An intensive production process and production management system for prefabricated concrete components
By using weight detectors and control modules to adjust the vibration strength in the production of prefabricated concrete components, and accurately planning the transportation time with electronic tags and management systems, the problems of insufficient vibration coverage and inaccurate transportation time are solved, and the quality and production efficiency of concrete are improved .
Patent Information
- Application Number
- CN202311450999.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-03
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2043-11-03
AI Technical Summary
In the production of existing concrete prefabricated components, the vibration coverage during vibration and stirring is insufficient and the strength is difficult to control, resulting in insufficient concrete quality management; traditional management systems cannot accurately adjust the transportation time, resulting in production delays.
The weight detector and control module are used to adjust the vibration intensity of the stirring table and stirring paddle, and the transportation time is accurately planned through electronic tags and management systems, and the theoretical time is corrected based on the actual transportation time.
The vibration strength is adjusted according to demand and the uniformity of concrete is improved, ensuring the accuracy and efficiency of production time, and reducing the risk of production delays.
Smart Images

Figure CN117774085B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of precast component production, and particularly relates to an intensive production process and a production management system for concrete precast components. Background Art
[0002] A concrete precast component is a building component that is pre-cast into a specific shape or size through a mold and then directly transported to a construction site for installation or assembly. Compared with the on-site casting component production method, precast components can be centrally produced in a factory, and modern technical and management means can be better utilized, having advantages in quality management and processing speed.
[0003] The production of general concrete precast components involves the mixing and pouring of concrete. During the mixing process, the concrete needs to be fully stirred and mixed. To further improve the adequacy and uniformity of the mixing, some existing processes introduce vibration mixing while the blades are stirring. For example, a concrete mixing plant equipped with a vibration mixing main engine disclosed in Chinese Patent CN103101116B includes an aggregate batching machine, an aggregate lifting mechanism, a main building platform, a cement silo, a fly ash silo, a cement screw conveyor, a fly ash screw conveyor, a cement scale, a fly ash scale, a water scale, a water tank, a control room, a main engine support platform, and a vibration mixing main engine. The main building platform is supported and fixed on the base surface by four main building legs. The main engine support platform is arranged at the central opening of the main building platform and is lower than the main building platform. The main engine support platform is supported and fixed on the base surface by four support platform legs. The four support platform legs and the four main building legs form a "mu" character structure. The vibration mixing main engine is fixed on the main engine support platform, and a rubber shock absorber is arranged between the vibration mixing main engine and the main engine support platform. It uses the mixing shaft and mixing blades as the vibration source. In the above structure, although the vibration source is arranged in the mixing shaft and mixing blades to cover the concrete at the central position of the mixing drum, however, the coverage range of the mixing shaft and mixing blades for the cement in the mixing tank is limited. When the vibration intensity is too low, the concrete far from the mixing shaft and mixing blades cannot be vibrated, and when the vibration intensity is too high, there is a probability of damaging the relatively fragile mixing blades, and the advantages of precast components in quality management cannot be exerted. Therefore, a production process for concrete precast components is needed that has sufficient vibration coverage during vibration mixing and the vibration intensity is controllable according to requirements.
[0004] At the same time, for the production of the entire precast concrete components, traditional management and control systems, such as a full-process management system for precast concrete components disclosed in Chinese patent CN109377586B, can only roughly count the transportation time. During actual transportation, different precast components have different shapes and require different lifting schemes, so the transportation time is different. The above management system fails to adjust the transportation time according to the shape of each precast component, and cannot accurately control the production process, resulting in a probability of production delays due to conflicts between the expected time and the actual time during the production process, and cannot give full play to the advantages of precast component production in processing speed. For this reason, a precast concrete component production management system that manages the above-mentioned precast concrete component production process and has high time management accuracy is needed. Summary of the invention
[0005] In order to solve the above problems existing in the prior art, the present invention provides an intensive production process and production management system for precast concrete components, which has the characteristics of precise control and high accuracy in production time estimation.
[0006] The purpose of the present invention can be achieved through the following technical solutions:
[0007] An intensive production process for precast concrete components comprises the following steps:
[0008] Step 1: Mix the concrete according to the proportion and add it into the mixing drum on the vibrating mixing table;
[0009] Step 2: The weight detector in the mixing drum detects the weight of the concrete in the mixing drum and uploads the weight monitoring data to the control module. The mixing paddle in the mixing drum stirs the cement. The control module starts the vibrator in the mixing table or the vibrator in the mixing paddle according to the weight data instruction. The vibrator is used to vibrate the cement in the mixing drum.
[0010] Step 3: The transport component hoists the precast component mold onto the vibrating table, and the output end of the mixing drum transports the mixed concrete into the precast component mold. The vibrating table below the precast component mold vibrates the precast component mold and the concrete therein;
[0011] Step 4: The transport assembly hoists the vibrated prefabricated component mold to the stacking site.
[0012] As a preferred technical solution of the present invention, the step 2 further includes: the control module is pre-input with the standard vibration power pt0 and the standard weight m0 of the vibration stirring table, and the control module calculates the vibration power pt of the vibration stirring table according to the weight data m, m0 and pt0;
[0013] Among them, 0.2m0≤m≤2m0, pt=pt0×[log(x-0.7)+1], x=m / m0.
[0014] As a preferred technical solution of the present invention, the step 2 further includes: the control module pre-inputs the standard vibration power pj0 of the stirring paddle, and the control module calculates the vibration power pj of the stirring paddle according to the weight data m, m0 and pj0;
[0015] Among them, 0.2m0≤m≤2m0, pj=pj0×|-1.5x+1.8|, x=m / m0.
[0016] As a preferred technical solution of the present invention, step two also includes: a vibration detector in the mixing drum detects the vibration intensity and frequency, and uploads the detection data to the control module, and the control module determines whether the vibration intensity and frequency reach the threshold through comparison. When the judgment result is no, the control module instructs the alarm to start.
[0017] The present invention also provides an intensive production management system for prefabricated concrete components, comprising a management module, a monitoring module, a planning module and a plurality of electronic tags, wherein the plurality of electronic tags are used to be placed one-to-one on the surfaces of a plurality of prefabricated components, the management module comprises a modeling module and a data storage module, the modeling module is used to establish a digital model for the plurality of prefabricated components and upload the model data to the data storage module, the data storage module is used to group and archive various data including the model data in units of prefabricated components, the monitoring module is used to obtain the position of the prefabricated components by reading the electronic tags, the planning module is used to calculate the number and position of the hanging points according to the model data, the planning module is used to plan the lifting path, and the planning module calculates and generates the theoretical transportation time according to the number and position of the hanging points and the lifting path.
[0018] As a preferred technical solution of the present invention, it also includes a comparison module, which is used to calculate the actual transportation time through the position of the prefabricated components, and upload the actual transportation time to the comparison module, and the comparison module is used to calculate the difference between the actual transportation time and the theoretical transportation time, and use the difference to correct the theoretical transportation time of the subsequent threshold components.
[0019] As a preferred technical solution of the present invention, the comparison module is used to determine whether the difference exceeds a threshold value, and when the determination result is yes, the instruction alarm is activated.
[0020] As a preferred technical solution of the present invention, the management module is electrically connected to the vibration detector and obtains vibration intensity and frequency data, and uploads the data to the data storage module, and the data storage module groups and archives the vibration intensity and frequency data.
[0021] As a preferred technical solution of the present invention, it also includes a monitoring module, which is used to scan the volume of objects on the lifting moving path and generate a transportation path collision model. The monitoring module uploads the transportation path collision model to the planning module, and the planning module plans the transportation path according to the model data of the prefabricated components and the transportation path collision model.
[0022] The beneficial effects of the present invention are:
[0023] By setting a weight detector and making the control module change the vibration intensity in the vibrating mixing table and the mixing shaft respectively according to the weight data in the mixing drum detected by the weight detector, when the vibration demand is low, only the vibrator in the mixing shaft is started to reduce energy consumption, when the vibration demand is medium, only the vibrating mixing table is started to ensure the life of the mixing paddle, and when the vibration demand is high, both vibrators are started at the same time to give priority to the mixing demand of concrete, thereby completing the adjustment of the vibration intensity according to the demand; at the same time, by making the control module instruct the vibration power of the vibrating mixing table according to the value of pt0×[log(x-0.7)+1], and making the control module instruct the vibration power of the mixing paddle according to the value of pj0×|-1.5x+1.8|, the vibration intensity can be adjusted according to the demand while completing the precise control of the vibration intensity.
[0024] The planning module is set up to simulate the lifting and transportation of prefabricated components, and the transportation time is generated according to the simulation results. At the same time, the transportation time and other data are stored in groups according to the prefabricated components through the data storage module, which facilitates the visual management of operators and enables operators to know the theoretical transportation time, which is convenient for production planning of operators;
[0025] By setting up a comparison module to obtain the difference between the actual transportation time and the theoretical transportation time, and correcting the theoretical transportation time of the next prefabricated component mold based on the difference, random errors and the impact of various random factors in the production site on production planning are reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.
[0027] Figure 1 It is a schematic diagram of the cross-sectional structure of the vibration stirring table of the present invention;
[0028] Figure 2 Module block diagram of the control module of the present invention.
[0029] Description of main component symbols:
[0030] In the figure: 1. Vibrating mixing table; 11. Placing platform; 12. Mixing drum; 13. Mixing paddle; 2. Control module. DETAILED DESCRIPTION
[0031] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation method, structure, characteristics and effects of the present invention are described in detail below in conjunction with the accompanying drawings and preferred embodiments.
[0032] See also Figure 1-2 , an intensive production process of precast concrete components, comprising the following steps: Step 1: Mix concrete according to a proportion and add it to a mixing drum 12 on a vibrating mixing table 1. Concrete is a mixture of cement, sand, stone and water, which needs to be mixed first and then stirred. In this embodiment, the vibrating mixing table 1 includes a placement platform 11 and a vibrator arranged below the placement platform 11. The vibrator is connected to the placement platform 11. At the same time, a mixing drum 12 is arranged above the placement platform 11. The mixing drum 12 is a horizontal cylindrical drum as a whole. A stirring shaft is passed through the cylindrical drum, and a plurality of stirring paddles 13 are arranged on the stirring shaft.
[0033] After the concrete materials according to the proportion required by the project are put into the mixing drum 12, step 2 is executed;
[0034] Step 2: The stirring paddle 13 in the mixing drum 12 stirs the cement. In this embodiment, the stirring shaft rotates around its own axis driven by the motor, driving the plurality of stirring paddles 13 thereon to rotate. The stirring paddles 13 exert collision and stirring effects on the mixture to complete the preliminary mixing of the concrete.
[0035] At the same time, since concrete is a composite material with an uneven texture and porous characteristics, it is necessary to make the mixture collide, convect and diffuse continuously, so as to make the quality of each part of the concrete uniform. In order to increase the number of effective collisions and fully carry out mixing at the microscopic level, during the mixing process, the vibrator in the vibrating mixing table 1 or the vibrator in the stirring paddle 13 is started. In this embodiment, the vibrator in the vibrating mixing table 1 is a vibration motor connected to the placement platform 11, and the vibrator in the stirring paddle 13 is a vibration motor arranged in the stirring paddle 13. When the vibration motor in the placement platform 11 vibrates, the vibration is transmitted along the platform to the outer wall of the mixing drum 12, and the outer wall of the mixing drum 12 vibrates, vibrating the concrete near the drum wall in the mixing drum 12, thereby promoting the mixing of this part of the concrete. At the same time, when the vibration motor in the stirring shaft vibrates, the vibration wave is transmitted to the stirring paddle 13 and transmitted to the concrete near the stirring paddle 13, thereby promoting the mixing of this part of the concrete.
[0036] By arranging a vibrator near the placement platform 11 and the stirring paddle 13, the concrete near the cylinder wall and the stirring paddle 13 can collide more effectively at the micro level, thereby improving the mixing uniformity of the concrete and making the strength of the component formed by subsequent pouring higher;
[0037] During the above-mentioned vibration-assisted mixing process, since the coverage of the cement in the mixing tank by the mixing shaft and the mixing blades is limited, when the vibration intensity is too low, the concrete far away from the mixing shaft and the mixing blades cannot be vibrated, and when the vibration intensity is too high, there is a probability of damaging the mixing blades with a relatively fragile structure, and the advantages of prefabricated components in quality management cannot be brought into play. In addition, the vibrating mixing table 1 and the cement are heavy. When the vibrator vibrates the entire vibrating mixing table 1, the power consumption is relatively large. Therefore, the vibration intensity is adjustable according to demand during mixing. In step 2, after the raw materials are added to the mixing drum 12 and before the above-mentioned mixing process is carried out, the weight detector in the mixing drum 12 performs weight detection on the concrete in the mixing drum 12 and uploads the weight monitoring data to the control module 2. The control module 2 instructs the vibrator in the vibrating mixing table 1 or the vibrator in the mixing paddle 13 to start according to the weight data;
[0038] Specifically, the control module 2 is pre-input with a weight threshold. When a batch of concrete raw materials is put into the mixing drum 12, the weight sensor detects the cement weight data m in the mixing drum 12 and uploads it to the control module 2. After receiving the weight data, the control module 2 compares the weight data with the threshold.
[0039] When the weight data is less than the threshold value, it means that there is less cement in the mixing drum 12, and the mixing uniformity of the concrete in the drum can be ensured without vibrating the entire vibrating mixing table 1. At this time, the control module 2 instructs the vibrating mixing table 1 to stop vibrating, and instructs the vibration motor in the mixing shaft to vibrate at a higher power;
[0040] When the weight data is close to the threshold value, it means that the amount of cement in the mixing drum 12 is medium. At this time, the vibrating mixing table 1 needs to vibrate to improve the mixing uniformity of the concrete. At this time, the control module 2 instructs the vibration motor in the vibrating mixing table 1 to start running. Since the vibrating mixing table 1 covers the concrete more evenly, there is no need for the stirring paddle 13 to consume extra life to vibrate. At this time, the control module 2 instructs the vibration motor in the vibration shaft to reduce the power to run;
[0041] When the weight data is higher than the threshold, it means that there is more cement and more vibration energy is needed to ensure mixing uniformity. The control module 2 instructs the vibration shaft and the vibration motor in the vibration mixing table 1 to operate at a higher power to give priority to ensuring mixing uniformity.
[0042] By setting a weight detector, and making the control module 2 change the vibration intensity in the vibrating mixing table 1 and the mixing shaft respectively according to the weight data in the mixing drum 12 detected by the weight detector, when the vibration demand is low, only the vibrator in the mixing shaft is started to reduce energy consumption, when the vibration demand is medium, only the vibrating mixing table 1 is started to ensure the life of the mixing paddle 13, and when the vibration demand is high, both vibrators are started at the same time to give priority to ensuring the mixing demand of concrete, thereby completing the adjustment of the vibration intensity according to the demand;
[0043] After vibration and stirring are completed, proceed to step 3;
[0044] Step 3: The transport component hoists the prefabricated component mold onto the vibrating table, and the output end of the mixing drum 12 transports the mixed concrete into the prefabricated component mold. The vibrating table below the prefabricated component mold vibrates the prefabricated component mold and the concrete therein. In this embodiment, the vibrating table is arranged on one side of the vibrating mixing table 1, and the mixing drum 12 is provided with an output pump, and the output end of the output pump faces the vibrating table. The transport component is a crane. When the transport component places the prefabricated component mold on the vibrating table by hoisting, the vibrating table clamps the prefabricated component, and at the same time, the output end is aligned with the feed port of the prefabricated component mold with the assistance of the operator or automatic correction. After the prefabricated component mold is filled, the vibrating table vibrates the prefabricated component mold and the concrete therein to make the concrete therein densely combined;
[0045] After the vibration is completed, proceed to step 4;
[0046] Step 4: The transport component hoists the vibrated prefabricated component mold to the stacking site. Specifically, one or more lifting points are pre-set on the prefabricated component mold. The crane serving as the transport component lifts the prefabricated component mold through the lifting points. After the crane lifts the prefabricated component mold, it moves it above the stacking site and puts down the prefabricated component mold. The operators cover it with water for curing. At the same time, the test block in step 3 is pressure tested to determine the demolding time. After the concrete in the prefabricated component mold is cured to the demolding time, the operators remove the mold to complete the production of the prefabricated component.
[0047] In the process of adjusting the vibration intensity according to the weight data in the above step 2, the control module 2 is specifically input with the standard vibration power pt0 and the standard weight m0 of the vibration mixing table 1 in advance, and the control module 2 calculates the vibration power pt of the vibration mixing table 1 according to the weight data m, m0 and pt0; wherein, 0.2m0≤m≤2m0, pt=pt0×[log(x-0.7)+1], x=m / m0, when the value of m is lower than 0.8m0, it means that the amount of cement in the mixing drum 12 is small, and there is no need to start the vibration motor of the vibration mixing table 1, at this time, the value of x=m / m0 is lower than 0.8m0, the value of log(x-0.7)+1 and pt0×[log( x-0.7)+1] is less than 0, the control module 2 instructs the vibration mixing table 1 to stop running. When the value of x=m / m0 is greater than 0.8m0, it means that the amount of cement in the mixing drum 12 is moderate, and the vibration mixing table 1 needs to vibrate to assist in concrete mixing. At this time, the value of log(x-0.7)+1 and the value of pt0×[log(x-0.7)+1] are greater than 0, and the control module 2 instructs the vibration mixing table 1 to start with a lower power. When the value of x=m / m0 is greater than 1.8m0, it means that the amount of cement is large, and the vibration mixing table 1 needs to run at a higher power. At this time, the value of log(x-0.7)+1 is greater than 1, and the control module 2 instructs the vibration mixing table 1 to vibrate with a power greater than pt0.
[0048] At the same time, the control module 2 pre-inputs the standard vibration power pj0 of the stirring paddle 13. The control module 2 calculates the vibration power pj of the stirring paddle 13 according to the weight data m, m0 and pj0, wherein 0.2m0≤m≤2m0, pj=pj0×|-1.5x+1.8|, x=m / m0, when the value of m is low, it means that the amount of cement in the mixing drum 12 is small. At this time, the concrete is mainly vibrated by the stirring paddle 13, and the stirring paddle 13 needs to vibrate with a higher power. The value of |-1.5x+1.8| is large. As the value of m approaches 1.2m0, it means that the weight of cement in the mixing drum 12 is moderate. At this time, the vibrating mixing table 1 takes over the vibration function, and the stirring paddle 13 is not required to vibrate. At this time, the value of |-1.5x+1.8| decreases continuously and approaches 0. The control module 2 instructs the vibration motor in the mixing shaft to run at a lower power. When the value of m continues to increase and approaches 2m0, it means that there is more cement in the mixing drum 12, and the stirring paddle 13 needs to be started with a larger power to assist the vibration mixing.
[0049] By making the control module 2 instruct the vibration power of the vibration stirring table 1 according to the value of pt0×[log(x-0.7)+1], and making the control module 2 instruct the vibration power of the stirring paddle 13 according to the value of pj0×|-1.5x+1.8|, the vibration intensity can be adjusted according to needs while achieving precise control of the vibration intensity.
[0050] During the actual vibration stirring process, sometimes due to the failure of the vibrator, the failure of the transmission structure or random failure factors, the vibration intensity in the mixing drum 12 cannot reach the expected value. For this reason, step two also includes: the vibration detector in the mixing drum 12 detects the vibration intensity and frequency, and uploads the detection data to the control module 2. The control module 2 determines whether the vibration intensity and frequency reach the threshold value by comparison. When the judgment result is no, the control module 2 instructs the alarm to start. In this embodiment, there are several vibration detectors in the mixing drum 12, and several vibrators respectively detect their own vibration intensity and upload it to the control module 2. The control module 2 adjusts the vibration intensity threshold value according to the current operating power of the two vibration motors. At the same time, after receiving the vibration intensity monitoring data, the control module 2 compares it with the vibration intensity threshold value to determine whether the vibration intensity reaches the threshold value. When the judgment result of two data is no, it means that there are multiple places in the mixing drum 12 where the vibration intensity cannot reach the expected value and needs to be adjusted. At this time, the control module 2 instructs the alarm to start to remind the operator.
[0051] In the preparation process of the above-mentioned precast concrete components, when the project that needs to use the precast components is large, resulting in a large number of types and quantities of precast components, a management system is needed to monitor the production process and progress by monitoring the on-site data, coordinating the material information and monitoring the estimated time. To this end, the present invention also provides an intensive production management system for precast concrete components, which is suitable for the production process of the above-mentioned precast concrete components, including a management module, a monitoring module, a planning module and a plurality of electronic tags, and the plurality of electronic tags are used to be placed on the surface of a plurality of precast components. In this embodiment, each building component corresponds to an electronic tag, and the electronic tag includes a signal generator pre-buried in the surface of the building component. At the same time, each precast component is set with a number, and the signal generator is pre-programmed to send a signal corresponding to the number of the precast component to the outside;
[0052] At the same time, the management module includes a modeling module and a data storage module. The modeling module is used to establish a digital model for a number of prefabricated components and upload the model data to the data storage module. The data storage module is used to group and archive various data including the model data in units of prefabricated components. In this embodiment, the management module includes a computer, and the data storage module is a data storage device of the computer. When a certain construction project is carried out, the construction project requires a certain number of prefabricated components. The operators number the prefabricated components. At this time, the management module establishes an equal number of data groups in the data storage module. The name of each data group is the number of this prefabricated component. When a certain prefabricated component starts to be produced, the management module calls the data group corresponding to the number of this prefabricated component for standby use, and starts timing at the time of calling, and stores the timing result in the corresponding data group. The operators can check the data group to know how much time has passed since the start of production of the current prefabricated component;
[0053] At the same time, the monitoring module is used to obtain the position of the prefabricated component by reading the electronic tag. In this embodiment, the monitoring module includes a radio frequency receiver. After receiving the signal, the radio frequency receiver parses the prefabricated component number in the signal and notifies the management module. The management module calls this data group and records the position of the prefabricated component at a certain moment in time with the timing. The operator can obtain the position of the prefabricated component at different times by checking the data group;
[0054] In addition, the planning module is used to calculate the number and position of the hanging points according to the model data, and the planning module is used to plan the lifting path. The planning module calculates and generates the theoretical transportation time according to the number, position and lifting path of the hanging points. In this embodiment, different components have different shapes, different numbers and positions of hanging points, and the modeling module also includes the modeling of the hanging points when modeling. The planning module simulates the lifting using the modeling data and determines the lifting time according to the simulation results. Specifically, the number of hanging points is b, the operation time of a single hanging point is t, and the transportation time is b×t. When the transportation time is calculated, the planning module uploads the transportation time to the management module, and the management module stores this data in the data group of the corresponding prefabricated component. The operator can know the theoretical transportation time of the prefabricated component by viewing the data group, and make the next production plan based on it.
[0055] The lifting and transportation of prefabricated components is simulated by setting up a planning module, and the transportation time is generated according to the simulation results. At the same time, the transportation time and other data are stored in groups according to the prefabricated components through the data storage module, which facilitates the visual management of operators and enables operators to know the theoretical transportation time, which facilitates their production planning.
[0056] In the actual production process, sometimes the actual transportation time and the theoretical transportation time may be different due to various factors. When the difference is large, it will deviate from the production plan made by the operator based on the transportation time. In order to reduce such influence, the management module also includes a comparison module, which is used to calculate the actual transportation time according to the position of the prefabricated component and upload the actual transportation time to the comparison module. In this embodiment, the comparison module calculates the difference between the timing of the prefabricated component at the beginning of transportation and the timing value after the transportation is completed to obtain the actual transportation time;
[0057] At the same time, the comparison module calculates the difference between the actual transportation time and the theoretical transportation time by calling the theoretical transportation time, and uses the difference to correct the subsequent theoretical transportation time of the prefabricated component. In this embodiment, after the comparison module obtains the difference, it adds the difference to the theoretical transportation time in the data group corresponding to the next prefabricated component mold waiting to be hoisted;
[0058] By setting up a comparison module to obtain the difference between the actual transportation time and the theoretical transportation time, and correcting the theoretical transportation time of the next prefabricated component mold based on the difference, random errors and the impact of various random factors in the production site on production planning are reduced.
[0059] At the same time, in the above-mentioned difference calculation process, when the difference is too large, there may be major hidden dangers and the operating personnel need to be reminded. For this reason, the comparison module is also used to determine whether the difference exceeds the threshold. When the judgment result is yes, the command alarm is activated. In this embodiment, the comparison module pre-inputs a deviation time threshold, and the comparison module determines whether the difference exceeds the threshold by comparison.
[0060] The degree of mixing of concrete will affect the strength of the components formed after curing, and the mixing uniformity is related to the vibration intensity. Therefore, it is necessary to archive the vibration intensity of the concrete constituting a prefabricated component during the mixing stage, so that the operating personnel can know the relationship between the strength and vibration intensity by viewing the data group. To this end, the management module and the vibration detector are electrically connected and obtain the vibration intensity and frequency data, and upload the data to the data storage module. The data storage module stores the vibration intensity and frequency data of the concrete of this prefabricated component in the data group corresponding to this prefabricated component. After curing and forming, the operating personnel can know the mixing uniformity by viewing the vibration data of this prefabricated component, so as to estimate the strength.
[0061] In the actual production process, there is a probability that equipment or materials that hinder the lifting are piled up on the shortest lifting path. At this time, the transportation module still has a probability of causing collisions with prefabricated components according to the lifting path planned by the planning module. For this reason, it also includes a monitoring module, which is used to scan the volume of objects on the lifting movement path and generate a transportation path collision model. The monitoring module uploads the transportation path collision model to the planning module. The planning module plans the transportation path according to the model data of the prefabricated components and the transportation path collision model. In this embodiment, the monitoring module is a laser radar. The monitoring module establishes a collision model on the transportation path by scanning. After receiving the collision model, the planning module simulates the lifting movement of the prefabricated components currently waiting for lifting. When the lifting movement path has a part that overlaps with the collision model, it means that there is a probability of collision. At this time, the planning module marks the collision point, moves the path away from the collision point, and simulates again until there is no point on the lifting movement path that overlaps with the collision model.
[0062] By setting up a monitoring module, a conflict model is established for the environment on the lifting and transportation path, and the planning module plans and corrects the transportation path according to the model data of the prefabricated components and the transportation path collision model. While automatically generating the path, it avoids collisions during transportation caused by changes in components.
[0063] The working principle and use process of the present invention:
[0064] Put the concrete materials in proportion according to the engineering requirements into the mixing drum 12, the weight detector in the mixing drum 12 detects the weight of the concrete in the mixing drum 12 and uploads the weight monitoring data to the control module 2, the stirring paddle 13 in the mixing drum 12 stirs the cement, the hoisting assembly hoists the prefabricated component mold to the vibrating table, the output end of the mixing drum 12 transports the mixed concrete to the prefabricated component mold, the vibrating table under the prefabricated component mold vibrates the prefabricated component mold and the concrete therein, and the transport assembly hoists the vibrated prefabricated component mold to the stacking site;
[0065] In the above process, the management module stores the transportation time and other data in groups according to the prefabricated components through the data storage module. The planning module calculates the number and positions of the hanging points according to the model data, and generates the theoretical transportation time according to the number, positions and lifting paths of the hanging points. The comparison module calculates the difference between the actual transportation time and the theoretical transportation time by retrieving the theoretical transportation time, and adds the difference to the theoretical transportation time in the data group corresponding to the next prefabricated component mold waiting to be lifted.
[0066] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any brief modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.
Claims
1. A production process for precast concrete components, characterized in that: The following steps are involved: Step 1: Mix the concrete according to the proportion and add it into the mixing drum on the vibrating mixing table; Step 2: The weight detector in the mixing drum detects the weight of the concrete in the mixing drum and uploads the weight monitoring data to the control module. The mixing paddle in the mixing drum stirs the cement. The control module starts the vibrator in the mixing table or the vibrator in the mixing paddle according to the weight data instruction. The vibrator is used to vibrate the cement in the mixing drum. Step 3: The transport component hoists the precast component mold onto the vibrating table, and the output end of the mixing drum transports the mixed concrete into the precast component mold. The vibrating table below the precast component mold vibrates the precast component mold and the concrete therein; Step 4: The transport component hoists the vibrated prefabricated component mold to the stacking site; The step 2 further includes: the control module is pre-input with the standard vibration power pt0 and the standard weight m0 of the vibration stirring table, and the control module calculates the vibration power pt of the vibration stirring table according to the weight data m, m0 and pt0; Wherein, 0.2m0≤m≤2m0, pt=pt0×[log(x-0.7)+1], x=m / m0, when the value of m is lower than 0.8m0, the control module instructs the vibration stirring table to stop running; The step 2 further includes: the control module pre-inputs a standard vibration power pj0 of the stirring paddle, and the control module calculates the vibration power pj of the stirring paddle according to the weight data m, m0 and pj0; Among them, 0.2m0≤m≤2m0, pj=pj0×(|-1.5x+1.8|), x=m / m0.
2. A production process for precast concrete components according to claim 1, characterized in that: The step 2 also includes: the vibration detector in the mixing drum detects the vibration intensity and frequency, and uploads the detection data to the control module. The control module determines whether the vibration intensity and frequency reach the threshold through comparison. When the judgment result is no, the control module instructs the alarm to start.
Citation Information
Patent Citations
A concrete batching plant equipped with a vibratory mixer
CN103101116B
A whole-process management system for precast concrete components
CN109377586B
Concrete mixing plant configured with vibration type mixing main engine
CN103101116A
Precast concrete element production system, concrete vibration device and concrete vibration control method
CN103862552A
Prefabricated building intelligent hoisting system and method
CN107010542A