Scene modeling method and system for industrial manufacturing based on digitalization

By constructing production processes, generating material paths and optimization algorithms, it solves the problem of low product output efficiency in industrial manufacturing scenarios, improves production efficiency and costs, and realizes intelligent management.

CN118261332BActive Publication Date: 2024-10-15深圳一飞立科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410473744.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-19
Publication Date
2024-10-15
Estimated Expiration
2044-04-19

AI Technical Summary

Technical Problem

Existing industrial manufacturing scene modeling technology cannot accurately describe the overall industrial manufacturing scene, resulting in low product output efficiency.

Method used

By acquiring product manufacturing data, the production process is constructed, the material path is generated, and the constraint parameters are generated based on the preset production status characteristics to form an automated optimization algorithm to optimize the material path and resource allocation, and achieve the calculation and visual modeling of the optimal product quantity.

Benefits of technology

It improves production efficiency, reduces costs, and achieves refined management and intelligent management of the production process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118261332B_ABST
    Figure CN118261332B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of digital technology, and discloses a scene modeling method and system for realizing industrial manufacturing based on digitalization, including: obtaining product manufacturing data of industrial manufacturing, constructing the production process corresponding to industrial manufacturing according to the product manufacturing data; generating the material path corresponding to industrial manufacturing according to the production process and product manufacturing data, generating the constraint parameters of the production process according to the preset production state characteristics; generating the automatic optimization algorithm of industrial manufacturing according to the material path and the constraint parameters; obtaining real-time product manufacturing data, calculating the optimal product quantity corresponding to the material path according to the real-time product manufacturing data using the automatic optimization algorithm; optimizing the material path according to the optimal product quantity to obtain the optimal material path, and visually modeling the industrial manufacturing scene corresponding to the optimal material path to obtain a visualized industrial manufacturing scene. The present invention can improve the product output efficiency in the industrial manufacturing scene.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of digital technology, and in particular to a scene modeling method and system for realizing industrial manufacturing based on digitalization. Background Art

[0002] With the rapid changes in the market and the continuous enhancement of market competitiveness, it is necessary to use digital modeling technology for scenes in industrial manufacturing to achieve intelligent manufacturing and automated production. However, in order to optimize the number of products in industrial manufacturing, it is necessary to conduct continuous virtual simulation and analysis of the product manufacturing process to improve product output efficiency.

[0003] The existing industrial manufacturing scene modeling technology is to use computer software to design and manufacture three-dimensional modeling of products, including product structure, assembly process, processing path, etc., to achieve digital product design and manufacturing. In practical applications, considering the overall industrial manufacturing scene cannot accurately describe industrial manufacturing products, resulting in the inability to optimize products during industrial manufacturing, resulting in low product output efficiency in industrial manufacturing scenes. Summary of the invention

[0004] The present invention provides a scene modeling method and system for realizing industrial manufacturing based on digitalization, the main purpose of which is to solve the problem of low product output efficiency in industrial manufacturing scenes.

[0005] To achieve the above-mentioned purpose, the present invention provides a scene modeling method for realizing industrial manufacturing based on digitalization, comprising:

[0006] S1. Obtain product manufacturing data of industrial manufacturing, and construct a production process corresponding to the industrial manufacturing according to the product manufacturing data;

[0007] S2. Generate a material path corresponding to the industrial manufacturing according to the production process and the product manufacturing data, and generate constraint parameters of the production process according to preset production status characteristics;

[0008] S3. Generate an automated optimization algorithm for industrial manufacturing according to the material path and the constraint parameters, including:

[0009] S31, extracting the material placement position in the material path;

[0010] S32, calculating the distance between the material placement position and the transmission position of each sub-process in the production process;

[0011] S33, generating an objective constraint function for industrial manufacturing according to the constraint parameters;

[0012] S34, generating an automated optimization algorithm according to the material placement position, the transmission position distance and the objective constraint function, wherein the automated optimization algorithm is:

[0013]

[0014] Among them, Z is the optimal value, min is the minimum function, max is the maximum function, C ij is the cost of placing material j at location i for production, x ijk S is the quantity of material j placed at location i to produce product k, ij is the transport distance for material j to be placed at position i, is the penalty coefficient, f h (x) is the production product quantity constraint function, demand quantity constraint function and supply capacity constraint function in the target constraint optimization function, y is the target constraint optimization parameter in the target constraint optimization function, q is the penalty index, H is the function number of the target constraint optimization function, n is the number of material placement locations, m is the number of material types, and p is the number of products produced;

[0015] S4. Acquire real-time product manufacturing data, and use the automated optimization algorithm to calculate the optimal product quantity corresponding to the material path according to the real-time product manufacturing data;

[0016] S5. Optimize the material path according to the optimal product quantity to obtain the optimal material path, and perform visual modeling on the industrial manufacturing scene corresponding to the optimal material path to obtain a visualized industrial manufacturing scene.

[0017] Optionally, constructing the production process corresponding to the industrial manufacturing according to the product manufacturing data includes:

[0018] Determining original material data of industrial manufacturing products based on the product manufacturing data;

[0019] Extracting the manufacturing process flow from the product manufacturing data;

[0020] Input the original material data into the target process flow in the manufacturing process flow to obtain target material data;

[0021] The target material data is used to update the original material data, and the process of inputting the original material data into the target process flow in the manufacturing process flow to obtain the target material data is returned until all the process flows in the manufacturing process flow are executed and completed;

[0022] The production process corresponding to the industrial manufacturing is generated by completing the steps in all the process flows.

[0023] Optionally, generating a material path corresponding to the industrial manufacturing according to the production process and the product manufacturing data includes:

[0024] generating a bill of materials for each sub-process according to the product manufacturing data;

[0025] Generate the material transportation direction of each sub-process according to the production process;

[0026] Extracting the material placement location of each sub-process in the bill of materials;

[0027] A material path corresponding to the industrial manufacturing is generated according to the material transportation direction and the material placement position.

[0028] Optionally, generating the constraint parameters of the production process according to preset production status characteristics includes:

[0029] Determine the production attributes and demand attributes of each sub-process in the production process according to the production status characteristics;

[0030] Determine the production quantity parameter and production cost parameter of each sub-process according to the production attributes;

[0031] Determine the demand quantity parameter and supply capacity parameter of each sub-process according to the demand attribute;

[0032] The production quantity parameter, the production cost parameter, the demand quantity parameter and the supply capacity parameter are collected as constraint parameters of each sub-process in the production process.

[0033] Optionally, generating an objective constraint function for industrial manufacturing according to the constraint parameters includes:

[0034] Determining a target constraint threshold according to the constraint parameter;

[0035] The target constraint function of industrial manufacturing is generated according to the target constraint threshold and the constraint parameter, wherein the target constraint function is:

[0036]

[0037] Among them, f h (x) is the production quantity constraint function, demand quantity constraint function and supply capacity constraint function in the objective constraint optimization function, x ijk is the quantity of material j placed in position i for producing product k in the constraint parameter, P k is the demand quantity threshold parameter in the target constraint threshold, S k is the supply capacity threshold parameter in the target constraint threshold, and n is the number of material placement locations.

[0038] Optionally, the calculating the optimal product quantity corresponding to the material path according to the real-time product manufacturing data using the automated optimization algorithm includes:

[0039] Extracting material placement locations from the real-time product manufacturing data;

[0040] Determine the real-time product production cost and the real-time product production quantity according to the material placement location;

[0041] Calculate the minimum cost corresponding to the material path according to the real-time product production cost and the real-time product production quantity using the automated optimization algorithm;

[0042] The optimal product quantity is determined based on the minimum cost.

[0043] Optionally, the optimizing the material path according to the optimal product quantity to obtain the optimal material path includes:

[0044] Determine the optimal placement position of the material according to the optimal product quantity;

[0045] The material path is optimized by the optimal material placement position and material transportation direction to obtain the optimal material path.

[0046] Optionally, the performing visual modeling on the industrial manufacturing scene corresponding to the optimal material path to obtain a visualized industrial manufacturing scene includes:

[0047] generating material path data according to the optimal material path;

[0048] Generate an industrial production and manufacturing scenario model of the industrial manufacturing scenario according to the material path data;

[0049] The industrial manufacturing scene model is optimized using the following preset difference-product algorithm to obtain the scene optimization area:

[0050]

[0051] Among them, A is the scene optimization area, B τ is the τth grid area in the industrial manufacturing scene model, C σ The σth grid area in the original scene model for industrial production;

[0052] Generate an industrial manufacturing scenario optimization model according to the scenario optimization area;

[0053] Visual texture mapping is performed on the industrial manufacturing scene optimization model to obtain a visualized industrial manufacturing scene.

[0054] Optionally, generating an industrial manufacturing scenario model of an industrial manufacturing scenario according to the material path data includes:

[0055] Generate a target static element position and a target dynamic element position in an industrial manufacturing scene according to the material path data;

[0056] Generate an industrial manufacturing boundary contour of the industrial manufacturing scene according to the target static element position and the target dynamic element position;

[0057] An industrial production and manufacturing scene model is constructed according to the industrial production and manufacturing boundary contour.

[0058] In order to solve the above problems, the present invention also provides a scene modeling system for realizing industrial manufacturing based on digitalization, the system comprising:

[0059] A production process construction module is used to obtain product manufacturing data of industrial manufacturing and construct the production process corresponding to the industrial manufacturing according to the product manufacturing data;

[0060] A constraint parameter generation module, used to generate a material path corresponding to the industrial manufacturing according to the production process and the product manufacturing data, and to generate constraint parameters of the production process according to preset production status characteristics;

[0061] An automated optimization algorithm generation module, used to generate an automated optimization algorithm for industrial manufacturing according to the material path and the constraint parameters;

[0062] An optimal product quantity calculation module, used to obtain real-time product manufacturing data, and calculate the optimal product quantity corresponding to the material path according to the real-time product manufacturing data using the automated optimization algorithm;

[0063] The visualized industrial manufacturing scene generation module is used to optimize the material path according to the optimal product quantity to obtain the optimal material path, and to perform visual modeling on the industrial manufacturing scene corresponding to the optimal material path to obtain the visualized industrial manufacturing scene.

[0064] The embodiment of the present invention constructs a production process through product manufacturing data, which can realize the refined management of the production process, and can monitor and analyze the time, cost, resources, etc. of each process in detail; the material path of industrial manufacturing is generated according to the production process and product manufacturing data, and the constraint parameters of the production process are generated according to the preset production state characteristics, so that the flow path of the material in the production process can be determined, and the constraint conditions can be set to ensure the smooth progress of the production process; the automatic optimization algorithm of industrial manufacturing is generated according to the material path and the constraint parameters, which is conducive to automatically adjusting the production process and resource allocation to achieve the best production efficiency and quality; and then according to the real-time data and the optimization algorithm, the optimal production quantity is calculated to meet market demand or improve production efficiency; the material path is optimized according to the optimal product quantity to obtain the optimal material path, and the industrial manufacturing scene corresponding to the optimal material path is visualized and modeled. Through the visualization modeling, the optimized path and layout in the production process can be intuitively displayed, which helps managers better understand and optimize the production process, thereby improving production efficiency, reducing costs, and realizing intelligent industrial manufacturing management. Therefore, the scene modeling method and system based on digital realization of industrial manufacturing proposed by the present invention can solve the problem of low product output efficiency in industrial manufacturing scenes. BRIEF DESCRIPTION OF THE DRAWINGS

[0065] Figure 1 A schematic flow chart of a scene modeling method for realizing industrial manufacturing based on digitalization provided by an embodiment of the present invention;

[0066] Figure 2 A schematic diagram of a process for generating a material path according to an embodiment of the present invention;

[0067] Figure 3 A schematic diagram of a process for generating an automated optimization algorithm provided by an embodiment of the present invention;

[0068] Figure 4 A functional module diagram of a scene modeling system for realizing industrial manufacturing based on digitalization provided by an embodiment of the present invention;

[0069] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0070] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

[0071] The embodiment of the present application provides a scenario modeling method based on digitalization to realize industrial manufacturing. The execution subject of the scenario modeling method based on digitalization to realize industrial manufacturing includes but is not limited to at least one of the electronic devices such as the server, the terminal, etc. that can be configured to execute the method provided by the embodiment of the present application. In other words, the scenario modeling method based on digitalization to realize industrial manufacturing can be executed by software or hardware installed on a terminal device or a server device, and the software can be a blockchain platform. The server includes but is not limited to: a single server, a server cluster, a cloud server or a cloud server cluster, etc. The server can be an independent server, or it can be a cloud server that provides cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, content delivery networks (Content Delivery Network, CDN), and basic cloud computing services such as big data and artificial intelligence platforms.

[0072] Reference Figure 1 FIG. 1 is a flow chart of a scene modeling method for realizing industrial manufacturing based on digitalization according to an embodiment of the present invention. In this embodiment, the scene modeling method for realizing industrial manufacturing based on digitalization includes:

[0073] S1. Acquire product manufacturing data of industrial manufacturing, and construct a production process corresponding to the industrial manufacturing according to the product manufacturing data.

[0074] In an embodiment of the present invention, the product manufacturing data includes but is not limited to production process data and bill of materials data, wherein the production process data includes information such as the specific production process flow, process sequence, process parameters, etc. of the product, and the bill of materials data includes a list of raw materials and parts required for the product.

[0075] In detail, industrial manufacturing product manufacturing data can be obtained from a pre-stored storage area through computer statements with data capture functions (such as Java statements, Python statements, etc.), where the storage area includes but is not limited to databases and blockchains.

[0076] Furthermore, in order to optimize the number of products in industrial manufacturing scenarios, it is necessary to construct production procedures and optimize the production process to ensure that each production link is closely connected, avoid bottlenecks and waste in the production process, and improve production efficiency.

[0077] In the embodiment of the present invention, the production process refers to the specific steps and operations for processing, assembling or handling raw materials, parts or semi-finished products in a certain order and method during the product manufacturing process. Each production process includes a series of operating steps, process parameters and required resources to ensure that the product can be produced according to the design requirements.

[0078] In the embodiment of the present invention, the step of constructing the production process corresponding to the industrial manufacturing according to the product manufacturing data includes:

[0079] Determining original material data of industrial manufacturing products based on the product manufacturing data;

[0080] Extracting the manufacturing process flow from the product manufacturing data;

[0081] Input the original material data into the target process flow in the manufacturing process flow to obtain target material data;

[0082] The target material data is used to update the original material data, and the process of inputting the original material data into the target process flow in the manufacturing process flow to obtain the target material data is returned until all the process flows in the manufacturing process flow are executed and completed;

[0083] The production process corresponding to the industrial manufacturing is generated by completing the steps in all the process flows.

[0084] In detail, based on the bill of materials information in the product manufacturing data, the list of raw materials and parts required to produce the product, including name, specifications, quantity, etc., is determined; and the manufacturing process flow is extracted from the product manufacturing data, including the sequence of each process, operating steps, process parameters and other information; and then the determined original material data is input into the target process flow in the manufacturing process flow, where the target industrial process refers to the sub-process flow in the manufacturing process flow, and the material data is matched with the target process flow according to the process requirements and sequence to obtain the target material data output by each target process flow.

[0085] Specifically, according to the requirements of the target process flow, the original material data is updated to ensure that the material data required for each process is met, and then the updated material data is re-entered into the target process flow of the next process flow until all process flows are executed. After iterative processing of the above steps, a complete production process corresponding to industrial manufacturing can be generated, including the specific operating steps, required materials, process parameters and other information of each process, thereby realizing the process of building a production process based on product manufacturing data, and can effectively convert product manufacturing data into production processes, realize automation and optimization of the production process, improve production efficiency and quality level, and facilitate refined management and optimization of production processes, helping enterprises to better achieve industrial manufacturing goals.

[0086] Exemplarily, when a product needs to be manufactured, such as automobile tires, the raw materials must first be prepared. The raw materials (rubber, nylon, steel wire, etc.) are input into the first target process flow in the manufacturing process flow, and the prepared raw materials are output. The prepared rubber and chemical substances are then input into the rubber mixing process flow, and the rubber mixture is output. The steel wire in the raw materials is input into the steel wire preparation process flow, and the prepared steel wire is output. The rubber mixture and steel wire are input into the tire molding process flow, and the molded tire is output. The molded tire is input into the drying and curing process flow, and the cured tire is output. The cured tire is input into the quality inspection process flow, and a qualified tire is output. The qualified tire is input into the packaging and shipping process flow, and the packaged tire is output, thereby obtaining the production process of automobile tires.

[0087] Furthermore, in order to optimize the number of products in industrial manufacturing scenarios, it is necessary to strictly control the material path to ensure that the materials used in each production process meet the requirements. Accurate material paths can reduce losses caused by incorrect use or waste of materials, reduce production costs, and improve resource utilization.

[0088] S2. Generate a material path corresponding to the industrial manufacturing according to the production process and the product manufacturing data, and generate constraint parameters of the production process according to preset production status characteristics.

[0089] In an embodiment of the present invention, the material path refers to the production flow path and storage location of raw materials, parts, semi-finished products and other materials from entering the factory to the final product during the production process. The path describes the flow trajectory of the material on the production line, including the transportation direction, flow path and storage location of the material between different locations such as warehouses, processing equipment, assembly lines, etc.

[0090] In the embodiment of the present invention, referring to Figure 2 As shown, the material path corresponding to the industrial manufacturing is generated according to the production process and the product manufacturing data, including:

[0091] S21, generating a bill of materials for each sub-process according to the product manufacturing data;

[0092] S22, generating a material transportation direction for each sub-process according to the production process;

[0093] S23, extracting the material placement location of each sub-process in the bill of materials;

[0094] S24. Generate a material path corresponding to the industrial manufacturing according to the material transportation direction and the material placement position.

[0095] In detail, based on the product manufacturing data and production processes, determine the bill of materials required for each sub-process, including raw materials, parts and components or semi-finished products, etc., and then determine the transportation direction of materials between different processes, including feeding, discharging and intermediate transfer, etc., based on the production line layout and the relationship between the processes; according to the factory layout and the placement of production equipment, determine the placement location of materials required for each sub-process, including warehouses, processing equipment, assembly lines, etc., combine the material transportation direction and placement location information, and generate a complete material path diagram according to the production sequence and material flow direction, showing the flow path and storage location of materials from entering the factory to the final finished product.

[0096] Exemplarily, the sub-process is equivalent to the process flow of rubber mixing, steel wire preparation, and tire molding in manufacturing automobile tires. The materials required for each sub-process, that is, the bill of materials, are determined. The material transportation direction can be determined according to the input and output materials of each sub-process, and then the initial material placement position of the corresponding material in each sub-process is initialized and customized in the bill of materials. The initial material path in automobile tire manufacturing can be generated according to the material transportation direction and material placement position.

[0097] Furthermore, in order to determine the best material placement location, it is necessary to optimize the material placement location in the initial material path. This requires more accurate production planning and scheduling by setting production status characteristics and constraint parameters, so as to achieve optimal configuration and utilization of production resources and improve production efficiency.

[0098] In the embodiment of the present invention, the constraint parameters refer to parameters used to define, limit or control certain variables or behaviors in the manufacturing production process. In the production process, the constraint parameters are usually used to guide and manage production activities to ensure that the production process proceeds according to the established plan and achieves the expected efficiency and quality level.

[0099] In the embodiment of the present invention, the step of generating the constraint parameters of the production process according to the preset production status characteristics includes:

[0100] Determine the production attributes and demand attributes of each sub-process in the production process according to the production status characteristics;

[0101] Determine the production quantity parameter and production cost parameter of each sub-process according to the production attributes;

[0102] Determine the demand quantity parameter and supply capacity parameter of each sub-process according to the demand attribute;

[0103] The production quantity parameter, the production cost parameter, the demand quantity parameter and the supply capacity parameter are collected as constraint parameters of each sub-process in the production process.

[0104] In detail, the production status characteristics are determined according to the actual situation, including information on the production environment, resource supply, market demand, etc. The production status characteristics will affect the subsequent constraint parameter generation process. The production status characteristics include but are not limited to product quantity, production quantity, demand, production cost, and supply capacity. Then, the production attributes and demand attributes of each sub-process are determined according to the production status characteristics. The production attributes include production quantity and production cost; the demand attributes include demand quantity and demand supply capacity. The production quantity parameters, production cost parameters, demand quantity parameters and supply capacity parameters are brought together to form the constraint parameters of each sub-process. The constraint parameters will be used to guide and control production activities during the production process to ensure that the production process proceeds according to the established plan.

[0105] Furthermore, by converting the production quantity parameters, production cost parameters, demand quantity parameters and supply capacity parameters into corresponding mathematical constraints and adding the mathematical constraints to the pre-built automated optimization algorithm, the optimal product quantity can be obtained. Therefore, through the automated optimization algorithm, the optimal scheduling of the production plan can be achieved while considering the constraint parameters, thus avoiding waste of resources and idle production lines, thereby improving production efficiency.

[0106] S3. Generate an automated optimization algorithm for industrial manufacturing according to the material path and the constraint parameters.

[0107] In an embodiment of the present invention, the automated optimization algorithm refers to the use of computer programs and mathematical methods to automatically optimize and adjust the product manufacturing process in a certain industrial manufacturing scenario to achieve the best effect or result.

[0108] In the embodiment of the present invention, referring to Figure 3 As shown, the automatic optimization algorithm for industrial manufacturing generated according to the material path and the constraint parameters includes:

[0109] S31, extracting the material placement position in the material path;

[0110] S32, calculating the distance between the material placement position and the transmission position of each sub-process in the production process;

[0111] S33, generating an objective constraint function for industrial manufacturing according to the constraint parameters;

[0112] S34, generating an automated optimization algorithm according to the material placement position, the transmission position distance and the objective constraint function, wherein the automated optimization algorithm is:

[0113]

[0114] Among them, Z is the optimal value, min is the minimum function, max is the maximum function, C ij is the cost of placing material j at location i for production, x ijk S is the quantity of material j placed at location i to produce product k, ij is the transport distance for material j to be placed at position i, is the penalty coefficient, f h (x) is the production product quantity constraint function, demand quantity constraint function and supply capacity constraint function in the target constraint optimization function, y is the target constraint optimization parameter in the target constraint optimization function, q is the penalty index, H is the function number of the target constraint optimization function, n is the number of material placement locations, m is the number of material types, and p is the number of products produced.

[0115] In detail, the material path includes the material placement position of each sub-process, which describes the placement of materials in different positions, that is, the spatial arrangement of materials in the factory or production line is taken into account; then different constraint functions are generated according to the constraint parameters, so as to construct an automated optimization algorithm based on the material placement position and constraint function, that is, to obtain the optimal production schedule and resource allocation plan by minimizing costs and satisfying various constraints.

[0116] In an embodiment of the present invention, generating the target constraint function of industrial manufacturing according to the constraint parameters includes:

[0117] Determining a target constraint threshold according to the constraint parameter;

[0118] The target constraint function of industrial manufacturing is generated according to the target constraint threshold and the constraint parameter, wherein the target constraint function is:

[0119]

[0120] Among them, f h (x) is the production quantity constraint function, demand quantity constraint function and supply capacity constraint function in the objective constraint optimization function, x ijk is the quantity of material j placed in position i for producing product k in the constraint parameter, P k is the demand quantity threshold parameter in the target constraint threshold, S k is the supply capacity threshold parameter in the target constraint threshold, and n is the number of material placement locations.

[0121] In detail, the constraint function can be generated according to different constraint parameters, then the objective constraint function f h(x) is the hth objective constraint function, where the objective constraint function includes the production quantity constraint function, the demand quantity constraint function and the supply capacity constraint function, which is used to represent the constraint function in industrial manufacturing. The objective constraint threshold is determined based on the constraint parameter, that is, for each product k, the sum of the quantity of material j used in all positions i is equal to the demand quantity P of the product. k ; For each product k, the sum of the quantities of material j used in all positions i is equal to the supply capacity threshold parameter S of the product k , and the quantity of material j used by product k at all positions i must be greater than or equal to 0, which can be achieved by adjusting x ijk The value of the constraint function f h (x) can minimize or maximize a certain goal while satisfying the constraints of product demand and supply capacity. In actual industrial manufacturing, constraint functions can help enterprises optimize production scheduling and resource utilization to achieve better production efficiency and cost control.

[0122] Specifically, in the automated optimization algorithm, x ijk is the quantity of material j placed at location i to produce product k, C ij is the cost of placing material j at position i for production, which means that the optimal number of products is obtained under the condition of minimizing the cost, that is, the placement and quantity of materials are reasonably arranged under the condition of meeting the product demand, so as to improve production efficiency and reduce costs, and the constraint function must be satisfied, then is the penalty coefficient, which controls the weight of the penalty; max[0,f h (x)] represents the constraint condition f h (x) and 0 take the larger value, that is, only when the constraint condition f h The penalty term only takes effect when (x) is greater than 0; q is the exponent of the penalty term, which is used to adjust the growth rate of the penalty term. The choice of the exponent q of the penalty term should be adjusted according to the specific problem and the importance of the constraints. The value of will more severely penalize solutions that violate the constraints, while smaller A smaller penalty will be imposed on solutions that violate the constraints. When the optimization algorithm attempts to approach or exceed the constraint boundary, the value of the penalty term will increase, causing the objective function to increase, which in turn makes the algorithm more inclined to generate solutions that satisfy the constraints.

[0123] Furthermore, the quantity of material j placed at position i for producing product k can be adjusted in real time according to the automated optimization algorithm, thereby obtaining the optimal quantity of products under the condition of minimum cost.

[0124] S4. Acquire real-time product manufacturing data, and use the automated optimization algorithm to calculate the optimal product quantity corresponding to the material path based on the real-time product manufacturing data.

[0125] In an embodiment of the present invention, the real-time product manufacturing data refers to the material placement position generated in real time, and thus the material path data generated according to the real-time material placement position, wherein the data on the production line can be obtained in real time through sensors and data acquisition equipment.

[0126] Furthermore, by combining real-time product manufacturing data, the latest production conditions and parameters can be obtained in a timely manner, making the calculated optimal product quantity closer to the current production environment, improving the real-time and accuracy of decision-making.

[0127] In an embodiment of the present invention, the optimal product quantity refers to the number of products that can achieve the best benefits under certain specific conditions (such as cost, resource constraints, market demand, etc.). The optimal product quantity is determined through calculation and analysis to achieve cost minimization, profit maximization or other specific goals.

[0128] In an embodiment of the present invention, the step of calculating the optimal product quantity corresponding to the material path according to the real-time product manufacturing data using the automated optimization algorithm includes:

[0129] Extracting material placement locations from the real-time product manufacturing data;

[0130] Determine the real-time product production cost and the real-time product production quantity according to the material placement location;

[0131] Calculate the minimum cost corresponding to the material path according to the real-time product production cost and the real-time product production quantity using the automated optimization algorithm;

[0132] The optimal product quantity is determined based on the minimum cost.

[0133] In detail, the material information required for each product and the relevant data of its placement location are extracted from the real-time product manufacturing data. The relevant data may include the type of material, quantity requirements and specific placement location in the production process; based on the material information and placement location in the real-time product manufacturing data, combined with the cost parameters in the production process (such as labor cost, material cost, equipment cost, etc.), the real-time production cost of each product can be calculated. At the same time, according to production demand and resource constraints, the production quantity of real-time products is determined, and then the real-time product production cost and the real-time product production quantity are input into the automatic optimization algorithm to calculate the minimum cost under a given material path. The automatic optimization algorithm will consider different material placement locations, production quantities and other factors to find the optimal production plan, and then determine the optimal product quantity based on the calculated minimum cost. The optimal quantity usually refers to the number of products that can meet market demand, resource constraints and profit maximization goals under the condition of minimum cost.

[0134] Furthermore, the optimal product quantity allocation plan can be obtained to meet the needs of all products at the lowest cost, and the placement and quantity of materials can be reasonably arranged to improve production efficiency and reduce costs. According to the optimal product quantity, the material path can be optimized to reduce the transportation distance and time of materials in the production process, thereby reducing production costs. The optimized material path can reduce waste in material handling and transportation, improve production efficiency and reduce production costs.

[0135] S5. Optimize the material path according to the optimal product quantity to obtain the optimal material path, and perform visual modeling on the industrial manufacturing scene corresponding to the optimal material path to obtain a visualized industrial manufacturing scene.

[0136] In an embodiment of the present invention, the optimal material path refers to the optimal transportation path and sequence of materials from suppliers to different processes on the production line during the production process. By determining the optimal material path, efficient transportation and processing of materials can be achieved, thereby improving production efficiency, reducing production costs, and ensuring the smooth progress of the production process.

[0137] In the embodiment of the present invention, the step of optimizing the material path according to the optimal product quantity to obtain the optimal material path includes:

[0138] Determine the optimal placement position of the material according to the optimal product quantity;

[0139] The material path is optimized by the optimal material placement position and material transportation direction to obtain the optimal material path.

[0140] In detail, according to the optimal product quantity, it is necessary to determine the optimal placement of materials in the production process, including determining the optimal storage position of each material on the production line so that it can be quickly accessed when needed, reducing the material transportation path and time; according to the determined optimal placement of materials, combined with the layout and process flow of the production line, optimize the transportation direction of materials to ensure that the flow direction of materials in the production process is reasonable and smooth, avoid cross-transportation and repeated handling, and improve material transportation efficiency; combine the determined optimal placement of materials with the optimized material transportation direction to optimize the entire material path, and determine the optimal material transportation path and sequence by analyzing factors such as the distance between each process, the material flow direction, and resource utilization, so as to achieve efficient transportation and processing of materials; once the optimal material path is determined, product manufacturing can be implemented according to the optimal material path, ensuring that production personnel carry out material handling and transportation according to the optimal material path, monitor the efficiency and accuracy of the material transportation process, and adjust and optimize the material path in time to ensure the smooth progress of the production process.

[0141] Furthermore, the industrial manufacturing scenario can be modeled based on the optimal material path corresponding to the optimal number of products. Through visual modeling, the transportation path, storage location and flow direction of materials in the production process can be intuitively displayed, helping people to better understand the flow patterns of materials in the entire production process, better identify problems, optimize decisions, and improve production efficiency and quality.

[0142] In an embodiment of the present invention, the visualized industrial manufacturing scene refers to the use of graphical technology to present the various links, equipment, material flow and other contents in the industrial manufacturing process as intuitive visual images. Through the visualized industrial manufacturing scene, the layout of the entire production line, the flow path of materials, the operating status of equipment and other information can be intuitively understood.

[0143] In an embodiment of the present invention, the visual modeling of the industrial manufacturing scene corresponding to the optimal material path to obtain the visual industrial manufacturing scene includes:

[0144] generating material path data according to the optimal material path;

[0145] Generate an industrial production and manufacturing scenario model of the industrial manufacturing scenario according to the material path data;

[0146] The industrial manufacturing scene model is optimized using the following preset difference-product algorithm to obtain the scene optimization area:

[0147]

[0148] Among them, A is the scene optimization area, B τ is the τth grid area in the industrial manufacturing scene model, Cσ The σth grid area in the original scene model for industrial production;

[0149] Generate an industrial manufacturing scenario optimization model according to the scenario optimization area;

[0150] Visual texture mapping is performed on the industrial manufacturing scene optimization model to obtain a visualized industrial manufacturing scene.

[0151] In detail, the material path data corresponding to the optimal material path is extracted, and the material path data includes the material equipment location, material placement location, material quantity, path starting point, end point, and path length, and then the industrial production and manufacturing scene model is generated according to the material path data. The industrial production and manufacturing scene model refers to a virtual three-dimensional model built according to actual industrial production and manufacturing needs and data to simulate and display various elements, equipment, process flow and material flow in the factory or production workshop. This model can include static elements (such as machinery and equipment, workbenches, storage areas, etc.) and dynamic elements (such as transport vehicles, robots, operators, etc.), and can show the relationship and interaction between them.

[0152] In an embodiment of the present invention, the industrial production manufacturing scenario model of the industrial manufacturing scenario is generated according to the material path data, including:

[0153] Generate a target static element position and a target dynamic element position in an industrial manufacturing scene according to the material path data;

[0154] Generate an industrial manufacturing boundary contour of the industrial manufacturing scene according to the target static element position and the target dynamic element position;

[0155] An industrial production and manufacturing scene model is constructed according to the industrial production and manufacturing boundary contour.

[0156] In detail, the target static element position refers to the static existence that will not change (such as equipment, storage area, workbench, etc.), and the target dynamic element position refers to the position and layout that can change dynamically in real time (such as material placement, transportation path, etc.). Then, according to the target static element position and the target dynamic element position, the industrial production and manufacturing boundary outline is generated, that is, the scope and boundary of the entire manufacturing scene are determined, that is, the layout and space allocation of the factory can be represented by drawing a plan or stereogram. Combined with the target static element position and the dynamic element position, a model of the industrial production and manufacturing scene is constructed using 3D modeling software such as AutoCAD and SolidWorks. The model includes elements such as equipment, work areas, material flow paths, and the trajectory and behavior of dynamic elements. Static elements and dynamic elements can be laid out and assembled to form a complete industrial manufacturing scene model.

[0157] Specifically, the preset difference product algorithm can be used to optimize the industrial production and manufacturing scene model to obtain a scene optimization area, that is, the industrial production and manufacturing scene model is gridded, and the industrial production and manufacturing original scene model is gridded, and then the scene model is optimized according to the comparison of the two grid areas, that is, by comparing the differences between the two grid areas, and then performing intersection and union operations on these differences to obtain a new area, then if the grid area corresponding to the industrial production and manufacturing scene model belongs to the grid area corresponding to the industrial production and manufacturing original scene model, then the grid area corresponding to the industrial production and manufacturing scene model is combined with the grid area corresponding to the industrial production and manufacturing original scene model to obtain a new scene optimization area. When the grid area corresponding to the original industrial manufacturing scene model belongs to the grid area corresponding to the industrial manufacturing scene model, the grid area corresponding to the industrial manufacturing scene model is intersected with the grid area corresponding to the original industrial manufacturing scene model to obtain a new scene optimization area, and then an industrial manufacturing scene optimization model is generated according to the scene optimization area, that is, the optimized scene area is applied to the industrial manufacturing scene model to generate a new optimization model; the industrial manufacturing scene optimization model is visualized and texture mapped to obtain a visualized industrial manufacturing scene, and the optimized model is rendered and mapped in combination with computer graphics, virtual reality and other technical means to generate an intuitive visualization effect.

[0158] Furthermore, through visual modeling, the various elements, equipment, process flows and material paths in the industrial manufacturing scenario can be intuitively displayed, making the complex production process clear and easy to understand. It can be used to simulate and analyze the effects of different production plans, such as adjusting equipment layout, optimizing material paths, etc., so as to find the best production plan to improve production efficiency and reduce costs.

[0159] The embodiment of the present invention constructs a production process through product manufacturing data, which can realize the refined management of the production process, and can monitor and analyze the time, cost, resources, etc. of each process in detail; the material path of industrial manufacturing is generated according to the production process and product manufacturing data, and the constraint parameters of the production process are generated according to the preset production state characteristics, so that the flow path of the material in the production process can be determined, and the constraint conditions can be set to ensure the smooth progress of the production process; the automatic optimization algorithm of industrial manufacturing is generated according to the material path and the constraint parameters, which is conducive to automatically adjusting the production process and resource allocation to achieve the best production efficiency and quality; and then according to the real-time data and the optimization algorithm, the optimal production quantity is calculated to meet market demand or improve production efficiency; the material path is optimized according to the optimal product quantity to obtain the optimal material path, and the industrial manufacturing scene corresponding to the optimal material path is visualized and modeled. Through the visualization modeling, the optimized path and layout in the production process can be intuitively displayed, which helps managers better understand and optimize the production process, thereby improving production efficiency, reducing costs, and realizing intelligent industrial manufacturing management. Therefore, the scene modeling method and system based on digital realization of industrial manufacturing proposed by the present invention can solve the problem of low product output efficiency in industrial manufacturing scenes.

[0160] like Figure 4 1 is a functional module diagram of a scene modeling system for realizing industrial manufacturing based on digitalization provided by an embodiment of the present invention.

[0161] The scene modeling system 100 for realizing industrial manufacturing based on digitalization according to the present invention can be installed in an electronic device. According to the functions implemented, the scene modeling system 100 for realizing industrial manufacturing based on digitalization can include a production process construction module 101, a constraint parameter generation module 102, an automatic optimization algorithm generation module 103, an optimal product quantity calculation module 104 and a visualized industrial manufacturing scene generation module 105. The module according to the present invention can also be referred to as a unit, which refers to a series of computer program segments that can be executed by an electronic device processor and can complete fixed functions, which are stored in the memory of the electronic device.

[0162] In this embodiment, the functions of each module / unit are as follows:

[0163] The production process construction module 101 is used to obtain product manufacturing data of industrial manufacturing, and construct the production process corresponding to the industrial manufacturing according to the product manufacturing data;

[0164] The constraint parameter generation module 102 is used to generate the material path corresponding to the industrial manufacturing according to the production process and the product manufacturing data, and to generate the constraint parameters of the production process according to the preset production status characteristics;

[0165] The automation optimization algorithm generation module 103 is used to generate an automation optimization algorithm for industrial manufacturing according to the material path and the constraint parameters;

[0166] The optimal product quantity calculation module 104 is used to obtain real-time product manufacturing data and calculate the optimal product quantity corresponding to the material path according to the real-time product manufacturing data using the automated optimization algorithm;

[0167] The visualized industrial manufacturing scene generation module 105 is used to optimize the material path according to the optimal product quantity to obtain the optimal material path, and to perform visual modeling on the industrial manufacturing scene corresponding to the optimal material path to obtain the visualized industrial manufacturing scene.

[0168] In detail, each module described in the scene modeling system 100 based on digitalization for industrial manufacturing in the embodiment of the present invention is used in the same manner as described above. Figures 1 to 3 The same technical means are used as the scene modeling method based on digitalization to realize industrial manufacturing described in , and can produce the same technical effects, so they will not be repeated here.

[0169] In the several embodiments provided by the present invention, it should be understood that the disclosed systems and methods can be implemented in other ways. For example, the system embodiments described above are only illustrative, for example, the division of the modules is only a logical function division, and there may be other division methods in actual implementation.

[0170] The modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0171] In addition, each functional module in each embodiment of the present invention may be integrated into one processing unit, each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of hardware plus software functional modules.

[0172] It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention.

[0173] Therefore, no matter from which point of view, the embodiments should be regarded as illustrative and non-restrictive, and the scope of the present invention is not limited only according to the above description, and it is intended that all changes within the meaning and scope of equivalent elements within the scope of protection are included in the present invention.

[0174] The embodiments of the present application can acquire and process relevant data based on artificial intelligence technology. Among them, artificial intelligence (AI) is the theory, method, technology and application system that uses digital computers or machines controlled by digital computers to simulate, extend and expand human intelligence, perceive the environment, acquire knowledge and use knowledge to obtain the best results.

[0175] In addition, it is obvious that the word "comprising" does not exclude other units or steps, and the singular does not exclude the plural. The multiple units or systems stated in the system embodiment can also be implemented by one unit or system through software or hardware. The words first, second, etc. are used to indicate names, and do not indicate any specific order.

[0176] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention.

Claims

1. A scene modeling method for realizing industrial manufacturing based on digitalization, characterized in that: The method comprises: S1. Obtain product manufacturing data of industrial manufacturing, and construct a production process corresponding to the industrial manufacturing according to the product manufacturing data; S2. Generate a material path corresponding to the industrial manufacturing according to the production process and the product manufacturing data, and generate constraint parameters of the production process according to preset production status characteristics; The generating of the constraint parameters of the production process according to the preset production status characteristics includes: Determine the production attributes and demand attributes of each sub-process in the production process according to the production status characteristics; Determine the production quantity parameter and production cost parameter of each sub-process according to the production attributes; Determine the demand quantity parameter and supply capacity parameter of each sub-process according to the demand attribute; The production quantity parameter, the production cost parameter, the demand quantity parameter and the supply capacity parameter are collected as constraint parameters of each sub-process in the production process; S3. Generate an automated optimization algorithm for industrial manufacturing according to the material path and the constraint parameters, including: S31, extracting the material placement position in the material path; S32, calculating the distance between the material placement position and the transmission position of each sub-process in the production process; S33, generating an objective constraint function for industrial manufacturing according to the constraint parameters; Generating the target constraint function of industrial manufacturing according to the constraint parameters includes: Determining a target constraint threshold according to the constraint parameter; The target constraint function of industrial manufacturing is generated according to the target constraint threshold and the constraint parameter, wherein the target constraint function is: Among them, f h (x) is the production quantity constraint function, demand quantity constraint function and supply capacity constraint function in the objective constraint optimization function, x ijk is the quantity of material j placed in position i for producing product k in the constraint parameter, P k is the demand quantity threshold parameter in the target constraint threshold, S k is the supply capacity threshold parameter in the target constraint threshold, and n is the number of material placement locations; S34, generating an automated optimization algorithm according to the material placement position, the transmission position distance and the objective constraint function, wherein the automated optimization algorithm is: Among them, Z is the optimal value, min is the minimum function, max is the maximum function, C ij is the cost of placing material j at location i for production, x ijk S is the quantity of material j placed at location i to produce product k, ij is the transport distance for material j to be placed at position i, is the penalty coefficient, f h (x is the production product quantity constraint function, demand quantity constraint function and supply capacity constraint function in the target constraint optimization function, y is the target constraint optimization parameter in the target constraint optimization function, q is the penalty index, H is the function number of the target constraint optimization function, n is the number of material placement locations, m is the number of material types, and p is the number of products produced; S4. Acquire real-time product manufacturing data, and use the automated optimization algorithm to calculate the optimal product quantity corresponding to the material path according to the real-time product manufacturing data; S5. Optimize the material path according to the optimal product quantity to obtain an optimal material path, and perform visual modeling on the industrial manufacturing scene corresponding to the optimal material path to obtain a visualized industrial manufacturing scene; The visualizing modeling of the industrial manufacturing scene corresponding to the optimal material path to obtain the visualized industrial manufacturing scene includes: generating material path data according to the optimal material path; Generate an industrial production and manufacturing scenario model of the industrial manufacturing scenario according to the material path data; The industrial manufacturing scene model is optimized using the following preset difference-product algorithm to obtain the scene optimization area: Among them, A is the scene optimization area, B τ is the τth grid area in the industrial manufacturing scene model, C σ The σth grid area in the original scene model for industrial production; Generate an industrial manufacturing scenario optimization model according to the scenario optimization area; Visual texture mapping is performed on the industrial manufacturing scene optimization model to obtain a visualized industrial manufacturing scene.

2. The scene modeling method for realizing industrial manufacturing based on digitalization according to claim 1, characterized in that: The step of constructing the production process corresponding to the industrial manufacturing according to the product manufacturing data includes: Determining original material data of industrial manufacturing products based on the product manufacturing data; Extracting the manufacturing process flow from the product manufacturing data; Inputting the original material data into the target process flow in the manufacturing process flow to obtain target material data; The target material data is used to update the original material data, and the process returns to the step of inputting the original material data into the target process flow in the manufacturing process flow to obtain the target material data, until all the process flows in the manufacturing process flow are executed and completed; The production process corresponding to the industrial manufacturing is generated by completing the steps in all the process flows.

3. The scene modeling method for realizing industrial manufacturing based on digitalization according to claim 1, characterized in that: The generating of the material path corresponding to the industrial manufacturing according to the production process and the product manufacturing data includes: generating a bill of materials for each sub-process according to the product manufacturing data; Generate the material transportation direction of each sub-process according to the production process; Extracting the material placement location of each sub-process in the bill of materials; A material path corresponding to the industrial manufacturing is generated according to the material transportation direction and the material placement position.

4. The scene modeling method for realizing industrial manufacturing based on digitalization according to claim 1, characterized in that: The using the automated optimization algorithm to calculate the optimal product quantity corresponding to the material path according to the real-time product manufacturing data includes: Extracting material placement locations from the real-time product manufacturing data; Determine the real-time product production cost and the real-time product production quantity according to the material placement location; Calculate the minimum cost corresponding to the material path according to the real-time product production cost and the real-time product production quantity using the automated optimization algorithm; The optimal product quantity is determined based on the minimum cost.

5. The scene modeling method for realizing industrial manufacturing based on digitalization according to claim 1, characterized in that: The step of optimizing the material path according to the optimal product quantity to obtain the optimal material path includes: Determine the optimal placement position of the material according to the optimal product quantity; The material path is optimized by the optimal material placement position and material transportation direction to obtain the optimal material path.

6. The scene modeling method for realizing industrial manufacturing based on digitalization according to claim 1, characterized in that: The industrial production manufacturing scenario model of the industrial manufacturing scenario is generated according to the material path data, including: Generate a target static element position and a target dynamic element position in an industrial manufacturing scene according to the material path data; Generate an industrial manufacturing boundary contour of the industrial manufacturing scene according to the target static element position and the target dynamic element position; An industrial production and manufacturing scene model is constructed according to the industrial production and manufacturing boundary contour.

7. A scene modeling system for realizing industrial manufacturing based on digitalization, characterized in that: The system comprises: A production process construction module is used to obtain product manufacturing data of industrial manufacturing and construct the production process corresponding to the industrial manufacturing according to the product manufacturing data; A constraint parameter generation module, used to generate a material path corresponding to the industrial manufacturing according to the production process and the product manufacturing data, and to generate constraint parameters of the production process according to preset production status characteristics; The generating of the constraint parameters of the production process according to the preset production status characteristics includes: Determine the production attributes and demand attributes of each sub-process in the production process according to the production status characteristics; Determine the production quantity parameter and production cost parameter of each sub-process according to the production attributes; Determine the demand quantity parameter and supply capacity parameter of each sub-process according to the demand attribute; The production quantity parameter, the production cost parameter, the demand quantity parameter and the supply capacity parameter are collected as constraint parameters of each sub-process in the production process; An automated optimization algorithm generation module is used to generate an automated optimization algorithm for industrial manufacturing according to the material path and the constraint parameters, including: extracting the material placement position in the material path; calculating the distance between the material placement position and the transmission position of each sub-process in the production process; generating an objective constraint function for industrial manufacturing according to the constraint parameters; Generating the target constraint function of industrial manufacturing according to the constraint parameters includes: Determining a target constraint threshold according to the constraint parameter; The target constraint function of industrial manufacturing is generated according to the target constraint threshold and the constraint parameter, wherein the target constraint function is: Among them, f h (x) is the production quantity constraint function, demand quantity constraint function and supply capacity constraint function in the objective constraint optimization function, x ijk is the quantity of material j placed in position i for producing product k in the constraint parameter, P k is the demand quantity threshold parameter in the target constraint threshold, S k is the supply capacity threshold parameter in the target constraint threshold, and n is the number of material placement locations; An automated optimization algorithm is generated according to the material placement position, the transmission position distance and the objective constraint function, wherein the automated optimization algorithm is: Among them, Z is the optimal value, min is the minimum function, max is the maximum function, C ij is the cost of placing material j at location i for production, x ijk S is the quantity of material j placed at location i to produce product k, ij is the transport distance for material j to be placed at position i, is the penalty coefficient, f h (x) is the production product quantity constraint function, demand quantity constraint function and supply capacity constraint function in the target constraint optimization function, y is the target constraint optimization parameter in the target constraint optimization function, q is the penalty index, H is the function number of the target constraint optimization function, n is the number of material placement locations, m is the number of material types, and p is the number of products produced; An optimal product quantity calculation module, used to obtain real-time product manufacturing data, and calculate the optimal product quantity corresponding to the material path according to the real-time product manufacturing data using the automated optimization algorithm; A visualized industrial manufacturing scene generation module is used to optimize the material path according to the optimal product quantity to obtain the optimal material path, and to perform visual modeling on the industrial manufacturing scene corresponding to the optimal material path to obtain the visualized industrial manufacturing scene; The visualizing modeling of the industrial manufacturing scene corresponding to the optimal material path to obtain the visualized industrial manufacturing scene includes: generating material path data according to the optimal material path; Generate an industrial production and manufacturing scenario model of the industrial manufacturing scenario according to the material path data; The industrial manufacturing scene model is optimized using the following preset difference-product algorithm to obtain the scene optimization area: Among them, A is the scene optimization area, B τ is the τth grid area in the industrial manufacturing scene model, C σ The σth grid area in the original scene model for industrial production; Generate an industrial manufacturing scenario optimization model according to the scenario optimization area; Visual texture mapping is performed on the industrial manufacturing scene optimization model to obtain a visualized industrial manufacturing scene.