An integrated adjustment method for train dispatching control considering passenger flow level
By acquiring and analyzing passenger flow data and optimizing train schedules and speed curves, the problem of unreasonable passenger flow in the existing technology affecting the following trains is solved, energy conservation and passenger demand satisfaction are achieved, and regenerative energy utilization rate and passenger comfort are improved. .
Patent Information
- Application Number
- CN202410497703.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-24
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-04-24
AI Technical Summary
The existing technology has failed to effectively consider the integrated optimization of passenger flow affecting the following train schedule and speed curve, resulting in the inability to reasonably arrange train operations, waste energy resources, reduce the utilization rate of regenerative energy, and fail to fully meet passenger needs.
By obtaining train parameters and historical passenger flow data, dividing flat and non-flat peak time periods, calculating the number of trains and weight coefficients of different operating modes, building a speed curve optimization model, and adjusting the control strategy to achieve optimization of timetables and speed curves.
Multi-schedule strategies under different passenger flow levels have been realized to reduce energy waste, improve regenerative energy utilization, improve passenger comfort, and adjust operating strategies in a timely manner to save passenger time.
Smart Images

Figure CN118358627B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of train control, and in particular to an integrated adjustment method for train dispatching control taking passenger flow levels into consideration. Background Art
[0002] At present, most of the research on train scheduling solves the problem of multi-train coordinated operation under the influence of passenger flow through timetable planning. In order to achieve the integrated optimization of timetable and speed curve under the influence of passenger flow, the goal of timetable optimization is to minimize passenger waiting time and operating cost, and the goal of speed curve planning is to improve the utilization rate of regenerative braking energy and operating energy consumption. An optimization method for train operation adjustment and control is proposed. With the timetable optimization result as input, the energy-saving speed curve of the train is calculated by energy-saving control of the train under the constraint of the running time of each section, and the adjustment of the train control mode is realized based on vehicle-to-vehicle communication. However, the existing technology does not consider the integrated optimization method of train timetable and speed curve under the influence of passenger flow, and the optimization of timetable under multi-weight selection scheme by dividing passenger flow levels, which leads to the inability to effectively and reasonably arrange the operation of trains; wastes energy resources, and cannot effectively utilize the regenerative energy of urban rail, further reducing the utilization rate of regeneration capacity; fails to fully consider the needs of passengers, reduces the comfort of passengers, and cannot modify the operation strategy in time, resulting in a waste of passengers' time. Summary of the invention
[0003] In view of the above-mentioned deficiencies in the prior art, the present invention provides an integrated adjustment method for train dispatching control taking into account passenger flow level, which solves the problem that the integrated optimization method for train timetables and speed curves does not fully consider the impact of passenger flow, and the timetable optimization under a multi-weight selection scheme of dividing passenger flow levels is realized, thereby failing to effectively and reasonably arrange the operation of trains; wasting energy resources, and failing to effectively utilize the regenerated energy of urban rails, further reducing the utilization rate of regeneration capacity.
[0004] In order to achieve the above-mentioned object of the invention, the technical solution adopted by the present invention is:
[0005] A method for integrated adjustment of train dispatching control considering passenger flow level is provided, which comprises the following steps:
[0006] S1. Obtain train parameters and historical passenger flow data;
[0007] S2, dividing the historical passenger flow data into off-peak time periods and off-peak time periods;
[0008] S3, determine whether the current time period is a peak time period; if so, proceed to step S4; otherwise, proceed to step S5;
[0009] S4, calculating the number of unpaired running trains of up and down trains and entering step S6; wherein, unpaired running means that the main passenger flow direction adopts a stop-at-station mode, and the non-main passenger flow direction adopts a stop-at-station mode, and the number of running trains of up and down trains is not equal;
[0010] S5. Calculate the number of up and down trains running in pairs; wherein running in pairs means that the number of running trains of the up and down trains is equal;
[0011] S6. Randomly select a train and adjust the weight coefficient ratio of the total waiting time of passengers and the operating cost of the train until the optimal weight coefficient ratio is obtained;
[0012] S7. Obtain the timetable corresponding to the train according to the number of train operations and the optimal weight coefficient ratio;
[0013] S8. Based on the speed limit constraint of the train, a speed curve optimization model is constructed and an initial optimized energy-saving speed curve of the train is planned;
[0014] S9, calculating the external power of the train and obtaining real-time information of other trains in real time;
[0015] S10, adjusting the control strategy of the train based on the external power of the train, the initial energy-saving speed curve and the real-time information of other trains;
[0016] S11, determine whether the train has finished running; if so, complete the dispatching control of the train; otherwise, return to step S8.
[0017] Furthermore, train parameters include train weight, train turning mass coefficient, traction characteristics and braking characteristics; historical passenger flow data include up and down line passenger flow data in each time period; timetable includes departure time, arrival time, stop time and section operation time; real-time information includes train position, speed and operation strategy; operation strategy includes traction, constant speed, coasting and braking.
[0018] Furthermore, the calculation formula for the number of running vehicles in step S4 and step S5 is:
[0019]
[0020]
[0021] Among them, I u,i ,I d,i are the number of trains running in the up and down directions of the line, respectively, min(·) is, are the maximum cross-sectional passenger flow in the up and down sections of the line, C0 is the vehicle capacity, m is the number of train formations, ρ is the train load factor level, H is the total departure interval, hmin The minimum departure interval.
[0022] Furthermore, step S6 further includes:
[0023] S6-1, obtaining the total waiting time and operating cost of the passengers of the train and initializing the value range of the corresponding weight coefficient ratio;
[0024] S6-2, select step length θ;
[0025] S6-3, based on the step length θ, select the initial values of the weight coefficient ratio in sequence within the initial value range, and use them as the current weight coefficient ratio;
[0026] S6-4, according to the formula:
[0027]
[0028]
[0029] min f=W1f1+W2f2
[0030] Obtain the corresponding current objective function value min f; where f1 and f2 are the total waiting time of passengers and the operating cost, respectively. up ,I down are the total number of train runs in the up and down directions, S up , S down are the total number of stations when the train runs in the up and down directions, ∑(·) is the summation function, ∪ is the union, q s,i is the number of passengers arriving at station s between train i and train i-1, are the departure times of train i and train i-1 at station s, respectively. u,k ,I d,k is the number of trains running in the up and down directions of the line in time period k, K is the total number of time periods, L(·) is the operating mileage of the line, and L D (·) is the distance from the line yard to the entrance, c1 and c2 are the unit operating train kilometer cost and unit empty train kilometer cost respectively, I d ,I u are the number of trains running in the up and down directions of the line, For the entry and exit line parking lot d The number of times For the entry and exit line parking lot u times, W1 and W2 are the weight coefficients of total passenger waiting time and operating cost respectively; the weight coefficient ratio is W1:W2;
[0031] S6-5, record the current weight coefficient ratio and its corresponding objective function value;
[0032] S6-6, determine whether all value ranges have been traversed; if so, proceed to step S6-7; otherwise, adjust the weight coefficient ratio and return to step S6-3;
[0033] S6-7, determine the weight coefficient ratio when the objective function is the smallest, that is, the optimal weight coefficient ratio. Generate the departure interval and stop plan based on the calculated number of running trains, and use the optimal weight coefficient ratio to generate the optimal timetable that minimizes passenger travel time and operator costs.
[0034] Furthermore, step S8 further includes:
[0035] S8-1. Construct a speed curve optimization model based on the train motion model and inter-station operation constraints;
[0036] S8-2, inputting the interval running time of the train into the speed curve optimization model to obtain the train speed curve under the corresponding shortest interval running time;
[0037] S8-3, calculating the shortest interval running time and the running time between stations of the train, and obtaining the corresponding initial surplus running time;
[0038] S8-4, dividing the running process between the running starting point and the running ending point of the train into N sub-processes;
[0039] S8-5, by temporarily changing the starting point of the coasting condition, and based on the formula:
[0040]
[0041] Get the energy consumption-time index ε of each sub-process n ; where ΔE n is the change in traction energy consumption of sub-process n after the coasting condition is inserted, ΔT n is the running time change of sub-process n after the coasting condition is inserted, E′ p 、E p They are respectively the position interval after inserting the coasting condition [x p ,x p+1 ], the train running traction energy consumption, the position interval before inserting the idling condition [x p ,x p+1 ]Train running traction energy consumption, d n is the end position index of the braking condition of sub-process n, is the time corresponding to the end position of the braking condition of the sub-process n after the coasting condition is inserted, and the time corresponding to the end position of the braking condition of the sub-process n before the coasting condition is inserted, a n is the starting position index of the traction condition of sub-process n, is the time corresponding to the starting position of the sub-process n traction condition after the coasting condition is inserted, and the time corresponding to the starting position of the sub-process n traction condition before the coasting condition is inserted, ∑(·) is the summation function;
[0042] S8-6, searching for the sub-process with the largest energy consumption-time index, and updating the starting position and the ending position of the coasting condition;
[0043] S8-7, updating the sub-process based on the updated starting position and ending position of the coasting condition to obtain an updated sub-process;
[0044] S8-8, update the surplus running time, and determine whether the updated surplus running time is greater than 0; if so, return to step S8-5; otherwise, use the updated surplus running time and the updated sub-process to optimize the train speed curve under the shortest interval running time to obtain the corresponding initial optimized energy-saving speed curve.
[0045] Furthermore, the formula of the speed curve optimization model in step S8-1 is:
[0046]
[0047] Among them, E p is the train running traction energy consumption, min(·) is the minimum function, P is the total number of discrete points, v p 、v p+1 are the train running speeds at discrete points p and p+1, respectively, and F max (v p ) is the train speed v p The maximum traction force corresponding to the time, Δx is the position discrete interval, η is the traction transmission coefficient, st is the constraint condition, a p is the position interval [x k ,x k+1 ], ub k is the braking force coefficient, uf p is the traction force coefficient, t1, t p ,t p+1 and t P+1 are the time when the train starts, the time when the train is at the discrete point p, the time when the train is at the end, and the time when the train is at the discrete point P+1. p is the line speed limit at discrete point p, P station is the discrete point index set corresponding to the station location, T set is the running time between stations.
[0048] Furthermore, the specific process of step S8-7 is as follows:
[0049] The sub-processes are screened based on the updated starting and ending positions of the coasting condition; when adjacent sub-processes cannot add the coasting condition, and the start and end points of the previous sub-process coincide with those of the braking condition, and the start and end points of the latter sub-process coincide with those of the traction condition, the two sub-processes are merged to obtain a merged sub-process; otherwise, there is no need to merge the sub-processes; wherein the updated sub-processes include the merged sub-processes and the remaining unmerged sub-processes.
[0050] Furthermore, the formula of the external power in step S9 is:
[0051] P r =ηF eb v
[0052] Among them, P r is the external power of the train, η is the traction transmission efficiency of the train, F eb is the electric braking force of the train, and v is the current speed of the train.
[0053] Furthermore, the specific steps of step S10 are:
[0054] S10-1. Obtain the current time t, the train traction end point t0 and the train braking start point t f ;
[0055] S10-2. Determine whether the current time t satisfies t0≤t≤t f ; If yes, go to step S10-3; otherwise go to step S10-9;
[0056] S10-3, determine whether there is regenerative braking energy feedback in the current power supply partition, that is, determine the external power P r Is it greater than 0? If so, go to step S10-4; otherwise, go to step S10-5;
[0057] S10-4, adjust to the traction control mode, and adjust the current acceleration of the train to a=a t ; Enter step S10-6; wherein, a t is the acceleration of the train traction;
[0058] S10-5, adjust to the coasting control mode, and adjust the current acceleration of the train to a=a c ; Enter step S10-6; wherein, a c is the acceleration of the train coasting;
[0059] S10-6, calculate the speed of the train at time t+Δt v(t+Δt)=v(t)+aΔt, and calculate the shortest running time t from time t+Δt to the final stop of the train r ;
[0060] S10-7, determine t+Δt+t r Is it less than the planned interval running time t? plan ; If yes, go to step S10-8; otherwise go to step S10-9;
[0061] S10-8, output the control mode adjusted at the current moment, and proceed to step S11;
[0062] S10-9, output the control mode of the initial optimized energy-saving speed curve, and enter step S11.
[0063] The beneficial effects of the present invention are as follows: the present method fully considers the characteristics of tidal passenger flow in urban rail transit, divides passenger flow levels according to passenger flow data, focuses on train scheduling optimization and energy-saving control, conducts integrated research, realizes multi-scheme generation strategies under different passenger flow levels, and effectively and reasonably arranges the operation of trains; reduces the waste of electric energy and transportation resources, and effectively utilizes the regenerated energy of urban rail to further improve the utilization rate of regeneration capacity; fully considers the needs of passengers, improves the comfort of passengers, and promptly modifies the operation strategy to further save passengers' time. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] Figure 1 The figure is a flow chart of the method. DETAILED DESCRIPTION
[0065] The specific implementation modes of the present invention are described below so that those skilled in the art can understand the present invention. However, it should be clear that the present invention is not limited to the scope of the specific implementation modes. For those of ordinary skill in the art, as long as various changes are within the spirit and scope of the present invention as defined and determined by the attached claims, these changes are obvious, and all inventions and creations utilizing the concept of the present invention are protected.
[0066] like Figure 1 As shown, a train dispatching control integrated adjustment method considering passenger flow level includes the following steps:
[0067] S1. Obtain train parameters and historical passenger flow data;
[0068] Train parameters include train weight, train turning mass coefficient, traction characteristics and braking characteristics; historical passenger flow data include uplink and downlink passenger flow data in each time period;
[0069] S2. Divide the historical passenger flow data into a peak time period and a non-peak time period; set the passenger flow level corresponding to the peak time period to 0; and set the passenger flow level corresponding to the non-peak time period to 1.
[0070] S3, determine whether the current time period is a peak time period; if so, proceed to step S4; otherwise, proceed to step S5;
[0071] S4, calculating the number of unpaired running trains of up and down trains and entering step S6; wherein, unpaired running means that the main passenger flow direction adopts a stop-at-station mode, and the non-main passenger flow direction adopts a stop-at-station mode, and the number of running trains of up and down trains is not equal;
[0072] S5. Calculate the number of up and down trains running in pairs; wherein running in pairs means that the number of running trains of the up and down trains is equal;
[0073] The calculation formula for the number of running vehicles in step S4 and step S5 is:
[0074]
[0075]
[0076] Among them, I u,i ,I d,i are the number of trains running in the up and down directions of the line, respectively, min(·) is, are the maximum cross-sectional passenger flow in the up and down sections of the line, C0 is the vehicle capacity, m is the number of train formations, ρ is the train load factor level, H is the total departure interval, h min The minimum departure interval.
[0077] S6. Randomly select a train and adjust the weight coefficient ratio of the total waiting time of passengers and the operating cost of the train until the optimal weight coefficient ratio is obtained;
[0078] Step S6 further comprises:
[0079] S6-1, obtaining the total waiting time and operating cost of the passengers of the train and initializing the value range of the corresponding weight coefficient ratio;
[0080] S6-2, select step length θ;
[0081] S6-3, based on the step length θ, select the initial values of the weight coefficient ratio in sequence within the initial value range, and use them as the current weight coefficient ratio;
[0082] S6-4, according to the formula:
[0083]
[0084]
[0085] min f=W1f1+W2f2
[0086] Obtain the corresponding current objective function value min f; where f1 and f2 are the total waiting time of passengers and the operating cost, respectively. up ,I down are the total number of train runs in the up and down directions, S up , S down are the total number of stations when the train runs in the up and down directions, ∑(·) is the summation function, ∪ is the union, q s,i is the number of passengers arriving at station s between train i and train i-1, are the departure times of train i and train i-1 at station s, respectively. u,k ,I d,k is the number of trains running in the up and down directions of the line in time period k, K is the total number of time periods, L(·) is the operating mileage of the line, and L D (·) is the distance from the line yard to the entrance, c1 and c2 are the unit operating train kilometer cost and unit empty train kilometer cost respectively, I d ,I u are the number of trains running in the up and down directions of the line, For the entry and exit line parking lot d The number of times For the entry and exit line parking lot u times, W1 and W2 are the weight coefficients of total passenger waiting time and operating cost respectively; the weight coefficient ratio is W1:W2;
[0087] S6-5, record the current weight coefficient ratio and its corresponding objective function value;
[0088] S6-6, determine whether all value ranges have been traversed; if so, proceed to step S6-7; otherwise, adjust the weight coefficient ratio and return to step S6-3;
[0089] S6-7. Determine the weight coefficient ratio when the objective function is minimized, that is, the optimal weight coefficient ratio.
[0090] S7. According to the number of train operations and the optimal weight coefficient ratio, obtain a timetable corresponding to the train; the timetable includes departure time, arrival time, stop time and interval operation time;
[0091] S8. Based on the speed limit constraint of the train, a speed curve optimization model is constructed and an initial optimized energy-saving speed curve of the train is planned;
[0092] S8-1. Construct a speed curve optimization model based on the train motion model and inter-station operation constraints;
[0093] The formula of the speed curve optimization model in step S8-1 is:
[0094]
[0095] Among them, E p is the train running traction energy consumption, min(·) is the minimum function, P is the total number of discrete points, v p 、v p+1 are the train running speeds at discrete points p and p+1, respectively, and F max (v p ) is the maximum traction force corresponding to the train speed vp, Δx is the position discrete interval, η is the traction transmission coefficient, st is the constraint condition, a p is the position interval [x k ,x k+1 ], ub k is the braking force coefficient, uf p is the traction force coefficient, t1, t p ,t p+1 and t P+1 are the time when the train starts, the time when the train is at the discrete point p, the time when the train is at the end, and the time when the train is at the discrete point P+1. p is the line speed limit at discrete point p, P station is the discrete point index set corresponding to the station location, T set is the running time between stations.
[0096] S8-2, inputting the interval running time of the train into the speed curve optimization model to obtain the train speed curve under the corresponding shortest interval running time;
[0097] S8-3. Calculate the shortest interval running time and the running time between stations of the train to obtain the corresponding initial surplus running time. The corresponding formula is as follows:
[0098] T sup =T set -T min
[0099] Among them, T sup is the initial rich running time, T set is the running time between stations, T min is the running time between stations;
[0100] S8-4, dividing the running process between the running starting point and the running ending point of the train into N sub-processes;
[0101] S8-5, by temporarily changing the starting point of the train's coasting condition, and based on the formula:
[0102]
[0103] Get the energy consumption-time index ε of each sub-process n ; where ΔE n is the change in traction energy consumption of sub-process n after the coasting condition is inserted, in kJ, ΔT n E′ is the running time change of the sub-process after changing the coasting condition, in seconds. p 、E p They are respectively the position interval after inserting the coasting condition [x p ,x p+1 ], the train running traction energy consumption, the position interval before inserting the idling condition [x p ,x p+1 ]Train running traction energy consumption, d n is the end position index of the braking condition of sub-process n, is the time corresponding to the end position of the braking condition of the sub-process n after the coasting condition is inserted, and the time corresponding to the end position of the braking condition of the sub-process n before the coasting condition is inserted, a n is the starting position index of the traction condition of sub-process n, is the time corresponding to the starting position of the sub-process n traction condition after the coasting condition is inserted, and the time corresponding to the starting position of the sub-process n traction condition before the coasting condition is inserted, ∑(·) is the summation function;
[0104] S8-6, searching for the sub-process with the largest energy consumption-time index, and updating the starting position and the ending position of the coasting condition;
[0105] S8-7, updating the sub-process based on the updated starting position and ending position of the coasting condition to obtain an updated sub-process;
[0106] The specific process of step S8-7 is:
[0107] The sub-processes are screened based on the updated starting and ending positions of the coasting condition; when adjacent sub-processes cannot add the coasting condition, and the start and end points of the previous sub-process coincide with those of the braking condition, and the start and end points of the latter sub-process coincide with those of the traction condition, the two sub-processes are merged to obtain a merged sub-process; otherwise, there is no need to merge the sub-processes; wherein the updated sub-processes include the merged sub-processes and the remaining unmerged sub-processes.
[0108] S8-8, according to the formula:
[0109] T sup =T sup -ΔT n
[0110] Update the surplus running time and determine whether the updated surplus running time is greater than 0; if so, return to step S8-5; otherwise, use the updated surplus running time and the updated sub-process to optimize the train speed curve under the shortest interval running time to obtain the corresponding initial optimized energy-saving speed curve. n is the running time change of sub-process n after the insertion of the coasting condition (s);
[0111] S9. Calculate the external power of the train and obtain real-time information of other trains in real time; the real-time information includes the position, speed, and operation strategy of the train; the operation strategy includes traction, constant speed, coasting, and braking.
[0112] The formula for the external power in step S9 is:
[0113] P r =ηF eb v
[0114] Among them, P r is the external power of the train, η is the traction transmission efficiency of the train, F eb is the electric braking force of the train, and v is the current speed of the train.
[0115] S10, adjusting the control strategy of the train based on the external power of the train, the initial energy-saving speed curve and the real-time information of other trains;
[0116] The specific steps of step S10 are:
[0117] S10-1. Obtain the current time t, the train traction end point t0 and the train braking start point t f ;
[0118] S10-2. Determine whether the current time t satisfies t0≤t≤t f ; If yes, go to step S10-3; otherwise go to step S10-9;
[0119] S10-3, determine whether there is regenerative braking energy feedback in the current power supply partition, that is, determine the external power P r Is it greater than 0? If so, go to step S10-4; otherwise, go to step S10-5;
[0120] S10-4, adjust to the traction control mode, and adjust the current acceleration of the train to a=a t ; Enter step S10-6; wherein, a t is the acceleration of the train coasting;
[0121] S10-5, adjust to the coasting control mode, and adjust the current acceleration of the train to a=a c; Enter step S10-6; wherein, a c is the acceleration of the train coasting;
[0122] S10-6, calculate the speed of the train at time t+Δt v(t+Δt)=v(t)+aΔt, and calculate the shortest running time t from time t+Δt to the final stop of the train r ;
[0123] S10-7, determine t+Δt+t r Is it less than the planned interval running time t? plan ; If yes, go to step S10-8; otherwise go to step S10-9;
[0124] S10-8, output the control mode adjusted at the current moment, and proceed to step S11;
[0125] S10-9, output the control mode of the initial optimized energy-saving speed curve, and enter step S11.
[0126] S11, determine whether the train has finished running; if so, complete the dispatching control of the train; otherwise, return to step S8. The train runs according to the control strategy output in step S10 until the running is finished.
[0127] In summary, the present invention fully considers the characteristics of tidal passenger flow in urban rail transit, divides passenger flow levels according to passenger flow data, focuses on train scheduling optimization and energy-saving control, conducts integrated research, and realizes multi-scheme generation strategies under different passenger flow levels, effectively and reasonably arranges the operation of trains; reduces the waste of electric energy and transportation resources, and effectively utilizes the renewable energy of urban rail to further improve the utilization rate of regeneration capacity; fully considers the needs of passengers, improves the comfort of passengers, and modifies the operation strategy in time to further save passengers' time.
Claims
1. A train dispatching control integrated adjustment method considering passenger flow level, characterized in that: The following steps are involved: S1. Obtain train parameters and historical passenger flow data; S2, dividing the historical passenger flow data into off-peak time periods and off-peak time periods; S3, determine whether the current time period is a peak time period; if so, proceed to step S4; otherwise, proceed to step S5; S4, calculating the number of unpaired running trains of up and down trains and entering step S6; wherein, unpaired running means that the main passenger flow direction adopts a stop-at-station mode, and the non-main passenger flow direction adopts a stop-at-station mode, and the number of running trains of up and down trains is not equal; S5. Calculate the number of up and down trains running in pairs; wherein running in pairs means that the number of running trains of the up and down trains is equal; S6. Randomly select a train and adjust the weight coefficient ratio of the total waiting time of passengers and the operating cost of the train until the optimal weight coefficient ratio is obtained; S7. Obtain the timetable corresponding to the train according to the number of train operations and the optimal weight coefficient ratio; S8. Based on the speed limit constraint of the train, a speed curve optimization model is constructed and an initial optimized energy-saving speed curve of the train is planned; S9, calculating the external power of the train and obtaining real-time information of other trains in real time; S10, adjusting the control strategy of the train based on the external power of the train, the initial optimized energy-saving speed curve and the real-time information of other trains; S11, determine whether the train has finished running; if so, complete the dispatching control of the train; otherwise, return to step S8; The step S6 further comprises: S6-1, obtaining the total waiting time and operating cost of the passengers of the train and initializing the value range of the corresponding weight coefficient ratio; S6-2, select step length θ; S6-3, based on the step length θ, select the initial values of the weight coefficient ratio in sequence within the initial value range, and use them as the current weight coefficient ratio; S6-4, according to the formula: min f=W1f1+W2f2 Obtain the corresponding current objective function value min f; where f1 and f2 are the total waiting time of passengers and the operating cost, respectively. up ,I down are the total number of train runs in the up and down directions, S up , S down are the total number of stations when the train runs in the up and down directions, Σ(·) is the summation function, ∪ is the union, q s,i is the number of passengers arriving at station s between train i and train i-1, are the departure times of train i and train i-1 at station s, respectively. u,k ,I d,k is the number of trains running in the up and down directions of the line in time period k, K is the total number of time periods, L(·) is the operating mileage of the line, and L D (·) is the distance from the line yard to the entrance, c1 and c2 are the unit operating train kilometer cost and unit empty train kilometer cost respectively, I d ,I u are the number of trains running in the up and down directions of the line, For the entry and exit line parking lot d The number of times, For the entry and exit line parking lot u times, W1 and W2 are the weight coefficients of total passenger waiting time and operating cost respectively; the weight coefficient ratio is W1:W2; S6-5, record the current weight coefficient ratio and its corresponding objective function value; S6-6, determine whether all value ranges have been traversed; if so, proceed to step S6-7; otherwise, adjust the weight coefficient ratio and return to step S6-3; S6-7. Determine the weight coefficient ratio when the objective function is minimized, that is, the optimal weight coefficient ratio.
2. The integrated train dispatching and control adjustment method considering passenger flow level according to claim 1 is characterized in that: The train parameters include train weight, train turning mass coefficient, traction characteristics and braking characteristics; the historical passenger flow data include up and down line passenger flow data in each time period; the timetable includes departure time, arrival time, ceasefire time and section operation time; the real-time information includes the train's position, speed and operation strategy; the operation strategy includes traction, constant speed, coasting and braking.
3. The integrated train dispatching and control adjustment method considering passenger flow level according to claim 1 is characterized in that: The calculation formula for the number of running vehicles in step S4 and step S5 is: Among them, I u,i ,I d,i are the number of trains running in the up and down directions of the line, respectively, min(·) is, are the maximum cross-sectional passenger flow in the up and down sections of the line, C0 is the vehicle capacity, n is the number of train formations, ρ is the train load factor level, H is the total departure interval, h min The minimum departure interval.
4. The integrated train dispatching and control adjustment method considering passenger flow level according to claim 1 is characterized in that: The step S8 further comprises: S8-1. Construct a speed curve optimization model based on the train motion model and inter-station operation constraints; S8-2, inputting the interval running time of the train into the speed curve optimization model to obtain the train speed curve under the corresponding shortest interval running time; S8-3, calculating the shortest interval running time and the running time between stations of the train, and obtaining the corresponding initial surplus running time; S8-4, dividing the running process between the running starting point and the running ending point of the train into N sub-processes; S8-5, by temporarily changing the starting point of the coasting condition, and based on the formula: Get the energy consumption-time index ε of each sub-process n ; where ΔE n is the change in traction energy consumption of sub-process n after the coasting condition is inserted, ΔT n is the running time change of sub-process n after the coasting condition is inserted, E′ p 、E p They are respectively the position interval after inserting the coasting condition [x p ,x p+1 ], the train running traction energy consumption, the position interval before inserting the idling condition [x p ,x p+1 ]Train running traction energy consumption, d n is the end position index of the braking condition of sub-process n, is the time corresponding to the end position of the braking condition of the sub-process n after the coasting condition is inserted, and the time corresponding to the end position of the braking condition of the sub-process n before the coasting condition is inserted, a n is the starting position index of the traction condition of sub-process n, is the time corresponding to the starting position of the sub-process n traction condition after the coasting condition is inserted, and the time corresponding to the starting position of the sub-process n traction condition before the coasting condition is inserted, ∑(·) is the summation function; S8-6, searching for the sub-process with the largest energy consumption-time index, and updating the starting position and the ending position of the coasting condition; S8-7, updating the sub-process based on the updated starting position and ending position of the coasting condition to obtain an updated sub-process; S8-8, update the surplus running time, and determine whether the updated surplus running time is greater than 0; if so, return to step S8-5; otherwise, use the updated surplus running time and the updated sub-process to optimize the train speed curve under the shortest interval running time to obtain the corresponding initial optimized energy-saving speed curve.
5. The integrated train dispatching and control adjustment method considering passenger flow level according to claim 4 is characterized in that: The formula of the speed curve optimization model in step S8-1 is: Among them, E p is the traction energy consumption of train operation, min(·) is the minimum function, P is the total number of discrete points, v p 、v p+1 are the train running speeds at discrete points p and p+1, respectively, and F max (v p ) is the train speed v p The maximum traction force corresponding to the time, Δx is the position discrete interval, η is the traction transmission coefficient, st is the constraint condition, a p is the position interval [x k ,x k+1 ], ub p is the braking force coefficient, uf p is the traction force coefficient, t1, t p ,t p+1 and t P+1 are the time when the train starts, the time when the train is at the discrete point p, the time when the train is at the end, and the time when the train is at the discrete point P+1. p is the line speed limit at discrete point p, P station is the discrete point index set corresponding to the station location, T set is the running time between stations.
6. The integrated train dispatching control adjustment method considering passenger flow level according to claim 4 is characterized in that: The specific process of step S8-7 is as follows: The sub-processes are screened based on the updated starting and ending positions of the coasting condition; when adjacent sub-processes cannot add coasting conditions, and the start and end points of the previous sub-process coincide with those of the braking condition, and the start and end points of the latter sub-process coincide with those of the traction condition, the two sub-processes are merged to obtain a merged sub-process; otherwise, there is no need to merge the sub-processes; wherein the updated sub-processes include the merged sub-processes and the remaining unmerged sub-processes.
7. The integrated train dispatching and control adjustment method considering passenger flow level according to claim 1 is characterized in that: The formula of the external power in step S9 is: P r =ηF eb v Among them, P r is the external power of the train, η is the traction transmission efficiency of the train, F eb is the electric braking force of the train, and v is the current speed of the train.
8. The integrated train dispatching and control adjustment method considering passenger flow level according to claim 1 is characterized in that: The specific steps of step S10 are: S10-1. Obtain the current time t, the train traction end point t0 and the train braking start point t f ; S10-2. Determine whether the current time t satisfies t0≤t≤t f ; If yes, go to step S10-3; otherwise go to step S10-9; S10-3, determine whether there is regenerative braking energy feedback in the current power supply partition, that is, determine the external power P r Is it greater than 0? If so, go to step S10-4; otherwise, go to step S10-5; S10-4, adjust to the traction control mode, and adjust the current acceleration of the train to a=a t ; Enter step S10-6; wherein, a t is the acceleration of the train traction; S10-5, adjust to the coasting control mode, and adjust the current acceleration of the train to a=a c ; Enter step S10-6; wherein, a c is the acceleration of the train coasting; S10-6, calculate the speed of the train at time t+Δt v(t+Δt)=v(t)+aΔt, and calculate the shortest running time t from time t+Δt to the final stop of the train r ; S10-7, determine t+Δt+t r Is it less than the planned interval running time t? plan ; If yes, go to step S10-8; otherwise go to step S10-9; S10-8, output the control mode adjusted at the current moment, and proceed to step S11; S10-9, output the control mode of the initial optimized energy-saving speed curve, and enter step S11.
