A method for intelligent processing of construction project list data
Through the automated identification of the list of construction projects and deep learning model analysis, the problems of inefficiency and data errors of traditional processing methods are solved, efficient and accurate data processing and risk warning are achieved, and standardized management of engineering projects is ensured.
Patent Information
- Application Number
- CN202410518513.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-26
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-04-26
Smart Images

Figure CN118410346B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of inventory data processing, and in particular to an intelligent processing method for inventory data of a construction project. Background Art
[0002] In the management of construction projects, the project list is the basis and basis for project execution, and the accuracy and completeness of its data are crucial. However, traditional project list processing often relies on manual operation and simple computer programs, which has many shortcomings. First, manual processing of project list data is inefficient and prone to errors. Due to the large amount and variety of data involved in construction projects, manual processing is not only time-consuming and labor-intensive, but also difficult to ensure the accuracy of data. At the same time, human factors such as fatigue and negligence can easily lead to data entry errors or omissions. Secondly, traditional computer programs have limited functions for processing project list data and cannot meet complex needs. Although some basic software tools can perform data entry, query and simple analysis, these tools are often unable to meet complex data processing requirements such as data cleaning, anomaly detection, pattern recognition, etc. In addition, with the continuous expansion of the scale and complexity of construction projects, the requirements for project list data processing are also getting higher and higher. Traditional data processing methods can no longer meet the needs of modern construction project management, and a more intelligent and efficient data processing method is urgently needed. Therefore, the development of an intelligent processing method for construction project list data has important practical significance and application value.
[0003] In a Chinese invention application with application publication number CN1 13806392A, a method for processing construction project list data, a method for calculating engineering quantity and an apparatus are disclosed, including obtaining a historical construction project list description set and a list processing requirement; extracting feature items from the historical construction project list description set based on the list processing requirement to obtain a feature item set; determining a feature value category based on a keyword corresponding to each feature item in the feature item set, and establishing a corresponding feature value professional vocabulary dictionary and feature value regular expression; and thereby forming a metadata set; processing the engineering content of the construction project list to be processed based on the metadata set to obtain a structured engineering list description.
[0004] In the above invention application, key words associated with the list processing requirements can be extracted, so that the final project list description is more in line with the needs of intelligent technology. The processing of the project list is only the processing of the list format. In actual situations, due to the large amount of data and various types involved in construction projects, it is very easy to cause data entry errors or omissions, and the accuracy of the list is difficult to guarantee. An erroneous list may lead to insufficient or excessive supply of materials during the construction process, affecting the construction progress, and may even cause project delays, thereby affecting the schedule of the project and increasing the risk and uncertainty of the project.
[0005] To this end, the present invention provides a method for intelligently processing construction project list data. Summary of the invention
[0006] 1. Technical issues to be resolved
[0007] In view of the deficiencies in the prior art, the present invention provides a method for intelligently processing construction project list data. By analyzing and comparing the construction project list with a generated first comparison list, the present invention can accurately identify the differences and potential problems between the two. When the first comparison list and the list of construction project projects to be processed have a large deviation, a second comparison list is generated, and the second comparison list is compared and analyzed with the list of construction project projects to be processed. A judgment is made on the accuracy of the list of construction project projects to be processed, and a corresponding list processing strategy is selected. The accuracy of the list of construction project projects to be processed can be analyzed more comprehensively and in-depth. When there are problems with the list of construction project projects to be processed, they can be discovered in time and responded to quickly, avoiding the expansion of risks and reducing unnecessary losses, thereby solving the technical problems recorded in the background technology.
[0008] (II) Technical solution
[0009] To achieve the above objectives, the present invention is implemented through the following technical solutions: A method for intelligently processing construction project list data, comprising the following steps:
[0010] Importing the list of construction engineering projects to be processed into the construction engineering project list recognition model, performing format and text recognition on the list of construction engineering projects to be processed, and determining whether the list of construction engineering projects meets the standards;
[0011] Obtaining construction project drawings and construction project specifications, importing into the first engineering quantity calculation software to generate a first comparison list, analyzing and comparing the first comparison list with the list of pending construction project items, obtaining a first project evaluation coefficient Dx, and issuing an abnormal warning of the first comparison list item when the first project evaluation coefficient Dx is greater than 0.1;
[0012] When there is a large deviation between the first comparison list and the list of pending construction projects, a second comparison list is generated, and the second comparison list is compared and analyzed with the list of pending construction projects to determine the accuracy of the list of pending construction projects and select a corresponding list processing strategy.
[0013] Furthermore, a large number of historical building project lists are obtained using depth-first search, and text mining technology is used to extract the features of each historical building project list, including list number, project name, construction content, measurement unit and engineering quantity, construction equipment and materials, and construction requirements and standards. The historical building project list after feature extraction is divided into a training set and a verification set. After importing the deep learning model for training and testing, the building project list recognition model is output.
[0014] The list number is a unique number used to identify each list, which is convenient for searching and reference; the project name is the name of the project to which the list belongs, which is used to clarify the project being constructed; the construction content is a detailed description of the specific content and scope of construction, including various construction processes and specific requirements; the unit of measurement and engineering quantity are used to calculate the cost and material requirements; the construction equipment and materials include name, specifications, quantity, etc.; the construction requirements and standards are the technical requirements, quality standards, acceptance specifications, etc. during the construction process to ensure construction quality and safety.
[0015] Further, the list of construction projects to be processed is imported into the construction project list recognition model, the format and text recognition of the list of construction projects to be processed is performed, whether the list of construction projects meets the standards and whether the wording is accurate is determined, and the abnormal project names and their corresponding data are output for further verification;
[0016] The corresponding data include project code construction content, measurement units and project quantities, construction equipment and materials, and construction requirements and standards.
[0017] Further, the total number of items Zs of the first comparison list and the list of pending construction project items is obtained by counting y 、Zs d , and use text mining technology to extract each project name, and after sorting, obtain the first comparison project name set and the to-be-processed project name set.
[0018] Furthermore, a text similarity algorithm is used to analyze the similarity between the first comparison project name set and the to-be-processed project name set to obtain a first comparison project name similarity Md.
[0019] Further, the total number of items Zs of the first comparison list and the list of pending construction project items is obtained. y 、Zs dAfter linear normalization processing with the first comparison project name similarity Md, the first project evaluation coefficient Dx is calculated:
[0020]
[0021] Among them, the superscript y represents the first comparison list, and d represents the list of pending construction projects;
[0022] When the evaluation coefficient Dx of the first item is greater than 0.1, an abnormal warning of the first comparison list item is issued.
[0023] Furthermore, when the first project evaluation coefficient Dx is not greater than 0.1, the first comparison list and the list of pending construction projects are imported into the cost calculation software, and the cost is calculated according to the same cost standard to obtain the first comparison cost Jz y and pending cost Jz d , after linear normalization, the first cost deviation coefficient Dz is calculated:
[0024]
[0025] When the first cost deviation coefficient Dz is greater than 0.1, an abnormal measurement warning of the first comparison list is issued;
[0026] When the first cost deviation coefficient Dz is not greater than 0.1, the cost list generated based on the list of construction engineering projects to be processed is output externally.
[0027] Software and algorithms for calculating construction costs can help complete the cost calculation work more quickly and accurately. Common software for calculating construction costs include Jianxin Artificial Intelligence Cost Software, Building Intelligent Manufacturing Intelligent Cost Software, etc.
[0028] Furthermore, when an abnormal warning of an item in the first comparison list or an abnormal warning of a measurement in the first comparison list is received, the construction project drawings and construction project specifications are imported into the second engineering quantity calculation software to generate a second comparison list, and the second comparison list is compared and analyzed with the list of construction projects to be processed to obtain the second project evaluation coefficient Ex and the second cost deviation coefficient Ez.
[0029] Furthermore, the second project evaluation coefficient Ex and the second cost deviation coefficient Ez are obtained to judge the accuracy of the list of construction projects to be processed, and select the corresponding list processing strategy, which is specifically:
[0030] When the second project evaluation coefficient Ex and the second cost deviation coefficient Ez are both less than 0.1, it is fed back that the current list of pending construction projects is highly accurate, and further cost processing can be performed, and a cost list generated based on the list of pending construction projects is output externally;
[0031] When the second project evaluation coefficient Ex and the second cost deviation coefficient Ez are both less than 0.1, it is fed back that the accuracy of the current list of pending construction projects is low, an abnormal warning of the list of pending construction projects is issued, and the list of pending construction projects needs to be re-verified.
[0032] (III) Beneficial effects
[0033] The present invention provides a method for intelligently processing construction project list data, which has the following beneficial effects:
[0034] 1. By importing the list of construction projects to be processed into the list recognition model, the list of construction projects to be processed is formatted and text recognized to determine whether the list of construction projects meets the standards. Through automated format and text recognition, the possibility of human input errors can be greatly reduced to ensure the accuracy of construction project data. And by determining whether the list of construction projects meets the standards, it can ensure that all project data follows a unified format and specification, which is conducive to standardized management of projects.
[0035] 2. Obtain the drawings and specifications of the construction project, import the first engineering quantity calculation software to generate the first comparison list, analyze and compare the first comparison list with the list of pending construction projects, and obtain the first project evaluation coefficient Dx. When the first project evaluation coefficient Dx is greater than 0.1, issue an abnormal warning for the first comparison list items, which can accurately identify the differences and potential problems between the two. When there are problems in the list of pending construction projects, they can be discovered and responded to promptly to avoid risk expansion and reduce unnecessary losses.
[0036] 3. When there is a large deviation between the first comparison list and the list of pending construction projects, a second comparison list is generated, and the second comparison list is compared and analyzed with the list of pending construction projects to make a judgment on the accuracy of the list of pending construction projects, and a corresponding list processing strategy is selected. By introducing the second comparison list, the accuracy of the list of pending construction projects can be analyzed more comprehensively and in-depth. Different list processing strategies can be selected based on the comparative analysis results between the second comparison list and the list to be processed. This targeted processing strategy can more effectively solve the problem and improve processing efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 A schematic diagram of a flow chart of a method for intelligently processing data of a list of construction engineering projects according to the present invention;
[0038] Figure 2 It is a schematic diagram of the process of building a construction project list identification model of the present invention. DETAILED DESCRIPTION
[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0040] See also Figure 1 and Figure 2 The present invention provides a method for intelligently processing construction project list data, comprising the following steps:
[0041] Step 1: Import the list of construction projects to be processed into the construction project list recognition model, perform format and text recognition on the list of construction projects to be processed, and determine whether the list of construction projects meets the standards.
[0042] The step 1 includes the following contents:
[0043] Step 101: Collect all relevant data of the construction project, including construction project drawings, construction project specifications and bills of quantities, and pre-process the collected data, including removing irrelevant information, correcting errors and standardizing data formats.
[0044] Step 102: Use depth-first search to obtain a large number of historical building project lists, and use text mining technology to extract the features of each historical building project list, including the list number, project name, construction content, measurement unit and engineering quantity, construction equipment and materials, and construction requirements and standards. The historical building project list after feature extraction is divided into a training set and a verification set. After importing the deep learning model for training and testing, the building project list recognition model is output.
[0045] The list number is a unique number used to identify each list, which is convenient for searching and reference; the project name is the name of the project to which the list belongs, which is used to clarify the project being constructed; the construction content is a detailed description of the specific content and scope of construction, including various construction processes and specific requirements; the unit of measurement and engineering quantity are used to calculate the cost and material requirements; the construction equipment and materials include name, specifications, quantity, etc.; the construction requirements and standards are the technical requirements, quality standards, acceptance specifications, etc. during the construction process to ensure construction quality and safety.
[0046] Step 103: Import the list of construction projects to be processed into the construction project list recognition model, perform format and text recognition on the list of construction projects to be processed, determine whether the list of construction projects meets the standards and whether the wording is accurate, and output the abnormal project names and their corresponding data for further verification.
[0047] Note: The corresponding data include project code construction content, measurement unit and engineering quantity, construction equipment and materials, and construction requirements and standards.
[0048] When using, combine the contents in steps 101 and 103:
[0049] By importing the list of construction projects to be processed into the list recognition model, the list of construction projects to be processed is formatted and text recognized, and whether the list of construction projects meets the standards is judged. Through automated format and text recognition, the possibility of human input errors can be greatly reduced, ensuring the accuracy of construction project data. And by judging whether the list of construction projects meets the standards, it can ensure that all project data follows a unified format and specification, which is conducive to standardized management of projects.
[0050] Step 2: Obtain construction project drawings and construction project specifications, import the first engineering quantity calculation software to generate a first comparison list, analyze and compare the first comparison list with the list of pending construction project lists, and obtain the first project evaluation coefficient Dx. When the first project evaluation coefficient Dx is greater than 0.1, issue an abnormal warning for the first comparison list items.
[0051] The step 2 includes the following contents:
[0052] Step 201: Obtain construction project drawings and construction project specifications, and import them into a first engineering quantity calculation software to generate a first comparison list.
[0053] Engineering quantity calculation software is a tool used to assist construction engineering personnel in calculating various engineering quantities, material usage and costs in engineering projects. These software are usually developed based on architectural drawings, design specifications and related calculation rules and formulas, which can greatly improve the accuracy and efficiency of engineering quantity calculation. Common engineering quantity calculation software includes Swell 3D quantity calculation software, CAD mini quantity calculation, EasyTable installation graphic quantity calculation software, etc. These software have some basic functions, such as fast measurement, statistics and calculation of engineering quantities, and also provide rich functions, such as one-click identification of components, automatic application of quotas, report generation, etc.
[0054] Step 202: Count and obtain the total number of items Zs in the first comparison list and the list of pending construction project items y 、Zs d , and use text mining technology to extract each project name, and after sorting, obtain the first comparison project name set and the to-be-processed project name set.
[0055] Step 203: Use a text similarity algorithm to analyze the similarity between the first comparison project name set and the to-be-processed project name set to obtain a first comparison project name similarity Md.
[0056] Text similarity algorithms include cosine similarity, Jaccard similarity, and edit distance. Jaccard similarity coefficient is a common indicator for measuring the similarity between two sets. Jaccard similarity coefficient is equal to the proportion of the intersection elements of two sets in their union. The larger the value of Jaccard similarity coefficient, the more similar the two sets are; Euclidean distance calculates similarity based on the distance between the position coordinates of two points in Euclidean space, and is applicable to data based on continuous variables, such as image and audio processing. The smaller the value of Euclidean distance, the more similar the two points are; cosine similarity calculates similarity based on the angle between two vectors, and is applicable to data based on discrete variables, such as text classification and recommendation systems. The larger the value of cosine similarity, the more similar the two vectors are; edit distance calculates similarity based on the number of operations between two strings.
[0057] Step 204: Obtain the total number of items Zs in the first comparison list and the list of pending construction project items y 、Zs d After linear normalization processing with the first comparison project name similarity Md, the first project evaluation coefficient Dx is calculated:
[0058]
[0059] Among them, the superscript y represents the first comparison list, and d represents the list of construction projects to be processed.
[0060] When the evaluation coefficient Dx of the first item is greater than 0.1, an abnormal warning of the first comparison list item is issued.
[0061] When using, combine the contents in steps 201 to 204:
[0062] By obtaining the construction project drawings and construction project specifications, the first engineering quantity calculation software is imported to generate a first comparison list, and the first comparison list and the list of pending construction projects are analyzed and compared to obtain the first project evaluation coefficient Dx. When the first project evaluation coefficient Dx is greater than 0.1, an abnormal warning of the first comparison list project is issued to the outside, which can accurately identify the differences and potential problems between the two. When there are problems in the list of pending construction projects, they can be discovered and responded to quickly to avoid the expansion of risks and reduce unnecessary losses.
[0063] Step 3. When there is a large deviation between the first comparison list and the list of pending construction projects, a second comparison list is generated, and the second comparison list is compared and analyzed with the list of pending construction projects to make a judgment on the accuracy of the list of pending construction projects and select a corresponding list processing strategy.
[0064] The step three includes the following contents:
[0065] Step 301: When the first project evaluation coefficient Dx is not greater than 0.1, the first comparison list and the list of pending construction projects are imported into the cost calculation software, and the cost is calculated according to the same cost standard to obtain the first comparison cost Jz y and pending cost Jz d , after linear normalization, the first cost deviation coefficient Dz is calculated:
[0066]
[0067] When the first cost deviation coefficient Dz is greater than 0.1, a first comparison list measurement abnormality warning is issued.
[0068] When the first cost deviation coefficient Dz is not greater than 0.1, the cost list generated based on the list of construction engineering projects to be processed is output externally.
[0069] Software and algorithms for calculating construction costs can help complete the cost calculation work more quickly and accurately. Common software for calculating construction costs include Jianxin Artificial Intelligence Cost Software, Building Intelligent Manufacturing Intelligent Cost Software, etc.
[0070] Step 302: When an abnormal warning of an item in the first comparison list or an abnormal warning of measurement in the first comparison list is received, the construction project drawings and construction project specifications are imported into the second engineering quantity calculation software to generate a second comparison list, and the second comparison list is compared and analyzed with the list of construction projects to be processed to obtain a second project evaluation coefficient Ex and a second cost deviation coefficient Ez.
[0071] Note: The calculation method of the second project evaluation coefficient Ex is the same as that of the first project evaluation coefficient Dx, and the calculation method of the second cost deviation coefficient Ez is the same as that of the first cost deviation coefficient Dz.
[0072] Step 303: Obtain the second project evaluation coefficient Ex and the second cost deviation coefficient Ez, determine the accuracy of the list of construction engineering projects to be processed, and select a corresponding list processing strategy, specifically:
[0073] When the second project evaluation coefficient Ex and the second cost deviation coefficient Ez are both less than 0.1, the feedback indicates that the current list of pending construction projects is highly accurate, and further cost processing can be performed to output a cost list produced based on the list of pending construction projects.
[0074] When the second project evaluation coefficient Ex and the second cost deviation coefficient Ez are both less than 0.1, it is fed back that the accuracy of the current list of pending construction projects is low, an abnormal warning of the list of pending construction projects is issued, and the list of pending construction projects needs to be re-verified.
[0075] When using, combine the contents in steps 301 to 303:
[0076] When there is a large deviation between the first comparison list and the list of construction projects to be processed, a second comparison list is generated, and the second comparison list is compared and analyzed with the list of construction projects to be processed, a judgment is made on the accuracy of the list of construction projects to be processed, and a corresponding list processing strategy is selected. By introducing the second comparison list, the accuracy of the list of construction projects to be processed can be analyzed more comprehensively and in-depth. Different list processing strategies can be selected based on the comparative analysis results between the second comparison list and the list to be processed. This targeted processing strategy can more effectively solve the problem and improve processing efficiency.
[0077] The above embodiments may be implemented in whole or in part by software, hardware, firmware or any other combination thereof. When implemented using software, the above embodiments may be implemented in whole or in part in the form of a computer program product. A person of ordinary skill in the art may appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein may be implemented in electronic hardware, or in a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution.
[0078] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0079] The above description is only a specific implementation manner of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application.
Claims
1. A method for intelligently processing construction project list data, characterized in that: The steps include: Importing the list of construction engineering projects to be processed into the construction engineering project list recognition model, performing format and text recognition on the list of construction engineering projects to be processed, and determining whether the list of construction engineering projects meets the standards; Obtaining construction project drawings and construction project specifications, importing into the first engineering quantity calculation software to generate a first comparison list, analyzing and comparing the first comparison list with the list of pending construction project items, obtaining a first project evaluation coefficient Dx, and issuing an abnormal warning of the first comparison list item when the first project evaluation coefficient Dx is greater than 0.1; When the first comparison list and the list of pending construction projects have a large deviation, a second comparison list is generated, and the second comparison list is compared and analyzed with the list of pending construction projects to make a judgment on the accuracy of the list of pending construction projects, and a corresponding list processing strategy is selected; Count the total number of projects that have been obtained from the first comparison list and the list of pending construction projects , , and use text mining to extract each project name, and after sorting, obtain a first comparison project name set and a to-be-processed project name set; Use the text similarity algorithm to analyze the similarity between the first comparison project name set and the to-be-processed project name set to obtain the first comparison project name similarity ; Get the total number of items in the first comparison list and the list of pending construction projects , Similarity with the first comparison project name , after linear normalization, the first project evaluation coefficient Dx is calculated: ; Among them, the superscript y represents the first comparison list, and d represents the list of pending construction projects; When the evaluation coefficient Dx of the first item is greater than 0.1, an abnormal warning of the first comparison list item is issued externally; When the first project evaluation coefficient Dx is not greater than 0.1, the first comparison list and the list of pending construction projects are imported into the cost calculation software, and the cost is calculated according to the same cost standard to obtain the first comparison cost. and pending cost , after linear normalization, the first cost deviation coefficient Dz is calculated: ; When the first cost deviation coefficient Dz is greater than 0.1, an abnormal measurement warning of the first comparison list is issued; When the first cost deviation coefficient Dz is not greater than 0.1, the cost list generated based on the list of construction engineering projects to be processed is output externally; When an abnormal warning of the first comparison list project or the first comparison list measurement is received, the construction project drawings and construction project specifications are imported into the second engineering quantity calculation software to generate a second comparison list, and the second comparison list is compared and analyzed with the list of construction projects to be processed to obtain the second project evaluation coefficient Ex and the second cost deviation coefficient Ez.
2. The method for intelligently processing construction project list data according to claim 1, characterized in that: Use depth-first search to obtain several lists of historical building project projects, and use text mining technology to extract the features of each list of historical building project projects, including list number, project name, construction content, measurement unit and engineering quantity, construction equipment and materials, and construction requirements and standards. The list of historical building project projects after feature extraction is divided into training set and verification set. After importing the deep learning model for training and testing, the building project list recognition model is output.
3. The intelligent processing method for construction project list data according to claim 2 is characterized by: Import the list of construction engineering projects to be processed into the construction engineering project list recognition model, perform format and text recognition on the list of construction engineering projects to be processed, determine whether the list of construction engineering projects meets the standards, and output the abnormal project names and their corresponding data for further verification; among which, the corresponding data include project code construction content, measurement unit and project quantity, construction equipment and materials, and construction requirements and standards.
4. The method for intelligently processing construction project list data according to claim 1, characterized in that: Obtain the second project evaluation coefficient Ex and the second cost deviation coefficient Ez, judge the accuracy of the list of construction projects to be processed, and select the corresponding list processing strategy, specifically: When the second project evaluation coefficient Ex and the second cost deviation coefficient Ez are both less than 0.1, it is fed back that the current list of pending construction projects is highly accurate, and a cost list generated based on the list of pending construction projects is output externally; When the second project evaluation coefficient Ex and the second cost deviation coefficient Ez are both less than 0.1, it is fed back that the accuracy of the current list of pending construction projects is low, an abnormal warning of the list of pending construction projects is issued, and the list of pending construction projects is re-verified.
