Multi-link and control method and device thereof
By obtaining and correcting the control parameters of the multi-online air conditioning system, the normal operation problem of the multi-online air conditioning system in the event of failure is solved, the system reliability and user experience is ensured, and the maintenance cost is reduced.
Patent Information
- Application Number
- CN202211476917.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-23
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-11-23
AI Technical Summary
Multi-online air conditioning systems are difficult to ensure the normal operation of the unit when they fail, and the complex system has high control accuracy, and there is a lack of effective fault handling methods.
By obtaining the working status of the target multi-online, calling the matching control parameters in the historical data, and selecting the closest multi-online parameters from the database when the failure continues to correct it, ensuring that the actual control parameters match the current working condition and avoiding downtime operations. Ensure system reliability.
It realizes the continuous working reliability of multiple online air conditioning systems in the event of failure, reduces maintenance costs, avoids secondary damage to other components, and improves user experience.
Smart Images

Figure CN115773572B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of air conditioning and provides a multi-split air conditioner and a control method and device thereof. Background Art
[0002] Air conditioner operation failures often occur, especially in multi-split air conditioning systems, which are complex and require high control accuracy. If a problem is detected in a component of a multi-split air conditioning system, there is no corresponding method to ensure the normal operation of the unit. Summary of the invention
[0003] The present invention aims to solve at least one of the technical problems existing in the related art. To this end, the present invention provides a control method for a multi-split unit to ensure that the multi-split unit can still operate normally when a component of the multi-split unit fails.
[0004] The embodiment of the present invention also provides a multi-link control device.
[0005] The embodiment of the present invention also provides a multi-link.
[0006] A first aspect of the present invention provides a method for controlling a multi-link system, comprising:
[0007] Obtaining the first working state of the target multi-link;
[0008] Determining that the first working state is a fault, calling a call control parameter corresponding to the current working condition of the target multi-connected machine in the historical data of the target multi-connected machine as an actual control parameter of the target multi-connected machine;
[0009] Acquire a second working state of the target multi-link;
[0010] Determining that the second working state is a fault, and determining a first multi-link and a second multi-link corresponding to the current working state of the target multi-link in a database;
[0011] The actual control parameter of the target multi-connection system is taken as the first control parameter of the first multi-connection system, and the actual control parameter of the target multi-connection system is corrected based on the second control parameter of the second multi-connection system.
[0012] According to the multi-connection control method provided by the embodiment of the first aspect of the present invention, when the first working state of the target multi-connection is a fault, the call control parameters matching the current working conditions in the historical data of the electrophoresis target multi-connection are used as the actual control parameters of the target multi-connection; when the second working state of the target multi-connection is still a fault, it means that the called control parameters cannot match the current operating conditions. At this time, the first control parameters of the first multi-connection and the second control parameters of the second multi-connection corresponding to the current working conditions of the target multi-connection in the database are called, and the first control parameters are used as the actual control parameters of the target multi-connection, and the actual control parameters of the target multi-connection are corrected by the second control parameters. This ensures that the target multi-connection can refer to the first multi-connection and the second multi-connection that match the current working conditions, and makes the adjustment of the actual control parameters of the target multi-connection more accurate, thereby ensuring the continuous operation of the target multi-connection without the need for shutdown operation of the target multi-connection, thereby ensuring the reliability of the continuous operation of the target multi-connection, and will not cause secondary damage to other components due to the use of the multi-connection control method, thereby reducing maintenance costs.
[0013] According to an embodiment of the present invention, the step of determining the first multi-link and the second multi-link corresponding to the current operating condition of the target multi-link in the database includes:
[0014] The first multi-link, the second multi-link and the target multi-link have the same operating condition parameter of machine type, connection scheme, geographical location and usage properties.
[0015] According to an embodiment of the present invention, after the step of using the first control parameter of the first multi-link as the actual control parameter of the target multi-link and correcting the actual control parameter of the target multi-link based on the second control parameter of the second multi-link, the method includes:
[0016] Uploading the actual control parameters of the target multi-link to a server;
[0017] Based on the judgment of the server on the working status of the target multi-link, the first control parameter and the second control parameter are continuously obtained to adjust the actual control parameter.
[0018] According to an embodiment of the present invention, after the step of using the first control parameter of the first multi-link as the actual control parameter of the target multi-link and correcting the actual control parameter of the target multi-link based on the second control parameter of the second multi-link, the method includes:
[0019] It is determined that the target multi-link is shut down or in standby mode, and a first multi-link and a second multi-link corresponding to the current operating conditions of the target multi-link are determined again in the database.
[0020] According to an embodiment of the present invention, after the step of calling the control parameters corresponding to the current working condition of the target multi-link in the historical data of the target multi-link, the method further comprises:
[0021] Based on the calling control parameter, the actual control parameter of the target multi-connection machine is controlled.
[0022] According to an embodiment of the present invention, after the step of controlling the actual control parameters of the target multi-link based on the calling control parameters, the method further includes:
[0023] Uploading the actual control parameters of the target multi-link to a server;
[0024] Based on the judgment of the server on the working status of the target multi-connection machine, the calling control parameter is continuously obtained to adjust the actual control parameter.
[0025] According to an embodiment of the present invention, the working status includes indoor unit information and outdoor unit information;
[0026] The indoor unit information includes at least one of fan speed, electronic expansion valve opening, and temperature information;
[0027] The outdoor unit information includes at least one of compressor frequency, fan speed, electronic expansion valve opening, solenoid valve opening, and all pressure and temperature information.
[0028] According to an embodiment of the present invention, the database includes location information of the target multi-connection machine, the first multi-connection machine, and the second multi-connection machine.
[0029] A second aspect of the present invention provides a multi-link control device, including:
[0030] An acquisition module, used for acquiring a first working state and a second working state of a target multi-link;
[0031] A determination module, configured to determine that the first working state and the second working state are faults, and to determine a first multi-link and a second multi-link in a database corresponding to the current working state of the target multi-link;
[0032] A calling module, used for calling the calling control parameters corresponding to the current working condition of the target multi-link in the historical data of the target multi-link as the actual control parameters of the target multi-link;
[0033] A control module is used to use the first control parameter of the first multi-link as the actual control parameter of the target multi-link, and to correct the actual control parameter of the target multi-link based on the second control parameter of the second multi-link.
[0034] According to the multi-connection control device provided by the embodiment of the second aspect of the present invention, when it is determined that the target multi-connection system fails, the calling control parameters in the historical data are called as the actual control parameters of the target multi-connection system. When the target multi-connection system fails again, the first control parameter and the second control parameter are selected as the actual control parameters of the target multi-connection system through the control module, thereby ensuring the continuous operation of the target multi-connection system and ensuring the reliability of the continuous operation of the target multi-connection system.
[0035] A third aspect of the present invention provides a multi-link system, including:
[0036] Indoor unit;
[0037] an outdoor unit in fluid communication with the indoor unit;
[0038] A processor is installed in at least one of the indoor unit and the outdoor unit, and the processor implements the above-mentioned multi-split control method when executing a program.
[0039] According to the multi-split system provided by the embodiment of the third aspect of the present invention, the multi-split system can ensure continuous operation of the multi-split system by running the above-mentioned multi-split system control method through the processor, reduce maintenance costs, and improve user experience.
[0040] The above one or more technical solutions in the embodiments of the present invention have at least one of the following technical effects:
[0041] According to the multi-connection control method provided by the embodiment of the first aspect of the present invention, when the first working state of the target multi-connection is a fault, the call control parameters matching the current working conditions in the historical data of the electrophoresis target multi-connection are used as the actual control parameters of the target multi-connection; when the second working state of the target multi-connection is still a fault, it means that the called control parameters cannot match the current operating conditions. At this time, the first control parameters of the first multi-connection and the second control parameters of the second multi-connection corresponding to the current working conditions of the target multi-connection in the database are called, and the first control parameters are used as the actual control parameters of the target multi-connection, and the actual control parameters of the target multi-connection are corrected by the second control parameters. This ensures that the target multi-connection can refer to the first multi-connection and the second multi-connection that match the current working conditions, and makes the adjustment of the actual control parameters of the target multi-connection more accurate, thereby ensuring the continuous operation of the target multi-connection without the need for shutdown operation of the target multi-connection, thereby ensuring the reliability of the continuous operation of the target multi-connection, and will not cause secondary damage to other components due to the use of the multi-connection control method, thereby reducing maintenance costs.
[0042] Furthermore, according to the multi-connection control device provided by the embodiment of the second aspect of the present invention, when it is determined that the target multi-connection system has failed, the calling control parameters in the historical data are called as the actual control parameters of the target multi-connection system. When the target multi-connection system fails again, the control module selects the first control parameter and the second control parameter as the actual control parameters of the target multi-connection system, thereby ensuring the continuous operation of the target multi-connection system and ensuring the reliability of the continuous operation of the target multi-connection system.
[0043] Furthermore, according to the multi-split system provided by the embodiment of the third aspect of the present invention, the multi-split system can ensure continuous operation of the multi-split system by running the above-mentioned multi-split system control method through the processor, thereby reducing maintenance costs and improving the user experience.
[0044] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0046] Figure 1 is a schematic flow chart of a multi-link control method provided by an embodiment of the present invention;
[0047] Figure 2 is a schematic structural diagram of a multi-connected control device provided in an embodiment of the present invention;
[0048] Figure 3 is a schematic structural diagram of an electronic device provided by an embodiment of the present invention.
[0049] Reference numerals:
[0050] 600, processor; 602, communication interface; 604, memory; 606, communication bus; 608, acquisition module; 610, determination module; 612, calling module; 614, control module. DETAILED DESCRIPTION
[0051] The following embodiments of the present invention are described in further detail in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0052] like Figure 1 As shown, a first aspect of the present invention provides a multi-link control method, comprising:
[0053] Step 100, obtaining a first working state of a target multi-link;
[0054] Step 200: determine that the first working state is a fault, and call control parameters corresponding to the current working condition of the target multi-link in historical data of the target multi-link as actual control parameters of the target multi-link;
[0055] Step 300, obtaining the second working state of the target multi-link;
[0056] Step 400, determining that the second working state is a fault, and determining a first multi-link and a second multi-link corresponding to the current working state of the target multi-link in the database;
[0057] Step 500: Based on the first control parameter of the first multi-link as the actual control parameter of the target multi-link, the actual control parameter of the target multi-link is corrected based on the second control parameter of the second multi-link.
[0058] According to the multi-connection control method provided by the embodiment of the first aspect of the present invention, when the first working state of the target multi-connection is a fault, the call control parameters matching the current working conditions in the historical data of the electrophoresis target multi-connection are used as the actual control parameters of the target multi-connection; when the second working state of the target multi-connection is still a fault, it means that the called control parameters cannot match the current operating conditions. At this time, the first control parameters of the first multi-connection and the second control parameters of the second multi-connection corresponding to the current working conditions of the target multi-connection in the database are called, and the first control parameters are used as the actual control parameters of the target multi-connection, and the actual control parameters of the target multi-connection are corrected by the second control parameters. This ensures that the target multi-connection can refer to the first multi-connection and the second multi-connection that match the current working conditions, and makes the adjustment of the actual control parameters of the target multi-connection more accurate, thereby ensuring the continuous operation of the target multi-connection without the need for shutdown operation of the target multi-connection, thereby ensuring the reliability of the continuous operation of the target multi-connection, and will not cause secondary damage to other components due to the use of the multi-connection control method, thereby reducing maintenance costs.
[0059] Please continue to see Figure 1 In step 100, the first working state of the target multi-split unit can be obtained through sensors installed on the multi-split unit. For example, the sensor mentioned here can be a sensor for obtaining the compressor frequency of the outdoor unit, a fan speed sensor, or a sensor for obtaining the opening of the electronic expansion valve of the indoor unit, a temperature sensor, etc.
[0060] It should be noted that the working status mentioned here includes indoor unit information and outdoor unit information.
[0061] Among them, the indoor unit information includes at least one of the fan speed, electronic expansion valve opening, and temperature information; the outdoor unit information includes at least one of the compressor frequency, fan speed, electronic expansion valve opening, solenoid valve opening, and all pressure and temperature information.
[0062] In step 200, based on the first working state of the target multi-connection machine obtained in step 100, it is determined whether the first working state of the target multi-connection machine is a fault. If it is determined that the first working state of the target multi-connection machine is a fault, a call control parameter corresponding to the current working state of the target multi-connection machine in the historical data of the target multi-connection machine is called as an actual control parameter of the target multi-connection machine.
[0063] In this step, when it is determined that the first working state is a fault, the call control parameters corresponding to the current working conditions in the historical data of the target multi-connected machine are first called, and the call control parameters are used as the actual control parameters of the target multi-connected machine to control the target multi-connected machine.
[0064] By setting in this way, it can be ensured that the target multi-link can respond in time and retrieve its own historical data to adjust the actual control parameters of the current target multi-link.
[0065] In step 300, the second working state of the target multi-split machine is again acquired by the sensor installed on the multi-split machine;
[0066] In step 400, based on the second working state of the target multi-connected system obtained in step 300, it is determined whether the second working state of the target multi-connected system is a fault. If it is determined that the second working state of the target multi-connected system is a fault, the first multi-connected system and the second multi-connected system corresponding to the current working condition of the target multi-connected system are determined from the database.
[0067] It can be understood that the first and second multi-links corresponding to the current operating conditions of the target multi-link mentioned here mean the first and second multi-links that are closest to the model type, connection plan, geographical location, and usage nature of the target multi-link.
[0068] According to one embodiment of the present invention, the working status includes indoor unit information and outdoor unit information; the indoor unit information includes at least one of fan speed, electronic expansion valve opening, and temperature information; the outdoor unit information includes at least one of compressor frequency, fan speed, electronic expansion valve opening, solenoid valve opening, and all pressure and temperature information.
[0069] In step 500, based on the first multi-link and the second multi-link determined in step 400, the first control parameter of the first multi-link is selected as the actual control parameter for controlling the target multi-link. This setting ensures that the target multi-link can continue to operate with the first control parameter of the first multi-link that is closest to its current operating condition.
[0070] At the same time, in this step, choosing to call the second control parameters of the second multi-link as the correction value for correcting the actual control parameters of the target multi-link can ensure that the target multi-link can operate more accurately, avoiding instability and mismatch when the target multi-link runs with the first control parameters.
[0071] According to one embodiment of the present invention, after step 500, the following steps are included:
[0072] Step 510, uploading the actual control parameters of the target multi-link to the server;
[0073] Step 520: Based on the server's judgment on the working status of the target multi-link, the first control parameter and the second control parameter are continuously obtained to adjust the actual control parameter.
[0074] In step 510, the modified actual control parameters of the target multi-connection system are transmitted to the server with a tag to save the actual control parameters.
[0075] In step 520, after receiving the marked actual control parameters, the server determines the working status of the target multi-link system, and continuously obtains and transmits the first control parameter and the second control parameter to perform feedback control on the target multi-link system, thereby ensuring the sustainable operation of the target multi-link system.
[0076] When the after-sales personnel arrive at the location of the target multi-connection machine, the communication between the server and the target multi-connection machine can be stopped. After the maintenance personnel completes the maintenance of the faulty target multi-connection machine, the target multi-connection machine can operate normally.
[0077] According to one embodiment of the present invention, after step 500, the following steps are included:
[0078] Step 530, determining whether the target multi-link is shut down or in standby mode, and again determining the first multi-link and the second multi-link in the database corresponding to the current operating conditions of the target multi-link.
[0079] In this step, it is determined that the target multi-link is shut down or on standby, proving that the current first control parameter and the second control parameter are not suitable as the actual control parameters of the target multi-link. At this time, the first multi-link and the second multi-link corresponding to the current operating conditions of the target multi-link are retrieved from the database again, and the first control parameters of the first multi-link and the second control parameters of the second multi-link that are retrieved again are used as new actual control parameters and correction parameters to complete the control of the target multi-link.
[0080] By setting in this way, it can be ensured that the target multi-link can match the optimal actual control parameters to ensure that the target multi-link is always in the optimal working state.
[0081] According to one embodiment of the present invention, after step 200, the method further includes:
[0082] Step 210, based on the called control parameters, control the actual control parameters of the target multi-link.
[0083] In step 210, when it is determined that the first working state of the target multi-connection machine is a fault, a call control parameter corresponding to the current working state of the target multi-connection machine in the historical data of the target multi-connection machine may also be called;
[0084] According to one embodiment of the present invention, after step 210, the following steps are included:
[0085] Step 220, uploading the actual control parameters of the target multi-link to the server;
[0086] Step 230, based on the server's judgment on the working status of the target multi-connection system, continuously obtain the call control parameters to adjust the actual control parameters.
[0087] In step 220, the actual control parameters of the target multi-connected system are transmitted to the server with a mark to save the actual control parameters so that the next time the target multi-connected system fails, the stored actual control parameters can be directly called for operation.
[0088] In step 230, based on the server's judgment of the target multi-connection's working state, the server continuously obtains the call control parameters, and implements the control of the target multi-connection based on the call control parameters. That is, if the working state of the target multi-connection is normal, the call control parameters can be continuously performed.
[0089] According to an embodiment of the present invention, the database includes location information of the target multi-connection machine, the first multi-connection machine, and the second multi-connection machine.
[0090] It is understandable that the information in the database may also include information according to global longitude and latitude and specific geographical locations.
[0091] See also Figure 2 The second aspect of the present invention provides a multi-link control device, including:
[0092] An acquisition module 608 is used to acquire a first working state and a second working state of a target multi-link;
[0093] A determination module 610 is used to determine that the first working state and the second working state are faults, and determine a first multi-link and a second multi-link corresponding to the current working state of the target multi-link in the database;
[0094] A calling module 612 is used to call the calling control parameters corresponding to the current working conditions of the target multi-link in the historical data of the target multi-link as the actual control parameters of the target multi-link;
[0095] The control module 614 is used to use the first control parameter of the first multi-link as the actual control parameter of the target multi-link, and to correct the actual control parameter of the target multi-link based on the second control parameter of the second multi-link.
[0096] According to the multi-connection control device provided by the embodiment of the second aspect of the present invention, when it is determined that the target multi-connection fails, the call control parameters in the historical data are called as the actual control parameters of the target multi-connection. When the target multi-connection fails again, the control module 614 selects the first control parameter and the second control parameter as the actual control parameters of the target multi-connection, thereby ensuring the continuous operation of the target multi-connection and ensuring the reliability of the continuous operation of the target multi-connection.
[0097] A third aspect of the present invention provides a multi-link system, including:
[0098] Indoor unit;
[0099] an outdoor unit in fluid communication with the indoor unit;
[0100] Processor 600, the processor 600 is installed in at least one of the indoor unit and the outdoor unit, and the processor 600 implements the above-mentioned multi-split control method when executing the program.
[0101] According to the multi-split system provided by the third aspect of the present invention, the processor 600 runs the multi-split system control method, which can ensure the continuous operation of the multi-split system, reduce maintenance costs, and improve the user experience. ,3 exemplifies a physical structure diagram of an electronic device, such as Figure 3 As shown, the electronic device may include: a processor 600 (processor), a communication interface 602 (Communications Interface), a memory 604 (memory) and a communication bus 606, wherein the processor 600, the communication interface 602, and the memory 604 communicate with each other through the communication bus 606. The processor 600 may call the logic instructions in the memory 604 to execute the following method:
[0102] Obtaining the first working state of the target multi-link;
[0103] Determining that the first working state is a fault, calling a call control parameter corresponding to the current working condition of the target multi-connected machine in the historical data of the target multi-connected machine as an actual control parameter of the target multi-connected machine;
[0104] Acquire a second working state of the target multi-link;
[0105] Determining that the second working state is a fault, and determining a first multi-link and a second multi-link corresponding to the current working state of the target multi-link in a database;
[0106] The actual control parameter of the target multi-connection system is taken as the first control parameter of the first multi-connection system, and the actual control parameter of the target multi-connection system is corrected based on the second control parameter of the second multi-connection system.
[0107] In addition, the logic instructions in the above-mentioned memory 604 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the relevant technology or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods of various embodiments of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory 604 (ROM, Read-Only Memory), random access memory 604 (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.
[0108] An embodiment of the present invention discloses a computer program product, which includes a computer program stored on a non-transitory computer-readable storage medium. The computer program includes program instructions. When the program instructions are executed by a computer, the computer can perform the methods provided by the above method embodiments, for example, including:
[0109] Obtaining the first working state of the target multi-link;
[0110] Determining that the first working state is a fault, calling a call control parameter corresponding to the current working condition of the target multi-connected machine in the historical data of the target multi-connected machine as an actual control parameter of the target multi-connected machine;
[0111] Acquire a second working state of the target multi-link;
[0112] Determining that the second working state is a fault, and determining a first multi-link and a second multi-link corresponding to the current working state of the target multi-link in a database;
[0113] The actual control parameter of the target multi-connection system is taken as the first control parameter of the first multi-connection system, and the actual control parameter of the target multi-connection system is corrected based on the second control parameter of the second multi-connection system.
[0114] On the other hand, an embodiment of the present invention further provides a non-transitory computer-readable storage medium on which a computer program is stored. When the computer program is executed by the processor 600, the transmission method provided in the above embodiments is implemented, for example, including:
[0115] Obtaining the first working state of the target multi-link;
[0116] Determining that the first working state is a fault, calling a call control parameter corresponding to the current working condition of the target multi-connected machine in the historical data of the target multi-connected machine as an actual control parameter of the target multi-connected machine;
[0117] Acquire a second working state of the target multi-link;
[0118] Determining that the second working state is a fault, and determining a first multi-link and a second multi-link corresponding to the current working state of the target multi-link in a database;
[0119] The actual control parameter of the target multi-connection system is taken as the first control parameter of the first multi-connection system, and the actual control parameter of the target multi-connection system is corrected based on the second control parameter of the second multi-connection system.
[0120] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.
[0121] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, by hardware. Based on this understanding, the above technical solution can be essentially or in other words, the part that contributes to the relevant technology can be embodied in the form of a software product, which can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiment.
[0122] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A multi-link control method, characterized in that: include: Obtaining the first working state of the target multi-link; Determining that the first working state is a fault, calling a call control parameter corresponding to the current working condition of the target multi-connected machine in the historical data of the target multi-connected machine as an actual control parameter of the target multi-connected machine; The second working state of the target multi-link is obtained again. When the second working state of the target multi-link is still faulty, it indicates that the calling control parameter cannot match the current operating condition, and the first multi-link and the second multi-link corresponding to the current operating condition of the target multi-link are determined in the database; The actual control parameter of the target multi-connection system is taken as the first control parameter of the first multi-connection system, and the actual control parameter of the target multi-connection system is corrected based on the second control parameter of the second multi-connection system.
2. The multi-link control method according to claim 1, characterized in that: The step of determining the first multi-link and the second multi-link corresponding to the current operating condition of the target multi-link in the database includes: The first multi-link, the second multi-link and the target multi-link have the same operating condition parameter of machine type, connection scheme, geographical location and usage properties.
3. The control method of a multi-link system according to claim 2, characterized in that: After the step of using the first control parameter of the first multi-link as the actual control parameter of the target multi-link and correcting the actual control parameter of the target multi-link based on the second control parameter of the second multi-link, the method includes: Uploading the actual control parameters of the target multi-link to a server; Based on the judgment of the server on the working status of the target multi-link, the first control parameter and the second control parameter are continuously obtained to adjust the actual control parameter.
4. The control method of a multi-link system according to claim 1, characterized in that: After the step of using the first control parameter of the first multi-link as the actual control parameter of the target multi-link and correcting the actual control parameter of the target multi-link based on the second control parameter of the second multi-link, the method includes: It is determined that the target multi-link is shut down or in standby mode, and a first multi-link and a second multi-link corresponding to the current operating conditions of the target multi-link are determined again in the database.
5. The control method of a multi-link machine according to any one of claims 1 to 4, characterized in that: After the step of calling the control parameters corresponding to the current working condition of the target multi-link in the historical data of the target multi-link, the method further comprises: Based on the calling control parameter, the actual control parameter of the target multi-connection machine is controlled.
6. The control method of a multi-link system according to claim 5, characterized in that: After the step of controlling the actual control parameters of the target multi-connection machine based on the calling control parameters, the method further comprises: Uploading the actual control parameters of the target multi-link to a server; Based on the judgment of the server on the working status of the target multi-connection machine, the calling control parameter is continuously obtained to adjust the actual control parameter.
7. The control method of a multi-link machine according to any one of claims 1 to 4, characterized in that: The working status includes indoor unit information and outdoor unit information; The indoor unit information includes at least one of fan speed, electronic expansion valve opening, and temperature information; The outdoor unit information includes at least one of compressor frequency, fan speed, electronic expansion valve opening, solenoid valve opening, and all pressure and temperature information.
8. The control method of a multi-link machine according to any one of claims 1 to 4, characterized in that: The database includes location information of the target multi-connection machine, the first multi-connection machine, and the second multi-connection machine.
9. A control device for a multi-split system for implementing the control method for a multi-split system according to any one of claims 1 to 8, characterized in that: include: An acquisition module (608), used for acquiring a first working state and a second working state of a target multi-link; A determination module (610) is used to determine that the first working state and the second working state are faults, and to determine a first multi-link and a second multi-link in a database corresponding to the current working state of the target multi-link; A calling module (612) is used to call the calling control parameters corresponding to the current working conditions of the target multi-link in the historical data of the target multi-link as the actual control parameters of the target multi-link; A control module (614) is used to use the first control parameter of the first multi-connection system as the actual control parameter of the target multi-connection system, and to correct the actual control parameter of the target multi-connection system based on the second control parameter of the second multi-connection system.
10. A multi-link system, characterized in that: include: Indoor unit; an outdoor unit in fluid communication with the indoor unit; A processor (600), the processor (600) being installed in at least one of the indoor unit and the outdoor unit, and the processor (600) implementing the control method of the multi-split unit according to any one of claims 1 to 8 when executing a program.