A concrete base for construction of prestressed steel cylinder concrete pipe
The concrete base for prestressed steel cylinder concrete pipes uses an arc-shaped groove and adjusting mechanisms to facilitate accurate installation and fixation, addressing the challenges of on-site casting and displacement, thereby enhancing construction efficiency and stability.
Patent Information
- Application Number
- CN202410261969.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-07
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-03-07
AI Technical Summary
Current concrete pipe construction methods require on-site casting of pipe bases, which are inconvenient, difficult to install, prone to displacement, and affect the quality of the project due to poor base fixation and alignment.
A concrete base for prestressed steel cylinder concrete pipes featuring an arc-shaped groove with an adjusting groove, roller, fixing bolt, and protective plate to facilitate accurate positioning and fixation, using elastic baffles and anchor bolts for stability and support.
Enhances installation efficiency by ensuring accurate alignment and fixation, reducing workload, and preventing displacement, while improving structural integrity and stability of the pipe base.
Smart Images

Figure CN118188881B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of engineering construction, in particular to a concrete base for the construction of a prestressed steel cylinder concrete pipe. Background Art
[0002] In the current concrete pipe construction, in order to lay the pipe, a concrete arc pipe foundation is usually cast on site for pipe auxiliary installation. This method generally requires on-site pouring, which is very inconvenient. If other auxiliary parts need to be set up later, it is also very inconvenient.
[0003] At the same time, if the pipe base is cast on site, it is difficult to install and fix the pipe base template, and the quality of the base after molding cannot be guaranteed. In addition, the pipeline is prone to displacement during the casting process, affecting the quality of the project construction. Summary of the invention
[0004] In order to make up for the deficiencies of the prior art, the position of the pipeline is adjusted to ensure the correct position of the pipeline, facilitate the laying of the pipeline, and fully fix the pipeline and the base to avoid displacement of the pipeline. The present invention proposes a concrete base for the construction of prestressed steel cylinder concrete pipes.
[0005] The technical solution adopted by the present invention to solve the technical problem is: the concrete base for the construction of prestressed steel cylinder concrete pipes described in the present invention has an arc-shaped groove on the base, and the arc-shaped groove is used to place and install the pipe;
[0006] An adjusting groove is provided on the surface of the arc-shaped groove, a roller is installed in the adjusting groove, a mounting groove is provided on the side wall of the adjusting groove, a rotating shaft of the roller is installed in the mounting groove, and the roller contacts the surface of the pipeline.
[0007] Preferably, a fixing hole is opened on the surface of the arc-shaped groove, a fixing bolt is installed in the fixing hole, a protective plate is installed on the fixing bolt, and the shape of the protective plate is the same as that of the arc-shaped groove;
[0008] A contact window is provided on the protective plate, and the upper surface of the roller passes through the contact window. The protective plate and the pipeline are in contact with each other, and the distance between the protective plate and the arc-shaped groove is adjusted by a fixing bolt.
[0009] Preferably, baffles are installed at both ends of the base, the protective plate is located between the baffles, and the baffles are made of elastic material;
[0010] The upper surface of the baffle contacts the pipeline surface before the surface of the protective plate, there is a gap between the bottom of the adjustment groove and the roller, and the space between the protective plate and the arc groove is filled with concrete slurry.
[0011] Preferably, a guide groove is opened on the surface of the arc-shaped groove, the guide groove is connected with the adjustment groove, the depth of the adjustment groove is greater than the depth of the guide groove, and the guide groove and the adjustment groove are perpendicular to each other.
[0012] Preferably, a protrusion is installed on the surface of the protective plate, and the protrusion is in contact with the surface of the pipeline.
[0013] Preferably, the height of the protrusion is smaller than the height of the baffle, and the protrusion is made of elastic material.
[0014] Preferably, the base is provided with symmetrically distributed through anchoring holes, the arc-shaped groove is located between the anchoring holes, anchor bolts are inserted and installed in the anchoring holes, and the lower ends of the anchor bolts are inserted into the soil.
[0015] Preferably, a locking groove is provided on the side of the base, the locking groove and the anchoring hole are communicated with each other, an annular groove is provided on the anchor bolt, a clamping block is inserted and installed in the locking groove, and the clamping block and the annular groove match each other.
[0016] The beneficial effects of the present invention are as follows:
[0017] 1. The concrete base for the construction of a prestressed steel cylinder concrete pipe described in the present invention is provided with an adjustment groove, a roller, a fixing bolt and a protective plate. The roller is used to adjust the position of the pipe on the base, and the protective plate is used to make the pipe fit and parallel to the base, so as to facilitate the installation of the pipe and avoid cumbersome pipe installation operations and affect the quality of engineering construction.
[0018] 2. The concrete base for the construction of a prestressed steel cylinder concrete pipe described in the present invention is provided with an adjustment groove, a guide groove, a contact window, a protrusion, a baffle and an anchor bolt, and concrete slurry is poured between the pipe and the protective plate, and between the protective plate and the arc-shaped groove, so that the pipe, the protective plate and the base form a whole, so that the pipe is firmly fixed, and the base and the ground are fully fixed by anchor bolts to avoid movement of the base during construction or backfilling, resulting in displacement of the pipe and affecting the normal use of the pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The present invention will be further described below in conjunction with the accompanying drawings.
[0020] Figure 1 It is a schematic diagram of the structure of the base of the present invention after the pipe is installed in the groove;
[0021] Figure 2 This is a schematic diagram of the structure of the base of the present invention after the pipeline is placed;
[0022] Figure 3 It is a schematic diagram of the structure of the base of the present invention before placing the pipeline;
[0023] Figure 4 It is a structural schematic diagram of the base of the present invention;
[0024] Figure 5 It is a front view of the roller in the base of the present invention;
[0025] Figure 6 yes Figure 2 A partial enlarged view of the middle part;
[0026] Figure 7 yes Figure 2 A partial enlarged view of point B in the middle;
[0027] Figure 8 yes Figure 3 A partial enlarged view of point C in the middle;
[0028] In the figure: base 1, fixing hole 11, fixing bolt 12, anchor hole 13, anchor bolt 131, locking groove 14, block 141, adjustment groove 2, installation groove 21, guide groove 22, roller 23, baffle 3, protective plate 4, contact window 41, protrusion 42, concrete slurry 5, pipeline 6. DETAILED DESCRIPTION
[0029] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0030] like Figures 1 to 8 As shown, the concrete base for the construction of a prestressed steel cylinder concrete pipe of the present invention has an arc-shaped groove formed on the base 1, and the arc-shaped groove is used for placing and installing the pipe 6;
[0031] An adjusting groove 2 is provided on the surface of the arc-shaped groove, a roller 23 is installed in the adjusting groove 2, a mounting groove 21 is provided on the side wall of the adjusting groove 2, a rotating shaft of the roller 23 is installed in the mounting groove 21, and the roller 23 is in contact with the surface of the pipe 6;
[0032] When constructing the prestressed steel cylinder concrete pipe, firstly, a trench is excavated on the ground along the planned route and the bottom surface of the trench is leveled. Then, the base 1 is hoisted into the trench, and then the prestressed steel cylinder concrete pipe 6 is placed on the base 1. At the same time, after the pipe 6 is installed on the base 1 in the trench, the backfill excavated when the trench is excavated is backfilled into the trench to fully bury the pipe 6 and the base 1, so as to ensure the construction effect and efficiency of the prestressed steel cylinder concrete pipe.
[0033] At the same time, after the base 1 is hoisted and installed on the bottom surface of the trench, the staff hoists the pipe 6 to the top of the trench by a crane or other equipment, and slowly lowers it into the arc-shaped groove on the base 1 to complete the placement of the pipe 6;
[0034] At the same time, since the length and diameter of a single section of pipe 6 are relatively large, when placing the pipe 6 into the arc-shaped groove, the position of the pipe 6 is likely to deviate, thereby affecting the connection between the two adjacent sections of pipe 6. At this time, the staff will mostly re-lift the pipe 6 to leave a gap between the pipe 6 and the arc-shaped groove, and then adjust the position of the pipe 6 and then re-place the pipe 6 on the arc-shaped groove to ensure that the position of the pipe 6 is relatively accurate. However, this method requires the staff to adjust it little by little, and the operation is relatively cumbersome, which affects the efficiency of the construction of the pipe 6 and increases the workload of the staff. Therefore, when the pipe 6 is placed in the arc-shaped groove on the base 1, the pipe 6 is not easily misaligned. After being inserted into the groove, the surface of the pipe 6 will contact the roller 23 installed in the adjustment groove 2. If there is a deviation in the position of the pipe 6, the staff can manually or use mechanical equipment to push the pipe 6 along the axial direction of the pipe 6, so that the pipe 6 slowly moves along the axial direction of the pipe 6 under the action of the roller 23, thereby adjusting the position of the pipe 6, facilitating the alignment and connection between two adjacent pipes 6, avoiding the need for the staff to re-lift the pipe 6 in order to adjust the position of the pipe 6, and re-place it after adjusting the position, making the installation of the pipe 6 relatively simple and convenient, improving the work efficiency of the staff and reducing the workload of the staff;
[0035] At the same time, since the adjustment groove 2 runs through the entire surface of the arc-shaped groove along the axial direction of the base 1, the two ends of the adjustment groove 2 are directly in an "open" state, so that the rollers 23 can be directly installed from the two ends of the adjustment groove 2. Therefore, in order to avoid the rollers 23 from falling off during the storage and transportation of the base 1 or the rollers 23 from gathering together in the adjustment groove 2, the rollers 23 can be installed in the adjustment groove 2 from the two ends by the staff after the base 1 is installed in the groove during the construction process. At the same time, the rollers 23 can be obtained by pouring concrete on the basis of using metal rods as rotating shafts, thereby further reducing production costs.
[0036] As an embodiment of the present invention, a fixing hole 11 is opened on the surface of the arc-shaped groove, a fixing bolt 12 is installed in the fixing hole 11, and a protective plate 4 is installed on the fixing bolt 12, and the shape of the protective plate 4 is the same as that of the arc-shaped groove;
[0037] The protective plate 4 is provided with a contact window 41, and the upper surface of the roller 23 passes through the contact window 41. The protective plate 4 and the pipe 6 are in contact with each other, and the distance between the protective plate 4 and the arc-shaped groove is adjusted by the fixing bolt 12;
[0038] Since the trenches during construction are mostly excavated on site or excavated by an excavator some time in advance, the bottom surface of the trench will be undulating, resulting in poor flatness of the bottom surface of the trench. Therefore, after the base 1 is installed on the bottom surface of the trench, there is a possibility that an angle will appear between the arc-shaped groove on the base 1 and the pipe 6 placed in the arc-shaped groove, that is, the axis of the base 1 will be inclined relative to the axis of the pipe 6, resulting in the pipe 6 and the arc-shaped groove not being fully fitted, causing the pipe 6 to be subjected to additional force, affecting the normal use or normal installation of the pipe 6;
[0039] At the same time, by installing the protective plate 4 on the surface of the arc groove using the fixing bolts 12, the protective plate 4 is used to support the pipe 6. When the bottom surface in the groove is uneven, resulting in an angle between the base 1 and the pipe 6, the fixing bolts 12 are used to adjust the distance between the protective plate 4 and the arc groove, so that the protective plate 4 and the pipe 6 are parallel to each other, ensuring the fitting and supporting effect of the protective plate 4 on the pipe 6, so as to prevent the pipe 6 from being subjected to additional force, which affects the normal use or normal installation of the pipe 6;
[0040] At the same time, the distance between the protective plate 4 and the arc-shaped groove is adjusted by fixing the bolts 12, so that the protective plate 4 and the pipe 6 are parallel to each other, ensuring the fitting and supporting effect of the pipe 6, so that the staff does not need to perform secondary leveling of the bottom surface of the groove under the base 1 or increase the additional workload of leveling the bottom surface of the groove during the trench excavation process, thereby reducing the requirement for the leveling height of the bottom surface of the groove, thereby effectively improving the work efficiency of the staff in installing the pipe 6 and reducing the workload of the staff;
[0041] At the same time, since a contact window 41 is provided on the protective plate 4 and the roller 23 installed in the adjusting groove 2 will pass through the contact window 41, the relative position of the roller 23 in the adjusting groove 2 will be fixed, thereby preventing the roller 23 from moving arbitrarily in the adjusting groove 2, or even the roller 23 from falling from both ends of the adjusting groove 2, thereby affecting the normal use of the roller 23. At the same time, the position of the roller 23 is restricted by the contact window 41, so that when the staff uses the roller 23 to adjust the position of the pipeline 6, it can be ensured that the roller 23 does not move excessively, thereby preventing the position of the roller 23 from being relatively close to the end of the adjusting groove 2, thereby causing the roller 23 to fall from the end of the adjusting groove 2, thereby affecting the normal work of the roller 23.
[0042] As an embodiment of the present invention, baffles 3 are installed at both ends of the base 1, the protective plate 4 is located between the baffles 3, and the baffles 3 are made of elastic material;
[0043] The upper surface of the baffle plate 3 contacts the surface of the pipe 6 before the surface of the protective plate 4, there is a gap between the bottom of the adjustment groove 2 and the roller 23, and the space between the protective plate 4 and the arc-shaped groove is filled with concrete slurry 5;
[0044] Since the hardness of the pipe 6, the base 1 and the protective plate 4 are relatively hard, when the pipe 6 is placed on the base 1 by a crane or other equipment, the pipe 6 is prone to collision or impact with the base 1 or the protective plate 4, which may cause concrete peeling and damage on the surface of the pipe 6 or the surface of the base 1, affecting the normal use of the pipe 6. Therefore, elastic baffles 3 are installed at both ends of the base 1, so that when the pipe 6 is placed, the pipe 6 first contacts the baffles 3, and the baffles 3 are used to buffer the impact force in the process of placing the pipe 6, so as to avoid impact between the pipe 6 and the base 1 or the protective plate 4, resulting in damage to the pipe 6 or the base 1, affecting the subsequent normal use of the pipe 6;
[0045] At the same time, after the pipe 6 is placed on the base 1, there will be a gap between the protective plate 4 and the surface of the arc-shaped groove under the action of the fixing bolts 12, so that a small space is formed between the protective plate 4 and the arc-shaped groove under the action of the baffle 3. The staff fills the small space with concrete slurry 5 so as to fully connect the protective plate 4 with the base 1 by using the concrete slurry 5, so as to avoid the protective plate 4 being installed on the base 1 only by the fixing bolts 12 and the protective plate 4 being subjected to excessive force by the fixing bolts 12, thereby affecting the normal use of the protective plate 4. At the same time, due to the contact window 41 opened on the protective plate 4, the concrete slurry 5 poured into the small space will overflow from the contact window 41 and contact the surface of the pipe 6, thereby improving the bonding strength between the pipe 6 and the base 1, and ensuring that the pipe 6 is firmly fixed on the base 1. At the same time, in the process of pouring the concrete slurry 5, the concrete slurry 5 will enter the adjusting groove 2, fill the adjusting groove 2 and immerse the roller 23 in the concrete slurry 5, thereby reducing the number of holes and grooves opened on the base 1 and improving the structural strength of the base 1.
[0046] As an embodiment of the present invention, a guide groove 22 is opened on the surface of the arc-shaped groove, the guide groove 22 is connected with the adjustment groove 2, the depth of the adjustment groove 2 is greater than the depth of the guide groove 22, and the guide groove 22 and the adjustment groove 2 are perpendicular to each other;
[0047] Since the distance between the protective plate 4 and the arc-shaped groove is adjusted by the fixing bolts 12, when the bottom surface of the groove is relatively flat, the staff does not need to adjust the distance between the protective plate 4 and the arc-shaped groove too much when placing the pipe 6, and can also ensure the parallelism between the protective plate 4 and the pipe 6 and sufficient support for the pipe 6. In this case, the distance between the protective plate 4 and the arc-shaped groove is relatively small. Therefore, by opening a guide groove 22 on the surface of the arc-shaped groove and utilizing the connection between the guide groove 22 and the adjustment groove 2, the concrete slurry 5 poured into the small space between the protective plate 4 and the arc-shaped groove can be conveniently guided and diverted, thereby filling the entire small space, improving the pouring effect of the concrete slurry 5, and at the same time, it can also make the protective plate 4 and the base 1 fully combined, further making the protective plate 4 and the base 1 firmly combined.
[0048] As an embodiment of the present invention, a protrusion 42 is installed on the surface of the protective plate 4, and the protrusion 42 is in contact with the surface of the pipe 6;
[0049] Since bumps are installed on the surface of the protective plate 4, after the pipe 6 is placed on the base 1, a gap will be formed between the protective plate 4 and the pipe 6. After the staff pours concrete slurry 5 into the small space between the protective plate 4 and the base 1, the concrete slurry 5 will overflow upward from the contact window 41 on the protective plate 4, so that the overflowed concrete slurry 5 penetrates, diffuses, and fills the gap between the protective plate 4 and the pipe 6 along the protrusion 42, thereby fully increasing the contact area between the concrete slurry 5 and the pipe 6, so that the pipe 6, the protective plate 4 and the base 1 form a whole, and the stability and effect of the installation of the pipe 6 are improved.
[0050] As an embodiment of the present invention, the height of the protrusion 42 is less than the height of the baffle 3, and the protrusion 42 is made of elastic material;
[0051] At the same time, since the protrusion 42 is made of elastic material, during the placement of the pipe 6, a buffer can be provided between the pipe 6 and the protective plate 4 to avoid impact between the pipe 6 and the protective plate 4, which may cause damage to the surface of the pipe 6 and affect the normal use of the pipe 6. At the same time, since the height of the protrusion 42 is less than the height of the baffle 3, during the placement of the pipe 6, the pipe 6 will first contact the baffle 3 and squeeze the baffle 3, and then the pipe 6 will contact the protrusion 42 on the protective plate 4, so as to facilitate the enclosure of the space between the protective plate 4 and the arc-shaped groove, and between the protective plate 4 and the pipe 6, and facilitate the pouring of concrete slurry 5. At the same time, through the elasticity of the protrusion 42 and the baffle 3, the buffering effect on the pipe 6 is improved to avoid the pipe 6 from impacting the base 1, causing damage to the surface of the pipe 6 and affecting the normal use of the pipe 6.
[0052] As an embodiment of the present invention, the base 1 is provided with symmetrically distributed through anchor holes 13, the arc-shaped groove is located between the anchor holes 13, an anchor bolt 131 is inserted and installed in the anchor hole 13, and the lower end of the anchor bolt 131 is inserted into the soil;
[0053] During the construction process, after the workers install the base 1 on the bottom surface of the trench, they insert the anchor bolt 131 into the anchor hole 13 on the base 1 and knock the anchor bolt 131 so that the lower end of the anchor bolt 131 is inserted into the soil, thereby using the anchor bolt 131 to fully fix the base 1 to the ground, ensuring the stability of the position of the base 1 and preventing the base 1 from moving under the pressure of the backfill when and after the backfill is completed, resulting in misalignment between the pipe 6 and the base 1, causing the pipe 6 to be subjected to lateral force, affecting the normal use of the pipe 6.
[0054] As an embodiment of the present invention, a locking groove 14 is provided on the side of the base 1, and the locking groove 14 is communicated with the anchor hole 13, and an annular groove is provided on the anchor bolt 131, and a clamping block 141 is inserted and installed in the locking groove 14, and the clamping block 141 and the annular groove match each other;
[0055] By providing an annular groove on the anchor bolt 131, the friction between the anchor bolt and the soil is sufficiently increased after the lower end of the anchor is inserted into the soil, thereby preventing the anchor bolt 131 from sliding in the soil and affecting the fixing effect of the anchor bolt 131. At the same time, by providing a locking groove 14 on the base 1, the block 141 is inserted into the locking groove 14, and the mutual matching between the block 141 and the annular groove is utilized to ensure that the anchor bolt and the base 1 are fully connected, thereby further ensuring the fixing effect of the anchor bolt on the base 1 and preventing the base 1 from moving during the construction process or the use of the pipeline 6, thereby affecting the normal use of the pipeline 6.
[0056] The specific workflow is as follows:
[0057] When constructing the prestressed steel cylinder concrete pipe, firstly, a trench is excavated on the ground along the planned route and the bottom surface of the trench is leveled. Then, the base 1 is hoisted into the trench, and then the prestressed steel cylinder concrete pipe 6 is placed on the base 1. At the same time, after the pipe 6 is installed on the base 1 in the trench, the backfill excavated when the trench is excavated is backfilled into the trench to fully bury the pipe 6 and the base 1, so as to ensure the construction effect and efficiency of the prestressed steel cylinder concrete pipe.
[0058] At the same time, after the base 1 is hoisted and installed on the bottom surface of the trench, the staff hoists the pipe 6 to the top of the trench by a crane or other equipment, and slowly lowers it into the arc-shaped groove on the base 1 to complete the placement of the pipe 6;
[0059] At the same time, since the length and diameter of a single section of pipe 6 are relatively large, when placing the pipe 6 into the arc-shaped groove, the position of the pipe 6 is likely to deviate, thereby affecting the connection between the two adjacent sections of pipe 6. At this time, the staff will mostly re-lift the pipe 6 to leave a gap between the pipe 6 and the arc-shaped groove, and then adjust the position of the pipe 6 and then re-place the pipe 6 on the arc-shaped groove to ensure that the position of the pipe 6 is relatively accurate. However, this method requires the staff to adjust it little by little, and the operation is relatively cumbersome, which affects the efficiency of the construction of the pipe 6 and increases the workload of the staff. Therefore, when the pipe 6 is placed in the arc-shaped groove on the base 1, the pipe 6 is not easily misaligned. After being inserted into the groove, the surface of the pipe 6 will contact the roller 23 installed in the adjustment groove 2. If there is a deviation in the position of the pipe 6, the staff can manually or use mechanical equipment to push the pipe 6 along the axial direction of the pipe 6, so that the pipe 6 slowly moves along the axial direction of the pipe 6 under the action of the roller 23, thereby adjusting the position of the pipe 6, facilitating the alignment and connection between two adjacent pipes 6, avoiding the need for the staff to re-lift the pipe 6 in order to adjust the position of the pipe 6, and re-place it after adjusting the position, making the installation of the pipe 6 relatively simple and convenient, improving the work efficiency of the staff and reducing the workload of the staff;
[0060] At the same time, since the adjustment groove 2 runs through the entire surface of the arc-shaped groove along the axial direction of the base 1, the two ends of the adjustment groove 2 are directly in an "open" state, so that the rollers 23 can be directly installed from the two ends of the adjustment groove 2. Therefore, in order to avoid the rollers 23 from falling off or the rollers 23 from gathering together in the adjustment groove 2 during the storage and transportation of the base 1, the rollers 23 can be installed into the adjustment groove 2 from the two ends of the adjustment groove 2 by the staff during the construction process after the base 1 is installed in the groove. At the same time, the rollers 23 can be cast by concrete on the basis of using metal rods as rotating shafts, which further reduces the production cost;
[0061] Since the trenches during construction are mostly excavated on site or excavated by an excavator some time in advance, the bottom surface of the trench will be undulating, resulting in poor flatness of the bottom surface of the trench. Therefore, after the base 1 is installed on the bottom surface of the trench, there is a possibility that an angle will appear between the arc-shaped groove on the base 1 and the pipe 6 placed in the arc-shaped groove, that is, the axis of the base 1 will be inclined relative to the axis of the pipe 6, resulting in the pipe 6 and the arc-shaped groove not being fully fitted, causing the pipe 6 to be subjected to additional force, affecting the normal use or normal installation of the pipe 6;
[0062] At the same time, by installing the protective plate 4 on the surface of the arc groove using the fixing bolts 12, the protective plate 4 is used to support the pipe 6. When the bottom surface in the groove is uneven, resulting in an angle between the base 1 and the pipe 6, the fixing bolts 12 are used to adjust the distance between the protective plate 4 and the arc groove, so that the protective plate 4 and the pipe 6 are parallel to each other, ensuring the fitting and supporting effect of the protective plate 4 on the pipe 6, so as to prevent the pipe 6 from being subjected to additional force, which affects the normal use or normal installation of the pipe 6;
[0063] At the same time, the distance between the protective plate 4 and the arc-shaped groove is adjusted by fixing the bolts 12, so that the protective plate 4 and the pipe 6 are parallel to each other, ensuring the fitting and supporting effect of the pipe 6, so that the staff does not need to perform secondary leveling of the bottom surface of the groove under the base 1 or increase the additional workload of leveling the bottom surface of the groove during the trench excavation process, thereby reducing the requirement for the leveling height of the bottom surface of the groove, thereby effectively improving the work efficiency of the staff in installing the pipe 6 and reducing the workload of the staff;
[0064] At the same time, since the protective plate 4 is provided with a contact window 41, and the roller 23 installed in the adjusting groove 2 will pass through the contact window 41, the relative position of the roller 23 in the adjusting groove 2 will be fixed, and the roller 23 will not move randomly in the adjusting groove 2, and even the roller 23 will not fall from the two ends of the adjusting groove 2, affecting the normal use of the roller 23. At the same time, the position of the roller 23 is restricted by the contact window 41, so that when the staff uses the roller 23 to adjust the position of the pipeline 6, it can be ensured that the roller 23 will not move excessively, and the position of the roller 23 will not be relatively close to the end of the adjusting groove 2, thereby causing the roller 23 to fall from the end of the adjusting groove 2, affecting the normal operation of the roller 23.
[0065] Since the hardness of the pipe 6, the base 1 and the protective plate 4 are relatively hard, when the pipe 6 is placed on the base 1 by a crane or other equipment, the pipe 6 is prone to collision or impact with the base 1 or the protective plate 4, which may cause concrete peeling and damage on the surface of the pipe 6 or the surface of the base 1, affecting the normal use of the pipe 6. Therefore, elastic baffles 3 are installed at both ends of the base 1, so that when the pipe 6 is placed, the pipe 6 first contacts the baffles 3, and the baffles 3 are used to buffer the impact force in the process of placing the pipe 6, so as to avoid impact between the pipe 6 and the base 1 or the protective plate 4, resulting in damage to the pipe 6 or the base 1, affecting the subsequent normal use of the pipe 6;
[0066] At the same time, after the pipe 6 is placed on the base 1, there will be a gap between the protective plate 4 and the surface of the arc-shaped groove under the action of the fixing bolts 12, so that a small space is formed between the protective plate 4 and the arc-shaped groove under the action of the baffle 3. The staff fills the small space with concrete slurry 5, so as to use the concrete slurry 5 to fully connect the protective plate 4 with the base 1, to avoid the protective plate 4 being installed on the base 1 only by the fixing bolts 12 and the protective plate 4 being subjected to excessive force on the fixing bolts 12, which affects the normal use of the protective plate 4. At the same time, due to the contact window 41 opened on the protective plate 4, the concrete slurry 5 poured into the small space will overflow from the contact window 41 and contact the surface of the pipe 6, thereby improving the bonding strength between the pipe 6 and the base 1, ensuring that the pipe 6 is firmly fixed on the base 1. At the same time, in the process of pouring the concrete slurry 5, the concrete slurry 5 will enter the adjustment groove 2, fill the adjustment groove 2 and immerse the roller 23 in the concrete slurry 5, thereby reducing the number of holes and grooves opened on the base 1 and improving the structural strength of the base 1.
[0067] Since the distance between the protective plate 4 and the arc-shaped groove is adjusted by the fixing bolts 12, when the bottom surface of the groove is relatively flat, the staff does not need to adjust the distance between the protective plate 4 and the arc-shaped groove too much when placing the pipe 6, and can also ensure the parallelism between the protective plate 4 and the pipe 6 and sufficient support for the pipe 6. In this case, the distance between the protective plate 4 and the arc-shaped groove is relatively small. Therefore, by providing a guide groove 22 on the surface of the arc-shaped groove and utilizing the connection between the guide groove 22 and the adjustment groove 2, the concrete slurry 5 poured into the small space between the protective plate 4 and the arc-shaped groove can be conveniently guided and diverted, thereby filling the entire small space, improving the pouring effect of the concrete slurry 5, and at the same time, it can also make the protective plate 4 and the base 1 fully combined, and further make the protective plate 4 and the base 1 firmly combined;
[0068] Since the surface of the protective plate 4 is provided with a protrusion, after the pipe 6 is placed on the base 1, there will be a gap between the protective plate 4 and the pipe 6. After the staff pours the concrete slurry 5 into the small space between the protective plate 4 and the base 1, the concrete slurry 5 will overflow upward from the contact window 41 on the protective plate 4, so that the overflowed concrete slurry 5 penetrates, diffuses, and fills the gap between the protective plate 4 and the pipe 6 along the protrusion 42, thereby fully increasing the contact area between the concrete slurry 5 and the pipe 6, so that the pipe 6, the protective plate 4 and the base 1 form a whole, and the stability and effect of the installation of the pipe 6 are improved;
[0069] At the same time, since the protrusion 42 is made of elastic material, during the placement of the pipe 6, a buffer can be provided between the pipe 6 and the protective plate 4, thereby avoiding impact between the pipe 6 and the protective plate 4, resulting in damage to the surface of the pipe 6 and affecting the normal use of the pipe 6. At the same time, since the height of the protrusion 42 is less than the height of the baffle 3, during the placement of the pipe 6, the pipe 6 will first contact the baffle 3 and squeeze the baffle 3, and then the pipe 6 will contact the protrusion 42 on the protective plate 4, so as to enclose the space between the protective plate 4 and the arc-shaped groove, and between the protective plate 4 and the pipe 6, and facilitate the pouring of concrete slurry 5. At the same time, through the elasticity of the protrusion 42 and the baffle 3, the buffering effect on the pipe 6 is improved, thereby avoiding the pipe 6 from impacting the base 1, resulting in damage to the surface of the pipe 6 and affecting the normal use of the pipe 6.
[0070] During the construction process, after the staff installs the base 1 on the bottom surface of the trench, the staff inserts the anchor bolt 131 from the anchor hole 13 on the base 1 and knocks the anchor bolt 131 so that the lower end of the anchor bolt 131 is inserted into the soil, thereby fully fixing the base 1 to the ground with the anchor bolt 131 to ensure the stability of the position of the base 1 and prevent the base 1 from moving under the pressure of the backfill when the backfill is refilled and after the backfill is completed, resulting in misalignment between the pipeline 6 and the base 1, causing the pipeline 6 to be subjected to lateral force, affecting the normal use of the pipeline 6;
[0071] By providing an annular groove on the anchor bolt 131, the friction between the anchor bolt and the soil is sufficiently increased after the lower end of the anchor is inserted into the soil, thereby preventing the anchor bolt 131 from sliding in the soil and affecting the fixing effect of the anchor bolt 131. At the same time, by providing a locking groove 14 on the base 1, the block 141 is inserted into the locking groove 14, and the mutual matching between the block 141 and the annular groove is utilized to ensure that the anchor bolt and the base 1 are fully connected, thereby further ensuring the fixing effect of the anchor bolt on the base 1 and preventing the base 1 from moving during the construction process or the use of the pipeline 6, thereby affecting the normal use of the pipeline 6.
[0072] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A concrete base for the construction of a prestressed steel cylinder concrete pipe, wherein the base (1) is provided with an arc-shaped groove, and the arc-shaped groove is used for placing and installing a pipe (6); Features: An adjusting groove (2) is provided on the surface of the arc-shaped groove, a roller (23) is installed in the adjusting groove (2), and the roller (23) is in contact with the surface of the pipe (6); A fixing hole (11) is provided on the surface of the arc-shaped groove, a fixing bolt (12) is installed in the fixing hole (11), a protective plate (4) is installed on the fixing bolt (12), and the shape of the protective plate (4) is the same as that of the arc-shaped groove; The protective plate (4) is provided with a contact window (41), the upper surface of the roller (23) passes through the contact window (41), the protective plate (4) and the pipe (6) are in contact with each other, and the distance between the protective plate (4) and the arc-shaped groove is adjusted by a fixing bolt (12); Baffles (3) are installed at both ends of the base (1), the protective plate (4) is located between the baffles (3), and the baffles (3) are made of elastic material; The upper surface of the baffle (3) contacts the surface of the pipe (6) before the surface of the protective plate (4), a gap exists between the bottom of the adjustment groove (2) and the roller (23), and the space between the protective plate (4) and the arc-shaped groove is filled with concrete slurry (5); A guide groove (22) is provided on the surface of the arc-shaped groove, the guide groove (22) is communicated with the adjustment groove (2), and the guide groove (22) and the adjustment groove (2) are perpendicular to each other.
2. A concrete base for construction of a prestressed steel cylinder concrete pipe according to claim 1, characterized in that: A protrusion (42) is installed on the surface of the protective plate (4), and the protrusion (42) is in contact with the surface of the pipe (6).
3. A concrete base for construction of a prestressed steel cylinder concrete pipe according to claim 2, characterized in that: The height of the protrusion (42) is smaller than the height of the baffle (3), and the protrusion (42) is made of elastic material.
4. The concrete base for construction of a prestressed steel cylinder concrete pipe according to claim 1, characterized in that: The base (1) is provided with symmetrically distributed through anchor holes (13), the arc-shaped groove is located between the anchor holes (13), an anchor bolt (131) is inserted and installed in the anchor hole (13), and the lower end of the anchor bolt (131) is inserted into the soil.
5. A concrete base for construction of a prestressed steel cylinder concrete pipe according to claim 4, characterized in that: A locking groove (14) is provided on the side of the base (1), the locking groove (14) and the anchor hole (13) are communicated with each other, an annular groove is provided on the anchor bolt (131), a clamping block (141) is inserted and installed in the locking groove (14), and the clamping block (141) and the annular groove match each other.
