A mine survey ore crushing device that is convenient for collecting crushed materials
By designing a mine survey ore crushing equipment that includes dust reduction, buffering and screening mechanisms, the problems of dust pollution, easy gravel damage and difficulty in collecting ore separately in the ore crushing process in the existing technology have been solved, and more efficient and more Safe ore crushing and collection process.
Patent Information
- Application Number
- CN202310231067.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-13
- Publication Date
- 2025-02-07
- Estimated Expiration
- 2043-03-13
AI Technical Summary
The existing hammer crusher has dust pollution during the ore crushing process, which is not conducive to the health of staff. The discharge port has no buffer mechanism, which causes the gravel to be easily damaged, and the screening mechanism is not set up to make it difficult to collect ores of different diameters separately.
A mine survey ore crushing equipment including a crusher body, a sedimentation mechanism, a feeding mechanism, a dust reduction mechanism, a crushing mechanism, a buffer mechanism and a screening mechanism are designed. The dust reduction mechanism sprays water and dust reduction through the water spray port, the buffer mechanism absorbs shock through the guide plate and torsion spring, and the screening mechanism separates ores of different sizes through the slide plate and the screen.
Effectively reduce dust pollution during crushing and protect the health of staff; protect the conveyor belt through buffer mechanism, extend the service life of the equipment; effectively collect and separate ore of different sizes through screening mechanism, improving ore treatment efficiency.
Smart Images

Figure CN116197010B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of ore crushing, in particular to a mine survey ore crushing device which is convenient for collecting crushed materials. Background Art
[0002] During mine survey, it is necessary to carry out crushing test on the ore in the mine. When crushing the ore, hammer crusher or jaw crusher is usually used. Hammer crusher is a kind of equipment that crushes materials in the form of impact. It is divided into single rotor and double rotor types. It is a crushing machine that directly crushes materials with a maximum particle size of 600-1800 mm to 25 or less.
[0003] However, when the current hammer crusher crushes the mine ore, the ore to be crushed is directly poured into the feed port of the crusher. When the ore is crushed, dust will be generated at the discharge port. There is no dust reduction mechanism at the feed port. When the ore is crushed for a long time, on the one hand, it pollutes the environment, and on the other hand, it is not conducive to the long-term operation of the staff. After the ore is crushed, the crushed stones of different diameters all fall from the discharge port onto the conveyor belt. There is no mechanism for buffering the crushed ore at the discharge port. The crushed stones can easily damage and deform the mesh conveyor belt, which is not conducive to the transportation of the ore. There is no mechanism for ore screening on the crusher, which is not conducive to the separate collection of ores of different diameters. Summary of the invention
[0004] In view of the problems in the prior art, the present invention provides a mine survey ore crushing device which is convenient for collecting crushed materials.
[0005] The technical solution adopted by the present invention to solve the technical problem is: a mine survey ore crushing equipment that is convenient for collecting crushed materials, comprising a crusher body, a sedimentation mechanism installed on the crusher body, a feeding mechanism installed between the sedimentation mechanism and the crusher body, a dust reduction mechanism installed on the crusher body, the dust reduction mechanism and the feeding mechanism are connected, a crushing mechanism installed on the crusher body, a buffer mechanism for buffering the crushed ore installed at the bottom of the crusher body, a screening mechanism located at the bottom of the buffer mechanism installed on the crusher body, and the screening mechanism conflicts with the crushing mechanism;
[0006] The dust reduction mechanism includes a third bracket, a third bracket is fixed on the side of the crusher body, a water pipe extending to the top of the crusher body is fixedly connected to the third bracket, and two fourth brackets are relatively fixedly connected to the top of the crusher body, a sleeve is rotatably connected to the two fourth brackets, the water pipe is rotatably connected to the inside of the sleeve, a belt disk is installed at one end of the sleeve, the belt disk is connected to the feeding mechanism through a belt, a plurality of water spray outlets are equidistantly provided on the water pipe, and conducting ports corresponding to the water spray outlets are equidistantly provided on the sleeve, a rubber ring that contacts the water pipe is provided on the inner wall of the sleeve, and holes connected to the conducting ports are equidistantly provided on the rubber ring.
[0007] Specifically, the third bracket is in an "L"-shaped structure, and the top of the third bracket is flush with the top of the fourth bracket.
[0008] Specifically, the sedimentation mechanism comprises a bottom plate, the bottom of the crusher body is fixedly connected to the bottom plate via a fixing frame, a sedimentation tank is arranged on the bottom plate, and a water outlet cylinder connected to the sedimentation tank is installed on the bottom plate.
[0009] Specifically, the feeding mechanism includes a first bracket, two first brackets are relatively fixedly connected on the bottom plate, two second brackets are relatively fixedly connected on the crusher body, a rotating shaft is rotatably connected between the two first brackets and the two second brackets, a conveyor belt is connected between the two rotating shafts, baffles are equidistantly fixed on the conveyor belt, a motor is installed on the bottom plate, the motor is connected to the rotating shaft on the first bracket through a coupling, and the belt is connected to the rotating shaft on the second bracket.
[0010] Specifically, the top of the crusher body is arranged obliquely, and the conveyor belt is arranged parallel to the top of the crusher body.
[0011] Specifically, the crushing mechanism includes an inner shaft rotatably connected to the inside of the crusher body, a crushing hammer is equidistantly fixedly connected to the inner shaft, a feed port is provided at the top of the crusher body, a grate plate is installed inside the crusher body, a discharge port is provided at the bottom of the crusher body, one end of the inner shaft is connected to a drive disk through a coupling, and the discharge port is arranged corresponding to the sedimentation tank.
[0012] Specifically, the crushing mechanism further comprises a partition, and the inner top of the crusher body is rotatably connected with the partition.
[0013] Specifically, the buffer mechanism includes a connecting cylinder, a connecting cylinder of a rectangular structure is fixedly connected to the bottom of the crusher body, a plurality of guide plates are rotatably connected inside the connecting cylinder, and a torsion spring is clamped between the guide plates and the connecting cylinder.
[0014] Specifically, the screening mechanism includes two slides, and the two slides are connected to the two sides of the crusher body for relative sliding, the bottom of the two slides is fixedly connected to a fixed shell, and a plurality of screens are fixedly connected to the inside of the fixed shell at equal intervals, and the ends of the plurality of screens are fixedly connected to a discharge plate extending to the outside of the fixed shell, and the lengths of the plurality of discharge plates decrease from the top to the bottom of the fixed shell, and the fixed shell and the discharge plate are inclined. Limiting plates are fixedly connected to the two slides, and a spring is clamped between the limiting plate and the crusher body. The fixed shell is located at the top of the sedimentation tank, and the top of the slide is an arc-shaped structure, and the slide is located between the driving disk and the crusher body.
[0015] Specifically, the screening mechanism further comprises a turntable and a protrusion. Two turntables are relatively fixedly connected to the inner shaft outside the crusher body, and the two turntables are fixedly connected to a protrusion that contacts the top of the slide plate.
[0016] The beneficial effects of the present invention are:
[0017] (1) The present invention provides a mining exploration ore crushing device that is convenient for collecting crushed materials. A feeding mechanism is installed on the sedimentation mechanism and the crusher body, and a dust reduction mechanism connected to the feeding mechanism is installed on the crusher body. When the feeding mechanism feeds the materials, the water spraying mechanism is driven to spray water to the top of the crusher body, thereby reducing dust at the feeding place, thereby preventing dust from polluting the environment and damaging the health of workers.
[0018] (2) The present invention discloses a mining exploration ore crushing device that is convenient for collecting crushed materials. A buffer mechanism is installed at the bottom of the crusher body. When the crushing mechanism crushes the ore and the ore falls into the buffer mechanism, the buffer mechanism can slow down the falling ore to prevent the ore from breaking the screening mechanism.
[0019] (3) The present invention discloses a mining exploration ore crushing device that is convenient for collecting crushed materials. A screening mechanism is installed at the bottom of the crusher body. When the ore at the bottom of the buffer mechanism falls onto the screening mechanism, the crushing mechanism rotates and collides with the screening mechanism at the same time, thereby causing the screening mechanism to vibrate. This enables the screening and collection of ores of different sizes, which is convenient for unloading. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0021] Figure 1 A schematic diagram of the overall structure of a preferred embodiment of a mine survey ore crushing device that is convenient for collecting crushed materials provided by the present invention;
[0022] Figure 2 for Figure 1 An enlarged schematic diagram of the structure of section A is shown;
[0023] Figure 3 A schematic diagram of the connection structure of the crusher body, the feed port, the partition, the fourth bracket, the belt reel, the sleeve, the water pipe and the conduction port of the present invention;
[0024] Figure 4 It is a schematic diagram of the connection structure of the water pipe, sleeve, rubber ring, water spray port and conduction port shown in the present invention;
[0025] Figure 5 for Figure 1 An enlarged schematic diagram of the structure of part B is shown;
[0026] Figure 6 for Figure 1 An enlarged schematic diagram of the C-section structure is shown;
[0027] Figure 7 It is a schematic diagram of the connection structure of the crusher body, feed port, inner shaft, beating hammer, grate plate, feed port, connecting tube and guide plate shown in the present invention;
[0028] Figure 8 for Figure 7 An enlarged schematic diagram of the D-section structure is shown;
[0029] Fig. 9 It is a schematic diagram of the connection structure of the crusher body, slide plate, spring, limit plate, rotating disk, protrusion, driving disk, connecting cylinder and fixed shell of the present invention.
[0030] In the figure: 1. Crusher body; 2. Feeding mechanism; 201. First bracket; 202. Second bracket; 203. Baffle; 204. Motor; 205. Rotating shaft; 206. Conveyor belt; 3. Dust suppression mechanism; 301. Third bracket; 302. Fourth bracket; 303. Casing; 304. Belt reel; 305. Belt; 306. Conducting port; 307. Water pipe; 308. Rubber ring; 309. Water spray port; 4. Crushing mechanism; 401. Partition plate; 402. Feeding port; 403. Driving disc; 404, inner shaft; 405, breaker; 406, grate plate; 407, discharge port; 5, buffer mechanism; 501, connecting tube; 502, guide plate; 503, torsion spring; 6, screening mechanism; 601, fixed shell; 602, spring; 603, slide plate; 604, limit plate; 605, screen; 606, discharge plate; 607, turntable; 608, protrusion; 7, sedimentation mechanism; 701, sedimentation tank; 702, fixed frame; 703, bottom plate; 704, water outlet tube. DETAILED DESCRIPTION
[0031] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0032] like Figure 1-Figure 9 As shown, a mine survey ore crushing device convenient for collecting crushed materials according to the present invention comprises a crusher body 1, a sedimentation mechanism 7 is installed on the crusher body 1, a feeding mechanism 2 is installed between the sedimentation mechanism 7 and the crusher body 1, a dust reduction mechanism 3 is installed on the crusher body 1, the dust reduction mechanism 3 is connected to the feeding mechanism 2, a crushing mechanism 4 is installed on the crusher body 1, a buffer mechanism 5 for buffering the crushed ore is installed at the bottom of the crusher body 1, a screening mechanism 6 located at the bottom of the buffer mechanism 5 is installed on the crusher body 1, and the screening mechanism 6 conflicts with the crushing mechanism 4;
[0033] The dust reduction mechanism 3 includes a third bracket 301, the third bracket 301 is fixed on the side of the crusher body 1, a water pipe 307 extending to the top of the crusher body 1 is fixedly connected to the third bracket 301, and two fourth brackets 302 are relatively fixedly connected to the top of the crusher body 1, and sleeves 303 are rotatably connected to the two fourth brackets 302. The water pipe 307 is rotatably connected to the inside of the sleeve 303, and a belt reel 304 is installed at one end of the sleeve 303. The belt reel 304 is connected to the feeding mechanism 2 through a belt 305. A plurality of water spray ports 309 are equidistantly provided on the water pipe 307, and conduction ports 306 corresponding to the water spray ports 309 are equidistantly provided on the sleeve 303. A rubber ring 308 that contacts the water pipe 307 is provided on the inner wall of the sleeve 303, and holes communicating with the conduction ports 306 are equidistantly provided on the rubber ring 308. The third bracket 301 is in an "L"-shaped structure. , the top of the third bracket 301 is flush with the top of the fourth bracket 302; when the conveyor belt 206 rotates, the two rotating shafts 205 rotate on the first bracket 201 and the second bracket 202 respectively, and further, one of the rotating shafts 205 drives the sleeve 303 to rotate on the fourth bracket 302 through the belt 305 and the belt reel 304. Further, when the sleeve 303 rotates, the conduction port 306 is connected with the water spray port 309 on the water pipe 307. At this time, the water inside the water pipe 307 is sprayed to the top of the crusher body 1, avoiding the large dust pollution of the crusher body 1 when working, achieving dust reduction, and benefiting the health of the staff. The inner wall of the sleeve 303 is provided with the rubber ring 308, which is beneficial for the sleeve 303 to seal the water spray port 309 when it is not rotating, avoiding water leakage and saving water resources.
[0034] Specifically, the sedimentation mechanism 7 includes a bottom plate 703, the bottom of the crusher body 1 is fixedly connected to the bottom plate 703 through a fixed frame 702, a sedimentation tank 701 is provided on the bottom plate 703, and a water outlet tube 704 connected to the sedimentation tank 701 is installed on the bottom plate 703; when water falls from the screen 605 at the bottom of the fixed shell 601 and flows into the interior of the sedimentation tank 701 on the bottom plate 703, the water is precipitated and can be reused, then the stone powder precipitated in the water can be collected for other uses, and the internal water of the sedimentation tank 701 can be released through the water outlet tube 704.
[0035] Specifically, the feeding mechanism 2 includes a first bracket 201, two first brackets 201 are relatively fixedly connected to the bottom plate 703, two second brackets 202 are relatively fixedly connected to the crusher body 1, a rotating shaft 205 is rotatably connected between the two first brackets 201 and the two second brackets 202, a conveyor belt 206 is connected between the two rotating shafts 205, baffles 203 are equidistantly fixed on the conveyor belt 206, a motor 204 is installed on the bottom plate 703, and the motor 204 is connected to the rotating shaft 205 on the first bracket 201 through a coupling. The belt 305 is connected to the rotating shaft 205 on the second bracket 202, the top of the crusher body 1 is inclined, and the conveyor belt 206 is parallel to the top of the crusher body 1; after sampling the ore on the mine, the motor 204 is powered on, and the ore to be crushed is placed on the conveyor belt 206. At this time, the conveyor belt 206 transports the ore to the top of the crusher body 1, and finally falls into the interior of the crusher body 1. The baffle 203 on the conveyor belt 206 blocks the ore and prevents the ore from falling.
[0036] Specifically, the crushing mechanism 4 includes an inner shaft 404 rotatably connected to the inner part of the crusher body 1, and a crushing hammer 405 is equidistantly fixedly connected to the inner shaft 404. A feed port 402 is provided at the top of the crusher body 1, and a grate plate 406 is installed inside the crusher body 1. A discharge port 407 is provided at the bottom of the crusher body 1. One end of the inner shaft 404 is connected to a drive disk 403 through a coupling, and the discharge port 407 is arranged corresponding to the sedimentation tank 701. The crushing mechanism 4 also includes a partition plate 401, and the inner top of the crusher body 1 is rotatably connected to the partition plate 401. The buffer mechanism 5 includes a connecting cylinder 501, and the bottom of the crusher body 1 is fixedly connected to a connecting cylinder 501 with a rectangular parallelepiped structure. A plurality of guide plates 502 are staggered and rotatably connected to the inside of the connecting cylinder 501, and the guide plates 502 and the connecting cylinder 501 are interlaced and rotatably connected. The clamp holds a torsion spring 503; the drive disc 403 is connected to a drive device, such as a diesel engine, and after the inner shaft 404 is driven, the inner shaft rotation 404 drives the breaker 405 to rotate. After the ore to be crushed is transported to the inside of the crusher body 1 by the conveyor belt 206, the breaker 405 knocks the ore to achieve the crushing of the ore. The grate plate 406 achieves the screening of the ore to prevent the crushed ore from being too large. The crushed ore falls from the discharge port 407 to the inside of the connecting cylinder 501 for unloading. After the crushed ore falls into the inside of the connecting cylinder 501, the ore falls onto the guide plate 502. Since the guide plates 502 are cross-arranged in multiple numbers and each of the guide plates 502 is provided with the torsion spring 503, the falling ore is damped to prevent the ore from hitting the screen 605.
[0037] Specifically, the screening mechanism 6 includes two slide plates 603, and the two sides of the crusher body 1 are relatively slidably connected to the two slide plates 603, and the bottoms of the two slide plates 603 are fixedly connected to a fixed shell 601, and the interior of the fixed shell 601 is equidistantly fixedly connected to a plurality of screens 605, and the ends of the plurality of screens 605 are fixedly connected to a blanking plate 606 extending to the outside of the fixed shell 601, and the lengths of the plurality of blanking plates 606 decrease from the top to the bottom of the fixed shell 601, and the fixed shell 601 and the blanking plate 606 are connected to each other. 06 is tilted, the two slide plates 603 are fixedly connected to the limit plates 604, a spring 602 is clamped between the limit plates 604 and the crusher body 1, the fixed shell 601 is located at the top of the sedimentation tank 701, the top of the slide plate 603 is an arc-shaped structure, the slide plate 603 is located between the drive disk 403 and the crusher body 1, the screening mechanism 6 also includes a rotating disk 607 and a protrusion 608, and two rotating disks 607 are relatively fixedly connected to the inner shaft 404 located outside the crusher body 1, and the two The rotating disk 607 is fixedly connected with a protrusion 608 that contacts the top of the slide plate 603; the crushed ore is buffered by the guide plate 502 and falls onto the top of the screen 605 inside the fixed shell 601. At this time, since the inner shaft 404 drives the two rotating disks 607 to rotate when the rotating disk 607 rotates, the protrusion 608 on the rotating disk 607 regularly knocks the slide plate 603 when the protrusion 608 is separated from the slide plate 603. The spring 602 Resetting the slide plate 603 realizes the shaking of the fixed shell 601 at the bottom of the slide plate 603, and further realizes the simultaneous shaking of the multiple screens 605, ensuring that the diameter of each screen 605 decreases from the top to the bottom of the fixed shell 601, thereby realizing the screening of the ore, which is beneficial for the screening and collection of ores of different sizes. Then water falls into the sedimentation tank 701, and a conveyor belt is installed at the bottom of the multiple unloading plates 606 to unload and transport ores of different sizes.
[0038] When the present invention is in use, first, after sampling the ore on the mine, the motor 204 is connected to the power supply, and the ore to be crushed is placed on the conveyor belt 206. At this time, the conveyor belt 206 transports the ore to the top of the crusher body 1, and finally falls into the inside of the crusher body 1. The baffle 203 located on the conveyor belt 206 blocks the ore and prevents the ore from falling. When the conveyor belt 206 rotates, the two rotating shafts 205 rotate on the first bracket 201 and the second bracket 202 respectively. Further, one of the rotating shafts 205 drives the sleeve 303 to rotate on the fourth bracket 302 through the belt 305 and the belt reel 304. Further, when the sleeve 303 rotates When the guide port 306 is connected with the water spray port 309 on the water pipe 307, the water in the water pipe 307 is sprayed toward the top of the crusher body 1, so that the environment is not polluted by a large amount of dust when the crusher body 1 is working, dust reduction is achieved, and it is beneficial to the health of the staff. The inner wall of the sleeve 303 is provided with a rubber ring 308, which is beneficial to the sealing of the water spray port 309 when the sleeve 303 is not rotating, so as to avoid water leakage and save water resources. Then, the driving disc 403 is connected to the driving device, such as a diesel engine, and after the inner shaft 404 is driven, the inner shaft rotation 404 drives the crushing hammer 405 to rotate. After the ore to be crushed is transported to the inside of the crusher body 1 by the conveyor belt 206, the crushing hammer 405 05 knocks the ore to break it, and the grate plate 406 screens the ore to prevent the broken ore from being too big. The broken ore falls from the discharge port 407 to the inside of the connecting cylinder 501 for unloading. After the broken ore falls into the inside of the connecting cylinder 501, the ore falls onto the guide plate 502. Since the guide plates 502 are cross-arranged with multiple ones, and each guide plate 502 is provided with a torsion spring 503, the falling ore is damped to prevent the ore from damaging the screen 605; the broken ore is buffered by the guide plate 502 and falls onto the top screen 605 inside the fixed shell 601. At this time, the inner shaft 404 drives the two rotating The disk 607 rotates, and when the turntable 607 rotates, the protrusion 608 on the turntable 607 regularly knocks the slide plate 603. After the protrusion 608 separates from the slide plate 603, the spring 602 resets the slide plate 603, so that the fixed shell 601 at the bottom of the slide plate 603 is shaken, and the multiple screens 605 are further shaken at the same time, ensuring that the diameter of each screen 605 decreases from the top to the bottom of the fixed shell 601, thereby achieving the screening of the ore, which is conducive to the screening and collection of ores of different sizes, and then the water falls into the interior of the sedimentation tank 701, and a conveyor belt is installed at the bottom of the multiple unloading plates 606 to unload and transport ores of different sizes;Finally, when the water falls from the screen 605 at the bottom of the fixed shell 601 and flows into the sedimentation tank 701 on the bottom plate 703, the water is precipitated and can be reused. Then the stone powder precipitated in the water can be collected for other uses, and the water inside the sedimentation tank 701 can be released through the water outlet tube 704. ;
[0039] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
[0040] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A mine survey ore crushing device that is convenient for collecting crushed materials, characterized in that: The invention comprises a crusher body (1), a settling mechanism (7) is installed on the crusher body (1), a feeding mechanism (2) is installed between the settling mechanism (7) and the crusher body (1), a dust reduction mechanism (3) is installed on the crusher body (1), the dust reduction mechanism (3) is connected to the feeding mechanism (2), a crushing mechanism (4) is installed on the crusher body (1), a buffer mechanism (5) for buffering crushed ore is installed at the bottom of the crusher body (1), a screening mechanism (6) located at the bottom of the buffer mechanism (5) is installed on the crusher body (1), and the screening mechanism (6) is in conflict with the crushing mechanism (4); The dust reduction mechanism (3) comprises a third bracket (301), the third bracket (301) is fixed on the side of the crusher body (1), a water pipe (307) extending to the top of the crusher body (1) is fixedly connected to the third bracket (301), and two fourth brackets (302) are relatively fixedly connected to the top of the crusher body (1), sleeves (303) are rotatably connected to the two fourth brackets (302), the water pipe (307) is rotatably connected to the inside of the sleeve (303), and the sleeve (303) is fixedly connected to the top of the crusher body (1). A belt reel (304) is installed at one end of the sleeve (303), and the belt reel (304) is connected to the feeding mechanism (2) through a belt (305). A plurality of water spraying ports (309) are evenly spaced on the water pipe (307), and conduction ports (306) corresponding to the water spraying ports (309) are evenly spaced on the sleeve (303). A rubber ring (308) that contacts the water pipe (307) is provided on the inner wall of the sleeve (303), and holes that communicate with the conduction ports (306) are evenly spaced on the rubber ring (308); The sedimentation mechanism (7) comprises a bottom plate (703), the bottom of the crusher body (1) is fixedly connected to the bottom plate (703) via a fixing frame (702), a sedimentation tank (701) is provided on the bottom plate (703), and a water outlet cylinder (704) connected to the sedimentation tank (701) is installed on the bottom plate (703); The feeding mechanism (2) comprises a first bracket (201), two first brackets (201) are relatively fixedly connected to the bottom plate (703), two second brackets (202) are relatively fixedly connected to the crusher body (1), a rotating shaft (205) is rotatably connected between the two first brackets (201) and the two second brackets (202), a conveyor belt (206) is connected between the two rotating shafts (205), baffles (203) are equidistantly fixed on the conveyor belt (206), a motor (204) is installed on the bottom plate (703), the motor (204) is connected to the rotating shaft (205) on the first bracket (201) via a coupling, and the belt (305) is connected to the rotating shaft (205) on the second bracket (202).
2. The ore crushing equipment for mining exploration that is convenient for collecting crushed materials according to claim 1 is characterized in that: The third bracket (301) is in an "L"-shaped structure, and the top of the third bracket (301) is flush with the top of the fourth bracket (302).
3. The ore crushing equipment for mining exploration that is convenient for collecting crushed materials according to claim 1 is characterized in that: The top of the crusher body (1) is arranged obliquely, and the conveyor belt (206) is arranged parallel to the top of the crusher body (1).
4. The ore crushing equipment for mining exploration and convenient collection of crushed materials according to claim 1 is characterized in that: The crushing mechanism (4) comprises an inner shaft (404) rotatably connected to the inside of a crusher body (1), a crushing hammer (405) being equidistantly fixedly connected to the inner shaft (404), a feed port (402) being provided at the top of the crusher body (1), a grate plate (406) being installed inside the crusher body (1), a discharge port (407) being provided at the bottom of the crusher body (1), one end of the inner shaft (404) being connected to a drive disc (403) via a coupling, and the discharge port (407) being arranged corresponding to a sedimentation tank (701).
5. The ore crushing equipment for mining exploration and convenient collection of crushed materials according to claim 4 is characterized in that: The crushing mechanism (4) further comprises a partition plate (401), and the partition plate (401) is rotatably connected to the inner top of the crusher body (1).
6. The ore crushing equipment for mining exploration and convenient collection of crushed materials according to claim 1 is characterized in that: The buffer mechanism (5) comprises a connecting cylinder (501), the bottom of the crusher body (1) is fixedly connected to a connecting cylinder (501) of a rectangular parallelepiped structure, a plurality of guide plates (502) are connected to the inside of the connecting cylinder (501) in an interlaced and rotatable manner, and a torsion spring (503) is clamped between the guide plates (502) and the connecting cylinder (501).
7. The ore crushing equipment for mining exploration and convenient collection of crushed materials according to claim 5 is characterized by: The screening mechanism (6) comprises two slide plates (603), the two sides of the crusher body (1) are slidably connected to each other with the two slide plates (603), the bottoms of the two slide plates (603) are fixedly connected to a fixed shell (601), the interior of the fixed shell (601) is fixedly connected with a plurality of screens (605) at equal intervals, the ends of the plurality of screens (605) are fixedly connected to a blanking plate (606) extending to the outside of the fixed shell (601), and the length of the plurality of blanking plates (606) is from the fixed shell (601) to the fixed shell (601). The shell (601) decreases from the top to the bottom, the fixed shell (601) and the unloading plate (606) are inclined, and the two slide plates (603) are fixedly connected to the limit plates (604), and a spring (602) is clamped between the limit plates (604) and the crusher body (1). The fixed shell (601) is located at the top of the sedimentation tank (701), and the top of the slide plate (603) is an arc-shaped structure. The slide plate (603) is located between the driving disc (403) and the crusher body (1).
8. The ore crushing equipment for mining exploration and convenient collection of crushed materials according to claim 7 is characterized in that: The screening mechanism (6) further comprises a rotating disc (607) and a protrusion (608). Two rotating discs (607) are relatively fixedly connected to the inner shaft (404) outside the crusher body (1). The two rotating discs (607) are fixedly connected to a protrusion (608) that contacts the top of the slide plate (603).
Citation Information
Patent Citations
Mining crushing and grinding integrated device
CN107029855A
Crushing and screening device for asphalt recovery
CN218190220U