A multifunctional ocean drilling ship type
Through the modular design and sharing of transport equipment, the multi-functional ocean drilling ship type has been solved, and the problem of insufficient operating capacity and poor economical water barrier pipes for ocean scientific drilling and natural gas hydrate drilling in the existing technology has been solved, and efficient and economical multi-functional Operations, adapt to different seabed conditions and experimental needs, reduce fuel consumption and safety risks.
Patent Information
- Application Number
- CN202211367014.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-02
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-11-02
AI Technical Summary
When conducting ocean scientific drilling and natural gas hydrate drilling, existing ocean drilling ships have problems such as insufficient operating capacity, poor economy, high fuel consumption and complex laboratory configuration, which are difficult to be economical and versatile, especially in the There are safety risks and technical difficulties in natural gas hydrate trial operation.
A multi-functional ocean drilling ship model was designed, using modular deck yards and shared transport equipment to realize various functions such as traditional water barrier operations, special hydrate trial testing system operations, and closed circulation operations without water barrier pipes. Meet different operating needs through modular switching, reducing hull size and fuel consumption, and improving economy and safety.
Advanced indicators of maximum water depth of 1500m-3000m and maximum drilling depth of 10000m-12000m have been achieved, reducing costs and fuel consumption, improving operational economy and safety, and adapting to different seabed geological conditions and experimental needs.
Smart Images

Figure CN115743427B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a multifunctional ocean drilling ship type, belonging to the technical field of ship design and manufacturing. Background Art
[0002] Natural gas hydrate is a clean and efficient energy source with huge reserves. The total amount of resources is equivalent to twice the total carbon content of known coal, oil and natural gas on the earth. The exploration and development of natural gas hydrates in the sea area and scientific ocean drilling are inseparable from the drilling ship type. At present, there are two professional ocean drilling ships in the world. One is the "Jodis Resolution" drilling ship of the United States, but the ship does not have the ability to drill with a riser. The second is the "Earth" drilling ship of Japan, which has the ability to penetrate the Moho surface. The "Jodis Resolution" drilling ship of the United States does not have the ability to operate with a riser, and cannot form a confined space from the wellhead back to the hull. At the same time, it is limited by the displacement and the small deck area, which makes it impossible to arrange the corresponding equipment through transformation and upgrading. Therefore, the "Jodis Resolution" drilling ship does not have the ability to test hydrates and can only be used for scientific ocean drilling. Japan's "Earth" drilling ship has poor operating economy due to its large main dimensions and displacement, especially in ocean scientific drilling operations that require long-term continuous operations. It is subject to large environmental loads such as wind, waves, and currents, resulting in excessive fuel consumption in the dynamic positioning system, which has a significant impact on the ship's efficiency.
[0003] The ocean drilling ship is a highly specialized marine engineering equipment. In particular, only the United States' "Jodis Resolution" and Japan's "Chikyu" drilling ship have the functions of both ocean scientific drilling and gas hydrate drilling. In addition, only Japan's "Chikyu" drilling ship has the above functions added to the test production of gas hydrates. This is because compared with conventional marine oil and gas resource drilling, ocean scientific drilling and natural gas hydrate drilling and test production face very different technical problems. First of all, conventional marine oil and gas resource drilling is mostly for soft and sedimentary rock formations, while ocean drilling ships need to adapt to various marine geological conditions including hard rock, and need to conduct 6,000 meters of hard rock coring throughout the seabed to achieve the purpose of penetrating the Earth's Moho surface. Therefore, when conducting ocean scientific drilling, it is necessary to frequently replace the drill bit and return the drill string to its original position. Hard rock drilling takes a long time, which requires the ocean drilling ship to have a long-term high-precision fixed-point positioning capability, as well as low fuel consumption and high economy. Secondly, ocean scientific drilling requires the cores to be subjected to a number of scientific experiments such as rock properties, paleontology, paleomagnetism, chemistry, and microorganisms. It is necessary to equip the ocean drilling ship with multidisciplinary and multi-category shipboard laboratories. There are many types of shipboard laboratories, and different experiments have different requirements for the aging, temperature, and experimental environment of the cores. In particular, the magnetic shielding technology of the paleomagnetic laboratory is difficult, and the main-trace element online laboratory has ultra-high cleanliness (reaching the thousandth level) environmental control requirements. Therefore, the configuration and design of the laboratory must meet the requirements for convenient core transportation. Thirdly, in the drilling and coring operation of natural gas hydrates, the samples need to be insulated and pressurized for the coring of natural gas hydrates to avoid the vaporization of natural gas hydrate samples; in the trial production of natural gas hydrates, the risk of wellhead side leakage and collapse is extremely high, and the mud temperature and density need to be strictly controlled during the hydrate drilling process, and sand plugging and secondary formation of hydrates must be prevented. The safety risk prevention and control requirements are extremely high, and the current natural gas hydrate mining method is still in the frontier research field, with great uncertainty. Therefore, the ocean drilling ship needs to be able to adapt to the special needs of different test production plans, process systems and mud systems, and have a multifunctional operation mode. Therefore, the technical field urgently needs to obtain a small-tonnage, multifunctional and modular multifunctional ocean drilling ship type that can have both the economic efficiency of ocean scientific drilling and the function of riser drilling operations, and can realize the test production of natural gas hydrates in the sea area. Summary of the invention
[0004] The purpose of the present invention is to solve the technical problem of how to obtain a small-tonnage, multifunctional and modular multifunctional ocean drilling ship that can have both the economy of ocean scientific drilling and the function of riser drilling operations, and can realize the trial production of natural gas hydrates in the sea area.
[0005] In order to achieve the purpose of solving the above-mentioned problems, the technical solution adopted by the present invention is to provide a multifunctional ocean drilling ship type, including a streamlined bow and a monohull at the stern extending in the direction of the ship's length; a moon pool is provided in the middle of the hull, the moon pool vertically penetrates the hull and is connected with the external seawater, and a derrick is provided above the moon pool; a ship-borne laboratory and a living area are provided on the side of the derrick close to the bow along the direction of the ship's length, and a deck yard is provided on the other side of the derrick close to the stern along the direction of the ship's length, and the deck yard is a modular yard that can meet the requirements of carrying operating equipment with different functions; a combustion arm is provided at the end of the stern.
[0006] Preferably, the deck yard is provided with a shared catwalk in the middle of the ship width direction for conveying pipelines from the deck yard to the derrick.
[0007] Preferably, a crane for lifting pipelines from the deck yard to the shared catwalk is provided around the deck yard.
[0008] Preferably, a core transfer catway is provided between the derrick and the shipboard laboratory; the derrick is provided with a derrick platform; and the core transfer catway is provided between the derrick platform and the top of the shipboard laboratory.
[0009] Preferably, a core storage for storing cores is provided at the bottom of the hull below the shipborne laboratory, and a vertical core transfer channel passing through the shipborne laboratory is provided between the core storage and the open deck of the hull.
[0010] Preferably, a blowout preventer assembly trolley and an auxiliary trolley which can move longitudinally along the length of the ship are respectively provided at the front and rear ends of the moon pool, and the blowout preventer assembly trolley and the auxiliary trolley are adapted to the carrying requirements of different underwater equipment; a blowout preventer assembly crane is also provided on the side where the blowout preventer assembly trolley is provided.
[0011] Preferably, three retractable full-rotation thrusters arranged in a triangular shape are provided at the bottom of the bow; three full-rotation thrusters are provided at the stern; and a tunnel thruster for auxiliary positioning is provided at the bow.
[0012] Preferably, the derrick is provided with a fuel tank on one side along the length of the ship, and a mud pool and a deck yard on the other side.
[0013] Preferably, the stern is provided with three engine rooms, which are independently arranged side by side, and the separation between the engine rooms meets the requirements of dynamic positioning level.
[0014] Preferably, a helicopter platform is provided on the roof of the living area.
[0015] Compared with the prior art, the present invention has the following beneficial effects:
[0016] The ocean drilling vessel type provided by the present invention adopts a modular deck yard, which can be modularly switched according to the needs of different operation functions, and at the same time share the main transfer equipment such as cranes, catwalks, blowout preventer group cranes, blowout preventer trolleys, auxiliary trolleys, etc., to transport equipment and materials to the operation location, thereby realizing four functions such as traditional riser operation, hydrate test production special test system operation, traditional riser-free operation and riser-free mud closed circulation operation. By adopting the above technical solution, the maximum water depth of riser operation can be adjusted to 1500m-3000m, and the maximum drilling depth can be 10000m-12000m. At the same time, the displacement and tonnage are greatly reduced compared with the reference ship type with the same function and capacity, the cost is relatively lower, and it has lower fuel consumption and better operating economy. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a side view structural schematic diagram of the present invention.
[0018] Figure 2 The deck yard layout diagram of the ocean drilling vessel of the present invention when realizing the traditional watertight pipe operation function.
[0019] Figure 3 This is a schematic diagram of the ocean drilling vessel of the present invention when realizing the traditional riser operation function.
[0020] Figure 4 The deck yard layout diagram of the ocean drilling ship of the present invention when realizing the operation function of the special test system for hydrate trial production.
[0021] Figure 5 This is a schematic diagram of the operation function of the special test system for hydrate trial production of the ocean drilling ship of the present invention.
[0022] Figure 6 The deck yard layout diagram of the ocean drilling vessel of the present invention when realizing the traditional riser-free operation function.
[0023] Figure 7 This is a schematic diagram of the ocean drilling vessel of the present invention realizing the traditional riser-free operation function.
[0024] Figure 8 The deck yard layout diagram of the ocean drilling vessel of the present invention when realizing the closed circulation operation function of mud without a riser.
[0025] Fig. 9 The schematic diagram is a schematic diagram of the ocean drilling vessel of the present invention realizing the closed circulation operation function of mud without a riser. DETAILED DESCRIPTION
[0026] In order to make the present invention more clearly understood, a preferred embodiment is described in detail with reference to the accompanying drawings as follows:
[0027] like Figure 1-9 As shown, the technical solution adopted by the present invention is to provide a multifunctional ocean drilling ship type, including a single ship hull with streamlined bow and stern extending in the length direction of the ship; a moon pool 13 is provided in the middle of the hull, and the moon pool 13 vertically penetrates the hull and communicates with the external seawater, and a derrick 1 is provided above the moon pool 13; a ship-borne laboratory 3 and a living area 7 are provided on the side of the derrick 1 near the bow along the length direction, and a deck yard is provided on the other side of the derrick 1 near the stern along the length direction, and the deck yard is a modular yard that can meet the requirements of carrying operating equipment with different functions; a burning arm 20 is provided at the end of the stern. A shared catwalk 25 for conveying pipelines from the deck yard to the derrick 1 is provided in the middle of the deck yard in the width direction. A crane for hoisting the pipelines from the deck yard to the shared catwalk 25 is provided around the deck yard. A core transfer catwalk 2 is provided between the derrick 1 and the ship-borne laboratory 3; the derrick 1 is provided with a derrick platform; and the core transfer catwalk 2 is provided between the derrick platform and the top of the ship-borne laboratory 3. A core storage 11 for storing cores is provided at the bottom of the hull below the shipborne laboratory 3, and a vertical core transfer channel 4 is provided between the core storage 11 and the open deck of the hull, passing through the shipborne laboratory 3. The front and rear ends of the moon pool 13 are respectively provided with a blowout preventer group trolley 28 and an auxiliary trolley that can move longitudinally along the length of the ship. The blowout preventer group trolley 28 and the auxiliary trolley meet the requirements of carrying different underwater equipment; a blowout preventer group crane 27 is also provided on the side where the blowout preventer group trolley 28 is provided. Three retractable full-rotation thrusters 10 arranged in a triangular shape are provided at the bottom of the bow; three full-rotation thrusters 19 are provided at the stern; and a tunnel-type thruster 9 for auxiliary positioning is provided at the bow. A fuel tank 12 is provided on one side of the derrick 1 along the length of the ship, and a mud pool 17 and a deck yard are provided on the other side. A bagged product warehouse 16 is provided above the mud pool 17 to replenish materials for mixing mud. The stern is provided with three engine rooms 18, which are arranged side by side and independently, and the separation between the engine rooms 18 meets the requirements of dynamic positioning level. A helicopter platform 8 is provided on the roof of the living area.
[0028] like Figure 1 The figure shows a side view of a monohull ocean drilling ship according to the present invention. According to different operational capability index requirements, the main dimensions of the ship can be adjusted to a length of 170m-190m, a beam of 30m-34m, a depth of 14m-17m, a designed displacement of about 40,000t-50,000t, a riser operating water depth of 1,500m-3,000m, and a maximum drilling depth of 10,000m-12,000m.
[0029] like Figure 1As shown, the derrick 1 is arranged in the middle of the hull, and the derrick 1 provides the necessary lifting capacity and pipeline connection capacity to meet the maximum operating water depth and the maximum drilling depth. A platform-type moon pool 13 is arranged below the derrick 1. The moon pool 13 is a large opening that passes through the upper surface and the lower surface of the hull, and is used to lower various underwater equipment from the derrick 1, including but not limited to the blowout preventer group 15, the watertight pipe 26 and the drill pipe 22.
[0030] like Figure 1 As shown, the ocean drilling ship is equipped with a shipboard laboratory 3, which is located on the same side of the derrick 1 as the living area 7, so that personnel can pass between the living area 7 and the shipboard laboratory 3. At the same time, the top of the shipboard laboratory 3 is basically flush with the derrick 1 platform, so that the core can be transferred from the derrick 1 to the shipboard laboratory 3. The shipboard laboratory 3 is divided into four floors with a total area of not less than 2800m 2 It has nine laboratories covering experiments in geophysics, paleomagnetism, inorganic geochemistry, organic geochemistry, microorganisms, micropaleontology, core processing, petrology, drilling technology, marine meteorology, marine biology, physical oceanography, marine chemistry, marine remote sensing, and natural gas hydrates.
[0031] like Figure 1 As shown, a core transfer channel 4 is provided in the shipboard laboratory 3, and the core transfer channel 4 vertically penetrates the core storage 11 at the bottom of the hull to the open deck at the top of the shipboard laboratory 3, and can be used for the transfer of cores between layers and the transfer from the open deck to the shore. A core transfer catwalk 2 is provided between the shipboard laboratory 3 and the derrick 1, and is used for the transfer of cores from the derrick 1 to the shipboard laboratory 3. A crane 5 is provided on the top of the shipboard laboratory 3, and can be used for lifting materials between the shipboard laboratory 3 and the living area 7. A cab 6 is provided on the top of the living area 7, and a helicopter platform 8 is provided above the cab 6.
[0032] like Figure 1 As shown, the drill pipe yard 22 and the riser yard 26 are located on the same side of the derrick 1, and are transported to the derrick 1 through the shared catwalk 25, and the pipelines are connected in the derrick 1. Cranes 23 and 24 are respectively set on both sides of the riser yard 26, and their lifting coverage range can completely cover the riser yard 26, and the risers are lifted to the shared catwalk 25 or unloaded from the shared catwalk 25 to the riser yard 26. A crane 21 is set next to the drill pipe yard 22, and the lifting range of the crane 21 can completely cover the drill pipe yard 22, and is used to lift the drill pipes to the shared catwalk 25 or unload them from the shared catwalk 25 to the drill pipe yard 22.
[0033] like Figure 1 As shown, a BOP crane 27 is provided on one side of the moon pool 13 along the length direction of the ship. The BOP crane 27 can move left and right along the width direction of the ship to move the BOP 15 from the storage area to the platform 14 in the moon pool 13, and the BOP trolley 28 ( Figure 2 ) is moved along the length of the ship to the wellhead below the derrick 1 and lowered into the water from the moon pool 13.
[0034] like Figure 1 As shown, a combustion arm 20 is provided at the end of the ocean drilling ship and is connected to the natural gas hydrate test production equipment through a pipeline. During the test production operation, the natural gas hydrate can burn the natural gas through the combustion arm 20 to achieve continuous test production of natural gas hydrate.
[0035] like Figure 1 As shown, the ocean drilling ship is provided with three retractable full-rotation thrusters 10 at the bow, arranged in a "pin" shape, which can be used for DP-3 dynamic positioning. During dynamic positioning, the retractable full-rotation thrusters 10 can be extended from the bottom of the ship, and according to the control system command, the direction can be adjusted within a range of 360 degrees, so that the ocean drilling ship can maintain a specific position. When sailing, the three retractable full-rotation thrusters 10 can be retracted into the main hull to reduce the sailing resistance of the ship.
[0036] like Figure 1 As shown, the ocean drilling ship is provided with three azimuth thrusters 19 at the rear, which can be used for DP-3 dynamic positioning and navigation. The three azimuth thrusters 19 are arranged above the baseline of the ship bottom, and will not collide with the seabed when positioning in shallow water at a dock or port. Optionally, a tunnel thruster 9 is provided at the bow of the ocean drilling ship. When the ocean drilling ship is positioned in shallow water at a dock or port, the retractable azimuth thruster 10 is recovered into the main hull, and the tunnel thruster 9 can be used for positioning and berthing operations.
[0037] like Figure 1 As shown, the mud pool 17 is located on one side of the moon pool 13 along the length of the ship, and the fuel tank 12 is located on the other side of the moon pool 13 along the length of the ship. When fully loaded, the weight of the riser yard 26, the drill pipe yard 22, and the mud pool 17 is roughly balanced with the weight of the fuel tank 12, which is beneficial to the floating state control of the ocean drilling ship. Three engine rooms 18 are arranged at the stern of the ocean drilling ship. The engine rooms 18 are arranged in parallel. The three engine rooms 18 are independent of each other and are equipped with fire separation and watertight separation that meet the requirements of DP-3 dynamic positioning level.
[0038] like Figure 2 The figure shows the arrangement of the deck of the yard when the monohull ocean drilling ship realizes the traditional riser operation function. The riser yard 26, the drill pipe yard 22 and the casing yard 29 are located on the same side of the moon pool 13 along the length of the ship. Figure 1 The shared catwalk 25 in the well is transported to the derrick 1. The blowout preventer group 15 is stored on one side of the moon pool and is transported to the derrick 1 by the blowout preventer group crane 27 ( Figure 1 ) is hoisted to the BOP trolley 28 and moved along the length of the ship to the center of the wellhead below the derrick 1.
[0039] like Figure 3 As shown, it is a schematic diagram of the present invention when realizing the traditional watertight pipe operation function of an exemplary single-body ocean drilling ship. A mud filling channel 32 is formed inside the drill pipe 31, and the annular space formed between the drill pipe 31 and the external watertight pipe 30 is a mud return channel 33. After the mud returns, it passes through the rotary sprayer 34 and the mud conveying pipeline 35, and flows back to the mud treatment module 36. After being processed, it is stored in the mud pool 17, enters the mud filling channel 32 again, and is conveyed to the wellhead to ensure the drilling operation, completing the mud circulation, thereby realizing the traditional watertight pipe operation function.
[0040] like Figure 4 The figure shows the deck layout of the yard when the monohull ocean drilling ship realizes the operation function of the dedicated test system for hydrate production. Through modular design, the original casing yard 29 is switched to the dedicated test system 38 yard for hydrate production, and the retaining piles on the original yard are detachable retaining piles 39. Various winches 37 are arranged around the moon pool 13 for auxiliary operation of the dedicated test system 38 for hydrate production and storage of umbilical cables.
[0041] like Figure 5 As shown, it is a schematic diagram of the present invention when realizing the operating function of the special test system for hydrate trial production in an exemplary single-body ocean drilling ship. The annular space formed between the drill pipe 31 and the external watertight pipe 30 is the natural gas transmission channel 40 after the hydrate is vaporized, which is connected to the combustion arm 20 through the pipeline 41, and combustion is carried out during trial production to realize continuous operation of the special test system 38 for hydrate trial production.
[0042] like Figure 6 As shown, it is a yard deck layout diagram of the present invention when a monohull ocean drilling ship realizes the traditional riser-free operation function. The wellhead plate 42 is located on one side of the moon pool 13 along the length of the ship, and can be moved to the center of the wellhead along the length of the ship by an auxiliary trolley 43, and lowered to the seabed by the derrick 1. The wellhead plate 42 can be used as a connection channel for the underwater wellhead. The drilling re-entry cone 44 and the bell mouth 45 are arranged on both sides of the moon pool 13 along the width of the ship. The drilling re-entry cone 44 and the bell mouth 45 can be moved to the center of the wellhead along the length of the ship by the blowout preventer trolley 28, and lowered by the derrick 1, providing a positioning function for the drill string to return to the borehole after the drill bit is replaced on board. Through modular design, the original riser yard 29 is switched to the ocean scientific drilling casing yard 47 and container 46. The container 46 is used for underwater high-pressure gas source power supply for ocean scientific drilling. The ocean scientific drilling casing yard 47 is set up as the ocean scientific drilling drill pipe yard 48 on one side along the length of the ship. The storage capacity of the ocean scientific drilling casing yard 47 and the ocean scientific drilling drill pipe yard 48 is greatly increased, which can meet the demand of the maximum drilling depth of 10000m-12000m.
[0043] like Figure 7As shown, it is a schematic diagram of the present invention when a single-body ocean drilling vessel is used to implement the traditional riser-free operation function. Environmentally friendly and harmless mud is transported from the inside of the drill pipe 31 to the wellhead 49, cleans the bottom of the well, carries rock cuttings, and is discharged into the sea water 50 from above the wellhead 49 and the bell mouth 45 through the annular space between the drill pipe 31 and the well wall.
[0044] like Figure 8 As shown, it is a yard deck layout diagram of the present invention when the example monohull ocean drilling ship realizes the closed circulation operation function of mud without riser. A winch 53 is arranged on one side of the moon pool 13 along the length direction, which is used for drilling operation assistance and umbilical cable storage. A seabed pump and control module 56 is arranged on the other side of the moon pool 13 along the length direction, which is used for circulating mud, and a seabed suction module 57 and a pressure control module 58 are arranged, which are respectively used for underwater wellhead control. An emergency disconnect device and a wellhead plate module 55 are arranged on one side of the moon pool 13 along the width direction. After the blowout preventer trolley converter 54 is installed on the blowout preventer trolley 28, it can be transported to the wellhead below the derrick 1, and lowered underwater by the derrick 1 to establish the wellhead at the mud line position. The original riser yard is converted into a mud return pipeline storage yard 52 through function switching, which is used to store the hoses and joints of the mud return pipeline.
[0045] like Fig. 9 The figure shows the principle diagram of the present invention when a single-body ocean drilling ship realizes the closed circulation operation function of the riser-free mud. The mud is transported from the drill pipe 31 to the wellhead, cleans the bottom of the well, carries rock cuttings, and is collected by the emergency disconnect device above the wellhead and the wellhead plate module 55. The mud is then recovered to the mud processing module 36 by the mud return pipeline 61 and the adapted seabed pump 60. After being processed, the mud is stored in the mud pool 17 and transported to the wellhead again to ensure the drilling operation, completing the mud circulation, thereby realizing the closed circulation operation process of the riser-free mud.
[0046] The above is only a preferred embodiment of the present invention, and is not any formal or substantial limitation of the present invention. It should be pointed out that ordinary technicians in this technical field can make several improvements and supplements without departing from the present invention, and these improvements and supplements should also be regarded as the protection scope of the present invention. Any technician familiar with this profession, without departing from the spirit and scope of the present invention, can make some changes, modifications and equivalent changes made by using the technical content disclosed above, which are equivalent embodiments of the present invention; at the same time, any changes, modifications and evolutions of any equivalent changes made to the above embodiments based on the essential technology of the present invention are still within the scope of the technical solution of the present invention.
Claims
1. A multifunctional ocean drilling ship, characterized in that: It comprises a monohull with streamlined bow and stern extending in the length direction of the ship; a platform-type moon pool is provided in the middle of the hull, the moon pool vertically penetrates the hull and communicates with the external seawater, and a derrick is provided above the moon pool; a shipboard laboratory and living area are provided on the side of the derrick close to the bow in the length direction, a core storage for storing cores is provided at the bottom of the hull below the shipboard laboratory, and a deck yard is provided on the other side of the derrick close to the stern in the length direction, and the deck yard is a modular yard that can meet the requirements of carrying operating equipment with different functions; a combustion arm is provided at the end of the stern; The core transfer channel runs vertically from the core storage at the bottom of the hull to the open deck on the top of the shipboard laboratory, and is used for the transfer of cores between layers and from the open deck to the shore; A winch is provided on one side of the moon pool along the length of the ship, which is used for drilling assistance and umbilical cable storage; a subsea pump and control module are provided on the other side of the moon pool along the length of the ship, which is used for mud circulation, and a subsea suction module and a pressure control module are provided, which are used for underwater wellhead control respectively; an emergency disconnect device and a wellhead plate module are arranged on one side of the moon pool along the width of the ship, which are transported to the wellhead below the derrick after the blowout preventer trolley converter is installed on the blowout preventer trolley, and then lowered underwater by the derrick to establish the wellhead at the mudline position; The mud is transported from the drill pipe to the wellhead, cleans the bottom of the well, carries the cuttings, and is collected by the emergency disconnect device and the wellhead plate module above the wellhead. The mud is then recovered to the mud processing module by the mud return pipeline and the adapted seabed pump. After treatment, the mud is stored in the mud pool and transported to the wellhead again to ensure drilling operations, completing the mud circulation and realizing a closed circulation operation process of mud without a riser.
2. A multifunctional ocean drilling ship according to claim 1, characterized in that: The deck yard is provided with a shared catwalk in the middle of the ship width direction for conveying pipelines from the deck yard to the derrick.
3. A multifunctional ocean drilling ship according to claim 2, characterized in that: Cranes for lifting pipelines from the deck yard to the shared catwalk are provided around the deck yard.
4. A multifunctional ocean drilling ship according to claim 1, characterized in that: A core transfer catwalk is provided between the derrick and the ship-borne laboratory; the derrick is provided with a derrick platform; and the core transfer catwalk is provided between the derrick platform and the top of the ship-borne laboratory.
5. The multifunctional ocean drilling ship according to claim 1, characterized in that: A vertical core transfer passage passing through the shipboard laboratory is arranged between the core storehouse and the open deck of the ship.
6. A multifunctional ocean drilling ship according to claim 1, characterized in that: The front and rear ends of the moon pool are respectively provided with a blowout preventer group trolley and an auxiliary trolley which can move longitudinally along the length of the ship. The blowout preventer group trolley and the auxiliary trolley can adapt to the carrying requirements of different underwater equipment; a blowout preventer group crane is also provided on the side where the blowout preventer group trolley is provided.
7. The multifunctional ocean drilling ship according to claim 1, characterized in that: The bottom of the bow is provided with three retractable full-rotation thrusters arranged in a triangular shape; the stern is provided with three full-rotation thrusters; and the bow is provided with a tunnel-type thruster for auxiliary positioning.
8. The multifunctional ocean drilling ship according to claim 1, characterized in that: The derrick is provided with a fuel tank on one side along the length of the ship, and a mud pool and a deck yard on the other side.
9. The multifunctional ocean drilling ship according to claim 1, characterized in that: The stern is provided with three engine rooms, which are independently arranged side by side, and the partitions between the engine rooms meet the requirements of dynamic positioning level.
10. The multifunctional ocean drilling ship according to claim 1, characterized in that: A helicopter platform is provided on the roof of the living area.
