Waterproof roof of tower crane opening

Through the galvanized steel plate structure of the quadrangular pyramid-shaped waterproof ceiling and the back-shaped drainage eaves, combined with airbag sealing, the problems of poor water cut-off effect and material perishability are solved, and efficient rainwater management and material utilization are achieved.

CN117403922BActive Publication Date: 2024-11-08CHINA RAILWAY CONSTRUCTION ENGINEERING GROUP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311353841.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-10-19
Publication Date
2024-11-08
Estimated Expiration
2043-10-19

AI Technical Summary

Technical Problem

The waterproofing measures for the existing tower crane holes use wooden square bars and wooden formwork, which cannot completely cover the holes, and the water cut-off effect is poor, and the wooden formwork is prone to decay and needs to be replaced frequently, and the material utilization rate is low.

Method used

It adopts a quadrangular waterproof ceiling and a back-shaped drainage eaves, and is composed of galvanized steel plates. It has a retractable structure, adapts to different tower crane hole specifications, and improves sealing performance through an airbag sealing mechanism.

Benefits of technology

It realizes efficient rainwater interception, prevents water accumulation in the basement, extends the service life of the equipment, improves waterproof performance and material turnover rate, and reduces the replacement frequency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117403922B_ABST
    Figure CN117403922B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building construction, and discloses a waterproof ceiling for a tower crane opening, comprising four tower crane columns distributed in a rectangular shape, wherein the four tower crane columns are provided with a waterproof ceiling, the surface of the waterproof ceiling is arranged in a concave-convex shape, and the waterproof ceiling comprises four triangular galvanized steel plates, four rectangular galvanized steel plates and eight first trapezoidal galvanized steel plates; the four triangular galvanized steel plates are distributed in a circumferential direction and are sequentially connected end to end to form the top of the waterproof ceiling, and the four rectangular galvanized steel plates and the eight first trapezoidal galvanized steel plates are distributed at intervals to form the bottom of the waterproof ceiling; the waterproof ceiling for the tower crane opening, which is composed of a tower crane ceiling through a four-sided pyramid ceiling and a U-shaped drainage eaves, has excellent waterproof performance, and the tower crane ceiling is retractable as a whole to adapt to tower crane openings of various structural specifications, and is also very convenient to install and disassemble, which is conducive to turnover.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, in particular to a waterproof ceiling for a tower crane opening. Background Art

[0002] At present, large vertical transportation machinery and equipment such as tower cranes and construction elevators are used in the construction process of most construction projects. Their foundations are all located on the basement floor. Therefore, installation openings need to be reserved at the upper part of the floor structure plate. A tower crane device is installed at each opening. The tower crane device usually consists of four tower crane columns and several groups of tower crane cross bars.

[0003] Since the opening of the tower crane is exposed, in order to prevent rainwater from flowing back into the basement, water interception measures need to be taken at appropriate locations to prevent rainwater from flowing back into the basement and causing water accumulation in the basement. The current waterproofing measure is to cover it with a combination of wooden strips + wooden formwork. This method has the following disadvantages: 1. The wooden formwork cannot completely cover the reserved opening, and the joints between the wooden formworks are not tight, and the water interception effect is not good. 2. The wooden formwork is soaked in rainwater for a long time, which is very easy to cause rot and fall off, resulting in the failure of waterproof performance. 3. Since the wooden formwork itself has low durability and is in a humid environment for a long time, it needs to be replaced frequently, and the material turnover cannot be carried out, and the material utilization rate cannot be effectively improved.

[0004] Therefore, in order to solve the above-mentioned technical problems existing in the prior art, a waterproof ceiling for a tower crane opening is proposed. Summary of the invention

[0005] The present invention provides a waterproof ceiling for a tower crane opening. The tower crane ceiling is composed of a four-sided pyramid ceiling and a U-shaped drainage eaves and has excellent waterproof performance. The tower crane ceiling is retractable as a whole and can be adapted to tower crane openings of various structural specifications. The installation and disassembly are also very convenient, which is beneficial for turnover. The invention solves the problem mentioned in the above background technology that the combination of wooden strips and wooden templates used in the existing tower crane opening waterproofing measures cannot completely cover the tower crane opening, has a poor water interception effect, and needs to be frequently replaced.

[0006] The present invention provides the following technical solution: a waterproof ceiling for a tower crane opening, comprising four tower crane columns distributed in a rectangular shape, the four tower crane columns are provided with a waterproof ceiling, the surface of the waterproof ceiling is arranged in a concave-convex shape, and the waterproof ceiling comprises four triangular galvanized steel plates, four rectangular galvanized steel plates and eight first trapezoidal galvanized steel plates;

[0007] The four triangular galvanized steel plates are distributed circumferentially and connected end to end in sequence to form the top of the waterproof ceiling, the four rectangular galvanized steel plates and the eight first trapezoidal galvanized steel plates are distributed at intervals to form the bottom of the waterproof ceiling, and the two first trapezoidal galvanized steel plates at intervals are slidably connected to the rectangular galvanized steel plate in the middle, so that the waterproof ceiling has a retractable four-sided pyramid structure;

[0008] The waterproof ceiling is also provided with a drainage eaves and a disassembly and assembly mechanism. The drainage eaves is in a U-shaped structure along the bottom of the waterproof ceiling, and a plurality of drainage holes are opened on the drainage eaves. The disassembly and assembly mechanism is used to control the extension and retraction of the waterproof ceiling to adapt to the four tower crane columns.

[0009] As an optional solution for the waterproof ceiling of the tower crane opening of the present invention, wherein: the lower ends of the four triangular galvanized steel plates are each provided with a first slide groove along the center line, the lower ends of the four triangular galvanized steel plates are respectively provided with two second slide grooves along the two side lines, the four rectangular galvanized steel plates are respectively slidably connected to the four first slide grooves, and the eight first trapezoidal galvanized steel plates are respectively slidably connected to the eight second slide grooves;

[0010] The waterproof ceiling also includes eight second trapezoidal galvanized steel plates, which are respectively located on the lower sides of the eight first trapezoidal galvanized steel plates, and the eight second trapezoidal galvanized steel plates are respectively slidably connected to the four rectangular galvanized steel plates. The four rectangular galvanized steel plates, the eight first trapezoidal galvanized steel plates and the eight second trapezoidal galvanized steel plates form a retractable four-sided pyramid structure covering the four tower crane columns.

[0011] As an optional solution for the waterproof ceiling of the tower crane opening described in the present invention, the drainage eaves includes four first eaves components and eight second eaves components, the four first eaves components are respectively arranged at the lower ends of the four rectangular galvanized steel plates, the eight second eaves components are respectively arranged at the lower ends of the eight second trapezoidal galvanized steel plates, and the two separated second eaves components are slidably connected to the first eaves component located in the middle.

[0012] As an optional solution for the waterproof ceiling of the tower crane opening of the present invention, wherein: the disassembly and assembly mechanism includes a cylindrical hot-dip galvanized keel and a first control component, the cylindrical hot-dip galvanized keel is arranged at the middle of the upper ends of the four triangular galvanized steel plates, the first control component includes four first hot-dip galvanized square keels circumferentially arranged on the cylindrical hot-dip galvanized keel, and the four first hot-dip galvanized square keels are all slidably provided with second hot-dip galvanized square keels;

[0013] The four triangular galvanized steel plates are respectively connected to the four first hot-dip galvanized square tube keels, the eight first trapezoidal galvanized steel plates are respectively connected to the four second hot-dip galvanized square tube keels, the four first hot-dip galvanized square tube keels are each provided with a first air chamber, the four second hot-dip galvanized square tube keels are each provided with a first piston, and the four first pistons are respectively slidably connected to the four first air chambers.

[0014] As an optional solution of the waterproof ceiling of the tower crane opening of the present invention, the disassembly and assembly mechanism further includes four second control components, which are respectively arranged in the four rectangular galvanized steel plates to control the extension and contraction of the eight second trapezoidal galvanized steel plates;

[0015] The second control component includes a double-headed cylinder arranged in the rectangular galvanized steel plate, and two second pistons are slidably connected in the double-headed cylinder. The two second pistons are each provided with a piston rod, and the two piston rods are respectively connected to the two spaced-apart second trapezoidal galvanized steel plates.

[0016] As an optional solution for the waterproof ceiling of the tower crane opening described in the present invention, a sealing mechanism is also provided on the waterproof ceiling, and the sealing mechanism includes a first air bag arranged at the lower end of the four triangular galvanized steel plates, a second air bag is arranged on each of the eight second trapezoidal galvanized steel plates, and a third air bag is arranged on each of the eight first trapezoidal galvanized steel plates.

[0017] As an optional solution for the waterproof ceiling of the tower crane opening described in the present invention, the disassembly and assembly mechanism also includes a driving component, and the driving component is used to control the operation of the first control component, the second control component and the sealing mechanism in sequence.

[0018] As an optional solution of the waterproof ceiling of the tower crane opening of the present invention, wherein: the driving assembly includes a second air chamber arranged in the cylindrical hot-dip galvanized keel, the second air chamber is provided with a valve core, a valve member is slidably arranged in the second air chamber, and the cylindrical hot-dip galvanized keel is provided with four first air holes, four second air holes and four third air holes connected with the second air chamber;

[0019] The four first air chambers are connected to the four first air holes through the four first air holes, respectively, the four double-headed cylinders are connected to the four second air holes through the four first air pipes, respectively, and the four sealing mechanisms are connected to the four third air holes through the four second air pipes, respectively.

[0020] As an optional solution for the waterproof ceiling of the tower crane opening described in the present invention, the driving assembly also includes a first piston cylinder arranged in the second air chamber, a second piston cylinder is slidably arranged on the first piston cylinder, the valve member is slidably connected to the second piston cylinder, the second piston cylinder is elastically connected to the first piston cylinder through a first spring, the valve member is elastically connected to the second piston cylinder through a second spring, and the elastic force of the first spring is smaller than the elastic force of the second spring.

[0021] As an optional solution for the waterproof ceiling of the tower crane opening described in the present invention, four tower crane cross bars are arranged on the tower crane columns, and the waterproof ceiling also includes a cross-shaped base, and a cylindrical hot-dip galvanized keel is slidably connected to the cross-shaped base, and four support plates are slidably arranged on the cross-shaped base, and the four support plates are respectively connected to the four tower crane cross bars.

[0022] The present invention has the following beneficial effects:

[0023] 1. The waterproof ceiling of the tower crane opening is a four-sided pyramid structure with a concave and convex surface. It is installed on the inner side of the four tower crane columns. A drainage eaves with a U-shaped structure is installed on the lower side of the four-sided pyramid structure, which can fit the side wall of the tower crane column well. Drainage outlets are set around to drain water to prevent rainwater from flowing back into the basement. The surface layer is made of concave and convex corrugated galvanized steel plate, which has good durability and does not need to be replaced frequently. The water interception efficiency is improved and the wind resistance is good. The cover will not be blown away due to strong winds. The waterproof performance is improved and the economic effect is good. The concave and convex corrugated galvanized steel plate is not easy to be damaged and can be turned over after use in a project and transported to other tower cranes for secondary use.

[0024] 2. The waterproof ceiling of the tower crane opening has a four-sided pyramid structure that is both retractable and can cover the four tower crane columns. Specifically, it is a fixed-size four-sided pyramid composed of four triangular galvanized steel plates on the upper part, and a retractable four-sided platform composed of four rectangular galvanized steel plates, eight first trapezoidal galvanized steel plates and eight second trapezoidal galvanized steel plates on the lower side, which can adapt to the spacing of the four tower crane columns. Therefore, it can be designed according to the different specifications and sizes of the specific tower crane opening without measuring and manufacturing the corresponding ceiling, achieving versatility and high turnover performance.

[0025] 3. The waterproof ceiling of the tower crane opening is equipped with air bags at each gap of the tower crane ceiling. After the tower crane ceiling is spliced, the gaps can be filled by the expansion of each air bag, which greatly improves the sealing performance and reduces water leakage.

[0026] 4. The installation of the waterproof ceiling of the tower crane opening is also very convenient. First, the cross-shaped base is connected to the four tower crane crossbars for support, and then the cylindrical hot-dip galvanized keel at the top of the quadrangular pyramid is inflated. Through the control of the driving component, the four rectangular galvanized steel plates and eight first trapezoidal galvanized steel plates can be driven in sequence to form a quadrangular platform structure with a notch that fits the four tower crane columns and extends downward to resist the four tower crane columns, and then the eight second trapezoidal galvanized steel plates are driven to complete the splicing and cover the four tower crane columns for a week. Finally, each airbag is inflated to fill the gap. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a first overall structural schematic diagram of the present invention.

[0028] Figure 2 It is a second overall structural schematic diagram of the present invention.

[0029] Figure 3 It is a first cross-sectional structural schematic diagram of the present invention.

[0030] Figure 4 For the present invention Figure 3 Schematic diagram of the local enlarged structure at point A in the middle.

[0031] Figure 5 It is a second cross-sectional structural schematic diagram of the present invention.

[0032] Figure 6 For the present invention Figure 5 Schematic diagram of the local enlarged structure at point B in the middle.

[0033] Figure 7 It is a third cross-sectional structural schematic diagram of the present invention.

[0034] Figure 8 It is a schematic diagram of the first explosion structure of the present invention.

[0035] Fig. 9 It is a schematic diagram of the second explosion structure of the present invention.

[0036] Fig.10 It is a schematic diagram of the third explosion structure of the present invention.

[0037] Fig.11 It is a schematic diagram of the local structure of the present invention.

[0038] In the figure: 100, tower crane column; 110, tower crane cross bar; 200, waterproof ceiling; 210, triangular galvanized steel plate; 220, rectangular galvanized steel plate; 230, first trapezoidal galvanized steel plate; 240, first slide; 250, second slide; 260, second trapezoidal galvanized steel plate; 270, cross-shaped base; 280, support plate; 300, drainage eaves; 310, first eaves component; 320, second eaves component; 400, disassembly and assembly mechanism; 410, cylindrical hot-dip galvanized keel; 420, first control component; 421, first hot-dip galvanized square keel; 422, second hot-dip galvanized square keel; 423, The first air chamber; 424, the first piston; 430, the second control component; 431, the double-headed cylinder; 432, the second piston; 433, the piston rod; 440, the driving component; 441, the second air chamber; 442, the first air hole; 443, the second air hole; 444, the third air hole; 445, the valve member; 446, the first piston cylinder; 447, the second piston cylinder; 448, the first spring; 449, the second spring; 450, the valve core; 460, the first air pipe; 470, the second air pipe; 500, the sealing mechanism; 510, the first air bag; 520, the second air bag; 530, the third air bag; 600, the drain port. DETAILED DESCRIPTION

[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0040] Example 1

[0041] Usually during construction, the tower crane openings reserved on each floor are rectangular, and are equipped with four tower crane columns 100 distributed in a rectangular shape, as well as several groups, each group including four tower crane cross bars 110 and diagonal bars connected in sequence between the four tower crane columns 100. The waterproofing measure usually taken for the tower crane openings is to cover them with wooden boards, which have poor waterproof performance, are not tightly spliced, and are easily damaged. And considering that during construction, depending on the specific circumstances, the tower crane columns, tower crane cross bars and tower crane openings at the tower crane openings have different size specifications, and traditional waterproofing measures are not universal. Therefore, in order to solve the above technical problems, Example 1 is proposed;

[0042] See also Figure 1-Figure 11The waterproof ceiling of the tower crane opening includes four tower crane columns 100 distributed in a rectangular shape, and a waterproof ceiling 200 is arranged on the four tower crane columns 100. The surface of the waterproof ceiling 200 is arranged in a concave-convex shape. The waterproof ceiling 200 includes four triangular galvanized steel plates 210, four rectangular galvanized steel plates 220 and eight first trapezoidal galvanized steel plates 230;

[0043] Four triangular galvanized steel plates 210 are distributed circumferentially and connected end to end in sequence to form the top of the waterproof ceiling 200, four rectangular galvanized steel plates 220 and eight first trapezoidal galvanized steel plates 230 are distributed at intervals to form the bottom of the waterproof ceiling 200, and the two first trapezoidal galvanized steel plates 230 at intervals are slidably connected to the rectangular galvanized steel plate 220 located in the middle, so that the waterproof ceiling 200 is a retractable four-sided pyramid structure;

[0044] The waterproof ceiling 200 is also provided with a drainage cornice 300 and a disassembly mechanism 400. The drainage cornice 300 is in a U-shaped structure along the bottom of the waterproof ceiling 200, and a plurality of drain holes 600 are opened on the drainage cornice 300. The disassembly mechanism 400 is used to control the expansion and contraction of the waterproof ceiling 200 to adapt to the four tower crane columns 100.

[0045] The lower ends of the four triangular galvanized steel plates 210 are provided with a first chute 240 along the center line, the lower ends of the four triangular galvanized steel plates 210 are provided with two second chute 250 along the two side lines, the four rectangular galvanized steel plates 220 are slidably connected in the four first chute 240, and the eight first trapezoidal galvanized steel plates 230 are slidably connected in the eight second chute 250;

[0046] The waterproof ceiling 200 further includes eight second trapezoidal galvanized steel plates 260, which are respectively located at the lower sides of the eight first trapezoidal galvanized steel plates 230, and the eight second trapezoidal galvanized steel plates 260 are respectively slidably connected to the four rectangular galvanized steel plates 220, and the four rectangular galvanized steel plates 220, the eight first trapezoidal galvanized steel plates 230 and the eight second trapezoidal galvanized steel plates 260 form a retractable quadrangular pyramid structure covering the four tower crane columns 100;

[0047] The drainage eaves 300 includes four first eaves components 310 and eight second eaves components 320. The four first eaves components 310 are respectively arranged at the lower ends of four rectangular galvanized steel plates 220, and the eight second eaves components 320 are respectively arranged at the lower ends of eight second trapezoidal galvanized steel plates 260, and the two intervals of the second eaves components 320 are slidably connected to the first eaves component 310 located in the middle.

[0048] In this embodiment: first, four triangular galvanized steel plates 210 can be spliced ​​and sealed with metal strips or directly welded to form a fixed-size and smaller four-sided pyramid as the top of the tower crane ceiling. Fig.11 In the upward perspective, four rectangular galvanized steel plates 220 slide along four first slide grooves 240 and eight first trapezoidal galvanized steel plates 230 slide along eight second slide grooves 250, and two adjacent first trapezoidal galvanized steel plates 230 are fixed to each other and slide along a diagonal line of the triangular galvanized steel plate 210, and the two separated first trapezoidal galvanized steel plates 230 slide left and right or front and back along a rectangular galvanized steel plate 220 in the middle position, thus forming a retractable four-sided platform, which can adapt to the different spacings between four tower crane columns 100 of different specifications.

[0049] Furthermore, in order to completely cover the four tower crane columns 100, two fixed first trapezoidal galvanized steel plates 230 are used as a group, and the bottom of a group of first trapezoidal galvanized steel plates 230 has a notch that fits with the tower crane column 100, and two second trapezoidal galvanized steel plates 260 are slidably installed on both sides of the lower part of each rectangular galvanized steel plate 220, a total of eight second trapezoidal galvanized steel plates 260, when the eight second trapezoidal galvanized steel plates 260 slide left and right or front and back and splice together, they cover the outer corners of the four tower crane columns 100. Thus, a retractable four-sided platform that can cover the four tower crane columns 100 is constructed.

[0050] The four first eaves components 310 and the eight second eaves components 320 installed at the lower ends of the four rectangular galvanized steel plates 220 and the lower ends of the eight second trapezoidal galvanized steel plates 260 are also spliced ​​together to form a U-shaped drainage eaves 300 at the same time as the four second trapezoidal galvanized steel plates 260 are spliced ​​together. Several drain ports 600 opened on the drainage eaves 300 are used for drainage.

[0051] The retractable quadrangular pyramid formed by the top quadrangular pyramid and the bottom retractable quadrangular platform is high in the middle and low on four sides, which is conducive to draining rainwater into the drainage eaves 300 and then draining through the drain port 600. The surface of the waterproof ceiling 200 is generally concave and convex, which is more conducive to drainage.

[0052] Example 2

[0053] In order to control the expansion and contraction of the four-sided pyramid structure composed of four rectangular galvanized steel plates 220 and eight first trapezoidal galvanized steel plates 230 at the bottom of the waterproof ceiling 200 to fit the four tower crane columns 100, and the four second trapezoidal galvanized steel plates 260 are spliced ​​to cover the four tower crane columns 100, embodiment 2 is proposed;

[0054] This embodiment is an improvement made on the basis of embodiment 1. For details, please refer to Figure 1-Figure 10The disassembly and assembly mechanism 400 includes a cylindrical hot-dip galvanized keel 410 and a first control assembly 420. The cylindrical hot-dip galvanized keel 410 is arranged at the middle of the upper end of four triangular galvanized steel plates 210. The first control assembly 420 includes four first hot-dip galvanized square keels 421 circumferentially arranged on the cylindrical hot-dip galvanized keel 410. Second hot-dip galvanized square keels 422 are slidably arranged on the four first hot-dip galvanized square keels 421.

[0055] The four triangular galvanized steel plates 210 are respectively connected to the four first hot-dip galvanized square keels 421, the eight first trapezoidal galvanized steel plates 230 are respectively connected to the four second hot-dip galvanized square keels 422, the four first hot-dip galvanized square keels 421 are each provided with a first air chamber 423, the four second hot-dip galvanized square keels 422 are each provided with a first piston 424, and the four first pistons 424 are respectively slidably connected to the four first air chambers 423;

[0056] The disassembly and assembly mechanism 400 further includes four second control components 430, which are respectively disposed in the four rectangular galvanized steel plates 220 for controlling the extension and retraction of the eight second trapezoidal galvanized steel plates 260;

[0057] The second control component 430 includes a double-headed cylinder 431 arranged in a rectangular galvanized steel plate 220, and two second pistons 432 are slidably connected in the double-headed cylinder 431. The two second pistons 432 are each provided with a piston rod 433, and the two piston rods 433 are respectively connected to the two spaced second trapezoidal galvanized steel plates 260.

[0058] In this embodiment: four triangular galvanized steel plates 210 are installed around the cylindrical hot-dip galvanized keel 410, and two adjacent first trapezoidal galvanized steel plates 230 are installed on the upper end of the second hot-dip galvanized square keel 422. The four first hot-dip galvanized square keels 421 and the four second hot-dip galvanized square keels 422 play the role of supporting the tower crane ceiling, making its structure more solid. At the same time, the four second hot-dip galvanized square keels 422 are retractable, and the four first pistons 424 drive the four second hot-dip galvanized square keels 422 to retract through the air chambers inside the four first hot-dip galvanized square keels 421 to inflate or deflate. The four second hot-dip galvanized square keels 422 then drive the four rectangular galvanized steel plates 220 and the eight first trapezoidal galvanized steel plates 230 to extend downward or shrink upward.

[0059] The air chambers on both sides of the double-headed cylinder 431 installed in the rectangular galvanized steel plate 220 are as follows: Figure 7 As shown in , when the air chambers on both sides of the double-headed cylinder 431 are inflated or deflated, the two second pistons 432 and the two piston rods 433 are driven to move inward or outward synchronously, thereby driving the two second trapezoidal galvanized steel plates 260 on both sides to expand and contract.

[0060] The air chambers on both sides, the two second pistons 432 and the two piston rods 433 are symmetrically arranged. A valve structure for maintaining the air pressure balance on both sides may also be added between the two air chambers. This is a conventional technical means and will not be elaborated on here.

[0061] Example 3

[0062] In order to further improve the sealing performance of the tower crane ceiling and reduce the occurrence of water leakage, embodiment 3 is proposed;

[0063] This embodiment is an improvement made on the basis of embodiment 2. For details, please refer to Figure 2-Figure 10 A sealing mechanism 500 is also provided on the waterproof ceiling 200, and the sealing mechanism 500 includes a first air bag 510 arranged at the lower end of the four triangular galvanized steel plates 210, a second air bag 520 is arranged on each of the eight second trapezoidal galvanized steel plates 260, and a third air bag 530 is arranged on each of the eight first trapezoidal galvanized steel plates 230.

[0064] In this embodiment: the first airbag 510 is installed at one end close to the four triangular galvanized steel plates 210, the four rectangular galvanized steel plates 220, and the eight first trapezoidal galvanized steel plates 230. When it is inflated, it will block the gap between the triangular galvanized steel plates 210 and the four rectangular galvanized steel plates 220, and the eight first trapezoidal galvanized steel plates 230 to improve the sealing performance.

[0065] like Fig. 9 As shown in FIG. 1 , the structure of a partial sealing mechanism 500 is shown. A second airbag 520 is also distributed on the zigzag portion on the upper side of the second trapezoidal galvanized steel plate 260. A third airbag 530 is also distributed on the lower side of the structure composed of two adjacent first trapezoidal galvanized steel plates 230. The second airbag 520 and the third airbag 530 are inflated to fill the gap between the first trapezoidal galvanized steel plate 230 and the second trapezoidal galvanized steel plate 260, as well as the gap between the first trapezoidal galvanized steel plate 230, the second trapezoidal galvanized steel plate 260 and the tower crane column 100, thereby improving the sealing performance. In addition, the two adjacent third airbags 530 can be used as a whole to ventilate each other.

[0066] Example 4

[0067] In order to facilitate the installation of the tower crane ceiling, it is necessary to realize the first control component 420, the second control component 430 and the sealing mechanism 500 to operate in sequence. First, the first control component 420 causes the retractable quadrangular platform to retract and contact with the four tower crane columns 100, and then the four second control components 430 cause the eight second trapezoidal galvanized steel plates 260 to splice and cover the tower crane columns 100. Finally, the air bags of the sealing mechanism 500 are inflated to fill the gaps to avoid affecting the operation of the first two steps. In order to facilitate the above installation process, Example 4 is proposed;

[0068] This embodiment is an improvement made on the basis of embodiment 3. For details, please refer to Figure 2-Figure 10 The disassembly and assembly mechanism 400 further includes a driving assembly 440, which is used to sequentially control the operation of the first control assembly 420, the second control assembly 430 and the sealing mechanism 500;

[0069] The driving assembly 440 includes a second air chamber 441 disposed in a cylindrical hot-dip galvanized keel 410, a valve core 450 is disposed on the second air chamber 441, a valve member 445 is slidably disposed in the second air chamber 441, and four first air holes 442, four second air holes 443 and four third air holes 444 communicating with the second air chamber 441 are opened on the cylindrical hot-dip galvanized keel 410;

[0070] The four first air chambers 423 are respectively connected to the four first air holes 442 through the four first air holes 442, the four double-headed cylinders 431 are respectively connected to the four second air holes 443 through the four first air pipes 460, and the four sealing mechanisms 500 are respectively connected to the four third air holes 444 through the four second air pipes 470;

[0071] The drive assembly 440 also includes a first piston cylinder 446 arranged in the second air chamber 441, a second piston cylinder 447 is slidably arranged on the first piston cylinder 446, a valve member 445 is slidably connected to the second piston cylinder 447, the second piston cylinder 447 is elastically connected to the first piston cylinder 446 via a first spring 448, the valve member 445 is elastically connected to the second piston cylinder 447 via a second spring 449, and the elastic force of the first spring 448 is smaller than the elastic force of the second spring 449.

[0072] In this embodiment: Figure 6 As shown in FIG. , the waterproof ceiling 200 is completely assembled, and the air bags in the sealing mechanism 500 have not yet expanded. At this time, the interface of the valve member 445 is connected to the second air hole 443 .

[0073] First, under the elastic force of the first spring 448 and the second spring 449, the second piston cylinder 447 and the valve member 445 shrink to the upper side, so that the upper interface of the second air chamber 441 is connected to the four first air holes 442 through the valve member 445. At this time, the valve core 450 is opened, and the second air chamber 441 is inflated with air by means of a manual air pump or an electric air pump. At this time, the gas will be filled into the four first air chambers 423, so that the four second hot-dip galvanized square keels 422 drive the four rectangular galvanized steel plates 220 and the eight first trapezoidal galvanized steel plates 230 of the waterproof ceiling 200 to extend downward.

[0074] Until the eight first trapezoidal galvanized steel plates 230 abut against the four tower crane columns 100, since the four first pistons 424 cannot move further, the continued inflation at this time will increase the downward pressure on the valve member 445, and then first resist the elastic force of the first spring 448, so that the second piston cylinder 447 drives the valve member 445 to move. Figure 6 As shown in the figure, the first air hole 442 is blocked by the second piston cylinder 447, and the upper opening of the second air chamber 441 is connected to the four second air holes 443 through the valve member 445. At this time, the air is continuously inflated to the eight air chambers on both sides of the four double-headed cylinders 431 through the four first air pipes 460, so that the eight second trapezoidal galvanized steel plates 260 move outward and are spliced ​​together.

[0075] Similarly, when the eight second trapezoidal galvanized steel plates 260 are spliced ​​together and cannot move further, the downward pressure on the valve member 445 continues to increase, counteracting the elastic force of the second spring 449, causing the valve member 445 to drop further, at which time the second air hole 443 is blocked by the valve member 445 itself, and the second air chamber 441 is connected to the four third air holes 444 through the valve member 445. Continuous inflation causes the air bags of the sealing mechanism 500 to expand.

[0076] It is necessary to add that Fig.10 Taking the schematic diagram of the connection between one group of third air holes 444 and the partial structure of the sealing mechanism 500 shown in the figure as an example, the first air pipe 460 and the second air pipe 470 are hoses arranged on the inner side of the waterproof ceiling 200. The two adjacent second air bags 520 and the two third air bags 530 can be connected at the same time through the second air pipe 470 shown in the figure, or the second air bags 520 can be connected first through the third air holes 444, and the second air bags 520 are then connected to the third air bags 530 by another hose.

[0077] In addition, air bags can also be arranged between the waterproof ceiling 200 and the drainage cornice 300 and at the gaps of the drainage cornice 300, and connected with the second air chamber 441 in the same manner as above to inflate and improve the sealing performance. As the same technical means, it is not shown in the figure.

[0078] Example 5

[0079] In order to facilitate fixing the entire device before completing the assembly of the tower crane ceiling by means of inflation through the disassembly and assembly mechanism 400, and to enhance the stability of the structure after installation, embodiment 5 is proposed;

[0080] This embodiment is an improvement made on the basis of embodiment 4. For details, please refer to Figure 2-Figure 10Four tower crane cross bars 110 are arranged on the tower crane column 100, and the waterproof ceiling 200 also includes a cross-shaped base 270. The cylindrical hot-dip galvanized keel 410 is slidably connected to the cross-shaped base 270. Four support plates 280 are slidably arranged on the cross-shaped base 270, and the four support plates 280 are respectively connected to the four tower crane cross bars 110.

[0081] In this embodiment, four tower crane cross bars 110 are used, and first, the cross-shaped base 270 is used as the base. Four support plates 280 can be stretched out and fixed to the four tower crane cross bars 110 by bolts or other means to play the role of bottom support. During the assembly process of the tower crane ceiling, the cylindrical hot-dip galvanized keel 410 drives the ceiling to rise based on the cross-shaped base 270.

[0082] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0083] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A waterproof ceiling for a tower crane opening, comprising four tower crane columns (100) distributed in a rectangular shape, characterized in that: A waterproof ceiling (200) is arranged on the four tower crane columns (100); the surface of the waterproof ceiling (200) is arranged in a concave-convex shape; the waterproof ceiling (200) comprises four triangular galvanized steel plates (210), four rectangular galvanized steel plates (220) and eight first trapezoidal galvanized steel plates (230); The four triangular galvanized steel plates (210) are distributed in a circumferential direction and connected end to end in sequence to form the top of the waterproof ceiling (200); the four rectangular galvanized steel plates (220) and the eight first trapezoidal galvanized steel plates (230) are distributed at intervals to form the bottom of the waterproof ceiling (200); and the two first trapezoidal galvanized steel plates (230) at intervals are slidably connected to the rectangular galvanized steel plate (220) located in the middle, so that the waterproof ceiling (200) has a retractable four-sided pyramid structure; The waterproof ceiling (200) is also provided with a drainage eaves (300) and a disassembly mechanism (400); the drainage eaves (300) is in a U-shaped structure along the bottom of the waterproof ceiling (200), and a plurality of drainage holes (600) are provided on the drainage eaves (300); the disassembly mechanism (400) is used to control the expansion and contraction of the waterproof ceiling (200) to adapt to the four tower crane columns (100); The lower ends of the four triangular galvanized steel plates (210) are each provided with a first slide groove (240) along the center line, the lower ends of the four triangular galvanized steel plates (210) are respectively provided with two second slide grooves (250) along two side lines, the four rectangular galvanized steel plates (220) are respectively slidably connected to the four first slide grooves (240), and the eight first trapezoidal galvanized steel plates (230) are respectively slidably connected to the eight second slide grooves (250); The waterproof ceiling (200) further comprises eight second trapezoidal galvanized steel plates (260), the eight second trapezoidal galvanized steel plates (260) being respectively located at the lower sides of the eight first trapezoidal galvanized steel plates (230), and the eight second trapezoidal galvanized steel plates (260) being respectively slidably connected to the four rectangular galvanized steel plates (220), and a retractable quadrangular pyramid structure covering the four tower crane columns (100) is formed by the four rectangular galvanized steel plates (220), the eight first trapezoidal galvanized steel plates (230) and the eight second trapezoidal galvanized steel plates (260); The disassembly and assembly mechanism (400) comprises a cylindrical hot-dip galvanized keel (410) and a first control component (420), wherein the cylindrical hot-dip galvanized keel (410) is arranged at the middle of the upper ends of the four triangular galvanized steel plates (210), and the first control component (420) comprises four first hot-dip galvanized square keels (421) circumferentially arranged on the cylindrical hot-dip galvanized keel (410), and second hot-dip galvanized square keels (422) are slidably arranged on the four first hot-dip galvanized square keels (421); The four triangular galvanized steel plates (210) are respectively connected to the four first hot-dip galvanized square keels (421); the eight first trapezoidal galvanized steel plates (230) are grouped in two adjacent ones; the four groups of the first trapezoidal galvanized steel plates (230) are respectively connected to the four second hot-dip galvanized square keels (422); the four first hot-dip galvanized square keels (421) are each provided with a first air chamber (423); the four second hot-dip galvanized square keels (422) are each provided with a first piston (424); the four first pistons (424) are respectively slidably connected to the four first air chambers (423); The disassembly and assembly mechanism (400) further comprises four second control components (430), wherein the four second control components (430) are respectively arranged in the four rectangular galvanized steel plates (220) and are used to control the extension and retraction of the eight second trapezoidal galvanized steel plates (260); The second control component (430) comprises a double-headed cylinder (431) arranged in the rectangular galvanized steel plate (220), two second pistons (432) are slidably connected in the double-headed cylinder (431), and the two second pistons (432) are each provided with a piston rod (433), and the two piston rods (433) are respectively connected to the two second trapezoidal galvanized steel plates (260) spaced apart from each other; The waterproof ceiling (200) is also provided with a sealing mechanism (500), the sealing mechanism (500) comprising a first air bag (510) provided at the lower ends of the four triangular galvanized steel plates (210), a second air bag (520) provided on each of the eight second trapezoidal galvanized steel plates (260), and a third air bag (530) provided on each of the eight first trapezoidal galvanized steel plates (230); The disassembly and assembly mechanism (400) further comprises a driving assembly (440), wherein the driving assembly (440) is used to sequentially control the operation of the first control assembly (420), the second control assembly (430), and the sealing mechanism (500); The driving assembly (440) comprises a second air chamber (441) arranged in the cylindrical hot-dip galvanized keel (410), a valve core (450) is arranged on the second air chamber (441), a valve member (445) is slidably arranged in the second air chamber (441), and four first air holes (442), four second air holes (443) and four third air holes (444) are opened on the cylindrical hot-dip galvanized keel (410) and are connected to the second air chamber (441); The four first air chambers (423) are respectively connected to the four second air chambers (441) through the four first air holes (442); the four double-headed air cylinders (431) are respectively connected to the four second air holes (443) through the four first air pipes (460); two adjacent second air bags (520) and two adjacent third air bags (530) form a group of passages; the four groups of passages are respectively connected to the four third air holes (444) through the four second air pipes (470); The driving assembly (440) further comprises a first piston cylinder (446) disposed in the second air chamber (441), a second piston cylinder (447) being slidably disposed on the first piston cylinder (446), the valve member (445) being slidably connected to the second piston cylinder (447), the second piston cylinder (447) being elastically connected to the first piston cylinder (446) via a first spring (448), the valve member (445) being elastically connected to the second piston cylinder (447) via a second spring (449), and the elastic force of the first spring (448) being smaller than the elastic force of the second spring (449).

2. The waterproof ceiling for the tower crane opening according to claim 1 is characterized in that: The drainage cornice (300) comprises four first cornice components (310) and eight second cornice components (320), wherein the four first cornice components (310) are respectively arranged at the lower ends of the four rectangular galvanized steel plates (220), and the eight second cornice components (320) are respectively arranged at the lower ends of the eight second trapezoidal galvanized steel plates (260), and the two spaced second cornice components (320) are slidably connected to the first cornice component (310) located in the middle.

3. The waterproof ceiling for the tower crane opening according to claim 1 is characterized by: Four tower crane cross bars (110) are arranged on the tower crane column (100), and the waterproof ceiling (200) further includes a cross-shaped base (270), a cylindrical hot-dip galvanized keel (410) is slidably connected to the cross-shaped base (270), and four support plates (280) are slidably arranged on the cross-shaped base (270), and the four support plates (280) are respectively connected to the four tower crane cross bars (110).