Engineering management system, method, electronic device and computer readable storage medium
Through the BIM6D model-driven engineering management system, the problems of safety accidents and substandard quality during the construction process were solved, the improvement of project quality and the reduction of safety accidents were achieved, and cost and environmental optimization solutions were provided.
Patent Information
- Application Number
- CN202410198249.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-22
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-02-22
AI Technical Summary
During the construction process, existing technology relies on manual management and is prone to safety accidents and substandard project quality.
Adopt a project management system based on BIM6D model, including safety management module, quality management module, cost management module, energy consumption management module and progress management module, to improve project management by establishing risk information database, virtual construction, cost adjustment and carbon emission optimization level and reduce the probability of safety accidents.
It effectively improves the level of project management, ensures that project quality meets standards, reduces the probability of safety accidents, and provides cost and environmental impact optimization solutions.
Smart Images

Figure CN118014362B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of engineering management, and in particular, to an engineering management system, method, electronic device and computer-readable storage medium. Background Art
[0002] During the construction process of the project, it is necessary to reasonably manage relevant factors such as safety, quality, cost, progress, etc. in order to ensure its successful completion.
[0003] Related technologies often rely on manual management of projects, which can easily lead to safety accidents, substandard project quality and other problems. Summary of the invention
[0004] The purpose of the embodiments of the present application is to provide a project management system, method, electronic device and computer-readable storage medium to improve the overall management level of the project and to effectively reduce the probability of safety accidents while ensuring that the project quality meets the standards.
[0005] In the first aspect, the embodiment of the present application provides a project management system, which includes: a safety management module, which is used to establish a risk information library according to the safety influencing factors involved in each construction node, so as to determine the risk information existing at the construction site according to the risk information library; wherein the various construction nodes are arranged according to the construction plan, and the construction plan is obtained by the BIM6D model based on the project information; a quality management module, which is used to use the BIM6D model to perform virtual construction and obtain virtual construction results, so as to manage the construction quality according to the virtual construction results; wherein the BIM6D model performs virtual construction according to the construction plan and quality control information. In this way, the overall management level of the project can be improved, and the probability of safety accidents can be effectively reduced while the project quality meets the standards.
[0006] Optionally, the safety management module is further used to determine the safety information of the construction personnel at the current construction node according to the location information of the construction personnel at the construction site and the risk information library. In this way, the probability of accidents occurring to the construction personnel at the construction site can be estimated, so as to achieve the purpose of early warning and improve the safety of personnel.
[0007] Optionally, the system further includes: a cost management module, which is used to determine the cause of the inconsistency between the actual cost data and the estimated cost data when the actual cost data is inconsistent with the estimated cost data; and adjust the construction plan according to the cause. In this way, the cause of the deviation of the cost data can be determined, so as to reasonably adjust the construction plan.
[0008] Optionally, the cost management module is further used to: if the actual cost data is inconsistent with the estimated cost data due to the increase in the price of construction materials, the BIM6D model is used to classify the construction materials, so as to manage the cost information of different categories of construction materials through the classification results; if the actual cost data is inconsistent with the estimated cost data due to secondary transportation, the BIM6D model is used to calculate the transportation information, so as to manage the cost information of secondary transportation through the transportation information. In this way, when the cost data deviates due to the increase in material prices and secondary transportation, a corresponding cost adjustment plan can be provided to help managers reasonably adjust the construction plan.
[0009] Optionally, the system further includes: an energy consumption management module, which is used to use the BIM6D model to perform virtual construction on different construction schemes of the current construction node; for each construction scheme, calculate the carbon emissions generated by the construction scheme during virtual construction; and determine the construction scheme with carbon emissions less than a preset carbon emission as the optimal construction scheme. In this way, the optimal construction scheme for the current construction node can be determined by carbon emissions, thereby reducing the impact on the environment.
[0010] Optionally, the system further includes: a progress management module, which is used to obtain a standby construction plan using the BIM6D model, and to perform virtual construction according to the standby construction plan; wherein the construction plan is a standby construction plan when the virtual construction result meets the preset requirements. In this way, a feasible construction plan can be determined, laying a solid foundation for the successful implementation of the project.
[0011] On the second aspect, the embodiment of the present application provides a project management method, which includes: using the BIM6D model to process project information to obtain a construction plan; establishing a risk information library according to the safety influencing factors involved in each construction node, so as to determine the risk information existing at the construction site according to the risk information library; wherein the various construction nodes are arranged according to the construction plan; inputting quality control information into the BIM6D model, so that the BIM6D performs virtual construction according to the quality control information and the construction plan to obtain a virtual construction result; and managing the project according to the virtual construction result and the risk information. In this way, the overall management level of the project can be improved, and the probability of safety accidents can be effectively reduced while the project quality meets the standards.
[0012] In a third aspect, an embodiment of the present application provides an electronic device, comprising a processor and a memory, wherein the memory stores computer-readable instructions, and when the computer-readable instructions are executed by the processor, the steps in the method provided in the second aspect are executed.
[0013] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps in the method provided in the second aspect are performed.
[0014] In a fifth aspect, an embodiment of the present application provides a computer program product, which includes a computer program or instructions, and when the computer program or instructions are executed by a processor, the method described in the second aspect is performed.
[0015] Other features and advantages of the present application will be described in the following description, and partly become apparent from the description, or be understood by practicing the embodiments of the present application. The purpose and other advantages of the present application can be realized and obtained by the structures specifically pointed out in the written description, claims, and drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments of the present application will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 A structural block diagram of an engineering management system provided in an embodiment of the present application;
[0018] Figure 2 A structural block diagram of an engineering management platform provided in an embodiment of the present application;
[0019] Figure 3 A flowchart of an engineering management method provided in an embodiment of the present application;
[0020] Figure 4 A schematic diagram of the structure of an electronic device for executing an engineering management method provided in an embodiment of the present application. DETAILED DESCRIPTION
[0021] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only a part of the embodiments of the present application, rather than all of the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present application.
[0022] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in subsequent drawings. At the same time, in the description of this application, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0023] It should be noted that the embodiments in this application or the technical features in the embodiments may be combined if there is no conflict.
[0024] In the related technology, there are problems that safety accidents are prone to occur and the quality of the project does not meet the standards. In order to solve this problem, this application provides a project management system, method, electronic device and computer-readable storage medium. Furthermore, this application establishes a project management system through BIM6D, so as to use the safety management module in the system to determine the risk information existing on the construction site, and use its quality management module to manage the construction quality. In this way, the overall management level of the project can be improved, and the probability of safety accidents can be effectively reduced while the project quality meets the standards.
[0025] The defects existing in the solutions in the above-mentioned related technologies are the results obtained by the inventor after practice and careful research. Therefore, the discovery process of the above-mentioned problems and the solutions proposed in the embodiments of the present invention below for the above-mentioned problems should all be the contributions made by the inventor to the present invention during the process of the present invention.
[0026] In some application scenarios, the above-mentioned engineering management system can be deployed in a server, server cluster or cloud platform. It can obtain data from multiple detection devices deployed at the construction site, data sent by operators through their terminals, etc., so that the project can be managed based on various data.
[0027] Please refer to Figure 1 , which shows a structural block diagram of an engineering management system provided by the present application. Figure 1 As shown, the engineering management system 10 may include a safety management module 101 and a quality management module 102 .
[0028] The safety management module 101 is used to establish a risk information database based on the safety influencing factors involved in each construction node, so as to determine the risk information existing at the construction site based on the risk information database; wherein, the various construction nodes are arranged according to the construction plan, and the construction plan is obtained by the BIM6D model based on the engineering information.
[0029] The above-mentioned BIM6D model is an extended form of the BIM model (Building Information Modeling, BIM for short). It is a six-dimensional data model formed by expanding the three dimensions of cost, progress and energy consumption on the basis of the three dimensions of the original BIM model.
[0030] It should be noted that the BIM6D model is an existing model. This application aims to use the BIM6D model to process data, so as to reasonably manage the project based on the data processing results. Therefore, the process of data processing using the BIM6D model is not described in detail here.
[0031] The above-mentioned project information is also information related to project management, which may include, for example, environmental information of the construction site, information of deployed construction personnel, information of deployed construction tools, project goals, etc.
[0032] By inputting the engineering information into the BIM6D model, a construction plan can be obtained. Among them, the construction plan can arrange the construction nodes in the order of the time of construction. The above-mentioned construction nodes are also the various links of construction, which can include, for example, the construction preparation link (which can be specific to the zero-time road construction node, the original topography and landform mapping node, etc.), the foundation construction link (for example, it can be specific to the earth excavation node, the waterproof construction node, etc.), the main structure construction link (for example, it can be specific to the steel bar binding node, the concrete pouring node, etc.), the decoration link (for example, it can be specific to the internal and external wall plastering node, the coating node, etc.), etc.
[0033] There are safety factors at most construction nodes, which may include construction process factors, engineering structure factors, geological environment factors, etc. For example, when construction workers are pouring concrete in high-rise buildings or deep foundation pits, there is a risk of falling if there are no effective guardrails or safety nets; when construction workers are in soft soil layers with high water content, there is a risk of ground collapse, etc.
[0034] Then, the safety influencing factors designed for each construction node can be obtained to establish a risk information library. In some application scenarios, for example, weights can be assigned to safety influencing factors according to the probability of accidents occurring at the same construction node in history, so that the risk information library can store the correlation between each safety influencing factor and its weight, so that the multiple weights corresponding to the multiple safety influencing factors involved can be weighted and summed to obtain the sum value corresponding to the current construction node. This sum value can also be regarded as the probability of risk occurrence (that is, risk information). In other application scenarios, for example, the probability of accidents occurring at the same construction node in history due to safety influencing factors can also be directly determined as the probability of risk occurrence.
[0035] After knowing the risk of accidents caused by various safety factors in each construction node, facilities to prevent accidents can be deployed in advance, thereby reducing the probability of accidents and improving construction safety.
[0036] The quality management module 102 is used to use the BIM6D model to perform virtual construction and obtain virtual construction results, so as to manage the construction quality according to the virtual construction results; wherein the BIM6D model performs virtual construction according to the construction plan and quality control information.
[0037] The above-mentioned quality control information is also the construction specification data, which may include, for example, design specification data of building structure, electromechanical equipment, or data such as specifications and models of building materials, manufacturer information, and corresponding test reports, certificates, etc.
[0038] Then, the quality control information can be input into the BIM6D model so that it can be combined with the construction plan for virtual construction and obtain virtual construction results. The above virtual construction results may include, for example, the building structure in 3D mode, dynamic simulation video of the construction process, the flow of personnel and equipment during the construction process, etc. Therefore, according to these virtual construction results, personnel, equipment, etc. can be reasonably dispatched to work in the direction of building a qualified building structure, thereby increasing the probability of meeting the project quality standards.
[0039] In some application scenarios, after obtaining the virtual construction results, the quality management module 102 can also display them visually to the construction personnel, for example, to improve the construction personnel's understanding of the construction project and its quality objectives.
[0040] In addition, the quality management module 102 can also obtain data from various types of testing equipment deployed at the construction site to clarify changes in various types of data, so as to facilitate timely adjustment of personnel structure, use of materials, etc.
[0041] Furthermore, if quality problems occur during actual construction, historical project data can be combined for analysis to facilitate the development of remedial solutions. For example, if the quality problem is that the concrete structure does not meet the standards, historical project data of concrete quality problems encountered in similar projects can be obtained. The above historical project data may include, for example, information such as the design proportion of concrete, construction technology, environmental conditions, remedial measures taken and their effects, and reasons for non-compliance. Then, the historical project that is most similar to the current construction project can be found to compare the project data of the current construction project with its project data, so as to infer a remedial solution.
[0042] In this implementation, the safety management module 101 and the quality management module 102 can improve the overall management level of the project, and can effectively reduce the probability of safety accidents while ensuring that the project quality meets the standards.
[0043] In some optional implementations, the safety management module 101 is further used to determine the safety information of the construction personnel at the current construction node according to the location information of the construction personnel at the construction site and the risk information library.
[0044] In some application scenarios, construction workers can, for example, wear smart positioning devices such as hard hats, mobile phones, or bracelets with positioning kinetic energy to send their location information to the engineering management system 10.
[0045] After the engineering management system 10 transmits the location information of the construction personnel to the safety management module 101, the safety management module 101 can determine the probability of an accident occurring at the current construction node in combination with the risk information stored in the risk information library, thereby reminding the construction personnel to pay attention to safety and sending early warning information to relevant management personnel.
[0046] In this implementation, the probability of accidents occurring to construction workers at the construction site can be estimated, thereby achieving the purpose of early warning and improving personnel safety.
[0047] In some application scenarios, if an accident occurs at a construction site, a rescue plan can be formulated based on pre-collected environmental information and building structure information of the accident site, location information of trapped persons, etc., to improve the safety of rescuers and trapped persons.
[0048] In some optional implementations, the engineering management system 10 further includes: a cost management module for determining the cause of the inconsistency between the actual cost data and the estimated cost data when the two are inconsistent; and adjusting the construction plan according to the cause.
[0049] In some application scenarios, the estimated cost data can be calculated, for example, by using the material unit price, material quantity, personnel cost, number of personnel, etc. stated in the construction plan. The material unit price, personnel cost, etc. can be determined, for example, by the actual cost of historical projects.
[0050] Then, when a certain construction node is completed, the actual cost of the construction node is calculated to obtain the above-mentioned actual cost data.
[0051] For a construction node, if the corresponding actual cost data is inconsistent with the estimated cost data, the cause of the inconsistency can be determined by comparing multiple factors related to the cost, so as to adjust the construction plan according to the determined cause. The above-mentioned cost-related factors may include, for example, the quantity of materials, material type, material price, personnel composition structure, equipment quantity, equipment price, construction time, etc.
[0052] In some application scenarios, if the cost management module finds that the actual cost data is inconsistent with the estimated cost data, for example, an alarm signal can be issued to help managers make relevant stop-loss operations in a timely manner.
[0053] In this implementation, the cause of the deviation in cost data can be determined so as to reasonably adjust the construction plan.
[0054] In some application scenarios, there is a time interval between the formulation of the construction plan and the actual construction. During this time interval, the price of the required materials is in a state of fluctuation. Therefore, there is often a situation where the actual cost is inconsistent with the estimated cost due to the fluctuation of material prices. In addition, during the actual construction, there is also a situation where materials need to be transported twice due to operational errors or other reasons.
[0055] Therefore, in some optional implementations, the cost management module is further used to: if the actual cost data is inconsistent with the estimated cost data due to an increase in the prices of construction materials, the BIM6D model is used to classify the construction materials, so as to manage the cost information of different categories of construction materials through the classification results; if the actual cost data is inconsistent with the estimated cost data due to secondary transportation, the BIM6D model is used to calculate the transportation information, so as to manage the cost information of secondary transportation through the transportation information.
[0056] In other words, if the reason for the inconsistency between the actual cost data and the estimated cost data is the increase in the prices of construction materials, BIM6D can be used to classify the construction materials according to their categories, specifications, etc., and then the usage and prices of materials of the same category and / or the same specification can be compared to determine whether there are substitutes, whether savings can be made, etc., thereby reducing costs.
[0057] If the actual cost data is inconsistent with the estimated cost data due to the need for secondary transportation, BIM6D can calculate transportation information such as the location before transportation, the location to be transported, the transportation route, and the transportation cost, so as to determine the best transportation plan. The above-mentioned best transportation plan can be, for example, the plan with the lowest cost or the shortest transportation route.
[0058] In this implementation, when cost data deviates due to rising material prices and secondary transportation, a corresponding cost adjustment plan can be provided to reasonably adjust the construction plan.
[0059] Furthermore, the cost management module can store the cost-related data in the cost database in advance so that the above-mentioned BIM6D can obtain it at any time. Then, BIM6D can also dynamically present the changes in cost data according to the construction plan, so that relevant managers can grasp the cost change trend in real time and improve cost management efficiency. The above-mentioned cost-related data can be, for example, the material unit price, personnel expenses, etc. mentioned above.
[0060] In some application scenarios, there may be different construction methods for the same construction project, and the impact of different construction methods on the environment varies.
[0061] Therefore, in some optional implementations, the engineering management system 10 also includes: an energy consumption management module, which is used to use the BIM6D model to perform virtual construction on different construction plans of the current construction node; for each construction plan, calculate the carbon emissions generated by the construction plan during virtual construction; and determine the construction plan whose carbon emissions are less than the preset carbon emissions as the optimal construction plan.
[0062] The above-mentioned carbon emissions refer to the total amount of greenhouse gases emitted into the atmosphere directly or indirectly by human activities in production and life activities.
[0063] In some application scenarios, for example, the carbon emission factors in the construction plan can be determined first, and then the carbon emission factors can be input into the BIM6D model so that the BIM6D model can calculate the carbon emissions corresponding to the construction plan. The above carbon emission factors can include, for example, information on activities that can generate carbon emissions (such as combustion) in the transportation, installation and waste disposal stages.
[0064] In some application scenarios, for example, equipment that monitors environmental data such as dust, noise, temperature, and humidity can be deployed at the construction site so that when certain environmental data is abnormal, the control equipment can be turned on in time to improve the environmental quality. For example, if the temperature data is too high, the industrial exhaust fan can be turned on to cool down.
[0065] In this implementation, the optimal construction plan for the current construction node can be determined by carbon emissions, thereby reducing the impact on the environment.
[0066] In some optional implementations, the engineering management system 10 also includes: a progress management module, which is used to use the BIM6D model to obtain a standby construction plan, and perform virtual construction according to the standby construction plan; wherein the construction plan is a standby construction plan when the virtual construction results meet preset requirements.
[0067] As mentioned above, the engineering management system 10 can use the BIM6D model to obtain a construction plan. However, not every construction plan is feasible, so it is necessary to verify the construction plan output by the BIM6D model to determine a feasible construction plan. Among them, the construction plan that has not been verified is the above-mentioned standby construction plan.
[0068] Furthermore, the BIM6D model can be used to perform virtual construction on the construction plan to be used, and a virtual construction result can be obtained. Then, the feasibility of the construction plan to be used can be determined by verifying whether the virtual construction result meets the preset requirements.
[0069] The above-mentioned preset requirements may, for example, include that the construction personnel and construction materials allocated in the construction plan can complete the corresponding amount of work within the specified time.
[0070] In some application scenarios, for example, the progress of the project can be checked through the progress management module to determine whether the project progress matches the construction plan, so that the construction plan can be adjusted in real time if it does not match. For example, the progress can be accelerated by adding construction personnel and construction equipment.
[0071] In this implementation, a practical construction plan can be determined, laying a solid foundation for the successful implementation of the project.
[0072] It should be noted that the above-mentioned project management system 10 can be used to manage above-ground projects or underground projects.
[0073] In some application scenarios, if it is used to manage underground projects, it can be achieved through Figure 2 The engineering management platform 20 including the engineering management system 10 described above implements relevant management operations. The engineering management platform 20 may include a data layer 201 , an analysis layer 202 , an application layer 203 and a user layer 204 .
[0074] Among them, data layer 201 includes such as regional basic geographic data, regional model information data, construction specification standard data and construction management data, thereby providing a rich and detailed data source for management engineering. The above-mentioned regional basic geographic data may include, for example, the historical planning data of the region, three-dimensional geological data, etc.; the regional model information data may include, for example, data such as building data, greening, land use type, etc. of the above-ground part; and data such as buildings, transportation, and municipal pipe networks of the underground part. Construction specification standard data may include, for example, the current design specifications, technical specifications, and control standards for the construction of underground space. Construction management data may include, for example, data such as machinery and equipment information, personnel information, and material lists.
[0075] The analysis layer 202 is provided with a variety of algorithms to operate on the data according to the calculation requirements. The BIM6D model can be provided in this layer.
[0076] The application layer 203 is also the location where the quality management module 102, safety management module 101, cost management module, energy consumption management module and progress management module mentioned above are set. Each module can obtain relevant data from the data layer 201 and the analysis layer 202 to reasonably manage the project. The process of managing the project through each module can be referred to in Figure 1 The various implementation methods of the illustrated embodiment are not described in detail here.
[0077] The user layer 204 includes various participants involved in the underground project, and each participant can receive or request relevant information. The participants may include, for example, construction units, design units, owner units, supervision units, and suppliers.
[0078] In this embodiment, the underground project can be reasonably managed through the engineering management platform 20, so that the engineering quality meets the standards and the probability of safety accidents is effectively reduced. In addition, since the engineering management platform 20 includes detailed data involved in the construction process, it is also possible to combine these data for engineering quantity settlement and completion acceptance.
[0079] Please refer to Figure 3 , which shows a flow chart of an engineering management method provided by an embodiment of the present application. Figure 3 As shown, the engineering management method includes the following steps 301 to 304.
[0080] Step 301, using the BIM6D model to process the project information and obtain a construction plan;
[0081] Step 302, establishing a risk information database according to the safety influencing factors involved in each construction node, so as to determine the risk information existing in the construction site according to the risk information database; wherein the construction nodes are arranged according to the construction plan;
[0082] Step 303, inputting the quality control information into the BIM6D model, so that the BIM6D performs virtual construction according to the quality control information and the construction plan to obtain a virtual construction result;
[0083] Step 304: managing the project according to the virtual construction results and the risk information.
[0084] It should be noted that the implementation process of the above-mentioned engineering management method and the technical effects achieved may be the same or similar to the implementation process of each functional module in the above-mentioned engineering management system and the technical effects achieved, and will not be repeated here.
[0085] Those skilled in the art will appreciate that, in the above method of a specific embodiment, the order in which the steps are written does not imply a strict execution order and does not constitute any limitation on the implementation process. The specific execution order of the steps should be determined by their functions and possible internal logic.
[0086] Please refer to Figure 4 , Figure 4 A structural diagram of an electronic device for executing an engineering management method provided in an embodiment of the present application, the electronic device may include: at least one processor 401, such as a CPU, at least one communication interface 402, at least one memory 403 and at least one communication bus 404. Among them, the communication bus 404 is used to realize direct connection and communication between these components. Among them, the communication interface 402 of the device in the embodiment of the present application is used to communicate signaling or data with other node devices. The memory 403 can be a high-speed RAM memory or a non-volatile memory (non-volatile memory), such as at least one disk storage. The memory 403 can optionally be at least one storage device located away from the aforementioned processor. Computer-readable instructions are stored in the memory 403. When the computer-readable instructions are executed by the processor 401, the electronic device can execute the above-mentioned Figure 3 The method process is shown.
[0087] Understandably, Figure 4 The structure shown is for illustration only, and the electronic device may also include Figure 4 More or fewer components as shown, or with Figure 4 Different configurations shown. Figure 4 Each component shown in the figure can be implemented by hardware, software or a combination thereof.
[0088] The present application embodiment provides a computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, the following can be performed: Figure 3 The method process in the method embodiment shown is executed by the electronic device.
[0089] An embodiment of the present application provides a computer program product, which includes a computer program or instruction stored on a non-transitory computer-readable storage medium. When the computer program or instruction is executed by a computer, the computer can execute the methods provided by the above-mentioned method embodiments. For example, the method may include: using a BIM6D model to process project information to obtain a construction plan; establishing a risk information library according to the safety influencing factors involved in each construction node, so as to determine the risk information existing at the construction site according to the risk information library; wherein the various construction nodes are arranged according to the construction plan; inputting quality control information into the BIM6D model, so that the BIM6D performs virtual construction according to the quality control information and the construction plan to obtain a virtual construction result; and managing the project according to the virtual construction result and the risk information.
[0090] In the embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. The device embodiments described above are merely schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some communication interfaces, and the indirect coupling or communication connection of the devices or units can be electrical, mechanical or other forms.
[0091] In addition, the units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0092] Furthermore, the functional modules in the various embodiments of the present application may be integrated together to form an independent part, or each module may exist separately, or two or more modules may be integrated to form an independent part.
[0093] In this document, relational terms such as first and second, etc. are used merely to distinguish one entity or operation from another entity or operation, but do not necessarily require or imply any such actual relationship or order between these entities or operations.
[0094] The above description is only an embodiment of the present application and is not intended to limit the protection scope of the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A project management system, characterized in that: include: A safety management module is used to establish a risk information database according to the safety influencing factors involved in each construction node, so as to determine the risk information existing at the construction site according to the risk information database; wherein each construction node is arranged according to a construction plan, and the construction plan is obtained by a BIM6D model based on engineering information; The risk information corresponding to the current construction node is obtained by weighted summing of multiple weights corresponding to multiple safety influencing factors involved at the current construction node, and the weights are obtained according to the probability of accidents occurring at the same construction node in history due to the safety influencing factors; or, the risk information corresponding to the current construction node is determined by the probability of accidents occurring at the same construction node in history due to the safety influencing factors; The safety management module is further used to: determine the safety information of the construction personnel at the current construction node according to the location information of the construction personnel at the construction site and the risk information database; the safety information represents the probability of an accident occurring to the construction personnel at the current construction node; The quality management module is used to use the BIM6D model to perform virtual construction and obtain virtual construction results, so as to manage the construction quality according to the virtual construction results; wherein the BIM6D model performs virtual construction according to the construction plan and quality control information.
2. The system according to claim 1, characterized in that Also includes: The cost management module is used to determine the cause of the inconsistency between the actual cost data and the estimated cost data when the two are inconsistent; According to the reasons, the construction plan is adjusted.
3. The system according to claim 2, characterized in that The cost management module is further used to: If the actual cost data is inconsistent with the estimated cost data due to price increases of construction materials, the BIM6D model is used to classify the construction materials, so as to manage the cost information of different categories of construction materials through the classification results; If the actual cost data is inconsistent with the estimated cost data due to secondary transportation, the BIM6D model is used to calculate the transportation information so as to manage the cost information of the secondary transportation through the transportation information.
4. The system according to claim 1, characterized in that Also includes: An energy consumption management module, used to use the BIM6D model to perform virtual construction on different construction plans of the current construction node; For each construction plan, calculate the carbon emissions generated by the construction plan during virtual construction; The construction plan with carbon emissions less than the preset carbon emissions is determined as the optimal construction plan.
5. The system according to claim 1, characterized in that Also includes: A progress management module, used to obtain a standby construction plan using the BIM6D model, and to perform virtual construction according to the standby construction plan; The construction plan is a standby construction plan when the virtual construction result meets the preset requirements.
6. A project management method, characterized in that: include: Use BIM6D model to process engineering information and obtain construction plan; A risk information database is established according to the safety influencing factors involved at each construction node, so as to determine the risk information existing at the construction site according to the risk information database; wherein the construction nodes are arranged according to the construction plan; wherein the risk information corresponding to the current construction node is obtained by weighted summing of multiple weights corresponding to multiple safety influencing factors involved at the current construction node, and the weight is obtained according to the probability of an accident occurring at the same construction node in history due to the safety influencing factors; or, the risk information corresponding to the current construction node is determined by the probability of an accident occurring at the same construction node in history due to the safety influencing factors; Determine the safety information of the construction personnel at the current construction node according to the location information of the construction personnel at the construction site and the risk information database; the safety information represents the probability of an accident occurring to the construction personnel at the current construction node; Inputting the quality control information into the BIM6D model, so that the BIM6D performs virtual construction according to the quality control information and the construction plan to obtain a virtual construction result; The project is managed according to the virtual construction results and the risk information and the safety information.
7. An electronic device, characterized in that: The method comprises a processor and a memory, wherein the memory stores computer-readable instructions. When the computer-readable instructions are executed by the processor, the method according to claim 6 is executed.
8. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method according to claim 6 is performed.
9. A computer program product comprising a computer program or instructions, characterized in that When the computer program or instruction is executed by a processor, the method according to claim 6 is performed.