Device and method for sealing water inrush from rock tunnel and tunnel face during blasting excavation
By designing the sealing module and hot water isolation module, combined with fly ash Portland cement slurry and remote control technology, the problem of ultra-high temperature water inrush sealing is solved and an efficient and safe sealing effect is achieved, which is suitable for rock tunnels. Blasting and excavation construction.
Patent Information
- Application Number
- CN202410390305.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-04-01
AI Technical Summary
Existing technology cannot effectively seal ultra-high temperature water inflow during blasting and excavation of rock tunnels, resulting in harsh construction environment, high safety risks and low blocking efficiency. The normal temperature water inflow sealing device is not suitable for ultra-high temperature conditions.
A water inflow sealing device for rock tunnel blasting excavation face is designed including a sealing module and a hot water isolation module. It utilizes the low hydration thermal properties of fly ash Portland cement slurry, combined with insulated drainage pipes and remote control. module to achieve effective blocking and safe management of ultra-high temperature water inrush.
It effectively avoids the rapid setting of slurry and the reduction of sealing quality, reduces the difficulty of sealing construction, improves the success rate of sealing, ensures the safety of construction personnel, and provides real-time parameter monitoring and data support.
Smart Images

Figure CN118187745B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel construction, and in particular to a device and method for sealing water inrush at a rock tunnel or tunnel face during blasting excavation. Background Art
[0002] In recent years, more and more deep-buried long tunnel projects need to pass through high-temperature and unfavorable geology that are difficult to bypass in the western region, especially in the southwestern mountainous areas. One of the main hazards of high geothermal temperature to tunnels and tunnel projects is high water temperature. According to preliminary survey data, there are more than 50 high-temperature hot springs with a significant impact on the line along the Sichuan-Tibet Railway alone, with water temperatures ranging from 40℃ to 100℃. The tunnel line affected by super-high temperature hot water (≥60℃) is about 50km long.
[0003] The large-section construction method of drilling and blasting can reduce the disturbance to the surrounding rock, realize the closure of the support into a ring as soon as possible, and effectively control the deformation of the surrounding rock. It is widely used in the excavation and construction of rock tunnels. For example, the Sichuan-Tibet Railway tunnels all use the large-section construction method of drilling and blasting. Ultra-high temperature hot water is the main heat source that deteriorates the construction environment of rock tunnel blasting. Once the ultra-high temperature hot water gushes out of the face, it will cause the temperature and humidity in the tunnel to rise, greatly reducing the labor productivity of the construction personnel and seriously threatening their health and safety; in addition, under high temperature and high humidity conditions, the performance stability of blasting equipment decreases, the blasting efficiency is greatly reduced, and blind shots and duds are very likely to occur, endangering construction safety. Therefore, in the process of tunnel blasting and excavation, for ultra-high temperature water gushing over a certain amount on the face, the principle of top water grouting and blocking is adopted as the main method and limited insulation discharge is adopted.
[0004] The top water grouting and plugging of ultra-high temperature water gushing from the face is to use a higher grouting pressure to push the ultra-high temperature water gushing leaking along the bedrock cracks to the outside of the surrounding rock blasting loosening circle, and rely on appropriate slurry to fill and plug the high temperature water leakage path, so that the surrounding rock of the cracks is consolidated into a relatively complete rock mass, ensuring that the subsequent face blasting excavation is not affected by ultra-high temperature water gushing. By plugging the ultra-high temperature water outlet points of the face with top water grouting, the heat source can be effectively controlled and the efficiency of tunnel blasting excavation can be significantly improved. However, top water grouting requires a higher grouting pressure. According to the experience of normal temperature tunnel water gushing grouting plugging projects, the grouting pressure must be at least 1MPa higher than the water pressure to achieve a better plugging effect. The effect of super-high temperature water gushing top water grouting plugging is directly determined by the sealing quality of the grouting hole. If the sealing quality of the grouting hole is high, the slurry will not run or bubble along the hole wall and the face during the grouting process, and the grouting pressure can meet the construction requirements, and the water gushing plugging can easily achieve the ideal effect. On the contrary, if the sealing quality of the grouting hole is poor, it will seriously affect the increase of grouting pressure, limit the distance of slurry top water, and the cracks within the influence range of the surrounding rock blasting cannot be fully blocked and consolidated, resulting in the problem of super-high temperature water gushing still existing in the later blasting excavation process of the face after the plugging construction, which seriously affects the efficiency of tunnel blasting excavation construction and endangers the health and safety of excavation construction personnel.
[0005] According to domestic and foreign research literature, there is no relevant literature report on the ultra-high temperature water gushing sealing device and method for tunnel blasting excavation. At present, the main method of sealing the ultra-high temperature water gushing at the tunnel face is: construction personnel wear high temperature steam protective clothing to enter the vicinity of the water gushing point, and use normal temperature water gushing sealing device for construction. The protective clothing equipment is bulky and expensive, and has limited protection against ultra-high temperature hot water. The continuous construction time of a single set of equipment is only about 10 minutes.
[0006] Therefore, the use of protective clothing combined with normal temperature sealing devices not only results in high sealing construction costs, low sealing efficiency, and high personnel safety risks, but also normal temperature water gushing sealing devices are not suitable for ultra-high temperature water gushing sealing treatment due to limitations in sealing materials, structural types, and equipment control functions. According to the materials involved in the hole sealing device, the devices for sealing water inrush at normal temperature at the tunnel face can be mainly divided into two categories: ① mold bag grouting sealing device (for example, patent CN105064368A-a mold bag grouting device, patent CN205399433U-a mold bag grouting device), which relies on injecting cement slurry into the mold bag to make it expand, and using the water-permeable but slurry-impermeable properties of the mold bag, accelerates the slurry secretion through the grouting pressure, and consolidates with the hole wall as a whole to achieve the purpose of hole sealing; ② Various types of bag-type grouting plugs (CN212454346U-a hole sealing device for grouting, CN201401179Y-a reusable grouting plug for mine and underground water plugging), which relies on injecting water or gas and other media into the bag to expand and deform the bag, and fasten the grouting plug in the grouting hole to achieve the purpose of hole sealing.
[0007] However, the normal temperature water gushing sealing technology is not suitable for ultra-high temperature water gushing sealing, which is mainly reflected in the following three aspects: ① Under high temperature conditions, the high hydration heat of cement slurry is easy to cause cement stone shrinkage and cracking, seriously affecting the quality of orifice sealing; high hydration heat causes the slurry to set quickly, which is easy to block the drainage holes of the mold bag, weaken the pressure water seepage effect, and greatly reduce the strength of the stone body in the sealing section. In the later top water sealing process, the large grouting pressure is easy to split the orifice sealing section, resulting in failure of water gushing sealing; ② During the water gushing sealing process, the pressure and flow rate increase rapidly, which is easy to form splashing water flow. The splashing of normal temperature water will not deteriorate the construction environment and endanger the safety of construction personnel. The corresponding orifice sealing device structure has not considered the sealing construction process. ③ In order to reduce the difficulty of closure construction, the displacement of the closure device needs to be adjusted in real time. At the same time, in order to meet the requirements of the later top water grouting and plugging construction, it is also necessary to monitor the gushing pressure, flow rate, water temperature and other parameters. The equipment control and information parameter collection of the normal temperature water gushing closing device need to be close to the gushing point for corresponding operations, which is not suitable for the working conditions of the ultra-high temperature water gushing point where the construction environment is harsh and it is difficult to approach the construction. In addition, the normal temperature plugging device does not collect parameters such as the gushing water temperature, and cannot meet the construction parameter requirements of the ultra-high temperature top water grouting. Summary of the invention
[0008] The purpose of the present invention is to provide a device and method for sealing water gushing from the face of a rock tunnel or tunnel blasting excavation, so as to solve the problems existing in the above-mentioned prior art and ensure the safety of construction personnel and the sealing effect of hot water gushing.
[0009] To achieve the above object, the present invention provides the following solutions:
[0010] The present invention provides a water gushing sealing device for a rock tunnel or tunnel face by blasting excavation, comprising a sealing module and a hot water isolation module, wherein the sealing module comprises a main pipe, a heat-insulating drainage pipe, a mold bag and a grouting pump, wherein one end of the main pipe extends into and is limited in a borehole opened at a water gushing influence range, and the other end of the main pipe extends in a direction away from the borehole, the heat-insulating drainage pipe is installed in the middle of the main pipe and can connect the main pipe with an external centralized drainage pipe, and the mold bag is fixedly sleeved at a position of the main pipe extending into the borehole, and the mold bag can connect the grouting pump; the hot water isolation module is installed around the circumference of the main pipe, the heat-insulating drainage pipe is located between the hot water isolation module and the borehole, and in a direction from close to away from the main pipe, the hot water isolation module extends in a direction close to the borehole, and the hot water isolation module comprises a accommodating element and a cooling element, wherein the cooling element is placed in the accommodating element, a side of the accommodating element opposite to the main pipe is hollowed out, and a side of the accommodating element opposite to the main pipe is closed.
[0011] Preferably, the main pipe includes a front section orifice pipe and a rear section orifice pipe, the front section orifice pipe, the rear section orifice pipe and the insulated drainage pipe are connected by a tee pipe, and a portion of the rear section orifice pipe extends into the drill hole, and a positioning pin is fixed on the outer wall of the rear section orifice pipe, and the positioning pin is used to contact the tunnel face.
[0012] Preferably, both ends of the mold bag are provided with tying wires, the mold bag and the rear section orifice pipe are connected by the tying wires, and the mold bag is connected to the grouting pump through a plurality of grouting pipes.
[0013] Preferably, a positioning clamp, a connecting sleeve and a fixing clamp are provided in the middle portion of the front section orifice tube, the positioning clamp is fixed on the outer wall of the front section orifice tube, the connecting sleeve is slidably connected to the front section orifice tube, the fixing clamp can be detachably connected to the front section orifice tube, and the connecting sleeve is limited between the positioning clamp and the fixing clamp, and the middle portion of the accommodating element is fixed on the connecting sleeve.
[0014] Preferably, the accommodating element includes an isolation steel mesh, an isolation cover plate, a closing plate and an entrance cover plate, a middle portion of the isolation steel mesh and a middle portion of the isolation cover plate are provided with through holes for connecting the connecting sleeve, and the outer edges of the isolation steel mesh and the isolation cover plate extend away from the connecting sleeve, the isolation cover plate and the isolation steel mesh are arranged along the length direction of the front section orifice tube, and the isolation steel mesh is located on the side of the isolation cover plate close to the rear section orifice tube, the outer edge of the isolation steel mesh and the outer edge of the isolation cover plate are connected and sealed by the closing plate, an input port is provided on the closing plate, and the entrance cover plate can be detachably installed at the input port and control the opening and closing of the input port.
[0015] Preferably, it also includes a control module, which includes a remote control collector, and a grouting solenoid valve, an electromagnetic flowmeter, a pressure transmitter, a drainage solenoid valve and a temperature sensor electrically connected to the remote control collector, the grouting solenoid valve, the electromagnetic flowmeter and the pressure transmitter are all installed on the main pipe, and the grouting solenoid valve, the electromagnetic flowmeter and the pressure transmitter are located on the side of the hot water isolation module away from the borehole, and the drainage solenoid valve and the temperature sensor are both installed on the insulated drainage pipe.
[0016] Preferably, the grouting pump is a screw pump.
[0017] Preferably, the cooling element is an ice cube, and the slurry injected by the grouting pump is fly ash silicate cement.
[0018] The present invention also provides a method for sealing water inrush at a rock tunnel or tunnel face excavated by blasting, using a device for sealing water inrush at a rock tunnel or tunnel face excavated by blasting as described in any one of the above technical solutions, comprising the following steps:
[0019] S1. Top water grouting plugging hole layout: a borehole is laid out at the water gushing point, and multiple boreholes are evenly laid out around the water gushing point along the water gushing influence range. The radius of the circle enclosed by the multiple boreholes is equal to the maximum radius of the water gushing influence range;
[0020] S2. Assemble the sealing module, use steel pipes to make the front section orifice pipe and the rear section orifice pipe, and connect the front section orifice pipe and the rear section orifice pipe with a tee pipe; use steel bars with a length greater than the drilling radius to weld the outer wall of the rear section orifice pipe as positioning pins; insert the grouting pipe into the middle of the sewn mold bag, and fix the two ends of the mold bag to the rear section orifice pipe with wire ties;
[0021] S3. Assemble the hot water isolation module, use a steel pipe support to connect the sleeve, the diameter of the connecting sleeve is larger than the diameter of the front section orifice pipe, use steel plates to make the isolation cover plate, the closing plate and the inlet cover plate, the closing cover plate has a reserved input port, and use multiple steel bars to weld and make the isolation steel mesh; weld the middle of the isolation cover plate and the middle of the isolation steel mesh to the connecting sleeve respectively, weld the outer edge of the isolation cover plate and the outer edge of the isolation steel mesh to the closing plate respectively, and weld the inlet cover plate to the input port;
[0022] S4. The hot water isolation module is in place, the positioning clamp is welded to the middle of the front orifice pipe, the connecting sleeve is sleeved on the front orifice pipe and moved to contact with the positioning clamp, the fixing clamp is installed on the front orifice pipe, and the end of the connecting sleeve away from the positioning clamp is limited;
[0023] S5. The control module is assembled in place, and the grouting solenoid valve, electromagnetic flowmeter, pressure transmitter, drainage solenoid valve and temperature sensor equipped with wireless modules are wirelessly connected to the remote control acquisition instrument; the drainage solenoid valve and temperature sensor are installed on the insulation drainage pipe in sequence, and the insulation drainage pipe is connected to the three-way pipe; the grouting solenoid valve, electromagnetic flowmeter and pressure transmitter are installed on the front orifice pipe in sequence;
[0024] S6. The sealing module is in place. With the assistance of the drilling equipment, the sealing module is slowly inserted into the borehole. The insertion depth is controlled by the contact of the positioning pin with the tunnel face.
[0025] S7. Drainage of gushing water: control the drainage solenoid valve to be in the open state and the grouting solenoid valve to be in the closed state, use the insulated drainage pipe to centrally drain the gushing water, ensure that the gushing water is drained to the rear of the tunnel face and discharged into the external centralized drainage pipe outside the tunnel;
[0026] S8. Fill the cooling element, open the inlet cover, and fill the cooling element into the accommodating element along the input port, and the cooling element will not fall through the isolation steel mesh;
[0027] S9. Mould bag grouting and sealing construction: after the cooling element is filled, use the grouting pump to pour fly ash silicate cement into the mould bag along the grouting pipe. After the grouting is screened at the set grouting pressure, close the valve corresponding to the grouting pipe, stop the grouting by the grouting pump, and end the mould bag grouting. For multiple boreholes on the face, the sealing order is from the peripheral boreholes to the middle boreholes, and from the boreholes with less water inflow to the boreholes with more water inflow.
[0028] S10. Remote control of instruments and equipment and feedback of plugging parameter information. After all boreholes are sealed, the drainage solenoid valve is remotely closed and the grouting solenoid valve is opened to allow the gushing water to flow out through the rear orifice pipe and the insulated drainage pipe in sequence; the gushing water pressure and flow are monitored by electromagnetic flowmeter and pressure transmitter respectively; after data collection is completed, the grouting solenoid valve is closed and the drainage solenoid valve is opened to continue to guide the gushing water away from the tunnel face through the insulated drainage pipe, and the water temperature is monitored by the temperature sensor; the gushing water pressure, flow and water temperature data are fed back to the remote control acquisition instrument in real time;
[0029] S11. Shotcrete surface sealing: hang an isolation steel mesh on the water gushing impact area on the tunnel face, and then spray concrete to seal the surface. The radius of the sealing area is larger than the radius of the water gushing impact area.
[0030] S12. Check the sealing effect. After the shotcrete surface is sealed, a water pressure test is carried out to check the sealing effect of the drilled hole.
[0031] S13. Dismantling and recycling of the sealing device: after the sealing material has reached the setting age, dismantle the control module, loosen the fixing clamp, dismantle the hot water isolation module, and clean up the recycled instruments.
[0032] Compared with the prior art, the present invention has achieved the following technical effects:
[0033] 1. Utilize the low hydration heat property of fly ash silicate cement slurry to avoid problems such as blockage of mold bag holes and drying, shrinkage and cracking of stone bodies caused by rapid setting of slurry in high temperature environment, so as to ensure the sealing quality and the subsequent grouting and sealing effect.
[0034] 2. In view of the rapid increase in pressure and flow rate during the water gushing and sealing process, an insulated drainage pipe is set up to divert the ultra-high temperature water gushing away from the face to prevent the ultra-high temperature water gushing from deteriorating the construction environment, while reducing the water gushing pressure and the difficulty of sealing construction; a hot water isolation module is set up to isolate the ultra-high temperature water gushing splashed during the sealing construction, and can reduce the ambient temperature around the borehole mouth to ensure the safety of personnel during the sealing construction.
[0035] 3. In view of the harsh construction environment and the difficulty in approaching the water gushing point, a control module is set up for remote control. According to the flow characteristics of the blocked water flow, the relevant valve opening is adjusted in real time at a long distance, and the water flow, pressure and temperature are collected to ensure the safety of the construction personnel, provide necessary data support for subsequent top water grouting construction, and improve the success rate of water gushing plugging. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0037] Figure 1 It is a schematic diagram of the structure of the water inrush sealing device for blasting excavation of rock tunnels and tunnel faces in Example 1;
[0038] Figure 2 It is a side view of the hot water isolation module in the first embodiment;
[0039] Figure 3 This is a schematic diagram of the layout of the top water grouting plugging holes in S1;
[0040] Figure 4 This is a cross-sectional view of the layout of the top water grouting plugging holes in S1;
[0041] In the figure: 1-tip face, 2-water gushing influence range, 3-drill hole, 4-water gushing leakage channel, 5-front section orifice pipe, 6-rear section orifice pipe, 7-tee pipe, 8-positioning pin, 9-mold bag, 10-grouting pipe, 11-tie wire, 12-grouting pump, 13-connecting sleeve, 14-isolating cover plate, 15-closing plate, 16-inlet cover plate, 17-isolating steel mesh, 18-cooling element, 19-positioning clamp ring, 20-fixing clamp ring, 21-grouting solenoid valve, 22-drainage solenoid valve, 23-electromagnetic flowmeter, 24-pressure transmitter, 25-temperature sensor, 26-remote control collector, 27-insulated drainage pipe, 28-concrete closing range. DETAILED DESCRIPTION
[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0043] The purpose of the present invention is to provide a device and method for sealing water gushing from the face of a rock tunnel or tunnel blasting excavation, so as to solve the problems existing in the prior art and ensure the safety of construction personnel and the sealing effect of hot water gushing.
[0044] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0045] Embodiment 1
[0046] like Figure 1-Figure 4As shown, the present embodiment provides a water gushing sealing device for a rock tunnel or tunnel face excavation by blasting, including a hole sealing module and a hot water isolation module. The hole sealing module includes a main pipe, a heat-insulating drainage pipe 27, a mold bag 9 and a grouting pump 12. One end of the main pipe extends into and is limited in a borehole 3 opened at a water gushing influence range 2, and the other end of the main pipe extends in a direction away from the borehole 3. The heat-insulating drainage pipe 27 is installed in the middle of the main pipe and can connect the main pipe with an external centralized drainage pipe. The ultra-high temperature gushing water is led away from the face 1 through the heat-insulating drainage pipe 27 to prevent the ultra-high temperature gushing water from deteriorating the construction environment, while reducing the gushing water pressure and reducing the difficulty of the sealing construction; a mold bag 9 is fixedly sleeved at the position where the main pipe extends into the borehole 3, and the mold bag 9 can connect the grouting pump 12. , so as to inject grout into the mold bag 9 through the grouting pump 12; the hot water isolation module is installed around the circumference of the main pipe, the heat-insulating drain pipe 27 is located between the hot water isolation module and the borehole 3, and in the direction from close to away from the main pipe, the hot water isolation module extends in the direction close to the borehole 3, the hot water isolation module includes a accommodating element and a cooling element 18, the cooling element 18 is placed in the accommodating element, the side of the accommodating element opposite to the main pipe is hollowed out, and the side of the accommodating element opposite to the main pipe is closed. During the sealing construction process, the ultra-high temperature gushing water splashed through the hollow side is splashed onto the cooling element for cooling. The closed side of the hot water isolation module isolates the splashing ultra-high temperature gushing water, reduces the ambient temperature around the borehole 3, and ensures the safety of personnel during the sealing construction.
[0047] Specifically, the main pipe includes a front section orifice pipe 5 and a rear section orifice pipe 6. The front section orifice pipe 5, the rear section orifice pipe 6 and the insulated drainage pipe 27 are connected by a tee pipe 7, and a portion of the rear section orifice pipe 6 extends into the borehole 3. A positioning pin 8 is fixed on the outer wall of the rear section orifice pipe 6. The positioning pin 8 is used to contact the face 1, and the length of the positioning pin 8 is greater than the inner diameter of the borehole 3. By changing the position of the positioning pin 8, the depth adjustment of the rear section orifice pipe 6 inserted into the borehole 3 can be achieved.
[0048] Both ends of the mold bag 9 are provided with tie wires 11 , and the mold bag 9 is connected to the rear section orifice pipe 6 through the tie wires 11 , and the mold bag 9 is connected to a grouting pump 12 through a plurality of grouting pipes 10 .
[0049] A positioning clamp ring 19, a connecting sleeve 13 and a fixing clamp ring 20 are provided in the middle part of the front section orifice tube 5. The positioning clamp ring 19 is fixed on the outer wall of the front section orifice tube 5. The connecting sleeve 13 is slidably connected to the front section orifice tube 5. The fixing clamp ring 20 can be detachably connected to the front section orifice tube 5. The fixing clamp ring 20 is preferably a clamp. The connecting sleeve 13 is limited between the positioning clamp ring 19 and the fixing clamp ring 20 to realize the fixation of the connecting sleeve 13. The middle part of the accommodating element is fixed on the connecting sleeve 13.
[0050] The accommodating element is arranged in an umbrella shape and includes an isolation steel mesh 17, an isolation cover plate 14, a closing plate 15 and an entrance cover plate 16. The middle of the isolation steel mesh 17 and the middle of the isolation cover plate 14 are provided with through holes for connecting the connecting sleeve 13, and the outer edges of the isolation steel mesh 17 and the outer edges of the isolation cover plate 14 extend away from the connecting sleeve 13. The isolation cover plate 14 and the isolation steel mesh 17 are arranged along the length direction of the front section orifice pipe 5, and the isolation steel mesh 17 is located on the side of the isolation cover plate 14 close to the rear section orifice pipe 6, so that the water pressure during the sealing construction process is reduced. The splashing hot water formed by the increase in flow rate can pass through the isolation steel mesh 17 and splash onto the cooling element 18. The cooling element 18 absorbs the heat of the hot water and reduces the ambient temperature around the opening of the borehole 3. At the same time, the isolation cover 14 can prevent the hot water from continuing to splash outward, further ensuring the safety of personnel during the plugging construction. The outer edge of the isolation steel mesh 17 and the outer edge of the isolation cover 14 are connected and blocked by the closing plate 15. The closing plate 15 is provided with an inlet for filling the cooling element 18, and the inlet cover 16 can be detachably installed at the inlet and control the opening and closing of the inlet.
[0051] This embodiment also includes a control module, which includes a remote control collector 26, and a grouting solenoid valve 21, an electromagnetic flowmeter 23, a pressure transmitter 24, a drainage solenoid valve 22 and a temperature sensor 25 electrically connected to the remote control collector 26. The grouting solenoid valve 21, the electromagnetic flowmeter 23 and the pressure transmitter 24 are all installed on the main pipe, and the grouting solenoid valve 21, the electromagnetic flowmeter 23 and the pressure transmitter 24 are located on the side of the hot water isolation module away from the borehole 3, and the drainage solenoid valve 22 and the temperature sensor 25 are both installed on the insulated drainage pipe 27.
[0052] The grouting pump 12 is a screw pump.
[0053] The cooling element 18 is an ice cube, and the size of the ice cube needs to be larger than the aperture of the isolation steel mesh 17 .
[0054] The slurry injected by the grouting pump 12 is fly ash silicate cement, that is, ordinary silicate cement-fly ash slurry (the mass proportion of fly ash is ≥30%). For ordinary silicate cement-fly ash composite slurry, when the mass proportion of fly ash in the composite material is higher than 30%, the fly ash will reduce the hydration rate of cement to a certain extent and reduce the heat release of the hydration reaction. Under high temperature conditions, the stone body of ordinary silicate cement-fly ash composite material has no shrinkage and cracking phenomenon, and the hole sealing quality is good; ordinary silicate cement-fly ash slurry has no rapid setting phenomenon, the mold bag 9 can drain normally, the pressure water seepage effect can be exerted normally, and the early strength of the stone body after pressure water seepage is not affected, ensuring the strength of the stone body in the sealing section and the later grouting and plugging effect.
[0055] Embodiment 2
[0056] This embodiment provides a method for sealing water inrush at the face of a rock tunnel or tunnel blasting excavation, using a device for sealing water inrush at the face of a rock tunnel or tunnel blasting excavation according to any one of the above technical solutions, such as Figure 1-Figure 4 As shown, the following steps are included:
[0057] S1. Top water grouting plugging hole layout: a borehole 3 is arranged at the water gushing point, and multiple boreholes 3 are evenly arranged around the water gushing point along the water gushing influence range 2. The radius of the circle surrounded by the multiple boreholes 3 is close to or equal to the maximum radius of the water gushing influence range 2. The direction, inclination, hole depth and other parameters of the borehole 3 are determined according to the exploration results of the ultra-high temperature water gushing leakage channel 4. The diameter of the borehole 3 is ≥65mm;
[0058] S2. Assemble the sealing module. Use steel pipes of appropriate size to make the front orifice pipe 5 and the rear orifice pipe 6, and connect the front orifice pipe 5 and the rear orifice pipe 6 with a tee pipe 7; the diameter of the front orifice pipe 5 and the rear orifice pipe 6 are both ≥40mm, the wall thickness is ≥5mm, the length is 1.2m, and both ends are threaded for easy connection with instruments and equipment. Technicians in this field can also adjust the above dimensions according to actual needs; Use steel bars with a length greater than the radius of the drill hole 3 to weld to the outer wall of the rear orifice pipe 6 as positioning pins 8, the steel bar diameter is ≥8mm, the length is ≥5mm, and the length is 1.2m. ≥65mm, welded at 30cm away from the end of the rear orifice pipe 6; insert the grouting pipe 10 (preferably a hard rubber pipe) into the middle of the sewn mold bag 9, and use the tie wire 11 to fix the two ends of the mold bag 9 to the rear orifice pipe 6. The fixed length of the tie wire 11 is 10cm, and one end of the mold bag 9 is 10cm away from the end of the rear orifice pipe 6; the length of the mold bag 9 is ≥80cm, which can be adjusted according to the quality of the enclosed rock. The diameter of the grouting pipe 10 is 8mm-15mm, and the length is ≥2.5m. The length of the grouting pipe 10 can be adjusted according to the ultra-high temperature water pressure and flow rate;
[0059] S3. The hot water isolation module is assembled, and a steel pipe support of appropriate size is used to connect the sleeve 13. The diameter of the connecting sleeve 13 is larger than the diameter of the front section orifice pipe 5. The diameter of the connecting sleeve 13 is ≥75mm, the length is ≥15cm, and the wall thickness is ≥5mm. The isolation cover plate 14, the closing plate 15 and the inlet cover plate 16 are made of steel plates of appropriate thickness. The thickness of the steel plate is ≤2mm, and the closing plate 15 is reserved for the input port. The isolation steel mesh 17 is made by welding multiple steel bars. The diameter of the steel bars is ≤8mm, and the aperture of the isolation steel mesh 17 is 5cm to 10cm. The middle part of the isolation cover plate 14 and the middle part of the isolation steel mesh 17 are welded to the connecting sleeve 13 respectively, and the outer edge of the isolation cover plate 14 and the outer edge of the isolation steel mesh 17 are welded to the closing plate 15 respectively, and the inlet cover plate 16 is welded to the input port. The outer diameter of the hot water isolation module can be adjusted according to the ultra-high temperature water pressure and flow rate. To ensure the safety of construction personnel, the radius should be ≥0.5m.
[0060] S4. The hot water isolation module is in place, the positioning clamp ring 19 is welded to the middle of the front orifice pipe 5, the connecting sleeve 13 is sleeved on the front orifice pipe 5 and moved to contact with the positioning clamp ring 19, the fixing clamp ring 20 is installed on the front orifice pipe 5, and the end of the connecting sleeve 13 away from the positioning clamp ring 19 is limited; the fixing clamp ring 20 is made of steel bars with a diameter greater than 8 mm;
[0061] S5. The control module is assembled in place, and the grouting solenoid valve 21, electromagnetic flowmeter 23, pressure transmitter 24, drainage solenoid valve 22 and temperature sensor 25 equipped with wireless modules are selected to wirelessly connect to the remote control acquisition instrument 26, such as Senya 2S-500-25F intelligent solenoid valve, Kuangjian LD intelligent electromagnetic flowmeter 23, CYB4500 pressure transmitter 24, PT100 wireless temperature sensor 25, etc.; the remote control acquisition instrument 26 is equipped with corresponding instrument control and data acquisition programs, and can realize wireless remote control and data acquisition of the instrument in a wireless LAN environment; the drainage solenoid valve 22 and the temperature sensor 25 are installed on the insulated drainage pipe 27 in sequence, and the insulated drainage pipe 27 is connected to the three-way pipe 7; the grouting solenoid valve 21, the electromagnetic flowmeter 23 and the pressure transmitter 24 are installed on the front orifice pipe 5 in sequence, and the distance between adjacent devices is ≥20cm;
[0062] S6. The sealing module is in place. With the assistance of the drilling device 3, the sealing module is slowly inserted into the borehole 3. The insertion depth is controlled by the contact of the positioning pin 8 with the tunnel face 1.
[0063] S7. Drainage of gushing water: Before the sealing module is inserted into the borehole 3, the drainage solenoid valve 22 is controlled to be in an open state and the grouting solenoid valve 21 is controlled to be in a closed state to avoid the formation of splashing hot water at the outlet of the front orifice pipe 5 during the insertion of the sealing module into the borehole 3. It is ensured that the ultra-high temperature gushing water in the borehole 3 flows through the three-way pipe 7 and then flows through the insulation drainage pipe 27, and the ultra-high temperature gushing water is drained to the centralized drainage pipe 20m behind the face 1, so as to realize the centralized drainage of gushing water, ensure that the gushing water is drained to the rear of the face 1, and is discharged into the external centralized drainage pipe outside the tunnel, so as to reduce the heat dissipation area of hot water and steam emission in the construction area of the face 1, and avoid deterioration of the construction environment;
[0064] S8. The cooling element 18 is filled. The inlet cover plate 16 is opened and the cooling element 18 is filled into the containing element along the input port. The cooling element 18 will not fall through the isolation steel mesh 17. During the sealing construction, the water pressure and flow rate increase to form splashing hot water. When the cooling element 18 is encountered, the cooling element 18 melts and absorbs the heat of the hot water. It can also reduce the ambient temperature around the borehole 3, ensuring the safety of personnel during the sealing construction.
[0065] S9. Grouting and sealing of mold bag 9. After the cooling element 18 is filled, a screw pump (power less than 1.5kw) is used to quickly pour low hydration heat ordinary silicate cement-fly ash slurry (fly ash mass proportion ≥30%) into the mold bag 9 along the grouting pipe 10. The slurry water-cement ratio is 1:1-0.5:1, the mold bag 9 grouting pressure is ≥0.25MPa, and the slurry screen time does not exceed 10min. The grouting pressure should be adjusted in real time according to the quality of the surrounding rock of the face 1 and the grouting construction process. It is advisable to complete the slurry pressure water seepage process as soon as possible under a larger grouting pressure; after the screen is completed, the valve corresponding to the grouting pipe 10 is closed, the grouting pump 12 stops grouting, and the grouting of the mold bag 9 is ended; for multiple boreholes 3 on the face 1, the closing order is from the peripheral boreholes 3 to the middle boreholes 3, and from the boreholes 3 with less water flow to the water-gushing holes with more water flow;
[0066] S10. Remote control of equipment and plugging parameter information feedback. After all boreholes 3 are sealed, the drainage solenoid valve 22 is remotely closed and the grouting solenoid valve 21 is opened to allow the gushing water to flow out through the rear orifice pipe 6 and the insulation drainage pipe 27 in sequence; the gushing water pressure and flow rate are monitored by the electromagnetic flowmeter 23 and the pressure transmitter 24 respectively; after data collection is completed, the grouting solenoid valve 21 is closed and the drainage solenoid valve 22 is opened to continue to lead the gushing water away from the tunnel face 1 through the insulation drainage pipe 27, and the water temperature is monitored by the temperature sensor 25; the gushing water pressure The force, flow rate, and water temperature data are fed back to the remote control acquisition instrument 26 in real time, providing data support for the determination of parameters such as grouting pressure, grouting volume, and grouting materials for subsequent top water grouting and plugging construction; in the later top water grouting construction process, after the grouting pipeline is connected, the drainage solenoid valve 22 is remotely closed, and the grouting solenoid valve 21 is opened to close the pipeline before top water grouting. The grouting pressure and flow rate can be monitored and fed back online through the electromagnetic flowmeter 23 and the pressure transmitter 24, and the grouting parameters can be adjusted in real time accordingly to improve the success rate of grouting and plugging;
[0067] S11. Shotcrete surface sealing, hang isolation steel mesh 17 on water gushing influence range 2 on tunnel face 1, and then spray concrete to seal the surface, the spraying thickness is ≥ 25cm, the radius of concrete sealing range 28 is greater than the radius of water gushing influence range 2, and the difference is about 0.5m;
[0068] S12. Check the sealing effect. After the shotcrete surface is sealed, a water pressure test is carried out to check the sealing effect of the three drill holes.
[0069] S13. Dismantling and recycling of the sealing device: after the plugging material has reached the setting age, the control module is dismantled, the fixing clamp 20 is loosened, the hot water isolation module is dismantled, and the recycled instruments are cleaned for use in the next orifice sealing construction.
[0070] Through the above-mentioned design, this embodiment combines the low hydration thermal properties of ordinary Portland cement-fly ash slurry, the flow characteristics of water gushing and plugging, the melting heat absorption characteristics of the coolant, the remote control of equipment and the remote data collection characteristics to quickly and effectively seal the ultra-high temperature hot water gushing in the rock tunnel and the tunnel blasting excavation face 1.
[0071] The present invention uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core ideas of the present invention. At the same time, for those skilled in the art, according to the ideas of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. A method for sealing water inrush from a rock tunnel or tunnel face during blasting excavation, characterized in that: The water inrush sealing device for rock tunnel and tunnel blasting excavation face includes the following steps: S1. Top water grouting plugging hole layout: a borehole is laid out at the water gushing point, and multiple boreholes are evenly laid out around the water gushing point along the water gushing influence range. The radius of the circle enclosed by the multiple boreholes is equal to the maximum radius of the water gushing influence range; S2. Assemble the sealing module, use steel pipes to make the front section orifice pipe and the rear section orifice pipe, and connect the front section orifice pipe and the rear section orifice pipe with a tee pipe; use steel bars with a length greater than the drilling radius to weld the outer wall of the rear section orifice pipe as positioning pins; insert the grouting pipe into the middle of the sewn mold bag, and fix the two ends of the mold bag to the rear section orifice pipe with wire ties; S3. Assemble the hot water isolation module, use a steel pipe support to connect the sleeve, the diameter of the connecting sleeve is larger than the diameter of the front section orifice pipe, use steel plates to make the isolation cover plate, the closing plate and the inlet cover plate, the closing cover plate has a reserved input port, and use multiple steel bars to weld and make the isolation steel mesh; weld the middle of the isolation cover plate and the middle of the isolation steel mesh to the connecting sleeve respectively, weld the outer edge of the isolation cover plate and the outer edge of the isolation steel mesh to the closing plate respectively, and weld the inlet cover plate to the input port; S4. The hot water isolation module is in place, the positioning clamp is welded to the middle of the front orifice pipe, the connecting sleeve is sleeved on the front orifice pipe and moved to contact with the positioning clamp, the fixing clamp is installed on the front orifice pipe, and the end of the connecting sleeve away from the positioning clamp is limited; S5. The control module is assembled in place, and the grouting solenoid valve, electromagnetic flowmeter, pressure transmitter, drainage solenoid valve and temperature sensor equipped with wireless modules are wirelessly connected to the remote control acquisition instrument; the drainage solenoid valve and temperature sensor are installed on the insulation drainage pipe in sequence, and the insulation drainage pipe is connected to the three-way pipe; the grouting solenoid valve, electromagnetic flowmeter and pressure transmitter are installed on the front orifice pipe in sequence; S6. The sealing module is in place. With the assistance of the drilling equipment, the sealing module is slowly inserted into the borehole. The insertion depth is controlled by the contact of the positioning pin with the tunnel face. S7. Drainage of gushing water: control the drainage solenoid valve to be in the open state and the grouting solenoid valve to be in the closed state, use the insulated drainage pipe to centrally drain the gushing water, ensure that the gushing water is drained to the rear of the tunnel face and discharged into the external centralized drainage pipe outside the tunnel; S8. Fill the cooling element, open the inlet cover, and fill the cooling element into the accommodating element along the input port, and the cooling element will not fall through the isolation steel mesh; S9. Mould bag grouting and sealing construction: after the cooling element is filled, use the grouting pump to pour fly ash silicate cement into the mould bag along the grouting pipe. After the grouting is screened at the set grouting pressure, close the valve corresponding to the grouting pipe, stop the grouting by the grouting pump, and end the mould bag grouting. For multiple boreholes on the face, the sealing order is from the peripheral boreholes to the middle boreholes, and from the boreholes with less water inflow to the boreholes with more water inflow. S10. Remote control of instruments and equipment and feedback of plugging parameter information. After all boreholes are sealed, the drainage solenoid valve is remotely closed and the grouting solenoid valve is opened to allow the gushing water to flow out through the rear orifice pipe and the insulated drainage pipe in sequence; the gushing water pressure and flow are monitored by the electromagnetic flowmeter and the pressure transmitter respectively; after data collection is completed, the grouting solenoid valve is closed and the drainage solenoid valve is opened to continue to lead the gushing water away from the tunnel face through the insulated drainage pipe, and the water temperature is monitored by the temperature sensor; the gushing water pressure, flow, and water temperature data are fed back to the remote control acquisition instrument in real time; S11. Shotcrete surface sealing: hang an isolation steel mesh on the water gushing impact area on the tunnel face, and then spray concrete to seal the surface. The radius of the sealing area is larger than the radius of the water gushing impact area. S12. Check the sealing effect. After the shotcrete surface is sealed, a water pressure test is carried out to check the sealing effect of the drilled hole. S13. Dismantling and recycling of the sealing device: after the plugging material has reached the setting age, dismantle the control module, loosen the fixing ring, dismantle the hot water isolation module, and clean up the recycled instruments; The water gushing sealing device for rock tunnel and tunnel blasting excavation face comprises a sealing module and a hot water isolation module, the sealing module comprises a main pipe, a heat-insulating drainage pipe, a mold bag and a grouting pump, one end of the main pipe extends into and is limited in a borehole opened at the water gushing influence range, the other end of the main pipe extends in a direction away from the borehole, the heat-insulating drainage pipe is installed in the middle of the main pipe and can connect the main pipe with an external centralized drainage pipe, the mold bag is fixedly sleeved at the position of the main pipe extending into the borehole, and the mold bag can connect the grouting pump; the hot water isolation module is installed around the circumference of the main pipe, the heat-insulating drainage pipe is located between the hot water isolation module and the borehole, and in a direction from close to away from the main pipe, the hot water isolation module extends in a direction close to the borehole, the hot water isolation module comprises a accommodating element and a cooling element, the cooling element is placed in the accommodating element, the side of the accommodating element opposite to the main pipe is hollowed out, and the side of the accommodating element opposite to the main pipe is closed.
2. The method for sealing water inrush from a rock tunnel or tunnel face excavated by blasting according to claim 1 is characterized by: The main pipe includes a front section orifice pipe and a rear section orifice pipe, the front section orifice pipe, the rear section orifice pipe and the insulation drainage pipe are connected by a tee pipe, and a portion of the rear section orifice pipe extends into the drill hole, and a positioning pin is fixed on the outer wall of the rear section orifice pipe, and the positioning pin is used to contact the tunnel face.
3. The method for sealing water inrush from a rock tunnel or tunnel face excavated by blasting according to claim 2 is characterized by: Both ends of the mold bag are provided with tying wires, the mold bag and the rear section orifice pipe are connected by the tying wires, and the mold bag is connected to the grouting pump through a plurality of grouting pipes.
4. The method for sealing water inrush from a rock tunnel or tunnel face excavated by blasting according to claim 2 is characterized by: A positioning clamp, a connecting sleeve and a fixing clamp are provided in the middle portion of the front section orifice tube, the positioning clamp is fixed on the outer wall of the front section orifice tube, the connecting sleeve is slidably connected to the front section orifice tube, the fixing clamp can be detachably connected to the front section orifice tube, and the connecting sleeve is limited between the positioning clamp and the fixing clamp, and the middle portion of the accommodating element is fixed on the connecting sleeve.
5. The method for sealing water inrush from a rock tunnel or tunnel face excavated by blasting according to claim 4 is characterized by: The accommodating element includes an isolation steel mesh, an isolation cover plate, a closing plate and an entrance cover plate. A through hole for connecting the connecting sleeve is provided in the middle of the isolation steel mesh and the middle of the isolation cover plate, and the outer edge of the isolation steel mesh and the outer edge of the isolation cover plate extend away from the connecting sleeve. The isolation cover plate and the isolation steel mesh are arranged along the length direction of the front section orifice tube, and the isolation steel mesh is located on the side of the isolation cover plate close to the rear section orifice tube. The outer edge of the isolation steel mesh and the outer edge of the isolation cover plate are connected and blocked by the closing plate. An input port is provided on the closing plate, and the entrance cover plate can be detachably installed at the input port and control the opening and closing of the input port.
6. The method for sealing water inrush from a rock tunnel or tunnel face excavated by blasting according to claim 1 is characterized by: It also includes a control module, which includes a remote control collector, and a grouting solenoid valve, an electromagnetic flowmeter, a pressure transmitter, a drainage solenoid valve and a temperature sensor electrically connected to the remote control collector. The grouting solenoid valve, the electromagnetic flowmeter and the pressure transmitter are all installed on the main pipe, and the grouting solenoid valve, the electromagnetic flowmeter and the pressure transmitter are located on the side of the hot water isolation module away from the borehole, and the drainage solenoid valve and the temperature sensor are both installed on the insulated drainage pipe.
7. The method for sealing water inrush from a rock tunnel or tunnel face excavated by blasting according to claim 1 is characterized by: The grouting pump is a screw pump.
8. The method for sealing water inrush from a rock tunnel or tunnel face excavated by blasting according to claim 1 is characterized by: The cooling element is an ice block, and the slurry injected by the grouting pump is fly ash silicate cement.