A project management system development method based on low-code configuration

Simplify the configuration of project management software through low-code configuration methods, support multiple project management modes and automated workflows, solve the problems of complex configuration and insufficient customization in the existing technology, and realize easy-to-use, flexible, efficient and safe projects Management system.

CN117971172BActive Publication Date: 2024-11-26CHINA SCI & TECH (BEIJING) TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410112618.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-26
Publication Date
2024-11-26
Estimated Expiration
2044-01-26

AI Technical Summary

Technical Problem

Existing project management software is complex to meet specific needs, lacks flexibility and user-friendliness, resulting in increased costs and project delays.

Method used

It adopts a low-code configuration method, and uses a graphical user interface to define project structure, workflow and tasks without writing code. It supports multiple project management modes and automated workflows, and provides modular design and integrated API interfaces.

Benefits of technology

Simplifies the configuration process, allowing users without programming backgrounds to easily configure and customize, improves project management flexibility and efficiency, reduces costs, adapts to different project needs, and provides strong security and mobility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117971172B_ABST
    Figure CN117971172B_ABST
Patent Text Reader

Abstract

The present invention provides a project management system development method based on low-code configuration, including: adopting a low-code configuration method, configuring the project management system through a graphical user interface, defining the structure, workflow, tasks and roles of the project by dragging and filling in forms; providing a large number of customization options, customizing the structure, tasks, workflow and reports of the project according to user needs; providing an integrated API interface, using the API interface to expand and integrate other software or services; supporting multiple project management modes; providing a user-friendly interface, displaying all functions and options of the system through an intuitive graphical user interface, and configuring and managing through click and drag operations; supporting automated workflows, and automatically executing common project management tasks. The project management system developed by the present invention is easy to use, flexible, efficient, and scalable, with good mobility and security, meets various project management needs, and improves the quality and efficiency of project management.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of information technology, and in particular, to the field of low-code project management software design technology; specifically, to a project management system development method based on low-code configuration. Background Art

[0002] Project management software is used by enterprises to plan, organize and manage resources to achieve specific project goals. Project management software is a tool used to help organizations plan, organize and manage resources to achieve specific project goals, usually including: task management, time tracking, resource allocation, risk and issue management and other functions.

[0003] Project management software has become an indispensable part of modern enterprises. With the development of information technology, project management software has evolved from the original command line-based tools to the current graphical user interface-based management system.

[0004] However, although these existing project management systems are already quite powerful in terms of functionality, existing project management software usually requires complex programming and configuration to meet specific project requirements. This is very difficult to implement for project managers without a programming background, and they need to rely on IT departments or external suppliers for configuration, which not only increases costs but may also cause project delays.

[0005] In addition, although existing project management software generally provides rich functions, there is a problem that it cannot meet the customized needs of specific enterprises. For example, some enterprises require specific workflows, reports or integrations based on their own special needs, which cannot be directly met by existing project management software.

[0006] Furthermore, existing project management software is usually based on specific project management methods, such as agile project management or waterfall project management models. However, many companies need to use different project management methods or customize their workflows based on the characteristics and needs of the project. Existing project management software lacks the flexibility to customize on demand.

[0007] In addition, existing project management software usually requires users to have a lot of professional technical knowledge in order to use it effectively. The user interface is not user-friendly, which causes users to frequently encounter difficulties during use, affecting their work efficiency and experience.

[0008] Therefore, there is an urgent need for a more efficient, flexible and fast project management system development model that simplifies the configuration process and provides higher customization to solve the above-mentioned pain points and difficult problems of the existing technology. Summary of the invention

[0009] In view of this, the purpose of the present invention is to design and implement an easy-to-configure and highly customizable project management system in combination with the current specific needs and technological development trends; by simplifying the configuration process, users without a programming background can also perform configuration and customization; and support various different project management methods and workflows, improve the flexibility of on-demand customization, and meet the project management needs of different users; at the same time, provide a user-friendly interface, so that users can easily use the project management system without having too much technical knowledge, thereby improving project management efficiency.

[0010] The present invention provides a project management system development method based on low-code configuration, comprising:

[0011] Use a low-code configuration method to configure the project management system through a graphical user interface without writing any code; define the project structure, workflow, tasks and roles by dragging and dropping and filling out forms;

[0012] The low-code configuration method greatly simplifies the configuration process, allowing users without a programming background to easily configure and customize; Low-code or no-code development (Low-Code / No-Code Development) is a new software development method that uses a graphical user interface and predefined modules to enable users to create applications by dragging and configuring parameters. The main advantage of the low-code or no-code development method is that it can significantly simplify the software development process, allowing people without a programming background to create complex applications.

[0013] Provides a large number of customization options to tailor the project structure, tasks, workflows and reports to user needs;

[0014] Provide an integrated API interface, and use the API interface to expand and integrate other software or services to meet the specific needs of different users;

[0015] Support multiple project management modes, including: agile project management mode, waterfall project management mode, hybrid project management mode or a combination of one or more of them;

[0016] Agile project management is a project management and product development method that emphasizes flexibility and interactivity. Agile project management is an iterative development method in which projects are divided into a series of small blocks, each of which is designed, developed, and tested. These small blocks are called "sprints", and each sprint usually lasts for a few weeks. At the end of each sprint, the team evaluates the progress of the project and what may need to be changed, and then starts the next sprint. Agile project management allows teams to adapt to changes more quickly and provide new features and improvements to users more frequently.

[0017] The waterfall project management model is a more traditional project management approach that is linear and sequential. In the waterfall project management model, the project is divided into a series of phases, each of which must be completed before starting the next phase. These phases may include requirements analysis, design, implementation, testing, deployment, and maintenance. Once a phase is completed, you cannot go back to the previous phase to make changes. The waterfall project management model works well for projects where the requirements are clear and unlikely to change.

[0018] The hybrid project management model combines the advantages of agile and waterfall. In a hybrid project management model, some parts of the project may use waterfall methods and other parts use agile methods. For example, the team may use waterfall methods for detailed requirements analysis and design in the early stages of the project, and then switch to agile methods during the implementation and testing phases to be able to adapt to changes more quickly. Hybrid methods provide greater flexibility and can be adjusted to the specific needs of the project.

[0019] Provides a user-friendly interface that displays all functions and options of the project management system through an intuitive graphical user interface, which can be configured and managed through simple click and drag operations;

[0020] Users can choose the most suitable method among agile project management model, waterfall project management model, and hybrid project management model according to project requirements.

[0021] Supports automated workflows to automatically perform common project management tasks including task assignment, status updates, report generation, notifications and reminders, and approval processes.

[0022] Furthermore, the method for automatically executing common project management tasks comprises the following steps:

[0023] S1. Task allocation: When a new task is created, the project management system automatically allocates the new task to a specific member;

[0024] S2, Status Update: When certain conditions of a task are met, the status of the task is automatically updated by the project management system;

[0025] S3. Report generation: The project management system generates a project progress report regularly, and automatically sends the project progress report to all members of the project, or only to specific members, such as the project manager;

[0026] S4. The project management system automatically sends notifications and reminders to help users track the status and progress of tasks;

[0027] For example, when a task is assigned to a user, a notification is automatically sent by the project management system. When a task deadline is approaching, a reminder is automatically sent by the project management system.

[0028] S5. For tasks or decisions that require approval, the project management system will automatically execute the approval process.

[0029] For example, when a task is completed, the project management system automatically sends an approval request to the project manager. The project manager approves the task directly in the system, and then the project management system automatically updates the status of the task.

[0030] Automated workflows allow users to automate repetitive, manual tasks, helping users save time and improve work efficiency.

[0031] Furthermore, the method of automatically updating the status of a task by the project management system in step S2 includes:

[0032] When all subtasks of a task are completed, the project management system automatically updates the status of the task to: completed;

[0033] When the deadline of a task is approaching, the project management system automatically updates the status of the task to: urgent.

[0034] Furthermore, the low-code configuration method includes:

[0035] The modular design allows for flexible addition or removal of functional modules according to the needs of different projects.

[0036] For example, if the project requires time tracking function, a time tracking module can be added; if the project does not require risk management function, the risk management module can be removed; modular design enables the project management system to better adapt to various project needs.

[0037] Furthermore, the allocation rule for allocating new tasks to specific members in step S1 is based on multiple factors including the member's role, skills, and current workload.

[0038] For example, an automated workflow might include checking the type and requirements of a new task and assigning the task to the most appropriate project member based on that information.

[0039] Furthermore, the project progress report of step S3 includes:

[0040] Completed tasks, uncompleted tasks, upcoming deadlines.

[0041] Furthermore, the format and content of the project progress report in step S3 are configured according to user needs.

[0042] Furthermore, the project management system development method based on low-code configuration also includes:

[0043] Provides extensive help and tutorials to help users understand and use the project management system.

[0044] The project management system developed by the present invention supports multiple roles, such as project manager, team member, stakeholder, etc. Each role has its own authority and function, and the configuration and function of the system can be customized according to the needs of the role. It supports mobile devices, and users can access and manage projects through mobile phones or tablets. It provides greater flexibility, allowing users to manage projects anywhere and at any time.

[0045] The project management system developed by the present invention provides powerful security and privacy protection functions, such as data encryption, user authentication, authority control, etc.

[0046] Among them, the configuration information of data encryption includes the selected encryption algorithm (such as AES, RSA, etc.), the generation and management method of encryption keys, the scope of encryption (such as whether to encrypt all data or only sensitive data), and the encryption mode (such as ECB, CBC, CFB, OFB, etc.).

[0047] The configuration information for user authentication includes the selected authentication method (such as username and password authentication, email or mobile phone verification code authentication, multi-factor authentication, etc.), the settings of the authentication steps (such as whether email confirmation or mobile phone verification code confirmation is required), and the handling method of authentication failure (such as whether to lock the account or send a warning notification).

[0048] The configuration information of permission control includes the defined roles and permissions (such as administrators, ordinary users, etc.), the settings of access control lists (such as which roles can access which resources), and the approval process for permission changes (such as whether the administrator is required to approve permission changes). These permission control configuration information are set in the management interface of the project management system. Users can choose the appropriate configuration options according to their needs to achieve the desired security and permission control effects and protect user data and information from unauthorized access and use.

[0049] Through the above technical means and measures, the project management system developed based on low-code configuration becomes more powerful and flexible, and can better meet various project management needs.

[0050] The present invention also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the project management system development method based on low-code configuration as described above.

[0051] The present invention also provides a computer device, which includes a memory, a processor, and a computer program stored in the memory and executable on the processor, and when the processor executes the program, the steps of the project management system development method based on low-code configuration as described above are implemented.

[0052] The project management system development method and development system based on low-code configuration provided by the present invention have the following advantages over the prior art:

[0053] 1. Ease of use: Due to the use of low-code configuration, the system can be configured and customized without writing code, so that users without programming background can easily use the system. The design of low-code configuration lowers the threshold for use, making project management tools no longer the patent of IT professionals, but can be used by a large number of non-professionals. For many small and medium-sized enterprises, it greatly reduces the difficulty and complexity of project management and improves the efficiency and quality of project management.

[0054] 2. Flexibility: The system provides a wealth of customization options and supports a variety of project management methods, allowing users to customize the system according to their needs. The customized design makes the system extremely flexible and can adapt to various project requirements. Whether it is agile project management or traditional waterfall project management, it can be effectively supported and managed through the system. It is not only applicable to software development projects, but also to various other types of projects, such as construction projects, design projects, R&D projects, etc.

[0055] 3. Efficiency improvement: The system's automated workflow and data-driven decision support help users save time and improve work efficiency. Automated workflows can automatically perform some common project management tasks, such as task assignment, status updates, report generation, etc., thereby saving users' time and energy. Data-driven decision support can help users better understand and manage projects, track key indicators such as project progress, performance, and risks through data reports, and support data-driven decision making. The design of automated workflows and data-driven decision support makes project management more scientific and precise, greatly improving the efficiency and quality of project management.

[0056] 4. Scalability: The modular design and integrated API interface of the system enable the system to be easily expanded and integrated with other software or services. The modular design and integrated API interface design make the system highly scalable and can be flexibly expanded and modified according to the development and needs of the project. Whether adding new functional modules or integrating other software or services, it can be easily and quickly implemented through the system. Scalability enables the system to not only meet current project management needs, but also adapt to future project management needs.

[0057] 5. Mobility: The system's mobile devices allow users to manage projects anywhere and at any time. The design of mobility makes project management no longer limited to a specific place and time, but can be carried out anytime and anywhere. Whether in the office, at home, or even on the road, you can access and manage projects through your mobile phone or tablet. The design of mobility makes project management more convenient and flexible, greatly improving the efficiency and quality of project management.

[0058] 6. Security: The system's powerful security and privacy protection functions can protect users' data and information from unauthorized access and use. The design of security and privacy protection functions makes the system extremely secure and can effectively prevent data leakage and information theft. Whether it is data encryption, user authentication, or even permission control, it can be effectively implemented through the system. The security design allows users to use the system with confidence without worrying about the security of data and information.

[0059] Compared with the prior art, the present invention has the following beneficial effects:

[0060] The project management system development method based on low-code configuration provided by the present invention adopts a low-code configuration method, which simplifies the configuration process, so that users without programming background can also easily configure, customize and use the project management system; it adopts a modular design, and can flexibly add or remove functional modules according to the needs of different projects, which solves the shortcomings of existing project management software such as complex configuration, insufficient customization, lack of flexibility and unfriendly user interface, and meets the specific needs of different users; the project management system developed by the present invention is easy to use, flexible, efficient, and scalable, and has good mobility and security, which effectively improves the quality and efficiency of project management. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the following detailed description of the preferred embodiment.The drawings are only for the purpose of illustrating the preferred embodiments and are not to be construed as limiting the invention.

[0062] In the attached picture:

[0063] Figure 1An interface diagram for defining a project by filling in a form in an embodiment of the present invention;

[0064] Figure 2 An interface diagram for defining the structure, workflow, tasks and roles of a project by dragging and dropping in an embodiment of the present invention;

[0065] Figure 3 Product architecture diagram of a low-code configuration-based project management system developed for an embodiment of the present invention;

[0066] Figure 4 A flow chart of the method for automatically performing common project management tasks according to the present invention;

[0067] Figure 5 The figure is a schematic diagram of the structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0068] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The implementations described in the following exemplary embodiments do not represent all implementations consistent with the present disclosure. Instead, they are merely examples of systems and products consistent with some aspects of the present disclosure as detailed in the appended claims.

[0069] The terms used in this disclosure are for the purpose of describing specific embodiments only and are not intended to limit the disclosure. The singular forms of "a", "said" and "the" used in this disclosure and the appended claims are also intended to include plural forms unless the context clearly indicates otherwise. It should also be understood that the term "and / or" used herein refers to and includes any or all possible combinations of one or more associated listed items.

[0070] It should be understood that although the terms first, second, third, etc. may be used in the present disclosure to describe various information, such information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of the present disclosure, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Depending on the context, the word "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining".

[0071] The embodiments of the present invention are described in further detail below.

[0072] An embodiment of the present invention provides a project management system development method based on low-code configuration, including:

[0073] Using a low-code configuration method, the project management system is configured through a graphical user interface without writing any code; the structure, workflow, tasks and roles of the project are defined by dragging and dropping and filling out forms (see Figure 1 , 2 shown);

[0074] The low-code configuration method includes:

[0075] The modular design allows for flexible addition or removal of functional modules according to the needs of different projects.

[0076] If the project requires time tracking function, a time tracking module can be added; if the project does not need risk management function, the risk management module can be removed; modular design enables the project management system to better adapt to various project needs.

[0077] The low-code configuration method greatly simplifies the configuration process, allowing users without a programming background to easily configure and customize; Low-code or no-code development (Low-Code / No-Code Development) is a new software development method that uses a graphical user interface and predefined modules to enable users to create applications by dragging and configuring parameters. The main advantage of the low-code or no-code development method is that it can significantly simplify the software development process, allowing people without a programming background to create complex applications.

[0078] Provides a large number of customization options to tailor the project structure, tasks, workflows and reports to user needs;

[0079] Provide an integrated API interface, and use the API interface to expand and integrate other software or services to meet the specific needs of different users;

[0080] Support multiple project management modes, including agile project management mode, waterfall project management mode and hybrid project management mode;

[0081] Provides a user-friendly interface that displays all functions and options of the project management system through an intuitive graphical user interface, which can be configured and managed through click and drag operations;

[0082] Supports automated workflows to automatically perform common project management tasks including task assignment, status updates, report generation, notifications and reminders, and approval processes.

[0083] For methods of automating common project management tasks, see Figure 4 As shown, the following steps are included:

[0084] S1. Task allocation: When a new task is created, the project management system automatically allocates the new task to a specific member;

[0085] The allocation rules for allocating new tasks to specific members are based on multiple factors including the member's role, skills, and current workload.

[0086] S2, Status Update: When certain conditions of a task are met, the status of the task is automatically updated by the project management system;

[0087] The method for automatically updating the status of a task by a project management system comprises:

[0088] When all subtasks of a task are completed, the project management system automatically updates the status of the task to: completed;

[0089] When the deadline of a task is approaching, the project management system automatically updates the status of the task to: urgent.

[0090] S3. Report generation: The project management system generates a project progress report regularly, and automatically sends the project progress report to all members of the project, or only to specific members (such as the project manager);

[0091] The project progress report includes:

[0092] Completed tasks, uncompleted tasks, upcoming deadlines.

[0093] The format and content of the project progress report are configured according to user needs.

[0094] S4. The project management system automatically sends notifications and reminders to help users track the status and progress of tasks;

[0095] When a task is assigned to a user, a notification is automatically sent by the project management system. When a task's deadline is approaching, a reminder is automatically sent by the project management system.

[0096] S5. For tasks or decisions that require approval, the project management system will automatically execute the approval process.

[0097] When a task is completed, the project management system automatically sends an approval request to the project manager. The project manager approves the task directly in the system, and then the project management system automatically updates the status of the task.

[0098] In this embodiment, the project management system development method based on low-code configuration also includes:

[0099] Provides extensive help and tutorials to help users understand and use the project management system.

[0100] Figure 3 The product architecture of the project management system based on low-code configuration developed in this embodiment is shown.

[0101] An embodiment of the present invention further provides a computer device, Figure 5 is a schematic diagram of the structure of a computer device provided by an embodiment of the present invention; see the accompanying drawings Figure 5 As shown, the computer device includes: an input system 23, an output system 24, a memory 22 and a processor 21; the memory 22 is used to store one or more programs; when the one or more programs are executed by the one or more processors 21, the one or more processors 21 implement the project management system development method based on low-code configuration as provided in the above embodiment; wherein the input system 23, the output system 24, the memory 22 and the processor 21 can be connected by a bus or other means, Figure 5 The example of connecting through bus is taken in the following.

[0102] The memory 22 is a readable and writable storage medium of a computing device, which can be used to store software programs, computer executable programs, such as the corresponding program instructions of the project management system development method based on low-code configuration described in the embodiment of the present invention; the memory 22 may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system, at least one application required for a function; the data storage area may store data created according to the use of the device, etc.; in addition, the memory 22 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage device; in some instances, the memory 22 may further include a memory remotely arranged relative to the processor 21, and these remote memories may be connected to the device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0103] The input system 23 may be used to receive input digital or character information, and to generate key signal input related to user settings and function control of the device; the output system 24 may include display devices such as display screens.

[0104] The processor 21 executes various functional applications and data processing of the device by running software programs, instructions and modules stored in the memory 22, thereby realizing the above-mentioned project management system development method based on low-code configuration.

[0105] The computer device provided above can be used to execute the project management system development method based on low-code configuration provided in the above embodiment, and has corresponding functions and beneficial effects.

[0106] The embodiment of the present invention also provides a storage medium containing computer executable instructions, which are used to execute the project management system development method based on low-code configuration as provided in the above embodiment when executed by a computer processor. The storage medium is any of various types of memory devices or storage devices, and the storage medium includes: installation media, such as CD-ROM, floppy disk or tape system; computer system memory or random access memory, such as DRAM, DDRRAM, SRAM, EDO RAM, Rambus RAM, etc.; non-volatile memory, such as flash memory, magnetic media (such as hard disk or optical storage); registers or other similar types of memory elements, etc.; the storage medium may also include other types of memory or a combination thereof; in addition, the storage medium may be located in a first computer system in which the program is executed, or may be located in a different second computer system, which is connected to the first computer system via a network (such as the Internet); the second computer system may provide program instructions to the first computer for execution. The storage medium includes two or more storage media that may reside in different locations (for example, in different computer systems connected via a network). The storage medium may store program instructions (for example, specifically implemented as a computer program) that can be executed by one or more processors.

[0107] Of course, the storage medium containing computer executable instructions provided by an embodiment of the present invention, whose computer executable instructions are not limited to the project management system development method based on low-code configuration as described in the above embodiment, can also execute related operations in the project management system development method based on low-code configuration provided by any embodiment of the present invention.

[0108] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.

[0109] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A project management system development method based on low-code configuration, characterized in that: include: Adopt low-code configuration method to configure the project management system through the graphical user interface without writing any code; Define project structure, workflow, tasks and roles by dragging and dropping and filling out forms; Provides a large number of customization options to tailor the project structure, tasks, workflows and reports to user needs; Provide an integrated API interface, and use the API interface to expand and integrate other software or services to meet the specific needs of different users; Support multiple project management modes, including: agile project management mode, waterfall project management mode, hybrid project management mode or a combination of one or more of them; Provides a user-friendly interface that displays all functions and options of the project management system through an intuitive graphical user interface, which can be configured and managed through click and drag operations; Supports automated workflows to automatically perform common project management tasks including task assignment, status updates, report generation, notifications and reminders, and approval processes; The method for automating common project management tasks comprises the following steps: S1. Task allocation: When a new task is created, the project management system automatically allocates the new task to a specific member; S2, Status Update: When certain conditions of a task are met, the status of the task is automatically updated by the project management system; S3. Report generation: The project management system generates a project progress report regularly, and automatically sends the project progress report to all members of the project, or only to specific members; S4. The project management system automatically sends notifications and reminders to help users track the status and progress of tasks; S5. For tasks or decisions that require approval, the project management system automatically executes the approval process; The method of automatically updating the status of a task by the project management system in step S2 includes: When all subtasks of a task are completed, the project management system automatically updates the status of the task to: completed; When the deadline of a task is approaching, the project management system automatically updates the status of the task to: urgent.

2. The project management system development method based on low-code configuration according to claim 1 is characterized in that: The low-code configuration method includes: The modular design allows for flexible addition or removal of functional modules according to the needs of different projects.

3. The project management system development method based on low-code configuration according to claim 1 is characterized in that: The allocation rule for allocating the new task to a specific member in step S1 is based on multiple factors including the member's role, skills, and current workload.

4. The project management system development method based on low-code configuration according to claim 1 is characterized in that: The project progress report of step S3 includes: Completed tasks, uncompleted tasks, upcoming deadlines.

5. The project management system development method based on low-code configuration according to claim 1 is characterized in that: The format and content of the project progress report in step S3 are configured according to user needs.

6. The method for developing a project management system based on low-code configuration according to claim 1, characterized in that: The project management system development method based on low-code configuration also includes: Provides extensive help and tutorials to help users understand and use the project management system.

7. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps of the project management system development method based on low-code configuration are implemented as described in any one of claims 1-6.

8. A computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, it implements the steps of the project management system development method based on low-code configuration as described in any one of claims 1-6.