A convenient sliding rail hanging rail system and control system for bridge maintenance

By designing a convenient sliding track lifting system and an automated control system, the problems of high transportation costs, environmental dependence and safety hazards in bridge maintenance are solved, and efficient and safe bridge maintenance and transportation are achieved.

CN118083782BActive Publication Date: 2025-02-14GUANGZHOU HUANAN ROAD&BRIDGE IND CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410243431.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-04
Publication Date
2025-02-14
Estimated Expiration
2044-03-04

AI Technical Summary

Technical Problem

In the maintenance of existing bridges, truck cranes and floating cranes have problems such as traffic impact, high cost, and environmental dependence. The sliding track cranes have great safety risks and lack a convenient control system.

Method used

A convenient sliding track lifting system was designed, including cross-bridge tracks, forward-bridge tracks, trap rods, anchor bolt devices and electric hoists, combined with track slip system monitoring module, load-bearing monitoring module, control module and main Controller to realize automated control and fault warning.

Benefits of technology

It has achieved convenient transportation and safety control of materials during bridge maintenance, reduced transportation costs and environmental impact, and improved construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118083782B_ABST
    Figure CN118083782B_ABST
Patent Text Reader

Abstract

The invention relates to the field of bridge maintenance and reinforcement construction, and discloses a convenient sliding track hanging rail system and a control system for bridge maintenance. The hanging rail system is fixed to the bottom of the beam by hoisting with an I-beam and the bottom of the beam, and is reinforced by welding of steel sections and anchor bolts to form a stable transportation hanging rail. At the same time, the movement of the electric hoist on the track and the vertical lifting and lowering of the chain on the hanging rail system can easily realize the transportation of materials in the space around the bridge pier, avoiding the cumbersome operation of the vehicle crane and the floating crane and the space limitation of the lifting under the bridge. The control system monitors the sliding smoothness of the hanging hoist during the horizontal transportation process through a sliding system monitoring module, monitors the system load-bearing capacity of the entire hanging rail system during the vertical transportation of the electric hoist through a load-bearing capacity monitoring module, and controls the horizontal and vertical transportation of the electric hoist according to the sliding smoothness and the system load-bearing capacity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of bridge maintenance and reinforcement construction, and in particular to a convenient sliding track hanging rail system and a control system for bridge maintenance. Background Art

[0002] With the rapid development of my country's transportation industry, bridge structures are facing increasing load pressure, and are also adversely affected by factors such as natural conditions and geographical environment. Especially for cross-river and cross-sea bridges, bridges are constantly eroded by river water or sea water, which leads to problems such as steel bar corrosion, concrete cracking and peeling that endanger the safety of bridge structures during long-term use. Therefore, it is of great significance to prevent and treat the diseases that occur during the use of bridges and to carry out repair, reinforcement and maintenance of bridges in a timely manner to ensure traffic safety and extend the service life of bridges.

[0003] In the repair and reinforcement of bridge piers across rivers or across seas, common ways to transport materials to the pier cap include truck cranes and floating cranes. Truck cranes are a common way to lift equipment and materials to the cap by using a crane on the bridge deck. However, the use of cranes will occupy lanes, which will have a certain impact on traffic, and is also subject to restrictions such as limited crane locations and the inability to transport under the bridge. In contrast, floating cranes use cranes to transport and lift materials on the water. Floating cranes have the advantages of large lifting capacity, strong flexibility, and high work efficiency, but they also have disadvantages such as high cost of use, dependence on the water environment, great influence of weather, environmental problems, and occupation of waterways. Especially for bridges with smaller spans, floating cranes may seriously affect water navigation conditions. Therefore, the present application proposes a convenient sliding track hanging rail system for bridge maintenance.

[0004] During the use of the sliding track hanging rail system, the staff generally relies on work experience to judge whether there are safety hazards, and then manually control the start and stop of each motion system. This will not only lead to misjudgment and affect construction, but also have certain safety hazards. Therefore, this application proposes a control system for a convenient sliding track hanging rail system for bridge maintenance. Summary of the invention

[0005] The purpose of the present invention is to provide a convenient sliding rail hanging rail system and control system for bridge maintenance to solve the above-mentioned technical problems.

[0006] The purpose of the present invention can be achieved through the following technical solutions:

[0007] A convenient sliding rail hanging rail system for bridge maintenance, comprising a transverse bridge rail, a longitudinal bridge rail, a diagonal tie rod connecting the transverse bridge rail and a beam web, an anchor bolt device for connecting and fixing the rails, and an electric hoist for hanging rail transportation;

[0008] The transverse bridge track is a high-strength I-beam installed on both sides of the pier in the transverse bridge direction. It is hoisted and fixed to the bottom of the beam by setting a steel wire rope through the opening of the beam bottom plate. The two ends of the transverse bridge track are connected to the longitudinal bridge track through high-strength anchor bolts, and the middle part is firmly connected to the pier through welded steel. One side of the inner track end is connected to the inclined rod through an anchor bolt;

[0009] The longitudinal track is a high-strength I-beam installed on both sides of the pier along the longitudinal direction of the bridge, with both ends fixed to the transverse track by high-strength anchor bolts, and the middle part is fixed to the pier by welded steel;

[0010] The diagonal tie rod is a high-strength I-beam connecting one end of the inner side rail and the beam web, and both ends of the diagonal tie rod are fixed to the rail and the pier by welding steel plates, drilling holes and anchor bolts on the surface of the rail and the pier.

[0011] The anchor device is a combination of steel plates and high-strength anchor bolts, which are fixedly connected to the rails on both sides or to the rails and bridge piers by welding steel plates, drilling holes and anchor bolts;

[0012] The electric hoist is arranged on each track, and the top pulleys are installed on both sides of the lower flange of the track.

[0013] As a further description of the scheme of the present invention, after the entire hanging rail system is installed, the electric hoist can be remotely controlled to vertically lift or lower the items to be transported through the chain to achieve vertical transportation of the items, and the horizontal transportation of the items can be achieved by controlling the movement of the electric hoist on the track. The transportation of items around the bridge pier can be achieved by the cooperation of the electric hoists on four tracks.

[0014] A control system for a portable sliding track hanging rail system for bridge maintenance, the system comprising: a track sliding system monitoring module, a bearing capacity monitoring module, a control module and a main controller;

[0015] The sliding system monitoring module includes a plurality of sound collection sensors evenly distributed on the transverse bridge track and the longitudinal bridge track, and is used to monitor the sliding smoothness between the top pulley of the electric hoist and the transverse bridge track and the longitudinal bridge track during operation;

[0016] The load-bearing capacity monitoring module includes a plurality of stress sensors distributed at key load-bearing positions of the entire hanging rail system, and is used to monitor the load-bearing capacity of the entire hanging rail system during the vertical transportation of the electric hoist;

[0017] The control module is used to analyze the sliding smoothness and system load-bearing capacity of the current wall cabinet system according to the data obtained by the sliding system monitoring module and the load-bearing capacity monitoring module, and control the horizontal and vertical transportation of the electric hoist according to the sliding smoothness and the system load-bearing capacity;

[0018] The main controller is used to control all modules to operate normally.

[0019] As a further description of the scheme of the present invention, the working process of the sliding system monitoring module includes: numbering all sound collection sensors evenly distributed on the transverse bridge track and the longitudinal bridge track, numbering them as 1, 2...n, and detecting the running noise of the top pulley of the real-time electric hoist during operation.

[0020] As a further description of the scheme of the present invention, the working process of the load-bearing force monitoring module includes: obtaining the key load-bearing positions of the entire hanging rail system through a neural network model, arranging stress sensors at these load-bearing positions, numbering all stress sensors, and numbering them 1, 2...m, respectively, to collect the key stresses of the key positions of the entire hanging rail system in real time.

[0021] As a further description of the solution of the present invention, the working process of the control module is:

[0022] Obtain the real-time data of the noise frequency collected by the sound sensor at the i-th location, and convert it into the sliding smoothness F according to the noise frequency i , where i belongs to n, construct the coordinate system xoy, according to the sliding smoothness F at the i-th position i The real-time data is fitted to the sliding smoothness F at the i-th position in the coordinate system xoy i Curve F changing with time i (t);

[0023] Draw the preset standard curve y=F0 in the coordinate system xoy, and compare the curve y=F0 with F i (t) The position relationship in the coordinate system xoy, if max[F i (t)] is greater than F0, it means that the horizontal transport of the electric hoist fails, and a first-level warning is issued immediately, and the horizontal transport of the electric hoist is shut down through the control module:

[0024] If max[F i (t)] is less than F0, and F i (t) The area S1 enclosed by the x-axis and the area S2 enclosed by y=F0 and the x-axis;

[0025] Through the formula σ i = S2-S1 Calculate the potential risk coefficient σ of sliding smoothness corresponding to the i-th area i , and i Compared with the preset target threshold of sliding smoothness, if σ i If it is greater than the preset target threshold of sliding smoothness, it means that there is a potential risk of failure in the horizontal transportation of the electric hoist. A secondary warning is immediately issued, and the horizontal transportation of the electric hoist is shut down through the control module.

[0026] As a further description of the solution of the present invention, the working process of the control module also includes:

[0027] Obtain the real-time stress data collected by the stress sensor at the jth location and convert it into the system load-bearing capacity H according to the stress j , where j belongs to m, construct the coordinate system xoy, according to the system load-bearing capacity H at the jth position j Real-time data fits the system load-bearing capacity H at the jth position in the coordinate system xoy j Curve H over time j (t);

[0028] Draw the preset standard curve y=H in the coordinate system xoy o , compare the curve y = H o and H j (t) The position relationship in the coordinate system xoy, if max[H j (t)] is greater than H0, it indicates that the hanging rail system has a fault, and a first-level warning is immediately issued, and the vertical transportation of the electric hoist is shut down through the control module;

[0029] If max[H j (t)] is less than H0, and H j (t) The area S3 enclosed by the x-axis and the area S4 enclosed by y=H0 and the x-axis;

[0030] Through the formula σ j = S3-S4 Calculate the potential risk coefficient σ of the system load-bearing capacity corresponding to the kth area of ​​the hanging rail system j , and j Compared with the preset target threshold of system load-bearing capacity, if σ j If it is greater than the preset target threshold of the system load-bearing capacity, it means that there is a potential risk of failure in the vertical transportation of the electric hoist. A secondary warning is immediately issued and the vertical transportation of the electric hoist is shut down through the control module.

[0031] As a further description of the scheme of the present invention, the control system also includes an early warning module, which issues a first-level early warning when a failure or potential failure risk occurs in the horizontal transportation of the electric hoist, and issues a second-level early warning when a failure or potential failure risk occurs in the vertical transportation of the electric hoist.

[0032] The beneficial effects of the present invention are as follows: 1. The transverse bridge track and the longitudinal bridge track are fixed to the bottom of the beam through the I-beam and the bottom of the beam, and are welded with steel sections and reinforced with anchor bolts to form a stable transport hanging rail. The structural design is simple and the force distribution is clear, and the processing and manufacturing cost is low, which is more economical and practical in engineering implementation. At the same time, the movement of the electric hoist on the transverse bridge track and the longitudinal bridge track and the vertical lifting and lowering of the chain can easily realize the transportation of materials in the space around the bridge pier, and the operation process only requires remote control of the movement of the electric hoist and the lifting of the chain, avoiding the cumbersome operation of the car crane and the floating crane and the space limitation of the lifting under the bridge. The operation is simpler and more convenient, and the safety risk is more controllable. Finally, the rail crane system provided by the present invention is less affected by the harsh environment than the traditional lifting transportation, and does not need to occupy any public transportation resources. Material transportation can be realized at any time, and has the advantages of low noise and environmental protection.

[0033] 2. The present invention monitors the sliding noise between the pulley and the track during the horizontal transportation of the hanging hoist through the sliding system monitoring module, and monitors the stress data of the key parts of the entire hanging rail system during the vertical transportation of the electric hoist through the bearing-force monitoring module. The control module is used to analyze the sliding smoothness and system bearing capacity of the current hanging cabinet system according to the data obtained by the sliding system monitoring module and the bearing-force monitoring module, and control the horizontal and vertical transportation of the electric hoist according to the sliding smoothness and the system bearing capacity. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] The present invention will be further described below in conjunction with the accompanying drawings.

[0035] Figure 1 It is a general elevation view of a convenient sliding track hanging rail system for bridge maintenance provided by the present invention;

[0036] Figure 2 The present invention provides a convenient sliding rail hanging rail system for bridge maintenance. Figure 1 Middle 1-1 view;

[0037] Figure 3 The present invention provides a convenient sliding rail hanging rail system for bridge maintenance. Figure 1 Middle 2-2 direction view;

[0038] Figure 4 It is a schematic diagram of the control system structure of a convenient sliding track hanging rail system for bridge maintenance provided by the invention. DETAILED DESCRIPTION

[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0040] See also Figure 1-Figure 3 As shown, the present invention is a convenient sliding track hanging rail system for bridge maintenance, comprising a transverse bridge track, a longitudinal bridge track, a diagonal tie rod connecting the transverse bridge track and the web of the beam, an anchor bolt device for track connection and fixation, and an electric hoist for hanging rail transportation;

[0041] The transverse bridge track is a high-strength I-beam installed on both sides of the pier in the transverse bridge direction. It is hoisted and fixed to the bottom of the beam by setting a steel wire rope through the opening of the beam bottom plate. The two ends of the transverse bridge track are connected to the longitudinal bridge track through high-strength anchor bolts, and the middle part is firmly connected to the pier through welded steel. One side of the inner track end is connected to the inclined rod through an anchor bolt;

[0042] The longitudinal track is a high-strength I-beam installed on both sides of the pier along the longitudinal direction of the bridge, with both ends fixed to the transverse track by high-strength anchor bolts, and the middle part is fixed to the pier by welded steel;

[0043] The diagonal tie rod is a high-strength I-beam connecting one end of the inner side rail and the beam web, and both ends of the diagonal tie rod are fixed to the rail and the pier by welding steel plates, drilling holes and anchor bolts on the surface of the rail and the pier.

[0044] The anchor device is a combination of steel plates and high-strength anchor bolts, which are fixedly connected to the rails on both sides or to the rails and bridge piers by welding steel plates, drilling holes and anchor bolts;

[0045] The electric hoist is arranged on each track, and the top pulleys are installed on both sides of the lower flange of the track.

[0046] After the entire hanging rail system is installed, the electric hoist can be remotely controlled to vertically lift or lower the items to be transported through the chain to achieve vertical transportation of the items. The movement of the electric hoist on the track can be controlled to achieve horizontal transportation of the items. The cooperation of the four-track electric hoist can realize the transportation of items around the bridge pier.

[0047] Through the above technical scheme, the transverse bridge track and the longitudinal bridge track are fixed to the bottom of the beam through the I-beam and the bottom of the beam, and are welded with steel sections and reinforced with anchor bolts to form a stable transport hanging rail. Its structural design is simple and the force distribution is clear, and the processing and manufacturing cost is low, which is more economical and affordable in engineering implementation. At the same time, the movement of the electric hoist on the transverse bridge track and the longitudinal bridge track on the track and the vertical lifting and lowering of the chain can easily realize the transportation of materials in the space around the bridge pier, and the operation process only needs to use remote control to control the movement of the electric hoist and the lifting of the chain, avoiding the cumbersome operation of the car crane and the floating crane and the space limitation of the lifting under the bridge. The operation is simpler and more convenient, and the safety risk is more controllable. Finally, the rail crane system provided by the present invention is less affected by the harsh environment than the traditional lifting transportation, and does not need to occupy any public transportation resources. It can realize the transportation of materials at any time and has the advantages of low noise and environmental protection.

[0048] See also Figure 4 As shown, a control system of a portable sliding track hanging rail system for bridge maintenance, the system comprises: a track sliding system monitoring module, a bearing capacity monitoring module, a control module and a main controller;

[0049] The sliding system monitoring module includes a plurality of sound collection sensors evenly distributed on the transverse bridge track and the longitudinal bridge track, and is used to monitor the sliding smoothness between the top pulley of the electric hoist and the transverse bridge track and the longitudinal bridge track during operation;

[0050] The load-bearing capacity monitoring module includes a plurality of stress sensors distributed at key load-bearing positions of the entire hanging rail system, and is used to monitor the load-bearing capacity of the entire hanging rail system during the vertical transportation of the electric hoist;

[0051] The control module is used to analyze the sliding smoothness and system load-bearing capacity of the current wall cabinet system according to the data obtained by the sliding system monitoring module and the load-bearing capacity monitoring module, and control the horizontal and vertical transportation of the electric hoist according to the sliding smoothness and the system load-bearing capacity;

[0052] The main controller is used to control all modules to operate normally.

[0053] Through the above technical scheme, the present invention monitors the sliding noise between the pulley and the track during the horizontal transportation of the hanging hoist through the sliding system monitoring module, and monitors the stress data of the key parts of the entire hanging rail system during the vertical transportation of the electric hoist through the bearing-force monitoring module. The control module is used to analyze the sliding smoothness and system bearing capacity of the current hanging cabinet system according to the data obtained by the sliding system monitoring module and the bearing-force monitoring module, and control the horizontal and vertical transportation of the electric hoist according to the sliding smoothness and the system bearing capacity.

[0054] The working process of the sliding system monitoring module includes: numbering all sound collection sensors evenly distributed on the transverse bridge track and the longitudinal bridge track, which are numbered 1, 2...n respectively, and detecting the running noise of the top pulley of the real-time electric hoist during operation.

[0055] The working process of the load-bearing force monitoring module includes: obtaining the key load-bearing positions of the entire hanging rail system through a neural network model, arranging stress sensors at these load-bearing positions, numbering all stress sensors, numbering them 1, 2...m, and collecting the key stresses of the key positions of the entire hanging rail system in real time.

[0056] Through the above technical scheme, the sliding system monitoring module of the present invention evenly distributes all the sound collection sensors on the transverse bridge track and the longitudinal bridge track and numbers them as 1, 2...n respectively. The load-bearing force monitoring module obtains the key load-bearing positions of the entire hanging rail system through a neural network model, arranges stress sensors at these load-bearing positions, and numbers all the stress sensors as 1, 2...m respectively.

[0057] The working process of the control module:

[0058] Obtain the real-time data of the noise frequency collected by the sound sensor at the i-th location, and convert it into the sliding smoothness F according to the noise frequency i , where i belongs to n, construct the coordinate system xoy, according to the sliding smoothness F at the i-th position i The real-time data is fitted to the sliding smoothness F at the i-th position in the coordinate system xoy i Curve F changing with time i (t);

[0059] Draw the preset standard curve y=F0 in the coordinate system xoy, and compare the curve y=F0 with F i (t) The position relationship in the coordinate system xoy, if max[F i (t)] is greater than F0, it means that the horizontal transport of the electric hoist fails, and a first-level warning is issued immediately, and the horizontal transport of the electric hoist is shut down through the control module;

[0060] If max[F i (t)] is less than F0, and F i (t) The area S1 enclosed by the x-axis and the area S2 enclosed by y=F0 and the x-axis;

[0061] Through the formula σ i = S2-S1 Calculate the potential risk coefficient σ of sliding smoothness corresponding to the i-th area i , and i Compared with the preset target threshold of sliding smoothness, if σ iIf it is greater than the preset target threshold of sliding smoothness, it means that there is a potential risk of failure in the horizontal transportation of the electric hoist. A secondary warning is immediately issued, and the horizontal transportation of the electric hoist is shut down through the control module.

[0062] Through the above technical solution, the present invention obtains the real-time data of the noise frequency collected by the sound sensor at the i-th location, and according to the sliding smoothness F at the i-th location, i The real-time data is fitted to the sliding smoothness F at the i-th position in the coordinate system xoy i Curve F changing with time i (t), draw the preset standard curve y = F0 in the coordinate system xoy, and compare the curve y = F0 with F i (t) The position relationship in the coordinate system xoy, if max[F i (t)] is greater than F0, it means that the horizontal transport of the electric hoist fails, and a first-level warning is issued immediately, and the horizontal transport of the electric hoist is shut down through the control module; if max[F i (t)] is less than F0, and F i The area S1 enclosed by (t) and the x-axis and the area S2 enclosed by y=F0 and the x-axis are calculated by the formula σ i = S2-S1 Calculate the potential risk coefficient σ of sliding smoothness corresponding to the i-th area i , and i Compared with the preset target threshold of sliding smoothness, if σ i If it is greater than the preset target threshold of sliding smoothness, it means that there is a potential risk of failure in the horizontal transportation of the electric hoist. A secondary warning is immediately issued, and the horizontal transportation of the electric hoist is shut down through the control module.

[0063] The working process of the control module also includes:

[0064] Obtain the real-time stress data collected by the stress sensor at the jth location and convert it into the system load-bearing capacity H according to the stress j , where j belongs to m, construct the coordinate system xoy, according to the system load-bearing capacity H at the jth position j Real-time data fits the system load-bearing capacity H at the jth position in the coordinate system xoy j Curve H over time j (t);

[0065] Draw the preset standard curve y=H in the coordinate system xoy o , compare the curve y = H o and H j (t) The position relationship in the coordinate system xoy, if max[H j (t)] is greater than H0, it indicates that the hanging rail system has a fault, and a first-level warning is immediately issued, and the vertical transportation of the electric hoist is shut down through the control module;

[0066] If max[H j (t)] is less than H0, and H j (t) The area S3 enclosed by the x-axis and the area S4 enclosed by y=H0 and the x-axis;

[0067] Through the formula σ j = S3-S4 Calculate the potential risk coefficient σ of the system load-bearing capacity corresponding to the kth area of ​​the hanging rail system j , and j Compared with the preset target threshold of system load-bearing capacity, if σ j If it is greater than the preset target threshold of the system load-bearing capacity, it means that there is a potential risk of failure in the vertical transportation of the electric hoist. A secondary warning is immediately issued and the vertical transportation of the electric hoist is shut down through the control module.

[0068] Through the above technical solution, the present invention obtains the real-time stress data collected by the stress sensor at the jth position, and fits the system load-bearing capacity H at the jth position in the coordinate system xoy. j Curve H over time j (t), draw the preset standard curve y=H in the coordinate system xoy o , compare the curves y = H0 and H j (t) The position relationship in the coordinate system xoy, if max[H j (t)] is greater than H0, it means that the hanging rail system fails, and a first-level warning is issued immediately, and the vertical transportation of the electric hoist is shut down through the control module; if max[H j (t)] is less than H0, and H j (t) The area enclosed by the x-axis is S3 and y = H o The area enclosed by the x-axis is S4; through the formula σ j = S3-S4 Calculate the potential risk coefficient σ of the system load-bearing capacity corresponding to the kth area of ​​the hanging rail system j , and j Compared with the preset target threshold of system load-bearing capacity, if σ j If it is greater than the preset target threshold of the system load-bearing capacity, it means that there is a potential risk of failure in the vertical transportation of the electric hoist. A secondary warning is immediately issued and the vertical transportation of the electric hoist is shut down through the control module.

[0069] The control system also includes an early warning module, which issues a first-level early warning when a fault or potential fault risk occurs in the horizontal transportation of the electric hoist, and issues a second-level early warning when a fault or potential fault risk occurs in the vertical transportation of the electric hoist.

[0070] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.

Claims

1. A control system for a portable sliding rail hanging rail system for bridge maintenance, characterized in that: The hanging rail system includes a transverse bridge rail, a longitudinal bridge rail, a diagonal tie rod connecting the transverse bridge rail and the beam web, an anchor bolt device for connecting and fixing the rails, and an electric hoist for hanging rail transportation; The transverse bridge track is a high-strength I-beam installed on both sides of the pier in the transverse bridge direction. It is hoisted and fixed to the bottom of the beam by setting a steel wire rope through the opening of the beam bottom plate. The two ends of the transverse bridge track are connected to the longitudinal bridge track through high-strength anchor bolts, and the middle part is firmly connected to the pier through welded steel. One side of the inner track end is connected to the inclined rod through an anchor bolt; The longitudinal track is a high-strength I-beam installed on both sides of the pier along the longitudinal direction of the bridge, with both ends fixed to the transverse track by high-strength anchor bolts, and the middle part is fixed to the pier by welded steel; The diagonal tie rod is a high-strength I-beam connecting one end of the inner side rail and the beam web, and both ends of the diagonal tie rod are fixed to the rail and the pier by welding steel plates, drilling holes and anchor bolts on the surface of the rail and the pier. The anchor device is a combination of steel plates and high-strength anchor bolts, which are fixedly connected to the rails on both sides or to the rails and bridge piers by welding steel plates, drilling holes and anchor bolts; The electric hoist is arranged on each track, and its top pulley is installed on both sides of the lower flange of the track; After the entire hanging rail system is installed, the electric hoist can be remotely controlled to vertically lift or lower the items to be transported through the chain to achieve vertical transportation of the items. The movement of the electric hoist on the track can be controlled to achieve horizontal transportation of the items. The cooperation of the four-track electric hoist can realize the transportation of items around the bridge pier. The control system includes: a track slip system monitoring module, a load-bearing capacity monitoring module, a control module and a main controller; The sliding system monitoring module includes a plurality of sound collection sensors evenly distributed on the transverse bridge track and the longitudinal bridge track, and is used to monitor the sliding smoothness between the top pulley of the electric hoist and the transverse bridge track and the longitudinal bridge track during operation; The load-bearing capacity monitoring module includes a plurality of stress sensors distributed at key load-bearing positions of the entire hanging rail system, and is used to monitor the load-bearing capacity of the entire hanging rail system during the vertical transportation of the electric hoist; The control module is used to analyze the sliding smoothness and system load-bearing capacity of the current wall cabinet system according to the data obtained by the sliding system monitoring module and the load-bearing capacity monitoring module, and control the horizontal and vertical transportation of the electric hoist according to the sliding smoothness and the system load-bearing capacity; The main controller is used to control all modules to operate normally.

2. The control system of a portable sliding rail hanging rail system for bridge maintenance according to claim 1 is characterized in that: The working process of the sliding system monitoring module includes: numbering all sound collection sensors evenly distributed on the transverse bridge track and the longitudinal bridge track, which are numbered 1, 2...n respectively, and detecting the running noise of the top pulley of the real-time electric hoist during operation.

3. The control system of a portable sliding rail hanging rail system for bridge maintenance according to claim 2 is characterized in that: The working process of the load-bearing force monitoring module includes: obtaining the key load-bearing positions of the entire hanging rail system through a neural network model, arranging stress sensors at these load-bearing positions, numbering all stress sensors, numbering them 1, 2...m, and collecting the key stresses of the key positions of the entire hanging rail system in real time.

4. The control system of a portable sliding rail hanging rail system for bridge maintenance according to claim 3 is characterized in that: The working process of the control module: Obtain the real-time data of the noise frequency collected by the sound sensor at the i-th location, and convert it into the sliding smoothness F according to the noise frequency i , where i belongs to n, construct the coordinate system xoy, according to the sliding smoothness F at the i-th position i The real-time data is fitted to the sliding smoothness F at the i-th position in the coordinate system xoy i Curve F changing with time i (t); Draw the preset standard curve y=F0 in the coordinate system xoy, and compare the curve y=F0 with F i (t) The position relationship in the coordinate system xoy, if max[F i (t)] is greater than F0, it means that the horizontal transport of the electric hoist fails, and a first-level warning is issued immediately, and the horizontal transport of the electric hoist is shut down through the control module; If max[F i (t)] is less than F0, and F i (t) The area S1 enclosed by the x-axis and the area S2 enclosed by y=F0 and the x-axis; Through the formula σ i = S2-S1 Calculate the potential risk coefficient σ of sliding smoothness corresponding to the i-th area i , and i Compared with the preset target threshold of sliding smoothness, if σ i If it is greater than the preset target threshold of sliding smoothness, it means that there is a potential risk of failure in the horizontal transportation of the electric hoist. A secondary warning is immediately issued, and the horizontal transportation of the electric hoist is shut down through the control module.

5. The control system of a portable sliding rail hanging rail system for bridge maintenance according to claim 4, characterized in that: The working process of the control module also includes: Obtain the real-time stress data collected by the stress sensor at the jth location and convert it into the system load-bearing capacity H according to the stress j , where j belongs to m, construct the coordinate system xoy, according to the system load-bearing capacity H at the jth position j Real-time data fits the system load-bearing capacity H at the jth position in the coordinate system xoy j Curve H over time j (t); Draw the preset standard curve y=H0 in the coordinate system xoy, and compare the curve y=H0 with H j (t) The position relationship in the coordinate system xoy, if max[H j (t)] is greater than H0, it indicates that the hanging rail system has a fault, and a first-level warning is immediately issued, and the vertical transportation of the electric hoist is shut down through the control module; If max[H j (t)] is less than H0, and H j (t) The area S3 enclosed by the x-axis and the area S4 enclosed by y=H0 and the x-axis; Through the formula σ j = S3-S4 Calculate the potential risk coefficient σ of the system load-bearing capacity corresponding to the kth area of ​​the hanging rail system j , and j Compared with the preset target threshold of system load-bearing capacity, if σ j If it is greater than the preset target threshold of the system load-bearing capacity, it means that there is a potential risk of failure in the vertical transportation of the electric hoist. A secondary warning is immediately issued and the vertical transportation of the electric hoist is shut down through the control module.

6. The control system of a portable sliding rail hanging rail system for bridge maintenance according to claim 5, characterized in that: The control system also includes an early warning module, which issues a first-level early warning when a fault or potential fault risk occurs in the horizontal transportation of the electric hoist, and issues a second-level early warning when a fault or potential fault risk occurs in the vertical transportation of the electric hoist.

Citation Information

Patent Citations

  • Beam bottom overhaul platform capable of spanning bridge piers and obstacle pillars and use method of beam bottom overhaul platform

    CN104358211A

  • Laser processing equipment

    CN115889972A