A detection device for topological curled PEC beam end plate connection structure
Through the combination of topological edge PEC beam end plate connection structure and detection equipment, the problems of low welding efficiency and poor quality of beam-column connection nodes in the existing technology are solved, and efficient and excellent construction results are achieved, and noise pollution is reduced. .
Patent Information
- Application Number
- CN202311112023.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-31
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2043-08-31
AI Technical Summary
In the prior art, the traditional welding method of beam-column connection nodes is carried out at the construction site, resulting in poor bearing capacity of beam-column nodes that have just been welded, affecting the overall project quality, and the welding position often leads to a longer construction period.
The topological curled PEC beam end plate connection structure is adopted, installed through multiple bolt nodes, and the welding situation is detected in combination with the detection equipment. Water mist and sound insulation cotton are used to reduce noise pollution.
Improve construction efficiency, ensure node quality, shorten construction period, and ensure that welding is qualified through inspection, reducing noise pollution.
Smart Images

Figure CN117071729B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of PEC beam end plate bodies, and in particular to a detection device for a topological curled PEC beam end plate connection structure. Background Art
[0002] In addition to the foundation, the beam-column structure is the foundation of a building. The load-bearing and earthquake resistance of the entire structure depend on the setting of the beam-column structure. How to quickly set the beam-column structure nodes with a high safety factor is the key to improving the installation speed of the overall structure of the prefabricated building.
[0003] The traditional method of PEC beam-column connection nodes in the prior art is to adopt bolt welding connection, full welding and other connection methods. Since the prior art usually requires welding at the construction site and then pouring between the welded beams and columns, the bearing capacity of the nodes between the beams and columns that have just been welded is poor, affecting the quality of the overall project. In addition, since there are many welding locations, this will result in a long construction period. Therefore, it is necessary to design a topological curled PEC beam end plate body connection structure to solve the above problems. Summary of the invention
[0004] The purpose of the present invention is to solve the shortcomings existing in the prior art, and proposes a detection device for a topological curled PEC beam end plate connection structure. The topological curled PEC beam end plate body connection is installed through multiple bolt nodes, which greatly improves the overall construction efficiency and ensures the quality of the nodes. At the same time, the welding between the topological curled PEC beam and the end plate body can be detected by the detection equipment. At the same time, water mist and sound insulation cotton are used to reduce the noise generated during the detection process, thereby reducing noise pollution.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A topological curling PEC beam end plate connection structure comprises two columns and a topological curling PEC beam body, wherein the topological curling PEC beam body is located between the two columns, and end plate bodies are welded on the left and right sides of the topological curling PEC beam body, the end plate body and the two columns are provided with a plurality of threaded holes, and bolts are commonly threadedly connected in every two matching threaded holes, a plurality of casting holes are provided at the upper end of the topological curling PEC beam body, and the upper ends of the plurality of casting holes are connected with sleeves, a node groove is provided on the front side of the two columns, and a grouting hole connected with the node groove is provided in the two columns, a plurality of first force-bearing longitudinal reinforcements are fixedly connected to the inner top and the inner bottom of the two node grooves, a second force-bearing longitudinal reinforcement is commonly welded between every two matching first force-bearing longitudinal reinforcements, a plurality of matching second force-bearing longitudinal reinforcements are commonly welded with C-type tie reinforcements, a stiffening plate is fixedly connected to the inner wall of the rear side of the two node grooves, and templates are provided at the grooves of the two node grooves.
[0007] In order to achieve the above-mentioned invention object, the present invention also provides a detection device for a topological curled PEC beam end plate connection structure:
[0008] The invention comprises a box body, wherein an impact assembly is arranged in the box body, wherein the impact assembly comprises four first rotating rods arranged in the box body, wherein the four first rotating rods are fixedly connected with rotating gears, wherein the outer walls of the four first rotating rods are fixedly connected with a plurality of moving rods, wherein a plurality of vertical boxes are fixedly connected with the front inner wall of the box body, wherein a plurality of vertical boxes are slidably connected with sliders, wherein a plurality of sliders are elastically connected with the inner walls of corresponding vertical boxes through first springs, wherein a plurality of vertical boxes are provided with strip openings on one side close to the corresponding first rotating rods, wherein a plurality of sliders are fixedly connected with pushing rods on one side close to the first rotating rods, wherein a plurality of pushing rods pass through the corresponding strip openings, wherein a plurality of sliders are fixedly connected with connecting rods on one side away from the first springs, wherein a plurality of connecting rods extend into the box body on one side away from the sliders and are fixedly connected with impact balls.
[0009] Preferably, pneumatic rods are fixedly connected to the left and right inner walls of the box body, the telescopic ends of the two pneumatic rods are fixedly connected to clamping blocks, and pressure sensors are provided on adjacent sides of the two clamping blocks.
[0010] Preferably, circular grooves are provided on the inner top and the inner bottom of the box body, the inner walls of the two circular grooves on the opposite sides are rotatably connected to a second rotating rod, the adjacent sides of the two circular grooves are fixedly connected to two fixed rods, and every two matching fixed rods are commonly fixedly connected to a circular ring, the inner walls of the two circular rings are provided with CCD visual sensors, and a display screen is installed on the left side of the box body.
[0011] Preferably, a fixed block is fixedly connected to the upper end of the disk located below, a movable groove is provided at the upper end of the fixed block, an electromagnet is provided at the inner bottom of the movable groove, a movable block is slidably connected in the movable groove, the adjacent surfaces of the movable block and the electromagnet are elastically connected by a second spring, the upper end of the movable block is fixedly connected to a support rod, and the upper end of the support rod is fixedly connected to the support block.
[0012] Preferably, the opposite sides of the two second rotating rods extend to the outside world, a mounting block is installed on the rear side of the box body, a driving motor is installed on the upper end of the mounting block, the rear side of the first rotating rod located on the left side extends to the outside world and is fixedly connected to the end of the output shaft of the driving motor, and the rear side of the box body is fixedly connected to two mounting blocks, and the adjacent surfaces of the two mounting blocks are rotatably connected to vertical rods, bevel gears are provided on the two vertical rods and the first rotating rod, the opposite sides of the two vertical rods pass through the corresponding mounting blocks, and the two second rotating rods are connected to the corresponding vertical rods through a transmission assembly.
[0013] Preferably, a water tank and a pump body are installed on the right side of the box body, the liquid inlet end of the pump body is connected to the bottom space of the water tank through an inlet pipe, and two atomizing nozzles are installed on the inner top of the box body, and the two atomizing nozzles are connected to the liquid outlet end of the pump body through an outlet pipe.
[0014] Preferably, a rectangular box is fixedly connected to the rear side of the box body, the vertical rod located below passes through the rectangular box, the outer wall of the vertical rod is provided with a threaded layer, the threaded layer part of the vertical rod is threadedly connected with a reciprocating block, the reciprocating block is slidably connected to the inner wall of the rectangular box, the reciprocating block and the inner top of the rectangular box are jointly and fixedly connected with a folding airbag, the folding airbag is connected with the outside through an air inlet, two hollow plates are provided on the inner top of the box body, the two hollow plates are connected to the folding airbag through an air outlet pipe, the air outlet pipe and the air inlet are both provided with one-way valves, and the right side space of the box body is connected with the bottom space of the water tank through a connecting pipe.
[0015] The present invention has the following beneficial effects:
[0016] 1. Compared with the existing technology, the topological curling PEC beam is fixed to the two columns with bolts, which is more convenient than welding, and makes the quality of the connected nodes higher, thus reducing the construction period of the entire building;
[0017] 2. Compared with the prior art, by setting the detection component, when the driving motor is running, multiple impact balls continuously impact the two end plate bodies, so that the welding condition between the end plate body and the topological curling PEC beam can be detected to ensure that the welding between the topological curling PEC beam and the end plate body is in a qualified state;
[0018] 3. Compared with the prior art, by setting up the CCD visual sensor, when inspecting the welding part between the topological curling PEC beam and the end plate body, multiple CCD visual sensors can detect whether cracks occur at the welding part between the end plate body and the topological curling PEC beam, so that the staff can better judge the welding condition of the topological curling PEC beam and the end plate body;
[0019] 4. Compared with the existing technology, the noise pollution caused by the detection process is reduced by setting the sound insulation cotton and water mist. At the same time, the rotation of the vertical rod generates a downward airflow in the box, so that the water mist can be quickly distributed in the box, thereby improving the noise reduction effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 A schematic diagram of the structure of a topological curled PEC beam body in a topological curled PEC beam end plate connection structure and a detection device thereof proposed by the present invention;
[0021] Figure 2 It is a schematic diagram of the structure of the topological curled PEC beam installed with two columns;
[0022] Figure 3 This is a schematic diagram of the structure after the C-type tie bar and the second longitudinal reinforcement are installed;
[0023] Figure 4 It is a schematic diagram of the structure after the template is sealed;
[0024] Figure 5 It is a structural schematic diagram of the detection equipment;
[0025] Figure 6 for Figure 5 A schematic diagram of the enlarged structure at A in the middle;
[0026] Figure 7 for Figure 5 A schematic diagram of the enlarged structure at B in the middle;
[0027] Figure 8 for Figure 5 Schematic diagram of the enlarged structure at C in the middle;
[0028] Fig. 9 for Figure 5 The right side structural diagram of ;
[0029] Fig.10 for Fig. 9 Schematic diagram of the internal structure of the medium rectangular box.
[0030] In the figure: 1 box body, 2 sound insulation cotton, 3 pneumatic rod, 4 clamping block, 5 pressure sensor, 6 first rotating rod, 7 moving rod, 8 display screen, 9 pump body, 10 water tank, 11 water inlet pipe, 12 connecting pipe, 13 support block, 14 atomizing nozzle, 15 water outlet pipe, 16 vertical rod, 17 hollow plate, 18 air outlet pipe, 19 vertical box, 20 first spring, 21 slider, 22 push rod, 23 connecting rod, 24 impact ball, 25 ring, 26 CCD visual sensor, 27 fixed rod, 28 fixed block, 2 9 moving block, 30 second spring, 31 electromagnet, 32 circular groove, 33 disc, 34 second rotating rod, 35 rectangular box, 36 driving motor, 37 bevel gear, 38 transmission assembly, 39 reciprocating block, 40 folding airbag, 41 air inlet, 42 topological curling PEC beam body, 43 end plate body, 44 casing, 45 column, 46 threaded hole, 47 grouting hole, 48 first load-bearing longitudinal reinforcement, 49 bolt, 50 stiffening plate, 51 second load-bearing longitudinal reinforcement, 52 C-type tie reinforcement, 53 rotating gear. DETAILED DESCRIPTION
[0031] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0032] Reference Figure 1-10 A topological curling PEC beam end plate connection structure includes two columns 45 and a topological curling PEC beam body 42. The topological curling PEC beam body 42 is located between the two columns 45. The left and right sides of the topological curling PEC beam body 42 are welded with an end plate body 43. The end plate body 43 and the two columns 45 are provided with a plurality of threaded holes 46. Bolts 49 are threadedly connected in each two matching threaded holes 46. The upper end of the topological curling PEC beam body 42 is provided with a plurality of casting holes. The upper ends of the plurality of casting holes are connected with sleeves 44. The sleeves 44 are steel pipes. The front sides of the two columns 45 are provided with node grooves. The two columns 45 are provided with a plurality of threaded holes 46. The columns 45 are provided with grouting holes 47 connected to the node grooves, and the 90° curved channels with a diameter greater than 50 mm can be realized by burying a 90° PVC adapter in precast concrete for pouring. One of the channels is a grouting port and the other is a grouting port. The inner tops and bottoms of the two node grooves are fixedly connected with a plurality of first force-bearing longitudinal reinforcements 48, and a second force-bearing longitudinal reinforcement 51 is welded between every two matching first force-bearing longitudinal reinforcements 48. A plurality of matching second force-bearing longitudinal reinforcements 51 are welded with C-type tie bars 52. Stiffening plates 50 are fixedly connected to the inner walls on the rear sides of the two node grooves, and templates are provided at the grooves of the two node grooves.
[0033] In order to achieve the above-mentioned invention object, the present invention also provides a detection device for a topological curled PEC beam end plate connection structure:
[0034] The box body 1 comprises a box body 1, the inner wall of the box body 1 is provided with sound insulation cotton 2, the front side of the box body 1 is provided with an entry, and a topological curling PEC beam body 42 welded with two end plate bodies 43 can be transported into the box body 1 through a hoisting device, and an impact assembly is provided in the box body 1, and the impact assembly comprises four first rotating rods 6 arranged in the box body 1, and the four first rotating rods 6 are all fixedly connected with rotating gears 53, and the four rotating gears 53 are meshed with each other, and the outer walls of the four first rotating rods 6 are all fixedly connected with a plurality of abutting rods 7, and the front inner wall of the box body 1 is fixedly connected with a plurality of vertical boxes 19, Slide blocks 21 are slidably connected in the plurality of vertical boxes 19, and the plurality of slide blocks 21 are elastically connected to the inner wall of the corresponding vertical boxes 19 through the first spring 20. The plurality of vertical boxes 19 are provided with strip openings on one side close to the corresponding first rotating rod 6, and the plurality of slide blocks 21 are fixedly connected to the pushing rod 22 on one side close to the first rotating rod 6, and the plurality of pushing rods 22 pass through the corresponding strip openings. The plurality of slide blocks 21 are fixedly connected to the connecting rod 23 on one side away from the first spring 20, and the plurality of connecting rods 23 extend into the box body 1 on one side away from the slide blocks 21 and are fixedly connected to the impact balls 24.
[0035] Among them, circular grooves 32 are provided on the inner top and inner bottom of the box body 1, and the inner walls of the two circular grooves 32 on the opposite sides are rotatably connected with the second rotating rod 34. The adjacent sides of the two circular grooves 32 are fixedly connected with two fixing rods 27, and every two matching fixing rods 27 are jointly fixedly connected with a ring 25. The inner walls of the two rings 25 are provided with CCD visual sensors 26, and a display screen is provided on the left side of the box body 1.
[0036] Among them, the inner walls on the left and right sides of the box body 1 are fixedly connected with pneumatic rods 3, the telescopic ends of the two pneumatic rods 3 are fixedly connected with clamping blocks 4, and the adjacent sides of the two clamping blocks 4 are provided with pressure sensors 5. The upper end of the disc 33 located below is fixedly connected with a fixed block 28, and the upper end of the fixed block 28 is provided with a moving groove, and the inner bottom of the moving groove is provided with an electromagnet 31. A moving block 29 is slidably connected in the moving groove, and the adjacent surfaces of the moving block 29 and the electromagnet 31 are elastically connected by a second spring 30. The upper end of the moving block 29 is fixedly connected with a support rod, and the upper end of the support rod is fixedly connected with a support block 13. A controller is provided, and the pressure sensor 5 generates an electrical signal and transmits it to the controller. The controller controls the electromagnet 31 to be energized. The moving block 29 is made of iron material, and the electromagnet 31 generates an attractive force on the moving block 29 after being energized.
[0037] Among them, the opposite sides of the two second rotating rods 34 extend to the outside world, a mounting block is installed on the rear side of the box body 1, and a driving motor 36 is installed on the upper end of the mounting block. The rear side of the first rotating rod 6 located on the left side extends to the outside world and is fixedly connected to the end of the output shaft of the driving motor 36. The rear side of the box body 1 is fixedly connected to two mounting blocks, and the adjacent surfaces of the two mounting blocks are rotatably connected with the vertical rod 16. Bevel gears 37 are provided on the two vertical rods 16 and the first rotating rod 6. The opposite sides of the two vertical rods 16 pass through the corresponding mounting blocks. The two second rotating rods 34 are connected to the corresponding vertical rods 16 through a transmission assembly 38. The transmission assembly 38 includes sprockets arranged on the second rotating rod 34 and the vertical rod 16, and the two sprockets are connected through chain transmission.
[0038] Among them, a water tank 10 and a pump body 9 are installed on the right side of the box body 1, the liquid inlet end of the pump body 9 is connected to the bottom space of the water tank 10 through an inlet pipe 11, two atomizing nozzles 14 are installed on the inner top of the box body 1, and the two atomizing nozzles 14 are connected to the liquid outlet end of the pump body 9 through an outlet pipe 15. A rectangular box 35 is fixedly connected to the rear side of the box body 1, and a vertical rod 16 located below passes through the rectangular box 35. The outer wall of the vertical rod 16 is provided with a threaded layer, and the threaded layer is similar to a threaded layer of a reciprocating screw. The threaded layer part of the vertical rod 16 is threadedly connected to a reciprocating block 39, and the reciprocating block 39 is slidably connected to the inner wall of the rectangular box 35. Then, the reciprocating block 39 and the inner top of the rectangular box 35 are fixedly connected with a folding airbag 40, and the folding airbag 40 is connected with the outside through the air inlet 41. Two hollow plates 17 are provided on the inner top of the box body 1. The two hollow plates 17 are connected with the folding airbag 40 through the air outlet pipe 18. Both the air outlet pipe 18 and the air inlet 41 are provided with a one-way valve. The outside gas enters the folding airbag 40 in one direction through the air inlet 41, and the gas in the folding airbag 40 enters the two hollow plates 17 in one direction through the air outlet pipe 18. The right side space of the box body 1 is connected with the bottom space of the water tank 10 through the connecting pipe 12.
[0039] The present invention can explain its functional principle through the following operation mode: a post-casting section is reserved at the end of the topological curled PEC beam body 42 to facilitate the installation of bolts 49. There are casting holes on both sides of the web on the top flange of the post-casting section, and the hole diameter is generally 25-35mm. A steel pipe is welded on the upper part of the hole, and fillet welds are welded around the bottom of the pipe as a sleeve 44 reinforcement to prevent the flange from causing a decrease in bearing capacity and local stress concentration due to the opening of the hole;
[0040] End plate bodies 43 are welded at both ends of the topological curling PEC beam body 42. The flanges and webs of the end plate body 43 and the topological curling PEC beam body 42 are all welded with groove penetration welding. The required number of bolts 49 are arranged on both sides of the upper and lower flanges according to the design force requirements to ensure the spacing and margins of the bolts 49 required by the specification. The size of the end plate body 43 is adjusted to accommodate a sufficient number of bolts 49. High-strength bolts are used for the installation bolts 49.
[0041] The topological curling PEC beam body 42 is installed on the two columns 45. A post-casting section is left between the two columns 45 and the topological curling PEC beam body 42 to facilitate the installation of the bolts 49. Two 90° curved channels (i.e., grouting holes 47) with a diameter greater than 50 mm are reserved in the upper concrete of the post-casting section of the two columns 45. This can be achieved by burying a 90° PVC adapter in the precast concrete after pouring. One of the channels is the grouting port and the other is the grouting outlet. After the high-strength bolts on site are installed, the templates on both sides of the post-casting section are sealed, and concrete is pumped from the grouting hole 47 on the left into the closed post-casting section. The concrete strength is the same as that of the column concrete until it is filled and overflows from the grouting hole 47 on the right, proving that it has been completely filled.
[0042] The post-cast section of the topological curled PEC beam body 42 is pumped with cement-based grouting material or slightly expanding self-compacting mortar from a casing 44. The strength requirements of both must not be lower than the strength of the concrete of the beam component itself. Since the pumped material has high fluidity, it can flow from the 1 / 4 circular welding hole on the web to the other side of the web. When one side of the casing 44 overflows, the node is cast densely.
[0043] After the topological curling PEC beam body 42 and the two end plate bodies 43 are welded, the topological curling PEC beam is hoisted as a whole into the box body 1 using existing hoisting equipment, so that the end plate body 43 located below contacts the support block 13, and then the two pneumatic rods 3 are started to stretch the two pneumatic rods 3, so that the two clamping blocks 4 move relative to each other to clamp the left and right sides of the topological curling PEC beam body 42. At this time, the two pressure sensors 5 generate electrical signals to be transmitted to the controller, and the controller controls the electromagnet 31 to be energized. After the electromagnet 31 is energized, it will generate an attractive force on the moving block 29, so that the moving block 29 moves downward, so that the support block 13 is separated from the end plate body 43;
[0044] Then, the driving motor 36 is started, so that the driving motor 36 drives the first rotating rod 6 on the left side to rotate. Since the four rotating gears 53 are in a meshing state, the remaining three first rotating rods 6 are rotated, and then the multiple abutting rods 7 are rotated;
[0045] When the abutting rod 7 contacts the corresponding pushing rod 22, as the abutting rod 7 rotates, the multiple sliders 21 move away from the corresponding end plate body 43, and the multiple first springs 20 are compressed. When the abutting rod 7 is disengaged, under the elastic action of the multiple first springs 20, the sliders 21 drive the impact balls 24 to approach the corresponding end plate body 43 and impact the end plate body 43. When a large crack is generated between the end plate body 43 and the topological curling PEC beam body 42, it means that the welding between the topological curling PEC beam body 42 and the two end plate bodies 43 is unqualified.
[0046] During the rotation of the driving motor 36, the two vertical rods 16 are driven to rotate through the two bevel gears 37, thereby driving the two second rotating rods 34 to rotate through the transmission assembly 38. At this time, the two disks 33 drive the two rings 25 to rotate, so that multiple CCD visual sensors 26 detect the welding points between the end plate body 43 and the topological curling PEC beam body 42, thereby avoiding the situation where the gap is too small and the staff cannot find it, making the detection of the welding points between the topological curling PEC beam body 42 and the two end plate bodies 43 more accurate;
[0047] During the detection process, the sound insulation cotton 2 can absorb most of the sound generated by the impact. At the same time, the operation of the pump body 9 will cause the water in the water tank 10 to be injected into the atomizing nozzle 14 and sprayed out. At this time, the atomized water can also play a certain noise reduction effect;
[0048] During the rotation of the two vertical rods 16, due to the setting of the threaded layer, the reciprocating block 39 will continuously move up and down, so that the folding airbag 40 will continuously stretch and shrink. When the folding airbag 40 stretches, the external gas will enter the folding airbag 40 through the air inlet 41. When the folding airbag 40 shrinks, the gas in the folding airbag 40 will be injected into the two hollow plates 17 and then sprayed into the box body 1. At this time, the airflow will carry water mist and quickly distribute it in the box body 1. At the same time, excess water mist will enter the water tank 10 with the airflow, so that the water mist can be remixed in the water in the water tank 10.
[0049] The above are only preferred specific implementation modes of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and inventive concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A detection device for a topological curled PEC beam end plate connection structure, the PEC beam end plate connection structure comprising two columns (45) and a topological curled PEC beam body (42), characterized in that: The topological curling PEC beam body (42) is located between two columns (45), and end plate bodies (43) are welded to the left and right sides of the topological curling PEC beam body (42). The end plate body (43) and the two columns (45) are provided with a plurality of threaded holes (46), and bolts (49) are threadedly connected in each of two matching threaded holes (46). The upper end of the topological curling PEC beam body (42) is provided with a plurality of casting holes, and the upper ends of the plurality of casting holes are connected to sleeves (44). The two columns (45) A node groove is provided on the front side, a grouting hole (47) connected to the node groove is provided in each of the two uprights (45), a plurality of first force-bearing longitudinal bars (48) are fixedly connected to the inner top and inner bottom of the two node grooves, a second force-bearing longitudinal bar (51) is welded between each two matching first force-bearing longitudinal bars (48), a plurality of matching second force-bearing longitudinal bars (51) are welded to a C-shaped tie bar (52), a stiffening plate (50) is fixedly connected to the inner wall on the rear side of the two node grooves, and a template is provided at the notch of the two node grooves; The detection device comprises a box (1), wherein an impact assembly is arranged in the box (1), wherein the impact assembly comprises four first rotating rods (6) arranged in the box (1), wherein the four first rotating rods (6) are all fixedly connected to a rotating gear (53), wherein the outer walls of the four first rotating rods (6) are all fixedly connected to a plurality of abutting rods (7), wherein the front inner wall of the box (1) is fixedly connected to a plurality of vertical boxes (19), wherein the plurality of vertical boxes (19) are all slidably connected to a slider (21), and the plurality of sliders (21) are slidably connected to the inner walls of the corresponding vertical boxes (19). The plurality of vertical boxes (19) are elastically connected via a first spring (20), a side of the plurality of vertical boxes (19) close to the corresponding first rotating rod (6) is provided with a strip opening, a side of the plurality of sliders (21) close to the first rotating rod (6) is fixedly connected to a push rod (22), a plurality of push rods (22) pass through the corresponding strip opening, a side of the plurality of sliders (21) away from the first spring (20) is fixedly connected to a connecting rod (23), a side of the plurality of connecting rods (23) away from the sliders (21) extends into the box body (1) and is fixedly connected to an impact ball (24); The inner walls on the left and right sides of the box body (1) are both fixedly connected with pneumatic rods (3), the telescopic ends of the two pneumatic rods (3) are both fixedly connected with clamping blocks (4), and the adjacent sides of the two clamping blocks (4) are both provided with pressure sensors (5); The inner top and the inner bottom of the box body (1) are both provided with circular grooves (32), the inner walls of the two circular grooves (32) on the opposite sides thereof are both rotatably connected to second rotating rods (34), the adjacent sides of the two circular grooves (32) are both fixedly connected to two fixed rods (27), each two matched fixed rods (27) are jointly fixedly connected to a circular ring (25), the inner walls of the two circular rings (25) are both provided with CCD visual sensors (26), a display screen (8) is installed on the left side of the box body (1), and when the driving motor (36) rotates, the two vertical rods (16) are driven to rotate via the two bevel gears (37), thereby driving the two second rotating rods (34) to rotate via the transmission assembly (38), and at this time, the two disks (33) drive the two circular rings (25) to rotate.
2. A detection device for a topological curled PEC beam end plate connection structure according to claim 1, characterized in that: The upper end of the circular disc (33) located at the bottom is fixedly connected to a fixed block (28), the upper end of the fixed block (28) is provided with a moving groove, the inner bottom of the moving groove is provided with an electromagnet (31), a moving block (29) is slidably connected in the moving groove, the adjacent surfaces of the moving block (29) and the electromagnet (31) are elastically connected via a second spring (30), the upper end of the moving block (29) is fixedly connected to a support rod, and the upper end of the support rod is fixedly connected to the support block (13).
3. A detection device for a topological curled PEC beam end plate connection structure according to claim 2, characterized in that: The opposite sides of the two second rotating rods (34) extend to the outside, a mounting block is installed on the rear side of the box body (1), a driving motor (36) is installed on the upper end of the mounting block, the rear side of the first rotating rod (6) located on the left side extends to the outside and is fixedly connected to the end of the output shaft of the driving motor (36), the rear side of the box body (1) is fixedly connected to two mounting blocks, the adjacent surfaces of the two mounting blocks are rotatably connected to the vertical rod (16), the two vertical rods (16) and the first rotating rod (6) are provided with bevel gears (37), the opposite sides of the two vertical rods (16) pass through the corresponding mounting blocks, and the two second rotating rods (34) are transmission-connected to the corresponding vertical rods (16) via a transmission assembly (38).
4. The detection device for the topological curled PEC beam end plate connection structure according to claim 1 is characterized in that: A water tank (10) and a pump body (9) are installed on the right side of the box body (1); a liquid inlet end of the pump body (9) is connected to the bottom space of the water tank (10) via a water inlet pipe (11); two atomizing nozzles (14) are installed on the inner top of the box body (1); the two atomizing nozzles (14) are connected to the liquid outlet end of the pump body (9) via a water outlet pipe (15).
5. The detection device for the topological curled PEC beam end plate connection structure according to claim 4, characterized in that: A rectangular box (35) is fixedly connected to the rear side of the box body (1), and the vertical rod (16) located below penetrates the rectangular box (35). The outer wall of the vertical rod (16) is provided with a threaded layer, and a reciprocating block (39) is threadedly connected to the threaded layer of the vertical rod (16). The reciprocating block (39) is slidably connected to the inner wall of the rectangular box (35). The reciprocating block (39) and the inner top of the rectangular box (35) are jointly fixedly connected with a folding airbag (40). The folding airbag (40) is connected to the outside through an air inlet (41). Two hollow plates (17) are provided on the inner top of the box body (1). The two hollow plates (17) are connected to the folding airbag (40) through an air outlet pipe (18). Both the air outlet pipe (18) and the air inlet (41) are provided with a one-way valve. The right side space of the box body (1) is connected to the bottom space of the water tank (10) through a connecting pipe (12).
Citation Information
Patent Citations
Beam-column joint for prefabricated PEC structure system and preparation method
CN112411767A