Equipment and Method for Measuring the Diameter Difference of Various Types of Steel Balls
By designing an automated steel ball diameter measurement equipment, using a laser rangefinder and image measuring instrument combined with a PLC controller and an HMI operating box, the problem of large manual measurement error in the existing technology is solved, and the diameter of multiple groups of bearing steel balls is realized. The rapid, accurate measurement and efficient quality control have improved production efficiency and intelligent manufacturing.
Patent Information
- Application Number
- CN202410467991.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-18
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-04-18
AI Technical Summary
The existing aircraft propeller bearing steel ball diameter measurement methods rely on manual handheld tools, resulting in large measurement errors, slow speeds, and unsuitable for batch testing, which reduces production efficiency and product quality control levels.
A multi-variety steel ball diameter mutual difference measurement device was designed, using a combination of steel ball diameter measurement mechanism, feeding mechanism and feeding mechanism, and using laser rangefinder and image measuring instrument to achieve automated measurement, through PLC controller and HMI The operation box performs precise control and data processing.
It realizes rapid and accurate measurement of the diameter of multiple groups of bearing steel balls, reduces manual operation errors, improves measurement efficiency and product quality control levels, and supports the enterprise's intelligent manufacturing and digital transformation.
Smart Images

Figure CN118347417B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of steel ball measurement, and in particular relates to a device and a method for measuring the mutual difference of diameters of multiple varieties of steel balls. Background Art
[0002] In order to enhance the equipment manufacturing industry chain capacity, deepen the integration and development of the aviation industry and local areas, promote the scientific and technological innovation of aviation industry enterprises, and achieve high-level development of the aviation industry. In recent years, more and more national aviation manufacturing industries have realized the importance of improving their core competitiveness and hope to improve key manufacturing and testing technologies. As a result, there is an urgent need for more and better special equipment with key manufacturing technologies to improve production efficiency and technological innovation.
[0003] At present, the contact steel ball measurement method is generally used to measure the diameter of the steel ball of the aircraft propeller bearing, including the measurement of the steel ball diameter using contact detection tools such as micrometers or micrometers. The traditional manual measurement process is generally used, mainly using a manual handheld lever micrometer or micrometer to measure the steel ball diameter, measuring up to 5 times, recording in a table, and calculating the average value as the measurement value of the steel ball diameter. A group of multiple steel ball diameter measurement values are recorded in the table in sequence, and the data values are manually compared and sorted (from large to small). Several maximum offset values or several minimum offset values are manually selected for replacement, so that the diameter values of this group of bearing steel balls are all within the required tolerance band range between -0.001mm and 0.001mm. Finally, they are packaged, labeled, and marked with tolerance band data values, and the process is complicated. On the one hand, the existing measurement method compares data values through manual measurement, which is labor-intensive and prone to errors. On the other hand, the manual measurement speed is slow, which is not conducive to rapid batch measurement of steel balls. In addition, the quality stability of manual detection is poor, which greatly reduces production efficiency. Summary of the invention
[0004] In view of this, an object of the present invention is to provide a device and method for measuring the difference in diameters of multiple types of steel balls to solve the problems raised in the above background technology.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] The device for measuring the mutual difference of diameters of various steel balls comprises a main frame; a main control cabinet and an air control cabinet are arranged on one side of the main frame, wherein the main control cabinet is arranged above the air control cabinet; the main frame is a frame-shaped structure, wherein an installation panel is arranged horizontally in the middle of the main frame; a steel ball diameter measuring mechanism, a steel ball feeding mechanism and a steel ball receiving mechanism are arranged above the installation panel; the steel ball diameter measuring mechanism and the steel ball feeding mechanism are arranged side by side, wherein the steel ball receiving mechanism is arranged below the steel ball diameter measuring mechanism; a display is installed above the main frame, wherein the front end of the main control cabinet is fixedly connected to an HMI operation box through a cantilever hanger; the main control cabinet is provided with a plurality of control panels, each of which is provided with a plurality of control panels. A PLC controller is arranged inside the cabinet, wherein the PLC controller is electrically connected to the air control cabinet, display, HMI operation box, steel ball diameter measuring mechanism, steel ball feeding mechanism and steel ball receiving mechanism and controls them; the air control cabinet is connected to the steel ball diameter measuring mechanism and the steel ball feeding mechanism through air pipes, wherein the air control cabinet is used to control the pneumatic components on the steel ball diameter measuring mechanism and the steel ball feeding mechanism; a discharge door is installed on the side of the main frame away from the main control cabinet, wherein an inspection door is arranged at the rear end of the main frame; a cover plate is arranged on the top of the main frame, wherein supporting feet are arranged at the four feet at the bottom of the main frame.
[0007] Preferably, the steel ball diameter measuring mechanism includes a lower mounting platform, wherein a lower connecting frame is symmetrically installed at both ends of the bottom of the lower mounting platform; support columns are fixedly installed at the four corners of the upper end of the lower mounting platform, wherein an upper mounting platform is fixedly installed on the top of the support column; a plurality of buffer feet are provided at the bottom of the lower connecting frame, wherein the buffer feet are connected to the mounting panel.
[0008] Preferably, a feeding assembly is fixedly installed on the upper mounting platform, wherein a unloading assembly is provided on one side of the feeding assembly; a steel ball carrier assembly is provided on the lower mounting platform, wherein a long waist through hole corresponding to the steel ball carrier assembly is opened in the middle of the upper mounting platform; a steel ball diameter measuring instrument is provided at the bottom of the upper mounting platform, wherein the steel ball diameter measuring instrument is arranged on both sides of the steel ball carrier assembly.
[0009] Preferably, the steel ball diameter measuring instrument includes a laser rangefinder and an image measuring instrument.
[0010] Preferably, the feeding assembly includes a frame-shaped support, wherein the bottom of the frame-shaped support is fixedly connected to the upper mounting platform; a plurality of groups of pushing cylinders are arranged side by side at the upper end of the frame-shaped support, wherein the top end of the piston rod of each pushing cylinder is respectively connected to a pushing slide rod; a material receiving plate is provided on the side of the frame-shaped support away from the pushing cylinder, wherein a plurality of groups of sliding holes compatible with the pushing slide rods are opened at the lower end of the material receiving plate.
[0011] Preferably, a plurality of groups of material receiving pipes are arranged side by side above the material receiving plate, wherein the lower ends of the material receiving pipes penetrate the material receiving plate and are connected with the sliding hole; a plurality of flexible material discharge channels are arranged side by side at the bottom of the frame-shaped support close to the material receiving plate, wherein the top end of each flexible material discharge channel penetrates the top plate of the frame-shaped support and is connected with the sliding hole opened at the lower end of the material receiving plate.
[0012] Preferably, the unloading assembly includes a servo electric cylinder, wherein the servo electric cylinder is fixedly connected to the upper mounting platform through an electric cylinder mounting seat; a transition connecting plate is fixedly connected to the sliding seat of the servo electric cylinder, wherein a fixed clamping plate is provided below the transition connecting plate; a plurality of groups of flexible feed channels are arranged side by side on the fixed clamping plate, wherein the flexible feed channels are arranged below and corresponding to the flexible discharge channels; a plurality of discharge ports are opened at the lower end of the fixed clamping plate, wherein each discharge port is respectively connected to the lower end of the flexible feed channel.
[0013] Preferably, the steel ball loading assembly includes a stepper motor, wherein the stepper motor is fixedly connected to the lower mounting platform via a motor fixing seat; a material receiving box is provided above the motor fixing seat, wherein the lower end of the material receiving box is fixedly connected to the motor fixing seat via a connecting frame; a steel ball loading platform is provided in the middle of the material receiving box, wherein the lower end of the steel ball loading platform downwardly passes through the bottom of the material receiving box and is fixedly connected to the output shaft of the stepper motor.
[0014] Preferably, a flexible material drop channel is provided at the bottom of one end of the material receiving box, wherein the upper end of the flexible material drop channel passes through the bottom of the material receiving box and is connected with the inner cavity of the material receiving box; a material drop positioning plate is provided at the front end of the lower mounting platform, wherein the material drop positioning plate is arranged directly below the flexible material drop channel; a material guide through hole is opened in the middle of the material drop positioning plate, wherein the material guide through hole is arranged corresponding to the discharge hole of the flexible material drop channel.
[0015] Preferably, a material guiding slope is provided at the bottom of the inner cavity of the material receiving box, wherein a material guiding strip protruding upward is provided in the middle of the material guiding slope.
[0016] Preferably, the steel ball feeding mechanism includes a feeding bracket, the lower end of which is fixedly connected to the mounting panel, wherein a mounting plate is provided at the upper end of the feeding bracket; a plurality of groups of silos are arranged side by side on one side of the mounting plate, wherein a plurality of groups of feed channels are arranged side by side on the other side of the mounting plate; each of the feed channels corresponds to a silo, wherein the feed hole of each feed channel passes through the mounting plate and is connected to the silo; a counting sensor is installed on the feed channel, wherein each of the feed channels corresponds one by one to a material receiving pipe and is connected through a flexible conveying pipe.
[0017] Preferably, a guide rod cylinder is provided under each silo, and a push block is fixedly installed on the top of the piston rod of the guide rod cylinder; the upper end of the push block penetrates the bottom of the silo upward and is arranged in the silo, wherein the lower end of the push block is provided with an anti-dropping receiving tray.
[0018] Preferably, an inclined slide groove is provided on the upper end surface of the push block, wherein the inclination angle of the inclined slide groove is 3 to 10°; an anti-misalignment hole penetrating the push block is provided at the bottom of the inclined slide groove, wherein the lower end of the anti-misalignment hole is connected to the anti-misalignment receiving tray.
[0019] Preferably, the steel ball material receiving mechanism includes a linear screw slide, wherein the linear screw slide is fixedly connected to the lower mounting platform; a servo motor is fixedly mounted on the sliding seat of the linear screw slide, wherein the output end of the servo motor is provided with a connecting plate; a material dropping tray is fixedly mounted on the connecting plate, wherein the material dropping tray is evenly provided with material receiving holes.
[0020] A measurement method for batch detection of bearing steel ball diameters comprises the following steps:
[0021] S10, Initial preparation: Make sure that all parts of the equipment have been correctly installed and fixed, open the main control cabinet, start the PLC controller, and check whether all sensors and actuators are in normal working condition; set the measurement parameters of steel ball diameter range, measurement accuracy, and measurement speed through the HMI operation box, and check the air control cabinet to ensure that the air supply of pneumatic components is normal;
[0022] S20, loading and positioning: Put the steel balls to be tested in batches into the corresponding silos of the steel ball feeding mechanisms, select the type of steel balls to be tested on the touch screen of the HMI operation box, press the start button for automatic testing, and the guide cylinder pushes the push block to rise, pushing the steel balls one by one from the corresponding silo into the corresponding feeding channel. During this process, the counting sensor ensures that the number of steel balls in each feeding channel is accurate. The steel balls enter the receiving pipe through the flexible conveying pipe and slide into the sliding hole on the receiving plate, waiting for further pushing;
[0023] S30, accurate measurement of steel ball diameter: the push cylinder of the feeding assembly moves, pushing the push slide rod to push the steel ball from the receiving plate into the flexible discharge channel, and the steel ball slides out of the flexible discharge channel and falls into the flexible feed channel of the fixed clamping plate; the servo electric cylinder drives the transition connecting plate and the fixed clamping plate to move, aligning the steel ball with the steel ball stage, so that it can accurately fall into the preset positioning groove on the steel ball stage; the stepper motor drives the steel ball stage to rotate slowly, and the steel ball diameter measuring instrument collects more than 10 sets of steel ball diameter data, and transmits the measurement data to the PLC controller in real time;
[0024] S40, steel ball receiving material: the steel ball with detected diameter falls into the receiving box, and enters the material guide hole provided on the material positioning plate through the flexible material drop channel provided under the receiving box, and falls directly onto the material drop tray from the material guide hole. The linear lead screw slide moves, driving the servo motor and the material drop tray to move to the receiving position, and the servo motor starts to adjust the angle and position of the material drop tray to ensure that the steel ball accurately falls into the receiving hole;
[0025] S50, data recording and processing: All measurement data are recorded in the memory of the main control cabinet through the PLC controller, and the steel ball diameter difference calculation is automatically completed according to the bearing steel ball diameter measurement value. After a certain number of bearing steel balls are measured through the difference measurement, the steel balls with measured diameter values are arranged in order on the blanking tray. At the same time, the display shows the current measurement data and statistical results in real time. The measurement value of each steel ball corresponds to it in the table on the display, which is convenient for selecting and replacing bearing steel balls with different diameter tolerance bands; operators can query historical data, adjust measurement parameters or perform other equipment operations at any time through the HMI operation box.
[0026] Compared with the prior art, the technical solution of the present application has the following beneficial technical effects: the present invention installs a steel ball diameter measuring mechanism on the mounting panel, sets the steel ball receiving mechanism below the steel ball diameter measuring mechanism, and sets the steel ball feeding mechanism on one side of the steel ball diameter measuring mechanism. Through the cooperation of the steel ball feeding mechanism, the steel ball diameter measuring mechanism and the steel ball receiving mechanism, the diameter of the bearing steel ball can be measured quickly and accurately, thereby avoiding the errors and cumbersome operations that may occur in the traditional manual measurement method, greatly improving the measurement accuracy and efficiency, and having low labor intensity and high work efficiency, effectively solving the problem that the traditional manual measurement method requires operators to hold the measuring tool for a long time to work, which has high labor intensity and is prone to fatigue; the present invention can simultaneously measure the diameters of multiple groups of bearing steel balls of different models and sizes, realizes batch detection, and further improves production efficiency. At the same time, through cooperation with intelligent equipment such as the main control cabinet and the HMI operation box, automatic data processing and analysis are completed, and steel balls that do not meet the requirements can be quickly screened out, greatly improving the product quality control level; the intelligence level of the entire production process is improved, providing strong support for the digital transformation and intelligent manufacturing upgrade of enterprises.
[0027] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiments of the present invention in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0029] Figure 1 It is a structural schematic diagram of a device for measuring the mutual difference of diameters of multiple varieties of steel balls according to the present invention;
[0030] Figure 2 It is a rear view of the device for measuring the difference in diameters of multiple varieties of steel balls of the present invention;
[0031] Figure 3It is a schematic diagram of the internal structure of the device for measuring the difference in diameters of multiple varieties of steel balls of the present invention;
[0032] Figure 4 It is a structural schematic diagram of the steel ball diameter measuring mechanism of the present invention;
[0033] Figure 5 It is a schematic structural diagram of the feeding assembly of the present invention;
[0034] Figure 6 It is a structural schematic diagram of the unloading assembly of the present invention;
[0035] Figure 7 It is a structural schematic diagram of the steel ball carrier assembly of the present invention;
[0036] Figure 8 It is a structural schematic diagram of the steel ball feeding mechanism of the present invention;
[0037] Fig. 9 It is a structural schematic diagram of the steel ball receiving mechanism of the present invention;
[0038] Fig.10 It is a schematic flow chart of the method for measuring the mutual difference of diameters of multiple varieties of steel balls of the present invention.
[0039] Among them: 1. Main frame; 2. Main control cabinet; 3. Installation panel; 4. Air control cabinet; 5. Steel ball diameter measuring mechanism; 501. Lower installation platform; 502. Lower connecting frame; 503. Support column; 504. Upper installation platform; 505. Buffering foot; 6. Steel ball feeding mechanism; 601. Feeding bracket; 602. Installation plate; 603. Material bin; 604. Feed channel; 605. Counting Sensor; 606, guide cylinder; 607, push block; 7, steel ball receiving mechanism; 701, linear screw slide; 702, servo motor; 703, connecting plate; 704, drop tray; 705, receiving hole; 8, feeding assembly; 801, frame support; 802, push cylinder; 803, push slide rod; 804, receiving plate; 805, slide hole; 806, receiving pipe; 807, flexible outlet Material channel; 9, unloading assembly; 901, servo electric cylinder; 902, electric cylinder mounting seat; 903, transition connecting plate; 904, fixed clamping plate; 905, flexible feeding channel; 906, discharge port; 10, steel ball loading assembly; 1001, stepping motor; 1002, motor fixing seat; 1003, receiving box; 1004, steel ball loading platform; 1005, positioning groove; 1006, flexible dropping channel; 1 007, connecting frame; 11, long waist through hole; 12, steel ball diameter measuring instrument; 13, blanking positioning plate; 14, material guide through hole; 15, material guide inclined surface; 16, material guide bar; 17, anti-misaligned material receiving tray; 18, inclined slide; 19, anti-misaligned hole; 20, material discharge door; 21, maintenance door; 22, cover plate; 23, supporting feet; 24, HMI operation box; 25, display; 26, cantilever hanger. DETAILED DESCRIPTION
[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] Please refer to Figures 1 to 9 To achieve the above purpose, the present invention provides the following technical solutions:
[0042] The multi-variety steel ball diameter mutual difference measuring device comprises a main frame 1, wherein the main frame 1 is made of aluminum alloy material to provide additional structural support, a main control cabinet 2 and an air control cabinet 4 are arranged on one side of the main frame 1, wherein the main control cabinet 2 is arranged above the air control cabinet 4; the main frame 1 is a frame-shaped structure, wherein an installation panel 3 is horizontally arranged in the middle of the main frame 1; wherein the outer surface of the installation panel 3 is nickel-plated to improve the corrosion resistance of the installation panel 3; a steel ball diameter measuring mechanism 5, a steel ball feeding mechanism 6 and a steel ball receiving mechanism 7 are arranged above the installation panel 3; The diameter measuring mechanism 5 and the steel ball feeding mechanism 6 are arranged side by side, wherein the steel ball receiving mechanism 7 is arranged below the steel ball diameter measuring mechanism 5; a display 25 is installed above the main frame 1, wherein the front end of the main control cabinet 2 is fixedly connected to the HMI operation box 24 through the cantilever hanger 26; a PLC controller (not shown) is arranged inside the main control cabinet 2, wherein the PLC controller is electrically connected to the air control cabinet 4, the display 25, the HMI operation box 24, the steel ball diameter measuring mechanism 5, the steel ball feeding mechanism 6 and the steel ball receiving mechanism 7 and controls them; the air control cabinet 4 is divided into The main frame 1 is connected to the steel ball diameter measuring mechanism 5 and the steel ball feeding mechanism 6 through air pipes, wherein the air control cabinet 4 is used to control the pneumatic components on the steel ball diameter measuring mechanism 5 and the steel ball feeding mechanism 6; a discharge door 20 is installed on the side of the main frame 1 away from the main control cabinet 2, wherein the rear end of the main frame 1 is provided with an inspection door 21; a cover plate 22 is provided on the top of the main frame 1, wherein the four feet at the bottom of the main frame 1 are respectively provided with supporting feet 23 to ensure the stability of the equipment installation on the main frame 1; wherein the steel ball feeding mechanism 6 is used to automatically transport the bearing steel balls to be tested to the steel ball The diameter measuring mechanism 5 is in the measuring position, the steel ball diameter measuring mechanism 5 is responsible for accurately measuring the diameter of the bearing steel ball, the steel ball receiving mechanism 7 is used to receive and classify the measured steel balls, and according to the measurement data, the PLC controller will determine whether each steel ball meets the specified diameter range, and the steel balls that meet the requirements are collected to the designated position by the steel ball receiving mechanism 7; through the mutual cooperation of the steel ball feeding mechanism 6, the steel ball diameter measuring mechanism 5 and the steel ball receiving mechanism 7, efficient and accurate detection of the bearing steel ball diameter is achieved, which helps to improve the production efficiency and product quality of the bearing manufacturing industry.
[0043] Furthermore, a discharge door 20 is installed on one side of the main frame 1 to control the placement and removal of materials. An inspection door 21 is provided at the rear end of the main frame 1 to facilitate maintenance personnel to enter the interior for inspection and maintenance work. A cover plate 22 is provided on the top of the main frame 1 to protect and seal the equipment and prevent external impurities from entering the interior and affecting the normal operation of the equipment. The discharge door 20 and the inspection door 21 are made of organic glass. The main control cabinet 2 is the control center of the entire system, responsible for receiving and processing various signals and controlling the operation of the equipment. An air control cabinet 4 is provided below the main control cabinet 2. The air control cabinet 4 is mainly used to control pneumatic components to ensure the stable operation of the pneumatic system. The display 25 is used to directly The main control cabinet 2 is used to display the operation status, measurement data, operation prompts and other information of the equipment. The front end of the main control cabinet 2 is fixedly connected to the HMI operation box 24 through the cantilever hanger 26. The HMI operation box 24 is equipped with input devices such as a touch screen and buttons to facilitate the interaction between the operator and the equipment. The main control cabinet 2 is built with a PLC controller, which is the core control unit of the entire system and is responsible for receiving and processing various signals and controlling the various mechanisms of the equipment to operate according to the preset program. The PLC controller is electrically connected to the gas control cabinet 4, the display 25, the HMI operation box 24, the steel ball diameter measuring mechanism 5, the steel ball feeding mechanism 6 and the steel ball receiving mechanism 7, respectively, to achieve precise control of these components;
[0044] Furthermore, the PLC controller automatically controls the steel ball diameter measuring mechanism 5 to accurately measure the diameter of the steel ball according to a preset program, and the measurement data is transmitted to the display 25 in real time for display. At the same time, the PLC controller receives instructions from the HMI operation box 24, and adjusts the operating parameters of the equipment according to the input of the operator, such as the steel ball feeding speed, the receiving position, etc. The PLC controller controls the steel ball feeding mechanism 6 to transport the steel ball to the measuring position according to the set speed and quantity to ensure the continuity and accuracy of the measurement. When the measured steel ball needs to be transferred, the PLC controller controls the steel ball receiving mechanism 7 to accurately transfer the steel ball from the measuring position to the measuring position. The equipment is received and transmitted to the next process. During the whole process, the PLC controller continuously monitors the operating status of each mechanism, promptly discovers and handles abnormal situations, and ensures the safe and stable operation of the equipment. The operator can view the real-time operating status, measurement data, fault prompts and other information of the equipment through the touch screen on the HMI operation box 24, and adjust the operating parameters of the equipment as needed. The HMI operation box 24 can also record and save historical data, which is convenient for operators to analyze and trace data. The data exchange between the PLC controller and the HMI operation box 24 realizes the intelligent management of the equipment and improves production efficiency and product quality.
[0045] Please refer to Figure 3 , Figure 4As an embodiment of the present invention, the steel ball diameter measuring mechanism 5 includes a lower installation platform 501, wherein the lower connection frames 502 are symmetrically installed at both ends of the bottom of the lower installation platform 501; support columns 503 are fixedly installed at the four corners of the upper end of the lower installation platform 501, wherein the upper installation platform 504 is fixedly installed at the top of the support column 503; a plurality of buffer feet 505 are provided at the bottom of the lower connection frame 502, wherein the buffer feet 505 are connected to the installation panel 3; a feeding assembly 8 is fixedly installed on the upper installation platform 504 , wherein a discharging assembly 9 is provided on one side of the feeding assembly 8; a steel ball carrier assembly 10 is provided on the lower mounting platform 501, wherein a long waist through hole 11 corresponding to the steel ball carrier assembly 10 is opened in the middle of the upper mounting platform 504; a steel ball diameter measuring instrument 12 is provided at the bottom of the upper mounting platform 504, wherein the steel ball diameter measuring instrument 12 is arranged on both sides of the steel ball carrier assembly 10; wherein the steel ball diameter measuring instrument 12 is a laser rangefinder, an image measuring instrument or other non-contact diameter measuring instrument, which is used to perform high-precision measurement of the diameter of the steel ball.
[0046] In the above-described scheme, the lower connecting frames 502 are symmetrically installed at both ends of the bottom of the lower mounting platform 501, wherein the lower connecting frame 502 is fixedly connected to the mounting panel 3 through the buffer foot 505, so as to provide stable support for the entire steel ball diameter measuring mechanism 5 and reduce the influence of vibration on the measurement accuracy; the support column 503 is fixedly installed at the four corners of the lower mounting platform 501, and its top end supports the upper mounting platform 504, so as to ensure the stability and rigidity of the upper structure; a feeding assembly 8 is fixedly installed on the upper mounting platform 504, and a unloading assembly 9 is arranged on one side of the feeding assembly 8, wherein the unloading assembly 9 is used to transfer the steel ball on the feeding assembly 8 to the measuring position; a steel ball carrier assembly 10 is provided on the lower mounting platform 501, wherein the steel ball carrier assembly 10 is used to carry and accurately position the steel ball to be measured; the long waist through hole 11 opened in the middle of the upper mounting platform 504 ensures that the steel ball can smoothly enter the measuring position on the steel ball carrier assembly 10 through the unloading assembly 9.
[0047] Furthermore, the steel ball diameter measuring instrument 12 arranged at the bottom of the upper mounting platform 504 is the core component of the measuring mechanism, which is responsible for accurately measuring the diameter of the steel ball. The steel ball diameter measuring instrument 12 is arranged on both sides of the steel ball carrier assembly 10 so as to measure the diameter after the steel ball is positioned. The measurement data is collected in real time and transmitted to the PLC controller of the equipment for processing and analysis; the workflow of the entire steel ball diameter measuring mechanism 5 requires close coordination and control between the various components. The PLC controller controls the coordinated work of the feeding assembly 8, the unloading assembly 9, the steel ball carrier assembly 10 and the steel ball diameter measuring instrument 12 according to the preset programs and parameters, and realizes the continuous processes of automatic loading, precise positioning, diameter measurement and automatic unloading of steel balls through precise timing control and data feedback mechanism, thereby improving the measurement efficiency and automation level.
[0048] See also Figure 5 As an embodiment of the present invention, the feeding assembly 8 includes a frame-shaped support 801, wherein the bottom of the frame-shaped support 801 is fixedly connected to the upper mounting platform 504; a plurality of groups of push cylinders 802 are arranged side by side at the upper end of the frame-shaped support 801, wherein the top of the piston rod of each push cylinder 802 is respectively connected to a push slide bar 803; a receiving plate 804 is provided on the side of the frame-shaped support 801 away from the push cylinder 802, wherein the lower end of the receiving plate 804 is provided with a plurality of groups of push slide bars 803 connected to the push slide bars 803; A sliding hole 805 is adapted to the material pushing slide rod 803; a plurality of groups of material receiving tubes 806 are arranged side by side above the material receiving plate 804, wherein the lower ends of the material receiving tubes 806 pass through the material receiving plate 804 and are connected with the sliding hole 805; a plurality of flexible material discharge channels 807 are arranged side by side at the bottom of the frame-shaped support 801 close to the material receiving plate 804, wherein the top end of each flexible material discharge channel 807 passes through the top plate of the frame-shaped support 801 and is connected with the sliding hole 805 opened at the lower end of the material receiving plate 804.
[0049] In the above scheme, the frame support 801 serves as the supporting structure of the entire feeding assembly 8, and its bottom is firmly connected to the upper mounting platform 504. Four groups of push cylinders 802 are arranged side by side at the upper end of the frame support 801, wherein the top of the piston rod of each push cylinder 802 is respectively connected to a push slide 803; a receiving plate 804 is arranged on the side of the frame support 801 away from the push cylinder 802, wherein the lower end of the receiving plate 804 is provided with four groups of slide holes 803 corresponding to the push slides 803. 5; Four groups of material receiving pipes 806 with different diameters are provided at the upper end of the material receiving plate 804, wherein the lower ends of the four groups of material receiving pipes 806 respectively penetrate the material receiving plate 804 and communicate with the slide hole 805; four groups of flexible material discharge channels 807 with different diameters are provided at the bottom of the frame-shaped support 801, wherein the top end of each flexible material discharge channel 807 upwardly penetrates the top plate of the frame-shaped support 801 and communicates with the slide hole 805 opened at the lower end of the material receiving plate 804; the four groups of flexible material discharge channels 807 with different diameters correspond to the four groups of material receiving pipes 806 with different diameters respectively.
[0050] Furthermore, the steel ball feeding mechanism 6 conveys the steel ball to be measured to the receiving tube 806 of the corresponding diameter, wherein the receiving tube 806 is connected with the slide hole 805 on the receiving plate 804, ensuring that the steel ball can smoothly enter the slide hole 805; when the equipment starts working, the pushing cylinder 802 operates according to the preset program and timing, wherein the pushing cylinder 802 controls the piston rod to extend, so that the piston rod pushes the pushing slide rod 803 to move forward along the slide hole 805, and as the pushing slide rod 803 moves, the steel ball in the slide hole 805 is pushed and moves forward along the slide hole 805, and when the steel ball reaches the position where the slide hole 805 is connected to the flexible discharge channel 807, the steel ball will directly fall into the flexible discharge channel 807. The design of the flexible discharge channel 807 allows the steel balls to slide out of it in a gentle manner, thus preventing the steel balls from being damaged or bouncing during the discharge process. After the steel balls slide out of the flexible discharge channel 807, they are transported to the subsequent measuring position. The working process of the feeding component 8 is precisely controlled by the PLC controller. The PLC controller precisely controls the action of the pushing cylinder 802 according to the overall work flow and timing requirements of the measuring equipment, ensuring that the steel balls can be transported to the measuring position at a preset speed and sequence. At the same time, the PLC controller also monitors the working status of the feeding component 8, such as the action of the cylinder and the supply of the steel balls, so as to ensure the stability and reliability of the feeding process.
[0051] See also Figure 6 As an embodiment of the present invention, the unloading assembly 9 includes a servo electric cylinder 901, wherein the servo electric cylinder 901 is fixedly connected to the upper mounting platform 504 through an electric cylinder mounting seat 902; a transition connecting plate 903 is fixedly connected to the sliding seat of the servo electric cylinder 901, wherein a fixed clamping plate 904 is provided below the transition connecting plate 903; a plurality of groups of flexible feed channels 905 are arranged side by side on the fixed clamping plate 904, wherein the flexible feed channel 905 is arranged below the flexible discharge channel 807; a plurality of discharge ports 906 are opened at the lower end of the fixed clamping plate 904, wherein each discharge port 906 is respectively connected to the lower end of the flexible feed channel 905.
[0052] In the above-described scheme, the servo electric cylinder 901 is a driving component, and the servo electric cylinder 901 is firmly fixed on the upper mounting platform 504 through the electric cylinder mounting seat 902, wherein a transition connecting plate 903 is fixed on the sliding seat of the servo electric cylinder 901, and the transition connecting plate 903 serves to connect the servo electric cylinder 901 and the fixed clamping plate 904; the fixed clamping plate 904 is located below the transition connecting plate 903, wherein four groups of flexible feed channels 905 of different diameters are arranged side by side on the fixed clamping plate 904, wherein the four groups of flexible feed channels 905 correspond one by one to the four groups of flexible discharge channels 807 of different diameters in the feeding assembly 8, wherein each flexible feed channel 905 can be respectively connected to The flexible discharge channel 807 is connected; four discharge ports 906 with different apertures are also opened at the lower end of the fixed clamping plate 904, wherein each discharge port 906 corresponds to a flexible feed channel 905 and is connected thereto; the unloading component 9 adopts a design in which four groups of flexible feed channels 905 are arranged side by side, so that the unloading component 9 can realize the function of continuous unloading. When the steel balls in one group of flexible feed channels 905 are removed, the next group of flexible feed channels 905 immediately enters the working state to receive new measured steel balls. This design improves the working efficiency of the unloading component, ensures the continuous operation capability of the measuring equipment, and provides an important guarantee for the continuous and efficient operation of the entire measuring equipment.
[0053] Furthermore, the servo electric cylinder 901 drives the transition connecting plate 903 to drive the flexible feed channel 905 to move, so that the flexible feed channel 905 is aligned with and connected to the flexible discharge channel 807 of the corresponding diameter, so that the steel ball to be measured falls into the flexible feed channel 905 from the flexible discharge channel 807, and then falls into the discharge port 906 below the fixed clamping plate 904 through the flexible feed channel 905. The design of the flexible feed channel 905 ensures that the steel ball can enter smoothly and reduces errors or damage caused by collisions; by controlling the servo electric cylinder 901 to drive the fixed clamping plate 904 to move and move the steel ball to be measured, The steel ball is placed on the steel ball stage 1004, and the steel ball diameter data is measured in real time by the steel ball diameter measuring instrument 12; when the measurement is completed, the servo electric cylinder 901 starts to move according to the control instruction, and the servo electric cylinder 901 drives the sliding seat to drive the transition connecting plate 903 and the fixed clamping plate 904 to move horizontally, so that the fixed clamping plate 904 moves the measured steel ball away from the measuring position of the steel ball stage 1004, so that it falls into the receiving box 1003 and enters the next processing link. After unloading is completed, the servo electric cylinder 901 drives the fixed clamping plate 904 to reset, preparing for the next round of unloading operation.
[0054] See also Figure 7As an embodiment of the present invention, the steel ball loading assembly 10 includes a stepper motor 1001, wherein the stepper motor 1001 is fixedly connected to the lower mounting platform 501 through a motor fixing seat 1002; a material receiving box 1003 is provided above the motor fixing seat 1002, wherein the lower end of the material receiving box 1003 is fixedly connected to the motor fixing seat 1002 through a connecting frame 1007; a steel ball loading platform 1004 is provided in the middle of the material receiving box 1003, and a positioning groove 1005 is provided at the top of the steel ball loading platform 1004, wherein the positioning groove 1005 is used to position the steel ball, and the steel ball loading platform 1004 is a cylindrical structure, wherein the lower end of the steel ball loading platform 1004 downwardly penetrates the material receiving frame 1007. The bottom of the box 1003 is fixedly connected to the output shaft of the stepper motor 1001; a flexible material drop channel 1006 is provided at the bottom of one end of the material receiving box 1003, wherein the upper end of the flexible material drop channel 1006 passes through the bottom of the material receiving box 1003 and is connected to the inner cavity of the material receiving box 1003; a material drop positioning plate 13 is provided at the front end of the lower mounting platform 501, wherein the material drop positioning plate 13 is arranged directly below the flexible material drop channel 1006; a material guide hole 14 is provided in the middle of the material drop positioning plate 13, wherein the material guide hole 14 is arranged corresponding to the discharge hole of the flexible material drop channel 1006; a material guide slope 15 is provided at the bottom of the inner cavity of the material receiving box 1003, wherein a material guide strip 16 protruding upward is provided in the middle of the material guide slope 15.
[0055] In the above scheme, the stepper motor 1001 is firmly mounted on the lower mounting platform 501 through the motor fixing seat 1002, wherein the stepper motor 1001 serves as the driving source of the steel ball loading platform 1004; the material receiving box 1003 is located above the motor fixing seat 1002, and is fixedly connected to the motor fixing seat 1002 through the connecting frame 1007 to form a stable bearing structure; the steel ball loading platform 1004 is arranged in the middle of the material receiving box 1003, and a positioning groove 1005 for placing the steel ball is opened at the top thereof, and the lower end of the steel ball loading platform 1004 passes through the bottom of the material receiving box 1003 The part is fixedly connected to the output shaft of the stepper motor 1001, so that the stepper motor 1001 can accurately control the rotation of the steel ball stage 1004; the flexible material drop channel 1006 is installed at the bottom of one end of the material receiving box 1003, wherein the flexible material drop channel 1006 is connected to the inner cavity of the material receiving box 1003, and is used to guide the measured steel ball to fall, and the material drop positioning plate 13 is arranged at the front end of the lower mounting platform 501, and a material guide through hole 14 is opened in the middle of the material drop positioning plate 13, wherein the material guide through hole 14 is directly opposite to the bottom of the discharge hole of the flexible material drop channel 1006, and is used to locate the landing point of the steel ball.
[0056] Furthermore, the unloading assembly 9 is used to accurately place the steel ball to be tested in the positioning groove 1005 opened at the top of the steel ball stage 1004. The stepper motor 1001 drives the steel ball stage 1004 to rotate by accurately controlling the rotation angle and speed of the output shaft, so that the steel ball stage 1004 drives the steel ball to rotate, so that the steel ball diameter measuring instrument 12 measures the diameter data of the steel ball at different positions and displays it on the display screen, and takes the average value as the measured diameter value of the steel ball; after the diameter of the steel ball is tested, the servo electric cylinder 901 drives the fixed clamping plate 9 04 Move the measured steel ball away from the positioning groove 1005, so that the steel ball falls into the receiving box 1003. The bottom of the inner cavity of the receiving box 1003 is designed with a material guide slope 15, and an upwardly protruding material guide bar 16 is provided in the middle. Such a structure helps the steel balls to automatically arrange and smoothly enter the flexible material drop channel 1006, so that the steel balls can fall accurately from the flexible material drop channel 1006 into the material guide through hole 14 provided in the middle of the material drop positioning plate 13, and then the steel balls are sent to the steel ball receiving mechanism below through the material guide through hole 14 for subsequent processing or collection.
[0057] Please refer to Figure 3 , Figure 8 As an embodiment of the present invention, the steel ball feeding mechanism 6 includes a feeding bracket 601, the lower end of the feeding bracket 601 is fixedly connected to the mounting panel 3, wherein the upper end of the feeding bracket 601 is provided with a mounting plate 602; a plurality of groups of silos 603 are arranged side by side on one side of the mounting plate 602, wherein a plurality of groups of feed channels 604 are arranged side by side on the other side of the mounting plate 602; each feed channel 604 corresponds to a silo 603, wherein the feeding hole of each feed channel 604 passes through the mounting plate 602 and is connected to the silo 603; a counting sensor 605 is installed on the feed channel 604, wherein each feed channel 604 is respectively connected to the receiving pipe 806 in a one-to-one manner. The material discharge channel 604 is connected with the material receiving pipe 806 through a flexible conveying pipe; a guide rod cylinder 606 is provided under each silo 603, and a push block 607 is fixedly installed on the top of the piston rod of the guide rod cylinder 606; the upper end of the push block 607 penetrates upward through the bottom of the silo 603 and is arranged in the silo 603, and the lower end of the push block 607 is provided with an anti-misalignment receiving tray 17; the upper end surface of the push block 607 is provided with an inclined chute 18, and the inclination angle of the inclined chute 18 is 3 to 10°; the bottom of the inclined chute 18 is provided with an anti-misalignment hole 19 that penetrates the push block 607, and the lower end of the anti-misalignment hole 19 is connected with the anti-misalignment receiving tray 17.
[0058] In the above-described scheme, the feeding bracket 601 serves as the supporting structure of the entire steel ball feeding mechanism 6. The feeding bracket 601 is made of aluminum alloy material, and its lower end is firmly mounted on the mounting panel 3. The mounting plate 602 is arranged at the upper end of the feeding bracket 601. The mounting plate 602 is used to install and fix the silo 603 and the discharge channel 604; the silo 603 is provided with four groups and arranged side by side, wherein the four groups of silos 603 are respectively used to store steel balls of four specifications with diameters of φ6.000mm, φ10.319mm, φ12.700mm, and φ16.000mm. Each silo 603 has sufficient capacity and can store 20 to 36 steel balls of each specification to ensure a continuous supply of steel balls.
[0059] Furthermore, four groups of material discharge channels 604 are provided, wherein the diameters of the material discharge channels 604 are respectively the same as the diameters of the steel balls stored in the silo 603, and each material discharge channel 604 is connected with the corresponding silo 603 through a feed hole to form an independent material discharge channel; each silo 603 is provided with a guide rod cylinder 606 under it, and a push block 607 is fixedly installed on the top of the piston rod of the guide rod cylinder 606. When material discharge is required, the guide rod cylinder 606 is actuated to push the push block 607 to move upward along the bottom of the silo 603, and the inclined chute 18 opened on the upper end surface of the push block 607 is designed with an inclination angle of 5°, wherein the inclined chute 18 enables the steel balls to slide smoothly and orderly along the inclined chute 18 under the action of gravity.
[0060] Furthermore, in order to prevent the steel balls from falling or getting stuck during the process of sliding down the inclined chute 18, an anti-falling hole 19 is opened at the bottom of the inclined chute 18, wherein the aperture of the anti-falling hole 19 is the same as the diameter of the steel balls stored in the corresponding silo 603. If a steel ball smaller than the diameter of the measured steel ball is mixed into the silo 603, the steel ball will directly fall into the anti-falling receiving tray 17 at the bottom of the push block 607 through the anti-falling hole 19; if the diameter of the steel ball mixed into the silo 603 is larger than that of the steel ball to be measured, it will remain in the silo 603 and finally be manually processed to ensure that each steel ball can smoothly fall into the predetermined position; the steel balls enter the corresponding discharge channel 604 along the inclined chute 18, and are transported by a flexible conveying pipe through the discharge channel 604 to the receiving pipe 806 with the same diameter as the discharge channel 604. At the same time, a counting sensor 605 is installed on the discharge channel 604 to accurately count the number of falling steel balls, thereby ensuring that each workstation can receive the correct number of steel balls.
[0061] Please refer to Figure 3 , Fig. 9As an embodiment of the present invention, the steel ball receiving mechanism 7 includes a linear screw slide 701, wherein the linear screw slide 701 is fixedly connected to the lower mounting platform 501; a servo motor 702 is fixedly installed on the sliding seat of the linear screw slide 701, wherein the output end of the servo motor 702 is provided with a connecting plate 703; a blanking tray 704 is fixedly installed on the connecting plate 703, wherein the blanking tray 704 is evenly distributed with receiving holes 705.
[0062] In the above-described scheme, the linear screw slide 701 serves as the movement basis of the steel ball receiving mechanism 7. The linear screw slide 701 is firmly mounted on the lower mounting platform 501, and the servo motor 702 is fixed on the sliding seat of the linear screw slide 701 to provide precise power control for the rotation of the drop tray 704. The connecting plate 703 is installed at the output end of the servo motor 702 to connect and support the drop tray 704. The drop tray 704 is a component for receiving steel balls, and its surface is evenly distributed with receiving holes 705 for positioning and receiving the falling steel balls.
[0063] Furthermore, before the equipment is started, the steel ball receiving mechanism 7 is in the initial position, so that the receiving hole 705 on the material dropping tray 704 is aligned with the material guiding hole 14 opened in the middle of the material dropping positioning plate 13. When the steel ball falls from the upper material guiding hole 14, the steel ball will accurately fall into the receiving hole 705. The size of the receiving hole 705 matches the steel ball, ensuring that each steel ball can be stably received and positioned; the linear screw slide 701 provides smooth and precise horizontal movement for the material dropping tray 704. By controlling the moving speed and distance of the linear screw slide 701, it can be ensured that the material dropping tray 704 can be accurately moved to the predetermined position in each material receiving cycle, ensuring that each material receiving hole 705 can accurately dock with the material guiding hole 14 where the steel ball falls, thereby achieving precise positioning of the steel ball; whenever a steel ball is received, the servo motor 702 will drive the material dropping tray 704 to move slightly, so that the next material receiving hole 705 is aligned with the steel ball material guiding hole 14, ready for receiving the next steel ball.
[0064] See also Fig.10 , a method for measuring the difference in diameter of multiple varieties of steel balls, specifically comprising the following steps:
[0065] S10, initial preparation: ensure that all parts of the equipment have been correctly installed and fixed, open the main control cabinet 2, start the PLC controller, and check whether all sensors and actuators are in normal working condition; set the measurement parameters of steel ball diameter range, measurement accuracy, and measurement speed through the HMI operation box 24, and check the air control cabinet to ensure that the air supply of pneumatic components is normal.
[0066] In step S10, the following steps are specifically included:
[0067] S101. Equipment component inspection and installation confirmation: Check all components of the equipment one by one to ensure that each component has been correctly installed and firmly fixed in accordance with the installation instructions, including but not limited to the discharge door 20, inspection door 21, cover plate 22, main control cabinet 2, air control cabinet 4, display 25, HMI operation box 24, steel ball diameter measuring mechanism 5, steel ball feeding mechanism 6 and steel ball receiving mechanism 7, etc.; pay special attention to the electrical connection part to ensure that all wires and cables are correctly connected without looseness, damage or poor contact, so as to prevent electrical failure or safety hazards.
[0068] S102. Start the main control cabinet 2 and the PLC controller: Open the door of the main control cabinet 2, check whether the internal layout is neat, whether the components are intact, and whether there is no dust or debris; start the PLC controller, observe the status of its indicator lights, and confirm that the PLC controller has started normally and there are no abnormal alarms; check the input / output status of the PLC controller through the self-test program of the PLC controller or related software tools, and ensure that all connections with sensors and actuators are normal.
[0069] S103. Sensor and actuator inspection: Check all sensors on the equipment to ensure that they are correctly installed and in normal working condition. This can be verified through the input signal of the PLC controller or related instruments. Check all actuators (such as cylinders, motors, valves, etc.) to ensure that they are flexible and free of sticking, and can accurately perform actions under the instructions of the PLC controller.
[0070] S104, HMI operation box setting and inspection: Turn on the power of the HMI operation box 24, start the touch screen interface, check whether the interface display is clear and has no distortion or dead point phenomenon, set the measurement parameters such as the steel ball diameter range, measurement accuracy and measurement speed through the HMI operation box 24. These parameters should be set according to actual production needs or process requirements to ensure the accuracy and efficiency of the measurement, and confirm that the communication between the HMI operation box 24 and the PLC controller is normal, and can display the equipment's operating status, measurement data, fault prompts and other information in real time on the interface.
[0071] S105. Inspection of air control cabinet and pneumatic components: Open the door of air control cabinet 4, check whether the internal pneumatic components (such as air source processor, solenoid valve, cylinder, etc.) are intact and whether the connections are firm, ensure that the air supply pressure of the pneumatic system meets the equipment requirements and there is no air leakage. It can be verified by a pressure gauge or related detection tools, and test the action of the pneumatic components to ensure that they can accurately perform actions under the control of the air control cabinet and there is no abnormal sound or jamming.
[0072] S20, loading and positioning: Put the steel balls to be tested in batches into the corresponding silos 603 of the steel ball loading mechanism 6, and select the type of steel balls to be tested on the touch screen of the HMI operation box 24, press the start button for automatic detection, the guide rod cylinder 606 pushes the push block 607 to rise, and pushes the steel balls one by one from the corresponding silo 603 into the corresponding discharge channel 604. During this process, the counting sensor 605 ensures that the number of steel balls in each discharge channel is accurate, and the steel balls enter the receiving pipe 806 through the flexible conveying pipe, and slide through the receiving pipe 806 to the sliding hole 805 on the receiving plate 804, waiting for further pushing.
[0073] In step S20, the following steps are specifically included:
[0074] S201, material loading preparation: the operator puts the steel balls to be tested into the corresponding silos 603 of the steel ball feeding mechanism 6 in batches according to the categories and specifications. This step needs to ensure that the steel balls are placed correctly to avoid mixing or misplacing. At the same time, on the touch screen of the HMI operation box 24, the operator selects the category of steel balls to be tested. This selection will determine the subsequent detection process and parameter settings.
[0075] S202, automatic detection start: After confirming that all settings are correct, the operator presses the start button on the HMI operation box 24 to start the automatic detection program. After receiving the start signal, the PLC controller controls each actuator to start action according to the preset program logic.
[0076] S203, pushing and counting of steel balls: the guide rod cylinder 606 starts to move under the instruction of the PLC controller, pushing the push block 607 to rise. This action will push the steel balls out of the silo 603 one by one and enter the corresponding discharge channel 604. During the pushing process, the counting sensor 605 monitors and counts the number of steel balls in each discharge channel 604 in real time to ensure that the number of steel balls in each discharge channel 604 is accurate. This step is crucial for subsequent detection and data processing.
[0077] S204, steel ball conveying and positioning: The steel ball enters the receiving pipe 806 through the flexible conveying pipe. During this process, it is necessary to ensure the smoothness of the conveying and the integrity of the steel ball to avoid jamming or damage. The steel ball slides from the receiving pipe 806 to the sliding hole 805 on the receiving plate 804, waiting for further pushing and processing. This step realizes the preliminary positioning and preparation of the steel ball, laying the foundation for subsequent precise measurement and judgment.
[0078] S30, precise measurement of steel ball diameter: the push cylinder 802 of the feeding assembly 8 is actuated to push the push slide rod 803 to push the steel ball from the receiving plate 804 into the flexible discharge channel 807, and the steel ball slides out from the flexible discharge channel 807 and falls into the flexible feed channel 905 of the fixed clamp plate 904; the servo electric cylinder 901 drives the transition connecting plate 903 and the fixed clamp plate 904 to move, aligning the steel ball with the steel ball stage 1004 so that it can accurately fall into the preset positioning groove 1005 on the steel ball stage 1004; the stepping motor 1001 drives the steel ball stage 1004 to rotate slowly in steps, and collects diameter data of more than 10 groups of steel balls through the steel ball diameter measuring instrument 12, and transmits the measurement data to the PLC controller in real time.
[0079] In step S30, the following steps are specifically included:
[0080] S301, steel ball pushing and feeding: the pushing cylinder 802 pushes the steel ball on the receiving plate 804 into the flexible discharge channel 807 by pushing the pushing slide rod 803. This step ensures that the steel ball can smoothly and stably enter the next processing link. After the steel ball slides out of the flexible discharge channel 807, it accurately falls into the flexible feed channel 905 of the fixed clamp plate 904. The design of the flexible feed channel 905 ensures the stability and accuracy of the steel ball during the falling process, laying the foundation for the subsequent alignment and measurement work.
[0081] S302, steel ball alignment and positioning: the servo electric cylinder 901 drives the transition connecting plate 903 and the fixed clamping plate 904 to move and align the steel ball with the steel ball stage 1004, ensuring that the steel ball can accurately fall into the preset positioning groove 1005 on the steel ball stage 1004. The design of the positioning groove 1005 ensures the stability and position accuracy of the steel ball during the measurement process. Under the precise control of the servo electric cylinder 901, the steel ball is accurately placed in the positioning groove 1005. At this time, the steel ball is in the best measuring position, which is fully prepared for the subsequent diameter measurement.
[0082] S303, steel ball diameter measurement and data collection: the stepper motor 1001 drives the steel ball stage 1004 to rotate slowly in steps. This step allows the steel ball to present different angles and positions during the measurement process, thereby ensuring the comprehensiveness and accuracy of the measurement. During the rotation of the steel ball, the steel ball diameter measuring instrument 12 begins to measure the diameter of the steel ball. The steel ball diameter measuring instrument 12 is a laser rangefinder, which is used to perform high-precision measurement of the diameter of the steel ball and can accurately collect the diameter data of the steel ball. In order to ensure the reliability of the measurement, the laser rangefinder collects more than 10 groups of diameter data of the steel ball. After the measurement is completed, the laser rangefinder transmits the collected measurement data to the PLC controller in real time. The PLC controller receives and processes the data to provide a basis for subsequent data analysis, judgment and control.
[0083] S40, steel ball receiving material: the steel ball after the diameter is detected falls into the receiving box 1003, and enters the material guide hole 14 opened on the material positioning plate 13 through the flexible material drop channel 1006 arranged under the material drop box 1003, and falls directly onto the material drop tray 704 from the material guide hole 14, and the linear screw slide 701 drives the servo motor 702 and the material drop tray 704 to move to the material receiving position, wherein the servo motor 702 is used to adjust the angle and position of the material drop tray 704 to ensure that the steel ball accurately falls into the receiving hole 705.
[0084] In step S40, the following steps are specifically included:
[0085] S401, steel balls fall into the receiving box: the steel balls after the diameter detection fall from the steel ball loading platform 1004 into the receiving box 1003. The design of the receiving box 1003 ensures that the steel balls can smoothly enter the next conveying link.
[0086] S402, the steel balls are transported to the blanking positioning plate: a flexible blanking channel 1006 is arranged below the receiving box 1003, and the steel balls smoothly slide down from the receiving box 1003 through the flexible blanking channel 1006. The design of the flexible blanking channel 1006 ensures the stability and smoothness of the sliding of the steel balls. The steel balls slide down into the material guiding holes 14 opened on the blanking positioning plate 13. The position and size of the material guiding holes 14 are precisely designed to ensure that the steel balls can accurately pass through and fall onto the blanking tray 704 below.
[0087] S403, the steel ball falls to the material drop tray and is positioned: the steel ball falls directly from the material guide hole 14 to the material receiving hole 705 set on the material drop tray 704, so that the material drop tray 704 can be used to receive and store the steel ball; wherein the linear screw slide 701 starts to move, driving the servo motor 702 and the material drop tray 704 to move as a whole to the material receiving position corresponding to the material guide hole 14, this step ensures the accurate alignment between the material receiving hole 705 and the bottom of the material guide hole 14; the servo motor 702 starts and drives the material drop tray 704 to rotate, accurately adjusting the angle and position of the material drop tray 704, and through the precise control of the servo motor 702, it can be ensured that the steel ball can accurately fall into the material receiving hole 705, avoiding the displacement or misalignment of the steel ball.
[0088] S403, steel ball receiving is completed: after confirming that the steel ball has accurately fallen into the receiving hole 705, the receiving is completed. At this time, the steel ball has been successfully transferred from the detection link to the receiving link, and is ready for subsequent processing or packaging.
[0089] S50, data recording and processing: All measurement data are recorded in the memory of the main control cabinet 2 through the PLC controller, and the steel ball diameter difference calculation is automatically completed according to the bearing steel ball diameter measurement value. After a certain number of bearing steel balls are measured through the difference measurement, the steel balls with measured diameter values are arranged in order on the blanking tray 704. At the same time, the display 25 displays the current measurement data and statistical results in real time. The measurement value of each steel ball corresponds to it in the table of the display 25, which is convenient for selecting and replacing bearing steel balls with different diameter tolerance bands; the operator can query historical data, adjust measurement parameters or perform other equipment operations at any time through the HMI operation box 24.
[0090] In step S50, the following steps are specifically included:
[0091] S501, data recording and storage: During the steel ball diameter measurement process, all measurement data are recorded in real time in the memory of the main control cabinet 2 through the PLC controller. These data include key information such as the diameter measurement value and measurement time of each steel ball. The capacity of the memory is large enough to store a large amount of measurement data for a long time for subsequent data analysis, processing and query.
[0092] S502, data processing and calculation: The PLC controller automatically completes the calculation of the mutual difference value of the steel ball diameter based on the stored measurement data. The mutual difference value calculation is an important indicator for evaluating the consistency of the steel ball diameter and helps to identify steel balls with excessive diameter deviation. After the calculation is completed, the PLC controller stores the processing results in the memory and updates the relevant data records.
[0093] S503, steel ball sorting and display: According to the measured value of the bearing steel ball diameter, the equipment arranges a certain number of steel balls in the order of diameter size in the receiving hole 705 opened at the upper end of the blanking tray 704. This step helps the operator to intuitively understand the diameter distribution of the steel balls, which is convenient for subsequent selection and replacement. The display 25 displays the current measurement data, statistical results and the sorting of the steel balls in real time. The measured value of each steel ball corresponds to it in the table of the display 25, so that the operator can clearly view the diameter information of each steel ball.
[0094] S504. Historical data query and parameter adjustment: The operator can query historical data at any time through the HMI operation box 24. The historical data includes previous measurement records, mutual difference calculation results and other information, which helps the operator understand the working status of the equipment and the quality of the steel balls. When necessary, the operator can also adjust the measurement parameters through the HMI operation box 24 to adapt to steel ball measurement tasks of different specifications or requirements. These parameters may include measurement accuracy, measurement speed, steel ball category, etc. In addition to data query and parameter adjustment, the HMI operation box 24 also provides other equipment operation functions, such as equipment start / stop, fault alarm, etc., so that the operator can comprehensively manage and control the equipment.
[0095] In conclusion, the present invention installs a steel ball diameter measuring mechanism 5 on the mounting panel 3, arranges a steel ball receiving mechanism 7 below the steel ball diameter measuring mechanism 5, and arranges a steel ball feeding mechanism 6 on one side of the steel ball diameter measuring mechanism 5. Through the mutual cooperation of the steel ball feeding mechanism 6, the steel ball diameter measuring mechanism 5 and the steel ball receiving mechanism 7, the bearing steel ball diameter is measured quickly and accurately, thus avoiding the errors and cumbersome operations that may occur in the traditional manual measurement method, greatly improving the measurement accuracy and efficiency, and having low labor intensity and high work efficiency, effectively solving the problem that the traditional manual measurement method requires operators to hold the measuring machine for a long time. The present invention can simultaneously measure the diameters of multiple groups of bearing steel balls of different models and sizes, thereby realizing batch detection and further improving production efficiency. At the same time, through automated data processing and analysis, steel balls that do not meet the requirements can be quickly screened out, thereby greatly improving the product quality control level. Through cooperation with intelligent equipment such as the main control cabinet 2 and the HMI operation box 24, functions such as remote monitoring, automatic data recording and analysis can be realized, thereby improving the intelligence level of the entire production process and providing strong support for the digital transformation and intelligent manufacturing upgrade of enterprises.
[0096] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0097] Finally, it should be noted that the above-described embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above-described embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-described embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims
1. Equipment for measuring the difference in diameter of various steel balls, characterized by: The invention comprises a main frame (1); a main control cabinet (2) and an air control cabinet (4) are arranged on one side of the main frame (1), wherein the main control cabinet (2) is arranged above the air control cabinet (4); the main frame (1) is a frame-shaped structure, wherein an installation panel (3) is arranged horizontally in the middle of the main frame (1); a steel ball diameter measuring mechanism (5), a steel ball feeding mechanism (6) and a steel ball receiving mechanism (7) are arranged above the installation panel (3); the steel ball diameter measuring mechanism (5) and the steel ball feeding mechanism (6) are arranged side by side, wherein the steel ball receiving mechanism (7) is arranged below the steel ball diameter measuring mechanism (5); the steel ball diameter measuring mechanism (5) comprises a lower installation platform (501), wherein the bottom ends of the lower installation platform (501) are symmetrical. A lower connecting frame (502) is installed; support columns (503) are fixedly installed at the four corners of the upper end of the lower mounting platform (501), wherein an upper mounting platform (504) is fixedly installed at the top of the support columns (503); a plurality of buffer feet (505) are provided at the bottom of the lower connecting frame (502), wherein the buffer feet (505) are connected to the mounting panel (3); a feeding assembly (8) is fixedly installed on the upper mounting platform (504), wherein a discharge assembly (9) is provided on one side of the feeding assembly (8); a steel ball loading assembly (10) is provided on the lower mounting platform (501), wherein a long waist through hole (11) corresponding to the steel ball loading assembly (10) is opened in the middle of the upper mounting platform (504); The steel ball feeding mechanism (6) comprises a feeding bracket (601), the lower end of which is fixedly connected to the mounting panel (3), wherein a mounting plate (602) is provided at the upper end of the feeding bracket (601); a plurality of groups of silos (603) are arranged side by side on one side of the mounting plate (602), wherein a plurality of groups of feed channels (604) are arranged side by side on the other side of the mounting plate (602), and a counting sensor (605) is installed on the feed channels (604); the feed channels (604) correspond to the silos (603) one by one, wherein a feed hole of the feed channel (604) passes through the mounting plate (602) and is in communication with the silos (603); The feeding assembly (8) comprises a frame-shaped support (801), wherein the bottom of the frame-shaped support (801) is fixedly connected to the upper mounting platform (504); a plurality of groups of push cylinders (802) are arranged side by side at the upper end of the frame-shaped support (801), wherein a receiving plate (804) is provided on the side of the frame-shaped support (801) away from the push cylinders (802); a plurality of sliding holes (805) are provided at the lower end of the receiving plate (804); A plurality of flexible discharge channels (807) are arranged at the bottom of one side close to the material receiving plate (804), wherein the upper ends of the flexible discharge channels (807) are respectively communicated with the slide holes (805); a plurality of flexible discharge channels (807) are arranged side by side at the bottom of one side close to the material receiving plate (804) of the frame-shaped support (801), wherein the top end of each flexible discharge channel (807) respectively penetrates the top plate of the frame-shaped support (801) and is communicated with the slide hole (805) opened at the lower end of the material receiving plate (804); The unloading assembly (9) comprises a servo electric cylinder (901), wherein the servo electric cylinder (901) is fixedly connected to the upper mounting platform (504) via an electric cylinder mounting seat (902); a transition connecting plate (903) is fixedly connected to the sliding seat of the servo electric cylinder (901), wherein a fixed clamping plate (904) is provided below the transition connecting plate (903); a plurality of groups of flexible feed channels (905) are arranged side by side on the fixed clamping plate (904), wherein the flexible feed channels (905) are arranged below and corresponding to the flexible discharge channels (807); a plurality of discharge ports (906) are provided at the lower end of the fixed clamping plate (904), wherein each discharge port (906) is respectively connected to the lower end of the flexible feed channel (905); A display (25) is installed above the main frame (1), wherein the front end of the main control cabinet (2) is fixedly connected to an HMI operation box (24) via a cantilever hanger (26); a PLC controller is arranged inside the main control cabinet (2), wherein the PLC controller is electrically connected to the air control cabinet (4), the display (25), the HMI operation box (24), the steel ball diameter measuring mechanism (5), the steel ball feeding mechanism (6) and the steel ball receiving mechanism (7) and controls them; the air control cabinet (4) is respectively The main frame (1) is connected to the steel ball diameter measuring mechanism (5) and the steel ball feeding mechanism (6) via an air pipe, wherein the air control cabinet (4) is used to control the pneumatic components on the steel ball diameter measuring mechanism (5) and the steel ball feeding mechanism (6); a discharge door (20) is installed on the side of the main frame (1) away from the main control cabinet (2), wherein an inspection door (21) is provided at the rear end of the main frame (1); a cover plate (22) is provided at the top of the main frame (1), wherein supporting feet (23) are respectively provided at the four feet of the bottom of the main frame (1).
2. The multi-variety steel ball diameter difference measuring device according to claim 1 is characterized in that: A steel ball diameter measuring instrument (12) is provided at the bottom of the upper installation platform (504), wherein the steel ball diameter measuring instrument (12) is a laser rangefinder or an image measuring instrument.
3. The multi-variety steel ball diameter difference measuring device according to claim 1 is characterized in that: The steel ball material receiving mechanism (7) comprises a linear screw slide (701), wherein the linear screw slide (701) is fixedly connected to the lower mounting platform (501); a servo motor (702) is fixedly mounted on the sliding seat of the linear screw slide (701), wherein the output end of the servo motor (702) is provided with a connecting plate (703); a material drop tray (704) is fixedly mounted on the connecting plate (703), wherein the material drop tray (704) is evenly distributed with material receiving holes (705).
4. The multi-variety steel ball diameter difference measuring device according to claim 1 is characterized in that: A guide rod cylinder (606) is provided below the silo (603), and a push block (607) is fixedly installed on the top of the piston rod of the guide rod cylinder (606); the upper end of the push block (607) penetrates upward through the bottom of the silo (603) and is arranged in the silo (603), wherein the lower end of the push block (607) is provided with an anti-misalignment receiving tray (17); an inclined chute (18) is provided on the upper end surface of the push block (607), wherein the inclined chute (18) has an inclination angle of 3 to 10 degrees; an anti-misalignment hole (19) is provided at the bottom of the inclined chute (18) and penetrates the push block (607), wherein the lower end of the anti-misalignment hole (19) is connected to the anti-misalignment receiving tray (17).
5. The multi-variety steel ball diameter difference measuring device according to claim 1 is characterized in that: The steel ball loading assembly (10) comprises a stepping motor (1001), wherein the stepping motor (1001) is fixedly connected to the lower mounting platform (501) via a motor fixing seat (1002); a material receiving box (1003) is provided above the motor fixing seat (1002), wherein the lower end of the material receiving box (1003) is fixedly connected to the motor fixing seat (1002) via a connecting frame (1007); a steel ball loading platform (1004) is provided in the middle of the material receiving box (1003), wherein the lower end of the steel ball loading platform (1004) passes downward through the bottom of the material receiving box (1003) and is connected to the stepping motor (1001). 1001); a flexible material drop channel (1006) is provided at the bottom of one end of the material receiving box (1003), wherein the upper end of the flexible material drop channel (1006) passes through the bottom of the material receiving box (1003) and is in communication with the inner cavity of the material receiving box (1003); a material drop positioning plate (13) is provided at the front end of the lower mounting platform (501), wherein the material drop positioning plate (13) is arranged directly below the flexible material drop channel (1006); a material guide through hole (14) is provided in the middle of the material drop positioning plate (13), wherein the material guide through hole (14) is arranged corresponding to the discharge hole of the flexible material drop channel (1006).
6. A method for measuring the difference in diameter of multiple types of steel balls, characterized in that: The method of measuring the diameter of a steel ball by using the multi-variety steel ball diameter mutual difference measuring device described in any one of claims 1 to 5 comprises the following steps: S10, initial preparation: ensure that all parts of the equipment have been correctly installed and fixed, open the main control cabinet (2), start the PLC controller, and check whether all sensors and actuators are in normal working condition; set the measurement parameters of the steel ball diameter range, measurement accuracy, and measurement speed through the HMI operation box (24), and check the air control cabinet to ensure that the air supply of the pneumatic components is normal; S20, loading and positioning: the steel balls to be tested are placed in batches into the corresponding material bins (603) of the steel ball loading mechanism (6), and the type of steel balls to be tested is selected on the touch screen of the HMI operation box (24). The start button is pressed to perform automatic testing. The guide rod cylinder (606) pushes the push block (607) to rise, and pushes the steel balls one by one from the corresponding material bin (603) into the corresponding material discharge channel (604). During this process, the counting sensor (605) ensures that the number of steel balls in each material discharge channel (604) is accurate. The steel balls enter the receiving pipe (806) through the flexible conveying pipe, and slide through the receiving pipe (806) to the sliding hole (805) on the receiving plate (804), waiting for further pushing; S30, accurate measurement of the diameter of the steel ball: the push cylinder (802) of the feeding assembly (8) is actuated to push the push slide bar (803) to push the steel ball from the receiving plate (804) into the flexible discharge channel (807), and the steel ball slides out from the flexible discharge channel (807) and falls into the flexible feed channel (905) of the fixed clamping plate (904); the servo electric cylinder (901) drives the fixed clamping plate (904) and the steel ball to move synchronously, aligning the steel ball with the steel ball stage (1004) so that the steel ball can accurately fall into the positioning groove (1005) on the steel ball stage (1004); the stepping motor (1001) drives the steel ball stage (1004) to rotate slowly in steps, and collects more than 10 sets of diameter data of the steel ball through the steel ball diameter measuring instrument (12), and transmits the measurement data to the PLC controller in real time; S40, steel ball receiving material: the steel ball after the diameter is detected falls into the receiving box (1003), and enters the material guide hole (14) provided on the material positioning plate (13) through the flexible material drop channel (1006) provided below the receiving box (1003), and falls directly onto the material drop tray (704) from the material guide hole (14), the linear lead screw slide (701) is actuated to drive the servo motor (702) and the material drop tray (704) to move to the material receiving position, the servo motor (702) is started, and the angle and position of the material drop tray (704) are adjusted to ensure that the steel ball accurately falls into the receiving hole (705); S50, data recording and processing: All measurement data are recorded in the memory of the main control cabinet (2) through the PLC controller, and the steel ball diameter difference calculation is automatically completed according to the bearing steel ball diameter measurement value. After a certain number of bearing steel balls are measured through the difference measurement, the steel balls with the measured diameter values are arranged in order on the blanking tray (704), and the display (25) displays the current measurement data and statistical results in real time. The measurement value of each steel ball is corresponding to it in the table of the display (25), which is convenient for selecting and replacing bearing steel balls with different diameter tolerance bands; the operator can query historical data, adjust measurement parameters or perform other equipment operations at any time through the HMI operation box (24).
