A natural resource spatial planning management system based on national land spatial element data
Through the natural resource spatial planning and management system based on land spatial element data, the problem of mismatch between the spatial distribution of natural resources and the economic center of gravity is solved, the improvement of resource utilization efficiency and the balance of regional development are achieved, and the environmental feasibility of cross-regional projects is ensured. .
Patent Information
- Application Number
- CN202410789310.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-19
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-06-19
AI Technical Summary
The spatial distribution of natural resources does not match the economic center of gravity, resulting in low resource utilization efficiency and uneven regional development. There is also a lack of effective coordination mechanisms, especially when implementing large-scale projects across provinces or regions, which can easily lead to irrational resource allocation and Environmental problems intensify.
Design a natural resource spatial planning and management system based on land spatial element data, including the resource distribution end, resource supply and demand end, and resource coordination end. By recording and locating the attributes of natural resource parcels in real time, it can calculate economic gaps, match needs, and perform financial compensation. , and perform data integration and environmental prediction through GIS to ensure the rationalization of resource allocation and the feasibility of environmental issues.
It achieves a match between the spatial distribution of natural resources and the center of economic gravity, narrows the economic gap between regions, solves the problems of low resource utilization efficiency and unbalanced regional development, ensures the coordination of land and space supply and demand and the prediction of environmental problems, and avoids resource allocation Unreasonable and environmental problems occur.
Smart Images

Figure CN118365098B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of spatial planning technology, and in particular to a natural resource spatial planning management system based on national land spatial element data. Background Art
[0002] National land and space element data is the key basic information for planning, managing, monitoring and protecting natural resources. These data include not only natural elements such as topography, water systems and lakes, and land use types, but also human elements such as built-up areas, road networks, and public facilities distribution. These suggestions are aimed at promoting the standardized and standardized management of national land and space element data, improving the efficiency and accuracy of data use, and thus better serving the preparation and implementation of municipal national land and space master plans.
[0003] Patent No. CN202010699023.1 discloses a GIS-based national land space planning system. The basic functional modules of the system are divided into eight main modules: project management, land parcel management, process management, archive management, fund management, GIS function, data processing, and system function. The present invention solves the problem of information collection and management of land transactions. Electronic management facilitates the query, statistics, and publication of information. The storage and management of massive information has become a basic management function for the current database management information system. It fully achieves fast, accurate, and simple management effects. By establishing a standardized land transaction management process through this system, the randomness of manual operations is greatly reduced, the occurrence of unintentional errors is minimized, and the possibility of illegal operations is also reduced.
[0004] After searching the above patents, it was found that the natural resource spatial planning and management system has the following deficiencies: 1. The spatial distribution of natural resources does not match the economic center of gravity. Resource-rich regions are not necessarily the center of economic development, which leads to problems of inefficient resource utilization and unbalanced regional development, exacerbating the economic gap between regions; 2. In some areas, there is a large gap between the indicators of new construction land and actual demand, which leads to contradictions in the supply and demand of national land space. The lack of land use indicators restricts economic development and the promotion of new urbanization; 3. In terms of natural resource spatial planning and management, there is often a lack of effective coordination mechanisms, especially in the implementation of large-scale cross-provincial or cross-regional projects. This deficiency may lead to irrational resource allocation and aggravation of environmental problems.
[0005] Therefore, a natural resource spatial planning management system based on national land space element data is proposed to solve the above problems. Summary of the invention
[0006] The main purpose of the present invention is to provide a natural resource spatial planning and management system based on national land space element data to solve the problems raised in the above background.
[0007] To achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a natural resource space planning and management system based on national land space element data, including a resource distribution end, a resource supply and demand end, and a resource coordination end;
[0008] The resource distribution terminal is used to record the spatial parcel attributes of natural resources in real time, locate the parcel attributes in real time, calculate the economic gap between natural resource areas in real time, and track the addition, deletion, modification and query data of natural resource parcels in real time;
[0009] The resource supply and demand end is used to receive the indicator requirements of each region, match the requirements of each region according to the indicator requirements of each region, make matching adjustments according to the requirements, and use virtual AI characters to broadcast the matching areas in real time, compensate funds for the matching plans of each region, and track the fund status in real time;
[0010] The resource coordination terminal is used to create, manage, analyze and map each area through GIS, connect the data with the map, integrate the location data of each area with the attribute information of each area, and receive the coordination attachments matching the indicators of each area in real time, approve the coordination attachments and the environmental problems generated by the coordination, set the execution time after approval, and record the fund details and environmental data in real time on the execution start date, as well as provide fund reminders and environmental forecasts before the funds expire, so as to ensure the rationality of resource allocation and the feasibility of environmental issues.
[0011] The resource distribution end includes a parcel information module, a resource distribution module and a parcel increase and decrease module;
[0012] The plot information module includes a plot attribute unit;
[0013] The land parcel attribute unit is used to record in real time through a data recorder the land parcel project, life cycle, planning situation, current time point status and historical change information of natural resources in each region.
[0014] The resource distribution module includes a regional positioning unit and an indicator recording unit;
[0015] The regional positioning unit is used to locate the plots in each region through GPS;
[0016] The index recording unit is used to record the distribution position and occupied area of the plots in each area in real time through the plot attribute information.
[0017] The land parcel increase and decrease module includes an increase, deletion, modification and query unit and a tracking and recording unit;
[0018] The add, delete, modify or search unit is used to add, delete, modify or search the coordinated parcel attribute information of each area in real time through the data tracker and the processor;
[0019] The tracking and recording unit is used to track and record the property information of each area in real time through a data tracker.
[0020] The resource supply and demand end includes a land demand module, a demand matching module and a matching fund module;
[0021] The parcel demand module includes a demand receiving unit and a demand attribute unit;
[0022] The demand receiving unit is used to receive the indicator requirements and indicator storage of other areas;
[0023] The demand attribute unit is used to classify the demand and storage of each regional indicator through a data tracker and GIS, and automatically divide the area into corresponding types of indicators.
[0024] The demand matching module includes a demand matching unit and a virtual AI broadcasting unit;
[0025] The demand matching unit is used to automatically match the indicators of the automatically divided areas and calculate the coefficient of variation. The calculation formula is as follows:
[0026] ;
[0027] in, is the standard deviation, is the average value, Indicates the economic difference between matching areas;
[0028] The virtual AI announcement unit is used to announce the automatically matched area by voice through a virtual AI character.
[0029] The matching funds module includes a matching compensation unit and a compensation tracking unit;
[0030] The matching compensation unit is used to calculate the compensation funds for each regional indicator. The calculation method is as follows:
[0031] Step 1: Calculate the capital cost rate of borrowing compensation for each regional indicator. The calculation formula is as follows:
[0032] Fund occupation fee = (fund cost rate × raised funds - fund raising fee) ÷ 100%
[0033] Among them, the capital occupation fee is the capital occupation fee of the borrowed land area, the capital cost rate is the capital cost rate obtained from the lent land area, and the capital raising fee is the raising fee of the borrowed land area;
[0034] Step 2: Calculate the cost rate of unsecured long-term borrowing funds using the following formula:
[0035] The cost rate of unsecured long-term loans = annual interest × (1-income tax rate). If long-term loans are chosen, financing costs and opportunity costs must also be added;
[0036] The compensation tracking unit is used to track the fund payment data in real time through a data tracker.
[0037] The resource coordination terminal includes a coordination attachment module, an attachment approval module, a funding connection module and a coordination search module;
[0038] The coordination attachment module includes a GIS functional unit and a coordination attachment unit;
[0039] The GIS functional unit is used to create, manage, analyze and map each area through GIS, connect the data with the map, and integrate the location data of each area with the attribute information of each area;
[0040] The coordination attachment unit is used to automatically generate a regional indicator coordination plan form through a data record table, add a new fund compensation amount, and set a fund compensation agreement plan.
[0041] The attachment approval module includes an environmental prediction unit;
[0042] The environmental prediction unit is used to monitor the site of the coordination area through GIS technology, collect environmental information of the area, store, display and analyze it, and perform environmental prediction on the projects in the coordination area. The prediction method is as follows:
[0043] Step I: Set the environmental standard parameters for the project in the corresponding area, and use earthquake monitoring equipment, landslide monitoring equipment, mud-rock flow monitoring equipment, ground subsidence monitoring equipment, volcanic eruption monitoring equipment, temperature sensors, humidity sensors and light sensors to detect the environmental parameters of the corresponding area in real time;
[0044] Step II: Calculate the difference between the environmental parameters of the corresponding area and the environmental standard parameters. If the difference = ±2, it is judged that the environmental parameters are approaching the safe value. If the difference is >2 or <-2, it is judged that the environmental parameters exceed the safe value, and an environmental warning is issued. One month is counted as one cycle. The environmental parameters of the corresponding area of natural resources are predicted based on the environmental parameters of three cycles. If the average values of the environmental parameters of the three cycles exceed the environmental standard parameters, it is judged that the project execution of the regional coordination plan is abnormal.
[0045] The fund docking module includes a real-time calculation unit;
[0046] The real-time calculation unit includes a fund detail unit, a detail visualization unit, a detail identification unit and an identification warning unit;
[0047] The fund detail unit is used to track the inflow and outflow of margin, transaction fee, late payment fee and tax funds in regional coordinated execution in real time through a data tracker;
[0048] The detail visualization unit displays the fund transaction details in real time through a page.
[0049] The detail identification unit is used to display the fund transaction details by category through GIS technology, and to color-code the unpaid funds;
[0050] The identification warning unit is used to record the fund payment situation in real time through a data recorder, and record the number of fund payments in real time according to the recorder, and when the fund is not paid for three times in total, the reporting system will issue a voice reminder;
[0051] The coordination search module is connected to the coordination attachment unit and is used to search for the allocation data or coordination records of natural resources in each region through a text transmitter.
[0052] The present invention has the following beneficial effects:
[0053] 1. In the present invention, by setting a resource distribution end, when conducting natural resource spatial planning for national land space element data, by real-time positioning of plot attributes and calculating the economic gap between natural resource regions, the spatial distribution of my country's natural resources can be matched with the economic center of gravity, and resource-rich regions can be coordinated with the centers of economic development for mutual benefit and win-win results, thereby solving the problems of low resource utilization efficiency and unbalanced regional development and narrowing the economic gap between regions.
[0054] 2. In the present invention, by setting up the resource supply and demand ends, when conducting natural resource spatial planning for national land space element data, matching adjustments are made according to demand, and real-time broadcasting of matching areas is carried out through virtual AI characters, so that the gap between new construction land and actual demand in certain areas is narrowed, the various areas are connected, and financial compensation is made for the matching plans of each area, so as to solve the contradiction of insufficient supply and demand of national land space and avoid the impact of insufficient land use indicators in certain areas on economic development and the promotion of new urbanization.
[0055] 3. In the present invention, by setting up a resource coordination terminal, when conducting natural resource spatial planning for national land space element data, each region is created, managed, analyzed and mapped through GIS, the location data of each region and the attribute information of each region are integrated, and funding reminders and environmental forecasts are conducted before the funds expire. This enables my country to effectively coordinate the supply and demand mechanisms of various regions in terms of natural resource spatial planning management, especially in the implementation of large-scale cross-provincial or cross-regional projects. The environment is predicted before the project is implemented. While reasonably planning the natural resource space, it can avoid unreasonable resource allocation and avoid environmental problems in the executed projects. BRIEF DESCRIPTION OF THE DRAWINGS
[0056] Figure 1 This is a schematic diagram of the overall system architecture of a natural resource space planning management system based on national land space element data of the present invention;
[0057] Figure 2 It is a schematic diagram of the architecture of a resource distribution end of a natural resource space planning management system based on national land space element data of the present invention;
[0058] Figure 3 It is a schematic diagram of the architecture of the resource supply and demand end of a natural resource spatial planning management system based on national land spatial element data of the present invention;
[0059] Figure 4 The present invention is a schematic diagram of the architecture of the resource coordination end of a natural resource spatial planning management system based on national land spatial element data. DETAILED DESCRIPTION
[0060] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0061] Embodiment 1
[0062] Please refer to Figure 1 to Figure 2 As shown: A natural resource space planning and management system based on national land space element data, including a resource distribution end, a resource supply and demand end, and a resource coordination end;
[0063] The resource distribution end is used to record the spatial parcel attributes of natural resources in real time, locate the parcel attributes in real time, calculate the economic gap between natural resource areas in real time, and track the addition, deletion, modification and query data of natural resource parcels in real time;
[0064] The resource supply and demand side is used to receive the indicator requirements of each region, match the requirements of each region according to the indicator requirements of each region, make matching adjustments according to the requirements, and use virtual AI characters to broadcast the matching areas in real time, compensate funds for the matching plans of each region, and track the status of funds in real time;
[0065] The resource coordination terminal is used to create, manage, analyze and map each area through GIS, connect the data with the map, integrate the location data of each area with the attribute information of each area, and receive the coordination attachments that match the indicators of each area in real time, approve the coordination attachments and the environmental problems generated by the coordination, set the execution time after approval, and record the funding details and environmental data in real time on the execution start date, as well as provide funding reminders and environmental forecasts before the funds expire, to ensure the rationality of resource allocation and the feasibility of environmental issues.
[0066] The resource distribution end includes a parcel information module, a resource distribution module, and a parcel increase and decrease module;
[0067] The parcel information module includes a parcel attribute unit;
[0068] The plot attribute unit is used to record in real time the project to which the plot belongs, life cycle, planning status, current time point status and historical change information of natural resources in each area through a data recorder.
[0069] The resource distribution module includes a regional positioning unit and an indicator recording unit;
[0070] The regional positioning unit is used to locate the parcels in each region through GPS;
[0071] The indicator recording unit is used to record the distribution location and occupied area of each area's plots in real time through the plot attribute information.
[0072] The land parcel increase and decrease module includes an increase, deletion, modification and query unit and a tracking and recording unit;
[0073] The add, delete, modify and search unit is used to add, delete, modify or search the coordinated parcel attribute information of each area in real time through the data tracker and processor;
[0074] The tracking and recording unit is used to track and record the property information of each area in real time through a data tracker.
[0075] By recording the spatial plot attributes of natural resources in real time, locating the plot attributes in real time, and calculating the economic gaps between natural resource regions in real time, we can match the spatial distribution of my country's natural resources with its economic center of gravity, coordinate resource-rich regions with centers of economic development, achieve mutual benefit and win-win results, solve the problems of inefficient resource utilization and unbalanced regional development, and narrow the economic gap between regions.
[0076] Embodiment 2
[0077] Please refer to Figure 3 As shown: Based on the first embodiment, the resource supply and demand end includes a land demand module, a demand matching module and a matching fund module;
[0078] The parcel demand module includes a demand receiving unit and a demand attribute unit;
[0079] The demand receiving unit is used to receive the indicator requirements of other areas and store indicators;
[0080] The demand attribute unit is used to classify the demand and storage of indicators in each region through data trackers and GIS, and automatically divide the regions corresponding to the types of indicators.
[0081] The demand matching module includes a demand matching unit and a virtual AI broadcasting unit;
[0082] The demand matching unit is used to automatically match the indicators of the automatically divided areas and calculate the coefficient of variation. The calculation formula is as follows:
[0083] ;
[0084] in, is the standard deviation, is the average value, Indicates the economic difference between matching areas;
[0085] The virtual AI broadcasting unit is used to broadcast the automatically matched area through the virtual AI character.
[0086] The matching funds module includes a matching compensation unit and a compensation tracking unit;
[0087] The matching compensation unit is used to calculate the compensation funds for each regional indicator. The calculation method is as follows:
[0088] Step 1: Calculate the capital cost rate of borrowing compensation for each regional indicator. The calculation formula is as follows:
[0089] Fund occupation fee = (fund cost rate × raised funds - fund raising fee) ÷ 100%
[0090] Among them, the capital occupation fee is the capital occupation fee of the borrowed land area, the capital cost rate is the capital cost rate obtained from the lent land area, and the capital raising fee is the raising fee of the borrowed land area;
[0091] Step 2: Calculate the cost rate of unsecured long-term borrowing funds using the following formula:
[0092] The cost rate of unsecured long-term loans = annual interest × (1-income tax rate). If long-term loans are chosen, financing costs and opportunity costs must also be added;
[0093] The compensation tracking unit is used to track the fund payment data in real time through the data tracker.
[0094] By receiving the indicator demands of each region, matching the demands of each region according to the indicator demands of each region, making matching adjustments according to the demands, and using virtual AI characters to conduct real-time broadcasts of matching areas, the gap between new construction land and actual demand in some areas can be narrowed, and the regions can be connected. Financial compensation is provided for the matching plans of each region to resolve the contradiction between insufficient supply and demand of land space and prevent insufficient land use indicators in some areas from affecting economic development and the promotion of new urbanization.
[0095] Embodiment 3
[0096] Please refer to Figure 4As shown: Based on the first embodiment, the resource coordination terminal includes a coordination attachment module, an attachment approval module, a funding connection module and a coordination search module;
[0097] The coordination attachment module includes GIS functional unit and coordination attachment unit;
[0098] The GIS functional unit is used to create, manage, analyze and map each area through GIS, connect the data with the map, and integrate the location data of each area with the attribute information of each area;
[0099] The coordination attachment unit is used to automatically generate a regional indicator coordination plan form through a data record table, add a new amount of financial compensation, and set a financial compensation agreement plan.
[0100] The attachment approval module includes an environmental prediction unit;
[0101] The environmental prediction unit is used to monitor the site of the coordination area through GIS technology, collect environmental information of the area, store, display and analyze it, and make environmental predictions for projects in the coordination area. The prediction methods are as follows:
[0102] Step I: Set the environmental standard parameters for the project in the corresponding area, and use earthquake monitoring equipment, landslide monitoring equipment, debris flow monitoring equipment, ground subsidence monitoring equipment, volcanic eruption monitoring equipment, temperature sensors, humidity sensors and light sensors to detect the environmental parameters of the corresponding area in real time. The earthquake monitoring equipment is any one or more of the front-end camera, water temperature and water level sensor, vibration sensor, seismic wave sensor, tilt sensor and displacement sensor. The landslide monitoring equipment is any one or more of the front-end camera, photoelectric sensor, pressure sensor, impact acceleration sensor and vibration sensor. The debris flow monitoring equipment is any one or more of the front-end camera, water quality analyzer, water temperature and water level sensor, rainfall sensor, humidity sensor, impact acceleration sensor, displacement sensor and geological sensor. The ground subsidence monitoring equipment is any one or more of the front-end camera, subsidence sensor, subsidence monitor, geological sensor and displacement sensor. The volcanic eruption monitoring equipment is any one or more of the front-end camera, pressure sensor, density sensor, vibration sensor, dust sensor, temperature sensor and humidity sensor.
[0103] Step II: Calculate the difference between the environmental parameters of the corresponding area and the environmental standard parameters. If the difference = ±2, it is judged that the environmental parameters are approaching the safe value. If the difference is >2 or <-2, it is judged that the environmental parameters exceed the safe value, and an environmental warning is issued. One month is counted as one cycle. The environmental parameters of the corresponding area of natural resources are predicted based on the environmental parameters of three cycles. If the average values of the environmental parameters of the three cycles exceed the environmental standard parameters, it is judged that the project execution of the regional coordination plan is abnormal.
[0104] The fund connection module includes a real-time calculation unit;
[0105] The real-time calculation unit includes a fund detail unit, a detail visualization unit, a detail identification unit and an identification warning unit;
[0106] The fund details unit is used to track the inflow and outflow of margin, transaction fees, late payment fees, and tax funds in regional coordinated execution in real time through the data tracker;
[0107] The detail visualization unit displays the fund transaction details in real time through the page.
[0108] The detail identification unit is used to display the fund transaction details by category through GIS technology, and to color-code the unpaid funds;
[0109] The identification warning unit is used to record the fund payment status in real time through the data recorder, and the fund payment times are recorded in real time according to the recorder. When the fund is not paid for three times in total, the reporting system will issue a voice reminder, which includes robot voice calls, sending and receiving text messages, etc.
[0110] The coordination search module is connected to the coordination attachment unit and is used to search for the allocation data or coordination records of natural resources in each region through a text transmitter.
[0111] Through GIS, we can create, manage, analyze and map each region, connect the data with the map, integrate the location data of each region with the attribute information of each region, receive the coordination attachments matching the indicators of each region in real time, and record the funding details and environmental data in real time on the implementation start date, as well as provide funding reminders and environmental forecasts before the funds expire. This enables my country to effectively coordinate the supply and demand mechanisms of various regions in the spatial planning and management of natural resources, especially in the implementation of large-scale cross-provincial or cross-regional projects. The environment can be predicted before the project is implemented, and while rationally planning the natural resource space, it can avoid irrational resource allocation and environmental problems in the implemented projects.
[0112] In the present invention, a natural resource space planning and management system based on land space element data, when the system is in operation, by real-time recording the natural resource space plot attributes, and real-time positioning the plot attributes, real-time calculation of the economic gap between natural resource regions, and real-time tracking of the addition, deletion, modification and query data of natural resource plots, the economic gap between natural resource regions, can match the spatial distribution of my country's natural resources with the economic center of gravity, and coordinate resource-rich regions with the center of economic development for mutual benefit and win-win results, solve the problems of low resource utilization efficiency and unbalanced regional development, and narrow the economic gap between regions; by receiving the indicator requirements of each region, matching the requirements of each region according to the indicator requirements of each region, matching and adjusting according to the requirements, and real-time broadcasting of matching areas through virtual AI characters, as well as financial compensation for matching plans of each region, and real-time tracking of the status of funds, by receiving the indicator requirements of each region, matching the requirements of each region according to the indicator requirements of each region, matching and adjusting according to the requirements, and real-time broadcasting of matching areas through virtual AI characters, so that certain regions The gap between the newly added construction land and the actual demand in the region is narrowed, the regions are connected, and financial compensation is made for the matching plans of each region to solve the contradiction between the supply and demand of the land space, and to avoid the impact of insufficient land use indicators in some regions on economic development and the promotion of new urbanization; through GIS, each region is created, managed, analyzed and mapped, and the data is connected to the map, the location data of each region and the attribute information of each region are integrated, and the coordination attachments of the indicator matching of each region are received in real time, and the coordination attachments and the environmental problems caused by the coordination are approved. After approval, the execution time is set, and the fund details and environmental data are recorded in real time on the execution start date, as well as fund reminders and environmental forecasts before the funds expire, to ensure the rationality of resource allocation and the feasibility of environmental problems, so that my country can effectively coordinate the supply and demand mechanisms of various regions in the spatial planning and management of natural resources, especially in the implementation of large-scale cross-provincial or cross-regional projects. The environment is predicted before the project is implemented. While rationally planning the natural resource space, it can avoid unreasonable resource allocation and environmental problems in the executed projects.
[0113] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A natural resource space planning and management system based on national land space element data, characterized in that: The system includes a resource distribution end, a resource supply and demand end, and a resource coordination end; The resource distribution terminal is used to record the spatial parcel attributes of natural resources in real time, locate the parcel attributes in real time, calculate the economic gap between natural resource areas in real time, and track the addition, deletion, modification and query data of natural resource parcels in real time; The resource supply and demand end is used to receive the indicator requirements of each region, match the requirements of each region according to the indicator requirements of each region, make matching adjustments according to the requirements, and use virtual AI characters to broadcast the matching areas in real time, compensate funds for the matching plans of each region, and track the fund status in real time; The resource coordination terminal is used to create, manage, analyze and draw each area through GIS, connect the data with the map, integrate the location data of each area with the attribute information of each area, and receive the coordination attachments matching the indicators of each area in real time, approve the coordination attachments and the environmental problems generated by the coordination, set the execution time after approval, and record the fund details and environmental data in real time on the execution start date, as well as make fund reminders and environmental forecasts before the funds expire, so as to ensure the rationality of resource allocation and the feasibility of environmental problems; The resource coordination terminal includes a coordination attachment module, an attachment approval module, a funding connection module and a coordination search module; The coordination attachment module includes a GIS functional unit and a coordination attachment unit; The GIS functional unit is used to create, manage, analyze and map each area through GIS, connect the data with the map, and integrate the location data of each area with the attribute information of each area; The coordination attachment unit is used to automatically generate a regional indicator coordination plan form through a data record table, add a new fund compensation amount, and set a fund compensation agreement plan; The attachment approval module includes an environmental prediction unit; The environmental prediction unit is used to monitor the site of the coordination area through GIS technology, collect environmental information of the area, store, display and analyze it, and perform environmental prediction on the projects in the coordination area. The prediction method is as follows: Step I: Set the environmental standard parameters for the project in the corresponding area, and use earthquake monitoring equipment, landslide monitoring equipment, mud-rock flow monitoring equipment, ground subsidence monitoring equipment, volcanic eruption monitoring equipment, temperature sensors, humidity sensors and light sensors to detect the environmental parameters of the corresponding area in real time; Step II: Calculate the difference between the environmental parameters of the corresponding area and the environmental standard parameters. If the difference = ±2, it is judged that the environmental parameters are approaching the safe value. If the difference is >2 or <-2, it is judged that the environmental parameters exceed the safe value, and an environmental warning is issued. One month is counted as one cycle. The environmental parameters of the corresponding area of natural resources are predicted based on the environmental parameters of three cycles. If the average values of the environmental parameters of the three cycles exceed the environmental standard parameters, it is judged that the project execution of the regional coordination plan is abnormal. The fund docking module includes a real-time calculation unit; The real-time calculation unit includes a fund detail unit, a detail visualization unit, a detail identification unit and an identification warning unit; The fund detail unit is used to track the inflow and outflow of margin, transaction fee, late payment fee and tax funds in regional coordinated execution in real time through a data tracker; The detail visualization unit displays the fund transaction details in real time through a page; The detail identification unit is used to display the fund transaction details by category through GIS technology, and to color-code the unpaid funds; The identification warning unit is used to record the fund payment situation in real time through a data recorder, and record the number of fund payments in real time according to the recorder, and when the fund is not paid for three times in total, the reporting system will issue a voice reminder; The coordination search module is connected to the coordination attachment unit and is used to search for the allocation data or coordination records of natural resources in each region through a text transmitter; The resource distribution end includes a parcel information module, a resource distribution module and a parcel increase and decrease module; The plot information module includes a plot attribute unit; The land parcel attribute unit is used to record the land parcel belonging project, life cycle, planning situation, current time point status and historical change information of natural resources in each region in real time through a data recorder; The resource distribution module includes a regional positioning unit and an indicator recording unit; The regional positioning unit is used to locate the plots in each region through GPS; The index recording unit is used to record the distribution position and occupied area of each area of the land in real time through the land attribute information; The land parcel increase and decrease module includes an increase, deletion, modification and query unit and a tracking and recording unit; The add, delete, modify or search unit is used to add, delete, modify or search the coordinated parcel attribute information of each area in real time through the data tracker and the processor; The tracking and recording unit is used to track and record the property information of each area in real time through a data tracker; The resource supply and demand end includes a land demand module, a demand matching module and a matching fund module; The parcel demand module includes a demand receiving unit and a demand attribute unit; The demand receiving unit is used to receive the indicator requirements and indicator storage of other areas; The demand attribute unit is used to classify the demand and storage of indicators in each region through a data tracker and GIS, and automatically divide the regions corresponding to the types of indicators; The demand matching module includes a demand matching unit and a virtual AI broadcasting unit; The demand matching unit is used to automatically match the indicators of the automatically divided areas and calculate the coefficient of variation. The calculation formula is as follows: ; in, is the standard deviation, is the average value, Indicates the economic difference between matching areas; The virtual AI broadcasting unit is used to broadcast the automatically matched area by voice through a virtual AI character; The matching funds module includes a matching compensation unit and a compensation tracking unit; The matching compensation unit is used to calculate the compensation funds for each regional indicator. The calculation method is as follows: Step 1: Calculate the capital cost rate of borrowing compensation for each regional indicator. The calculation formula is as follows: Fund occupation fee = (fund cost rate × raised funds - fund raising costs) ÷ 100% Among them, the capital occupation fee is the capital occupation fee of the borrowed land area, the capital cost rate is the capital cost rate of the lent land area, and the capital raising fee is the raising fee of the borrowed land area; Step 2: Calculate the cost rate of unsecured long-term borrowing funds using the following formula: The cost rate of unsecured long-term loans = annual interest × (1-income tax rate). If long-term loans are chosen, financing costs and opportunity costs must also be added; The compensation tracking unit is used to track the fund payment data in real time through a data tracker.
