adjustment feasibility modeling on the conflicting train operation diagram to obtain a train operation diagram adjustment model of the train operation diagram.

[0126] The solving module 420 is used to solve the train operation diagram adjustment model to obtain the adjustment information of each train number in the train operation diagram.

[0127] The adjustment module 430 is used to adjust the train operation diagram according to the adjustment information of each train number.

[0128] In some embodiments, the modeling module 410 is specifically configured to:

[0129] Taking the minimum sum of the arrival and departure time adjustment variables of each train as the model solution objective, and taking the minimum arrival interval time constraint, the minimum departure interval time constraint, the prohibition of overtaking constraint, the minimum return time constraint, and the minimum stop time constraint as model constraints, a train timetable adjustment model of the train timetable is constructed.

[0130] In some embodiments, the modeling module 410 is specifically configured to:

[0131] Constructing information nodes of each parking area corresponding to each train number, wherein the parking area is a platform or a return track, and the information nodes include: an arrival information node and a departure information node;

[0132] The arrival information nodes and departure information nodes of each vehicle number in each parking area corresponding to each vehicle number are divided into an ordered occupancy list corresponding to each parking area, wherein the ordered occupancy list of the parking area includes: the arrival information nodes and departure information nodes of each vehicle number passing through the parking area arranged in the order of the vehicle number;

[0133] According to the arrival information nodes and departure information nodes of each train number at each corresponding station, the arrival information nodes and departure information nodes of each train number at each corresponding section are determined, and the arrival information nodes and departure information nodes of each train number at each corresponding section are divided into an orderly occupancy list corresponding to each section, and the orderly occupancy list of the section includes: the arrival information nodes and departure information nodes of each train number passing through the section arranged in the order of the train number;

[0134] Based on the ordered occupancy lists corresponding to each parking area and the ordered occupancy lists corresponding to each section, the model solving objective is to minimize the sum of the arrival and departure time adjustment variables of each train, and the minimum arrival interval time constraint, the minimum departure interval time constraint, the no-overtaking constraint, the minimum return time constraint, and the minimum stop time constraint are used as model constraints to construct a train timetable adjustment model of the train timetable.

[0135] In some embodiments, the arrival and departure time adjustment variable is the cumulative value of the sum of the arrival time adjustment variable and the departure time adjustment variable of the vehicle number in each corresponding parking area.

[0136] In some embodiments, the modeling module 410 is specifically configured to:

[0137] Before modeling the feasibility of adjusting the conflicting train operation diagram, performing conflict judgment on the adjusted train operation diagram;

[0138] If there is a conflict in the adjusted train operation diagram, the feasibility of adjustment will be modeled.

[0139] In some embodiments, the train operation diagram conflict resolution device 400 further includes:

[0140] The preprocessing module is used to preprocess the train operation diagram before adjusting the feasibility modeling of the conflicting train operation diagram, if the conflict in the train operation diagram includes an overtaking conflict.

[0141] Preprocessing includes:

[0142] Correct the order of each train number corresponding to the overtaking conflict in the train operation diagram.

[0143] In some embodiments, the adjustment module 430 is specifically used to:

[0144] According to the adjustment information of each train, the target arrival time and target departure time of each train in its corresponding parking area are calculated;

[0145] According to the calculated target arrival time and target departure time of each train in its corresponding parking area, the planned arrival time and planned departure time of each train in its corresponding parking area in the train operation diagram are updated.

[0146] Understandably, Figure 4 Each module / unit in the train timetable conflict resolution device 400 shown has the function of implementing each step in the train timetable conflict resolution method 100 provided in the embodiment of the present disclosure, and can achieve its corresponding technical effect. For the sake of brevity, it will not be repeated here.

[0147] Figure 5 A block diagram of an electronic device that can be used to implement an embodiment of the present disclosure is shown. Electronic device 500 is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. Electronic device 500 can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices, and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present disclosure described and / or required herein.

[0148] like Figure 5As shown, the electronic device 500 may include a computing unit 501, which can perform various appropriate actions and processes according to a computer program stored in a read-only memory (ROM) 502 or a computer program loaded from a storage unit 508 into a random access memory (RAM) 503. In the RAM 503, various programs and data required for the operation of the electronic device 500 can also be stored. The computing unit 501, the ROM 502, and the RAM 503 are connected to each other via a bus 504. An input / output (I / O) interface 505 is also connected to the bus 504.

[0149] Multiple components in the electronic device 500 are connected to the I / O interface 505, including: an input unit 506, such as a keyboard, a mouse, etc.; an output unit 507, such as various types of displays, speakers, etc.; a storage unit 508, such as a disk, an optical disk, etc.; and a communication unit 509, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 509 allows the electronic device 500 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.

[0150] The computing unit 501 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the computing unit 501 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various computing units running machine learning model algorithms, digital signal processors (DSPs), and any appropriate processors, controllers, microcontrollers, etc. The computing unit 501 performs the various methods and processes described above, such as method 100. For example, in some embodiments, the method 100 may be implemented as a computer program product, including a computer program, which is tangibly contained in a computer-readable medium, such as a storage unit 508. In some embodiments, part or all of the computer program may be loaded and / or installed on the device 500 via ROM 502 and / or communication unit 509. When the computer program is loaded into RAM 503 and executed by the computing unit 501, one or more steps of the method 100 described above may be performed. Alternatively, in other embodiments, the computing unit 501 may be configured to perform the method 100 in any other appropriate manner (e.g., by means of firmware).

[0151] The various embodiments described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various embodiments may include: being implemented in one or more computer programs, which may be executed and / or interpreted on a programmable system including at least one programmable processor, which may be a dedicated or general programmable processor, which may receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.

[0152] The program code for implementing the method of the present disclosure may be written in any combination of one or more programming languages. These program codes may be provided to a processor or controller of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.

[0153] In the context of the present disclosure, a computer-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A computer-readable medium may be a computer-readable signal medium or a computer-readable storage medium. A computer-readable medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices, or equipment, or any suitable combination of the foregoing. A more specific example of a computer-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0154] It should be noted that the present disclosure also provides a non-transitory computer-readable storage medium storing computer instructions, wherein the computer instructions are used to enable a computer to execute method 100 and achieve the corresponding technical effect achieved by executing the method in the embodiment of the present disclosure. For the sake of concise description, they are not repeated here.

[0155] In addition, the present disclosure also provides a computer program product, which includes a computer program. When the computer program is executed by a processor, the method 100 is implemented.

[0156] To provide interaction with a user, the above-described embodiments may be implemented on a computer having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the computer. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).

[0157] The embodiments described above can be implemented in a computing system that includes back-end components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes front-end components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such back-end components, middleware components, or front-end components. The components of the system can be interconnected by digital data communication of any form or medium (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), and the Internet.

[0158] A computer system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The relationship of client and server is generated by computer programs running on respective computers and having a client-server relationship with each other. The server may be a cloud server, a server of a distributed system, or a server combined with a blockchain.

[0159] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps recorded in this disclosure can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solutions disclosed in this disclosure can be achieved, and this document does not limit this.

[0160] The above specific implementations do not constitute a limitation on the protection scope of the present disclosure. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present disclosure shall be included in the protection scope of the present disclosure.

Claims

1. A method for solving a train operation diagram conflict, characterized in that: The method comprises: Conducting adjustment feasibility modeling on the conflicting train operation diagram to obtain a train operation diagram adjustment model of the train operation diagram; Solving the train operation diagram adjustment model to obtain adjustment information of each train number in the train operation diagram; Adjusting the train operation diagram according to the adjustment information of each train number; The step of performing adjustment feasibility modeling on the conflicting train operation diagram to obtain a train operation diagram adjustment model of the train operation diagram includes: Constructing information nodes of each parking area corresponding to each train number, wherein the parking area is a platform or a return track, and the information nodes include: an arrival information node and a departure information node; The arrival information nodes and departure information nodes of each vehicle number in each parking area corresponding to each vehicle number are divided into an ordered occupancy list corresponding to each parking area, wherein the ordered occupancy list of the parking area includes: the arrival information nodes and departure information nodes of each vehicle number passing through the parking area arranged in the order of the vehicle number; According to the arrival information nodes and departure information nodes of each train number at each corresponding station, the arrival information nodes and departure information nodes of each train number at each corresponding section are determined, and the arrival information nodes and departure information nodes of each train number at each corresponding section are divided into an orderly occupancy list corresponding to each section, and the orderly occupancy list of the section includes: the arrival information nodes and departure information nodes of each train number passing through the section arranged in the order of the train number; Based on the ordered occupancy lists corresponding to each parking area and the ordered occupancy lists corresponding to each section, the model solving objective is to minimize the sum of the arrival and departure time adjustment variables of each train, and the minimum arrival interval time constraint, the minimum departure interval time constraint, the no-overtaking constraint, the minimum return time constraint, and the minimum stop time constraint are used as model constraints to construct a train timetable adjustment model of the train timetable.

2. The method according to claim 1, characterized in that The arrival and departure time adjustment variable is the cumulative value of the sum of the arrival time adjustment variable and the departure time adjustment variable of the vehicle number in each corresponding parking area.

3. The method according to claim 1, characterized in that Before the adjustment feasibility modeling is performed on the conflicting train operation diagram, the method further includes: Conduct conflict judgment on the adjusted train operation diagram; If there is a conflict in the adjusted train operation diagram, the feasibility of adjustment will be modeled.

4. The method according to claim 1, characterized in that: Before the adjustment feasibility modeling is performed on the conflicting train operation diagram, the method further includes: If the conflict occurring in the train operation diagram includes an overtaking conflict, preprocessing the train operation diagram; The pre-processing comprises: The order of each train number corresponding to the overtaking conflict is corrected in the train operation diagram.

5. The method according to claim 1, characterized in that The step of adjusting the train operation diagram according to the adjustment information of each train number includes: According to the adjustment information of each train, the target arrival time and target departure time of each train in its corresponding parking area are calculated; According to the calculated target arrival time and target departure time of each train number at each corresponding parking area, the planned arrival time and planned departure time of each train number at each corresponding parking area in the train operation diagram are updated.

6. A train operation diagram conflict resolution device, characterized in that: The device comprises: A modeling module, used for modeling the feasibility of adjusting the conflicting train operation diagram to obtain a train operation diagram adjustment model of the train operation diagram; A solution module, used for solving the train operation diagram adjustment model to obtain adjustment information of each train number in the train operation diagram; An adjustment module, used for adjusting the train operation diagram according to the adjustment information of each train number; The modeling module is specifically used for: Constructing information nodes of each parking area corresponding to each train number, wherein the parking area is a platform or a return track, and the information nodes include: an arrival information node and a departure information node; The arrival information nodes and departure information nodes of each vehicle number in each parking area corresponding to each vehicle number are divided into an ordered occupancy list corresponding to each parking area, wherein the ordered occupancy list of the parking area includes: the arrival information nodes and departure information nodes of each vehicle number passing through the parking area arranged in the order of the vehicle number; According to the arrival information nodes and departure information nodes of each train number at each corresponding station, the arrival information nodes and departure information nodes of each train number at each corresponding section are determined, and the arrival information nodes and departure information nodes of each train number at each corresponding section are divided into an orderly occupancy list corresponding to each section, and the orderly occupancy list of the section includes: the arrival information nodes and departure information nodes of each train number passing through the section arranged in the order of the train number; Based on the ordered occupancy lists corresponding to each parking area and the ordered occupancy lists corresponding to each section, the model solving objective is to minimize the sum of the arrival and departure time adjustment variables of each train, and the minimum arrival interval time constraint, the minimum departure interval time constraint, the no-overtaking constraint, the minimum return time constraint, and the minimum stop time constraint are used as model constraints to construct a train timetable adjustment model of the train timetable.

7. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to perform the method according to any one of claims 1 to 5.

8. A non-transitory computer-readable storage medium storing computer instructions, characterized in that: The computer instructions are used to enable a computer to execute the method according to any one of claims 1 to 5.