A temporary construction access road for mountainous areas and its construction method
By using hinged rods, rotating shafts, filter mesh and geotextile structures in the temporary construction walkway in the Chongqing Mountain area, the problems of extended construction period and insufficient support in the existing technology have been solved, and rapid and stable construction of walkways and efficient construction efficiency have been achieved.
Patent Information
- Application Number
- CN202211642051.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-20
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-12-20
AI Technical Summary
The prior art requires leveling the road during the construction of temporary construction walkways in Chongqing area, resulting in extended construction period and insufficient support strength, resulting in easy depression of the walkways, affecting construction efficiency and safety.
The structure includes foundation steel plate, hinged rod, rotary shaft, clamp, filter mesh, geotextile and mud-corrosive gravel layer. The foundation steel plate is fixed by hinged and fitted sockets, combining the fixing mechanism of permanent magnets and screws to simplify the The laying process ensures support strength and prevents water erosion through slope formation.
There is no need to level the road, which greatly shortens the construction period, improves the support strength of the walkway, avoids depression, simplifies the installation and disassembly of geotextiles, and reduces costs and resource waste.
Smart Images

Figure CN116005511B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of temporary road construction, and in particular to a temporary construction temporary road used in mountainous areas and a construction method thereof. Background Art
[0002] People usually call mountainous areas, hilly areas, and relatively rugged plateaus mountainous areas. Compared with plains, mountainous areas are not very suitable for agricultural development and are prone to soil erosion. However, some areas with relatively good water and heat conditions can vigorously develop forestry and animal husbandry, and can also be developed into tourist areas to increase income for local people. Due to the rugged terrain, transportation is not suitable for popularization and infrastructure construction is difficult, so temporary construction access roads need to be built during construction in mountainous areas.
[0003] After searching, Chinese patent number CN110284393A discloses a method for constructing a temporary road on a soft foundation of peat soil. Although the overall stability of the temporary road is enhanced, it is resistant to water erosion, and the raw materials such as sandbags used are low in cost and easy to obtain, the method is highly safe and beneficial to ecological protection. However, the road needs to be leveled during its construction, so the road needs to be measured and leveled, which greatly prolongs the construction period of the temporary construction temporary road. At the same time, the supporting strength of the road after leveling cannot be guaranteed, making the temporary construction road easy to sink, affecting construction operations, and bringing about the problem of method defects. Summary of the invention
[0004] The purpose of the present invention is to solve the defects in the prior art and to propose a temporary construction access road and a construction method thereof for mountainous areas.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A temporary construction access road for mountainous areas, comprising a foundation steel plate, wherein two ends of the foundation steel plate are respectively fixedly connected with a hinge rod one and a hinge rod two, the end face of the hinge rod two is provided with a through hole, a rotating shaft is fitted and sleeved in the through hole, a clamping strip is fixedly connected to the outer surface of the rotating shaft, and a connecting block is fixedly connected to the side wall of the foundation steel plate, a fixing rod is meshingly sleeved in the connecting block, a supporting tube is fixedly connected to the bottom surface of the foundation steel plate, a supporting rod is slidably sleeved in the supporting tube, a foot pad is fixedly connected to the other end of the supporting rod, and a positioning groove is provided through the outer surface of the support rod, a cross bar is fitted and sleeved in the positioning groove.
[0007] Furthermore, a through groove is formed on the top surface of the base steel plate, a filter is fixedly connected to the inner surface of the through groove, the hinged rod 1 and the hinged rod 2 are hinged to each other, the rotating shaft passes through the hinged rod 1 and the hinged rod 2 respectively, the clamping strip is clamped to the inner surface of the through hole, and the clamping strip is evenly distributed about the central axis of the rotating shaft.
[0008] Furthermore, the cross bar is connected to the support tube, the positioning groove is composed of a plurality of circular holes, and the distance between the centers of the circular holes is equal to the radius of the circular holes.
[0009] Furthermore, the top surface of the base steel plate is respectively provided with a card slot one and a card slot two, the bottom surface of the card slot one is fixedly connected with a permanent magnet one, the top surface of the permanent magnet one is adsorbed with a permanent magnet two, the other end of the permanent magnet two is fixedly connected with a geotextile, the other side of the geotextile is paved with a hilltop soil layer, the other side of the hilltop soil layer is paved with a mud-bound gravel layer, and both sides of the geotextile are fixedly sleeved with fixing columns, a cavity is provided in the fixing column, the top wall of the cavity is meshingly sleeved with a screw, the bottom surface of the screw is contacted and connected with a pressure block, a spring is installed between the pressure block and the bottom surface of the cavity, and a connecting rod is hinged on the outer surface of the pressure block, and the other end of the connecting rod is hinged with a card rod.
[0010] Furthermore, a clamping hole is formed on the inner surface of the second clamping slot, and the clamping hole is clamped with a clamping rod. The clamping rod penetrates the outer surface of the fixing column, and the clamping rod is evenly distributed about the central axis of the fixing column.
[0011] Furthermore, the pressing block is slidably sleeved with the inner surface of the cavity, and the geotextile is fixedly connected with the foundation steel plate through a fixing column, a clamping rod and a clamping groove.
[0012] Furthermore, the first and second card slots are alternately distributed, and the geotextile is fixedly connected to the base steel plate via the second permanent magnet, the first permanent magnet and the first card slot.
[0013] A method for constructing a temporary construction access road in a mountainous area, wherein the specific steps of the method for constructing a temporary construction access road in a mountainous area are as follows:
[0014] Step 1: Laying the foundation steel plate: After transporting the foundation steel plate to the designated location, arrange the hinged rod 1 on the foundation steel plate corresponding to the hinged rod 2 on the next foundation steel plate, and then determine the maximum elevation of the ground undulation in the heavy mountainous area, and determine the height of the foundation steel plate based on this maximum elevation. At this time, the foundation steel plate is hoisted and suspended in the air, and is on the same horizontal plane as the maximum elevation. Then, the cross bar on the support tube is pulled out, so that the cross bar releases the fixation of the support tube and the support rod, so that the support rod and the foot pad fall naturally and contact the ground in the heavy mountainous area. At this time, the cross bar is inserted into the outer surface of the support tube, and is engaged with the positioning groove on the support rod, so that the cross bar is re-fixed. The support tube and the support rod are fixed, and the foot pads on the support rods fit the ground undulations in the heavy mountainous area, and then the foundation steel plate is pressed down until the foundation steel plate can no longer sink, and the fixing of the foundation steel plate is completed. According to the above process, the foundation steel plates are fixed in sequence, and the hinge rod 1 is hinged with the hinge rod 2, and then the rotating shaft is inserted into the through hole, and passes through the hinge rod 1 and the hinge rod 2 until the card strip contacts the through hole. At this time, the end of the rotating shaft is hammered by a hammer, so that the rotating shaft drives the card strip to be embedded in the through hole, so that the rotating shaft and the hinge rod 2 are fixed, so that the foundation steel plates are connected in sequence, and finally the fixing rod on the connecting block is drilled into the ground in the heavy mountainous area, and the laying of the foundation steel plate is completed;
[0015] Step 2: Fix the geotextile: insert the permanent magnet 2 on the geotextile into the slot 1, and make the permanent magnet 2 adsorb to the permanent magnet 1, then insert the fixing column into the slot 2, and turn the screw on it to make the screw rotate and descend, so that the clamping rod extends out of the fixing column and engages with the clamping hole on the slot 2, so that the fixing column is fixed to the slot 2, and the geotextile is fixed;
[0016] Step 3: Laying the mountain soil layer: Spread the mountain soil produced by the construction of the heavy mountain area on the geotextile and compact it to form a mountain soil layer. Repeat the above operation until the thickness of the compacted mountain soil layer reaches 15 to 20 cm, and the laying of the mountain soil layer is completed;
[0017] Step 4: Laying the mud-bound gravel layer: Lay the mud-bound gravel layer on the hillside soil layer and compact it until the mud-bound gravel layer reaches 10 to 15 cm, thus completing the laying of the mud-bound gravel layer;
[0018] Step 5: Post-processing: pile up the mud-bound gravel layer around the mud-bound gravel layer and compact it, so as to form a slope around the mud-bound gravel layer, thus completing the construction of the temporary construction access road in the mountainous area.
[0019] Furthermore, in step 5, the slope ratio of the slopes on both sides of the mud-bonded gravel layer to the slopes at both ends is 3:4.
[0020] Compared with the prior art, the present invention has the following beneficial effects:
[0021] 1. The present invention removes the cross bar on the support tube so that the cross bar releases the fixation of the support tube and the support rod, allowing the support rod and the foot pad to fall naturally and contact the ground in the heavy mountain area. At this time, the cross bar is inserted into the outer surface of the support tube and is engaged with the positioning groove on the support rod, so that the cross bar fixes the support tube and the support rod again. At the same time, the foot pad on the support rod fits the ground undulations in the heavy mountain area, and then presses down the basic steel plate until the basic steel plate can no longer sink, thereby achieving the purpose of fixing the basic steel plate. Therefore, there is no need to level the ground in the heavy mountain area, and there is no need to measure and level the road, which greatly shortens the construction period of the temporary construction access road. At the same time, the basic steel plate ensures the supporting strength of the temporary construction access road, making the temporary construction access road not easy to sink, thereby ensuring construction operations.
[0022] 2. The present invention uses a hammer to hit the end of the rotating shaft so that the rotating shaft drives the card strip to embed into the through hole, thereby fixing the rotating shaft and the hinge rod 2. At the same time, the rotating shaft passes through the hinge rod 1 and the hinge rod 2 to achieve the purpose of connecting the basic steel plates in sequence. Finally, the fixing rod on the connecting block is drilled into the ground in the mountainous area to achieve the purpose of fixing the basic steel plate. In this process, the basic steel plate can be disassembled or reassembled, which is convenient for the transportation and installation of the basic steel plate. At the same time, it can be reused, saving cost consumption and avoiding waste of resources.
[0023] 3. The present invention achieves preliminary fixation of the geotextile to the foundation steel plate by engaging the permanent magnet No. 2 with the card slot No. 1 and making the permanent magnet No. 2 adsorb with the permanent magnet No. 1. At this time, the fixing column on the geotextile should be located above the card slot No. 2. The fixing column is then inserted into the card slot No. 2, and the screw thereon is rotated to make the screw rotate and descend, and press the pressure block downward, so that the pressure block compresses the spring while driving one end of the connecting rod to descend, so that the other end of the connecting rod pushes the card rod to extend out of the fixing column and engage with the card hole on the card slot No. 2, thereby fixing the fixing column to the card slot No. 2, further fixing the geotextile and the foundation steel plate, and achieving the purpose of fixing the geotextile, making the installation and disassembly of the geotextile simple and easy, without destroying the geotextile, thereby facilitating the removal of temporary construction access roads, not only reducing the investment in labor costs, but also reducing the investment in geotextile costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the embodiments of the present invention and do not constitute a limitation of the present invention.
[0025] Figure 1 This is a schematic diagram of the overall structure of a temporary construction access road for mountainous areas proposed by the present invention;
[0026] Figure 2 A temporary construction access road for heavy mountainous areas proposed by the present invention Figure 1 A magnified view of the structure of part A;
[0027] Figure 3 A temporary construction access road for heavy mountainous areas proposed by the present invention Figure 1 A magnified view of the structure of part B;
[0028] Figure 4 This is a cross-sectional view of a fixed column structure for a temporary construction access road in a mountainous area proposed by the present invention;
[0029] Figure 5 This is a front view of a foundation steel plate for a temporary construction access road in a mountainous area proposed by the present invention;
[0030] Figure 6 This is a left view of a support rod structure for a temporary construction access road in a mountainous area proposed by the present invention;
[0031] Figure 7 The present invention is a schematic flow chart of a method for constructing a temporary construction access road in mountainous areas.
[0032] In the figure: 1. foundation steel plate; 2. through groove; 3. filter screen; 4. hinged rod 1; 5. hinged rod 2; 6. through hole; 7. rotating shaft; 8. clamping strip; 9. clamping slot 1; 10. clamping slot 2; 11. permanent magnet 1; 12. permanent magnet 2; 13. geotextile; 14. fixing column; 15. cavity; 16. screw rod; 17. pressure block; 18. spring; 19. connecting rod; 20. clamping rod; 21. clamping hole; 22. connecting block; 23. fixing rod; 24. mountain soil layer; 25. mud-bound gravel layer; 26. support tube; 27. support rod; 28. foot pad; 29. positioning groove; 30. cross bar. DETAILED DESCRIPTION
[0033] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0034] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0035] Embodiment 1:
[0036] See also Figure 1-Figure 6The present invention provides a technical solution: a temporary construction access road for heavy mountainous areas, comprising a foundation steel plate 1, two ends of the foundation steel plate 1 are respectively fixedly connected with a hinge rod 1 4 and a hinge rod 2 5, the end surface of the hinge rod 2 5 is provided with a through hole 6, a rotating shaft 7 is fitted and sleeved in the through hole 6, a clamping strip 8 is fixedly connected to the outer surface of the rotating shaft 7, and a connecting block 22 is fixedly connected to the side wall of the foundation steel plate 1, a fixing rod 23 is meshed and sleeved in the connecting block 22, a supporting tube 26 is fixedly connected to the bottom surface of the foundation steel plate 1, a supporting rod 27 is slidably sleeved in the supporting tube 26, a foot pad 28 is fixedly connected to the other end of the supporting rod 27, and the supporting rod 2 The outer surface of 7 is penetrated with a positioning groove 29, and a cross bar 30 is inserted and sleeved in the positioning groove 29. The top surface of the basic steel plate 1 is penetrated with a through groove 2, and the inner surface of the through groove 2 is fixed with a filter 3. The hinge rod 1 4 and the hinge rod 2 5 are hinged to each other. The rotating shaft 7 passes through the hinge rod 1 4 and the hinge rod 2 5 respectively. The card strip 8 is clamped with the inner surface of the through hole 6, and the card strip 8 is evenly distributed about the central axis of the rotating shaft 7. The cross bar 30 is connected with the support cylinder 26. The positioning groove 29 is composed of a plurality of circular holes, and the center distance of the circular holes is equal to the radius of the circular holes. The top surface of the basic steel plate 1 is respectively provided with a card slot 1 9 and a card slot 2 10, a permanent magnet 11 is fixedly connected to the bottom surface of the card slot 19, a permanent magnet 2 12 is adsorbed on the top surface of the permanent magnet 11, a geotextile 13 is fixedly connected to the other end of the permanent magnet 2 12, a mountain soil layer 24 is laid on the other side of the geotextile 13, a mud-bound gravel layer 25 is laid on the other side of the mountain soil layer 24, and a fixed column 14 is fixedly sleeved on both sides of the geotextile 13, a cavity 15 is opened in the fixed column 14, a screw 16 is meshed and sleeved on the top wall of the cavity 15, a pressing block 17 is contacted and connected to the bottom surface of the screw 16, a spring 18 is installed between the pressing block 17 and the bottom surface of the cavity 15, and the pressing block 17 A connecting rod 19 is hinged on the outer surface, and a clamping rod 20 is hinged on the other end of the connecting rod 19. A clamping hole 21 is opened on the inner surface of the clamping slot 10, and the clamping hole 21 is clamped with the clamping rod 20. The clamping rod 20 passes through the outer surface of the fixed column 14, and the clamping rod 20 is evenly distributed about the central axis of the fixed column 14. The pressing block 17 is slidably sleeved with the inner surface of the cavity 15. The geotextile 13 is fixed to the base steel plate 1 through the fixed column 14, the clamping rod 20 and the clamping slot 10. The clamping slot 1 9 and the clamping slot 2 10 are alternately distributed. The geotextile 13 is fixed to the base steel plate 1 through the permanent magnet 2 12, the permanent magnet 1 11 and the clamping slot 1 9.
[0037] Specifically, in the process of building a temporary construction access road in a heavy mountain area, after the foundation steel plate 1 is transported to the designated location, the hinged rod 1 4 on the foundation steel plate 1 is arranged correspondingly to the hinged rod 2 5 on the next foundation steel plate 1, and then the maximum elevation of the ground undulation in the heavy mountain area is determined, and the height of the foundation steel plate 1 is determined according to the maximum elevation. At this time, the foundation steel plate 1 is hoisted and suspended in the air and is located on the same horizontal plane as the maximum elevation, and then the cross bar 30 on the support tube 26 is pulled out, so that the cross bar 30 releases the fixation of the support tube 26 and the support rod 27, so that the support rod 27 and the foot pad 28 fall naturally and contact with the ground in the heavy mountain area, and then The cross bar 30 is inserted into the outer surface of the support tube 26 and is engaged with the positioning groove 29 on the support rod 27, so that the cross bar 30 re-fixes the support tube 26 and the support rod 27. At the same time, the foot pad 28 on the support rod 27 fits the ground undulations in the heavy mountainous area, and then presses down the basic steel plate 1 until the basic steel plate 1 can no longer sink, thereby achieving the purpose of fixing the basic steel plate 1, thereby eliminating the need to level the ground in the heavy mountainous area and eliminating the need to measure and level the road. This greatly shortens the construction period of the temporary construction access road, and at the same time, the basic steel plate 1 ensures the supporting strength of the temporary construction access road, making the temporary construction access road not easy to sink, thereby ensuring construction operations.
[0038] Embodiment 2:
[0039] See also Figure 7 The present invention provides a technical solution: a method for constructing a temporary construction access road in a mountainous area. The specific steps of the method for constructing a temporary construction access road in a mountainous area are as follows:
[0040] Step 1: Laying the foundation steel plate: After transporting the foundation steel plate to the designated location, arrange the hinged rod 1 on the foundation steel plate corresponding to the hinged rod 2 on the next foundation steel plate, and then determine the maximum elevation of the ground undulation in the heavy mountainous area, and determine the height of the foundation steel plate based on this maximum elevation. At this time, the foundation steel plate is hoisted and suspended in the air, and is on the same horizontal plane as the maximum elevation. Then, the cross bar on the support tube is pulled out, so that the cross bar releases the fixation of the support tube and the support rod, so that the support rod and the foot pad fall naturally and contact the ground in the heavy mountainous area. At this time, the cross bar is inserted into the outer surface of the support tube, and is engaged with the positioning groove on the support rod, so that the cross bar is re-fixed. The support tube and the support rod are fixed, and the foot pads on the support rods fit the ground undulations in the heavy mountainous area, and then the foundation steel plate is pressed down until the foundation steel plate can no longer sink, and the fixing of the foundation steel plate is completed. According to the above process, the foundation steel plates are fixed in sequence, and the hinge rod 1 is hinged with the hinge rod 2, and then the rotating shaft is inserted into the through hole, and passes through the hinge rod 1 and the hinge rod 2 until the card strip contacts the through hole. At this time, the end of the rotating shaft is hammered by a hammer, so that the rotating shaft drives the card strip to be embedded in the through hole, so that the rotating shaft and the hinge rod 2 are fixed, so that the foundation steel plates are connected in sequence, and finally the fixing rod on the connecting block is drilled into the ground in the heavy mountainous area, and the laying of the foundation steel plate is completed;
[0041] Step 2: Fix the geotextile: insert the permanent magnet 2 on the geotextile into the slot 1, and make the permanent magnet 2 adsorb to the permanent magnet 1, then insert the fixing column into the slot 2, and turn the screw on it to make the screw rotate and descend, so that the clamping rod extends out of the fixing column and engages with the clamping hole on the slot 2, so that the fixing column is fixed to the slot 2, and the geotextile is fixed;
[0042] Step 3: Laying the mountain soil layer: Spread the mountain soil produced by the construction of the heavy mountain area on the geotextile and compact it to form a mountain soil layer. Repeat the above operation until the thickness of the compacted mountain soil layer reaches 15cm, and the laying of the mountain soil layer is completed;
[0043] Step 4: Laying the mud-bound gravel layer: Lay the mud-bound gravel layer on the hillside soil layer and compact it until the mud-bound gravel layer reaches 10 cm, which means the laying of the mud-bound gravel layer is completed;
[0044] Step 5: Post-processing: pile up mud-bonded gravel layers around the mud-bonded gravel layer and compact them to form slopes around the mud-bonded gravel layer, thus completing the construction of temporary construction access roads in mountainous areas. The slope ratio of the slopes on both sides of the mud-bonded gravel layer to the slopes at both ends is 3:4.
[0045] Specifically, in the process of fixing the geotextile, the permanent magnet 2 12 on the geotextile 13 is inserted into the slot 1 9, and the permanent magnet 2 12 is adsorbed with the permanent magnet 1 11, so that the geotextile 13 is initially fixed to the base steel plate 1. At this time, the fixing column 14 on the geotextile 13 should be located above the slot 2 10, and then the fixing column 14 is inserted into the slot 2 10, and the screw 16 thereon is rotated so that the screw 16 rotates and descends, and the pressing block 17 is pressed down, so that the pressing block 17 compresses the spring 18 while driving the connecting rod 1 9 drops, so that the other end of the connecting rod 19 pushes the clamping rod 20 to extend out of the fixing column 14 and engages with the clamping hole 21 on the clamping slot 10, so that the fixing column 14 is fixed to the clamping slot 10, further fixing the geotextile 13 and the foundation steel plate 1, thereby achieving the purpose of fixing the geotextile 13, making the installation and disassembly of the geotextile 13 simple and easy, without destroying the geotextile 13, thereby facilitating the dismantling of the temporary construction access road, not only reducing the investment in labor costs, but also reducing the investment in the cost of the geotextile 13.
[0046] The working principle and use process of the present invention are as follows: when constructing a temporary construction access road in a heavy mountain area, after transporting the foundation steel plate 1 to the designated location, the hinged rod 1 4 on the foundation steel plate 1 is arranged correspondingly to the hinged rod 2 5 on the next foundation steel plate 1, and then the maximum elevation of the ground undulation in the heavy mountain area is determined, and the height of the foundation steel plate 1 is determined according to the maximum elevation. At this time, the foundation steel plate 1 is hoisted and suspended in the air and is located on the same horizontal plane as the maximum elevation, and then the cross bar 30 on the support tube 26 is pulled out, so that the cross bar 30 releases the fixation of the support tube 26 and the support rod 27, so that the support rod 27 and the foot pad 28 fall naturally and contact the ground in the heavy mountain area. At this time, the cross bar 30 is inserted into the outer surface of the support tube 26 and is engaged with the positioning groove 29 on the support rod 27, so that the cross bar 30 fixes the support tube 26 and the support rod 27 again, and at the same time, the foot pad 28 on the support rod 27 fits the ground undulations in the heavy mountain area, and then presses down the base steel plate 1 until the base steel plate 1 can no longer sink, so as to achieve the purpose of fixing the base steel plate 1, so that there is no need to level the ground in the heavy mountain area, and there is no need to measure and level the road, which greatly shortens the construction period of the temporary construction access road. At the same time, the base steel plate 1 ensures the supporting strength of the temporary construction access road, so that the temporary construction access road is not easy to sink, and the construction operation is guaranteed;
[0047] According to the above process, the basic steel plate 1 is fixed in sequence, and the hinge rod 1 4 is hinged with the hinge rod 2 5, and then the rotating shaft 7 is inserted into the through hole 6, and passes through the hinge rod 1 4 and the hinge rod 2 5, until the clamping strip 8 contacts the through hole 6, and then the end of the rotating shaft 7 is hammered by a hammer, so that the rotating shaft 7 drives the clamping strip 8 to embed into the through hole 6, so that the rotating shaft 7 and the hinge rod 2 5 are fixed, so as to achieve the purpose of connecting the basic steel plates 1 in sequence, and finally the fixing rod 23 on the connecting block 22 is drilled into the ground in the heavy mountainous area, so as to achieve the purpose of fixing the basic steel plate 1. In this process, the basic steel plate 1 can be disassembled or reassembled, which is convenient for the transportation and installation of the basic steel plate 1, and can be reused, saving cost consumption and avoiding waste of resources;
[0048] In the process of fixing the geotextile 13, the permanent magnet 2 12 on the geotextile 13 is inserted into the slot 1 9, and the permanent magnet 2 12 is adsorbed with the permanent magnet 1 11, so that the geotextile 13 is initially fixed to the foundation steel plate 1. At this time, the fixing column 14 on the geotextile 13 should be located above the slot 2 10, and then the fixing column 14 is inserted into the slot 2 10, and the screw 16 thereon is rotated so that the screw 16 rotates and descends, and the pressing block 17 is pressed down, so that the pressing block 17 compresses the spring 18 while driving one side of the connecting rod 19. The first end of the connecting rod 19 descends, so that the other end of the connecting rod 19 pushes the clamping rod 20 to extend out of the fixing column 14 and engages with the clamping hole 21 on the clamping slot 10, so that the fixing column 14 is fixed to the clamping slot 10, and the geotextile 13 and the foundation steel plate 1 are further fixed, so as to achieve the purpose of fixing the geotextile 13, and make the installation and disassembly of the geotextile 13 simple and easy, without destroying the geotextile 13, so as to facilitate the dismantling of the temporary construction access road, which not only reduces the investment in labor cost, but also reduces the investment in the cost of geotextile 13, and completes the operation.
[0049] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A temporary construction access road for mountainous areas, characterized in that: The base steel plate (1) comprises a base steel plate (1), wherein two ends of the base steel plate (1) are respectively fixedly connected with a hinge rod 1 (4) and a hinge rod 2 (5), the end surface of the hinge rod 2 (5) is provided with a through hole (6), a rotating shaft (7) is sleeved and engaged in the through hole (6), and a clamping strip (8) is fixedly connected to the outer surface of the rotating shaft (7); a connecting block (22) is fixedly connected to the side wall of the base steel plate (1), a fixing rod (23) is sleeved and engaged in the connecting block (22), a supporting tube (26) is fixedly connected to the bottom surface of the base steel plate (1), a supporting rod (27) is slidably sleeved in the supporting tube (26), a foot pad (28) is fixedly connected to the other end of the supporting rod (27), and a positioning groove (29) is provided through the outer surface of the supporting rod (27), and a cross bar (30) is sleeved and engaged in the positioning groove (29); The top surface of the base steel plate (1) is respectively provided with a first card slot (9) and a second card slot (10); the bottom surface of the first card slot (9) is fixedly connected to a first permanent magnet (11); the top surface of the first permanent magnet (11) is adsorbed with a second permanent magnet (12); the other end of the second permanent magnet (12) is fixedly connected to a geotextile (13); the other side of the geotextile (13) is paved with a mountain soil layer (24); the other side of the mountain soil layer (24) is paved with a mud-bound gravel layer (25); and the geotextile Both sides of (13) are fixedly sleeved with fixing columns (14), a cavity (15) is defined in the fixing columns (14), a screw rod (16) is meshedly sleeved on the top wall of the cavity (15), a pressure block (17) is contacted and connected to the bottom surface of the screw rod (16), a spring (18) is installed between the pressure block (17) and the bottom surface of the cavity (15), and a connecting rod (19) is hingedly connected to the outer surface of the pressure block (17), and a clamping rod (20) is hingedly connected to the other end of the connecting rod (19); The inner surface of the second clamping slot (10) is provided with a clamping hole (21), the clamping hole (21) is clamped with a clamping rod (20), the clamping rod (20) penetrates the outer surface of the fixing column (14), and the clamping rod (20) is evenly distributed about the central axis of the fixing column (14); The pressing block (17) is slidably sleeved with the inner surface of the cavity (15), and the geotextile (13) is fixedly connected to the base steel plate (1) via a fixing column (14), a clamping rod (20) and a second clamping groove (10); The first clamping groove (9) and the second clamping groove (10) are alternately distributed, and the geotextile (13) is fixedly connected to the base steel plate (1) via the second permanent magnet (12), the first permanent magnet (11) and the first clamping groove (9).
2. A temporary construction access road for mountainous areas according to claim 1, characterized in that: A through groove (2) is formed through the top surface of the base steel plate (1), a filter screen (3) is fixedly connected to the inner surface of the through groove (2), the hinged rod 1 (4) and the hinged rod 2 (5) are hinged to each other, the rotating shaft (7) passes through the hinged rod 1 (4) and the hinged rod 2 (5) respectively, the clamping strip (8) is clamped to the inner surface of the through hole (6), and the clamping strip (8) is evenly distributed about the central axis of the rotating shaft (7).
3. The temporary construction access road for mountainous areas according to claim 1 is characterized in that: The cross bar (30) is interlinked with the support tube (26); the positioning groove (29) is composed of a plurality of circular holes, and the distance between the centers of the circular holes is equal to the radius of the circular holes.
4. A method for constructing a temporary construction access road in a mountainous area according to any one of claims 1 to 3, characterized in that: The specific steps of the construction method of the temporary construction access road in the mountainous area are as follows: Step 1: Laying the foundation steel plate: After transporting the foundation steel plate to the designated location, arrange the hinged rod 1 on the foundation steel plate corresponding to the hinged rod 2 on the next foundation steel plate, and then determine the maximum elevation of the ground undulation in the heavy mountainous area, and determine the height of the foundation steel plate based on this maximum elevation. At this time, the foundation steel plate is hoisted and suspended in the air, and is on the same horizontal plane as the maximum elevation. Then, the cross bar on the support tube is pulled out, so that the cross bar releases the fixation of the support tube and the support rod, so that the support rod and the foot pad fall naturally and contact the ground in the heavy mountainous area. At this time, the cross bar is inserted into the outer surface of the support tube, and is engaged with the positioning groove on the support rod, so that the cross bar The rod re-fixes the support tube and the support rod, and at the same time, the foot pad on the support rod fits the ground undulation of the heavy mountain area, and then presses down the foundation steel plate until the foundation steel plate can no longer sink, and the foundation steel plate is fixed in turn, and the hinge rod one is hinged with the hinge rod two, and then the shaft is inserted into the through hole, and passes through the hinge rod one and the hinge rod two, until the card strip contacts the through hole, at this time, the end of the shaft is hammered by a hammer, so that the shaft drives the card strip to embed into the through hole, so that the shaft and the hinge rod two are fixed, so that the foundation steel plates are connected in turn, and finally the fixing rod on the connecting block is drilled into the ground of the heavy mountain area, that is, the laying of the foundation steel plate is completed; Step 2: Fix the geotextile: insert the permanent magnet 2 on the geotextile into the slot 1, and make the permanent magnet 2 adsorb to the permanent magnet 1, then insert the fixing column into the slot 2, and turn the screw on it to make the screw rotate and descend, so that the clamping rod extends out of the fixing column and engages with the clamping hole on the slot 2, so that the fixing column is fixed to the slot 2, and the geotextile is fixed; Step 3: Laying the mountain soil layer: Spread the mountain soil produced by the construction of the heavy mountain area on the geotextile and compact it to form a mountain soil layer. Repeat step 3 until the thickness of the compacted mountain soil layer reaches 15 to 20 cm, and the laying of the mountain soil layer is completed; Step 4: Laying the mud-bound gravel layer: Lay the mud-bound gravel layer on the hillside soil layer and compact it until the mud-bound gravel layer reaches 10 to 15 cm, thus completing the laying of the mud-bound gravel layer; Step 5: Post-processing: pile up the mud-bound gravel layer around the mud-bound gravel layer and compact it, so as to form a slope around the mud-bound gravel layer, thus completing the construction of the temporary construction access road in the mountainous area.
5. A method for constructing a temporary construction access road in a mountainous area according to claim 4, characterized in that: The slope ratio of the slopes on both sides of the mud-bonded gravel layer and the slopes at both ends in step 5 is 3:4.