A shotcrete UHPC tunnel lining structure based on steel-FRP mesh reinforcement and its construction method
The jet-coated UHPC tunnel lining structure reinforced with steel-FRP composite mesh solves the problems of long construction period and poor durability of tunnels, and realizes rapid and durable tunnel construction and reinforcement, improving the structural performance and usable space of tunnels.
Patent Information
- Application Number
- CN202311751875.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-19
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2043-12-19
AI Technical Summary
Existing tunnel lining construction methods are time-consuming and costly, and are prone to corrosion in humid environments. Traditional FRP meshes have low elastic modulus and are prone to brittle failure, making it difficult to meet the requirements of speed, durability, and space for new tunnel construction and reinforcement.
The tunnel lining structure is formed by using steel-FRP composite mesh reinforced ultra-high performance concrete (UHPC) through shotcrete construction, combined with U-shaped I-beams and anchoring and fastening components, to form a multi-layer steel-FRP composite mesh and UHPC layer, achieving rapid construction and high durability.
It significantly improves the construction speed and structural performance of tunnel lining, reduces the total life cycle cost, expands tunnel space, and enhances safe service life and impermeability and crack control performance.
Smart Images

Figure CN117627676B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of tunnel construction and reinforcement technology, and in particular to a jet-reinforced UHPC tunnel lining structure based on steel-FRP mesh reinforcement and its construction method. Background Technology
[0002] In the construction of new and reinforced tunnels, strict requirements are placed on the construction period, especially for tunnel reinforcement projects. Common concrete lining construction has disadvantages such as long construction periods and high costs. Furthermore, in the humid underground environment where tunnels are located, corrosion of the reinforcing steel bars caused by water seepage in the concrete seriously threatens the safe service of the tunnel. Common reinforcement methods for tunnel projects include increasing the concrete cross-section, steel structure lining reinforcement, and bonding FRP (fiber reinforced polymers / plastics) sheets / fabric. However, increasing the concrete cross-section encroaches on the tunnel's usable space and has a long construction period; steel structure lining reinforcement is complex to construct and has poor durability; and bonding FRP sheets / fabric is complex to construct, has poor high-temperature resistance, and does not significantly improve structural stiffness.
[0003] In addition, FRP mesh has the advantages of high node stiffness, corrosion resistance and bidirectional stress, but it is limited by the linear elastic characteristics of basalt fiber and the low overall fiber content of FRP mesh due to the low level of technology. This results in the low elastic modulus of FRP mesh and the overall brittle failure, making it difficult to achieve ideal results when directly applied to tunnel engineering.
[0004] Therefore, there is an urgent need for a new type of tunnel structure based on FRP mesh material that can simultaneously meet the requirements of new tunnel construction / reinforcement projects, has a short cycle time, does not occupy space, and has excellent structural performance. Summary of the Invention
[0005] The purpose of this invention is to provide a steel-FRP composite mesh reinforced ultra-high performance concrete (UHPC) tunnel lining structure and its construction method, which meets the requirements of rapid construction, high rigidity and durability, and usable space in tunnel construction and reinforcement projects, and solves the shortcomings of existing tunnel lining construction and reinforcement technologies.
[0006] To achieve the above objectives, the present invention adopts the following technical solution: In a first aspect, the present invention provides a construction method for a shotcrete UHPC tunnel lining structure based on steel-FRP mesh reinforcement, comprising the following steps: Step 1: Clean and roughen the inner wall of the tunnel to be constructed, and thoroughly wet it; Step 2: Mark and lay out the design location, and install U-shaped I-beams along the tunnel direction using anchoring components, so that one side flange of the U-shaped I-beam is tightly attached to the inner wall of the tunnel. Step 3: Pre-tighten and fix the first layer of steel-FRP composite mesh to the U-shaped I-beam using fastening components, so that the fastening components are in close contact with the flange of the U-shaped I-beam on the side closest to the tunnel inner wall; Step 4: Spray UHPC onto the first layer of steel-FRP composite mesh to form the first UHPC layer. The spray thickness is one-third to one-half of the designed bushing thickness. Step 5: Continue to pre-tighten and fix the second layer of steel-FRP composite mesh to the U-shaped I-beam using the fastening components, so that the fastening components are tightly attached to the first layer of UHPC. Step 6: Continue to spray UHPC onto the second layer of steel-FRP composite mesh to form a second UHPC layer. The total thickness of the two UHPC layers should be at least 2cm higher than the height of the U-shaped I-beam.
[0007] Furthermore, the steel-FRP composite mesh is a two-way rigid node mesh composed of several mutually perpendicular horizontal and vertical branches connected together. The horizontal and vertical branches form multiple square mesh openings. Both the horizontal and vertical branches include an inner steel core and an FRP wrapping layer wrapped around the outside of the steel core.
[0008] Furthermore, the cross-sections of the horizontal and vertical branches are the same, and the cross-sectional area of the steel core is one-third to one-half of the cross-sectional area of the horizontal or vertical branches.
[0009] Furthermore, the side length of the mesh is more than three times the fiber length used in jet-type UHPC.
[0010] Furthermore, the molding material of the FRP cladding layer is any one of CFRP, BFRP, GFRP, or AFRP.
[0011] Furthermore, the compressive strength of the jet-type UHPC is greater than or equal to 120 MPa.
[0012] Furthermore, the fastening assembly includes two symmetrically distributed locking members and a bolt and nut assembly connecting the two locking members. The locking members include a C-shaped clamp and locking plates located at both ends of the C-shaped clamp. The web of the U-shaped I-beam has positioning holes for the bolt and nut assembly to pass through. The longitudinal branches of the steel-FRP composite mesh are locked by the C-shaped clamp, thereby firmly fixing the steel-FRP composite mesh to the U-shaped I-beam.
[0013] Furthermore, the anchoring assembly includes an anchor rod, and the flange of the U-shaped I-beam near the inner wall of the tunnel has a hole for the anchor rod to pass through; or, the anchoring assembly includes an anchor rod and an anchor member, the anchor member being composed of an integrally bent and connected positioning plate, connecting plate and pressure plate, the two ends of the connecting plate being perpendicularly connected to the positioning plate and the pressure plate respectively, and the positioning plate having a hole for the anchor rod to pass through.
[0014] Furthermore, the anchor bolt is a steel anchor bolt or an FRP anchor bolt.
[0015] Furthermore, after completing the second spraying of the jet-type UHPC, the UHPC is covered and sealed with a plastic film for 24 hours for curing.
[0016] Secondly, the present invention provides a jet-reinforced UHPC tunnel lining structure based on steel-FRP mesh reinforcement, which is manufactured using the above-mentioned construction method. The jet-reinforced UHPC tunnel lining structure includes several U-shaped I-beams, two layers of steel-FRP composite mesh fixed on the U-shaped I-beams, and a UHPC layer. The U-shaped I-beams are installed along the tunnel direction by anchoring components. The two layers of steel-FRP composite mesh are pre-tightened and fixed on the U-shaped I-beams by fastening components. The UHPC layer is formed by spraying jet-reinforced UHPC onto the U-shaped I-beams and the two layers of steel-FRP composite mesh. The total thickness of the final sprayed UHPC layer is at least 2 cm higher than the height of the U-shaped I-beams.
[0017] Compared with the prior art, the present invention provides a method with the following beneficial effects: (1) The steel-FRP composite mesh used in this invention combines the performance advantages of steel and FRP mesh. When applied to the construction and reinforcement of tunnels, it overcomes the durability problem caused by the corrosion of reinforcing steel bars in traditional linings, improves the service life of tunnels, and reduces the total life cycle cost of tunnel linings. On the other hand, it overcomes the problem of brittle failure of traditional FRP materials and greatly improves the ductility of FRP reinforced concrete structures.
[0018] (2) The present invention adopts a structural form of steel-FRP composite mesh reinforced shotcrete ultra-high performance concrete. First, the construction method of shotcrete ultra-high performance concrete can significantly improve the construction speed of tunnel lining; second, the early strength characteristics of ultra-high performance concrete (UHPC) can enable the lining to quickly obtain structural strength, further shortening the construction period; third, the ultra-high strength and stiffness of ultra-high performance concrete can significantly reduce the thickness of the lining or the lining reinforcement layer, reducing the encroachment on the tunnel's usable space; finally, the ultra-high toughness of ultra-high performance concrete and the secondary stiffness of steel-FRP composite mesh can significantly improve the plastic energy dissipation capacity of the overall lining.
[0019] (3) This invention meets the needs of new tunnel construction and reinforcement. The organic combination of steel-FRP composite mesh, UHPC and shotcrete construction not only meets the requirements of rapid tunnel lining construction, but also achieves the complementary performance of the three materials: steel, FRP mesh and UHPC. Compared with the traditional lining structure, while meeting the lining design requirements, it significantly reduces the lining thickness, expands the tunnel space, and significantly improves the lining's impermeability, crack control and durability, effectively extending the safe service life of the tunnel lining. Attached Figure Description
[0020] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0021] Figure 1 This is a three-dimensional structural diagram of the present invention; Figure 2 This is a schematic diagram of the cross-sectional structure of the present invention; Figure 3 This is a schematic diagram of a steel-FRP composite mesh structure. Figure 4 A schematic diagram of the fixing of a U-shaped I-beam; Figure 5 This is a schematic diagram of the anchor component. Figure 6 This is a schematic diagram of the fixing of a two-layer steel-FRP composite mesh; Figure 7 This is a schematic diagram of the locking mechanism; Figure 8 This is a performance comparison diagram between the present invention and traditional steel-concrete structures.
[0022] Reference numerals: 1. U-shaped I-beam; 11. Wing plate; 12. Web plate; 2. Steel-FRP composite mesh; 21. Horizontal branch; 22. Longitudinal branch; 23. Mesh size; 24. Steel core; 25. FRP cladding layer; 3. UHPC layer; 4. Anchor bolt; 5. Anchor; 51. Positioning plate; 52. Connecting plate; 53. Pressure plate; 6. Fastening assembly; 61. Locking component; 611. C-shaped clamp; 612. Locking plate; 62. Bolt and nut assembly; 7. Tunnel inner wall. Detailed Implementation
[0023] The technical solution of the present invention will be clearly and completely described below. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention. Example
[0024] refer to Figures 1 to 7 This embodiment provides a sprayed UHPC tunnel lining structure based on steel-FRP mesh reinforcement for tunnel construction and reinforcement, offering the advantage of rapid construction. The sprayed UHPC tunnel lining structure includes several U-shaped I-beams, two layers of steel-FRP composite mesh fixed to the U-shaped I-beams, and a UHPC layer. The U-shaped I-beams are installed along the tunnel direction using anchoring components. The two layers of steel-FRP composite mesh are pre-tightened and fixed to the U-shaped I-beams using fastening components. The UHPC layer is formed by spraying sprayed UHPC onto the U-shaped I-beams and the two layers of steel-FRP composite mesh, with the total thickness of the final sprayed UHPC layer exceeding the height of the U-shaped I-beams by 2 cm.
[0025] Specifically, the construction method of this sprayed UHPC tunnel lining structure includes the following steps: Step 1: Clean and roughen the inner wall of the tunnel to be constructed, and thoroughly wet it.
[0026] Step 2: Mark and lay out the design location, and install U-shaped I-beams along the tunnel direction using anchoring components, so that one side flange of the U-shaped I-beam is tightly attached to the inner wall of the tunnel.
[0027] Step 3: Pre-tighten and fix the first layer of steel-FRP composite mesh to the U-shaped I-beam using fastening components, so that the fastening components are in close contact with the flange of the U-shaped I-beam on the side closest to the tunnel inner wall.
[0028] Step 4: Spray UHPC onto the first layer of steel-FRP composite mesh to form the first UHPC layer. The spray thickness is 5cm, which is half of the designed liner thickness.
[0029] Step 5: Continue to pre-tighten and fix the second layer of steel-FRP composite mesh to the U-shaped I-beam using the fastening components, so that the fastening components are tightly attached to the first layer of UHPC.
[0030] Step Six: Continue spraying UHPC onto the second layer of steel-FRP composite mesh to form a second UHPC layer. The total thickness of the two UHPC layers should be 2cm greater than the height of the U-shaped I-beam. The final thickness of the sprayed UHPC tunnel lining structure is 100mm. After completing the second spraying of the sprayed UHPC, cover and seal the UHPC with plastic film for 24 hours for curing. The UHPC layer is formed through two spraying processes, thus preventing the formation of cavities between the two layers of steel-FRP composite mesh.
[0031] In step two, such as Figure 4 and Figure 5 As shown, the anchoring assembly includes an anchor bolt and an anchor member. The anchor member consists of an integrally bent and connected positioning plate, connecting plate, and pressure plate. Both ends of the connecting plate are perpendicularly connected to the positioning plate and pressure plate, respectively. The positioning plate has insertion holes for the anchor bolt to pass through. The anchor bolt is a steel anchor bolt or an FRP anchor bolt. The U-shaped I-beam has a height of 8cm, a flange width of 6cm, and a flange and web thickness of 4mm. The steel material is Q235 steel.
[0032] In some other embodiments, the anchoring assembly may also include anchor bolts, with the flange of the U-shaped I-beam near the inner wall of the tunnel having insertion holes for the anchor bolts, thereby directly fixing the U-shaped I-beam using the anchor bolts.
[0033] In steps three and five, such as Figure 6 and Figure 7 As shown, the fastening assembly includes two symmetrically distributed locking components and a bolt and nut assembly connecting the two locking components. The locking components include C-shaped clamps and locking plates located at both ends of the C-shaped clamps. The web of the U-shaped I-beam has positioning holes for the bolt and nut assembly to pass through. The longitudinal branches of the steel-FRP composite mesh are locked by the C-shaped clamps, thereby firmly fixing the steel-FRP composite mesh to the U-shaped I-beam.
[0034] In steps four and six, the compressive strength of the sprayed UHPC is 120 MPa, the elastic modulus is 42 GPa, and the tensile strength is 6.5 MPa.
[0035] In steps three and five, such as Figure 3As shown, two layers of steel-FRP composite mesh serve as reinforcement for the tunnel lining. Both are bidirectional rigid node meshes composed of several mutually perpendicular horizontal and vertical branches. The horizontal and vertical branches form multiple square mesh openings. Each horizontal and vertical branch includes an inner steel core and an FRP cladding layer surrounding the steel core. Specifically, the horizontal and vertical branches have the same cross-section, with a width of 15mm and a thickness of 8mm. The cross-sectional area of the steel core is half that of either the horizontal or vertical branch. The side length of the mesh openings is more than three times the fiber length used in sprayed UHPC, specifically 50mm*50mm. The FRP cladding layer is made of BFRP.
[0036] Based on the design concept of the embodiment, the finite element method (ABAQUS software) was used for verification. In the calculation, the steel core material properties were taken as those of Q235 steel, and the tensile strength and elastic modulus of the BFRP material portion in the mesh were 650 MPa and 30 GPa respectively. A C55 reinforced concrete liner structure with a thickness of 100 mm and the same reinforcement ratio was selected as a control group to verify the performance advantages of the novel liner structure proposed in this invention. A comparison of the structural performance of the two liner structures is shown below. Figure 8 .
[0037] Depend on Figure 8 It is evident that employing the steel-FRP mesh-reinforced sprayed UHPC tunnel lining structure proposed in this invention for tunnel lining construction can significantly improve the overall mechanical properties of the structure, leveraging the combined mechanical advantages of steel, FRP, and UHPC, resulting in a remarkable improvement in structural performance. Compared to traditional steel-concrete lining structures of the same thickness, the novel lining structure proposed in this invention increases the ultimate bearing capacity by 35% and the secondary stiffness by 77%. Therefore, using the steel-FRP mesh-reinforced sprayed UHPC tunnel lining structure proposed in this invention for tunnel construction and reinforcement can significantly improve the mechanical properties of tunnel linings. Furthermore, the construction method of this invention also possesses excellent characteristics such as high durability, minimal encroachment on usable space, and rapid construction, meeting the construction and design requirements of modern tunnel construction and reinforcement.
[0038] Example 1
[0039] The difference between this embodiment 1 and the previous embodiment is that the molding material of the FRP coating layer is CFRP, which has similar performance effects to the previous embodiment.
[0040] Example 2
[0041] The difference between this embodiment 2 and the embodiment 1 is that the molding material of the FRP coating layer is GFRP, which has the same performance effect as the embodiment 1.
[0042] Example 3
[0043] The difference between this embodiment 3 and the previous embodiment is that the molding material of the FRP coating layer is AFRP, which has similar performance effects to the previous embodiment.
[0044] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
[0045] Furthermore, it should be understood that although this specification describes embodiments, not every embodiment contains only one independent technical solution. This narrative style is merely for clarity. Those skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can also be appropriately combined to form other embodiments that can be understood by those skilled in the art.
Claims
1. A construction method for a shotcrete UHPC tunnel lining structure based on steel-FRP mesh reinforcement, characterized in that, Includes the following steps: Step 1: Clean and roughen the inner wall of the tunnel to be constructed, and thoroughly wet it; Step 2: Mark and lay out the design location, and install U-shaped I-beams along the tunnel direction using anchoring components, so that one side flange of the U-shaped I-beam is tightly attached to the inner wall of the tunnel. Step 3: Pre-tighten and fix the first layer of steel-FRP composite mesh to the U-shaped I-beam using fastening components, so that the fastening components are in close contact with the flange of the U-shaped I-beam on the side closest to the tunnel inner wall; Step 4: Spray UHPC onto the first layer of steel-FRP composite mesh to form the first UHPC layer. The spray thickness is one-third to one-half of the designed bushing thickness. Step 5: Continue to pre-tighten and fix the second layer of steel-FRP composite mesh to the U-shaped I-beam using the fastening components, so that the fastening components are tightly attached to the first layer of UHPC. Step 6: Continue to spray UHPC onto the second layer of steel-FRP composite mesh to form a second UHPC layer, and the total thickness of the two UHPC layers is at least 2cm higher than the height of the U-shaped I-beam. The steel-FRP composite mesh is a bidirectional rigid node mesh composed of several mutually perpendicular horizontal and vertical branches. The horizontal and vertical branches form multiple square mesh openings. Each horizontal and vertical branch includes an inner steel core and an FRP coating layer wrapped around the steel core. The horizontal and vertical branches have the same cross-section, and the cross-sectional area of the steel core is one-third to one-half of the cross-sectional area of the horizontal or vertical branch. The side length of the mesh opening is more than three times the fiber length used in the sprayed UHPC. The compressive strength of the sprayed UHPC is greater than or equal to 120 MPa.
2. The construction method according to claim 1, characterized in that, The molding material for the FRP cladding layer can be any one of CFRP, BFRP, GFRP, or AFRP.
3. The construction method according to claim 1, characterized in that, The fastening assembly includes two symmetrically distributed locking components and a bolt and nut assembly connecting the two locking components. The locking components include a C-shaped clamp and locking plates located at both ends of the C-shaped clamp. The web of the U-shaped I-beam is provided with positioning holes for the bolt and nut assembly to pass through.
4. The construction method according to claim 1, characterized in that, The anchoring assembly includes an anchor rod, and the flange of the U-shaped I-beam near the inner wall of the tunnel has a hole for the anchor rod to pass through; or, the anchoring assembly includes an anchor rod and an anchor member, the anchor member being composed of an integrally bent and connected positioning plate, connecting plate and pressure plate, the two ends of the connecting plate being perpendicularly connected to the positioning plate and the pressure plate respectively, and the positioning plate having a hole for the anchor rod to pass through.
5. The construction method according to claim 4, characterized in that, The anchor bolt is a steel anchor bolt or an FRP anchor bolt.
6. The construction method according to claim 1, characterized in that, After the second coat of the spray-type UHPC is completed, the UHPC is covered and sealed with plastic film for 24 hours for curing.
7. A jet-supported UHPC tunnel lining structure based on steel-FRP mesh reinforcement, characterized in that, The UHPC tunnel lining structure, manufactured using the construction method described in claim 1, comprises several U-shaped I-beams, two layers of steel-FRP composite mesh fixed on the U-shaped I-beams, and a UHPC layer. The U-shaped I-beams are installed along the tunnel direction via anchoring components, and the two layers of steel-FRP composite mesh are pre-tightened and fixed to the U-shaped I-beams via fastening components. The UHPC layer is formed by spraying UHPC onto the U-shaped I-beams and the two layers of steel-FRP composite mesh, and the total thickness of the final sprayed UHPC layer is at least 2 cm higher than the height of the U-shaped I-beams.
Citation Information
Patent Citations
Tunnel lining rapid repair structure based on carbon fiber woven mesh and repair method thereof
CN104895581A
FRP (fiber reinforced plastics) grid arch-fiber reinforced concrete composite support structure with embedded reinforcing steel bars
CN106640143A
Method and device for reinforcing tunnel by adopting FRP (Fiber Reinforced Plastic) grid and concrete UHPC (Ultra High Performance Concrete)
CN114718604A