A cantilever formwork construction method suitable for large-section vertical shaft concrete structure wall

Through the cantilever mold frame construction method, large-section vertical shaft concrete structure walls are poured one by one, solving the problems of high costs and long construction periods in traditional construction, and achieving simpler construction technology and cost savings.

CN116044137BActive Publication Date: 2024-12-03THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211492294.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-11-25
Publication Date
2024-12-03
Estimated Expiration
2042-11-25

AI Technical Summary

Technical Problem

The construction of traditional large-section vertical shaft concrete structure walls has high cost and long construction period, especially when the depth is deep and the section size is large, the construction materials are numerous and time-consuming.

Method used

The construction method of cantilever mold frame is adopted. By tying steel bars at the bottom of the shaft, setting up embedded steel plates and cantilever beams, erecting formwork and scaffolding, and pouring concrete structure walls one by one, reducing the dependence on the entire supporting frame body. The wire rope fixes the cantilever beam and gradually completes the construction of the structural wall.

Benefits of technology

There is no need to set up large-scale full-house scaffolding, which shortens the construction period, reduces material consumption, and saves about 30%.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116044137B_ABST
    Figure CN116044137B_ABST
Patent Text Reader

Abstract

The present invention provides a cantilever formwork construction method suitable for large-section vertical shaft concrete structure walls, firstly, the initial support of the vertical shaft is constructed, the first section of the concrete structure wall is cast on the foundation at the bottom of the vertical shaft and a pre-embedded steel plate is set, then a cantilever beam for bearing the formwork is welded on the pre-embedded steel plate, the cantilever beam is tied by a steel wire rope, two secondary beams are welded on the cantilever beam to carry the upper load distribution, then an external frame guardrail, a steel pipe scaffold, a safety mesh, and a walkway board are installed on the secondary beam, then the steel bars of the second section of the concrete structure wall are tied, the pre-embedded steel plate is set again, the formwork is fixed, concrete is poured, and finally the above process is repeated to carry out the construction of the remaining sections of the concrete structure wall. The present invention does not need to set up a large-volume full-house scaffolding, but only needs to set up a formwork system with a relatively simple structure. In comparison, the construction period is shorter, the material consumption is less, and the cost of about 30% can be saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and in particular relates to a cantilever formwork construction method suitable for large-section vertical shaft concrete structure walls. Background Art

[0002] A vertical shaft refers to a vertical well, which can be a few meters deep at shallow depths or tens of meters deep at deeper depths. Its cross-sectional dimensions vary, with the largest cross-sectional dimensions being up to twenty or thirty meters. Vertical shafts are usually used as temporary entrances and exits for tunnel construction, and also have functions such as ventilation, emergency evacuation, and pump rooms. The construction of large-section vertical shafts requires solving two problems: one is the construction of the shaft wall support structure, and the other is the construction of the secondary concrete structural wall close to the support structure. In traditional technology, the full-chamber support method is usually used for the construction of large-section vertical shaft structural walls. As the name suggests, after the vertical shaft is dug to the bottom of the shaft, a whole supporting operating frame is erected, and the structural wall is constructed in sections on the frame. When faced with a vertical shaft with a deeper depth and a larger cross-sectional dimension, the construction materials required are particularly large, the construction takes a long time, and the cost is high. In response to this defect, the present invention designs a cantilever formwork construction method suitable for large-section vertical shaft concrete structural walls. The construction of the structural wall can be completed without erecting a whole supporting operating frame, which is low in cost and short in time. Summary of the Invention

[0003] In response to the shortcomings of the existing technology, the present invention provides a cantilever formwork construction method suitable for large-section vertical shaft concrete structure walls, which solves the problems of high cost and long construction period in the traditional full-floor support method of constructing large-section vertical shaft concrete structure walls.

[0004] The present invention achieves the above technical objectives through the following technical means.

[0005] A cantilever formwork construction method suitable for large-section vertical shaft concrete structure walls comprises the following steps:

[0006] Step 1: First, construct the shaft's locking ring beam and shaft wall support structure. Then, tie steel bars on the foundation at the bottom of the shaft, install embedded steel plates, set up formwork, and pour concrete to form the first section of the concrete structure wall.

[0007] Step 2: Weld the cantilever beam for supporting the formwork on the embedded steel plate;

[0008] Step 3: Tie the outer ends of each cantilever beam with steel wire ropes;

[0009] Step 4: Weld secondary beams on the cantilever beams to carry the upper load distribution;

[0010] Step 5: Weld the external frame guardrail vertically to the secondary beam, set up the steel pipe scaffolding on the secondary beam and the external frame guardrail, then lay the walkway board on the secondary beam, and hang the safety mesh protection on the outside of the steel pipe scaffolding;

[0011] Step 6: Based on the working platform formed by the steel pipe scaffolding and the walkway slab, install the steel bars, embedded steel plates and formwork corresponding to the second section of the concrete structure wall, and then pour concrete to form the second section of the concrete structure wall;

[0012] Step 7: Repeat steps 2 to 6 to complete the construction of the remaining sections of the concrete structural wall.

[0013] Furthermore, the multiple embedded steel plates in each section of the concrete structural wall are set near the top of the concrete structural wall, arranged along the circumference of the shaft, and the intervals between the embedded steel plates on the four sides of the shaft are 1.5m.

[0014] Furthermore, the cantilever beams are I-beams, which are arranged along the circumference of the shaft, and the spacing between the cantilever beams on the four sides of the shaft is the same as the embedded steel plates.

[0015] Furthermore, a steel wire rope is fixed to the outer end of the cantilever beam, the other end of the steel wire rope is connected to the shaft wall support structure, and the spacing between the steel wire ropes on the four sides of the shaft wall is the same as that of the cantilever beam.

[0016] Furthermore, two parallel secondary beams are vertically welded to the cantilever beams on each side of the shaft wall, and the secondary beams are arranged along the circumference of the shaft; the secondary beams are I-beams, and the distance between the two parallel secondary beams on each side of the shaft wall is 0.8m.

[0017] Furthermore, the template is opened with holes, and the force-bearing screw passes through the holes on the template and is fixed to the well wall support structure to achieve the fastening of the template, and the template is supported on one side.

[0018] Furthermore, in step 6, when pouring concrete, it is pumped and poured from the wellhead in succession, and the pouring height each time is not more than 80 cm.

[0019] The present invention has the following beneficial effects:

[0020] When the method of the present invention is used to construct the walls of large-section vertical shaft concrete structures, there is no need to erect a large-scale full-floor scaffolding. Only a formwork system with a relatively simple structure needs to be erected. In comparison, the construction period of the present invention is shorter, the material consumption is less, and the cost can be saved by about 30%. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is a construction elevation drawing of the cantilever formwork according to the present invention;

[0022] Figure 2 This is a construction plan of the cantilever beam and secondary beam described in the present invention.

[0023] In the figure: 1-concrete structural wall; 2-locking ring beam; 3-shaft wall support structure; 4-embedded steel plate; 5-cantilever beam; 6-secondary beam; 7-external frame guardrail; 8-steel pipe scaffolding; 9-walkway plate; 10-steel wire rope; 11-formwork; 12-load-bearing screw; 13-gantry crane. DETAILED DESCRIPTION

[0024] The present invention will be further described below with reference to the accompanying drawings and specific embodiments, but the protection scope of the present invention is not limited thereto.

[0025] The cantilever formwork construction method applicable to large-section vertical shaft concrete structure walls of the present invention comprises the following steps:

[0026] Step 1: Construction of the first section of concrete structural wall 1;

[0027] Refer to the attached Figure 1 First, the initial support of the shaft is constructed, including the locking ring beam 2 at the shaft mouth and the shaft wall support structure 3. Then, steel bars are tied to the foundation at the bottom of the shaft, embedded steel plates 4 are set, formwork 11 is erected, and concrete is poured to form the first section of the concrete structure wall 1.

[0028] Among them, the height of the first section of the concrete structure wall 1 is 3m and the thickness is 500mm; the embedded steel plate 4 is located near the top of the first section of the concrete structure wall 1, arranged along the circumference of the well, and the intervals between the embedded steel plates 4 on the four sides of the shaft are 1.5m. The thickness of the embedded steel plate 4 is 10mm and the plane size is 300×300mm.

[0029] Step 2: Welding cantilever beam 5;

[0030] Reference Attachment Figure 1 、 2 After the strength of the first section of the concrete structure wall 1 meets the requirements, the cantilever beam 5 used to support the formwork is welded on the embedded steel plate 4. The cantilever beam 5 is an I20b I-beam with a length of 1.5m and is arranged along the circumference of the well. The spacing between the cantilever beams 5 on the four sides of the shaft is the same as that of the embedded steel plate 4.

[0031] Step 3: Tie the steel wire rope 10;

[0032] Refer to the attached Figure 1 In order to prevent the formwork from overturning, a steel wire rope 10 is fixed at the outer end of each cantilever beam 5, and the other end of the steel wire rope 10 is connected to the shaft wall support structure 3; wherein, the diameter of the steel wire rope 10 is 10mm, and the spacing between the steel wire ropes 10 on the four sides of the shaft is the same as that of the cantilever beam 5.

[0033] Step 4: Welding the secondary beam 6;

[0034] Refer to the attached Figure 1 、 2 Two secondary beams 6 are welded on the cantilever beam 5 to carry the upper load distribution. The two secondary beams 6 are arranged along the circumference of the shaft. The two secondary beams 6 on each side of the shaft wall are parallel to each other and perpendicular to the cantilever beam 5 below them; among them, the secondary beams 6 are I14b I-beams, and the distance between the two parallel secondary beams 6 on each side of the shaft wall is 0.8m.

[0035] Step 5: Install the external frame guardrail 7;

[0036] Refer to the attached Figure 1 The outer frame guardrail 7 is vertically welded and fixed on the outer secondary beam 6, wherein the outer frame guardrail 7 adopts a fastener-type steel pipe with a diameter of 30 mm and a wall thickness of 2.8 mm.

[0037] Step 6: Set up the outer frame;

[0038] Refer to the attached Figure 1 A coupler-type steel pipe scaffolding 8 is set up on the secondary beam 6 and the external frame guardrail 7. The height of the steel pipe scaffolding 8 is 4.2m. Then a walkway board 9 is laid on the secondary beam 6 with a step distance of 1.5m. The walkway board 9 is a 20mm thick wooden board. Then, a safety mesh net is hung on the outside of the steel pipe scaffolding 8 for protection.

[0039] Step 7: Refer to the attached Figure 1 Based on the working platform formed by the steel pipe scaffolding 8 and the walkway plate 9, the steel bars of the second section of the concrete structure wall 1 are tied, the embedded steel plate 4 is set again, and the corresponding template 11 is opened. Then, the force-bearing screw 12 is passed through the hole on the template 11 and fixed to the shaft wall support structure 3 to achieve the fastening of the template 11. The template 11 adopts a single-side support method to ensure that the joints are precise and there is no leakage of mortar.

[0040] The template 11 is a 15 mm thick wooden template, the diameter of the force-bearing screw 12 is 10 mm, and the arrangement spacing is 450 mm.

[0041] Step 8: After the structures such as the steel bars, embedded steel plates 4, and formwork 11 set in step 7 have been accepted, C40 concrete is pumped and poured from the wellhead in sequence to form the second section of the concrete structure wall 1 (in this embodiment, the height of each section of the concrete structure wall 1 is 3m), and the pouring height each time is not more than 80cm.

[0042] Step 9: Repeat steps 2 to 8 to complete the remaining concrete structural walls 1 in sections.

[0043] During the above process, all materials are hoisted by the gantry crane 13 at the upper part of the shaft.

[0044] The embodiments described are preferred implementations of the present invention, but the present invention is not limited to the above-mentioned implementations. Any obvious improvements, substitutions or modifications that can be made by those skilled in the art without departing from the essence of the present invention are within the scope of protection of the present invention.

Claims

1. A cantilever formwork construction method suitable for large-section vertical shaft concrete structure wall, characterized in that: The steps include: Step 1: First, construct the locking ring beam (2) and the shaft wall support structure (3) of the shaft, then tie steel bars on the foundation at the bottom of the shaft, set embedded steel plates (4), set up formwork (11), and then pour concrete to form the first section of the concrete structure wall (1); Step 2: Welding a cantilever beam (5) for supporting the formwork on the embedded steel plate (4); Step 3: Tie each cantilever beam (5) at its outer end with a steel wire rope (10); Step 4: Weld the secondary beam (6) on the cantilever beam (5) to carry the upper load distribution; Step 5: vertically weld the external frame guardrail (7) to the secondary beam (6), set up a steel pipe scaffold (8) on the secondary beam (6) and the external frame guardrail (7), then lay a walkway board (9) on the secondary beam (6), and hang a safety mesh on the outside of the steel pipe scaffold (8) for protection; Step 6: Based on the working platform formed by the steel pipe scaffolding (8) and the walkway plate (9), after installing the steel bars, embedded steel plates (4) and formwork (11) corresponding to the second section of the concrete structure wall (1), pouring concrete to form the second section of the concrete structure wall (1); Step 7: Repeat steps 2 to 6 to complete the construction of the remaining sections of the concrete structural wall (1); The plurality of embedded steel plates (4) in each section of the concrete structural wall (1) are arranged at a position close to the top of the concrete structural wall (1) and arranged along the circumference of the shaft, and the intervals between the embedded steel plates (4) on the four sides of the shaft are all 1.5 m; The cantilever beams (5) are I-beams and are arranged along the shaft circumference. The spacing between the cantilever beams (5) on the four sides of the shaft wall is the same as the spacing between the embedded steel plates (4); A steel wire rope (10) is fixed to the outer end of the cantilever beam (5), the other end of the steel wire rope (10) is connected to the shaft wall support structure (3), and the spacing between the steel wire ropes (10) on the shaft walls of the four sides of the shaft is the same as the spacing between the cantilever beams (5); Two mutually parallel secondary beams (6) are vertically welded to the cantilever beam (5) on each side of the shaft wall, and the secondary beams (6) are arranged along the entire length of the shaft circumference; the secondary beams (6) are I-beams, and the distance between the two mutually parallel secondary beams (6) on each side of the shaft wall is 0.8 m; The template (11) is provided with a hole, and the force-bearing screw rod (12) passes through the hole on the template (11) and is fixed to the well wall support structure (3), thereby fastening the template (11), and the template (11) is supported on one side.

2. The cantilever formwork construction method applicable to large-section vertical shaft concrete structure wall according to claim 1 is characterized in that: In step 6, when pouring concrete, it is pumped and poured from the wellhead in succession, and the pouring height each time is not more than 80 cm.