A polar airport snow compaction runway construction equipment system and method
By introducing sensing and broadcasting modules into the polar airport's compacted snow runway construction equipment system, the proportion of ice and water and the status of construction equipment can be monitored and adjusted in real time, which solves the problem that existing technology cannot simulate the proportion of ice and water and sense the status of construction equipment. Improved the efficiency and quality of snow track construction.
Patent Information
- Application Number
- CN202410616690.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-17
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-05-17
AI Technical Summary
The general ground airport compacted snow runway construction equipment system on the market cannot simulate the proportion of sintered ice water, resulting in the inability to obtain appropriate ice water proportion information, and the inability to sense the status of the construction equipment and broadcast the construction progress in real time, resulting in low construction efficiency. The quality of the snow track is poor.
A polar airport compacted snow runway construction equipment system is designed, including a preparation module, an induction module, a sintering component module, a processing interval simulation module, an implementation module and a construction broadcast module. Through communication and data transmission between modules, construction equipment is sensed in real time. Position and moving speed, analyze the proportion of ice and water, adjust the construction interval and speed, and broadcast the construction progress in a timely manner.
It achieves accurate simulation of the proportion of ice and water and real-time monitoring of the status of construction equipment, improves the quality and construction efficiency of the snow runway, ensures that construction equipment operates as planned, and can be adjusted in time to avoid speed abnormalities.
Smart Images

Figure CN118333796B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of snow runways, and in particular to a construction equipment system and method for compacting snow runways at polar airports. Background Art
[0002] Polar airports refer to airports built in polar regions (such as the Arctic or Antarctic). Due to the special climate and geographical conditions in polar regions, polar airports face many challenges, such as extreme low temperatures, strong winds, ice and snow coverage, etc. In order to adapt to these conditions, polar airports usually adopt a series of special designs and facilities. Snow runways refer to runways laid on snow for aircraft takeoff and landing. In cold areas or high-altitude areas, snow runways are a common type of take-off and landing site. Snow runways play an important role in some remote areas or under special climatic conditions, providing temporary or permanent take-off and landing sites for aircraft. When constructing snow runways, most of the time, vehicles are needed to carry construction equipment, which makes construction more convenient.
[0003] The general equipment systems and methods for compacting snow runways at polar airports on the market cannot simulate the ratio of sintered ice and water during snow runway construction, making it inconvenient to obtain appropriate ice-water ratio information. In addition, the status of the construction equipment cannot be sensed and reported during construction. To this end, we propose a system and method for compacting snow runways at polar airports. Summary of the invention
[0004] The object of the present invention is to provide a polar airport snow compaction runway construction equipment system and method.
[0005] In order to solve the problems raised in the above background technology, the present invention provides the following technical solutions: a polar airport snow compaction runway construction equipment system, the polar airport snow compaction runway construction equipment system includes a preparation module, a sensing module, a sintering component module, a processing interval simulation module, an implementation module, a construction procedure module and a construction broadcast module;
[0006] The preparation module is connected in communication with the sensing module and the sintering component module, the sensing module is connected in communication with the implementation module, the sintering component module is connected in communication with the processing interval simulation module, the processing interval simulation module is connected in communication with the implementation module, the implementation module is connected in communication with the construction program module, and the construction program module is connected in communication with the construction broadcast module;
[0007] A preparation module is used to receive the planned construction route information and the construction sequence information of the construction equipment, and then transmit the construction route information and the construction sequence information to the sensing module and the sintering component module;
[0008] The sensing module is used to receive the construction route information and construction sequence information transmitted by the preparation module, then sense the position of the construction equipment, check whether the construction equipment has completed the construction preparation, and then transmit the information of the completion of the construction preparation to the implementation module;
[0009] The sintering component module is used to receive the construction route information and construction sequence information transmitted by the preparation module, analyze the hardness of the snow runway after sintering is completed, and then transmit the information of different sintering methods and the corresponding snow runway quality information to the processing interval simulation module;
[0010] The processing interval simulation module is used to receive the different sintering method information and the corresponding snow runway quality information transmitted by the sintering component module, and then calculate the construction interval of the construction equipment according to the different sintering methods, and transmit the construction interval information to the implementation module;
[0011] An implementation module is used to receive the completed construction preparation information and the construction interval information transmitted by the sensing module and the processing interval simulation module respectively, transmit the information to the corresponding construction equipment according to the construction interval information, display the start time and running speed of the construction equipment to the driver, and then transmit the start information of the construction equipment to the construction program module;
[0012] The construction program module is used to receive the construction equipment start-up information transmitted by the implementation module, and then start the sensing device in the construction equipment to detect the position and moving speed of various construction equipment, and then transmit the position information and moving speed information of the construction equipment to the construction broadcast module;
[0013] The construction broadcast module is used to receive the construction equipment location information and movement speed information transmitted by the construction program module, and then broadcast the construction equipment location information and movement speed information.
[0014] As a further solution of the present invention: the preparation module is capable of receiving the planned construction route and the construction sequence information of the construction equipment. After receiving the construction sequence information, the driver moves the construction equipment to be used to the set position, and then transmits the construction route information and the construction sequence information of the construction equipment to the sensing module and the sintering component module.
[0015] As a further solution of the present invention: the sensing module can receive the construction route information and the construction sequence information of the construction equipment transmitted by the preparation module, and simultaneously sense the position of the construction equipment, check the parking sequence of the construction equipment, and analyze whether the parking sequence of the construction equipment is parked in accordance with the construction sequence. The specific parking information is as follows;
[0016] When the parking order of the construction equipment is in accordance with the construction order, the information is summarized as a sequence, and then the sequence signal is transmitted to the implementation module;
[0017] When the parking sequence of the construction equipment is not in accordance with the construction sequence, the information is classified as misplacement, and then a misplacement signal is transmitted to the preparation module.
[0018] As a further solution of the present invention: the sintering component module can receive the construction route information and the construction sequence information of the construction equipment transmitted by the preparation module. At this time, the sintering component module will connect to the Internet and establish a sintering library. When the sintering information is obtained from the Internet, the sintering information can be recorded in the sintering library. At this time, the sintering component module simulates the sintering quality of different ice-water ratios. Assume that the ice ratio is Z X , assuming that the water ratio is Z 1-X , assuming the sintering mass is S JX , sintering quality S JX The X in the figure represents the sintering mass obtained for the Xth time, and the ice percentage Z can be obtained. X And water proportion Z 1-X Sintering quality S J1 , assuming that the amount of ice water ratio adjustment each time is T X , and then adjust the ice-water ratio to get the ice cube ratio Z X ±T X And water proportion Z 1-X ±T X Sintering quality S J2 , S is obtained by adjusting the ice-water ratio. J3 , S J4 , S J5 ,,,S JX , draw a quality fluctuation diagram based on the sintering quality, and when S JX-1 The sintering quality value before is increasing, S JX When the sintering quality value decreases, it is necessary to adjust S JX-1 With S JX The intermediate sintering mass is calculated, assuming S JX-1 With S JX The intermediate sintering mass is Z SJ ;
[0019]
[0020] The above formula can be used to obtain appropriate sintering quality information, thereby obtaining appropriate ice-water ratio information, and then the appropriate ice-water ratio information is transmitted to the processing interval simulation module.
[0021] As a further solution of the present invention: the processing interval simulation module is capable of receiving appropriate ice-water ratio information transmitted by the sintering component module, and then calculating the construction interval time of different construction equipment, the start-up time of the construction equipment and the moving speed of the construction equipment according to the ice-water ratio information, and then transmitting the calculated construction interval time information, construction equipment start-up time information and moving speed information to the implementation module.
[0022] As a further solution of the present invention: the implementation module can receive the sequence and misplacement signals of the sensing module. When the sequence information is received, it means that the construction equipment has been prepared and can be started at any time for construction. When the misplacement signal is received, it means that the construction equipment is not ready. At this time, the staff will be notified to adjust the parking order of the construction equipment until the sequence signal is transmitted from the sensing module. The implementation module can receive the construction interval time information, construction equipment start time information and moving speed information transmitted by the processing interval simulation module, and then transmit the construction interval time information, construction equipment start time information and moving speed information to the corresponding construction equipment, and display it to the driver through the display screen on the construction equipment. When the start time of the construction equipment is reached, the driver will start the construction equipment, and then transmit the construction equipment start signal, construction interval time information and moving speed information to the construction program module.
[0023] As a further solution of the present invention: the construction program module is capable of receiving the construction equipment start-up signal, construction interval time information and moving speed information transmitted by the implementation module, and incorporating the construction equipment start-up signal, construction interval time information and moving speed information into the planning information. When the construction equipment start-up signal is received, the sensing device inside the construction equipment will be activated to sense the position and moving speed of the construction equipment, and the sensed construction equipment position information and moving speed information will be incorporated into the implementation information. Then, a comparison table is constructed based on the planning information and the implementation information, and then it is determined in real time whether the implementation information is consistent with the planning information, and the real-time comparison table information is transmitted to the construction broadcast module.
[0024] As a further solution of the present invention: the construction broadcast module can receive a real-time comparison table transmitted by the construction program module. When the implementation information does not conform to the planned information, it will determine whether the moving speed of the construction equipment is slower than the planned moving speed. When the moving speed of the construction equipment is slower than the planned moving speed, it will remind the driver to increase the moving speed of the construction equipment. When the moving speed of the construction equipment is faster than the planned moving speed, it will remind the driver to reduce the moving speed of the construction equipment. At the same time, the construction broadcast module has an interval broadcast function, which can broadcast the position of the construction equipment according to the set time interval.
[0025] In addition, the present invention also provides a method for constructing equipment for compacting snow runways at polar airports, comprising the following steps:
[0026] Step 1: After the implementation module receives the snow runway construction route information and construction sequence information, it can notify the driver to move the corresponding construction equipment to the set position, and then the sensing module senses the position of the construction equipment to check whether the parking sequence of the construction equipment is in accordance with the construction sequence. When the parking sequence of the construction equipment is in accordance with the construction sequence, the sequence signal is transmitted to the implementation module; when the parking sequence of the construction equipment is not in accordance with the construction sequence, the misplacement signal is transmitted to the preparation module;
[0027] Step 2: When the implementation module receives the misplacement signal, it will notify the driver to move the corresponding construction equipment to the corresponding position until the implementation module receives the alignment signal transmitted by the sensing module, and at the same time use the sintering component module to calculate the appropriate ice-water ratio, and transmit the calculated appropriate ice-water ratio information to the processing interval simulation module;
[0028] Step 3: Calculate the interval construction time, start time and moving speed of the construction equipment by processing the interval simulation module, summarize the interval construction time, start time and moving speed of the construction equipment as planning information, and when the construction equipment is started, the sensing equipment will be started synchronously to obtain the position information and moving speed information of the construction equipment, summarize the position information and moving speed information of the sensing construction equipment as implementation information, and compare whether the implementation information is consistent with the planning information;
[0029] Step 4. When it is detected that the moving speed of the construction equipment is lower than the moving speed in the planning information, the driver inside the construction equipment will be reminded to speed up in time. When it is detected that the moving speed of the construction equipment is higher than the speed in the planning information, the driver inside the construction equipment will be reminded to slow down in time. At the same time, the construction broadcast module has an interval broadcast function, which can broadcast the position of the construction equipment according to the set time interval.
[0030] By adopting the above technical solution, compared with the prior art, the beneficial effects of the present invention are:
[0031] 1. The present invention can sense the position of construction equipment through the sensing module, and can also check the parking order of the construction equipment to determine whether the parking order of the construction equipment is in accordance with the construction order. When the parking position of the construction equipment is not in accordance with the construction order, the driver will be notified to adjust it according to the construction order. The sintering component module can simulate the quality of snow roads sintered with different ice-water ratio information, and draw a quality fluctuation diagram based on the sintering quality simulated multiple times, so as to analyze the appropriate ice-water ratio information and improve the quality of snow roads;
[0032] 2. The present invention can display the construction interval and start time of the construction equipment on the construction equipment through the implementation module, so as to conveniently remind the driver to work according to the set time, and can calculate the moving speed of the construction equipment, so that the driver can adjust the moving speed of the construction equipment according to the set moving speed, and further improve the quality of the snow road after construction;
[0033] 3. The present invention can compare whether the implementation information is consistent with the planning information through the construction program module. When the implementation information does not conform to the information, the operating status of the construction equipment can be adjusted according to the actual situation, and the construction broadcast module can be used to promptly notify the driver to speed up or slow down, and has an interval broadcast function, which can broadcast the position and moving speed of the construction equipment at a certain time interval. At the same time, the time interval can be adjusted according to needs, so that the position and moving speed of the construction equipment can be checked in real time. When the moving speed of the construction equipment is abnormal, it can be remedied in time. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 This is a schematic diagram of the overall process in an embodiment of the present invention;
[0035] Figure 2 Schematic diagram of the method flow in an embodiment of the present invention. DETAILED DESCRIPTION
[0036] The specific embodiments of the present invention are further described below in conjunction with the accompanying drawings. It should be noted that the description of these embodiments is used to help understand the present invention, but does not constitute a limitation of the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0037] Example 1, please refer to the attached Figure 1 -Attached Figure 2 , the present invention provides a technical solution: a polar airport snow compaction runway construction equipment system, the polar airport snow compaction runway construction equipment system includes a preparation module, a sensing module, a sintering component module, a processing interval simulation module, an implementation module, a construction procedure module and a construction broadcast module;
[0038] The preparation module is connected in communication with the sensing module and the sintering component module, the sensing module is connected in communication with the implementation module, the sintering component module is connected in communication with the processing interval simulation module, the processing interval simulation module is connected in communication with the implementation module, the implementation module is connected in communication with the construction program module, and the construction program module is connected in communication with the construction broadcast module;
[0039] A preparation module is used to receive the planned construction route information and the construction sequence information of the construction equipment, and then transmit the construction route information and the construction sequence information to the sensing module and the sintering component module;
[0040] The sensing module is used to receive the construction route information and construction sequence information transmitted by the preparation module, then sense the position of the construction equipment, check whether the construction equipment has completed the construction preparation, and then transmit the information of the completion of the construction preparation to the implementation module;
[0041] The sintering component module is used to receive the construction route information and construction sequence information transmitted by the preparation module, analyze the hardness of the snow runway after sintering is completed, and then transmit the information of different sintering methods and the corresponding snow runway quality information to the processing interval simulation module;
[0042] The processing interval simulation module is used to receive the different sintering method information and the corresponding snow runway quality information transmitted by the sintering component module, and then calculate the construction interval of the construction equipment according to the different sintering methods, and transmit the construction interval information to the implementation module;
[0043] An implementation module is used to receive the completed construction preparation information and the construction interval information transmitted by the sensing module and the processing interval simulation module respectively, transmit the information to the corresponding construction equipment according to the construction interval information, display the start time and running speed of the construction equipment to the driver, and then transmit the start information of the construction equipment to the construction program module;
[0044] The construction program module is used to receive the construction equipment start-up information transmitted by the implementation module, and then start the sensing device in the construction equipment to detect the position and moving speed of various construction equipment, and then transmit the position information and moving speed information of the construction equipment to the construction broadcast module;
[0045] The construction broadcast module is used to receive the construction equipment location information and movement speed information transmitted by the construction program module, and then broadcast the construction equipment location information and movement speed information.
[0046] Please see attached Figure 1 The preparation module can receive the planned construction route and the construction sequence information of the construction equipment. After receiving the construction sequence information, the driver moves the construction equipment to the set position, and then transmits the construction route information and the construction sequence information of the construction equipment to the sensing module and the sintering component module. The sensing module can receive the construction route information and the construction sequence information of the construction equipment transmitted by the preparation module, and sense the position of the construction equipment at the same time, check the parking sequence of the construction equipment, and analyze whether the parking sequence of the construction equipment is parked in accordance with the construction sequence. The specific parking information is as follows;
[0047] When the parking order of the construction equipment is in accordance with the construction order, the information is summarized as a sequence, and then the sequence signal is transmitted to the implementation module;
[0048] When the parking order of the construction equipment is not in accordance with the construction order, the information is summarized as misplacement, and then the misplacement signal is transmitted to the preparation module. The sintering component module can receive the construction route information and the construction sequence information of the construction equipment transmitted by the preparation module. At this time, the sintering component module will connect to the Internet and establish a sintering library. When the sintering information is obtained from the Internet, the sintering information can be recorded in the sintering library. At this time, the sintering component module simulates the sintering quality of different ice-water ratios. Let the ice ratio be Z. X , assuming that the water ratio is Z 1-X , assuming the sintering mass is S JX , sintering quality S JX The X in the figure represents the sintering mass obtained for the Xth time, and the ice percentage Z can be obtained. X And water proportion Z 1-X Sintering quality S J1 , assuming that the amount of ice water ratio adjustment each time is T X , and then adjust the ice-water ratio to get the ice cube ratio Z X ±T X And water proportion Z 1-X ±T X Sintering quality S J2 , S is obtained by adjusting the ice-water ratio. J3 , S J4 , S J5 ,,,S JX , draw a quality fluctuation diagram based on the sintering quality, and when S JX-1 The sintering quality value before is increasing, S JX When the sintering quality value decreases, it is necessary to adjust S JX-1 With S JX The intermediate sintering mass is calculated, assuming S JX-1 With S JX The intermediate sintering mass is Z SJ ;
[0049]
[0050] The above formula can be used to obtain appropriate sintering quality information, thereby obtaining appropriate ice-water ratio information, and then the appropriate ice-water ratio information is transmitted to the processing interval simulation module;
[0051] In this embodiment, the preparation module can receive the construction route information and construction sequence information of the construction equipment, thereby making the construction more convenient.
[0052] When in use, the sensing module can sense the position of the construction equipment, and can also check the parking order of the construction equipment to determine whether the parking order of the construction equipment is in accordance with the construction order. When the parking position of the construction equipment is not in accordance with the construction order, the driver will be notified to make adjustments according to the construction order. The sintering component module can simulate the quality of snow roads sintered with different ice-water ratio information, and draw a quality fluctuation graph based on the sintering quality simulated multiple times, so as to analyze the appropriate ice-water ratio information and improve the quality of the snow roads.
[0053] Example 2, please refer to the attached Figure 1 -Attached Figure 2 , the present invention provides a technical solution: a polar airport snow compaction runway construction equipment system, the polar airport snow compaction runway construction equipment system includes a preparation module, a sensing module, a sintering component module, a processing interval simulation module, an implementation module, a construction procedure module and a construction broadcast module;
[0054] The preparation module is connected in communication with the sensing module and the sintering component module, the sensing module is connected in communication with the implementation module, the sintering component module is connected in communication with the processing interval simulation module, the processing interval simulation module is connected in communication with the implementation module, the implementation module is connected in communication with the construction program module, and the construction program module is connected in communication with the construction broadcast module;
[0055] A preparation module is used to receive the planned construction route information and the construction sequence information of the construction equipment, and then transmit the construction route information and the construction sequence information to the sensing module and the sintering component module;
[0056] The sensing module is used to receive the construction route information and construction sequence information transmitted by the preparation module, then sense the position of the construction equipment, check whether the construction equipment has completed the construction preparation, and then transmit the information of the completion of the construction preparation to the implementation module;
[0057] The sintering component module is used to receive the construction route information and construction sequence information transmitted by the preparation module, analyze the hardness of the snow runway after sintering is completed, and then transmit the information of different sintering methods and the corresponding snow runway quality information to the processing interval simulation module;
[0058] The processing interval simulation module is used to receive the different sintering method information and the corresponding snow runway quality information transmitted by the sintering component module, and then calculate the construction interval of the construction equipment according to the different sintering methods, and transmit the construction interval information to the implementation module;
[0059] An implementation module is used to receive the completed construction preparation information and the construction interval information transmitted by the sensing module and the processing interval simulation module respectively, transmit the information to the corresponding construction equipment according to the construction interval information, display the start time and running speed of the construction equipment to the driver, and then transmit the start information of the construction equipment to the construction program module;
[0060] The construction program module is used to receive the construction equipment start-up information transmitted by the implementation module, and then start the sensing device in the construction equipment to detect the position and moving speed of various construction equipment, and then transmit the position information and moving speed information of the construction equipment to the construction broadcast module;
[0061] The construction broadcast module is used to receive the construction equipment location information and movement speed information transmitted by the construction program module, and then broadcast the construction equipment location information and movement speed information.
[0062] Please see attached Figure 1 , the processing interval simulation module can receive the appropriate ice-water ratio information transmitted by the sintering component module, and then calculate the construction interval time, the start time of the construction equipment and the moving speed of the construction equipment according to the ice-water ratio information, and then transmit the calculated construction interval time information, the construction equipment start time information and the moving speed information to the implementation module, the implementation module can receive the sequence and misplacement signals of the sensing module, when the sequence information is received, it means that the construction equipment has been prepared and can be started at any time for construction, when the misplacement signal is received, it means that the construction equipment is not ready, and then the staff will be notified to adjust the parking order of the construction equipment until the sequence signal is transmitted from the sensing module, the implementation module can receive the construction interval time information, the construction equipment start time information and the moving speed information transmitted by the processing interval simulation module, and then transmit the construction interval time information, the construction equipment start time information and the moving speed information to the corresponding construction equipment, and display it to the driver through the display screen on the construction equipment, when the start time of the construction equipment is reached, the driver will start the construction equipment, and then transmit the construction equipment start signal, the construction interval time information and the moving speed information to the construction program module;
[0063] In this embodiment, the construction interval time can be calculated according to the ice-water ratio information by processing the interval simulation module, thereby facilitating the calculation of the construction time of the construction equipment.
[0064] When in use, the implementation module can display the construction interval and start time of the construction equipment on the construction equipment, so as to conveniently remind the driver to work according to the set time, and can calculate the moving speed of the construction equipment, so that the driver can adjust the moving speed of the construction equipment according to the set moving speed, thereby further improving the quality of the snow road after construction.
[0065] Example 3, please refer to the attached Figure 1 -Attached Figure 2 , the present invention provides a technical solution: a polar airport snow compaction runway construction equipment system, the polar airport snow compaction runway construction equipment system includes a preparation module, a sensing module, a sintering component module, a processing interval simulation module, an implementation module, a construction procedure module and a construction broadcast module;
[0066] The preparation module is connected in communication with the sensing module and the sintering component module, the sensing module is connected in communication with the implementation module, the sintering component module is connected in communication with the processing interval simulation module, the processing interval simulation module is connected in communication with the implementation module, the implementation module is connected in communication with the construction program module, and the construction program module is connected in communication with the construction broadcast module;
[0067] A preparation module is used to receive the planned construction route information and the construction sequence information of the construction equipment, and then transmit the construction route information and the construction sequence information to the sensing module and the sintering component module;
[0068] The sensing module is used to receive the construction route information and construction sequence information transmitted by the preparation module, then sense the position of the construction equipment, check whether the construction equipment has completed the construction preparation, and then transmit the information of the completion of the construction preparation to the implementation module;
[0069] The sintering component module is used to receive the construction route information and construction sequence information transmitted by the preparation module, analyze the hardness of the snow runway after sintering is completed, and then transmit the information of different sintering methods and the corresponding snow runway quality information to the processing interval simulation module;
[0070] The processing interval simulation module is used to receive the different sintering method information and the corresponding snow runway quality information transmitted by the sintering component module, and then calculate the construction interval of the construction equipment according to the different sintering methods, and transmit the construction interval information to the implementation module;
[0071] An implementation module is used to receive the completed construction preparation information and the construction interval information transmitted by the sensing module and the processing interval simulation module respectively, transmit the information to the corresponding construction equipment according to the construction interval information, display the start time and running speed of the construction equipment to the driver, and then transmit the start information of the construction equipment to the construction program module;
[0072] The construction program module is used to receive the construction equipment start-up information transmitted by the implementation module, and then start the sensing device in the construction equipment to detect the position and moving speed of various construction equipment, and then transmit the position information and moving speed information of the construction equipment to the construction broadcast module;
[0073] The construction broadcast module is used to receive the construction equipment location information and movement speed information transmitted by the construction program module, and then broadcast the construction equipment location information and movement speed information.
[0074] Please see attached Figure 1 The construction program module can receive the construction equipment start-up signal, construction interval time information and moving speed information transmitted by the implementation module, and incorporate the construction equipment start-up signal, construction interval time information and moving speed information into the planning information. When the construction equipment start-up signal is received, the sensing device inside the construction equipment will be activated to sense the position and moving speed of the construction equipment, and the sensed construction equipment position information and moving speed information will be incorporated into the implementation information. Then, a comparison table is constructed according to the planning information and the implementation information, and then it is judged in real time whether the implementation information is consistent with the planning information, and the real-time comparison table information is transmitted to the construction broadcast module. The construction broadcast module can receive the real-time comparison table transmitted by the construction program module. When the implementation information does not conform to the planning information, it will determine whether the moving speed of the construction equipment is slower than the planned moving speed. When the moving speed of the construction equipment is slower than the planned moving speed, it will remind the driver to increase the moving speed of the construction equipment. When the moving speed of the construction equipment is faster than the planned moving speed, it will remind the driver to reduce the moving speed of the construction equipment. At the same time, the construction broadcast module has an interval broadcast function, which can broadcast the position of the construction equipment according to the set time interval;
[0075] In this embodiment, the position and moving speed of the construction equipment can be sensed in real time through the construction program module, thereby facilitating the control of the position of the construction equipment.
[0076] During use, the construction program module can be used to compare whether the implementation information is consistent with the planned information. When the implementation information does not conform to the information, the operating status of the construction equipment can be adjusted according to the actual situation. The construction broadcast module can be used to promptly notify the driver to speed up or slow down, and it has an interval broadcast function, which can broadcast the position and moving speed of the construction equipment at a certain time interval. At the same time, the time interval can be adjusted as needed, so that the position and moving speed of the construction equipment can be viewed in real time. When the moving speed of the construction equipment is abnormal, it can be remedied in time.
[0077] Working principle:
[0078] The first step is that after the implementation module receives the snow runway construction route information and the construction sequence information, it can notify the driver to move the corresponding construction equipment to the set position, and then the sensing module senses the position of the construction equipment to check whether the parking sequence of the construction equipment is in accordance with the construction sequence. When the parking sequence of the construction equipment is in accordance with the construction sequence, the sequence signal is transmitted to the implementation module. When the parking sequence of the construction equipment is not in accordance with the construction sequence, the misplacement signal is transmitted to the preparation module. When the implementation module receives the misplacement signal, it will notify the driver to move the corresponding construction equipment to the corresponding position until the implementation module receives the sequence signal transmitted by the sensing module, and at the same time, the sintering component module is used to calculate the appropriate ice-water ratio, and the calculated appropriate ice-water ratio information is transmitted to the processing interval simulation module;
[0079] The second step is to calculate the interval construction time, start-up time and moving speed of the construction equipment by processing the interval simulation module, and summarize the interval construction time, start-up time and moving speed of the construction equipment as planning information. When the construction equipment is started, the sensing equipment will be started synchronously to obtain the position information and moving speed information of the construction equipment. The position information and moving speed information of the sensed construction equipment are summarized as implementation information, and compared to see whether the implementation information is consistent with the planning information. When it is detected that the moving speed of the construction equipment is lower than the moving speed in the planning information, the driver inside the construction equipment will be reminded to speed up in time. When it is detected that the moving speed of the construction equipment is higher than the speed in the planning information, the driver inside the construction equipment will be reminded to slow down in time. At the same time, the construction broadcast module has an interval broadcast function, which can broadcast the position of the construction equipment at the set time interval.
[0080] Those skilled in the art should understand that the modules or steps of the present invention described above can be implemented by a general-purpose computer device, or alternatively, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. The present invention is not limited to any specific combination of hardware and software.
[0081] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various changes and variations. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
[0082] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.
Claims
1. A polar airport snow compaction runway construction equipment system, characterized by: The polar airport snow compaction runway construction equipment system includes a preparation module, a sensing module, a sintering component module, a processing interval simulation module, an implementation module, a construction procedure module and a construction broadcast module; The preparation module is connected in communication with the sensing module and the sintering component module, the sensing module is connected in communication with the implementation module, the sintering component module is connected in communication with the processing interval simulation module, the processing interval simulation module is connected in communication with the implementation module, the implementation module is connected in communication with the construction program module, and the construction program module is connected in communication with the construction broadcast module; A preparation module is used to receive the planned construction route information and the construction sequence information of the construction equipment, and then transmit the construction route information and the construction sequence information to the sensing module and the sintering component module; The sensing module is used to receive the construction route information and construction sequence information transmitted by the preparation module, then sense the position of the construction equipment, check whether the construction equipment has completed the construction preparation, and then transmit the information of the completion of the construction preparation to the implementation module; The sintering component module is used to receive the construction route information and construction sequence information transmitted by the preparation module, analyze the hardness of the snow runway after sintering is completed, and then transmit the information of different sintering methods and the corresponding snow runway quality information to the processing interval simulation module; The processing interval simulation module is used to receive the different sintering method information and the corresponding snow runway quality information transmitted by the sintering component module, and then calculate the construction interval of the construction equipment according to the different sintering methods, and transmit the construction interval information to the implementation module; An implementation module is used to receive the completed construction preparation information and the construction interval information transmitted by the sensing module and the processing interval simulation module respectively, transmit the information to the corresponding construction equipment according to the construction interval information, display the start time and running speed of the construction equipment to the driver, and then transmit the start information of the construction equipment to the construction program module; The construction program module is used to receive the construction equipment start-up information transmitted by the implementation module, and then start the sensing device in the construction equipment to detect the position and moving speed of various construction equipment, and then transmit the position information and moving speed information of the construction equipment to the construction broadcast module; The construction broadcast module is used to receive the construction equipment location information and movement speed information transmitted by the construction program module, and then broadcast the construction equipment location information and movement speed information.
2. The polar airport snow compaction runway construction equipment system according to claim 1, characterized in that: The preparation module can receive the planned construction route and the construction sequence information of the construction equipment. After receiving the construction sequence information, the driver moves the construction equipment to the set position, and then transmits the construction route information and the construction sequence information of the construction equipment to the sensing module and the sintering component module.
3. The polar airport snow compaction runway construction equipment system according to claim 2, characterized in that: The sensing module can receive the construction route information and the construction sequence information of the construction equipment transmitted by the preparation module, and simultaneously sense the position of the construction equipment, check the parking sequence of the construction equipment, and analyze whether the parking sequence of the construction equipment is parked in accordance with the construction sequence. The specific parking information is as follows; When the parking order of the construction equipment is in accordance with the construction order, the information is summarized as a sequence, and then the sequence signal is transmitted to the implementation module; When the parking sequence of the construction equipment is not in accordance with the construction sequence, the information is classified as misplacement, and then a misplacement signal is transmitted to the preparation module.
4. The polar airport snow compaction runway construction equipment system according to claim 2, characterized in that: The sintering component module can receive the construction route information and the construction sequence information of the construction equipment transmitted by the preparation module. At this time, the sintering component module will connect to the Internet and establish a sintering library. When the sintering information is obtained from the Internet, the sintering information can be recorded in the sintering library. At this time, the sintering component module simulates the sintering quality of different ice-water ratios. Assume that the ice ratio is Z X , assuming that the water ratio is Z 1-X , assuming the sintering mass is S JX , sintering quality S JX The X in the figure represents the sintering mass obtained for the Xth time, and the ice percentage Z can be obtained. X And water proportion Z 1-X Sintering quality S J1 , assuming that the amount of ice water ratio adjustment each time is T X , and then adjust the ice-water ratio to get the ice cube ratio Z X ±T X And water proportion Z 1-X ±T X Sintering quality S J2 , S is obtained by adjusting the ice-water ratio. J3 , S J4 , S J5 ,……,S JX , draw a quality fluctuation diagram based on the sintering quality, and when S JX-1 The sintering quality value before is increasing, S JX When the sintering quality value decreases, it is necessary to adjust S JX-1 With S JX The intermediate sintering mass is calculated, assuming S JX-1 With S JX The intermediate sintering mass is Z SJ ; The above formula can be used to obtain appropriate sintering quality information, thereby obtaining appropriate ice-water ratio information, and then the appropriate ice-water ratio information is transmitted to the processing interval simulation module.
5. The polar airport snow compaction runway construction equipment system according to claim 4, characterized in that: The processing interval simulation module can receive appropriate ice-water ratio information transmitted by the sintering component module, and then calculate the construction interval time, construction equipment start-up time and construction equipment moving speed of different construction equipment according to the ice-water ratio information, and then transmit the calculated construction interval time information, construction equipment start-up time information and moving speed information to the implementation module.
6. A polar airport snow compaction runway construction equipment system according to claim 3 or 5, characterized in that: The implementation module can receive the sequence and misplacement signals of the sensing module. When the sequence information is received, it means that the construction equipment has been prepared and can be started at any time for construction. When the misplacement signal is received, it means that the construction equipment is not ready. At this time, the staff will be notified to adjust the parking order of the construction equipment until the sequence signal is transmitted from the sensing module. The implementation module can receive the construction interval time information, construction equipment start time information and moving speed information transmitted by the processing interval simulation module, and then transmit the construction interval time information, construction equipment start time information and moving speed information to the corresponding construction equipment, and display it to the driver through the display screen on the construction equipment. When the start time of the construction equipment is reached, the driver will start the construction equipment, and then transmit the construction equipment start signal, construction interval time information and moving speed information to the construction program module.
7. The polar airport snow compaction runway construction equipment system according to claim 6, characterized in that: The construction program module can receive the construction equipment start-up signal, construction interval time information and moving speed information transmitted by the implementation module, and incorporate the construction equipment start-up signal, construction interval time information and moving speed information into the planning information. When receiving the construction equipment start-up signal, the sensing device inside the construction equipment will be activated to sense the position and moving speed of the construction equipment, and the sensed construction equipment position information and moving speed information will be incorporated into the implementation information. Then, a comparison table is constructed based on the planning information and the implementation information, and then it is determined in real time whether the implementation information is consistent with the planning information, and the real-time comparison table information is transmitted to the construction broadcast module.
8. The polar airport snow compaction runway construction equipment system according to claim 7, characterized in that: The construction broadcast module can receive the real-time comparison table transmitted by the construction program module. When the implementation information does not conform to the planned information, it will determine whether the moving speed of the construction equipment is slower than the planned moving speed. When the moving speed of the construction equipment is slower than the planned moving speed, it will remind the driver to increase the moving speed of the construction equipment. When the moving speed of the construction equipment is faster than the planned moving speed, it will remind the driver to reduce the moving speed of the construction equipment. At the same time, the construction broadcast module has an interval broadcast function, which can broadcast the position of the construction equipment according to the set time interval.
9. A method for constructing a polar airport snow compaction runway applicable to the polar airport snow compaction runway construction equipment system according to any one of claims 1 to 8, characterized in that: The following steps are involved: Step 1: After the implementation module receives the snow runway construction route information and construction sequence information, it can notify the driver to move the corresponding construction equipment to the set position, and then the sensing module senses the position of the construction equipment to check whether the parking sequence of the construction equipment is in accordance with the construction sequence. When the parking sequence of the construction equipment is in accordance with the construction sequence, the sequence signal is transmitted to the implementation module; when the parking sequence of the construction equipment is not in accordance with the construction sequence, the misplacement signal is transmitted to the preparation module; Step 2: When the implementation module receives the misplacement signal, it will notify the driver to move the corresponding construction equipment to the corresponding position until the implementation module receives the alignment signal transmitted by the sensing module, and at the same time use the sintering component module to calculate the appropriate ice-water ratio, and transmit the calculated appropriate ice-water ratio information to the processing interval simulation module; Step 3: Calculate the interval construction time, start time and moving speed of the construction equipment by processing the interval simulation module, summarize the interval construction time, start time and moving speed of the construction equipment as planning information, and when the construction equipment is started, the sensing equipment will be started synchronously to obtain the position information and moving speed information of the construction equipment, summarize the position information and moving speed information of the sensing construction equipment as implementation information, and compare whether the implementation information is consistent with the planning information; Step 4. When it is detected that the moving speed of the construction equipment is lower than the moving speed in the planning information, the driver inside the construction equipment will be reminded to speed up in time. When it is detected that the moving speed of the construction equipment is higher than the speed in the planning information, the driver inside the construction equipment will be reminded to slow down in time. At the same time, the construction broadcast module has an interval broadcast function, which can broadcast the position of the construction equipment according to the set time interval.
Citation Information
Patent Citations
Compaction quality monitoring system based on cloud radiation
CN106680848A
Cockpit display systems and methods for displaying taxiing route on airport moving map
US20220005364A1