A foundation pit support construction method and system for high-rise buildings
By comparing the weight distribution and a line chart analysis of the accuracy of the foundation pit construction data, and removing abnormal data nodes, the problem of inaccurate data monitoring in foundation pit support construction is solved, and the accuracy and reliability of construction is improved.
Patent Information
- Application Number
- CN202310878646.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-07-18
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In urban foundation pit support construction, data monitoring is not accurate enough, mainly due to the accumulation of errors caused by the acquisition errors of multiple data monitoring nodes, especially the problem of low acquisition accuracy, which affects the accuracy of the construction.
By comparing the weight distribution of each data monitoring node, data nodes that may have large errors are eliminated to ensure the accuracy of subsequent calculations. The specific methods include dividing the foundation pit construction progress into the drawing feasibility evaluation and construction process arrangement stage, calculating the weight distribution diagram of each factor, and judging the correlation of the data monitoring nodes through the accuracy line chart, and eliminating abnormal data nodes.
It improves the data acquisition accuracy of foundation pit support construction, reduces errors, ensures the accuracy and reliability of construction, and is suitable for foundation pit support construction of high-rise buildings.
Smart Images

Figure CN116862437B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of foundation pit support construction, and in particular to a foundation pit support construction method and system for high-rise buildings. Background Art
[0002] In recent years, with the rapid rise of high-rise buildings, more and more projects involving foundation pit excavation and engineering support have been involved, which has promoted the development of foundation pit support technology.
[0003] Foundation pit support construction projects often have many construction processes, and each construction process often has a corresponding responsible person. The responsible person goes to the site to carry out construction based on the pre-planned construction period of the process he is responsible for.
[0004] Regarding the above-mentioned related technologies, the inventor believes that there are the following defects: At present, in the monitoring operation of urban foundation pit support, there is a problem of inaccurate data detection and monitoring. One of the reasons is that there are multiple data monitoring nodes arranged in the foundation pit support of the same area. Each data monitoring node will upload its own collected data, such as drawings and data from material entry to construction completion. The collected data will generally be pre-processed, that is, averaged, to minimize the error of all collected data. However, the above processing process will have a large gap with the real data, especially most of the data monitoring nodes in the area have low collection accuracy, which is not conducive to obtaining the final accurate results. Summary of the invention
[0005] The purpose of the present invention is to provide a method and system for foundation pit support construction of high-rise buildings. The method and system calculate two monitoring objects for each data monitoring node separately, and then compare the weight distribution according to the respective calculation results. According to the weight distribution comparison result, it is judged whether the data monitoring node has a large error, and the data collected by the data monitoring node is eliminated in advance to reduce the error of subsequent calculations, thereby ensuring the accuracy of foundation pit support construction.
[0006] The embodiment of the present invention is achieved as follows:
[0007] In a first aspect, a method for foundation pit support construction of a high-rise building comprises the following steps: dividing the support construction progress of the foundation pit of the high-rise building, obtaining a drawing feasibility evaluation stage and a construction process arrangement stage, wherein the drawing feasibility evaluation stage is used to evaluate the rationality of the cost, safety and operability of the foundation pit support drawings, and the construction process arrangement stage is used to divide the foundation pit support into detailed processes from the arrival of materials to the completion of construction; obtaining all foundation pit drawings and construction drawings within the drawing feasibility evaluation stage, and determining the dimensions, materials and labor price data of all foundation pit drawings and construction drawings to form a pre-construction dimension, material and labor price data group, and calculating the weight of each dimension, material and labor price data in the pre-construction dimension, material and labor price data group on the construction, and obtaining a weight distribution diagram of different factors before construction; obtaining all materials, personnel and labor price data within the construction process arrangement stage. The allocation process during construction is determined, and the allocation process scheduling data of all materials and personnel during construction is determined to form a data group of completion degrees at different stages during construction, and the weight of the allocation process scheduling data of each material and personnel during construction within the data group of completion degrees at different stages during construction is calculated to obtain a weight distribution diagram of different factors during construction; the construction schedule is used to match the foundation pit drawings and construction drawings with the allocation process of materials and personnel during construction, and the paired foundation pit drawings and construction drawings with the allocation process of materials and personnel during construction are used to determine their respective weights of impact on construction and make judgments; if the weight values of the foundation pit drawings and construction drawings in the weight distribution diagram of different factors before construction are the same as the weight values of the allocation process of materials and personnel during construction in the weight distribution diagram of different factors during construction, then the foundation pit drawings and construction drawings and the allocation process of materials and personnel during construction are used as key nodes for construction.
[0008] In an optional implementation manner, the foundation pit drawings and construction drawings serving as construction nodes are calibrated as pre-construction data monitoring nodes, a line graph of the accuracy of pre-construction drawings is established using all the foundation pit drawings and construction drawings, the pre-construction correlation monitoring points of the pre-construction data monitoring nodes are determined using the pre-construction drawing accuracy line graph, all the pre-construction correlation monitoring points are compared with the data monitored by the pre-construction data monitoring nodes, and based on the comparison results, it is determined whether the pre-construction data monitoring nodes are to be used as key construction nodes; the allocation process of materials and personnel serving as construction nodes during construction is calibrated as data monitoring nodes during construction, and a line graph of the accuracy of the allocation process during construction is established using the allocation process of all materials and personnel during construction; the construction-time correlation monitoring points of the data monitoring nodes during construction are determined using the line graph of the accuracy of the allocation process during construction; all the construction-time correlation monitoring points are compared with the data monitored by the data monitoring nodes during construction, and based on the comparison results, it is determined whether the data monitoring nodes during construction are to be used as key construction nodes.
[0009] In an optional implementation, the comparison includes the following steps: determining a collection method for size, material and labor price data, wherein the collection method includes manual statistics and computer scanning statistics; determining the proportions between different items in the collection method, calculating a dynamic distribution diagram of the proportions of different items in the corresponding correlation monitoring point collection method and the proportions of different items in the corresponding data monitoring node collection method, obtaining the color changes of all dynamic distribution diagrams, and using the color changes to calculate the comparison results between the corresponding correlation monitoring points and the corresponding data monitoring nodes.
[0010] In an optional implementation, before obtaining the color changes of all dynamic distribution graphs, the following steps are also included: classifying all dynamic distribution graphs according to the degree of color change to obtain classification results; assigning initial coefficients to different items in the classification results, and then using the corresponding accuracy line graph to assign error correction coefficients to each initial coefficient to obtain multiple error correction results, and determining the dynamic distribution graphs corresponding to the first A error correction results among the multiple error correction results to perform subsequent steps, where A is a positive integer.
[0011] In an optional implementation, when determining A error correction results, the error correction results corresponding to the abnormal dynamic distribution graph are supplemented, wherein the abnormal dynamic distribution graph is obtained by performing error analysis based on all dynamic distribution graphs.
[0012] In an optional implementation, after determining the pre-construction correlation monitoring point of the pre-construction data monitoring node using the pre-construction drawing accuracy line graph, the following steps are also included: obtaining the degree of correlation between the pre-construction data monitoring node and the pre-construction correlation monitoring point; and eliminating the pre-construction correlation monitoring points whose correlation degree is greater than the initial preset amplitude.
[0013] In an optional implementation, eliminating pre-construction correlation monitoring points whose correlation degree is greater than an initial preset amplitude also includes the following steps: using a pre-construction drawing accuracy line graph to determine the number of nodes B between the eliminated pre-construction correlation monitoring points and the pre-construction data monitoring nodes; if the B value is greater than or equal to the adjusted preset amplitude, then supplementing the eliminated pre-construction correlation monitoring points as a basis for comparison with the pre-construction data monitoring nodes.
[0014] In an optional implementation, the supplemented pre-construction correlation monitoring points are assigned correlation error coefficients, and the correlation error coefficients are used as a calculation basis for substituting the pre-construction correlation monitoring points for comparison.
[0015] In a second aspect, a foundation pit support construction system for a high-rise building comprises:
[0016] The construction progress division unit is used to divide the support construction progress of the foundation pit of the high-rise building, and obtain the drawing feasibility evaluation stage and the construction process arrangement stage. The drawing feasibility evaluation stage is used to evaluate the rationality of the cost, safety and operability of the foundation pit support drawings, and the construction process arrangement stage is used to divide the foundation pit support process in detail from the arrival of materials to the completion of construction;
[0017] A pre-construction weight calculation unit is used to obtain all foundation pit drawings and construction drawings in the drawing feasibility assessment stage, and determine the size, material and labor price data of all foundation pit drawings and construction drawings to form a pre-construction size, material and labor price data group, and calculate the weight of each size, material and labor price data in the pre-construction size, material and labor price data group on the construction, and obtain a weight distribution diagram of different factors before construction;
[0018] The weight calculation unit during construction is used to obtain the allocation process of all materials and personnel during construction in the construction process arrangement stage, and determine the allocation process scheduling data of all materials and personnel during construction, constitute a data group of completion degree at different stages of construction, and calculate the weight of the allocation process scheduling data of each material and personnel during construction in the data group of completion degree at different stages of construction on the construction, and obtain the weight distribution diagram of different factors during construction;
[0019] The construction impact judgment unit is used to match the foundation pit drawings with the construction drawings and the allocation process of materials and personnel during construction using the construction schedule, and to determine the weights of their respective impacts on construction and make judgments based on the matched foundation pit drawings with the construction drawings and the allocation process of materials and personnel during construction;
[0020] The key construction node determination unit is used to judge: if the weight values of the foundation pit drawings and the construction drawings in the weight distribution diagram of different factors before construction are the same as the weight values of the allocation process of materials and personnel during construction in the weight distribution diagram of different factors during construction, then the foundation pit drawings and the construction drawings and the allocation process of materials and personnel during construction are regarded as key construction nodes.
[0021] In an optional implementation, it also includes a construction key node judgment unit, which is used to mark the foundation pit drawings and construction drawings as construction nodes as pre-construction data monitoring nodes, use all the foundation pit drawings and construction drawings to establish a pre-construction drawing accuracy line graph, use the pre-construction drawing accuracy line graph to determine the pre-construction correlation monitoring points of the pre-construction data monitoring node, compare all the pre-construction correlation monitoring points with the data monitored by the pre-construction data monitoring node, and judge whether to use the pre-construction data monitoring node as a construction key node based on the comparison result; mark the allocation process of materials and personnel during construction as a construction node as a construction data monitoring node, use all the allocation processes of materials and personnel during construction to establish a construction allocation process accuracy line graph; use the construction allocation process accuracy line graph to determine the construction correlation monitoring points of the construction data monitoring node; compare all the construction correlation monitoring points with the data monitored by the construction data monitoring node, and judge whether to use the construction data monitoring node as a construction key node based on the comparison result. Beneficial Effects
[0022] A method and system for foundation pit support construction of a high-rise building provided by an embodiment of the present invention divides data monitoring nodes corresponding to various types of dimensions, materials and labor price data of the foundation pit of the high-rise building, such as main drawings and data from the arrival of materials to the completion of construction, to form a drawing feasibility evaluation stage and a construction process arrangement stage, and performs longitudinal comparative analysis on each type of dimension, material and labor price data, especially the probability that only one of the drawing data and the data from the arrival of materials to the completion of construction of the same data monitoring node is abnormal is very low, either the same or similar degree of abnormality occurs, or it is a normal situation, and the above-mentioned longitudinal comparison method is adopted to finally match the foundation pit drawings of the corresponding matching zoning positions with the construction drawings and the allocation process of materials and personnel during construction, and determine whether the degree of abnormality of the two is the same or tends to be the same to judge whether the data collection function of the data monitoring node is normal, thereby pre-eliminating the data monitoring nodes that may have abnormal collection and do not participate in the subsequent data analysis process, thereby ensuring the accuracy of the final foundation pit support construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0024] Figure 1 is a first flow chart of the method of the present invention;
[0025] Figure 2 is a second flow chart of the method of the present invention;
[0026] Figure 3 is a third flow chart of the method of the present invention;
[0027] Figure 4 It is a unit composition diagram of the system of the present invention. Implementation
[0028] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0029] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. All other embodiments obtained by ordinary technicians in the field without creative work using the embodiments of the present invention are within the scope of protection of the present invention.
[0030] It should be understood that the "system", "device" and / or "unit" used in the present invention is a method for distinguishing different components, elements, parts, portions or assemblies at different levels. However, if other words can achieve the same purpose, the words can be replaced by other expressions.
[0031] As shown in the present invention and claims, unless the context clearly indicates an exception, the words "a", "an", "an" and / or "the" do not refer to the singular, but also include the plural. In general, the terms "include" and "comprise" only indicate the inclusion of the steps and elements that have been clearly identified, and these steps and elements do not constitute an exclusive list, and the method or device may also include other steps or elements.
[0032] Flowcharts are used in the present invention to illustrate the operations performed by the system according to the embodiments of the present application. It should be understood that the preceding or following operations are not necessarily performed accurately in order. On the contrary, the various steps may be processed in reverse order or simultaneously. At the same time, other operations may also be added to these processes, or one or more operations may be removed from these processes.
[0033] Embodiment: In the monitoring operation of urban foundation pit support, for the foundation pit support domain of the same area, data transmitted by multiple data monitoring nodes will be obtained during data monitoring. In some cases, there will be collection errors between these dimensions, materials and labor price data, that is, the dimensions, materials and labor price data of the same object at different data monitoring nodes are not exactly the same. The previous processing method is to average all collected data to minimize the error, but there are still situations where the accuracy can be further improved for this processing method, especially when most of the above data monitoring nodes have collection accuracy problems. At this time, the average processing result is still far from the actual result, and it cannot provide reliable data support for the subsequent intelligent management application level. In order to further optimize the above problems, this embodiment provides a foundation pit support construction method for high-rise buildings, which further improves the accuracy of data collection by judging in advance that there are data monitoring nodes with low monitoring accuracy among the data monitoring nodes for the same object and eliminating them.
[0034] See also Figure 1 The present embodiment provides a method for constructing a foundation pit support for a high-rise building, comprising the following steps:
[0035] A1: Divide the support construction progress of the foundation pit of the high-rise building to obtain the drawing feasibility assessment stage and the construction process arrangement stage, wherein the drawing feasibility assessment stage is used to evaluate the rationality of the cost, safety and operability of the foundation pit support drawings, and the construction process arrangement stage is used to divide the foundation pit support from the material entry to the completion of construction in detail; this step indicates determining the foundation pit of the high-rise building, which is mainly equipped with two monitoring functions from the material entry to the completion of construction and drawings, which are realized by multiple data monitoring nodes arranged in the foundation pit of the high-rise building, and each data monitoring node will perform synchronous monitoring from the material entry to the completion of construction and drawings at the corresponding point. Considering that the probability of normal or abnormal monitoring from the material entry to the completion of construction and drawing monitoring at the same data monitoring node is greater, and the probability of abnormality of only one of them is smaller, the size, material and labor price data of the two functions corresponding to each data monitoring node are separately extracted for longitudinal comparison, which can further determine whether there is a possibility of abnormal monitoring of the data monitoring node. The support construction progress of the foundation pit of the high-rise building will be divided into the drawing feasibility evaluation stage and the construction process arrangement stage to facilitate subsequent vertical comparison.
[0036] A2: Obtain all foundation pit drawings and construction drawings in the feasibility assessment stage of the drawings, and determine the size, material and labor price data of all the foundation pit drawings and construction drawings to form a pre-construction size, material and labor price data group, and calculate the weight of each size, material and labor price data in the pre-construction size, material and labor price data group on the construction, and obtain the weight distribution diagram of different factors before construction. This step means using the weight of the size, material and labor price data on the construction to achieve the above-mentioned vertical comparison. Since this step is unclear whether there is a possibility of abnormal monitoring of the data monitoring node, it is necessary to present and analyze the size, material and labor price data of all foundation pit drawings and construction drawings. Similarly, the same processing measures are taken for the allocation process of materials and personnel during construction, that is, step A3 is performed: the allocation process of all materials and personnel during construction within the construction process arrangement stage is obtained, and the allocation process scheduling data of all materials and personnel during construction is determined to form a data group of completion degrees at different stages of construction, and the weight of the impact of the allocation process scheduling data of each material and personnel during construction within the data group of completion degrees at different stages of construction on the construction is calculated to obtain a weight distribution diagram of different factors during construction; the allocation process scheduling data of all materials and personnel during construction is presented and analyzed.
[0037] In step A2 and step A3, by presenting the weight distribution diagram of different factors before construction and the weight distribution diagram of different factors during construction, it is possible to find the comparison between the data monitored by the two functions of the same data monitoring node and the data monitored by the two functions of the other data monitoring nodes. If the weight distribution trends of the size, material and labor price data of the two functions of the same data monitoring node are the same, it means that the size, material and labor price data of the two functions are accurate or correct from the perspective of the data monitoring node, and step A4 can be performed: use the construction schedule to match the foundation pit drawings with the construction drawings and the materials and personnel during construction. The allocation process of the paired foundation pit drawings and construction drawings and the allocation process of materials and personnel during construction will determine the weights of their respective impacts on the construction and make judgments; the construction schedule here mainly refers to the situation where they belong to the same configuration and responsible entity. In practice, the drawings and monitoring from the arrival of materials to the completion of construction may be carried out at different monitoring points, but the different monitoring points are all under the supervision of the same entity. It is necessary to combine the corresponding separate foundation pit drawings and construction drawings with the allocation process of materials and personnel during construction to carry out the above-mentioned vertical comparison, especially based on the weights of their own impacts on the construction and make judgments.
[0038] A5: When the weight values of the foundation pit drawings and the construction drawings in the weight distribution diagram of different factors before construction are the same as the weight values of the material and personnel allocation process during construction in the weight distribution diagram of different factors during construction, the foundation pit drawings and the construction drawings and the material and personnel allocation process during construction are taken as the key nodes of construction; this step means that if the foundation pit drawings and the construction drawings and the material and personnel allocation process during construction that are matched to the same monitoring point have the same or approximately the same weight distribution trends in their respective weight distribution trend diagrams, then it can be determined that they are preliminarily judged to be points that may belong to normal and accurately collected data, and if their respective weight distribution trends are far apart, then they can be judged to be abnormal monitoring points, and their uploaded data will be eliminated to further reduce data errors.
[0039] Through the above technical solution, only the size, material and labor price data of the monitoring points with high possibility of abnormality are eliminated from the perspective of preliminary screening, and the retained monitoring points may also have abnormal monitoring situations, but compared with the method of applying the size, material and labor price data of all monitoring points as average, the error is smaller and the data acquisition is more reliable. In some embodiments, in order to further analyze the retained monitoring points, in order to further determine whether the monitoring points are abnormal. Please refer to Figure 2 , the analysis method provided in this embodiment also includes step A6 and its sub-steps.
[0040] A6: by establishing a correctness line graph, finding correlation monitoring points for comparison, so as to further screen the foundation pit drawings and construction drawings and the allocation process of materials and personnel during construction, specifically: marking the foundation pit drawings and construction drawings as construction nodes as pre-construction data monitoring nodes, using all the foundation pit drawings and construction drawings to establish a pre-construction drawing correctness line graph, using the pre-construction drawing correctness line graph to determine the pre-construction correlation monitoring points of the pre-construction data monitoring node, comparing all the pre-construction correlation monitoring points with the data monitored by the pre-construction data monitoring node, and judging whether to use the pre-construction data monitoring node as a key construction node according to the comparison result; marking the allocation process of materials and personnel during construction as construction nodes as data monitoring nodes during construction, using all the allocation processes of materials and personnel during construction to establish a construction allocation process correctness line graph; using the construction allocation process correctness line graph to determine the construction correlation monitoring points of the construction data monitoring node; comparing all the construction correlation monitoring points with the data monitored by the construction data monitoring node, and judging whether to use the construction data monitoring node as a key construction node according to the comparison result.
[0041] Step A6 indicates that the corresponding data monitoring nodes obtained by step A5 that can be used as construction nodes may have two monitoring functions that are normal or abnormal at the same time. In order to further identify, further longitudinal comparison is adopted. Taking the foundation pit drawings and construction drawings as construction nodes as an example, they are marked as pre-construction data monitoring nodes, and a topological relationship is established between the pre-construction data monitoring node and the remaining foundation pit drawings and construction drawings to obtain a pre-construction drawing accuracy line graph. The pre-construction drawing accuracy line graph is used to find the remaining foundation pit drawings and construction drawings directly associated with the pre-construction data monitoring node and use them as pre-construction correlation monitoring points. The drawing data of one or more pre-construction correlation monitoring points are compared with the drawing data of the pre-construction data monitoring node. Direct association, that is, two monitoring points that are directly connected in the actual underground environment, are used for data comparison. The principle of connectivity principle that the drawing data theoretically remains the same further identifies whether the data collection of the pre-construction data monitoring node is normal. The data monitoring nodes during construction are processed in the same way, which will not be repeated here.
[0042] By performing the above-mentioned longitudinal comparison of the data of the pre-construction data monitoring node or the data monitoring node during construction separately or simultaneously, it is possible to further identify whether the pre-construction data monitoring node or the data monitoring node during construction has monitored abnormalities, thereby determining whether it can be used as a key construction node. For example, if it is found that the data similarity between one of the pre-construction data monitoring nodes and multiple pre-construction related monitoring points is low, the size, material and labor price data of the pre-construction data monitoring node will be excluded to ensure that the data source for subsequent analysis has further reliability.
[0043] In this embodiment, the comparison is mainly carried out through smaller or more detailed indicators for differentiation analysis, please refer to Figure 3 , the comparison comprises the following steps:
[0044] B1: Determine the collection method of size, material and labor price data, where the collection methods include manual statistics and computer scanning statistics; this step indicates the method of obtaining the size, material and labor price data of the corresponding correlation monitoring points (correlation monitoring points before construction or correlation monitoring points during construction) and the corresponding data monitoring nodes (data monitoring nodes before construction or data monitoring nodes during construction). There are mainly two relevant methods: manual statistics, such as data collection through manual filling out of forms by construction staff; computer scanning statistics, such as electronic scanning of paper documents of size, material and labor price data, and automatic reading and statistics through a computer.
[0045] Then, step B2 is performed: determining the ratio between different items in the collection method, and calculating the dynamic distribution diagram of the ratio of different items in the corresponding correlation monitoring point collection method and the ratio of different items in the corresponding data monitoring node collection method; this step represents the use of the size, material and labor price data sub-items between the corresponding correlation monitoring point and the corresponding data monitoring node for comparison, and further finding the comparison of indicators for specific similarity monitoring, wherein the principle of expressing the high and low similarity in the form of the distance between the corresponding data is used to further obtain the judgment result of whether there is abnormal monitoring of the corresponding data monitoring node. Thus, step B4 is performed: obtaining the color change of all dynamic distribution diagrams, and using the color change to calculate the comparison result between the corresponding correlation monitoring point and the corresponding data monitoring node. This step represents observing and analyzing all dynamic distribution diagrams, selecting the median using the concentration, and then using the median selected by the concentration to judge the similarity. For example, if the dynamic distribution diagram represented by the median is greater than 1, it means that the similarity is not high, otherwise it means that the degree of similarity is acceptable, so that the corresponding data monitoring node is used as a construction node.
[0046] Based on the above technical solution, the following steps are also included before obtaining the color change of all dynamic distribution maps
[0047] B3: All dynamic distribution graphs are classified according to the degree of color change to obtain classification results; different items in the classification results are assigned initial coefficients, and then the error correction coefficients are assigned to each of the initial coefficients using the corresponding correct rate line graph, which means that it is necessary to combine the distance between the nodes of the correct rate line graph for comprehensive assignment to obtain multiple error correction results, and determine the dynamic distribution graphs corresponding to the first A error correction results in the multiple error correction results for subsequent steps, where A is a positive integer. This step indicates that when calculating the concentration of the dynamic distribution graph, it is necessary to consider the number of nodes between the corresponding correlation monitoring point and the data monitoring node, which is obtained by the corresponding correct rate line graph. If the number of nodes is larger, the error correction coefficient is larger, and the error correction coefficient difference is merged on the initial coefficient, so that the error correction result obtained is closer to the actual situation. Among them, the relationship between the error correction coefficient and the initial coefficient can be obtained by using the theoretical model formed by historical data, or it can be assigned by experience, but if the dynamic distribution graph is larger in the final error correction result, it will be excluded as an abnormal point to ensure that the concentration calculation is more accurate. In other words, the value of A mainly depends on the abnormal situation of the dynamic distribution graph, and the dynamic distribution graph with a variance greater than a specified value can be eliminated.
[0048] It should be noted that, based on the above scheme, there may be real and correct dynamic distribution maps in the eliminated abnormal dynamic distribution maps, which need to be added into the concentration measurement process to obtain a more objective and reasonable basis for constructing data comparison, that is, to determine the A error correction results corresponding to the abnormal dynamic distribution map, wherein the abnormal dynamic distribution map is obtained by error analysis of all dynamic distribution maps. By error analyzing all dynamic distribution maps, the numerical value of the dynamic distribution map is used as the horizontal coordinate, and the corresponding node distance position is used as the vertical coordinate for error analysis to find the abnormal dynamic distribution map. If the value of the abnormal dynamic distribution map is large, but the node, that is, the coordinate, is close to the corresponding data monitoring node, and the node position is determined by the error analysis curve, it can be used as a supplementary object.
[0049] In the actual comparative calculation, there will be situations where the basic environment between adjacent nodes is different, especially for drawing data. In a geographical environment with some faults or correlation errors between two nodes, the drawing data of the two nodes cannot be calculated by the connectivity principle to calculate the similarity of size, material and labor price data. At this time, the following steps need to be performed, that is, after determining the pre-construction correlation monitoring point of the pre-construction data monitoring node using the pre-construction drawing accuracy line chart, the following steps are also included: obtaining the degree of correlation between the pre-construction data monitoring node and the pre-construction correlation monitoring point; eliminating the pre-construction correlation monitoring points whose correlation degree is greater than the initial preset amplitude. This step represents the elimination of the pre-construction correlation monitoring points with relatively large correlation errors between the pre-construction correlation monitoring points and the pre-construction data monitoring nodes, and does not serve as the basis for subsequent comparisons to ensure the rationality of data analysis, in which the initial preset amplitude is predetermined and can be sufficiently small while ensuring the calculation accuracy.
[0050] On the basis of the above technical solution, it is considered that once all the pre-construction correlation monitoring points are greater than the initial preset amplitude, there will be too few samples of pre-construction correlation monitoring points, which is not conducive to comprehensively obtaining more reasonable data comparison results. That is, the pre-construction correlation monitoring points that may cause larger errors in size, material and labor price data due to correlation errors can be eliminated, and the rest can be supplemented. Then, the elimination of pre-construction correlation monitoring points whose correlation degree is greater than the initial preset amplitude also includes the following steps: using the pre-construction drawing accuracy line chart to determine the number of nodes B between the eliminated pre-construction correlation monitoring points and the pre-construction data monitoring nodes, if the B value is less than or equal to the adjusted preset amplitude, the eliminated pre-construction correlation monitoring points are supplemented as the basis for comparison with the pre-construction data monitoring nodes.
[0051] This step means that the pre-construction correlation monitoring points with distant nodes but reasonable correlation errors are supplemented, and the pre-construction correlation monitoring points with close nodes but serious relative correlation errors are kept removed. The preset amplitude of the adjustment is also predetermined, and the value can be large enough while ensuring that the calculation meets the limit. On the basis of this scheme, in order to further obtain a more accurate data calculation basis, the supplemented pre-construction correlation monitoring points are assigned a correlation error coefficient, and the correlation error coefficient is used as the calculation basis for substituting the pre-construction correlation monitoring points for comparison. That is, the reasonable correlation error (such as the relative correlation error caused by the difference in terrain) is converted into a correlation error coefficient, which is substituted as a weight and assigned to the dynamic distribution map, so that when performing comparative calculations, a more reliable and reasonable data calculation basis is available.
[0052] This embodiment also provides a foundation pit support construction system 100 for a high-rise building. Figure 4 The modular schematic diagram of a foundation pit support construction system 100 for a high-rise building is mainly used to divide the functional modules of a foundation pit support construction system 100 for a high-rise building according to the embodiment of the above method. For example, each functional module can be divided, or two or more functions can be integrated into one processing module. The above integrated modules can be implemented in the form of hardware or in the form of software functional modules. It should be noted that the division of modules in the present invention is schematic and is only a logical functional division. There may be other division methods in actual implementation. For example, in the case of dividing each functional module corresponding to each function, Figure 4 What is shown is only a schematic diagram of a system / device, wherein the foundation pit support construction system 100 for a high-rise building may include a construction progress division unit 101, a pre-construction weight calculation unit 102, a construction weight calculation unit 103, a construction impact judgment unit 104, and a construction key node determination unit 105. The functions of each unit module are described below.
[0053] The construction progress division unit 101 is used to divide the support construction progress of the foundation pit of the high-rise building, and obtain the drawing feasibility evaluation stage and the construction process arrangement stage, wherein the drawing feasibility evaluation stage is used to evaluate the rationality of the cost, safety and operability of the foundation pit support drawings, and the construction process arrangement stage is used to divide the foundation pit support from the entry of materials to the completion of construction in detail; the pre-construction weight calculation unit 102 is used to obtain all the foundation pit drawings and construction drawings in the drawing feasibility evaluation stage, and determine the size, material and labor price data of all the foundation pit drawings and construction drawings to form a pre-construction size, material and labor price data group, and calculate the weight of each size, material and labor price data in the pre-construction size, material and labor price data group on the construction, and obtain the weight distribution diagram of different factors before construction; the construction weight calculation unit 103 is used to obtain the distribution process of all materials and personnel in the construction process arrangement stage during construction , and determine the allocation process scheduling data of all the materials and personnel during construction, constitute a data group of completion degrees at different stages during construction, and calculate the weight of the allocation process scheduling data of each material and personnel during construction in the data group of completion degrees at different stages during construction on the construction, and obtain a weight distribution diagram of different factors during construction; a construction impact judgment unit 104, which is used to use the construction schedule to match the foundation pit drawings and construction drawings with the allocation process of the materials and personnel during construction, and determine the weights of the paired foundation pit drawings and construction drawings with the allocation process of the materials and personnel during construction and make a judgment; a construction key node determination unit 105, which is used to take the foundation pit drawings and construction drawings and the allocation process of the materials and personnel during construction as the key construction node when the weight values of the foundation pit drawings and construction drawings in the weight distribution diagram of different factors before construction are the same as the weight values of the allocation process of the materials and personnel during construction in the weight distribution diagram of different factors during construction.
[0054] In some embodiments, the foundation pit support construction system 100 for a high-rise building also includes a construction key node judgment unit 106, which is used to mark the foundation pit drawings and construction drawings as construction nodes as pre-construction data monitoring nodes, use all the foundation pit drawings and construction drawings to establish a pre-construction drawing accuracy line graph, use the pre-construction drawing accuracy line graph to determine the pre-construction correlation monitoring points of the pre-construction data monitoring node, compare all pre-construction correlation monitoring points with the data monitored by the pre-construction data monitoring node, and judge whether to use the pre-construction data monitoring node as a construction key node based on the comparison result; mark the allocation process of materials and personnel during construction as a construction node as a construction data monitoring node, use all the allocation processes of materials and personnel during construction to establish a construction allocation process accuracy line graph; use the construction allocation process accuracy line graph to determine the construction correlation monitoring points of the construction data monitoring node; compare all construction correlation monitoring points with the data monitored by the construction data monitoring node, and judge whether to use the construction data monitoring node as a construction key node based on the comparison result.
[0055] In some embodiments, the construction key node judgment unit 106 is also used to determine the collection method of size, material and labor price data, wherein the collection method includes manual statistics and computer scanning statistics; determine the ratio between different items in the collection method, and calculate the dynamic distribution diagram of the ratio of different items in the corresponding correlation monitoring point collection method and the ratio of different items in the corresponding data monitoring node collection method; classify all dynamic distribution diagrams according to the degree of color change to obtain classification results; assign initial coefficients to different items in the classification results, and then use the corresponding correct rate line chart to assign error correction coefficients to each of the initial coefficients to obtain multiple error correction results, and determine the dynamic distribution diagram corresponding to the first A error correction results in the multiple error correction results to perform subsequent steps; obtain the color change of all dynamic distribution diagrams, and use the color change to calculate the comparison result between the corresponding correlation monitoring point and the corresponding data monitoring node. And obtain the correlation degree between the pre-construction data monitoring node and the pre-construction correlation monitoring point; remove the pre-construction correlation monitoring points whose correlation degree is greater than the initial preset amplitude.
[0056] Obviously, those skilled in the art can make various changes and modifications to the embodiments of the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the embodiments of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
Claims
1. A foundation pit support construction method for a high-rise building, characterized in that: The steps include: The support construction progress of the foundation pit of the high-rise building is divided into a drawing feasibility evaluation stage and a construction process arrangement stage, wherein the drawing feasibility evaluation stage is used to evaluate the rationality of the cost, safety and operability of the drawings of the foundation pit support, and the construction process arrangement stage is used to divide the process of the foundation pit support in detail from the arrival of materials to the completion of construction; Obtain all foundation pit drawings and construction drawings in the feasibility evaluation stage of the drawings, and determine the size, material and labor price data of all the foundation pit drawings and construction drawings to form a pre-construction size, material and labor price data group, and calculate the weight of the impact of each size, material and labor price data in the pre-construction size, material and labor price data group on the construction, and obtain a weight distribution diagram of different factors before construction; Obtain the allocation process of all materials and personnel during the construction process arrangement stage, and determine the allocation process scheduling data of all materials and personnel during the construction, to form a data group of completion degree at different stages of the construction, and calculate the weight of the allocation process scheduling data of each material and personnel during the construction in the data group of completion degree at different stages of the construction on the construction, and obtain the weight distribution diagram of different factors during the construction; Using the construction schedule to match the foundation pit drawings and construction drawings with the allocation process of the materials and personnel during construction, the weights of the impacts on the construction of the matched foundation pit drawings and construction drawings and the allocation process of the materials and personnel during construction are determined and judged; When the weight values of the foundation pit drawings and the construction drawings in the weight distribution diagram of different factors before construction are the same as the weight values of the allocation process of materials and personnel during construction in the weight distribution diagram of different factors during construction, the foundation pit drawings and the construction drawings and the allocation process of materials and personnel during construction are taken as the key nodes of construction; Mark the foundation pit drawings and construction drawings as construction nodes as pre-construction data monitoring nodes, use all the foundation pit drawings and construction drawings to establish a pre-construction drawing accuracy line graph, use the pre-construction drawing accuracy line graph to determine the pre-construction correlation monitoring point of the pre-construction data monitoring node, compare all the pre-construction correlation monitoring points with the data monitored by the pre-construction data monitoring node, and determine whether to use the pre-construction data monitoring node as a key construction node based on the comparison result; The allocation process of materials and personnel during construction as construction nodes is calibrated as a construction data monitoring node, and a line graph of the accuracy of the allocation process during construction is established using all the allocation processes of materials and personnel during construction; the construction-time allocation process accuracy line graph is used to determine the construction-time correlation monitoring points of the construction data monitoring node; all construction-time correlation monitoring points are compared with the data monitored by the construction data monitoring node, and based on the comparison results, it is determined whether to use the construction data monitoring node as a key construction node.
2. A foundation pit support construction method for a high-rise building according to claim 1, characterized in that: The comparison comprises the following steps: Determine the collection method of size, material and labor price data, wherein the collection method includes manual statistics and computer scanning statistics; determine the proportion between different items in the collection method, and calculate the dynamic distribution diagram of the proportion of different items in the corresponding correlation monitoring point collection method and the proportion of different items in the corresponding data monitoring node collection method; obtain the color change of all dynamic distribution diagrams, and use the color change to calculate the comparison result between the corresponding correlation monitoring point and the corresponding data monitoring node.
3. A foundation pit support construction method for a high-rise building according to claim 2, characterized in that: The step of obtaining the color changes of all dynamic distribution graphs also includes the following steps: All dynamic distribution graphs are classified according to the degree of color change to obtain classification results; initial coefficients are assigned to different items in the classification results, and then error correction coefficients are assigned to each of the initial coefficients using a corresponding accuracy line graph to obtain multiple error correction results, and the dynamic distribution graphs corresponding to the first A error correction results are determined among the multiple error correction results to perform subsequent steps, where A is a positive integer.
4. A foundation pit support construction method for a high-rise building according to claim 3, characterized in that: When determining the A error correction results, the error correction results corresponding to the abnormal dynamic distribution diagram are supplemented, wherein the abnormal dynamic distribution diagram is obtained by performing error analysis based on all dynamic distribution diagrams.
5. The method for foundation pit support construction of a high-rise building according to claim 1, characterized in that: After determining the pre-construction correlation monitoring point of the pre-construction data monitoring node using the pre-construction drawing accuracy line graph, the following steps are also included: obtaining the degree of correlation between the pre-construction data monitoring node and the pre-construction correlation monitoring point; and eliminating the pre-construction correlation monitoring points whose correlation degree is greater than the initial preset amplitude.
6. A foundation pit support construction method for a high-rise building according to claim 5, characterized in that: The method of eliminating pre-construction correlation monitoring points whose correlation degree is greater than the initial preset amplitude also includes the following steps: using the pre-construction drawing accuracy line chart to determine the number of nodes B between the eliminated pre-construction correlation monitoring points and the pre-construction data monitoring nodes; if the B value is greater than or equal to the adjusted preset amplitude, the eliminated pre-construction correlation monitoring points are supplemented as the basis for comparison with the pre-construction data monitoring nodes.
7. A foundation pit support construction method for a high-rise building according to claim 6, characterized in that: The additional pre-construction correlation monitoring points are assigned correlation error coefficients, and the correlation error coefficients are used as the calculation basis for substituting the pre-construction correlation monitoring points for comparison.
8. A foundation pit support construction system for a high-rise building, characterized in that: include: A construction progress division unit is used to divide the support construction progress of the foundation pit of a high-rise building, and obtain a drawing feasibility evaluation stage and a construction process arrangement stage, wherein the drawing feasibility evaluation stage is used to evaluate the rationality of the cost, safety, and operability of the drawings of the foundation pit support, and the construction process arrangement stage is used to divide the process of the foundation pit support in detail from the arrival of materials to the completion of construction; A pre-construction weight calculation unit is used to obtain all foundation pit drawings and construction drawings in the drawing feasibility assessment stage, and determine the size, material and labor price data of all the foundation pit drawings and construction drawings to form a pre-construction size, material and labor price data group, and calculate the weight of each size, material and labor price data in the pre-construction size, material and labor price data group on the construction, and obtain a weight distribution diagram of different factors before construction; A weight calculation unit during construction, which is used to obtain the allocation process of all materials and personnel during construction in the construction process arrangement stage, and determine the allocation process scheduling data of all materials and personnel during construction, to form a data group of completion degree at different stages of construction, and calculate the weight of the allocation process scheduling data of each material and personnel during construction in the data group of completion degree at different stages of construction on the construction, and obtain a weight distribution diagram of different factors during construction; A construction impact judgment unit is used to match the foundation pit drawings and construction drawings with the allocation process of materials and personnel during construction using the construction schedule, and to determine the weights of the impacts on construction of the matched foundation pit drawings and construction drawings with the allocation process of materials and personnel during construction and make judgments; A construction key node determination unit is used to determine that when the weight values of the foundation pit drawings and the construction drawings in the weight distribution diagram of different factors before construction are the same as the weight values of the material and personnel allocation process during construction in the weight distribution diagram of different factors during construction, the foundation pit drawings and the construction drawings and the material and personnel allocation process during construction are taken as construction key nodes.
9. A foundation pit support construction system for a high-rise building according to claim 8, characterized in that: It also includes a construction key node judgment unit, which is used to: The foundation pit drawings and construction drawings that serve as construction nodes are calibrated as pre-construction data monitoring nodes, and a line graph of the accuracy of the pre-construction drawings is established using all the foundation pit drawings and construction drawings. The pre-construction correlation monitoring points of the pre-construction data monitoring nodes are determined using the pre-construction drawing accuracy line graph. All pre-construction correlation monitoring points are compared with the data monitored by the pre-construction data monitoring nodes, and it is determined whether the pre-construction data monitoring nodes are used as key construction nodes based on the comparison results; the allocation process of materials and personnel during construction that serves as construction nodes is calibrated as data monitoring nodes during construction, and a line graph of the accuracy of the allocation process during construction is established using the allocation process of all the materials and personnel during construction; the construction-time correlation monitoring points of the data monitoring nodes during construction are determined using the construction-time allocation process accuracy line graph; all construction-time correlation monitoring points are compared with the data monitored by the construction-time data monitoring nodes, and it is determined whether the data monitoring nodes during construction are used as key construction nodes based on the comparison results.