A filling false bottom structure with flexible net and anchor rod as skeleton and construction method
Through the filling fake bottom structure of the flexible mesh and anchor skeleton, combined with the design of filter cloth and fasteners, the problems of high cost of artificial fake bottoms and low construction efficiency in the mine are solved, and efficient and safe filling fake bottom structure is achieved.
Patent Information
- Application Number
- CN202410599254.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-15
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-05-15
AI Technical Summary
The existing artificial fake bottom structure has high cost, high labor intensity for workers and low construction efficiency, especially in the mine recovery process, which has insufficient safety and stability.
The filling fake bottom structure with flexible mesh and anchor rods as the skeleton is used to fix the flexible hook net by setting inclined drilling holes and fastening anchor rods in the mine exit tunnel, combining the design of filter cloth and fasteners to form a "box" shape The skeleton is filled with high gray sand-specific tailings sand cemented filling material, simplifying the construction process and installation method.
The cost and labor intensity of filling the fake bottom structure is reduced, construction efficiency and safety are improved, the stability and safety of the fake bottom are ensured, and the problem of fasteners and filter cloth falling off is avoided.
Smart Images

Figure CN118346353B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underground mining, and in particular to a filling false bottom structure with a flexible net and anchor rods as a framework and a construction method. Background Art
[0002] The backfill mining method is a safer and green mining method that directly or after processing the solid waste generated during the mining process is filled into the goaf to control ground pressure activities and surface collapse, improve the recovery rate, and protect surface vegetation. At present, most mines in China require the use of backfill mining methods. In order to ensure the safety of workers, top pillars or bottom pillars are often left in the mining area. In order to recover the top and bottom pillars, reduce the mining loss rate, improve economic benefits, and further enhance safety and stability of the goaf, artificial false bottoms or artificial false tops will be prepared.
[0003] Patent CN116607969A proposes a method for constructing an artificial false roof, which uses four layers of staggered FRP grids as a skeleton, uses permeable bricks to construct a permeable retaining wall on the outside, and then pours artificial concrete. This effectively reduces the labor intensity and cost of workers and improves quality and safety, but there are still problems of complex structure and low efficiency.
[0004] Patent CN114776347A proposes a method for laying an artificial false roof as a whole, using the first wood pile, the first I-beam, and the first anchor cable to suspend and fix to form the first false roof layer; laying a metal mesh below the second false roof layer to form an artificial false roof structure, using wooden sleepers, the first I-beam and the first anchor cable to form the first false roof layer and the chute to form a whole, and arranging the second false roof layer below the first false roof layer to facilitate support by the bracket, and no obvious deformation and displacement occurs during the operation, which greatly improves safety, effectively prevents the occurrence of roof collapse accidents, and ensures a safe and reliable working environment. However, there are problems such as complex operations and low efficiency.
[0005] In view of the problems of high cost, high labor intensity and low construction efficiency of the existing artificial false bottom, the present invention proposes a filling false bottom structure with a flexible net and anchor rods as a skeleton and a use method thereof. Summary of the invention
[0006] The purpose of the present invention is to solve the problems existing in the prior art and to propose a filling false bottom structure and a construction method using a flexible net and anchor rods as a framework.
[0007] In order to achieve the above object, the present invention adopts the following technical solutions:
[0008] A filling false bottom structure with a flexible net and anchor rods as a framework, including a mine exit tunnel with an inclined drill hole, and also comprising:
[0009] A flexible chain link fence is arranged in the mine tunnel and is fitted with the inner side of the mine tunnel to form a "box"-shaped frame;
[0010] A plurality of fastening anchor rods are provided and inserted into the drilled holes to fix the flexible chain link fence; and
[0011] A filter cloth, the filter cloth is coated on the inner side of the head and tail connection ends of the "box"-shaped frame, and a plurality of fasteners are arranged between the filter cloth and the "box"-shaped frame;
[0012] Wherein, the "box"-shaped frame is filled with fillers;
[0013] The fastener comprises a main rod body, a piercing rod slidably connected in the main rod body, a main gasket fixed on the main rod body, and a top support assembly arranged on the main rod body.
[0014] Preferably, the end of the puncture rod away from the main gasket is set to be tapered, and one end of the main rod body is provided with a tapered surface matching the tapered shape of the puncture rod. After the puncture rod is moved out of the main rod body, the tapered shape and the tapered surface form a smooth curved surface.
[0015] Preferably, a push handle is provided at one end of the puncture rod away from the cone, a movable groove for the push handle to move is provided in the main rod body, and a first elastic element is provided between the push handle and the inner wall of the movable groove.
[0016] Preferably, the top support assembly includes flat grooves opened on the outside of the main rod body and evenly distributed circumferentially, a fixed plate is fixed in each of the flat grooves, the fixed plate is rotatably connected to a rotating shaft, a swing rod is provided on the rotating shaft, a first torsion spring with two ends respectively connected to the swing rod and the fixed plate is sleeved on the rotating shaft, the end of the swing rod away from the rotating shaft is rotatably connected to the top support plate via a pin shaft, and the pin shaft is sleeved with a second torsion spring for driving the top support plate to reset and rotate.
[0017] Preferably, the supporting assembly further comprises a movable plate fixed on the puncture rod, a rack is arranged on the movable plate, and a movable gear meshing with the rack is arranged on the rotating shaft.
[0018] Preferably, a slide groove connected to the flat groove is provided on the main rod body, a stopper is slidably connected in the slide groove, a second elastic element is arranged between the stopper and the inner wall of the slide groove, a first inclined surface which abuts against the movement of the teeth of the moving gear is provided on the side of the stopper away from the second elastic element, a push rod is fixed on the movable plate, a concave hole for the movement of the push rod is provided on the stopper, and a second inclined surface which abuts against the movement of the push rod is provided on the inner wall of the concave hole.
[0019] Preferably, the push handle includes a push plate, a connecting rod connected to the push plate, and a piston connected to one end of the connecting rod away from the push plate. A pneumatic cavity for sliding of the piston is provided on the puncture rod. A third elastic element is sleeved on the outer side of the connecting rod, and two ends of the third elastic element are respectively connected to the inner wall of the pneumatic cavity and the piston. The pneumatic cavity is connected to an trachea. One end of the trachea away from the pneumatic cavity passes through the puncture rod and is connected to a pneumatic telescopic rod. The pneumatic telescopic rod is fixed in a top support plate, and the movable end of the pneumatic telescopic rod is connected to an auxiliary pad slidably arranged in the top support plate.
[0020] Preferably, the two fasteners are arranged as a group, and the two fasteners in a group are respectively connected to the head and tail ends of the "box"-shaped skeleton, and a connecting belt is arranged between the two fasteners.
[0021] Preferably, the filling material is a high lime-sand ratio tailings cemented filling material, and the lime-sand ratio is 1:4-6.
[0022] The present invention also discloses a construction method of a filling false bottom structure using a flexible net and anchor rods as a framework, comprising the following steps:
[0023] S1: Customize the flexible chain link fence according to the specific conditions of the mine exit tunnel, cut and fold the customized flexible chain link fence into a "box"-shaped frame that fits the mine exit tunnel;
[0024] On the side of the mine tunnel without access, drill holes at the same intervals and insert fastening anchor rods. The fastening anchor rods are tilted downward by 5°, with two rows in total. Fastening anchor rods are also inserted on both sides of the mine tunnel entrance to fix the folded "box" frame of the flexible chain link fence;
[0025] S2: Then the staff added filter cloth to the "box"-shaped frame of the folded flexible chain link fence, that is, added filter cloth to the connection between the head and tail of the "box"-shaped frame and the inner side of the mine roadway entrance, and fixed the filter cloth to the "box"-shaped frame through fasteners;
[0026] The staff manually presses the push plate, which first drives the piston to move in the pneumatic cavity through the connecting rod, so that the pneumatic cavity is a negative pressure area and the air in the pneumatic telescopic rod is sucked through the air pipe. The pneumatic telescopic rod contracts and pulls the auxiliary pad to contract into the top support plate, reducing the external expansion volume of the main rod.
[0027] As the thrust is continuously applied to the push plate, the piston cannot continue to move in the pneumatic cavity, so the push handle presses the first elastic element, and the push handle drives the puncture rod to move in the main rod body;
[0028] When the puncture rod moves in the main rod body, the puncture rod drives the moving plate to move. When the moving plate moves, the push rod pushes the second inclined surface of the inner wall of the block concave hole, and the block is forced to shrink into the slide groove. The block no longer restricts the rotation of the moving gear. As the moving plate continues to move, the rack on the moving plate meshes with the moving gear on the rotating shaft for transmission. The moving gear drives the rotating shaft and the swing rod to flip, and the swing rod drives the top support plate to flip to the other side of the flat groove.
[0029] At this time, the conical end of the puncture rod moves out of the main rod body, and the conical end of the puncture rod and the conical surface of the main rod body end form a complete curved surface;
[0030] S3: The staff uses the cone at the end of the puncture rod to penetrate the mesh of the flexible chain link fence and the filter cloth. The cone at the end of the main rod expands the cone of the puncture rod to puncture the mesh of the filter cloth, so that the main rod passes through the filter cloth until the top support plate and the swing rod in the flat groove move to the other side of the filter cloth;
[0031] S4: Then the staff no longer applies thrust to the push handle, and the push handle is reset under the elastic force of the first elastic element, the puncture rod is retracted in the main rod body, the rack is no longer meshed with the moving gear, and the rotating shaft drives the swing rod to reset and rotate under the action of the first torsion spring, so that the swing rod drives the top support plate connected to the end to abut against the filter cloth attached to the flexible chain link fence, and the top support plate applies force to the filter cloth, so that the filter cloth is tightly abutted against the flexible chain link fence;
[0032] After the piston is free from force, it is reset under the push of the elastic force of the third elastic element, and the piston discharges the air extracted from the pneumatic cavity back to the pneumatic telescopic rod, and the pneumatic telescopic rod stretches and pushes the auxiliary pad to move out of the top support plate, thereby increasing the contact surface with the filter cloth;
[0033] S5: Repeat the above operation, and install two fasteners of a group at the head and tail ends of the "box"-shaped frame respectively, and further connect the head and tail ends of the "box"-shaped frame through the connecting belt between the two fasteners;
[0034] S6: Finally, the staff used high-ash-sand ratio tailings cemented filling material to form an integrated filling false bottom structure.
[0035] Compared with the prior art, the present invention provides a filling false bottom structure and construction method with a flexible net and anchor rods as the framework, which has the following beneficial effects:
[0036] 1. The filling false bottom structure and construction method with flexible nets and anchor rods as the skeleton adopts customized integral flexible chain link fence to cover the entire section of the mine access road, saving the time and cost of traditional steel bar welding and filling retaining wall construction, greatly reducing the high cost of filling false bottom construction, and using fastening anchor rods to lock the flexible chain link fence on both sides of the mine access road, thereby increasing the strength of the false bottom and ensuring the safety of subsequent construction. Fasteners can be used to quickly connect and fix the filter cloth and the flexible chain link fence, replacing the traditional installation method of screwing bolts and nuts. The artificial false bottom construction method is convenient and fast, which speeds up the work efficiency of the mine and reduces labor intensity and preparation costs.
[0037] 2. The filled false bottom structure and construction method with a flexible net and anchor rods as the skeleton, by shrinking the puncture rod inside the main rod body, avoids the cone at the end of the puncture rod from causing damage to the staff when the fastener is not in use. When the fastener is in use, the push handle is pushed to drive the puncture rod out of the main rod body. The cone at the end of the puncture rod and the cone at the end of the main rod body form a complete curved surface, which is convenient for the fastener to quickly and smoothly penetrate the filter cloth, ensuring the smooth operation of the fastener.
[0038] 3. The filled false bottom structure and construction method with the flexible net and anchor rod as the skeleton, by pushing the push handle, the auxiliary gasket is contracted in the top support plate, reducing the external expansion volume of the main rod, and the rotating shaft drives the swing rod and the top support plate to flip to the other side of the flat groove, so that the main rod body can smoothly pass through the filter cloth. After the push handle is no longer applied with force, the swing rod drives the top support plate to flip and reset under the action of the first torsion spring, so that the top support plate applies a thrust to the filter cloth during the resetting process, so that the filter cloth is connected and fixed to the flexible chain link mesh. It is suitable for flexible chain link meshes and filter cloths of different thicknesses, and the auxiliary gasket is moved out of the top support plate to increase the contact surface with the filter cloth, effectively avoiding the fasteners and the filter cloth from falling off, and ensuring the connection stability between the filter cloth and the flexible chain link mesh.
[0039] 4. The filling false bottom structure and construction method with flexible net and anchor rods as the skeleton limit the rotation direction of the moving gear by setting a block to prevent the rotating shaft from driving the top support plate to rotate away from the filter cloth through the swing rod after the top support plate drives the auxiliary gasket to abut against the filter cloth, resulting in poor supporting effect of the top support plate on the filter cloth, thereby making the installation connection between the filter cloth and the flexible chain link fence stable.
[0040] 5. The filling false bottom structure and construction method with flexible net and anchor rods as the skeleton are arranged as a group through two fasteners, so that the two fasteners are respectively installed at the head and tail ends of the "box"-shaped skeleton, and the head and tail ends of the "box"-shaped skeleton are further connected through the connecting belt between the two fasteners, thereby improving the structural stability of the "box"-shaped skeleton formed by the folding of the flexible chain link fence and effectively avoiding the loosening of the "box"-shaped skeleton. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1It is a schematic diagram of the "box"-shaped skeleton structure of the flexible chain link fence of the present invention after folding;
[0042] Figure 2 It is a schematic structural diagram of the flexible chain link fence of the present invention when folded;
[0043] Figure 3 It is a schematic diagram of the planar unfolded structure of the flexible chain link fence of the present invention;
[0044] Figure 4 It is a schematic diagram of the structure of the fastening anchor rod of the present invention when being inserted into a drill hole;
[0045] Figure 5 It is a schematic diagram of the arrangement structure of the anchor rods fastened at the cross section of the mine tunnel of the present invention;
[0046] Figure 6 It is a schematic diagram of the structure of a set of fasteners of the present invention when working;
[0047] Figure 7 It is a schematic diagram of the structure of the fastener of the present invention when it is not in use;
[0048] Figure 8 It is a schematic diagram of the structure when the fastener of the present invention punctures the filter cloth;
[0049] Fig. 9 For the present invention Figure 8 A schematic cross-sectional structure diagram of ;
[0050] Fig.10 For the present invention Fig. 9 A partial enlarged structural diagram of the middle part;
[0051] Fig.11 It is a schematic diagram of the structure of the baffle rod and the push rod of the present invention;
[0052] Fig.12 It is a schematic diagram of the cross-sectional structure of the expansion support plate of the present invention.
[0053] In the figure: 1, mine tunnel; 101, drilling hole; 2, flexible chain link fence; 3, fastening anchor rod; 4, filter cloth; 401, fastener; 4011, main rod body; 4012, piercing rod; 4013, main gasket; 402, connecting belt; 5, cone surface; 6, push handle; 601, push plate; 602, connecting rod; 603, piston; 7, movable groove; 701, first elastic element; 8, flat groove; 801, fixing plate; 802, rotating shaft; 803, swing rod; 804, first torsion spring; 805, top support plate; 806, second torsion spring; 9, moving plate; 901, rack; 902, push rod; 10, moving gear; 11, slide groove; 111, stopper; 112, second elastic element; 113, recessed hole; 12, pneumatic cavity; 121, third elastic element; 122, air pipe; 13, pneumatic telescopic rod; 131, auxiliary pad. DETAILED DESCRIPTION
[0054] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0055] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0056] Example 1: Reference Figure 1-6 A filling false bottom structure with a flexible net and anchor rods as a framework includes a mine tunnel 1 with an inclined borehole 101, and also includes:
[0057] The flexible chain link fence 2 is arranged in the mine tunnel 1 and is fitted with the inner side of the mine tunnel 1 to form a "box"-shaped frame;
[0058] A plurality of fastening anchor rods 3 are provided and inserted into the borehole 101 to fix the flexible chain link fence 2; and
[0059] Filter cloth 4, the filter cloth 4 is wrapped around the inner side of the head and tail connection ends of the "box"-shaped frame, and a plurality of fasteners 401 are arranged between the filter cloth 4 and the "box"-shaped frame;
[0060] Wherein, the "box"-shaped frame is filled with fillers;
[0061] The fastener 401 includes a main rod body 4011 , a piercing rod 4012 slidably connected in the main rod body 4011 , a main gasket 4013 fixed on the main rod body 4011 , and a top support assembly arranged on the main rod body 4011 .
[0062] Furthermore, the filling material adopts high lime-sand ratio tailings cemented filling material, and the lime-sand ratio is 1:4-6.
[0063] Specifically, a flexible chain link fence 2 is customized according to the specific conditions of the mine exit tunnel 1, the customized flexible chain link fence 2 is cut and folded into a "box"-shaped frame that fits the mine exit tunnel 1, and holes 101 are opened to the side wall at the same interval on the side of the mine exit tunnel 1 without an access road, and fastening anchor rods 3 are inserted. The fastening anchor rods 3 are tilted downward by 5°, and there are two rows in total. Fastening anchor rods 3 are also inserted on both sides of the mine exit tunnel 1 to fix the "box"-shaped frame folded by the flexible chain link fence 2. The fastening anchor rods 3 are tilted into the surrounding rock to prevent the fastening anchor rods 3 from being pulled out by the horizontal tension, thereby improving the fastening effect of the fastening anchor rods 3. The fastening anchor rods 3 fix the "box"-shaped frame folded by the flexible chain link fence 2 in the mine exit tunnel 1, and then the staff covers the filter cloth 4 at the "box"-shaped frame folded by the flexible chain link fence 2. The fastener 401 fixes the filter cloth 4 at the connecting ends of the "box"-shaped skeleton and the inner side of the entrance of the mine tunnel 1. The setting of the filter cloth 4 can effectively prevent the loss of filler and facilitate the dehydration and fixation of the artificial false bottom, thereby improving the preparation quality of the artificial false bottom. Finally, the staff uses a high-ash-sand ratio tailings cemented filling body to fill the filling material to form an integrated filled false bottom structure. When the fastener 401 is used, the piercing rod 4012 passes through the mesh of the flexible chain link fence 2 and the filter cloth 4, and the expansion support assembly cooperates with the main gasket 4013 to connect and lock the flexible chain link fence 2 and the filter cloth 4 placed therebetween. The fastener 401 can be used to quickly connect and fix the filter cloth 4 and the flexible chain link fence 2, replacing the traditional installation method of screwing bolts and nuts, thereby speeding up the work efficiency of the mine and reducing labor intensity and preparation costs.
[0064] Example 2: Reference Figure 6-9 A filling false bottom structure with a flexible net and an anchor rod as a skeleton. On the basis of Example 1, further, the end of the puncture rod 4012 away from the main gasket 4013 is set to be cone-shaped, and one end of the main rod body 4011 is provided with a cone surface 5 matching the cone of the puncture rod 4012. After the puncture rod 4012 is moved out of the main rod body 4011, the cone and the cone surface 5 form a smooth curved surface.
[0065] Furthermore, a push handle 6 is provided at one end of the piercing rod 4012 away from the cone, a movable groove 7 for the push handle 6 to move is provided in the main rod body 4011, and a first elastic element 701 is provided between the push handle 6 and the inner wall of the movable groove 7.
[0066] Specifically, the puncture rod 4012 is usually retracted in the main rod body 4011 to prevent the tapered end of the puncture rod 4012 from causing damage to the staff when the fastener 401 is not in use. When in use, the staff manually presses the push handle 6, and the push handle 6 squeezes the first elastic element 701. The push handle 6 drives the puncture rod 4012 to move in the main rod body 4011, and the tapered end of the puncture rod 4012 moves out of the main rod body 4011. The tapered end of the puncture rod 4012 and the tapered surface 5 at the end of the main rod body 4011 form a complete curved surface, which facilitates the fastener 401 to quickly and smoothly penetrate the filter cloth 4, thereby ensuring that the fastener 401 works smoothly.
[0067] Example 3: Reference Figure 6-10 , a filled false bottom structure with a flexible net and anchor rods as the skeleton, based on Example 2, further, the top support assembly includes flat grooves 8 opened on the outside of the main rod body 4011 and evenly distributed on the circumference, each flat groove 8 is fixed with a fixed plate 801, the fixed plate 801 is rotatably connected to a rotating shaft 802, a swing rod 803 is arranged on the rotating shaft 802, a first torsion spring 804 with two ends respectively connected to the swing rod 803 and the fixed plate 801 is sleeved on the rotating shaft 802, the end of the swing rod 803 away from the rotating shaft 802 is rotatably connected to a top support plate 805 through a pin shaft, and a second torsion spring 806 for driving the top support plate 805 to reset and rotate is sleeved on the pin shaft.
[0068] Furthermore, the supporting assembly also includes a moving plate 9 fixed on the piercing rod 4012 , a rack 901 is provided on the moving plate 9 , and a moving gear 10 meshing with the rack 901 is provided on the rotating shaft 802 .
[0069] Specifically, the staff manually presses the push handle 6, and the push handle 6 squeezes the first elastic element 701, and the push handle 6 drives the puncture rod 4012 to move in the main rod body 4011. When the movable plate 9 moves, the rack 901 engages with the movable gear 10 on the rotating shaft 802, and the movable gear 10 drives the rotating shaft 802 and the swing rod 803 to flip, and the swing rod 803 drives the top support plate 805 to flip to the other side of the flat groove 8, and then the end of the puncture rod 4012 is tapered out of the main rod body 4011, and the tapered end of the puncture rod 4012 and the tapered surface 5 at the end of the main rod body 4011 form a complete curved surface. At this time, the staff uses the tapered end of the puncture rod 4012 to pass through the mesh of the flexible chain link fence 2 and the filter cloth 4, and the tapered surface 5 at the end of the main rod body 4011 expands the tapered penetration of the puncture rod 4012 The mesh of the filter cloth 4 is pierced so that the main rod body 4011 penetrates the filter cloth 4 until the top support plate 805 and the swing rod 803 in the flat groove 8 move to the other side of the filter cloth 4. Then the staff no longer applies thrust to the push handle 6, and the push handle 6 is reset under the elastic force of the first elastic element 701. The piercing rod 4012 shrinks in the main rod body 4011, and the rack 901 is no longer engaged with the moving gear 10. The rotating shaft 802 drives the swing rod 803 to reset and rotate under the action of the first torsion spring 804, so that the swing rod 803 drives the top support plate 805 connected at the end to abut against the filter cloth 4 fitted with the flexible chain link fence 2, and the top support plate 805 applies force to the filter cloth 4, so that the filter cloth 4 is tightly abutted against the flexible chain link fence 2, which is suitable for fixed installation and use of flexible chain link fences 2 and filter cloth 4 of different thicknesses.
[0070] Example 4: Reference Figure 6-11 , a filling false bottom structure with a flexible net and anchor rods as a skeleton, based on Example 3, further, a main rod body 4011 is provided with a slide groove 11 connected with the flat groove 8, a stopper 111 is slidably connected in the slide groove 11, a second elastic element 112 is arranged between the stopper 111 and the inner wall of the slide groove 11, a first inclined surface that abuts against the movement of the teeth of the moving gear 10 is arranged on the side of the stopper 111 away from the second elastic element 112, a push rod 902 is fixed on the movable plate 9, a concave hole 113 for the movement of the push rod 902 is arranged on the stopper 111, and a second inclined surface that abuts against the movement of the push rod 902 is arranged on the inner wall of the concave hole 113.
[0071] Specifically, the staff manually presses the push handle 6, and the push handle 6 squeezes the first elastic element 701, and the push handle 6 drives the puncture rod 4012 to move in the main rod body 4011. When the puncture rod 4012 moves in the main rod body 4011, the puncture rod 4012 drives the movable plate 9 to move. When the movable plate 9 moves, the push rod 902 pushes the second inclined surface of the inner wall of the concave hole 113 of the stopper 111, and the stopper 111 is forced to shrink into the slide groove 11, and the stopper 111 no longer restricts the rotation of the movable gear 10. As the movable plate 9 continues to move, the rack 901 on the movable plate 9 and the rotating shaft 802 The movable gear 10 on the upper part is meshed for transmission, and the movable gear 10 drives the rotating shaft 802 and the swing rod 803 to flip, and the swing rod 803 drives the top support plate 805 to flip to the other side of the flat groove 8, and then the end of the piercing rod 4012 is tapered out of the main rod body 4011, and the tapered end of the piercing rod 4012 and the tapered surface 5 at the end of the main rod body 4011 form a complete curved surface, and the staff uses the tapered end of the piercing rod 4012 to pass through the mesh of the flexible chain link fence 2 and the filter cloth 4, and the tapered surface 5 at the end of the main rod body 4011 expands the tapered piercing rod 4012 to pierce the mesh of the filter cloth 4, so that the main rod body 4011 passes through the filter cloth 4 until The top support plate 805 and the swing rod 803 in the flat groove 8 are moved to the other side of the filter cloth 4, and then the staff no longer applies thrust to the push handle 6, and the push handle 6 is reset under the elastic force of the first elastic element 701, the piercing rod 4012 is retracted in the main rod body 4011, the rack 901 is no longer engaged with the moving gear 10, the stopper 111 is reset and will avoid the moving gear 10 that rotates with the rotation shaft 802, and the rotation shaft 802 drives the swing rod 803 to reset and rotate under the action of the first torsion spring 804, so that the swing rod 803 drives the top support plate 805 connected at the end to fit the filter cloth of the flexible chain link fence 2 4 is abutted, and the top support plate 805 applies a force to the filter cloth 4, so that the filter cloth 4 is tightly abutted against the flexible chain link fence 2, which is suitable for the fixed installation and use of the flexible chain link fence 2 and the filter cloth 4 of different thicknesses. The stopper 111 limits the rotation direction of the movable gear 10, and maintains the abutment state of the top support plate 805 against the filter cloth 4 and the flexible chain link fence 2, to avoid that after the top support plate 805 abuts against the filter cloth 4, the rotating shaft 802 drives the top support plate 805 to rotate away from the filter cloth 4 through the swing rod 803, resulting in poor supporting effect of the top support plate 805 on the filter cloth 4, thereby making the installation connection between the filter cloth 4 and the flexible chain link fence 2 stable.
[0072] Example 5: Reference Figure 6-12, a filling false bottom structure with a flexible net and an anchor rod as a skeleton. On the basis of Example 4, further, the push handle 6 includes a push plate 601, a connecting rod 602 connected to the push plate 601, and a piston 603 connected to the end of the connecting rod 602 away from the push plate 601. A pneumatic cavity 12 for the sliding of the piston 603 is opened on the puncture rod 4012, and a third elastic element 121 is sleeved on the outer side of the connecting rod 602, whose two ends are respectively connected to the inner wall of the pneumatic cavity 12 and the piston 603. The pneumatic cavity 12 is connected to an air pipe 122, and the end of the air pipe 122 away from the pneumatic cavity 12 passes through the puncture rod 4012 and is connected to a pneumatic telescopic rod 13, and the pneumatic telescopic rod 13 is fixed in the top support plate 805, and the movable end of the pneumatic telescopic rod 13 is connected to an auxiliary pad 131 slidably arranged in the top support plate 805.
[0073] Specifically, the staff manually presses the push plate 601, and the push plate 601 first drives the piston 603 to move in the pneumatic chamber 12 through the connecting rod 602. The pneumatic chamber 12 is under negative pressure and sucks the air in the pneumatic telescopic rod 13 through the trachea 122. The pneumatic telescopic rod 13 contracts and pulls the auxiliary pad 131 to contract toward the top support plate 805, reducing the outward expansion volume of the main rod body 4011, so that the subsequent main rod body 4011 can smoothly pass through the mesh of the flexible chain link fence 2 and the filter cloth 4. As the push plate 601 continues to be pushed, the piston 603 cannot continue to move in the pneumatic chamber 12, and the push handle 6 squeezes the first elastic element 701, and the push handle 6 drives the puncture rod 4012 to move in the main rod body 4011; after the main rod body 4011 passes through the flexible chain link fence 2 and the filter cloth 4, the staff no longer applies thrust to the push handle 6, and the push handle 6 is in the first elastic element The piercing rod 4012 is retracted in the main rod body 4011, and the rack 901 is no longer meshed with the moving gear 10. The rotating shaft 802 drives the swing rod 803 to reset and rotate under the action of the first torsion spring 804, so that the swing rod 803 drives the top support plate 805 connected at the end to abut against the filter cloth 4 that is fitted with the flexible chain link fence 2. The top support plate 805 applies a force to the filter cloth 4 to make the filter cloth 4 tightly abut against the flexible chain link fence 2. After the piston 603 is not subjected to force, it is reset under the elastic force of the third elastic element 121. The piston 603 discharges the air extracted in the pneumatic cavity 12 back to the pneumatic telescopic rod 13. The pneumatic telescopic rod 13 stretches and pushes the auxiliary pad 131 to move out of the top support plate 805, thereby increasing the contact surface with the filter cloth 4, effectively preventing the fastener 401 from falling off from the filter cloth 4, and ensuring the connection stability between the filter cloth 4 and the flexible chain link fence 2.
[0074] Example 6: Reference Figure 6 , a filled false bottom structure with a flexible net and anchor rods as a skeleton. On the basis of Example 5, further, two fasteners 401 are set as a group, and the two fasteners 401 of a group are respectively connected to the head and tail ends of the "box"-shaped skeleton, and a connecting belt 402 is set between the two fasteners 401.
[0075] Specifically, two fasteners 401 are arranged as a group, and the two fasteners 401 are respectively installed at the head and tail ends of the "box"-shaped frame, and the connecting belt 402 between the two fasteners 401 further connects the head and tail ends of the "box"-shaped frame, thereby improving the structural stability of the "box"-shaped frame formed by folding the flexible chain link fence 2, and effectively avoiding the loosening of the "box"-shaped frame.
[0076] The present invention also discloses a construction method of a filling false bottom structure using a flexible net and anchor rods as a framework, comprising the following steps:
[0077] S1: Customize the flexible chain link fence 2 according to the specific conditions of the mine exit tunnel 1, cut and fold the customized flexible chain link fence 2 into a "box"-shaped frame that fits the mine exit tunnel 1;
[0078] On the side of the mine tunnel 1 without access, drill holes 101 are opened at the same interval to the side wall and fastening anchor rods 3 are inserted. The fastening anchor rods 3 are tilted downward by 5 degrees, and there are two rows in total. Fastening anchor rods 3 are also inserted on both sides of the mine tunnel 1 to fix the folded "box"-shaped frame of the flexible chain link fence 2;
[0079] S2: Then the staff adds filter cloth 4 to the "box"-shaped frame of the folded flexible chain link fence 2, that is, adds filter cloth 4 to the connection between the head and tail of the "box"-shaped frame and the inner side of the entrance of the mine roadway 1, and fixes the filter cloth 4 to the "box"-shaped frame through fasteners 401;
[0080] The staff manually presses the push plate 601, and the push plate 601 first drives the piston 603 to move in the pneumatic chamber 12 through the connecting rod 602, so that the pneumatic chamber 12 is in a negative pressure area, and the air in the pneumatic telescopic rod 13 is sucked through the air pipe 122, and the pneumatic telescopic rod 13 contracts and pulls the auxiliary pad 131 to contract into the top support plate 805, reducing the outward expansion volume of the main rod body 4011;
[0081] As the push force is continuously applied to the push plate 601, since the piston 603 cannot continue to move in the pneumatic chamber 12, the push handle 6 squeezes the first elastic element 701, and the push handle 6 drives the piercing rod 4012 to move in the main rod body 4011;
[0082] When the piercing rod 4012 moves in the main rod body 4011, the piercing rod 4012 drives the moving plate 9 to move. When the moving plate 9 moves, the push rod 902 pushes the second inclined surface of the inner wall of the concave hole 113 of the stopper 111, and the stopper 111 is forced to shrink into the slide groove 11. The stopper 111 no longer restricts the rotation of the moving gear 10. As the moving plate 9 continues to move, the rack 901 on the moving plate 9 is meshed with the moving gear 10 on the rotating shaft 802 for transmission. The moving gear 10 drives the rotating shaft 802 and the swing rod 803 to flip, and the swing rod 803 drives the top support plate 805 to flip to the other side of the flat groove 8;
[0083] At this time, the conical end of the puncture rod 4012 moves out of the main rod body 4011, and the conical end of the puncture rod 4012 and the conical surface 5 of the end of the main rod body 4011 form a complete curved surface;
[0084] S3: The staff uses the cone at the end of the piercing rod 4012 to penetrate the mesh of the flexible chain link fence 2 and the filter cloth 4, and the conical surface 5 at the end of the main rod body 4011 expands the cone of the piercing rod 4012 to pierce the mesh of the filter cloth 4, so that the main rod body 4011 penetrates the filter cloth 4 until the top support plate 805 and the swing rod 803 in the flat groove 8 move to the other side of the filter cloth 4;
[0085] S4: Then the staff member no longer applies thrust to the push handle 6, and the push handle 6 is reset under the elastic force of the first elastic element 701, the piercing rod 4012 shrinks in the main rod body 4011, the rack 901 is no longer meshed with the moving gear 10, and the rotating shaft 802 drives the swing rod 803 to reset and rotate under the action of the first torsion spring 804, so that the swing rod 803 drives the top support plate 805 connected to the end to abut against the filter cloth 4 attached to the flexible chain link fence 2, and the top support plate 805 applies force to the filter cloth 4, so that the filter cloth 4 is tightly abutted against the flexible chain link fence 2;
[0086] After the piston 603 is free from stress, it is reset under the elastic force of the third elastic element 121. The piston 603 discharges the air extracted from the pneumatic chamber 12 back to the pneumatic telescopic rod 13. The pneumatic telescopic rod 13 stretches and pushes the auxiliary pad 131 to move out of the top support plate 805, thereby increasing the contact surface with the filter cloth 4.
[0087] S5: Repeat the above operation, and install two fasteners 401 of a group at the head and tail ends of the "box"-shaped frame respectively, and further connect the head and tail ends of the "box"-shaped frame through the connecting belt 402 between the two fasteners 401;
[0088] S6: Finally, the staff used high-ash-sand ratio tailings cemented filling material to form an integrated filling false bottom structure.
[0089] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A filling false bottom structure with a flexible net and anchor rods as a framework, comprising a mine exit tunnel (1) with an inclined borehole (101), characterized in that: Also includes: A flexible chain link fence (2), wherein the flexible chain link fence (2) is arranged in the mine exit tunnel (1) and fits with the inner side of the mine exit tunnel (1) to form a "box"-shaped frame; Fastening anchor rods (3), wherein the fastening anchor rods (3) are provided in multiple groups and inserted into the drilled holes (101) and used to fix the flexible chain link fence (2); and A filter cloth (4), the filter cloth (4) being coated on the inner side of the head and tail connection ends of the "box"-shaped frame, and a plurality of fasteners (401) being arranged between the filter cloth (4) and the "box"-shaped frame; Wherein, the "box"-shaped frame is filled with fillers; The fastener (401) comprises a main rod body (4011), a piercing rod (4012) slidably connected inside the main rod body (4011), a main gasket (4013) fixedly mounted on the main rod body (4011), and a top support assembly arranged on the main rod body (4011); The supporting assembly comprises flat grooves (8) which are formed on the outside of the main rod body (4011) and are evenly distributed around the circumference. A fixed plate (801) is fixedly disposed in each of the flat grooves (8). A rotating shaft (802) is rotatably connected to the fixed plate (801). A swinging rod (803) is disposed on the rotating shaft (802). A first torsion spring (804) is sleeved on the rotating shaft (802), with two ends respectively connected to the swinging rod (803) and the fixed plate (801). One end of the swinging rod (803) away from the rotating shaft (802) is rotatably connected to a supporting plate (805) via a pin. A second torsion spring (806) for driving the supporting plate (805) to return and rotate is sleeved on the pin. The supporting assembly further comprises a movable plate (9) fixedly mounted on the puncture rod (4012), the movable plate (9) being provided with a rack (901), and the rotating shaft (802) being provided with a movable gear (10) meshing with the rack (901); The main rod body (4011) is provided with a slide groove (11) connected to the flat groove (8), a stopper (111) is slidably connected in the slide groove (11), a second elastic element (112) is provided between the stopper (111) and the inner wall of the slide groove (11), a first inclined surface is provided on the side of the stopper (111) away from the second elastic element (112) and is movably opposed to the teeth of the movable gear (10), a push rod (902) is fixedly provided on the movable plate (9), a concave hole (113) is provided on the stopper (111) for the push rod (902) to move, and a second inclined surface is provided on the inner wall of the concave hole (113) and is movably opposed to the push rod (902).
2. A filling false bottom structure with a flexible net and anchor rods as a framework according to claim 1, characterized in that: One end of the puncture rod (4012) away from the main gasket (4013) is arranged in a cone shape, and one end of the main rod body (4011) is arranged with a cone surface (5) matching the cone of the puncture rod (4012); after the puncture rod (4012) is moved out of the main rod body (4011), the cone shape and the cone surface (5) form a smooth curved surface.
3. The filling false bottom structure with flexible net and anchor rod as the framework according to claim 2, characterized in that: A push handle (6) is provided at one end of the piercing rod (4012) away from the cone, a movable groove (7) for the push handle (6) to move is provided in the main rod body (4011), and a first elastic element (701) is provided between the push handle (6) and the inner wall of the movable groove (7).
4. The filling false bottom structure with a flexible net and anchor rods as a framework according to claim 3, characterized in that: The push handle (6) comprises a push plate (601), a connecting rod (602) connected to the push plate (601), and a piston (603) connected to one end of the connecting rod (602) away from the push plate (601); a pneumatic cavity (12) for the piston (603) to slide is provided on the puncture rod (4012); a third elastic element (121) is sleeved on the outer side of the connecting rod (602), the third elastic element (121) having two ends respectively connected to the inner wall of the pneumatic cavity (12) and the piston (603); the pneumatic cavity (12) is connected to an air tube (122); the end of the air tube (122) away from the pneumatic cavity (12) passes through the puncture rod (4012) and is connected to a pneumatic telescopic rod (13); the pneumatic telescopic rod (13) is fixed in the top support plate (805); the movable end of the pneumatic telescopic rod (13) is connected to an auxiliary pad (131) slidably arranged in the top support plate (805).
5. The filling false bottom structure with flexible net and anchor rod as the framework according to claim 4, characterized in that: The two fasteners (401) are arranged as a group, and the two fasteners (401) in a group are respectively connected to the head and tail ends of the "box"-shaped skeleton, and a connecting belt (402) is arranged between the two fasteners (401).
6. The filling false bottom structure with flexible net and anchor rod as the framework according to claim 5, characterized in that: The filling material is a high lime-sand ratio tailings cemented filling material, and the lime-sand ratio is 1:4~6.
7. A construction method of a filling false bottom structure with a flexible net and anchor rods as a framework as claimed in claim 6, characterized in that: The following steps are involved: S1: Customizing a flexible chain link fence (2) according to the specific conditions of the mine exit tunnel (1), cutting and folding the customized flexible chain link fence (2) into a "box"-shaped frame that fits the mine exit tunnel (1); Drill holes (101) are opened at the same intervals on the side of the mine exit tunnel (1) without an access road and fastening anchor rods (3) are inserted. The fastening anchor rods (3) are tilted downward by 5 degrees and are arranged in two rows. Fastening anchor rods (3) are also inserted on both sides of the mine exit tunnel (1) to fix the folded "box"-shaped frame of the flexible chain link fence (2); S2: Subsequently, the staff adds filter cloth (4) to the folded "box"-shaped frame of the flexible chain link fence (2), that is, adds filter cloth (4) to the connection between the head and tail of the "box"-shaped frame and the inner side of the entrance of the mine roadway (1), and fixes the filter cloth (4) to the "box"-shaped frame by means of fasteners (401); The staff manually presses the push plate (601), and the push plate (601) first drives the piston (603) to move in the pneumatic chamber (12) through the connecting rod (602), so that the pneumatic chamber (12) forms a negative pressure area and the air in the pneumatic telescopic rod (13) is sucked through the air pipe (122), and the pneumatic telescopic rod (13) contracts and pulls the auxiliary pad (131) to contract into the top support plate (805), thereby reducing the outward expansion volume of the main rod body (4011); As the thrust is continuously applied to the push plate (601), the piston (603) cannot move further in the pneumatic chamber (12), so the push handle (6) presses the first elastic element (701), and the push handle (6) drives the piercing rod (4012) to move in the main rod body (4011); When the piercing rod (4012) moves in the main rod body (4011), the piercing rod (4012) drives the moving plate (9) to move. When the moving plate (9) moves, the push rod (902) pushes the second inclined surface of the inner wall of the concave hole (113) of the stopper (111), and the stopper (111) is forced to shrink into the slide groove (11). The stopper (111) no longer restricts the rotation of the moving gear (10). As the moving plate (9) continues to move, the rack (901) on the moving plate (9) meshes with the moving gear (10) on the rotating shaft (802) for transmission. The moving gear (10) drives the rotating shaft (802) and the swing rod (803) to flip, and the swing rod (803) drives the top support plate (805) to flip to the other side of the flat groove (8); At this time, the conical end of the puncture rod (4012) moves out of the main rod body (4011), and the conical end of the puncture rod (4012) and the conical surface (5) of the end of the main rod body (4011) form a complete curved surface; S3: The staff uses the cone at the end of the piercing rod (4012) to penetrate the mesh of the flexible chain link fence (2) and the filter cloth (4), and the conical surface (5) at the end of the main rod body (4011) expands the cone of the piercing rod (4012) to pierce the mesh of the filter cloth (4), so that the main rod body (4011) penetrates the filter cloth (4) until the top support plate (805) and the swing rod (803) in the flat groove (8) move to the other side of the filter cloth (4); S4: Then the staff member no longer applies a thrust to the push handle (6), the push handle (6) is reset under the elastic force of the first elastic element (701), the piercing rod (4012) is retracted in the main rod body (4011), the rack (901) is no longer meshed with the movable gear (10), the rotating shaft (802) drives the swing rod (803) to reset and rotate under the action of the first torsion spring (804), so that the swing rod (803) drives the top support plate (805) connected to the end to abut against the filter cloth (4) attached to the flexible chain link fence (2), and the top support plate (805) applies a force to the filter cloth (4), so that the filter cloth (4) is tightly abutted against the flexible chain link fence (2); After the piston (603) is no longer subjected to force, it is reset under the push of the elastic force of the third elastic element (121), and the piston (603) discharges the air extracted from the pneumatic chamber (12) back to the pneumatic telescopic rod (13), and the pneumatic telescopic rod (13) stretches and pushes the auxiliary pad (131) out of the top support plate (805), thereby increasing the contact surface with the filter cloth (4); S5: repeat the above operation, and install two fasteners (401) of a group at the head and tail ends of the "box"-shaped frame respectively, and further connect the head and tail ends of the "box"-shaped frame through the connecting belt (402) between the two fasteners (401); S6: Finally, the staff used high-ash-sand ratio tailings cemented filling material to form an integrated filling false bottom structure.