A compacting device for road bridge head

By designing a compacting equipment for the bridge head, using the combined structure of the upper hammer assembly and the lower hammer assembly, efficient compacting on the bridge head and slope is achieved, solving the problems of low efficiency of existing hydraulic compacting machines and equipment vibration, ensuring compaction Quality and equipment protection.

CN118422664BActive Publication Date: 2024-11-22ZHEJIANG ZHONGQI CONSTR CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410894877.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2024-11-22
Estimated Expiration
2044-07-04

AI Technical Summary

Technical Problem

During the bridge head compaction process, existing hydraulic compactors need to frequently lift and transfer the equipment, resulting in low efficiency. The impact force is insufficient during slope compaction, which affects the compaction quality. The equipment vibrates frequently and is prone to damage.

Method used

Design a compacting device for road bridge heads, adopting a structure that combines the upper hammer assembly and the lower hammer assembly, drives the lower hammer head to raise and move through a draw rope to avoid collision with the foundation, and use the third hydraulic cylinder to make the lower hammer assembly The swing adapts to the slope and absorbs impact components through the buffer assembly to ensure effective transmission of impact forces.

Benefits of technology

Improves compaction efficiency, avoids vibration damage to equipment, ensures the quality and efficiency of slope compaction, and protects the excavator or loader from damage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118422664B_ABST
    Figure CN118422664B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of compaction equipment, and in particular, relates to a compaction equipment for road bridge heads, including an upper hammer assembly, a lower hammer assembly, and a buffer assembly. The upper hammer assembly is used to convert gravitational potential energy into impact force for compacting a foundation, the lower hammer assembly is used to transmit the impact force generated by the upper hammer assembly to a flat foundation or a slope foundation, and the buffer assembly is used to drive the upper hammer assembly to generate impact force and buffer and absorb the impact generated by the lower hammer assembly along the slope. When it is necessary to compact a slope, the lower hammer assembly in the present invention can swing a certain amplitude relative to the upper hammer assembly under the drive of a third hydraulic cylinder to adapt to the slope, while the upper hammer head in the upper hammer assembly still maintains a vertical motion state, and the height of the upper hammer head remains almost unchanged, thereby ensuring that the upper hammer head still has sufficient gravitational potential energy to generate effective impact force when the lower hammer head tampers the slope.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of compaction equipment, and in particular relates to a compaction equipment used for a road bridge head. Background Art

[0002] Hydraulic compactors are compactors driven by hydraulic pressure, including hydraulic vibration compactors and hydraulic impact compactors. Hydraulic impact compactors are commonly known as hydraulic compactors. Hydraulic compactors are generally installed on loaders or excavators for use. Because their vertical dimensions are larger than their horizontal dimensions, they are also called vertical hydraulic compactors.

[0003] Hydraulic compactor is a compaction equipment that is widely used in engineering construction. It includes a bearing mechanism, a frame, upper and lower hammers, a special transmission device, a hydraulic control system and an electronic control system. The hydraulic compactor uses the hydraulic power of an excavator or loader to perform construction operations.

[0004] The hydraulic compactor lifts the upper hammer to the set height through the hydraulic cylinder and then quickly applies force in the reverse direction. The upper hammer accelerates down under the combined effect of gravity and the hydraulic cylinder's thrust, and hits the lower hammer through the conduction pad to compact the foundation or fill soil and stone materials, thereby achieving the purpose of increasing the density.

[0005] The hydraulic compactor can effectively eliminate the differential foundation settlement on bridges, culverts and roadbeds caused by differences in construction progress and process conditions, rushing construction deadlines, and other factors, thereby eliminating in advance the post-construction settlement that may occur during the service life of the bridges, culverts and roadbeds, and further solving the common problems of bridge head jumping and differential settlement at the junction of the new and old roadbeds or the junction of roadbed fill and excavation.

[0006] like Figure 1 , 2 As shown, for the tamping of the bridge head, when tamping and hammering, the tamping machine shell is placed on the foundation, and the lower hammer head will enter the foundation to a certain depth when hammering. If the hammer head needs to be transferred to the next hammer point, it will hit the foundation due to the lower hammer head at a certain depth in the foundation. Although the foundation is soft and will not cause damage to the tamping equipment, it will inevitably cause vibration of the loader or excavator, which will inevitably cause damage to the loader or excavator in the long run. Therefore, the loader or excavator will first lift the tamping equipment to a certain height and then transfer it. Such operation will reduce the tamping construction efficiency of the tamping equipment.

[0007] like Figure 1As shown, the bridgehead foundation generally has a slope. In order to ensure the effective connection between the bridgehead foundation and the bridgehead of the bridge, the slope also needs to be compacted. The compaction equipment is tilted and perpendicular to the slope by a loader or excavator. The impact force required for compaction comes from the kinetic energy converted from the gravitational potential energy during the falling process of the hammer head on the one hand, and from the downward push of the hammer head by the hydraulic cylinder on the other hand. The inclined compaction equipment will reduce the height of the hammer head, and then reduce the gravitational potential energy of the hammer head, so that the kinetic energy generated by the falling hammer head is reduced, and the impact force generated by the hammer head is reduced, thereby affecting the compaction quality of the slope by the compaction equipment and reducing the efficiency of slope compaction due to the increase in the number of compaction times due to the reduction in impact force.

[0008] In addition, the time required for a single impact of the compaction equipment on different flat ground or slopes is different. When the impact force of the upper hammer head of the compaction equipment is the same, the time required for a single impact of the compaction equipment is currently determined by the buffering capacity of the buffer plate, and the buffering capacity of the buffer plate is not adjustable.

[0009] The present invention designs a compaction device for a road bridge head to solve the above problems. Summary of the invention

[0010] Based on this, it is necessary to provide a tamping device for road bridge heads in response to the problems existing in the current tamping equipment. In the present invention, after the upper hammer head of the upper hammer assembly is lifted to a certain height, the lower hammer head will be lifted together by a pull rope and the lower hammer head will be separated from the tamping pit tamped on the flat ground or slope. There is no need to lift the present invention specifically by an excavator or loader for transfer, and the present invention can be transferred parallel to the base surface on the flat ground or slope, thereby saving the lifting operation and effectively improving the tamping efficiency. At the same time, it avoids the collision of the lower hammer head with the flat ground or slope when transferring after tamping, thereby avoiding the vibration of the excavator or loader due to the collision of the lower hammer head with the flat ground or slope, and protecting the excavator or loader from damage. When the slope needs to be compacted, the lower hammer assembly in the present invention can swing a certain amplitude relative to the upper hammer assembly under the drive of the third hydraulic cylinder. The degree is to adapt to the slope, while the upper hammer head in the upper hammer assembly still maintains a state of vertical movement, and the height of the upper hammer head remains almost unchanged, thereby ensuring that the upper hammer head still has sufficient gravitational potential energy to generate effective impact force when the lower hammer head tamps the slope. If the slope is steep, the excavator can be used to fine-tune the present invention so that the height of the upper hammer head in the upper hammer assembly is slightly reduced without affecting the upper hammer head having sufficient gravitational potential energy to generate effective impact force. The cooperation between the buffer assembly and the lower hammer assembly in the present invention can buffer and absorb the impact component force generated by the lower hammer head tamping the slope along the slope when tamping the slope, and the impact component force generated along the slope when the lower hammer head tamps the slope is buffered and absorbed by the present invention itself and the impact component force will not be transmitted to the excavator or loader, thereby achieving the purpose of protecting the excavator or loader.

[0011] The above purpose is achieved through the following technical solutions:

[0012] A compaction device for a road bridge head, used for compacting flat ground and slopes at the bridge head, comprising:

[0013] The upper hammer assembly is used to convert gravitational potential energy into impact force for compacting the foundation; the upper hammer assembly includes a second square cylinder, which is installed at the end of the dipper arm of the excavator, an upper hammer head slides in the second square cylinder, a sliding block slides in the first sliding groove in the middle of the upper hammer head and is installed with a first spring for driving the sliding block to slide upward.

[0014] The lower hammer assembly is used to transmit the impact force generated by the upper hammer assembly to a flat foundation or a sloped foundation; the lower hammer assembly includes a guide cylinder, which is hinged between two first ears on both sides of the lower end of the second square cylinder through a round pin and swings under the drive of a third hydraulic cylinder; a lower hammer head is slidably arranged in the guide cylinder, the upper end of the lower hammer head has a round head matching the arc surface of the lower end of the upper hammer head, and a buffer pad matching the arc surface is arranged on the round head; a rotating pin is rotatably arranged in the middle swing groove of the lower hammer head, and the rotating pin is connected to the slider through a pull rope; a second top block and a first top block abutting against the side wall of the lower hammer head are slidably arranged in the lower swing end of the guide cylinder, the first top block is connected to the second top block through a second spring, and the second top block is connected to the limiting plate through a connecting rod.

[0015] The buffer assembly is used to drive the upper hammer assembly to generate impact force and to buffer and absorb the impact generated by the lower hammer assembly along the slope; the buffer assembly includes a first square cylinder sleeved on the second square cylinder, two first hydraulic cylinders for driving the upper hammer head are symmetrically installed on the top of the second square cylinder, and two inclined rods that cooperate with the limit plate and limit the downward swing range of the guide cylinder are installed on the side wall of the second square cylinder, and a locking structure is provided between the first square cylinder and the second square cylinder.

[0016] In one embodiment, the first square tube is hinged to the dipper arm of the excavator through the third lug of the outer wall thereof, and the first square tube is hinged to the bucket cylinder on the excavator through the second lug of the outer wall thereof.

[0017] In one embodiment, a wall surface of the first square tube is provided with a clearance groove matched with the second support ear, and the first square tube is connected to the inclined rod through a limiting rod.

[0018] In one embodiment, the locking structure includes three V-shaped rocker arms, the corners of the three V-shaped rocker arms are respectively hinged to the fourth ears on the three side walls of the second square tube, one end of the V-shaped rocker arm is hinged to the fifth ear on the side wall of the second square tube through a second hydraulic cylinder, and the other end of the V-shaped rocker arm has a locking hook that cooperates with the first limit strip on the first square tube.

[0019] In one embodiment, one end of the third hydraulic cylinder is hinged to the sixth support ear of the side wall of the second square cylinder, and the other end of the third hydraulic cylinder is hinged to the fixed rod of the upper swing end of the guide cylinder.

[0020] In one embodiment, two guide blocks are respectively provided on both sides of the first top block and the second top block, the guide blocks slide in the guide grooves on the inner wall of the guide cylinder, and the connecting rod slides in the second slide groove on the lower end surface of the guide cylinder.

[0021] In one of the embodiments, a soil compaction strip is provided at the lower end of the guide cylinder so that the lower end of the guide cylinder is located on a flat or sloping foundation surface.

[0022] In one embodiment, baffles are installed on the upper and lower sides of the first top block to prevent soil from entering the guide cylinder.

[0023] In one of the embodiments, a second limiting strip is provided on the side wall of the lower hammer head to prevent the lower hammer head from falling off the guide cylinder downward.

[0024] In one embodiment, a steel sheet is provided on the upper surface of the buffer pad, and a movable groove is provided on the steel sheet and the buffer pad to allow the pull rope to swing. The two ends of the steel sheet are respectively fixed to the round head by bolts, and the round head is provided with a groove threadedly connected to the bolt on the corresponding end of the steel sheet, and there is a gap between the inner wall of the groove and the corresponding end of the steel sheet.

[0025] The beneficial effects of the present invention are:

[0026] The upper hammer head of the upper hammer assembly in the present invention, after being raised to a certain height, will drive the lower hammer head to be raised together through a pull rope and make the lower hammer head leave the tamping pit tamped on the flat ground or slope. There is no need to lift the present invention by an excavator or loader for transfer, and it can be transferred parallel to the base surface on the flat ground or slope, thereby saving the lifting operation and effectively improving the compaction efficiency. At the same time, it avoids the collision of the lower hammer head with the flat ground or slope when transferring after tamping, thereby avoiding the vibration of the excavator or loader due to the collision of the lower hammer head with the flat ground or slope, thereby protecting the excavator or loader from damage.

[0027] When it is necessary to compact the slope, the lower hammer assembly in the present invention can be driven by the third hydraulic cylinder to swing a certain amplitude relative to the upper hammer assembly to adapt to the slope, while the upper hammer head in the upper hammer assembly still maintains a vertical movement state, and the height of the upper hammer head remains almost unchanged, thereby ensuring that the upper hammer head still has sufficient gravitational potential energy to generate effective impact force when the lower hammer head compacts the slope. If the slope is steep, the present invention can be fine-tuned by the excavator so that the height of the upper hammer head in the upper hammer assembly is slightly reduced without affecting the upper hammer head having sufficient gravitational potential energy to generate effective impact force.

[0028] The cooperation between the buffer assembly and the lower hammer assembly in the present invention can buffer and absorb the impact component force generated along the slope when the lower hammer head hits the slope when tamping the slope, and the impact component force generated along the slope when the lower hammer head hits the slope is buffered and absorbed by the present invention itself and will not be transmitted to the excavator or loader, thereby achieving the purpose of protecting the excavator or loader. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a schematic diagram of the compaction of the flat ground and slope at the bridge head by a traditional compactor;

[0030] Figure 2 It is a schematic diagram of the connection between the present invention and the excavator;

[0031] Figure 3 It is a cross-sectional view of the present invention for compacting flat land and slopes;

[0032] Figure 4 It is a schematic diagram of two viewing angles of the present invention;

[0033] Figure 5 It is a cross-sectional view of the buffer assembly, the upper hammer assembly and the lower hammer assembly in the present invention;

[0034] Figure 6 is an overall cross-sectional view of the present invention;

[0035] Figure 7 is a cross-sectional view of the lower end structure of the present invention;

[0036] Figure 8 It is the first square tube upper structure and its cross-sectional view in the present invention;

[0037] Fig. 9 It is the second square tube upper structure and its cross-sectional view in the present invention;

[0038] Fig.10 This is a cross-sectional view of the structure of the upper hammer head in the present invention;

[0039] Fig.11 It is a cross-sectional view of the structure of the guide tube in the present invention;

[0040] Fig.12 1. It is a schematic diagram of the cooperation between the first top block and the second top block;

[0041] Fig.13 It is the structure on the lower hammer head and its cross-sectional view;

[0042] Name of the label in the figure:

[0043] 100, buffer assembly; 101, first square tube; 102, clearance groove; 103, first limit bar; 104, first hydraulic cylinder; 105, limit rod; 106, inclined rod;

[0044] 200, upper hammer assembly; 201, second square tube; 202, first ear; 203, second ear; 204, third ear; 205, fourth ear; 206, fifth ear; 207, sixth ear; 210, V-shaped swing arm; 211, second hydraulic cylinder; 212, upper hammer head; 213, arc surface; 214, first slide groove; 215, slider; 216, first spring;

[0045] 300, lower hammer assembly; 301, guide cylinder; 302, guide groove; 303, second slide groove; 304, soil pressing strip; 305, fixing rod; 306, round pin; 307, lower hammer head; 308, round head; 309, swing groove; 310, groove; 312, rotating pin; 313, second limit strip; 314, buffer pad; 315, steel sheet; 316, bolt; 317, first top block; 318, guide block; 319, baffle; 320, second top block; 321, second spring; 322, connecting rod; 323, limit plate; 324, third hydraulic cylinder; 325, pull rope;

[0046] 401, flat ground; 402, slope; 403, excavator; 404, bucket arm; 405, bucket cylinder; 406, bridge. DETAILED DESCRIPTION

[0047] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below through embodiments and in conjunction with the accompanying drawings. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0048] The serial numbers assigned to the components herein, such as "first", "second", etc., are only used to distinguish the objects described and do not have any order or technical meaning. The "connection" and "coupling" mentioned in this application, unless otherwise specified, include direct and indirect connections (couplings). In the description of the present invention, it should be understood that the orientation or position relationship indicated by the terms "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", etc. are based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation to the present invention.

[0049] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0050] like Figure 1-13 As shown, a compaction device for a road bridge head is used for compacting a flat ground 401 and a slope 402 at the bridge head, comprising:

[0051] The upper hammer assembly 200 is used to convert gravitational potential energy into impact force for compacting the foundation; the upper hammer assembly 200 includes a second square cylinder 201, which is installed at the end of the boom 404 of the excavator 403, and an upper hammer head 212 slides in the second square cylinder 201, and a slider 215 slides in the first sliding groove 214 in the middle of the upper hammer head 212 and is installed with a first spring 216 for driving the slider 215 to slide upward.

[0052] The lower hammer assembly 300 is used to transmit the impact force generated by the upper hammer assembly 200 to the flat ground 401 foundation or the slope 402 foundation; the lower hammer assembly 300 includes a guide cylinder 301, which is hinged between the two first ears 202 on both sides of the lower end of the second square cylinder 201 through a round pin 306 and swings under the drive of the third hydraulic cylinder 324. A lower hammer head 307 is slidably arranged in the guide cylinder 301, and the upper end of the lower hammer head 307 has a round head 308 matching the lower end arc surface 213 of the upper hammer head 212. A buffer pad 314 cooperating with the arc surface 213 is arranged on the head 308, a swivel pin 312 is rotatably arranged in the middle swing groove 309 of the lower hammer head 307, and the swivel pin 312 is connected to the slider 215 through a pull rope 325, a second top block 320 and a first top block 317 abutting against the side wall of the lower hammer head 307 are slidably arranged in the lower swing end of the guide cylinder 301, the first top block 317 is connected to the second top block 320 through a second spring 321, and the second top block 320 is connected to the limiting plate 323 through a connecting rod 322.

[0053] The buffer assembly 100 is used to drive the upper hammer assembly 200 to generate impact force and buffer and absorb the impact generated by the lower hammer assembly 300 along the slope 402; the buffer assembly 100 includes a first square cylinder 101 mounted on the second square cylinder 201, and two first hydraulic cylinders 104 for driving the upper hammer head 212 are symmetrically installed on the top of the second square cylinder 201. The side wall of the second square cylinder 201 is equipped with two inclined rods 106 that cooperate with the limit plate 323 and limit the downward swing range of the guide cylinder 301, and a locking structure is provided between the first square cylinder 101 and the second square cylinder 201.

[0054] In a further embodiment, Figure 3 , 9 As shown, the first square tube 101 is hinged to the dipper arm 404 of the excavator 403 through the third lug 204 of the outer wall thereof, and the first square tube 101 is hinged to the bucket cylinder 405 on the excavator 403 through the second lug 203 of the outer wall thereof.

[0055] In a further embodiment, Figure 5 , 8 As shown, a recess 102 cooperating with the second support ear 203 is provided on the wall surface of the first square tube 101 , and the first square tube 101 is connected to the inclined rod 106 via a limiting rod 105 .

[0056] In a further embodiment, Figure 5 , 9 As shown, the lock structure includes three V-shaped rocker arms 210, and the corners of the three V-shaped rocker arms 210 are respectively hinged to the fourth ears 205 on the three side walls of the second square tube 201, one end of the V-shaped rocker arm 210 is hinged to the fifth ear 206 on the side wall of the second square tube 201 through the second hydraulic cylinder 211, and the other end of the V-shaped rocker arm 210 has a lock hook that cooperates with the first limit strip 103 on the first square tube 101.

[0057] In a further embodiment, Figure 5 , 7 As shown in FIG. 11 , one end of the third hydraulic cylinder 324 is hinged to the sixth support ear 207 of the side wall of the second square cylinder 201 , and the other end of the third hydraulic cylinder 324 is hinged to the fixed rod 305 at the upper swing end of the guide cylinder 301 .

[0058] In a further embodiment, Fig.11 , 12 As shown, two guide blocks 318 are respectively provided on both sides of the first top block 317 and the second top block 320 , and the guide blocks 318 slide in the guide groove 302 on the inner wall of the guide cylinder 301 , and the connecting rod 322 slides in the second slide groove 303 on the lower end surface of the guide cylinder 301 .

[0059] In a further embodiment, Figure 3 ,11 As shown, the lower end of the guide cylinder 301 is provided with a soil compaction strip 304 so that the lower end of the guide cylinder 301 is located on the surface of the flat ground 401 or the slope 402 foundation.

[0060] In a further embodiment, Figure 5 , 12 As shown, baffles 319 are installed on the upper and lower sides of the first top block 317 to prevent soil from entering the guide cylinder 301.

[0061] In a further embodiment, Figure 5 , 13 As shown, a second limiting strip 313 is provided on the side wall of the lower hammer head 307 to prevent the lower hammer head 307 from falling off the guide cylinder 301 downward.

[0062] In a further embodiment, Figure 5 , 13 As shown, a steel sheet 315 is provided on the upper surface of the buffer pad 314, and a movable groove is provided on the steel sheet 315 and the buffer pad 314 to allow the pull rope 325 to swing. The two ends of the steel sheet 315 are respectively fixed to the round head 308 by bolts 316, and the round head 308 is provided with a groove 310 threadedly connected to the bolt 316 on the corresponding end of the steel sheet 315, and there is a gap between the inner wall of the groove 310 and the corresponding end of the steel sheet 315.

[0063] The operation process of the present invention is as follows:

[0064] In the initial state, the present invention is vertically suspended, the upper hammer 212 is located in the second square tube 201, the first spring 216 is in a stretched state, the pull rope 325 is in a straightened state, the second limit strip 313 at the upper end of the lower hammer 307 is against the guide tube 301 and the lower end of the lower hammer 307 protrudes from the guide tube 301, the locking hooks on the three rocker arms are hooked with the first limit strip 103 on the first square tube 101 and are in a locked state for the first square tube 101 and the second square tube 201, the top inside the first square tube 101 is against the top of the second square tube 201, the second spring 321 is in a compressed state, the second top block 320 is against the inner wall of the guide tube 301, the limit plate 323 is separated from the two inclined rods 106, and the central axis of the guide tube 301 is in a vertical state.

[0065] When it is necessary to tamp the flat ground 401 foundation at the bridge head, first start the three second hydraulic cylinders 211 to drive the corresponding rocker arms to unlock the first square cylinder 101 and the second square cylinder 201, and drive the present invention to be placed in a vertical state on the flat ground 401 foundation through the dipper arm 404 of the excavator 403, and the lower hammer head 307 moves upward under the action of the foundation, so that the lower end of the lower hammer head 307 is flush with the lower end of the guide cylinder 301, and the second limit strip 313 on the lower hammer head 307 is separated from the guide cylinder 301 and is at a large distance, and the lower end of the guide cylinder 301 is against the flat ground 401 foundation, and during the upward movement of the lower hammer head 307, the slider 215 continues to straighten the pull rope 325 under the action of the first spring 216.

[0066] Then, the two first hydraulic cylinders 104 are started, and the two first hydraulic cylinders 104 simultaneously drive the upper hammer head 212 to move upward. During the upward movement of the upper hammer head 212, the slider 215 is pulled by the pull rope 325 under the action of the lower hammer head 307 and remains stationary, and the first spring 216 continues to stretch. When the slider 215 reaches the bottom of the first slide groove 214, the upper hammer head 212 reaches a certain height and has a large gravitational potential energy, driving the two first hydraulic cylinders 104 to run in the opposite direction. The two first hydraulic cylinders 104 drive the upper hammer head 212 to move downward rapidly and accelerate. During the downward movement of the upper hammer head 212, the slider 215 slides upward in the first slide groove 214 under the action of the first spring 216 and keeps the pull rope 325 in a straight state at all times.

[0067] When the upper hammer 212 meets the buffer pad 314 on the lower hammer 307, the lower hammer 307 tamps the foundation of the flat ground 401 under the hammering of the upper hammer 212 and enters a certain depth of the foundation of the flat ground 401. During the process of the lower hammer 307 tamping the foundation of the flat ground 401, the upper hammer 212 rams and squeezes the buffer pad 314, so that there is an impact time between the upper hammer 212 and the lower hammer 307, and the impact time can be adjusted by adjusting the thickness of the buffer pad 314. The longer the impact time, the lower hammer 307 can convert more kinetic energy of the upper hammer 212 into impact force on the foundation of the flat ground 401, and the impact efficiency is higher, otherwise the impact efficiency is lower.

[0068] The thickness of the cushion pad 314 is adjusted as follows:

[0069] The bolt 316 on one side corresponding to the groove 310 on the lower hammer 307 is rotated, and the bolt 316 drives the steel sheet 315 to further squeeze or further relax the buffer pad 314, so that the buffer pad 314 becomes thinner or thicker, and the bolt 316 can be stopped from rotating after the thickness of the buffer pad 314 reaches the required thickness. The thinner the buffer pad 314 is, the shorter the impact buffering time of the upper hammer 212 is, and the thicker the buffer pad 314 is, the longer the impact buffering time of the upper hammer 212 is.

[0070] When the lower hammer 307 finishes compacting the foundation of the flat ground 401 in a single time, the two first hydraulic cylinders 104 drive the upper hammer 212 to move upward. During the movement of the upper hammer 212, the pull rope 325 remains in a straight state. When the upper hammer 212 reaches a certain height, the slider 215 reaches the bottom of the first slide 214, and the upper hammer 212 continues to move upward by a certain amplitude under the drive of the two first hydraulic cylinders 104. The upper hammer 212 drives the lower hammer 307 to move upward by a certain amplitude through the slider 215 and the pull rope 325, so that the lower end of the lower hammer 307 shrinks into the guide cylinder 301 and leaves the ramming pit on the foundation of the flat ground 401 produced by the ramming of the lower hammer 307. Then, the dipper arm 404 of the excavator 403 drives the present invention to move horizontally to the next ramming point. The retraction of the lower hammer 307 into the guide cylinder 301 can avoid the collision of the lower hammer 307 with the edge of the ramming pit, thereby preventing the excavator 403 from vibrating, thereby achieving the purpose of protecting the excavator 403.

[0071] When the present invention is translated to a new tamping point by the excavator 403, the tamping of the new tamping point is completed according to the above process. In the process of each hammering of the upper hammer head 212 on the lower hammer head 307, since the first square cylinder 101 and the second square cylinder 201 are unlocked, the vertical vibration generated by the hammering of the upper hammer head 212 and the lower hammer head 307 will be transmitted in reverse to the first square cylinder 101, so that the square cylinder will have a slight relative movement relative to the second square cylinder 201, thereby realizing the self-absorption of the vibration generated by the impact by the present invention itself and not transmitting it to the excavator 403, thereby achieving the purpose of protecting the excavator 403.

[0072] After the present invention has finished compacting the flat ground 401 , the two first hydraulic cylinders 104 are started to drive the upper hammer 212 to reset. After the guide cylinder 301 swings back to reset, the three second hydraulic cylinders 211 are started to drive the swing rod to complete the locking of the first square cylinder 101 and the second square cylinder 201 .

[0073] When the present invention is needed to tamp the foundation of the bridgehead slope 402 of the bridge 406, first start the three second hydraulic cylinders 211 to drive the corresponding swing arms to unlock the first square cylinder 101 and the second square cylinder 201, and drive the present invention to be transferred to the top of the tamping point of the foundation of the slope 402 in a vertical state through the dipper arm 404 of the excavator 403, and start the third hydraulic cylinder 324 to drive the guide cylinder 301 to swing a certain amplitude relative to the second square cylinder 201, so that the lower end surface of the lower hammer head 307 is parallel to the slope 402, and the two sides of the limit plate 323 are respectively against the two inclined rods 106, and the second top block 320 moves a certain amplitude in the direction of the first top block 317 under the interaction of the inclined rod 106 and the limit plate 323 and further compresses the second spring 321.

[0074] The present invention is placed on the tamping point on the slope 402 by the excavator 403, and the lower hammer head 307 moves upward under the action of the foundation, so that the lower end of the lower hammer head 307 is flush with the lower end of the guide cylinder 301, and the second limit strip 313 on the lower hammer head 307 is separated from the guide cylinder 301 and is at a large distance, and the lower end of the guide cylinder 301 is against the foundation of the flat ground 401. During the upward movement of the lower hammer head 307, the slider 215 continues to straighten the pull rope 325 under the action of the first spring 216.

[0075] Then, the two first hydraulic cylinders 104 are started, and the two first hydraulic cylinders 104 simultaneously drive the upper hammer head 212 to move upward. During the upward movement of the upper hammer head 212, the slider 215 is pulled by the pull rope 325 under the action of the lower hammer head 307 and remains stationary, and the first spring 216 continues to stretch. When the slider 215 reaches the bottom of the first slide groove 214, the upper hammer head 212 reaches a certain height and has a large gravitational potential energy, driving the two first hydraulic cylinders 104 to run in the opposite direction. The two first hydraulic cylinders 104 drive the upper hammer head 212 to move downward rapidly and accelerate. During the downward movement of the upper hammer head 212, the slider 215 slides upward in the first slide groove 214 under the action of the first spring 216 and keeps the pull rope 325 in a straight state at all times.

[0076] When the upper hammer 212 meets the buffer pad 314 on the lower hammer 307, the lower hammer 307 tamps the foundation of the slope 402 under the hammering of the upper hammer 212 and enters the foundation of the slope 402 to a certain depth. During the process of the lower hammer 307 tamping the foundation of the slope 402, the upper hammer 212 rams and squeezes the buffer pad 314, so that there is an impact time between the upper hammer 212 and the lower hammer 307, and the impact time can be adjusted by adjusting the thickness of the buffer pad 314. The longer the impact time, the lower hammer 307 can convert more kinetic energy of the upper hammer 212 into impact force on the foundation of the flat ground 401, and the impact efficiency is higher, otherwise the impact efficiency is lower.

[0077] During the process of the lower hammer 307 compacting the foundation of the slope 402, the impact force received by the lower hammer 307 can be decomposed into an impact component along the direction perpendicular to the slope 402 and an impact component along the direction of the slope 402. The impact component along the direction of the slope 402 will drive the first top block 317 to move and compress the second spring 321. The second spring 321 transmits the impact force to the first square tube 101 through the second top block 320, the limiting plate 323, the inclined rod 106 and the limiting rod 105, and pulls down the first square tube 101. On the contrary, the first square cylinder 101 moves upward under the reverse drive of the two first hydraulic cylinders 104. The first square cylinder 101 will buffer and offset the impact component force generated by the lower hammer head 307 along the slope 402 direction through the inclined rod 106, the limit plate 323, the second top block 320, the second spring 321 and the first top block 317, so as to prevent the lower hammer head 307 from forming a lateral impact on the guide cylinder 301, thereby preventing the guide cylinder 301 from vibrating due to the impact, thereby achieving the purpose of protecting the excavator 403.

[0078] During the compaction process of the slope 402, since the upper hammer head 212 still moves in the vertical direction and its height relative to the lower hammer head 307 remains basically unchanged, the impact force generated by the upper hammer head 212 converting gravitational potential energy into kinetic energy remains basically unchanged, thereby improving the compaction efficiency of the slope 402.

[0079] When the lower hammer 307 finishes compacting the foundation of the slope 402 in a single operation, the two first hydraulic cylinders 104 drive the upper hammer 212 to move upward. During the movement of the upper hammer 212, the pull rope 325 remains in a straight state. When the upper hammer 212 reaches a certain height, the slider 215 reaches the bottom of the first slide 214, and the upper hammer 212 continues to move upward by a certain amplitude under the drive of the two first hydraulic cylinders 104. The upper hammer 212 drives the lower hammer 307 to move upward by a certain amplitude through the slider 215 and the pull rope 325, so that the lower end of the lower hammer 307 shrinks into the guide cylinder 301 and leaves the ramming pit on the foundation of the slope 402 produced by the ramming of the lower hammer 307. Then, the dipper arm 404 of the excavator 403 drives the present invention to move horizontally to the next ramming point. The retraction of the lower hammer 307 into the guide cylinder 301 can avoid the collision of the lower hammer 307 with the edge of the ramming pit, thereby preventing the excavator 403 from vibrating, thereby achieving the purpose of protecting the excavator 403.

[0080] When the present invention is translated by the excavator 403 to a new tamping point on the slope 402, the tamping of the new tamping point is completed according to the above process. In the process of each hammering of the upper hammer head 212 on the lower hammer head 307, since the lock between the first square cylinder 101 and the second square cylinder 201 is released, the vertical vibration generated by the hammering between the upper hammer head 212 and the lower hammer head 307 will also be transmitted in reverse to the first square cylinder 101, so that the square cylinder will have a slight relative movement with respect to the second square cylinder 201, thereby realizing the self-absorption of the vibration generated by the impact by the present invention itself and not transmitting it to the excavator 403, thereby achieving the purpose of protecting the excavator 403.

[0081] When the present invention completes compaction of the slope 402, the third hydraulic cylinder 324 is started to drive the guide cylinder 301 to swing back and reset, and the two first hydraulic cylinders 104 are started to drive the upper hammer head 212 to reset. After the guide cylinder 301 swings back and resets, the three second hydraulic cylinders 211 are started to drive the swing rod to complete the locking of the first square cylinder 101 and the second square cylinder 201.

Claims

1. A compaction device for road bridgeheads, used for compacting flat ground and slopes at bridgeheads, characterized in that: include: The upper hammer assembly is used to convert the gravitational potential energy into the impact force for compacting the foundation; the upper hammer assembly includes a second square tube, the second square tube is installed at the end of the dipper arm of the excavator, an upper hammer head slides in the second square tube, a slider slides in the first sliding groove in the middle of the upper hammer head and is installed with a first spring for driving the slider to slide upward; The lower hammer assembly is used to transmit the impact force generated by the upper hammer assembly to a flat foundation or a sloped foundation; the lower hammer assembly includes a guide cylinder, which is hinged between two first ears on both sides of the lower end of the second square cylinder through a round pin and swings under the drive of a third hydraulic cylinder, a lower hammer head is slidably arranged in the guide cylinder, the upper end of the lower hammer head has a round head matching the arc surface of the lower end of the upper hammer head, and a buffer pad matching the arc surface is arranged on the round head, a rotating pin is rotatably arranged in the middle swing groove of the lower hammer head, and the rotating pin is connected to the slider through a pull rope, a second top block and a first top block abutting against the side wall of the lower hammer head are slidably arranged in the lower swing end of the guide cylinder, the first top block is connected to the second top block through a second spring, and the second top block is connected to the limiting plate through a connecting rod; The buffer assembly is used to drive the upper hammer assembly to generate impact force and to buffer and absorb the impact generated by the lower hammer assembly along the slope; the buffer assembly includes a first square cylinder sleeved on the second square cylinder, two first hydraulic cylinders for driving the upper hammer head are symmetrically installed on the top of the second square cylinder, and two inclined rods that cooperate with the limit plate and limit the downward swing range of the guide cylinder are installed on the side wall of the second square cylinder, and a locking structure is provided between the first square cylinder and the second square cylinder.

2. A compaction device for a road bridge head according to claim 1, characterized in that: The first square tube is hinged to the bucket arm of the excavator through the third lug on the outer wall thereof, and the first square tube is hinged to the bucket cylinder on the excavator through the second lug on the outer wall thereof.

3. A compaction device for a road bridge head according to claim 2, characterized in that: A clearance groove matched with the second support ear is provided on the wall surface of the first square tube, and the first square tube is connected with the oblique rod through a limiting rod.

4. The compaction equipment for road bridge head according to claim 1, characterized in that: The locking structure includes three V-shaped rocker arms, the corners of the three V-shaped rocker arms are respectively hinged to the fourth ears on the three side walls of the second square tube, one end of the V-shaped rocker arm is hinged to the fifth ear on the side wall of the second square tube through the second hydraulic cylinder, and the other end of the V-shaped rocker arm is provided with a locking hook that cooperates with the first limit strip on the first square tube.

5. The compaction equipment for road bridge head according to claim 1, characterized in that: One end of the third hydraulic cylinder is hinged to the sixth support ear of the side wall of the second square cylinder, and the other end of the third hydraulic cylinder is hinged to the fixed rod of the upper swing end of the guide cylinder.

6. The compaction equipment for road bridge head according to claim 1, characterized in that: Two guide blocks are respectively arranged on both sides of the first top block and the second top block. The guide blocks slide in the guide grooves on the inner wall of the guide cylinder, and the connecting rod slides in the second slide groove on the lower end surface of the guide cylinder.

7. The compaction equipment for road bridge head according to claim 1, characterized in that: The lower end of the guide cylinder is provided with a soil pressing strip which enables the lower end of the guide cylinder to be located on a flat ground or a slope foundation surface.

8. The compaction equipment for road bridge head according to claim 1, characterized in that: Baffles are installed on the upper and lower sides of the first top block to prevent soil from entering the guide cylinder.

9. The compaction equipment for road bridge head according to claim 1, characterized in that: A second limiting strip is arranged on the side wall of the lower hammer head to prevent the lower hammer head from falling off the guide cylinder downward.

10. The compaction equipment for road bridge head according to claim 1, characterized in that: A steel sheet is provided on the upper surface of the buffer pad, and a movable groove is provided on the steel sheet and the buffer pad to allow the pull rope to swing. The two ends of the steel sheet are respectively fixed to the round head by bolts. The round head is provided with a groove threadedly connected to the bolt on the corresponding end of the steel sheet, and there is a gap between the inner wall of the groove and the corresponding end of the steel sheet.