Switch tube control method, control processing unit and voltage converter

By introducing a delay control mechanism into the parallel bridge arm of the DC-DC converter, the problem of large power loss in the switching tube control process of the traditional DC-DC converter is solved, and the effect of reducing the power loss of the switching tube is achieved and the voltage is improved. Conversion efficiency of the converter.

CN116488439BActive Publication Date: 2024-11-05SHENZHEN MEGMEET ELECTRICAL CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202310477295.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-04-26
Publication Date
2024-11-05
Estimated Expiration
2043-04-26

AI Technical Summary

Technical Problem

Traditional DC-DC converters have large power losses during switching tube control, and it is necessary to reduce the power losses on the switching tube.

Method used

By introducing a delay control mechanism in the parallel bridge arm of the voltage converter, the switch tube in the corresponding bridge arm is delayed when the switch tube is turned off to reduce the free current through the body diode, thereby reducing power loss. The specific steps include delaying the first time when the switch tube of the first upper bridge arm is turned off and then closing the switch tube in the second lower bridge arm is turned off and delaying the first time when the switch tube of the first lower bridge arm is turned off. After the duration, the switch tube in the second upper bridge arm is turned off, and the conduction and shutdown of the switch tube is similarly controlled in other bridge arms.

Benefits of technology

Effectively reduces power loss on the switching tube, improves the conversion efficiency of the voltage converter, and enables the current to be recurrent through the switching tube more effectively, reducing the voltage drop of the body diode, thereby reducing the power loss.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116488439B_ABST
    Figure CN116488439B_ABST
Patent Text Reader

Abstract

The present application discloses a switch tube control method, a control processing unit and a voltage converter. The switch tube control method is used to control the switch tube in the voltage converter, the voltage converter includes a first bridge arm and a second bridge arm connected in parallel, the first bridge arm and the second bridge arm are used to convert the voltage of the input power supply into a first voltage, the first bridge arm includes a first upper bridge arm and a first lower bridge arm, and the second bridge arm includes a second upper bridge arm and a second lower bridge arm. The method includes one of the following two steps: step (i), when the switch tube in the first upper bridge arm is turned off, delay a first time length; at the moment when the first time length ends, control the switch tube in the second lower bridge arm to turn off. Step (ii), when the switch tube in the first lower bridge arm is turned off, delay a first time length; at the moment when the first time length ends, control the switch tube in the second upper bridge arm to turn off. Through the above method, the power loss on the switch tube can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of converters, and in particular to a switch tube control method, a control processing unit and a voltage converter. Background Art

[0002] DC-DC converters have always been an important part of the power electronics field. There are many topological structures of DC-DC converters. In the field of medium and large power, the full-bridge PWM converter is the most commonly used topology. In other words, the current DC-DC converters all achieve the conversion of electromagnetic energy by controlling the on and off of the switch tube.

[0003] However, for a traditional DC-DC converter, during the control process of the switch tube, the power loss on the switch tube is relatively large. Summary of the invention

[0004] The present application aims to provide a switch tube control method, a control processing unit and a voltage converter, which can reduce the power loss of the switch tube.

[0005] To achieve the above-mentioned purpose, in a first aspect, the present application provides a switch tube control method, the method is used to control the switch tube in a voltage converter, the voltage converter includes a first bridge arm and a second bridge arm connected in parallel, the two ends of the first bridge arm are connected to the two ends of an input power supply, the first bridge arm and the second bridge arm are used to convert the voltage of the input power supply into a first voltage, and the first voltage is output from the midpoint of the first bridge arm and the midpoint of the second bridge arm, wherein the first bridge arm includes a first upper bridge arm and a first lower bridge arm, and the connection point between the first upper bridge arm and the first lower bridge arm is the midpoint of the first bridge arm, and the second bridge arm includes a second upper bridge arm and a second lower bridge arm, and the connection point between the second upper bridge arm and the second lower bridge arm is the midpoint of the second bridge arm;

[0006] The method includes one of the following two steps:

[0007] Step (i), when the switch tube of the first upper bridge arm is turned off, delaying for a first time length;

[0008] At the end of the first time period, the switch tube in the second lower bridge arm is controlled to be turned off;

[0009] Step (ii), when the switch tube in the first lower bridge arm is turned off, delaying for a first time length;

[0010] At the moment when the first time period ends, the switch tube in the second upper bridge arm is controlled to be turned off.

[0011] In an optional manner, step (i) further includes: when the switch tube in the second lower bridge arm is turned off, delaying for a second time period;

[0012] At the end of the second time period, the switch tube in the first lower bridge arm is controlled to be turned on;

[0013] Step (ii) further includes: when the switch tube in the second upper bridge arm is turned off, delaying for a second time period;

[0014] At the moment when the second time period ends, the switch tube in the first upper bridge arm is controlled to be turned on.

[0015] In an optional manner, step (i) further includes: when the switch tube in the first lower bridge arm is turned on, delaying for a third time period;

[0016] At the end of the third time period, the switch tube in the second upper bridge arm is controlled to be turned on;

[0017] Step (ii) further includes: when the switch tube in the first upper bridge arm is turned on, delaying for a third time period;

[0018] At the moment when the third time period ends, the switch tube in the second lower bridge arm is controlled to be turned on.

[0019] In an optional manner, step (i) further includes: after controlling the switch tube of the second upper bridge arm to be turned on, controlling the switch tube in the second upper bridge arm to remain turned on for a fourth time period;

[0020] At the end of the fourth time period, the switch tube in the second upper bridge arm is controlled to be turned off;

[0021] Step (ii) further includes: after controlling the switch tube of the second lower bridge arm to be turned on, controlling the switch tube in the second lower bridge arm to remain turned on for a fourth time period;

[0022] At the moment when the fourth time period ends, the switch tube in the second lower bridge arm is controlled to be turned off.

[0023] In an optional manner, step (i) further includes: when the switch tube in the second upper bridge arm is turned off, delaying for a fifth time period;

[0024] At the end of the fifth time period, the switch tube in the first lower bridge arm is controlled to be turned off;

[0025] Step (ii) further includes: when the switch tube in the second lower bridge arm is turned off, delaying for a fifth time period;

[0026] At the moment when the fifth time period ends, the switch tube in the first upper bridge arm is controlled to be turned off.

[0027] In an optional manner, step (i) further includes: when the switch tube in the first lower bridge arm is turned off, delaying for a sixth time period;

[0028] At the end of the sixth time period, the switch tube in the second lower bridge arm is controlled to be turned on;

[0029] Step (ii) further includes: when the switch tube in the first upper bridge arm is turned off, delaying for a sixth time period;

[0030] At the moment when the sixth time period ends, the switch tube in the second upper bridge arm is controlled to be turned on.

[0031] In an optional manner, step (i) further includes: when the switch tube in the second lower bridge arm is turned on, delaying for a seventh time period;

[0032] At the end of the seventh time period, the switch tube in the first upper bridge arm is controlled to be turned on;

[0033] Step (ii) further includes: when the switch tube in the second upper bridge arm is turned on, delaying for a seventh time period;

[0034] At the end of the seventh time period, the switch tube in the first lower bridge arm is controlled to be turned on.

[0035] In an optional manner, step (i) further includes: after controlling the switch tube of the first upper bridge arm to be turned on, controlling the switch tube in the first upper bridge arm to remain turned on for an eighth time period;

[0036] At the end of the eighth time period, the switch tube in the first upper bridge arm is controlled to be turned off;

[0037] Step (ii) further includes: after controlling the switch tube of the first lower bridge arm to be turned on, controlling the switch tube in the first lower bridge arm to remain turned on for an eighth time period;

[0038] At the end of the eighth time period, the switch tube in the first lower bridge arm is controlled to be turned off.

[0039] In an optional manner, the sum of the first duration, the second duration, and the third duration is equal to the sum of the fifth duration, the sixth duration, and the seventh duration;

[0040] The ratio of the first duration, the second duration and the third duration is 2:1:2;

[0041] The ratio of the fifth duration, the sixth duration and the seventh duration is 2:1:2.

[0042] In a second aspect, the present application provides a control processing unit, including:

[0043] At least one processor and a memory communicatively connected to the at least one processor, the memory storing instructions executable by the at least one processor, the instructions being executed by the at least one processor so that the at least one processor can execute the method as described above.

[0044] In a third aspect, the present application provides a voltage converter, comprising:

[0045] A first bridge arm, a second bridge arm, and a control processing unit as claimed in claim 10;

[0046] The first bridge arm and the second bridge arm are connected in parallel, wherein the first bridge arm and the second bridge arm each include at least one switch tube;

[0047] The control processing unit is used to control the on and off of the switch tube.

[0048] The beneficial effect of the present application is that the switch tube control method provided by the present application is used to control the switch tube in the voltage converter. Wherein, the voltage converter includes a first bridge arm and a second bridge arm connected in parallel, the two ends of the first bridge arm are connected to the two ends of the input power supply, the first bridge arm and the second bridge arm are used to convert the voltage of the input power supply into a first voltage, and the first voltage is output from the midpoint of the first bridge arm and the midpoint of the second bridge arm, wherein the first bridge arm includes a first upper bridge arm and a first lower bridge arm, and the connection point between the first upper bridge arm and the first lower bridge arm is the midpoint of the first bridge arm, and the second bridge arm includes a second upper bridge arm and a second lower bridge arm, and the connection point between the second upper bridge arm and the second lower bridge arm is the midpoint of the second bridge arm. For step (i), in the process of controlling the switch tube, if the switch tube of the first upper bridge arm is turned off first, the switch tube in the second lower bridge arm is turned off after delaying for the first time length. Then, when the switch tube in the first upper bridge arm is turned off, the current in the voltage converter can be continued through the switch tube in the second lower bridge arm, rather than continued through the body diode of the switch tube in the second lower bridge arm. Since the voltage drop of the switch tube in the second lower bridge arm when it is turned on is less than the voltage drop of the body diode of the switch tube in the second lower bridge arm, the power loss on the switch tube in the second lower bridge arm is relatively small at this time. For step (ii), based on the same analysis process, it can be determined that the power loss on the switch tube in the second upper bridge arm is relatively small. In summary, both step (i) and step (ii) can achieve the purpose of reducing the power loss on the switch tube during the control process of the switch tube. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] One or more embodiments are exemplarily described by pictures in the corresponding drawings, and these exemplified descriptions do not constitute limitations on the embodiments. Elements with the same reference numerals in the drawings represent similar elements, and unless otherwise stated, the figures in the drawings do not constitute proportional limitations.

[0050] Figure 1 A schematic diagram of the structure of a voltage converter provided in one embodiment of the present application;

[0051] Figure 2 A schematic diagram of the circuit structure of a voltage converter provided in one embodiment of the present application;

[0052] Figure 3 A flow chart of a switch control method provided in one embodiment of the present application;

[0053] Figure 4 A schematic diagram of various signals in a voltage converter provided in an embodiment of the present application;

[0054] Figure 5 In the implementation provided by an embodiment of the present application Figure 3 Flow chart of the method after step 32 shown in;

[0055] Figure 6 In the implementation provided by an embodiment of the present application Figure 5 Flow chart of the method after step 52 shown in;

[0056] Figure 7 In the implementation provided by an embodiment of the present application Figure 6 Flow chart of the method after step 62 shown in;

[0057] Figure 8 In the implementation provided by an embodiment of the present application Figure 7 Flow chart of the method after step 72 shown in;

[0058] Fig. 9 In the implementation provided by an embodiment of the present application Figure 8 Flow chart of the method after step 82 shown in;

[0059] Fig.10 In the implementation provided by an embodiment of the present application Fig. 9 Flow chart of the method after step 92 shown in;

[0060] Fig.11 In the implementation provided by an embodiment of the present application Fig.10 Flow chart of the method after step 102 shown in;

[0061] Fig.12 A flow chart of a switch tube control method provided in another embodiment of the present application;

[0062] Fig.13 A schematic diagram of various signals in a voltage converter provided by another embodiment of the present application;

[0063] Fig.14 A schematic diagram of the structure of a control processing unit provided in one embodiment of the present application. DETAILED DESCRIPTION

[0064] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0065] Please refer to Figure 1 , Figure 1 Schematic diagram of the structure of the voltage converter 100 provided in the embodiment of the present application. Figure 1 As shown, the voltage converter 100 includes a first bridge arm 10 and a second bridge arm 20 connected in parallel. The two ends of the first bridge arm 10 are connected to the two ends of the input power supply VIN. The two ends of the second bridge arm 20 are connected to the two ends of the input power supply VIN. Among them, the first bridge arm 10 includes a first upper bridge arm 11 and a first lower bridge arm 12, and the second bridge arm 20 includes a second upper bridge arm 21 and a second lower bridge arm 22. The connection point between the first upper bridge arm 11 and the first lower bridge arm 12 is the midpoint N1 of the first bridge arm 10, and the connection point between the second upper bridge arm 21 and the second lower bridge arm 22 is the midpoint N2 of the second bridge arm 20.

[0066] In this embodiment, the first bridge arm 10 and the second bridge arm 20 are used to convert the voltage of the input power supply VIN into a first voltage. In addition, the first voltage is output from the midpoint of the first bridge arm 10 and the midpoint of the second bridge arm 20. Specifically, the first upper bridge arm 11, the first lower bridge arm 12, the second upper bridge arm 21 and the second lower bridge arm 22 each include at least one switch tube, and the voltage of the input power supply VIN can be converted into the first voltage by controlling the switch tube in the first upper bridge arm 11, the switch tube in the first lower bridge arm 12, the switch tube in the second upper bridge arm 21 and the switch tube in the second lower arm to be turned on or off.

[0067] Please refer to Figure 2 , Figure 2 exemplarily shows a structure in which the first upper bridge arm 11, the first lower bridge arm 12, the second upper bridge arm 21 and the second lower bridge arm 22 all include at least one switch tube.

[0068] like Figure 2 As shown, the first upper bridge arm 11 includes a first switch tube Q1, the first lower bridge arm 12 includes a second switch tube Q2, the second upper bridge arm 21 includes a third switch tube Q3, and the second lower bridge arm 22 includes a fourth switch tube Q4. The control signals of the first switch tube Q1, the second switch tube Q2, the third switch tube Q3 and the fourth switch tube Q4 are all pulse width modulation (PWM) signals.

[0069] Among them, in this embodiment, the first switch tube Q1, the second switch tube Q2, the third switch tube Q3 and the fourth switch tube Q4 are all switch tubes with body diodes. In addition, this embodiment takes the first switch tube Q1, the second switch tube Q2, the third switch tube Q3 and the fourth switch tube Q4 as MOS tubes as an example, and in other embodiments, other types of switch tubes can also be used, and it is only necessary to have a body diode. The embodiment of the present application does not make specific restrictions on this. For example, in some embodiments, the first switch tube Q1, the second switch tube Q2, the third switch tube Q3 and the fourth switch tube Q4 are all IGBT switch tubes with body diodes.

[0070] It is understandable that if Figure 2 As shown, in the voltage converter 100, the midpoint of the first bridge arm 10 and the midpoint of the second bridge arm 20 are usually connected to the transformer U1. The specific circuit structure of the voltage converter 100 is well known and will not be repeated here. Taking the DC-DC voltage converter 100 as an example, the midpoint of the first bridge arm 10 and the midpoint of the second bridge arm 20 are connected to the transformer U1, and the transformer U1 is connected to the full-wave rectifier circuit through the interface J1 and the interface J2, and finally the voltage of the input power supply VIN is converted into a stable DC voltage output.

[0071] Please refer to Figure 3 , Figure 3 A schematic diagram of a flow chart of a switch tube control method provided in an embodiment of the present application. The switch tube control method is used to control Figure 1 or Figure 2 The switch tube in the voltage converter shown in FIG. Figure 1 to Figure 2 The detailed description will not be repeated here.

[0072] like Figure 3 As shown, the switch tube control method includes the following steps:

[0073] Step 31: When the switch tube of the first upper bridge arm is turned off, delay for a first time period.

[0074] Step 32: When the first time period ends, the switch tube in the second lower bridge arm is controlled to be turned off.

[0075] Among them, the first duration is a pre-set duration, which can be set according to actual application conditions, and the embodiment of the present application does not impose any specific restrictions on this.

[0076] by Figure 2Take the circuit structure shown as an example. Specifically, assuming that at the current moment, the first switch tube Q1 and the fourth switch tube Q4 are in the on state, the input power supply VIN, the first switch tube Q1, the transformer U1, and the fourth switch tube Q4 form a loop. Then, when the on time of the first switch tube Q1 is reached, the first switch tube Q1 is turned off. At this time, the timing starts and the first time is counted. At the moment when the timing stops, that is, the moment when the first time stops, the fourth switch tube Q4 is turned off.

[0077] In the related art, the first switch tube Q1 and the fourth switch tube Q4 are usually turned off at the same time. Moreover, when the first switch tube Q1 and the fourth switch tube Q4 are turned off, there is still current on the voltage converter 100. The current flows through the body diode of the first switch tube Q1 and the body diode of the fourth switch tube Q4. At this time, the power loss is the sum of the product of the square of the current and the voltage drop of the body diode of the first switch tube Q1 and the product of the square of the current and the voltage drop of the body diode of the fourth switch tube Q4.

[0078] For this application, please refer to Figure 2 and Figure 4 , Figure 4 Schematic diagram of the control signals of the first switch tube Q1, the second switch tube Q2, the third switch tube Q3 and the fourth switch tube Q4 and the current of the voltage converter 100 is shown in FIG. 1 , wherein the abscissa represents time. Curve L11 represents the control signal of the first switch tube Q1; curve L12 represents the control signal of the second switch tube Q2; curve L13 represents the control signal of the third switch tube Q3; curve L14 represents the control signal of the fourth switch tube Q4; and curve L15 represents the current of the voltage converter 100.

[0079] like Figure 4 As shown, before the moment T1, the first switch tube Q1 and the fourth switch tube Q4 remain turned on. At the moment T1, it can be seen from the curve L11 that the turn-on time of the first switch tube Q1 ends, and the first switch tube Q1 is turned off. It can be seen from the curve L14 that the fourth switch tube Q4 is still turned on, and it can be seen from the curve L15 that the current of the voltage converter 100 is not zero. At this time, since the fourth switch tube Q4 remains turned on, the current of the voltage converter 100 can be continued through the fourth switch tube Q4. The voltage drop of the fourth switch tube Q4 when it is turned on is less than the voltage drop of the body diode of the fourth switch tube Q4. The power consumption generated by the continued current through the fourth switch tube Q4 must be less than the power consumption generated by the continued current through the body diode of the fourth switch tube Q4. Therefore, the switch tube control method provided in the embodiment of the present application can reduce the power loss on the switch tube compared with the technical solutions in the related art.

[0080] Afterwards, at time T2, the fourth switch tube Q4 is turned off. The first time length is the time length between time T1 and time T2.

[0081] In one embodiment, if Figure 5 As shown, after executing step 32, the switch control method further includes the following steps:

[0082] Step 51: When the switch tube in the second lower bridge arm is turned off, delay for a second time period.

[0083] Step 52: When the second time period ends, the switch tube in the first lower bridge arm is controlled to be turned on.

[0084] Among them, the second duration is a pre-set duration, which can be set according to actual application conditions, and the embodiment of the present application does not impose any specific restrictions on this.

[0085] by Figure 2 Take the circuit structure shown as an example. Specifically, when the fourth switch tube Q4 is turned off, the timing starts and the second time period is counted. When the timing ends, the second switch tube Q2 is controlled to be turned on.

[0086] Please refer to Figure 2 and Figure 4 At time T2, the fourth switch tube Q4 is turned off as shown in curve L14. The second time period is delayed until time T3, when the second time period ends, that is, the time period between time T2 and time T3 is the second time period. At time T3, the second switch tube Q2 is turned on as shown in curve L12.

[0087] In this embodiment, by setting the second time length, it can be ensured that the second switch tube Q2 is turned on only when the fourth switch tube Q4 is completely turned off, which can prevent the second switch tube Q2 from being turned on when the fourth switch tube Q4 is not completely turned off and causing a short circuit, thereby improving the reliability and stability of the voltage transformer U1.

[0088] In one embodiment, if Figure 6 As shown, after executing step 52, the switch control method further includes the following steps:

[0089] Step 61: When the switch tube in the first lower bridge arm is turned on, delay for a third time period.

[0090] Step 62: When the third time period ends, control the switch tube in the second upper bridge arm to be turned on.

[0091] Among them, the third duration is a pre-set duration, which can be set according to actual application conditions, and the embodiment of the present application does not impose any specific restrictions on this.

[0092] by Figure 2 Take the circuit structure shown as an example. Specifically, when the second switch tube Q2 is turned on, the timing starts and the third time period is counted. When the timing ends, the third switch tube Q3 is controlled to be turned on.

[0093] Please refer to Figure 2 and Figure 4 At time T3, it can be seen from curve L12 that the second switch tube Q2 is turned on. And the third time length is delayed. Until time T4, the third time length ends, that is, the time length between time T3 and time T4 is the third time length. At time T4, it can be seen from curve L13 that the third switch tube Q3 is turned on. At this time, the input power supply, the third switch tube, the transformer, and the second switch tube form a loop.

[0094] In one embodiment, if Figure 7 As shown, after executing step 62, the switch control method further includes the following steps:

[0095] Step 71: after controlling the switch tube of the second upper bridge arm to be turned on, controlling the switch tube in the second upper bridge arm to remain turned on for a fourth time period.

[0096] Step 72: When the fourth time period ends, the switch tube in the second upper bridge arm is controlled to be turned off.

[0097] Among them, the fourth duration is a pre-set duration, which can be set according to actual application conditions, and the embodiment of the present application does not impose any specific restrictions on this.

[0098] by Figure 2 Take the circuit structure shown in FIG. 1 as an example. Specifically, when the third switch tube Q3 is turned on, timing starts and the fourth time period is counted. When the timing ends, the third switch tube Q3 is controlled to be turned off.

[0099] Please refer to Figure 2 and Figure 4 At time T4, the third switch tube Q3 is turned on as shown in curve L13. The fourth time period is delayed until time T5, when the fourth time period ends, that is, the time period between time T4 and time T5 is the fourth time period. At time T5, the third switch tube Q3 is turned off as shown in curve L13.

[0100] Then, in one embodiment, if Figure 8 As shown, after executing step 72, the switch control method further includes the following steps:

[0101] Step 81: When the switch tube in the second upper bridge arm is turned off, delay for a fifth time period.

[0102] Step 82: When the fifth time period ends, the switch tube in the first lower bridge arm is controlled to be turned off.

[0103] Among them, the fifth duration is a pre-set duration, which can be set according to actual application conditions, and the embodiment of the present application does not impose any specific restrictions on this.

[0104] by Figure 2Take the circuit structure shown in FIG. 1 as an example. Specifically, when the third switch tube Q3 is turned off, timing starts and the fifth time period is counted. When the timing ends, the second switch tube Q2 is controlled to be turned off.

[0105] Please refer to Figure 2 and Figure 4 At time T5, the third switch tube Q3 is turned off as shown in curve L13. The fifth time period is delayed until time T6, when the fifth time period ends, that is, the time period between time T5 and time T6 is the fifth time period. At time T6, the second switch tube Q2 is turned off as shown in curve L12.

[0106] In this embodiment, after the third switch tube Q3 is turned off, between time T5 and time T6, it can be seen from curve L12 that the second switch tube Q2 is still turned on, and it can be seen from curve L15 that the current of the voltage converter 100 is not zero. At this time, since the second switch tube Q2 remains turned on, the current of the voltage converter 100 can be continued through the second switch tube Q2. When the voltage drop of the second switch tube Q2 is turned on, it is less than the voltage drop of the body diode of the second switch tube Q2. Therefore, the power consumption generated by the continued current through the second switch tube Q2 must be less than the power consumption generated by the continued current through the body diode of the second switch tube Q2. Therefore, at this time, the power loss on the switch tube can also be reduced, and the conversion efficiency of the voltage converter 100 can be improved.

[0107] In one embodiment, if Fig. 9 As shown, after executing step 82, the switch control method further includes the following steps:

[0108] Step 91: When the switch tube in the first lower bridge arm is turned off, delay for a sixth time period.

[0109] Step 92: When the sixth time period ends, the switch tube in the second lower bridge arm is controlled to be turned on.

[0110] Among them, the sixth duration is a pre-set duration, which can be set according to actual application conditions, and the embodiment of the present application does not impose any specific restrictions on this.

[0111] by Figure 2 Take the circuit structure shown in FIG. 1 as an example. Specifically, when the second switch tube Q2 is turned off, timing starts and the sixth time period is counted. When the timing ends, the fourth switch tube Q4 is controlled to be turned on.

[0112] Please refer to Figure 2 and Figure 4 At time T6, the second switch tube Q2 is turned off as shown in curve L12. The sixth time period is delayed until time T7, when the sixth time period ends, that is, the time period between time T6 and time T7 is the sixth time period. At time T7, the fourth switch tube Q4 is turned on as shown in curve L14.

[0113] In this embodiment, by setting the sixth time duration, it can be ensured that the fourth switch tube Q4 is turned on only when the second switch tube Q2 is completely turned off, thereby preventing the fourth switch tube Q4 from being turned on when the second switch tube Q2 is not completely turned off and causing a short circuit, thereby improving the reliability and stability of the voltage transformer 100.

[0114] In one embodiment, if Fig.10 As shown, after executing step 92, the switch control method further includes the following steps:

[0115] Step 101: When the switch tube in the second lower bridge arm is turned on, delay for a seventh time period.

[0116] Step 102: When the seventh time period ends, the switch tube in the first upper bridge arm is controlled to be turned on.

[0117] Among them, the seventh duration is a pre-set duration, which can be set according to actual application conditions, and the embodiment of the present application does not impose any specific restrictions on this.

[0118] by Figure 2 Take the circuit structure shown as an example. Specifically, when the fourth switch tube Q4 is turned on, the timing starts and the seventh time period is counted. When the timing ends, the first switch tube Q1 is controlled to be turned on.

[0119] Please refer to Figure 2 and Figure 4 At time T7, it can be seen from curve L14 that the fourth switch tube Q4 is turned on. And the seventh time period is delayed. Until time T8, the seventh time period ends, that is, the time period between time T7 and time T8 is the seventh time period. At time T8, it can be seen from curve L11 that the first switch tube Q1 is turned on. At this time, the input power supply VIN, the first switch tube Q1, the transformer U1, and the fourth switch tube Q4 form a loop.

[0120] In one embodiment, if Fig.11 As shown, after executing step 102, the switch control method further includes the following steps:

[0121] Step 111: after controlling the switch tube of the first upper bridge arm to be turned on, controlling the switch tube in the first upper bridge arm to remain turned on for an eighth time period.

[0122] Step 112: At the end of the eighth time period, the switch tube in the first upper bridge arm is controlled to be turned off.

[0123] Among them, the eighth time length is a pre-set time length, which can be set according to actual application conditions, and the embodiment of the present application does not impose any specific restrictions on this.

[0124] by Figure 2Take the circuit structure shown in FIG. 1 as an example. Specifically, when the first switch tube Q1 is turned on, the timing starts and the eighth time period is counted. When the timing ends, the first switch tube Q1 is controlled to be turned off.

[0125] Please refer to Figure 2 and Figure 4 At time T8, the first switch tube Q1 is turned on as shown in the curve L11. The eighth time period is delayed until time T9, when the eighth time period ends, that is, the time period between time T8 and time T9 is the eighth time period. At time T9, the first switch tube Q1 is turned off as shown in the curve L11.

[0126] Then, execute again Figure 3 The method steps shown. The above process is repeated continuously to realize the complete control process of the switch tube in the voltage converter 100. And, in this process, each time the switch tube in the upper bridge arm is turned off, the switch tube in the lower bridge arm will be turned off with a delay. For example, the fourth switch tube Q4 is turned off with a delay after the first switch tube Q1 is turned off. For another example, the second switch tube Q2 is turned off with a delay after the third switch tube Q3 is turned off. Thereby, the energy loss generated during the freewheeling can be reduced, thereby improving the overall conversion efficiency of the voltage converter 100.

[0127] Please refer to Fig.12 , Fig.12 A schematic flow chart of a switch control method provided by another embodiment of the present application. The switch control method is also used to control the Figure 1 or Figure 2 The switch tube in the voltage converter shown in FIG. Figure 1 to Figure 2 The detailed description of is not repeated here. Fig.12 As shown, the switch tube control method includes the following steps:

[0128] Step 121: When the switch tube in the first lower bridge arm is turned off, delay for a first time period.

[0129] Step 122: When the first time period ends, the switch tube in the second upper bridge arm is controlled to be turned off.

[0130] Still Figure 2 Take the circuit structure shown as an example. Specifically, assuming that at the current moment, the second switch tube Q2 and the third switch tube Q3 are in the on state, the input power supply VIN, the third switch tube Q3, the transformer U1, and the second switch tube Q2 form a loop. Then, when the on time of the second switch tube Q2 is reached, the second switch tube Q2 is turned off. At this time, the timing starts and the first time is counted. At the moment when the timing stops, that is, the moment when the first time stops, the third switch tube Q3 is turned off.

[0131] In one embodiment, after executing step 122, the switch tube control method further includes the following steps: when the switch tube in the second upper bridge arm is turned off, delaying for a second time period; when the second time period ends, controlling the switch tube in the first upper bridge arm to turn on.

[0132] In one embodiment, the switch tube control method further includes the following steps: when the switch tube in the first upper bridge arm is turned on, delaying for a third time period; at the end of the third time period, controlling the switch tube in the second lower bridge arm to be turned on.

[0133] In one embodiment, the switch tube control method also includes the following steps: after controlling the switch tube of the second lower bridge arm to be turned on, controlling the switch tube in the second lower bridge arm to remain turned on within a fourth time period; at the end of the fourth time period, controlling the switch tube in the second lower bridge arm to be turned off.

[0134] In one embodiment, the switch tube control method further includes the following steps: when the switch tube in the second lower bridge arm is turned off, delaying for a fifth time period; at the end of the fifth time period, controlling the switch tube in the first upper bridge arm to turn off.

[0135] In one embodiment, the switch tube control method further includes the following steps: when the switch tube in the first upper bridge arm is turned off, delaying for a sixth time period; at the end of the sixth time period, controlling the switch tube in the second upper bridge arm to be turned on.

[0136] In one embodiment, the switch tube control method further includes the following steps: when the switch tube in the second upper bridge arm is turned on, delaying for a seventh time period; at the end of the seventh time period, controlling the switch tube in the first lower bridge arm to be turned on.

[0137] In one embodiment, the switch tube control method also includes the following steps: after controlling the switch tube of the first lower bridge arm to be turned on, controlling the switch tube in the first lower bridge arm to remain turned on within an eighth time period; at the end of the eighth time period, controlling the switch tube in the first lower bridge arm to be turned off.

[0138] Please refer to Fig.13 , Fig.13 The example shows Fig.12 The schematic diagram of each signal in the voltage converter corresponding to the method steps shown. And, Fig.13 The control signal in Figure 1 and Figure 2 The structure shown. The horizontal axis represents time. Curve L21 represents the control signal of the second switch tube; curve L22 represents the control signal of the first switch tube; curve L23 represents the control signal of the fourth switch tube; curve L24 represents the control signal of the third switch tube.

[0139] It is understandable that in Figure 3In the embodiment shown, the switch tube in the upper bridge arm is disconnected first, and then the switch tube in the lower bridge arm is disconnected. For example, the switch tube in the first upper bridge arm is disconnected first, and then the switch tube in the second lower bridge arm is disconnected. For another example, the switch tube in the second upper bridge arm is disconnected first, and then the switch tube in the first lower bridge arm is disconnected.

[0140] And in Figure 5 In the embodiment shown, the switch tube in the lower bridge arm is disconnected first, and then the switch tube in the upper bridge arm is disconnected. For example, the switch tube in the first lower bridge arm is disconnected first, and then the switch tube in the second upper bridge arm is disconnected. For another example, the switch tube in the second lower bridge arm is disconnected first, and then the switch tube in the first upper bridge arm is disconnected.

[0141] and, Figure 5 The specific implementation process of the embodiment shown is Figure 3 The specific implementation process of the embodiment shown is similar, and the specific implementation process can be referred to the above Figure 3 The detailed description of the illustrated embodiment will not be repeated here.

[0142] Similarly, for Fig.13 For a detailed description and the beneficial effects thereof, please refer to the above Figure 4 For the sake of brevity, the corresponding description is not repeated here.

[0143] In one embodiment, the sum of the first duration, the second duration, and the third duration is equal to the sum of the fifth duration, the sixth duration, and the seventh duration. In addition, the ratio of the first duration, the second duration, and the third duration is 2:1:2, and the ratio of the fifth duration, the sixth duration, and the seventh duration is 2:1:2.

[0144] In some embodiments, the sum of the first duration, the second duration, and the third duration is referred to as the dead time. The sum of the fifth duration, the sixth duration, and the seventh duration is also the dead time. The dead time is recorded as DT, and the first duration, the second duration, and the third duration are 40% DT, 20% DT, and 40% DT, respectively. The fifth duration, the sixth duration, and the seventh duration are 40% DT, 20% DT, and 40% DT, respectively.

[0145] Please refer to Fig.14 , Fig.14 A schematic diagram of the structure of the control processing unit 140 provided in an embodiment of the present application.

[0146] The control processing unit 140 may be a microcontroller unit (MCU) or a digital signal processing (DSP) controller.

[0147] The control processing unit 140 includes at least one processor 141 and a memory 142, wherein the memory 142 may be built into the control processing unit 140 or may be external to the control processing unit 140. The memory 142 may also be a remotely set memory connected to the control processing unit 140 via a network.

[0148] The memory 142, as a non-volatile computer-readable storage medium, can be used to store non-volatile software programs, non-volatile computer executable programs and modules. The memory 142 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the terminal, etc. In addition, the memory 142 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage device. In some embodiments, the memory 142 may optionally include a memory remotely arranged relative to the processor 141, and these remote memories may be connected to the terminal via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0149] The processor 141 performs various functions of the terminal and processes data by running or executing software programs and / or modules stored in the memory 142, and calling data stored in the memory 142, thereby monitoring the terminal as a whole, for example, implementing the switch tube control method described in any embodiment of the present application.

[0150] The processor 141 may be one or more, Figure 1 In the figure, a processor 141 is taken as an example. The processor 141 and the memory 142 may be connected via a bus or other means. The processor 141 may include a central processing unit (CPU), a digital signal processor (DSP), an application specific integrated circuit (ASIC), a controller, a field programmable gate array (FPGA) device, etc. The processor 141 may also be implemented as a combination of computing devices, for example, a combination of a DSP and a microprocessor, a plurality of microprocessors, one or more microprocessors combined with a DSP core, or any other such configuration.

[0151] The embodiment of the present application also provides a voltage converter, which includes a first bridge arm, a second bridge arm, and a control processing unit in any embodiment of the present application. The first bridge arm and the second bridge arm are connected in parallel. The first bridge arm and the second bridge arm each include at least one switch tube.

[0152] Specifically, the control processing unit is used to control the on and off of the switch tube.

[0153] In some embodiments, the voltage converter can be Figure 1-Figure 2 The structure shown is implemented, and each switch tube needs to be connected to the control processing unit. The specific implementation process has been described in detail in the above embodiment and will not be repeated here.

[0154] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Under the concept of the present application, the technical features in the above embodiments or different embodiments can also be combined, the steps can be implemented in any order, and there are many other changes in different aspects of the present application as described above, which are not provided in detail for the sake of simplicity. Although the present application has been described in detail with reference to the aforementioned embodiments, a person of ordinary skill in the art should understand that the technical solutions described in the aforementioned embodiments can still be modified, or some of the technical features can be replaced by equivalents. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present application.

Claims

1. A switch tube control method, characterized in that: The method is used to control a switch tube in a voltage converter, wherein the voltage converter comprises a first bridge arm and a second bridge arm connected in parallel, wherein two ends of the first bridge arm are connected to two ends of an input power supply, and the first bridge arm and the second bridge arm are used to convert the voltage of the input power supply into a first voltage, and the first voltage is output from a midpoint of the first bridge arm and a midpoint of the second bridge arm, wherein the first bridge arm comprises a first upper bridge arm and a first lower bridge arm, and the connection point between the first upper bridge arm and the first lower bridge arm is the midpoint of the first bridge arm, and the second bridge arm comprises a second upper bridge arm and a second lower bridge arm, and the connection point between the second upper bridge arm and the second lower bridge arm is the midpoint of the second bridge arm; The method comprises one of the following two steps: Step i, when the switch tube of the first upper bridge arm is turned off, delaying for a first time length; At the moment when the first time period ends, controlling the switch tube in the second lower bridge arm to turn off; When the switch tube in the second lower bridge arm is turned off, delaying for a second time period; At the moment when the second time period ends, controlling the switch tube in the first lower bridge arm to be turned on; Step ii, when the switch tube in the first lower bridge arm is turned off, delaying the first time length; At the moment when the first time period ends, controlling the switch tube in the second upper bridge arm to turn off; When the switch tube in the second upper bridge arm is turned off, delaying the second time length; At the moment when the second time period ends, the switch tube in the first upper bridge arm is controlled to be turned on.

2. The switch tube control method according to claim 1, characterized in that: The step i further comprises: when the switch tube in the first lower bridge arm is turned on, delaying for a third time period; At the moment when the third time period ends, controlling the switch tube in the second upper bridge arm to be turned on; The step ii further comprises: when the switch tube in the first upper bridge arm is turned on, delaying the third time length; At the moment when the third time period ends, the switch tube in the second lower bridge arm is controlled to be turned on.

3. The switch control method according to claim 2, characterized in that: The step i further comprises: after the switch tube of the second upper bridge arm is controlled to be turned on, controlling the switch tube in the second upper bridge arm to remain turned on for a fourth time period; At the moment when the fourth time period ends, controlling the switch tube in the second upper bridge arm to turn off; The step ii further comprises: after controlling the switch tube of the second lower bridge arm to be turned on, controlling the switch tube in the second lower bridge arm to remain turned on within the fourth time length; At the moment when the fourth time period ends, the switch tube in the second lower bridge arm is controlled to be turned off.

4. The switch control method according to claim 3, characterized in that: The step i further comprises: when the switch tube in the second upper bridge arm is turned off, delaying for a fifth time period; At the moment when the fifth time period ends, controlling the switch tube in the first lower bridge arm to turn off; The step ii further comprises: when the switch tube in the second lower bridge arm is turned off, delaying the fifth time length; At the moment when the fifth time period ends, the switch tube in the first upper bridge arm is controlled to be turned off.

5. The switch control method according to claim 4, characterized in that: The step i further comprises: when the switch tube in the first lower bridge arm is turned off, delaying for a sixth time period; At the moment when the sixth time period ends, controlling the switch tube in the second lower bridge arm to be turned on; The step ii further comprises: when the switch tube in the first upper bridge arm is turned off, delaying the sixth time length; At the moment when the sixth time period ends, the switch tube in the second upper bridge arm is controlled to be turned on.

6. The switch control method according to claim 5, characterized in that: The step i further comprises: when the switch tube in the second lower bridge arm is turned on, delaying for a seventh time period; At the moment when the seventh time period ends, controlling the switch tube in the first upper bridge arm to be turned on; The step ii further comprises: when the switch tube in the second upper bridge arm is turned on, delaying the seventh time length; At the moment when the seventh time period ends, the switch tube in the first lower bridge arm is controlled to be turned on.

7. The switch control method according to claim 6, characterized in that: The step i further comprises: after the switch tube of the first upper bridge arm is controlled to be turned on, controlling the switch tube in the first upper bridge arm to remain turned on for an eighth time period; At the end of the eighth time period, controlling the switch tube in the first upper bridge arm to turn off; The step ii further comprises: after controlling the switch tube of the first lower bridge arm to be turned on, controlling the switch tube in the first lower bridge arm to remain turned on within the eighth time period; At the moment when the eighth time period ends, the switch tube in the first lower bridge arm is controlled to be turned off.

8. The switch control method according to claim 7, characterized in that: The sum of the first duration, the second duration, and the third duration is equal to the sum of the fifth duration, the sixth duration, and the seventh duration; The ratio of the first duration, the second duration and the third duration is 2:1:2; The ratio of the fifth duration, the sixth duration and the seventh duration is 2:1:

2.

9. A control processing unit, characterized in that: include: At least one processor and a memory communicatively connected to the at least one processor, the memory storing instructions executable by the at least one processor, the instructions being executed by the at least one processor so that the at least one processor can execute the method according to any one of claims 1 to 8.

10. A voltage converter, characterized in that: include: A first bridge arm, a second bridge arm, and a control processing unit as claimed in claim 9; The first bridge arm and the second bridge arm are connected in parallel, wherein the first bridge arm and the second bridge arm each include at least one switch tube; The control processing unit is used to control the on and off of the switch tube.

Citation Information

Patent Citations

  • Full-bridge driving controller and full-bridge converting circuit

    CN102684499A

  • Brushless motor current sampling method and brushless motor control mechanism

    CN112117938A

  • Phase commutation control method and device, electronic equipment and storage medium

    CN115664269A

  • Power converter

    JP2013252029A

  • Full bridge system bidirectional insulation DC / DC converter

    JP2016131446A