Tunnel structure with double arches and double semi-bright and semi-dark staggered walls and its construction method

By adopting the double-arch, double-semi-light and semi-dark staggered-wall entrance tunnel structure and its construction method in the large bias section, combined with the support structure of reinforced concrete retaining walls and concrete special-shaped arches, it solves the problem of single tunnel construction method and conventional structure. Adapting to the problem of bias voltage improves the safety and environmental protection of the tunnel structure, adapts to terrain with large bias voltage and reduces engineering costs.

CN117404102BActive Publication Date: 2024-10-15CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310561187.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-14
Publication Date
2024-10-15
Estimated Expiration
2043-09-14

AI Technical Summary

Technical Problem

When building a tunnel in a section with large bias pressure, the existing construction method is single, which affects the construction period and cost, and the conventional semi-dark and semi-dark tunnel structure cannot adapt to the demand of biased entry of multi-arch tunnels, resulting in tunnel structure safety and environmental protection insufficient.

Method used

The tunnel structure and its construction method are adopted with double arches and double semi-light and semi-dark staggered wall entrances. By setting up a single-hole biased semi-light and semi-dark section and a double-arch semi-dark and semi-dark section structure, the reinforced concrete retaining wall, concrete The special-shaped protective arch and surrounding rock form a closed support structure, which is combined with advanced support and underground excavation construction to achieve effective support and release of slope bias and surrounding rock pressure.

Benefits of technology

It has realized a construction method that ensures the safety and stability of the tunnel structure in large bias terrain, reduces project costs, improves deformation resistance and engineering efficiency, conforms to the concept of green and environmentally friendly construction, adapts to large bias terrain and bears overall stress with the surrounding rock.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117404102B_ABST
    Figure CN117404102B_ABST
Patent Text Reader

Abstract

The present invention discloses a double-arch double semi-bright and semi-dark staggered wall tunnel structure, which relates to the field of tunnel engineering. It includes a single-hole biased semi-bright and semi-dark section structure and a double-arch semi-bright and semi-dark section structure; the single-hole biased semi-bright and semi-dark section structure is provided with a right-hole reinforced concrete retaining wall, the right-hole reinforced concrete retaining wall is provided with a right-hole enlarged foundation, and the right-hole biased semi-bright and semi-dark section structure is provided with a right-hole concrete special-shaped protective arch; the double-arch semi-bright and semi-dark section structure is provided with a double-hole reinforced concrete retaining wall, the double-hole reinforced concrete retaining wall is provided with a left-hole enlarged foundation, and the double-arch semi-bright and semi-dark section structure is provided with a left-hole concrete special-shaped protective arch. The present invention is adaptable to large biased terrain, can not only resist bias, but also form a system with the surrounding rock to achieve overall force on the tunnel structure and the surrounding rock. The present invention also relates to a construction method for this double-arch double semi-bright and semi-dark staggered wall tunnel structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of tunnel engineering, more specifically to a double-arch double semi-bright semi-dark staggered wall tunnel structure. The invention also relates to a construction method of the double-arch double semi-bright semi-dark staggered wall tunnel structure. Background Art

[0002] my country is a mountainous country. When building tunnels in mountainous areas, it is inevitable to encounter areas with large bias pressure. When building tunnels in such areas, problems such as tunnel bias and slope treatment are often encountered.

[0003] The length of a double-arch tunnel is generally less than 500m. As a control point of a non-full line, the tunnel portal bias is often more serious than that of a separated long tunnel or an extra-long tunnel. With the rapid development of "railway and highway infrastructure" construction, rich theoretical and practical experience has been accumulated in the design and construction of biased double-arch tunnels. In particular, biased tunnels have been widely used in the construction of mountain tunnels in recent years. For the construction of double-arch tunnel portals with large bias, the railway industry mainly adopts a large excavation construction plan, while the highway industry mainly promotes further optimization of the horizontal and vertical alignment. At present, there are still the following limitations for the construction of double-arch tunnel portals with large bias:

[0004] 1) For the large excavation scheme, its construction method is single, which seriously affects the construction period and cost, and is contrary to my country's concept of building green and environmentally friendly projects. How to choose a safe, economical and reasonable construction method under the premise of ensuring the safety and stability of the arch tunnel structure portal needs further research.

[0005] 2) The conventional semi-bright and semi-dark tunnel structure cannot adapt to the construction of the double-arch tunnel with biased entry. The design can only sacrifice the horizontal and vertical line shape parameters to avoid the appearance of high slopes at the entrance of the double-arch tunnel;

[0006] Therefore, it is necessary to develop a double-arch tunnel structure with double semi-bright and semi-dark staggered walls and its construction method that can adapt to large bias terrain, not only resist the bias but also form a system with the surrounding rock to achieve the overall stress of the tunnel structure and the surrounding rock. Summary of the invention

[0007] The first purpose of the present invention is to overcome the shortcomings of the above-mentioned background technology and provide a double-arch tunnel structure with double semi-bright and semi-dark staggered walls.

[0008] The second purpose of the present invention is to provide a construction method for the double-arched tunnel structure with double semi-bright and semi-dark staggered walls.

[0009] In order to achieve the above-mentioned first purpose, the technical solution of the present invention is: a double-arch double semi-bright and semi-dark staggered wall tunnel structure, characterized in that it includes a single-hole biased semi-bright and semi-dark section structure and a double-arch semi-bright and semi-dark section structure; the left side of the single-hole biased semi-bright and semi-dark section structure is the air side, and the air side of the single-hole biased semi-bright and semi-dark section structure is provided with a right hole reinforced concrete retaining wall, the bottom of the right hole reinforced concrete retaining wall is provided with a right hole expansion foundation, and the top of the right hole biased semi-bright and semi-dark section structure is provided with a right hole concrete special-shaped guard arch, one end of the right hole concrete special-shaped guard arch is connected to the right hole reinforced concrete retaining wall, and the other end is embedded in the mountain, and the right hole reinforced concrete retaining wall, the right hole concrete special-shaped guard arch and the surrounding rock form a closed support structure;

[0010] The left side of the double-arch semi-bright and semi-hidden section structure is the air-facing side, and a double-hole reinforced concrete retaining wall is arranged on the air-facing side of the double-arch semi-bright and semi-hidden section structure, and a left hole enlarged foundation is arranged at the bottom of the double-hole reinforced concrete retaining wall, and a left hole concrete special-shaped guard arch is arranged on the top of the double-arch semi-bright and semi-hidden section structure, one end of the left hole concrete special-shaped guard arch is connected to the double hole reinforced concrete retaining wall, and the other end is embedded in the mountain, and the double hole reinforced concrete retaining wall, the left hole concrete special-shaped guard arch and the surrounding rock form a closed support structure;

[0011] The right hole of the single-hole biased semi-bright and semi-dark section structure is connected with the right hole of the double-arch semi-bright and semi-dark section structure.

[0012] In the above technical scheme, a waterproof layer, a cement soil layer, a clay waterproof layer and planting soil are arranged in sequence from bottom to top between the top of the right hole concrete special-shaped protective arch and the right hole reinforced concrete retaining wall, and between the top of the left hole concrete special-shaped protective arch and the double hole reinforced concrete retaining wall.

[0013] In the above technical solution, drainage holes are arranged on the tops of the right hole reinforced concrete retaining wall and the double hole reinforced concrete retaining wall, and the drainage holes are at the same height as the waterproof layer.

[0014] In the above technical solution, the drainage behind the portal wall is discharged from the right tunnel to the right tunnel reinforced concrete retaining wall, then discharged longitudinally along the line to the left tunnel portal wall, and finally discharged to the left tunnel reinforced concrete retaining wall.

[0015] In order to achieve the above second purpose, the technical scheme of the present invention is: a construction method of a double-arch double semi-bright and semi-dark staggered wall tunnel structure, characterized in that pile number one is the right tunnel entrance pile number of the single tunnel biased semi-bright and semi-dark section structure, pile number two is the left tunnel entrance pile number of the double-arch semi-bright and semi-dark section structure and the right tunnel bright and dark boundary pile number of the double-arch semi-bright and semi-dark section structure, and pile number three is the left tunnel bright and dark boundary pile number of the double-arch semi-bright and semi-dark section structure, comprising the following steps:

[0016] Step 1: Start excavation from the other end of the large offset end, and after excavating to pile number three, excavate and grout reinforce the side slope of the tunnel entrance at the large offset end;

[0017] Step 2: In the section from pile number 2 to pile number 3, construct the expanded foundation of the left hole, cast the double-hole reinforced concrete retaining wall and the left hole concrete special-shaped arch in sequence, and construct the double-arch semi-visible and semi-hidden section structure;

[0018] Step 3: In the section from pile number 1 to pile number 2, construct the expanded foundation of the right hole, cast the reinforced concrete retaining wall of the right hole and the special-shaped concrete arch of the right hole in sequence, construct the single hole eccentric semi-visible and semi-hidden section structure, connect the right hole of the double-arch semi-visible and semi-hidden section structure with the right hole of the single hole eccentric semi-visible and semi-hidden section structure, and complete the overall construction.

[0019] In the above technical scheme, in step 2 and step 3, the double-arch semi-bright and semi-dark section structure and the single-hole biased semi-bright and semi-dark section structure are first supported in advance, and then the soil in the hole is excavated, initial support is applied, secondary lining is applied, and finally the top of the hole is backfilled and greened.

[0020] Compared with the prior art, the present invention has the following advantages:

[0021] 1) The present invention realizes the support of the slope bias and the release of the tunnel bias surrounding rock pressure by setting a single-hole biased semi-bright and semi-dark section structure and a double-arch semi-bright and semi-dark section structure, while fully reducing the damage to the existing mountain, utilizing the self-bearing capacity of the biased section surrounding rock, ensuring the safety of the tunnel structure and reducing the engineering cost.

[0022] 2) The present invention can be flexibly connected with the tunnel entrance bridge or roadbed and select the optimal entry pile number.

[0023] 3) The present invention is adaptable to terrain with large bias pressure. It can not only resist the bias pressure, but also form a system with the surrounding rock to achieve overall stress on the tunnel structure and the surrounding rock.

[0024] 4) The present invention has strong anti-deformation capability, saves construction time, and improves engineering construction efficiency on the premise of greatly improving the anti-disturbance capability of the tunnel structure.

[0025] 5) The present invention has small excavation, is environmentally friendly, and conforms to the construction concept of green highways BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the tunnel pile number of the present invention.

[0027] Figure 2 This is a structural schematic diagram of a single-hole biased semi-bright and semi-dark section structure located at pile number one.

[0028] Figure 3 This is a structural schematic diagram of a single-hole biased semi-bright and semi-dark section structure located at pile number two.

[0029] Figure 4 This is a structural schematic diagram of the double-arch semi-visible and semi-hidden section structure located at pile number two.

[0030] Figure 5 It is a structural schematic diagram of the connection between the single-hole biased semi-bright and semi-dark section structure and the double-arch semi-bright and semi-dark section structure.

[0031] Figure 6 This is a structural schematic diagram of the double-arch semi-visible and semi-hidden section structure located at pile number three.

[0032] Among them, 1-single-hole eccentrically compressed semi-visible and semi-hidden section structure, 11-right hole reinforced concrete retaining wall, 111-right hole enlarged foundation, 12-right hole concrete special-shaped guard arch, 2-double-arch semi-visible and semi-hidden section structure, 21-double-hole reinforced concrete retaining wall, 211-left hole enlarged foundation, 22-left hole concrete special-shaped guard arch, 31-waterproof layer, 32-cement soil layer, 33-clay waterproof layer, 34-planting soil. DETAILED DESCRIPTION

[0033] The following detailed description of the implementation of the present invention is made in conjunction with the accompanying drawings, but they do not constitute a limitation of the present invention and are only given as examples. At the same time, the advantages of the present invention will become clearer and easier to understand through the description.

[0034] Referring to the attached drawings, it can be seen that the double-arch double semi-bright and semi-dark staggered wall tunnel structure is characterized by comprising a single-hole biased semi-bright and semi-dark section structure 1 and a double-arch semi-bright and semi-dark section structure 2; the left side of the single-hole biased semi-bright and semi-dark section structure 1 is the air side, and the air side of the single-hole biased semi-bright and semi-dark section structure 1 is provided with a right hole reinforced concrete retaining wall 11, and the bottom of the right hole reinforced concrete retaining wall 11 is provided with a right hole expansion foundation 111, and the top of the single-hole biased semi-bright and semi-dark section structure 1 is provided with a right hole concrete special-shaped guard arch 12, one end of the right hole concrete special-shaped guard arch 12 is connected to the right hole reinforced concrete retaining wall 11, and the other end is embedded in the mountain, and the right hole reinforced concrete retaining wall 11, the right hole concrete special-shaped guard arch 12 and the surrounding rock form a closed support structure to form a dark excavation environment, and then the dark excavation method is used for construction;

[0035] The left side of the double-arch semi-bright and semi-dark section structure 2 is the air-facing side, and a double-hole reinforced concrete retaining wall 21 is arranged on the air-facing side of the double-arch semi-bright and semi-dark section structure 2. A left hole enlarged foundation 211 is arranged at the bottom of the double-hole reinforced concrete retaining wall 21. A left hole concrete special-shaped guard arch 22 is arranged on the top of the double-arch semi-bright and semi-dark section structure 2. One end of the left hole concrete special-shaped guard arch 22 is connected to the double-hole reinforced concrete retaining wall 21, and the other end is embedded in the mountain. The double-hole reinforced concrete retaining wall 21, the left hole concrete special-shaped guard arch 22 and the surrounding rock form a closed supporting structure to form a dark excavation environment, and then the dark excavation method is used for construction;

[0036] The right hole of the single-hole biased semi-bright and semi-dark section structure 1 is connected to the right hole of the double-arch semi-bright and semi-dark section structure 2.

[0037] A waterproof layer 31, a cement soil layer 32, a clay waterproof layer 33 and planting soil 34 are arranged in sequence from bottom to top between the right hole concrete special-shaped protective arch 12 and the right hole reinforced concrete retaining wall 11 and between the left hole concrete special-shaped protective arch 22 and the double hole reinforced concrete retaining wall 21.

[0038] The tops of the right hole reinforced concrete retaining wall 11 and the double hole reinforced concrete retaining wall 21 are both provided with drainage holes, and the drainage holes are at the same height as the waterproof layer 31 .

[0039] The drainage behind the portal wall is discharged from the right tunnel to the right tunnel reinforced concrete retaining wall 11, and then discharged longitudinally along the line to the left tunnel portal wall, and finally discharged to the left tunnel reinforced concrete retaining wall 21. Figure 5 shown.

[0040] The construction method of a double-arch double semi-bright and semi-dark staggered wall tunnel structure is characterized in that pile number one is the right tunnel entrance pile number of the single tunnel biased semi-bright and semi-dark section structure 1, pile number two is the left tunnel entrance pile number of the double-arch semi-bright and semi-dark section structure 2 and the right tunnel bright and dark boundary pile number of the double-arch semi-bright and semi-dark section structure 2, and pile number three is the left tunnel bright and dark boundary pile number of the double-arch semi-bright and semi-dark section structure 2, comprising the following steps:

[0041] Step 1: Start excavation from the other end of the large offset end, and after excavating to pile number three, excavate and grout reinforce the side slope of the tunnel entrance at the large offset end;

[0042] Step 2: In the section from pile number 2 to pile number 3, construct the left hole expansion foundation 211, cast the double hole reinforced concrete retaining wall 21 and the left hole concrete special-shaped arch 22 in sequence, and construct the double arch semi-bright and semi-hidden section structure 2; Figure 4 and Figure 6 As shown;

[0043] Step 3: In the section from pile number 1 to pile number 2, construct the right hole expansion foundation 111, cast the right hole reinforced concrete retaining wall 11 and the right hole concrete special-shaped arch 12 in sequence, construct the single hole biased semi-bright and semi-dark section structure 1, and connect the right hole of the double-arch semi-bright and semi-dark section structure 2 with the right hole of the single hole biased semi-bright and semi-dark section structure 1 to complete the overall construction; Figure 2 and 3 shown.

[0044] In step 2 and step 3, firstly, advance support is carried out on the double-arch semi-bright and semi-dark section structure 2 and the single-hole biased semi-bright and semi-dark section structure 1, and then the soil in the hole is excavated, initial support is applied, secondary lining is applied, and finally the top of the hole is backfilled and greened.

[0045] In actual use, the present invention is a double-arch tunnel with a left tunnel and a right tunnel; the present invention includes two sections, the single-tunnel biased semi-bright and semi-dark section structure 1 is a single-tunnel section with only a right tunnel; the double-arch semi-bright and semi-dark section structure 2 is a double-tunnel section with a left tunnel and a right tunnel; the single-tunnel biased semi-bright and semi-dark section structure 1 and the double-arch semi-bright and semi-dark section structure 2 both adopt a semi-bright and semi-dark structure; at the single-tunnel biased semi-bright and semi-dark section structure 1, the left tunnel adopts a bridge or roadbed (such as Figure 2 ), the right cave is first partially and then completely located in the mountain. At the 2nd place of the double-arch semi-bright and semi-dark section structure, the left cave is first partially and then completely located in the mountain. The right cave is completely located in the mountain, forming a staggered wall entrance cave.

[0046] The single-hole biased semi-bright and semi-hidden section structure 1 and the double-arch semi-bright and semi-hidden section structure 2 tunnels are both provided with reinforced concrete retaining walls on the airside, which are formed into a whole by splicing; the bottom of the reinforced concrete retaining wall adopts a concrete enlarged foundation, and the concrete special-shaped protective arch is applied upwards with a waterproof layer 31, a cement soil layer 32, a clay waterproof layer 33 and a planting soil 34 in sequence; during construction, the slope surface is first adjusted and reinforced, and then the reinforced concrete retaining wall and the concrete special-shaped protective arch are applied; after the concrete special-shaped protective arch structure is applied to form the dark hole conditions, the construction is carried out according to the dark hole construction method, and finally the top of the hole is backfilled with soil.

[0047] The bottom of the right tunnel enlarged foundation 111 and the left tunnel enlarged foundation 211 are reinforced by grouting.

[0048] Other parts not described belong to the prior art.

Claims

1. A double-arch double half-bright and half-dark staggered wall tunnel structure, characterized by: It comprises a single-hole biased semi-bright and semi-dark section structure (1) and a double-arched semi-bright and semi-dark section structure (2); the left side of the single-hole biased semi-bright and semi-dark section structure (1) is the air-facing side; a right-hole reinforced concrete retaining wall (11) is arranged on the air-facing side of the single-hole biased semi-bright and semi-dark section structure (1); a right-hole enlarged foundation (111) is arranged at the bottom of the right-hole reinforced concrete retaining wall (11); a right-hole concrete special-shaped protective arch (12) is arranged on the top of the single-hole biased semi-bright and semi-dark section structure (1); one end of the right-hole concrete special-shaped protective arch (12) is connected to the right-hole reinforced concrete retaining wall (11), and the other end is embedded in the mountain; the right-hole reinforced concrete retaining wall (11), the right-hole concrete special-shaped protective arch (12) and the surrounding rock form a closed support structure; The left side of the double-arch semi-bright and semi-dark section structure (2) is the air-facing side. A left hole reinforced concrete retaining wall (21) is arranged on the air-facing side of the double-arch semi-bright and semi-dark section structure (2). A left hole enlarged foundation (211) is arranged at the bottom of the left hole reinforced concrete retaining wall (21). A left hole concrete special-shaped protective arch (22) is arranged on the top of the double-arch semi-bright and semi-dark section structure (2). One end of the left hole concrete special-shaped protective arch (22) is connected to the left hole reinforced concrete retaining wall (21), and the other end is embedded in the mountain. The left hole reinforced concrete retaining wall (21), the left hole concrete special-shaped protective arch (22) and the surrounding rock form a closed support structure. The right hole of the single-hole biased semi-bright and semi-dark section structure (1) is connected to the right hole of the double-arch semi-bright and semi-dark section structure (2); Pile number 1 is the right hole entrance pile number of the single hole biased semi-bright and semi-dark section structure (1), pile number 2 is the left hole entrance pile number of the double arch semi-bright and semi-dark section structure (2) and the right hole bright and dark boundary pile number of the double arch semi-bright and semi-dark section structure (2), and pile number 3 is the left hole bright and dark boundary pile number of the double arch semi-bright and semi-dark section structure (2); pile number 3 is higher than pile number 2, and pile number 2 is higher than pile number 1; In the single-tunnel biased semi-bright and semi-dark section structure (1), the left tunnel adopts a bridge or roadbed, and the right tunnel is first partially and then completely located in the mountain. In the double-arch semi-bright and semi-dark section structure (2), the left tunnel is first partially and then completely located in the mountain, and the right tunnel is completely located in the mountain, forming a staggered wall entry tunnel.

2. The double-arched tunnel structure with double semi-bright and semi-dark staggered walls according to claim 1 is characterized in that: A waterproof layer (31), a cement soil layer (32), a clay waterproof layer (33) and planting soil (34) are sequentially arranged from bottom to top between the upper part of the right hole special-shaped concrete protective arch (12) and the right hole reinforced concrete retaining wall (11) and between the upper part of the left hole special-shaped concrete protective arch (22) and the left hole reinforced concrete retaining wall (21).

3. The double-arched tunnel structure with double semi-bright and semi-dark staggered walls according to claim 2 is characterized in that: The tops of the right hole reinforced concrete retaining wall (11) and the left hole reinforced concrete retaining wall (21) are both provided with drainage holes, and the drainage holes are at the same height as the waterproof layer (31).

4. The double-arched tunnel structure with double semi-bright and semi-dark staggered walls according to claim 3 is characterized in that: The drainage behind the portal wall is discharged from the right tunnel to the right tunnel reinforced concrete retaining wall (11), then discharged longitudinally along the route to the left tunnel portal wall, and finally discharged to the left tunnel reinforced concrete retaining wall (21).

5. The construction method of the double-arched tunnel structure with double semi-bright and semi-dark staggered walls according to any one of claims 1 to 4, characterized in that: The pile number 1 is the right hole entrance pile number of the single hole biased semi-bright and semi-dark section structure (1), the pile number 2 is the left hole entrance pile number of the double arch semi-bright and semi-dark section structure (2) and the right hole bright and dark boundary pile number of the double arch semi-bright and semi-dark section structure (2), and the pile number 3 is the left hole bright and dark boundary pile number of the double arch semi-bright and semi-dark section structure (2), comprising the following steps: Step 1: Start excavation from the other end of the large offset end, and after excavating to pile number three, excavate and grout reinforce the side slope of the tunnel entrance at the large offset end; Step 2: In the section from pile number 2 to pile number 3, construct the left hole expansion foundation (211), cast the left hole reinforced concrete retaining wall (21) and the left hole concrete special-shaped arch (22) in sequence, and construct the double-arch semi-visible and semi-hidden section structure (2); Step 3: In the section from pile number 1 to pile number 2, construct the right hole expansion foundation (111), cast the right hole reinforced concrete retaining wall (11) and the right hole concrete special-shaped arch (12) in sequence, construct the single hole eccentric pressure semi-bright and semi-hidden section structure (1), and connect the right hole of the double-arch semi-bright and semi-hidden section structure (2) with the right hole of the single hole eccentric pressure semi-bright and semi-hidden section structure (1), thus completing the overall construction.

6. The construction method of the double-arch double semi-bright and semi-dark staggered wall tunnel structure according to claim 5 is characterized in that: In step 2 and step 3, firstly, the double-arch semi-bright and semi-hidden section structure (2) and the single-hole biased semi-bright and semi-hidden section structure (1) are supported in advance, then the soil in the hole is excavated, initial support is applied, secondary lining is applied, and finally the top of the hole is backfilled and greened.