Grouting water blocking device and method for water-rich tunnel

By setting an airbag on the guide pipe to seal the gap between the guide pipe and the borehole, the problem of high construction cost in the existing technology is solved, the efficient grouting and water plugging effect is achieved, and the advanced drilling operation is simplified.

CN116398185BActive Publication Date: 2024-11-26CHINA RAILWAY NO 5 ENGINEERING GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310330544.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-30
Publication Date
2024-11-26
Estimated Expiration
2043-03-30

AI Technical Summary

Technical Problem

In the construction of water-rich tunnels, the existing technology has led to increased construction costs due to water inrush during advanced drilling. Furthermore, the existing grouting and water-blocking devices cannot effectively seal the rock fissures in front of the borehole, requiring re-drilling and increasing the workload.

Method used

The method involves installing front and rear airbags on the guide pipe. When the airbags are inflated, they fill the gap between the guide pipe and the borehole, allowing the high-pressure grout to enter only the rock fractures. After the grout has initially set, the airbags are deflated, the guide pipe is pulled out, and the grout is prevented from spreading, thus simplifying subsequent drilling operations.

Benefits of technology

By using airbags to seal the gap between the guide tube and the borehole, the amount of pre-drilling work is reduced, thus lowering construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116398185B_ABST
    Figure CN116398185B_ABST
Patent Text Reader

Abstract

The present invention discloses a grouting water blocking device and method for a water-rich tunnel, the device comprises a catheter with a closed front end, a grouting hole formed on the side wall of the catheter, and an annular air bag is mounted on both the front and rear sides of the grouting hole, and the air bag can fill the gap between the catheter and the borehole in an inflated state. The method comprises measuring the original water inflow; determining the number and depth of rock mass fissures; adjusting the position of the catheter and the air bag so that each rock mass fissure is located between the two air bags; inflating the air bag until the gap between the catheter and the borehole is completely filled, and injecting high-pressure slurry into the catheter; when the slurry is initially solidified, the air bag is deflated, and the initial solidified slurry in the gap between the catheter and the borehole is broken by reversing the catheter; and the catheter is pulled out from the borehole. By setting the air bag, the gap can be blocked, and the slurry is prevented from filling the borehole. When performing subsequent detection, the drill rod can be directly inserted into the original borehole and continue to drill forward, thereby reducing the workload of the advance drilling operation and effectively reducing the construction cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention mainly relates to the technical field of grouting water blocking, and in particular to a grouting water blocking device and method for a water-rich tunnel. Background Art

[0002] During the construction of deep buried tunnels, it is difficult to accurately grasp the geological conditions along the tunnel, and the frequency of geological disasters encountered during construction has increased sharply, especially the fault fracture zone and water gushing problems in water-rich tunnels, which often cause project delays. Therefore, advance drilling should be used first to predict the surrounding rock classification and water seepage, water pressure, water temperature and other parameters in front of the face, and then select different grouting materials for timely grouting and plugging to reduce the risk of geological disasters.

[0003] The water gushing that occurs during the advance drilling construction process does not necessarily come from the rock cracks penetrated by the front end of the drill rod during drilling. It may also be caused by the interaction between the middle and rear parts of the drill rod and the rock wall during the drilling process, causing the rock in the corresponding area to be disturbed, thereby generating cracks (for example, when the depth of the borehole has reached 80m, the drill rod collides with the borehole 20m away from the orifice to generate water gushing cracks). In the prior art, there is no grouting and water blocking device and method for this situation. When grouting and water blocking is performed using the device and method in the prior art, it is necessary to first insert and fix the orifice pipe in the borehole, and connect the exposed part of the orifice pipe to the pipeline of the high-pressure grouting machine, and then use the high-pressure grouting machine to fill the borehole with slurry through the orifice pipe. Under the action of pressure, the slurry in the borehole diffuses along the cracks, and the water flow can be blocked after solidification. This construction method not only fills the rock cracks, but also blocks the borehole (that is, originally only grouting was needed to block the cracks 20m away from the hole mouth, but in fact the entire 80m long borehole was blocked). In order to continue to detect whether there is water seepage at a farther distance, it is necessary to re-drill ahead (that is, reopen the 80m long borehole and continue to drill ahead). It can be seen that the construction using the device and method in the prior art will increase the workload of the advance drilling operation, thereby increasing the construction cost. Therefore, there is an urgent need for a grouting and water blocking device and method that can fill the rock cracks in front without blocking the borehole. Summary of the invention

[0004] The technical problem to be solved by the present invention is to overcome the deficiencies of the prior art and provide a grouting water blocking device and method for a water-rich tunnel.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0006] A grouting and water blocking device for a water-rich tunnel comprises a conduit with a closed front end, a grouting hole formed on the side wall of the conduit, and an annular air bag is mounted on both the front and rear sides of the grouting hole. The air bag can fill the gap between the conduit and the borehole in an inflated state.

[0007] As a further improvement of the above technical solution:

[0008] The airbag is slidably mounted on the catheter, and a wire rope is pulled by the airbag for controlling the forward and backward movement of the airbag.

[0009] The rear section of the catheter is molded with scale lines for marking the insertion depth of the catheter.

[0010] A three-way valve is installed at the rear end of the conduit, one port of the three-way valve is connected to the grouting pipe, and a measuring instrument is installed at the other port.

[0011] The measuring instrument includes one or more of a flow meter, a thermometer, a pH meter and a conductivity meter.

[0012] The measuring instrument comprises a water pressure gauge, and a two-way valve is serially connected in the downstream direction of the measuring instrument.

[0013] Then, the present invention discloses a grouting water blocking method for a water-rich tunnel, the grouting water blocking method is applied to the above-mentioned grouting water blocking device, and comprises the following steps:

[0014] Step S1, measuring the original water inflow.

[0015] Step S2, determining the number and depth of rock mass fractures.

[0016] Step S3, adjusting the positions of the guide tube and the airbags so that each rock mass fracture is located between the two airbags.

[0017] Step S4, the airbag is inflated until the gap between the catheter and the drill hole is completely filled, and high-pressure slurry is injected into the catheter.

[0018] Step S5, when the slurry is initially solidified, the air bag is deflated, and the initially solidified slurry in the gap between the catheter and the drill hole is broken by twisting the catheter.

[0019] Step S6, pulling out the catheter from the drill hole.

[0020] As a further improvement of the above technical solution:

[0021] The step S2 comprises:

[0022] Step S21, the front end of the catheter is inserted into the drill hole, and the airbag located at the rear side is inflated to fill the gap between the catheter and the drill hole.

[0023] Step S22A: Insert the conduit forward. If the water stops flowing out, it is determined that the rock mass fracture is single, and the insertion depth of the conduit at this time is recorded as L. A .

[0024] Step S22B, insert the conduit forward. If water flows out of the conduit and the borehole at the same time, it is determined that there are multiple rock fractures. The insertion depth of the conduit at this time is recorded as L. A .

[0025] Step S23: If there are multiple rock fractures, continue to insert the catheter forward. When no water flows out of the catheter, record the insertion depth of the catheter as L. B .

[0026] If the rock mass fissure is single, step S3 includes:

[0027] Step S31A, move the catheter backward to an insertion depth of (L A -S); where S ≥ 2cm, but not greater than the original distance between the two airbags.

[0028] If there are multiple rock mass fissures, step S3 includes:

[0029] Step S31B, move the catheter backward to an insertion depth of (L A -S); where S ≥ 2cm, but not greater than the original distance between the two airbags.

[0030] Step S32, the airbag located at the front side is inflated to fill the gap between the catheter and the drill hole.

[0031] Step S33, moving the airbag located at the front side forward by means of the rope until the amount of water per unit time flowing out of the catheter is the same as the original water inflow.

[0032] Compared with the prior art, the advantages of the present invention are:

[0033] By setting an airbag on the catheter, and the airbag is located on the front and rear sides of the grouting hole, when it is in an inflated state, the gap between the catheter and the borehole can be completely blocked, so that the high-pressure slurry cannot diffuse outside the area clamped by the airbag, thereby avoiding the slurry from filling the entire borehole. During subsequent detection, the drill rod can be directly inserted into the original borehole, and continue to drill forward from the position where water gushing occurs, thereby reducing the workload of advance drilling operations and effectively reducing construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is a schematic structural diagram of the grouting water blocking device for the water-rich tunnel in Example 1.

[0035] Figure 2 It is a flow chart of the grouting water blocking method in Example 2.

[0036] Figure 3 It is a process schematic diagram of step S21 in Example 2.

[0037] Figure 4It is a process schematic diagram of step S22 in Example 2.

[0038] Figure 5 It is a process schematic diagram of step S23 in Example 2.

[0039] Figure 6 It is a process diagram of step S31 in Example 2.

[0040] Figure 7 It is a process diagram of step S32 in Example 2.

[0041] Figure 8 It is a process diagram of step S33 in Example 2.

[0042] Fig. 9 This is a process diagram of step S4 in Example 2.

[0043] Fig.10 It is a process schematic diagram of step S5 in Example 2.

[0044] Fig.11 This is a process diagram of step S6 in Example 2.

[0045] Fig.12 It is a process schematic diagram of step S22 in Example 3.

[0046] Fig.13 It is a process schematic diagram of step S31 in Example 3.

[0047] The numbers in the figure represent: 1. catheter; 11. grouting hole; 12. air bag; 13. rope; 14. scale line; 15. air pipe; 16. ring; 2. borehole; 3. three-way valve; 4. grouting pipe; 5. measuring instrument; 6. two-way valve; 7. rock crack. DETAILED DESCRIPTION

[0048] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.

[0049] Example 1

[0050] like Figure 1As shown, the first embodiment of the grouting and water plugging device for a water-rich tunnel of the present invention comprises a conduit 1 with a closed front end, a grouting hole 11 is formed on the side wall of the conduit 1, and an annular air bag 12 is mounted on both the front and rear sides of the grouting hole 11. The air bag 12 can fill the gap between the conduit 1 and the borehole 2 in an inflated state. When using this device for grouting and water plugging construction, first adjust the position of the conduit 1 and the air bag 12 so that each rock fissure 7 is located between the two air bags 12, and inflate the air bag 12 to completely fill the gap between the conduit 1 and the borehole 2, and then inject high-pressure grout into the conduit 1. The high-pressure grout is discharged from the grouting hole 11 into the space between the two air bags 12, and the space is connected to the rock fissure 7. Under the action of pressure, the high-pressure grout enters the rock fissure 7 and diffuses. After the slurry is initially solidified and the airbag 12 is deflated, the catheter 1 is screwed to break the initial solidified slurry in the gap between the catheter 1 and the borehole 2 and release the connection, and then the catheter 1 is pulled out of the borehole 2 to complete the grouting and water blocking construction. Compared with the prior art, in the technical solution of the present application, since the airbag 12 is provided on the catheter 1, and the airbag 12 is located on the front and rear sides of the grouting hole 11, when it is in an inflated state, the gap between the catheter 1 and the borehole 2 can be completely blocked, so that the high-pressure slurry cannot spread outside the area clamped by the airbag 12, and the slurry is prevented from filling the entire borehole 2. When performing subsequent detection, the drill rod can be directly inserted into the original borehole, and continue to drill forward from the position where the water gushing occurs, thereby reducing the workload of the advance drilling operation and effectively reducing the construction cost.

[0051] Specifically, in order to control the inflation and deflation of the airbag 12 , an air tube 15 is connected to the airbag 12 , and a distal end of the air tube 15 passes through the drilled hole 2 .

[0052] In this embodiment, the airbag 12 is slidably mounted on the catheter 1, and the airbag 12 pulls a wire 13 for controlling the forward and backward movement of the airbag 12. The wires 13 are pulled on both the front and rear sides of each airbag 12, and the ends of the wires 13 are passed through the drill hole 2. A ring 16 for passing the wires 13 is formed on the catheter 1 in front of each airbag 12. The wire 13 pulled on the front side of the airbag 12 passes through the ring 16 and then turns, so that the airbag 12 can be driven forward when the wire 13 is pulled.

[0053] In this embodiment, the rear section of the catheter 1 is formed with scale lines 14 for marking the insertion depth of the catheter 1. By setting the scale lines 14 on the outer surface of the rear section of the catheter 1, by reading the scale at the opening of the borehole 2, the depth of the catheter 1 inserted into the borehole 2 can be known, so that the specific position of the rock fracture 7 can be further determined.

[0054] In this embodiment, a three-way valve 3 is installed at the rear end of the catheter 1, one port of the three-way valve 3 is connected to the grouting pipe 4, and the other port is installed with a measuring instrument 5, which is a water pressure gauge, and a two-way valve 6 is connected in series in its downstream direction. When it is necessary to obtain the water pressure information of the gushing water, the port of the three-way valve 3 connected to the water pressure gauge is opened, and the port connected to the grouting pipe 4 is closed at the same time. At this time, the gushing water in the borehole 2 flows out through the water pressure gauge and the two-way valve 6. After the two-way valve 6 is closed, the gushing water gathers in the pipeline and increases pressure. At this time, the water pressure gauge can obtain the water pressure information of the gushing water. When it is necessary to grout into the catheter 1, it is only necessary to close the port of the three-way valve 3 connected to the water pressure gauge and open the port connected to the grouting pipe 4 at the same time. The other end of the grouting pipe 4 is connected to the catheter of the external high-pressure grouting machine, and the high-pressure slurry enters the catheter 1 from the grouting pipe 4 through the three-way valve 3. In other embodiments, the measuring instrument 5 can also be one or more of a flow meter, a thermometer, a pH meter, and a conductivity meter.

[0055] Then, the invention also discloses a grouting water blocking method for a water-rich tunnel.

[0056] Example 2

[0057] like Figure 2As shown, the first embodiment of the grouting water blocking method for a water-rich tunnel of the present invention is applied to the above-mentioned grouting water blocking device and includes the following steps: step S1, measuring the original water inflow; step S2, determining the number and depth of the rock fissures 7; step S3, adjusting the position of the catheter 1 and the airbag 12 so that each rock fissure 7 is located between the two airbags 12; step S4, inflating the airbag 12 to completely fill the gap between the catheter 1 and the borehole 2, and injecting high-pressure slurry into the catheter 1; step S5, after the slurry is initially solidified, the airbag 12 is deflated, and the initial solidified slurry in the gap between the catheter 1 and the borehole 2 is broken by screwing the catheter 1; step S6, pulling the catheter 1 out of the borehole 2. When using this device for grouting water blocking construction, the flow rate of the water inflow is first measured before the catheter 1 is inserted into the borehole 2, and then the number and depth of the rock fissures 7 are detected. After the number and depth information of the rock fissures 7 are determined, the positions of the catheter 1 and the airbag 12 are adjusted so that each rock fissure 7 is located between the two airbags 12, and the airbag 12 is inflated to completely fill the gap between the catheter 1 and the borehole 2, and then high-pressure grout is injected into the catheter 1. The high-pressure grout is discharged from the grouting hole 11 into the space between the two airbags 12, which is connected to the rock fissures 7. Under the action of pressure, the high-pressure grout enters the rock fissures 7 and diffuses. After the slurry is initially solidified, the airbag 12 is deflated, and the catheter 1 is screwed to break the initial solidification slurry in the gap between the catheter 1 and the borehole 2, and the connection is released, and then the catheter 1 is pulled out from the borehole 2 to complete the grouting and water blocking construction. Compared with the prior art, in the technical solution of the present application, since an airbag 12 is provided on the catheter 1, and the airbag 12 is located on the front and rear sides of the grouting hole 11, when it is in an inflated state, the gap between the catheter 1 and the borehole 2 can be completely blocked, so that the high-pressure slurry cannot diffuse outside the area clamped by the airbag 12, thereby avoiding the slurry from filling the entire borehole 2. When conducting subsequent detection, the drill rod can be directly inserted into the original borehole, and continue to drill forward from the position where the water gushing occurs, thereby reducing the workload of the advance drilling operation and effectively reducing the construction cost.

[0058] In this embodiment, there are three rock cracks 7, and step S2 includes: step S21, the front end of the catheter 1 is inserted into the borehole 2, and the air bag 12 located at the rear side is inflated to fill the gap between the catheter 1 and the borehole 2 (such as Figure 3 As shown, at this time, under the blocking of the air bag 12 located at the rear side, all the gushing water enters the catheter 1 from the grouting hole 11 and is discharged from the rear end); step S22, go deep into the catheter 1, and the gushing water flows out from the catheter 1 and the borehole 2 at the same time, and it is determined that there are multiple rock cracks 7, and the insertion depth of the catheter 1 at this time is recorded as L A (like Figure 4As shown, the air bag 12 at the rear side has just passed the position of the rock fissure 7 at the rear side. At this time, the water gushing out of the rock fissure 7 at the rear side cannot enter the catheter 1 because it is blocked by the air bag 12, and thus flows out from the borehole 2; while the water gushing out of the soil fissure 7 at the front side continues to enter the catheter 1 from the grouting hole 11 and flows out from the rear end); step S23, continue to insert the catheter 1 forward, and when no water flows out of the catheter 1, record the insertion depth of the catheter 1 as L B (like Figure 5 As shown, the airbag 12 at the rear side has just passed the location of the rock fissure 7 at the front side. At this time, all the water gushing out of the rock fissure 7 cannot enter the catheter 1 because it is blocked by the airbag 12, so it all flows out from the borehole 2). The rear section of the catheter 1 is formed with a scale line 14 for marking the insertion depth of the catheter 1. By setting the scale line 14 on the outer surface of the rear section of the catheter 1, by reading the scale at the opening of the borehole 2, the depth of the catheter 1 inserted into the borehole 2 can be known, so that the specific location of the rock fissure 7 can be further determined. By moving the catheter 1 to change the depth of the rear airbag 12 in the borehole 2, and observing the outflow method of the gushing water and the scale of the catheter 1, the value L can be obtained. A and L B , where L A It reflects the depth of the last rock crack 7 from the borehole, L B That is, in the technical solution disclosed in the present application, the number and depth of the rock fissures 7 can be measured by simply pushing the guide tube 1 and observing the water flow without the need for external equipment, thereby reducing the construction difficulty and saving construction costs.

[0059] In this embodiment, step S3 includes: step S31, moving the catheter 1 backward to an insertion depth of (L A -S); where S≥2cm, but not greater than the original spacing between the two airbags 12 (such as Figure 6 As shown, when the insertion depth of the catheter 1 is L A In step S32, the airbag 12 at the rear side is facing the rock fissure 7 at the rear side. In order to prevent the high-pressure slurry from entering the rock fissure 7 at the rear side due to the blockage of the airbag 12, the airbag 12 is moved backward by a distance S); step S32, the airbag 12 at the front side is inflated to fill the gap between the conduit 1 and the borehole 2 (such as Figure 7 As shown in FIG. 1 , at this time, the rock fissure 7 at the front side is located in front of the air bag 12 at the front side, so the water gushing out of it cannot enter the conduit 1 through the grouting hole 11 and be discharged. If grouting is performed at this time, the slurry cannot enter the rock fissure 7 at the front side); step S33, moving the air bag 12 at the front side forward by the rope 13 until the water volume per unit time flowing out of the conduit 1 is the same as the original water volume (such as Figure 8As shown, at this time, the airbag 12 on the front side is located in front of the rock fissure 7 at the front side, that is, the three rock fissures 7 are all located in the area sandwiched by the two airbags 12, so the water gushing out of the three rock fissures 7 enters the catheter 1 through the grouting hole 11 and is discharged. At this time, the water volume per unit time flowing out of the catheter 1 is the same as the original water volume. If grouting is performed at this time, the slurry can enter the three rock fissures 7). The airbag 12 can be slidably mounted on the catheter 1, and the airbag 12 pulls a rope 13 for controlling the forward and backward movement of the airbag 12. The front and rear sides of each airbag 12 are pulled by the rope 13, and the ends of the rope 13 are all passed through the borehole 2. A ring 16 for passing the rope 13 is formed on the catheter 1 in front of each airbag 12. The rope 13 pulled on the front side of the airbag 12 passes through the ring 16 and then turns, so that the airbag 12 can be driven forward when the rope 13 is pulled. In the technical solution disclosed in the present application, the depth of the airbag 12 in the borehole 2 can be adjusted simply by pulling the rope 13. Combined with the observation of the water flow, each rock fissure 7 can be located between the two airbags 12 to prevent the slurry from entering the rock fissure 7. This method is easy to operate and does not require the assistance of external equipment.

[0060] In this embodiment, after completing step S33, step S4 will be executed: the airbag 12 will be inflated to completely fill the gap between the catheter 1 and the borehole 2, and form a strong squeeze with the outer wall of the catheter 1 and the inner wall of the borehole 2. The squeezing force must be able to effectively resist the push of the slurry. After that, high-pressure slurry is injected into the catheter 1, and the high-pressure slurry is discharged from the grouting hole 11 into the space between the two airbags 12. The space is connected to the rock fissure 7. Under the action of pressure, the high-pressure slurry enters the rock fissure 7 and diffuses (such as Fig. 9 shown).

[0061] In this embodiment, after completing step S4, step S5 is executed: after the slurry is initially solidified, the airbag 12 is deflated and the catheter 1 is screwed to break the initially solidified slurry in the gap between the catheter 1 and the borehole 2, and the connection between the catheter 1 and the borehole 2 is released (such as Fig.10 shown).

[0062] In this embodiment, after completing step S5, step S6 is executed: the catheter 1 is pulled out from the borehole 2, and the grouting and water blocking construction is completed. The pulled-out catheter 1 only needs to clean the slurry and can be kept for next use (such as Fig.11 shown).

[0063] Example 3

[0064] The second embodiment of the grouting water plugging method for a water-rich tunnel of the present invention is basically the same as the embodiment 2, except that: there is only one rock fissure 7, and step S2 includes: step S21, the front end of the catheter 1 is inserted into the borehole 2, and the air bag 12 located at the rear side is inflated to fill the gap between the catheter 1 and the borehole 2 (at this time, under the plugging of the air bag 12 located at the rear side, all the gushing water enters the catheter 1 from the grouting hole 11 and is discharged from the rear end); step S22, go deep into the catheter 1 forward, the gushing water stops flowing out, it is determined that there is only one rock fissure 7, and the insertion depth of the catheter 1 at this time is recorded as L A (like Fig.12 As shown, the air bag 12 located at the rear side is located at the position of the rock fissure 7 on the rear side. At this time, the water gushing out of the rock fissure 7 on the rear side is blocked by the air bag 12, so the gushing water stops flowing out). The rear section of the catheter 1 is formed with a scale line 14 for marking the insertion depth of the catheter 1. By setting the scale line 14 on the outer surface of the rear section of the catheter 1, by reading the scale at the opening of the borehole 2, the depth of the catheter 1 inserted into the borehole 2 can be known, so that the specific position of the rock fissure 7 can be further determined. By moving the catheter 1 to change the depth of the rear air bag 12 in the borehole 2, and observing the outflow method of the gushing water and the scale of the catheter 1, the value L can be obtained. A , which reflects the depth of the rock fissure 7 from the borehole. That is to say, in the technical solution disclosed in the present application, the number and depth of the rock fissure 7 can be measured by simply pushing the guide tube 1 and observing the water flow without the need for external equipment, thereby reducing the construction difficulty and saving the construction cost.

[0065] In this embodiment, the step S3 includes: step S31, moving the catheter 1 backward to an insertion depth of (L A -S); where S≥2cm, but not greater than the original spacing between the two airbags 12 (such as Fig.13 As shown, when the insertion depth of the catheter 1 is L A At the same time, in order to prevent the airbag 12 located at the front side from coming to the rear side of the rock fissure 7 due to the blockage of the airbag 12, it is moved backward a distance S. At the same time, in order to prevent the airbag 12 located at the front side from coming to the rear side of the rock fissure 7 due to excessive movement distance, S should not be greater than the original distance between the two airbags 12).

[0066] Although the present invention has been disclosed as above with preferred embodiments, it is not intended to limit the present invention. Any technician familiar with the art can make many possible changes and modifications to the technical solution of the present invention by using the technical content disclosed above without departing from the scope of the technical solution of the present invention, or modify it into an equivalent embodiment of equivalent changes. Therefore, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention should fall within the scope of protection of the technical solution of the present invention.

Claims

1. A grouting water blocking device for a water-rich tunnel, characterized in that: The invention comprises a catheter (1) with a closed front end, a grouting hole (11) formed on the side wall of the catheter (1), an annular air bag (12) is mounted on both the front and rear sides of the grouting hole (11), and the air bag (12) can fill the gap between the catheter (1) and the borehole (2) in an inflated state; the air bag (12) can be slidably mounted on the catheter (1), and the air bag (12) pulls a wire rope (13) for controlling the forward and backward movement of the air bag (12).

2. The grouting water blocking device for a water-rich tunnel according to claim 1 is characterized in that: The rear section of the catheter (1) is formed with a scale line (14) for marking the insertion depth of the catheter (1).

3. The grouting water blocking device for a water-rich tunnel according to claim 1 is characterized in that: A three-way valve (3) is installed at the rear end of the conduit (1); one port of the three-way valve (3) is connected to a grouting pipe (4), and the other port is installed with a measuring instrument (5).

4. The grouting water blocking device for a water-rich tunnel according to claim 3 is characterized in that: The measuring instrument (5) comprises one or more of a flow meter, a thermometer, a pH meter and a conductivity meter.

5. The grouting water blocking device for a water-rich tunnel according to claim 3 is characterized in that: The measuring instrument (5) comprises a water pressure gauge, and a two-way valve (6) is connected in series in the downstream direction of the measuring instrument (5).

6. A method for blocking water by grouting in a water-rich tunnel, characterized in that: The grouting and water blocking device used in any one of claims 1 to 5 comprises the following steps: Step S1, measuring the original water inflow; Step S2, determining the number and depth of rock mass fissures (7); Step S3, adjusting the positions of the guide tube (1) and the airbag (12) so that each rock mass fissure (7) is located between the two airbags (12); Step S4, the airbag (12) is inflated until the gap between the catheter (1) and the borehole (2) is completely filled, and high-pressure slurry is injected into the catheter (1); Step S5, when the slurry is initially solidified, the air bag (12) is deflated, and the initially solidified slurry in the gap between the catheter (1) and the drill hole (2) is broken by twisting the catheter (1); Step S6, pulling out the catheter (1) from the drill hole (2).

7. The grouting water blocking method for a water-rich tunnel according to claim 6, characterized in that: The step S2 comprises: Step S21, the front end of the catheter (1) is inserted into the drill hole (2), and the air bag (12) located at the rear side is inflated until the gap between the catheter (1) and the drill hole (2) is filled; Step S22A, insert the conduit (1) forward. If the gushing water stops flowing out, it is determined that the rock mass fissure (7) is a single location, and the insertion depth of the conduit (1) at this time is recorded as L. A ; Step S22B, insert the conduit (1) forward. If water gushes out of the conduit (1) and the borehole (2) at the same time, it is determined that there are multiple rock fractures (7). The insertion depth of the conduit (1) at this time is recorded as L. A ; Step S23: If there are multiple rock cracks (7), continue to insert the catheter (1) forward. When no water flows out of the catheter (1), record the insertion depth of the catheter (1) as L. B .

8. The grouting water blocking method for a water-rich tunnel according to claim 7, characterized in that: If the rock mass fissure (7) is single, step S3 comprises: Step S31A, move the catheter (1) backward to an insertion depth of (L A -S); wherein S≥2cm, but not greater than the original spacing between the two airbags (12).

9. The grouting water blocking method for a water-rich tunnel according to claim 7, characterized in that: If there are multiple rock mass fissures (7), step S3 includes: Step S31B, move the catheter (1) backward to an insertion depth of (L A -S); wherein S≥2cm, but not greater than the original spacing between the two airbags (12); Step S32, the airbag (12) located at the front side is inflated until it fills the gap between the catheter (1) and the drill hole (2); Step S33, moving the air bag (12) located at the front side forward by means of the wire rope (13) until the amount of water per unit time flowing out of the catheter (1) is the same as the original water inflow amount.