A real-time monitoring device and method for monitoring the height of cast-in-place pile concrete

By using real-time pouring height monitoring device in cast piles and using rotating blades and feed window design, the problem of real-time measurement of the concrete aggregate height in the pile in the prior art is solved, and precise monitoring and construction of the concrete pouring process is achieved Improved efficiency.

CN117685852BActive Publication Date: 2024-11-08GUANGZHOU TAIJI ENG TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311786992.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-22
Publication Date
2024-11-08
Estimated Expiration
2043-12-22

AI Technical Summary

Technical Problem

The existing cast pile casting measurement technology cannot measure the height of the concrete coarse aggregate in the pile in real time, resulting in inaccurate removal length of the concrete casting conduit during construction, affecting structural strength and construction efficiency.

Method used

A real-time pouring height monitoring device for cast pile concrete is designed, including a height monitoring sensor and a main unit. The sensor consists of an outer pipe, a power unit, an elastic restraint, a rotating blade, a start switch and an alarm switch, through the rotating blade and the feed window. Designed to identify and measure the surface elevation of concrete coarse aggregate in real time during concrete pouring, and perform sound and light alarms and data recording through the host.

Benefits of technology

It realizes the accurate identification and measurement of the actual surface elevation of concrete coarse aggregate in complex cast-in-fill pile hole environments, reduces the need to rework and eliminate excess concrete, improves the accuracy and efficiency of construction, and avoids damage to structural strength.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117685852B_ABST
    Figure CN117685852B_ABST
Patent Text Reader

Abstract

The invention discloses a real-time height monitoring device and method for cast-in-place pile concrete pouring, and relates to the technical field of geotechnical foundation engineering. The device comprises a height monitoring sensor and a main machine, wherein the height monitoring sensor is electrically connected to the main machine; the height monitoring sensor comprises a power unit installed in an outer tube; two ends of the power unit are respectively installed in the outer tube and are transmission-connected with rotating blades; two ends of an elastic constraint are respectively connected to the outer tube and the power unit; a feeding window is provided on the outer tube at the position of the rotating blades; a start switch and an alarm switch are installed in the outer tube within the rotation range of the power unit; the power unit triggers the start switch and the alarm switch to transmit the power to the main machine for connecting and cutting off the power of the power unit respectively; during pouring, concrete coarse aggregate enters the feeding window and blocks the rotating blades, causing the power unit to reverse and trigger the alarm switch, and the main machine alarms and records the sensor position, thereby solving the problem that the height of the concrete coarse aggregate in the pile cannot be measured in real time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of geotechnical foundation engineering, and more specifically, to a real-time monitoring device and method for monitoring the height of cast-in-place pile concrete. Background Art

[0002] A large number of bored cast-in-place piles are used in foundation pit enclosure and slope support projects. The pile cross-section of the bored cast-in-place piles in the prior art is circular, and the steel cages involved are also mostly circular. This type of cast-in-place pile can achieve the purpose of uniform force as a vertical bearing member. During the engineering pouring, due to the complex environment in the pile hole and the presence of various building materials such as mud, sediment, concrete slurry, concrete fine aggregate, concrete coarse aggregate, etc., it is not conducive to monitoring the height of the coarse aggregate in the pile hole.

[0003] In the prior art, a method for monitoring the pouring of concrete for steel-concrete composite columns is disclosed, wherein a sensing optical fiber is laid in the pouring area of ​​the steel tube concrete composite column; the optical fiber sensing detection unit receives the optical signal of the sensing optical fiber and analyzes and obtains data information, which is sent to the real-time data analysis and processing unit; the real-time data analysis and processing unit determines the vibrating position of the vibrating rod and the pouring height of the concrete according to the data information. However, the height data obtained will be affected by the vibrating position of the vibrating rod. In the case of being invisible in the concrete, the data is obtained only by the vibration sensing optical fiber, resulting in uncertainty in the obtained data and low detection accuracy.

[0004] In addition, the existing concrete coarse aggregate identification tools generally have low identification accuracy and signal delay, which makes it difficult to accurately obtain the surface elevation information of the concrete coarse aggregate poured into the pile hole; therefore, the most commonly used measurement method is to estimate the surface elevation data of the concrete coarse aggregate to determine whether the poured concrete coarse aggregate has reached the designed elevation of the pile top, so as to further estimate the removal length of the concrete pouring conduit in order to complete the next construction operation; however, the estimated concrete coarse aggregate surface elevation data often has a large deviation from the actual data, resulting in the following three situations when excavating and testing after the construction of the engineering cast-in-place pile is completed:

[0005] (1) If the actual filling height of the concrete coarse aggregate does not reach the design elevation because there is only concrete slurry at the design elevation of the pile top, a lot of manpower and material resources will be required for rework and repair;

[0006] (2) If the actual surface elevation of the concrete coarse aggregate greatly exceeds the designed elevation of the pile top, a lot of manpower and material resources will be required to remove the excess concrete aggregate;

[0007] (3) If the estimated data of the concrete aggregate surface is too high and the length of the concrete pouring conduit is removed too long, after the conduit is pulled out of the concrete aggregate surface, a large amount of mud, sediment, etc. will flow into the pile body, affecting the structural strength, which will cause the pile body inspection to fail.

[0008] In summary, the applicant has found that the prior art has at least the following technical problems:

[0009] The existing bored pile casting measurement technology has the technical problem of being unable to measure the height of the coarse aggregate of concrete in the pile in real time. Summary of the invention

[0010] The purpose of the present invention is to provide a real-time monitoring device and method for the height of cast-in-place pile concrete pouring, so as to solve the technical problem that the existing cast-in-place pile pouring measurement technology cannot measure the height of concrete coarse aggregate in the pile in real time.

[0011] The various technical effects that can be produced by the preferred technical solutions among the various technical solutions provided by the present invention are described in detail below.

[0012] In order to solve the above technical problems, the technical solution of the present invention is as follows:

[0013] The present invention provides a real-time height monitoring device for pouring concrete of a bored pile, comprising a height monitoring sensor and a main machine, wherein the height monitoring sensor is electrically connected to the main machine; the height monitoring sensor comprises an outer tube, a power unit, an elastic constraint, a rotating blade, a start switch and an alarm switch; the power unit is installed in the outer tube; the two ends of the power unit are respectively set as a reversing end and a transmission end, the reversing end is rotatably installed in the outer tube, and the transmission end is transmission-connected to the rotating blade; the two ends of the elastic constraint are respectively connected to the outer tube and the power unit; the outer tube is provided with a feeding window at the position of the rotating blade; in the outer tube, the start switch and the alarm switch are installed within the rotation range of the power unit; the power unit triggers the start switch and the alarm switch to transmit the power to the main machine for connecting and cutting off the power of the power unit respectively.

[0014] Furthermore, the power unit includes a transmission housing and a motor; the motor is installed in the transmission housing, and the output shaft of the motor extends out of the transmission end; the output shaft of the motor is connected to the rotating blades; a rotation shaft and a constraint shaft are provided on the outer side of the reversing end of the transmission housing; the rotation shaft is rotatably connected to the outer tube, and the constraint shaft is connected to the elastic constraint member.

[0015] Furthermore, the rotation axis is located at the edge of the end surface of the transmission housing, and the constraint axis is located at the center of the end surface of the transmission housing; the output shaft of the motor is located on the axis of the outer tube; the output shaft of the motor is located between the rotation axis and the constraint axis; the rotation axis, the constraint axis and the output shaft of the motor are located on the same normal line on the plane.

[0016] Furthermore, an upper baffle and a middle baffle are installed in the outer tube; the power unit, the elastic constraint, the start switch and the alarm switch are located between the upper baffle and the middle baffle, and the rotating blade is located under the middle baffle; a fixed shaft is provided on the end surface of the upper baffle facing the middle baffle, and both ends of the elastic constraint are respectively connected to the fixed shaft and the constraint shaft; the rotation shaft is rotatably installed on the upper baffle.

[0017] Furthermore, a lower baffle is installed in the outer tube; the rotating blades are arranged between the middle baffle and the lower baffle; the output shaft of the motor passes through the middle baffle and is connected to the rotating blades; the output shaft of the motor is rotatably connected to the middle baffle.

[0018] Furthermore, the motor is any one of an AC motor, a stepper motor, or a servo motor.

[0019] Furthermore, it also includes a tail pipe; there are multiple height monitoring sensors; multiple height monitoring sensors are coaxially connected in sequence to form a first monitoring unit; and the tail pipe is installed on the tail of the first monitoring unit.

[0020] Furthermore, it also includes a hollow tube and a tail pipe; there are N height monitoring sensors; there are N-1 hollow tubes; a plurality of the height monitoring sensors and a plurality of the hollow tubes are coaxially connected in a staggered manner to form a second monitoring unit, and the head and tail of the second monitoring unit are both arranged with height monitoring sensors; the tail pipe is installed on the tail of the second monitoring unit.

[0021] The present invention also provides a monitoring method, comprising the following steps: selecting an assembly mode of a height monitoring sensor, assembling the height monitoring sensor into a first monitoring unit or a second monitoring unit; placing the height monitoring sensor in a steel cage of a bored pile; connecting the height monitoring sensor to a host via a data transmission cable, starting the host, and energizing the height monitoring sensor; triggering a start switch at a starting position by a power unit, and receiving a start signal from the start switch by the host; starting the power unit by the host to rotate the rotating blades; rotating the rotating blades clockwise; the concrete surface in the bored pile rises to the feed window, and concrete coarse aggregate enters the feed window to jam the rotating blades, and the transmission housing rotates counterclockwise; the transmission housing rotates to the alarm switch, and the transmission housing triggers the alarm switch; the sound and light alarm of the host flashes lights to alarm and voice broadcasts that the concrete is poured to the Nth height monitoring sensor; the host disconnects the power supply of the height monitoring sensor that has triggered the alarm switch; and the elastic constraint member pulls the transmission housing back to the start switch.

[0022] Furthermore, the communicator installed on the host is connected to the wireless terminal of the background management; after the height monitoring sensor is installed, before the bored pile is poured, the pile number, pile diameter, pile length, designed pile top elevation, and theoretical volume information are input into the host; after the pouring is completed, the actual volume information is input; after the height monitoring sensor triggers the alarm switch, the host receives the electrical signal of the alarm switch, and the host starts the sound and light alarm; the host calculates the actual elevation data according to the information fed back by the height monitoring sensor; the host transmits the alarm signal to the wireless terminal, and the wireless terminal displays that the Nth height monitoring sensor monitors the concrete coarse aggregate and displays the elevation position of the concrete coarse aggregate; after the bored pile is poured, the host displays the actual pile top elevation data; the host uploads the measured bored pile number, pile diameter, pile length, designed pile top elevation, actual pile top elevation, theoretical volume, and actual volume information to the cloud Internet of Things platform; the background management system obtains the information of the cloud Internet of Things platform through the API interface; the background management system generates real-time data connection and daily report, and authorizes the viewing of real-time dynamic information of the bored pile construction site.

[0023] Compared with the prior art, the technical solution of the present invention has the following beneficial effects:

[0024] The real-time pouring height monitoring device for cast-in-place pile concrete is provided with a height monitoring sensor and a host, and the height monitoring sensor is electrically connected to the host. The height monitoring sensor includes an outer tube, a power unit, an elastic constraint, a rotating blade, a start switch and an alarm switch; the power unit is installed in the outer tube; the two ends of the power unit are respectively set as a reversing end and a transmission end, the reversing end is rotatably installed in the outer tube, and the transmission end is transmission-connected with the rotating blade; the two ends of the elastic constraint are respectively connected to the outer tube and the power unit; the tension provided by the elastic constraint to the reversing end of the power unit is used to keep the reversing end stable when the rotating blade rotates.

[0025] Because the start switch and the alarm switch are installed in the outer tube within the rotation range of the power unit; a feed window is provided in the outer tube at the position of the rotating blade; the power unit triggers the start switch and the alarm switch to be transmitted to the main engine for connecting and cutting off the power of the power unit respectively; when the height monitoring sensor is started, the power unit is located at the start switch, the power unit triggers the start switch, the main engine receives the signal of the start switch, and the main engine starts the power unit; the start of the power unit drives the rotating blade to rotate clockwise, the concrete surface rises to enter the feed window, the rotating blade is stuck by the entering concrete coarse aggregate, and the rotor of the power unit does not move, thereby forcing the outer shell to rotate, so that the power unit reverses to the alarm switch, triggering the alarm switch, and the signal of the alarm switch is transmitted to the main engine, the main engine gives an audible and visual alarm prompt, and at the same time disconnects the power supply of the power unit. The rotating blades are stuck by the entering concrete coarse aggregate, causing the power unit to reverse and trigger the alarm switch, while mud, silt, concrete slurry, concrete fine aggregate, etc. will not cause the blades to get stuck, so that the height monitoring sensor can accurately identify the concrete coarse aggregate in a complex cast-in-place pile hole environment and accurately measure the actual surface elevation of the concrete coarse aggregate. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solution of the present invention, the drawings required for use in the implementation mode will be briefly introduced below. Obviously, the drawings described below are only some implementation modes of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0027] Figure 1 is a schematic diagram of the structure of the height monitoring sensor in Example 1;

[0028] Figure 2 is a cross-sectional schematic diagram of the height monitoring sensor in Example 1;

[0029] Figure 3 is a top view of the power unit in Example 1 at the start switch position;

[0030] Figure 4 is a top view of the power unit in Example 1 located at the alarm switch position;

[0031] Figure 5 is a schematic diagram of the installation of the height monitoring sensor and the host in Example 1;

[0032] Figure 6 is a schematic diagram of the structure of the host in Example 1;

[0033] Figure 7is a schematic diagram of the structure of the first monitoring unit composed of the height monitoring sensor and the tail pipe in Example 2;

[0034] Figure 8 It is a schematic diagram of the structure of the second monitoring unit composed of the height monitoring sensor, the hollow tube and the tail pipe in Example 3.

[0035] The reference numerals are as follows:

[0036] 1. Host; 11. Data transmission cable; 12. Sound and light alarm; 13. Communicator; 14. Cable reel; 15. Machine;

[0037] 2. Height monitoring sensor;

[0038] 3. Outer tube; 31. Feeding window; 32. Upper baffle; 321. Fixed shaft; 33. Middle baffle; 34. Lower baffle; 4. Power unit; 41. Reversing end; 42. Transmission end; 43. Transmission housing; 431. Rotation shaft; 432. Constraint shaft; 44. Motor;

[0039] 5. Elastic restraints;

[0040] 6. Rotating blades;

[0041] 71. Start switch; 72. Alarm switch;

[0042] 81. A first monitoring unit; 82. A second monitoring unit;

[0043] 91. Hollow pipe; 92. Tail pipe;

[0044] 10. Wireless terminal; 101. Steel cage; 102. Casting conduit. DETAILED DESCRIPTION

[0045] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme of the present application will be clearly and completely described below in conjunction with the drawings of the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. Based on the described embodiments, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0046] Unless otherwise defined, the technical terms or scientific terms used in this application should be understood by people with ordinary skills in the field to which this application belongs. "First", "second" and similar words used in this application do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word cover the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0047] In a specific embodiment, a real-time monitoring device and method for the height of cast-in-place pile concrete pouring are provided. During pouring, coarse concrete aggregate enters the feed window and jams the rotating blades, causing the power unit to reverse and trigger the alarm switch. The host alarm is used to record the sensor position, which can effectively solve the technical problem of the existing cast-in-place pile pouring measurement technology that is unable to measure the height of coarse concrete aggregate in the pile in real time.

[0048] Example 1

[0049] This embodiment discloses a real-time monitoring device for the height of cast-in-place pile concrete. Figures 1 to 4 ,as well as Figure 6 As shown, it includes a height monitoring sensor 2 and a main machine 1, and the height monitoring sensor 2 is electrically connected to the main machine 1; the height monitoring sensor 2 includes an outer tube 3, a power unit 4, an elastic constraint 5, a rotating blade 6, a start switch 71 and an alarm switch 72; the power unit 4 is installed in the outer tube 3; the two ends of the power unit 4 are respectively set as a reversing end 41 and a transmission end 42, the reversing end 41 is rotatably installed in the outer tube 3, and the transmission end 42 is transmission-connected with the rotating blade 6; the two ends of the elastic constraint 5 are respectively connected to the outer tube 3 and the power unit 4; the outer tube 3 is provided with a feeding window 31 at the position of the rotating blade 6; in the outer tube 3, the start switch 71 and the alarm switch 72 are installed within the rotation range of the power unit 4; the power unit 4 triggers the start switch 71 and the alarm switch 72 to transmit to the main machine 1 for connecting and cutting off the power of the power unit 4 respectively.

[0050] A monitoring method such as Figures 1 to 8 As shown, it includes selecting an assembly method of the height monitoring sensor 2, and the height monitoring sensor 2 is assembled into a first monitoring unit 81 or a second monitoring unit 82;

[0051] Place the height monitoring sensor 2 in the steel cage 101 of the cast-in-place pile;

[0052] The height monitoring sensor 2 is connected to the host 1 via a data transmission cable 11, the host 1 is started, and the height monitoring sensor 2 is powered on;

[0053] The power unit 4 triggers the start switch 71 at the starting position, and the host 1 receives the start signal of the start switch 71; the host 1 energizes the power unit 4 to start the power unit 4 to rotate the rotating blade 6; the rotating blade 6 rotates clockwise;

[0054] The concrete surface in the cast-in-place pile rises to the feed window 31, the coarse concrete aggregate enters the feed window 31 and blocks the rotating blade 6, and the transmission housing 43 rotates counterclockwise;

[0055] The transmission housing 43 rotates to the alarm switch 72, and the transmission housing 43 triggers the alarm switch 72; the sound and light alarm 12 of the host 1 flashes light alarm and voice broadcasts that the concrete is poured to the Nth height monitoring sensor 2;

[0056] The host 1 disconnects the power supply of the height monitoring sensor 2 which has triggered the alarm switch 72 ; the elastic restraint 5 pulls back the transmission housing 43 to the start switch 71 .

[0057] The specific steps of the host 1 processing and managing the elevation information of the cast-in-place pile include the communicator 13 installed on the host 1 connecting to the wireless terminal 10 managed by the background;

[0058] After the height monitoring sensor 2 is installed, before the bored pile is poured, the pile number, pile diameter, pile length, designed pile top elevation, and theoretical volume information are input into the host 1; after the pouring is completed, the actual volume information is input;

[0059] After the height monitoring sensor 2 triggers the alarm switch 72, the host 1 receives the electrical signal of the alarm switch 72, and the host 1 activates the sound and light alarm 12;

[0060] The host 1 calculates the actual elevation data according to the information fed back by the height monitoring sensor 2;

[0061] The host 1 transmits the alarm signal to the wireless terminal 10, and the wireless terminal 10 displays that the Nth height monitoring sensor 2 detects the concrete coarse aggregate and displays the elevation position of the concrete coarse aggregate;

[0062] After the cast-in-place pile is poured, the host 1 displays the actual pile top elevation data;

[0063] Host 1 uploads the measured pile number, pile diameter, pile length, designed pile top elevation, actual pile top elevation, theoretical volume, and actual volume information of the cast-in-place pile to the cloud Internet of Things platform;

[0064] The backend management system obtains information from the cloud IoT platform through the API interface;

[0065] The backend management system generates real-time data connections and daily reports, and authorizes the viewing of real-time dynamic information of the bored pile construction site.

[0066] The real-time pouring height monitoring device for cast-in-place pile concrete is provided with a height monitoring sensor 2 and a main unit 1, and the height monitoring sensor 2 is electrically connected to the main unit 1. Among them, the height monitoring sensor 2 includes an outer tube 3, a power unit 4, an elastic constraint 5, a rotating blade 6, a start switch 71 and an alarm switch 72; the power unit 4 is installed in the outer tube 3; the two ends of the power unit 4 are respectively set as a reversing end 41 and a transmission end 42, the reversing end 41 is rotatably installed in the outer tube 3, and the transmission end 42 is connected to the rotating blade 6 in a transmission manner; the two ends of the elastic constraint 5 are respectively connected to the outer tube 3 and the power unit 4; the tension provided by the elastic constraint 5 to the reversing end 41 of the power unit 4 is used to keep the reversing end 41 stable when the rotating blade 6 rotates.

[0067] Since the start switch 71 and the alarm switch 72 are installed in the outer tube 3 within the rotation range of the power unit 4; a feed window 31 is provided on the outer tube 3 at the position of the rotating blade 6; the power unit 4 triggers the start switch 71 and the alarm switch 72 to be transmitted to the main machine 1 for connecting and disconnecting the power of the power unit 4 respectively; when the height monitoring sensor 2 is started, the power unit 4 is located at the start switch 71, the power unit 4 triggers the start switch 71, the main machine 1 receives the signal of the start switch 71, and the main machine 1 starts the power unit 4; the power unit 4 starts to drive the rotating blade 6 to rotate clockwise, the concrete surface rises to enter the feed window 31, the rotating blade 6 is stuck by the entering concrete coarse aggregate, and the rotor of the power unit 4 does not move, thereby forcing the outer shell to rotate, so that the power unit 4 reverses to the alarm switch 72, triggering the alarm switch 72, and the signal of the alarm switch 72 is transmitted to the main machine 1, the main machine 1 gives an audible and visual alarm prompt, and at the same time disconnects the power supply of the power unit 4.

[0068] The rotating blades 6 are stuck by the entering concrete coarse aggregate, causing the power unit 4 to reverse and trigger the alarm switch 72, while mud, silt, concrete slurry, concrete fine aggregate, etc. will not cause the blades to get stuck, so that the height monitoring sensor 2 can accurately identify the concrete coarse aggregate in the complex cast-in-place pile hole environment and accurately measure the actual surface elevation of the concrete coarse aggregate.

[0069] In the specific implementation process,

[0070] Regarding the specific structure of the above host, this implementation is as follows Figure 6 As shown, the host 1 is installed on a machine platform 15, and a cable reel 14 is also installed on the machine platform 15; the host 1 is connected to the height monitoring sensor 2 through a data transmission cable 11; and an audible and visual alarm 12 and a communicator 13 are installed on the host.

[0071] Regarding the specific structure of the power unit 4, this embodiment Figures 1 to 4 As shown, the power unit 4 includes a transmission housing 43 and a motor 44; the motor 44 is installed in the transmission housing 43, and the output shaft of the motor 44 extends out of the transmission end 42; the output shaft of the motor 44 is connected to the rotating blade 6; a rotation shaft 431 and a constraint shaft 432 are provided on the outer side of the reversing end 41 of the transmission housing 43; the rotation shaft 431 is rotationally connected to the outer tube 3, and the constraint shaft 432 is connected to the elastic constraint 5.

[0072] Regarding the specific type of the motor 44 , the motor 44 is any one of an AC motor 44 , a stepper motor 44 , or a servo motor 44 .

[0073] Regarding the specific positions of the above-mentioned rotation axis 431, the constraint axis 432 and the output axis of the motor 44, this embodiment is as follows: Figures 1 to 4 As shown, the rotation axis 431 is located at the end surface edge of the transmission housing 43, and the constraint axis 432 is located at the end surface center of the transmission housing 43; the output shaft of the motor 44 is located on the axis of the outer tube 3; the output shaft of the motor 44 is located between the rotation axis 431 and the constraint axis 432; the rotation axis 431, the constraint axis 432 and the output shaft of the motor 44 are located on the same normal line on the plane.

[0074] Regarding the specific structure of the outer tube 3 fixed power structure and the rotating blades 6, this embodiment is as follows: Figures 1 to 4 As shown, an upper baffle 32 and a middle baffle 33 are installed in the outer tube 3; the power unit 4, the elastic constraint 5, the start switch 71 and the alarm switch 72 are located between the upper baffle 32 and the middle baffle 33, and the rotating blade 6 is located under the middle baffle 33; a fixed shaft 321 is provided on the end surface of the upper baffle 32 facing the middle baffle 33, and the two ends of the elastic constraint 5 are respectively connected to the fixed shaft 321 and the constraint shaft 432; the rotation shaft 431 is rotatably installed on the upper baffle 32.

[0075] A lower baffle 34 is installed in the outer tube 3; the rotating blade 6 is arranged between the middle baffle 33 and the lower baffle 34; the output shaft of the motor 44 passes through the middle baffle 33 and is connected to the rotating blade 6; the output shaft of the motor 44 is rotationally connected to the middle baffle 33.

[0076] Regarding the specific type of the elastic restraint 5, the elastic restraint 5 is any one of a spring, an elastic tendon, an elastic band, or an elastic rope.

[0077] Regarding the specific structure of the above-mentioned rotating blade 6, the rotating blade 6 is a double-blade blade.

[0078] Example 2

[0079] In the specific implementation process, Figure 7As shown, the difference between this embodiment and embodiment 1 is that it also includes a tail pipe 92; there are multiple height monitoring sensors 2; the multiple height monitoring sensors 2 are coaxially connected in sequence to form a first monitoring unit 81; and the tail pipe 92 is installed on the tail of the first monitoring unit 81.

[0080] When applied, 10 height monitoring sensors 2 + 1 tail pipe 92 can be used. The monitoring range of the first monitoring unit 81 composed of this is 1m, that is, the monitoring range of 1 height monitoring sensor 2 is 10cm; the first monitoring unit 81 composed of this can accurately identify the elevation position of concrete aggregate every 10cm within the range of 0.5m above and below the designed pile top elevation.

[0081] Example 3

[0082] In the specific implementation process, Figure 8 As shown, the difference between this embodiment and embodiment 1 is that it also includes a hollow tube 91 and a tail pipe 92; there are N height monitoring sensors 2; there are N-1 hollow tubes 91; multiple height monitoring sensors 2 and multiple hollow tubes 91 are coaxially connected in a staggered manner to form a second monitoring unit 82, and the head and tail of the second monitoring unit 82 are both arranged with height monitoring sensors 2; the tail pipe 92 is installed on the tail of the second monitoring unit 82.

[0083] When applied, since the monitoring range of one height monitoring sensor 2 is 10 cm and the length of one hollow tube 91 is 10 cm, 10 height monitoring sensors 2 + 9 hollow tubes 91 + 1 tail tube 92 can be used. The monitoring range of the second monitoring unit 82 composed of this combination is 2 m, which can accurately identify the elevation position of the concrete aggregate every 20 cm within the range of 1 m above and below the designed pile top elevation.

[0084] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.

Claims

1. A real-time monitoring device for the height of cast-in-place pile concrete, characterized in that: It comprises a height monitoring sensor and a host, wherein the height monitoring sensor is electrically connected to the host; The height monitoring sensor comprises an outer tube, a power unit, an elastic restraint, a rotating blade, a start switch and an alarm switch; The power unit is installed in the outer tube; two ends of the power unit are respectively set as a reversing end and a transmission end, the reversing end is rotatably installed in the outer tube, and the transmission end is transmission-connected to the rotating blade; The two ends of the elastic restraint are respectively connected to the outer tube and the power unit; The outer tube is provided with a feed window at the position of the rotating blade; In the outer tube, the start switch and the alarm switch are installed within the rotation range of the power unit; the power unit triggers the start switch and the alarm switch to transmit to the host to connect and disconnect the power of the power unit respectively; The power unit includes a transmission housing and a motor; The motor is installed in the transmission housing, and the output shaft of the motor extends out of the transmission end; the output shaft of the motor is connected to the rotating blade; A self-rotation shaft and a constraint shaft are provided on the outer side of the reverse-rotation end of the transmission housing; The rotation shaft is rotatably connected to the outer tube, and the constraint shaft is connected to the elastic constraint member; The rotation axis is located at the edge of the end surface of the transmission housing, and the constraint axis is located at the center of the end surface of the transmission housing; The output shaft of the motor is located on the axis of the outer tube; the output shaft of the motor is located between the rotation axis and the constraint axis; The rotation axis, the constraint axis and the output shaft of the motor are located on the same normal line on the plane; An upper baffle and a middle baffle are installed in the outer tube; The power unit, the elastic restraint, the start switch and the alarm switch are located between the upper baffle and the middle baffle, and the rotating blade is located under the middle baffle; A fixed shaft is provided on the end surface of the upper baffle plate facing the middle baffle plate, and two ends of the elastic restraint member are respectively connected to the fixed shaft and the restraint shaft; The rotation shaft is rotatably mounted on the upper baffle; A lower baffle is installed in the outer tube; the rotating blades are arranged between the middle baffle and the lower baffle; The output shaft of the motor passes through the middle baffle and is connected to the rotating blade; the output shaft of the motor is rotationally connected to the middle baffle.

2. The real-time pouring height monitoring device for bored pile concrete according to claim 1 is characterized in that: The motor is any one of an AC motor, a stepping motor, or a servo motor.

3. The real-time pouring height monitoring device for bored pile concrete according to claim 1 is characterized in that: It also includes the tail pipe; There are multiple height monitoring sensors; multiple height monitoring sensors are coaxially connected in sequence to form a first monitoring unit; The tail pipe is installed on the tail of the first monitoring unit.

4. The real-time pouring height monitoring device for bored pile concrete according to claim 1 is characterized in that: The real-time pouring height monitoring device for cast-in-place pile concrete also includes a hollow pipe and a tail pipe; There are N height monitoring sensors; there are N-1 hollow tubes; A plurality of the height monitoring sensors and a plurality of the hollow tubes are coaxially connected in a staggered manner to form a second monitoring unit, and a height monitoring sensor is arranged at the head and the tail of the second monitoring unit; The tail pipe is installed on the tail of the second monitoring unit.

5. A monitoring method using the real-time pouring height monitoring device for bored pile concrete according to any one of claims 1 to 4, characterized in that: The following steps are involved: Selecting an assembly method of the height monitoring sensor, the height monitoring sensor is assembled into a first monitoring unit or a second monitoring unit; Place height monitoring sensors inside the steel cage of the cast-in-place pile; The height monitoring sensor is connected to the host through a data transmission cable, the host is started, and the height monitoring sensor is powered on; The power unit triggers the start switch at the starting position, and the host receives the start signal from the start switch; the host energizes the power unit to start the power unit and make the rotary blades rotate; The rotating blades rotate clockwise; The concrete surface in the cast-in-place pile rises to the feeding window, the coarse concrete aggregate enters the feeding window and blocks the rotating blades, and the transmission housing rotates counterclockwise; The transmission housing rotates to the alarm switch, and the transmission housing triggers the alarm switch; the sound and light alarm of the host flashes the light to alarm and voice broadcasts that the concrete is poured to the Nth height monitoring sensor; The host disconnects the power supply of the height monitoring sensor that has triggered the alarm switch; the elastic restraint pulls the transmission housing back to the start switch.

6. The monitoring method according to claim 5, characterized in that: The communicator installed on the host is connected to the wireless terminal managed in the background; After the height monitoring sensor is installed, before the bored pile is poured, the pile number, pile diameter, pile length, designed pile top elevation, and theoretical volume information are input into the host; after the pouring is completed, the actual volume information is input; After the height monitoring sensor triggers the alarm switch, the host receives the electrical signal from the alarm switch and activates the sound and light alarm; The host calculates the actual elevation data based on the information fed back by the height monitoring sensor; The host transmits the alarm signal to the wireless terminal, and the wireless terminal displays that the Nth height monitoring sensor has detected the concrete coarse aggregate, and displays the elevation position of the concrete coarse aggregate; After the cast-in-place pile is poured, the host displays the actual pile top elevation data; The host uploads the measured pile number, pile diameter, pile length, designed pile top elevation, actual pile top elevation, theoretical volume, and actual volume information of the cast-in-place pile to the cloud IoT platform; The backend management system obtains information from the cloud IoT platform through the API interface; The backend management system generates real-time data connections and daily reports, and authorizes the viewing of real-time dynamic information of the bored pile construction site.