Real-time settlement management method based on distribution network engineering

By evaluating the completion degree of the distribution network project and the real-time settlement impact coefficient, real-time settlement management is optimized, the problem of insufficient data in the distribution network project is solved, and the accuracy and efficiency of settlement management are improved.

CN118428903BActive Publication Date: 2024-10-01ECONOMIC TECH RES INST OF STATE GRID ANHUI ELECTRIC POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410809252.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-21
Publication Date
2024-10-01
Estimated Expiration
2044-06-21

AI Technical Summary

Technical Problem

The existing technology lacks analysis of material-related physical parameters in real-time settlement management in distribution network projects, resulting in insufficient data to support discrete graph drawing and fitting straight line slope analysis, which in turn affects the accuracy of estimated completion quantities.

Method used

By obtaining information related to the completion status of distribution network projects, evaluate project completion, and determine the real-time settlement impact coefficients of construction implementation projects, completed projects, and unplanned operations respectively, comprehensively analyze real-time settlement management satisfaction, and optimize distribution network projects. Real-time settlement management.

Benefits of technology

It improves the accuracy of real-time settlement data, shortens the settlement cycle, allows managers to make faster and more accurate decisions during the project construction process, and ensures accurate management operations of different project types.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118428903B_ABST
    Figure CN118428903B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of real-time settlement, and specifically discloses a real-time settlement management method based on a distribution network project. The method comprises the following steps: firstly evaluating the completion degree of the distribution network project; respectively determining the real-time settlement influence coefficient of the construction implementation project, the real-time settlement influence coefficient of the completed project and the real-time settlement influence coefficient of the unplanned operation, comprehensively analyzing the satisfaction of the real-time settlement management of the distribution network project, optimizing the real-time settlement management of the distribution network project, accurately grasping the real-time settlement situation of the distribution network project, improving the satisfaction of the settlement management personnel of the distribution network project with the real-time settlement management, and timely discovering the situation that the distribution network project has wasted resources due to insufficient real-time settlement management, thereby optimizing the resource allocation of the distribution network project and improving the management quality of the real-time settlement in the distribution network project.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of real-time settlement, and in particular to a real-time settlement management method based on a distribution network project. Background Art

[0002] Currently, real-time settlement involves a large amount of data transmission and processing. If security measures are not in place, it may lead to data leakage or theft, posing a threat to the operation and management of the project. Moreover, in the field of distribution network engineering, the maturity of data management needs to be improved. Therefore, it is necessary to introduce a new real-time settlement technology to reduce the risk of settlement data leakage or theft in distribution network projects. By processing the data of real-time settlement of the project, the satisfaction of the settlement managers of the distribution network project with the real-time settlement management can be obtained, thereby improving the maturity of real-time settlement management.

[0003] For example, the invention patent with announcement number CN116757458B involves the field of construction material management, and is used to solve the problem of serious waste of steel bar raw materials in construction, resulting in high steel bar loss and arbitrary steel bar cutting, resulting in a high proportion of steel bar processing loss. Specifically, it is a refined management system for construction site materials based on data analysis; in the above application, by settling the actual usage in real time during the construction process, it is possible to promptly discover abnormal material loss and make adjustments, and at the same time, the material loss at the current stage can be used to estimate the overall material consumption of the project. By comprehensively analyzing and calculating the overall material usage and design usage after completion, the final material loss, material use and unreasonable cutting of the project can be analyzed, which is conducive to continuously improving the material utilization rate in the project. By counting the recovery of residual materials, the loss of construction materials is divided into unreasonable cutting loss and material use loss, so that management personnel can understand the respective proportions of cutting loss and use loss.

[0004] However, in the process of implementing the above-mentioned application embodiments, the present application discovered that the above-mentioned technology has at least the following technical problems: when the above-mentioned application estimates the total amount of construction material consumption in a discrete graph and draws a fitting straight line in the discrete graph, and analyzes the slope of the fitting straight line, it lacks analysis of the relevant physical parameters of the material, which makes the obtained data insufficient to support the drawing of the discrete graph; and the data processing method of using the discrete graph to analyze the slope of the fitting straight line will cause the management personnel to be inaccurate and deviate when estimating changes in the completion amount. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides a real-time settlement management method based on distribution network engineering, which can effectively solve the problems involved in the above-mentioned background technology.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: The present invention provides a real-time settlement management method based on distribution network projects, including: obtaining relevant information on the completion status of distribution network projects, evaluating the completion degree of distribution network projects, and matching construction implementation projects, completed projects, and unplanned operations in the distribution network project settlement platform; obtaining real-time settlement related information of construction implementation projects, real-time settlement related information of completed projects, and real-time settlement related information of unplanned operations, respectively determining the real-time settlement impact coefficient of the construction implementation project, the real-time settlement impact coefficient of the completed project, and the real-time settlement impact coefficient of the unplanned operations, and comprehensively analyzing the real-time settlement management satisfaction of the distribution network project, and finally optimizing the real-time settlement management of the distribution network project.

[0007] As a further method, the real-time settlement management of the distribution network project is optimized, and the specific analysis process is: comparing the real-time settlement management satisfaction of the distribution network project with the real-time settlement management satisfaction threshold defined in the engineering data service platform; if the real-time settlement management satisfaction of the distribution network project is lower than the real-time settlement management satisfaction threshold, performing difference processing on the real-time settlement management satisfaction of the distribution network project and the real-time settlement management satisfaction threshold to obtain a real-time settlement management deviation value; matching the real-time settlement management deviation value with the required optimization degree corresponding to each real-time settlement management deviation value interval defined in the engineering data service platform to obtain the required optimization degree of the real-time settlement management of the distribution network project; and finally optimizing the real-time settlement management of the distribution network project.

[0008] As a further method, the real-time settlement management satisfaction of the distribution network project is specifically formulated as follows:

[0009]

[0010] in It is expressed as the satisfaction of real-time settlement management of distribution network projects. It is expressed as the influence coefficient of real-time settlement of construction implementation project, It is expressed as the influence coefficient of the real-time settlement of completed projects. It is expressed as the coefficient of influence of real-time settlement of unplanned operations. It is represented by the weight factor corresponding to the predefined construction implementation project real-time settlement impact coefficient, It is represented by the weight factor corresponding to the predefined coefficient of influence of the real-time settlement of completed projects. It is expressed as the weight factor corresponding to the predefined coefficient of influence of real-time settlement of unplanned operations, and e is a natural constant.

[0011] As a further method, the influence coefficient of real-time settlement of construction implementation project is specifically analyzed as follows: according to the relevant information of real-time settlement of construction implementation project, the average engineering tax rate of the construction implementation project within the set real-time settlement period, the total implementation cost of various soil types and the total transportation cost of various transportation channels are extracted; from the engineering data service platform, the reference value of engineering tax rate, the reference implementation cost of various soil types and the reference transportation cost of various transportation channels are extracted to comprehensively analyze the influence coefficient of real-time settlement of construction implementation project.

[0012] As a further method, the impact coefficient of real-time settlement of completed projects is specifically analyzed as follows: based on the relevant information of real-time settlement of completed projects, the total project tax rate, construction fee discount rate and supervision fee discount rate of the completed projects are extracted; from the project data service platform, the project definition tax rate, construction fee discount reference rate and supervision fee discount reference rate are extracted, and the impact coefficient of real-time settlement of completed projects is comprehensively analyzed.

[0013] As a further method, the specific analysis process of the impact coefficient of real-time settlement of unplanned operations is as follows: based on the related information of real-time settlement of unplanned operations, the engineering quota tax rate and design fee discount rate of unplanned operations within the set real-time settlement period of unplanned operations are extracted; from the engineering data service platform, the engineering quota definition tax rate and design fee discount reference rate are extracted, and the impact coefficient of real-time settlement of unplanned operations is comprehensively analyzed.

[0014] As a further method, the matching obtains the construction implementation projects, completed projects and unplanned operations in the distribution network engineering settlement platform, and the specific matching process is: if the value of the distribution network project completion degree is in the first interval, the distribution network project is matched as the construction implementation project in the distribution network engineering settlement platform; if the value of the distribution network project completion degree is in the second interval, the distribution network project is matched as the completed project in the distribution network engineering settlement platform; otherwise, the distribution network project is matched as the unplanned operation in the distribution network engineering settlement platform.

[0015] As a further method, the distribution network project completion degree is specifically analyzed by the formula:

[0016] ,in It is expressed as the completion degree of distribution network project. It is expressed as the distribution network engineering quality impact coefficient, It is expressed as the coefficient of influence on the benefits of distribution network engineering, Expressed as a weight factor corresponding to the predefined quality impact coefficient, It is expressed as the weight factor corresponding to the predefined benefit impact coefficient, and e is a natural constant.

[0017] As a further method, the distribution network project completion status related information includes distribution network project quality related information and distribution network project benefit related information. By analyzing the distribution network project quality related information and the distribution network project benefit related information, the distribution network project quality impact coefficient and the distribution network project benefit impact coefficient are obtained respectively.

[0018] Compared with the prior art, the embodiments of the present invention have at least the following advantages or beneficial effects:

[0019] (1) The present invention provides a real-time settlement management method based on a distribution network project. First, the completion degree of the distribution network project is evaluated; the real-time settlement impact coefficient of the construction implementation project, the real-time settlement impact coefficient of the completed project and the real-time settlement impact coefficient of the unplanned operation are determined respectively, and the real-time settlement management satisfaction of the distribution network project is comprehensively analyzed. The real-time settlement management of the distribution network project is optimized, and data processing of the real-time settlement management of the distribution network project is performed in multiple dimensions to improve the accuracy of the real-time settlement data. The various coefficients are comprehensively analyzed through information analysis technology, so as to realize rapid data collection, analysis and processing, greatly shorten the settlement cycle, and enable real-time settlement management personnel to make faster and more accurate decisions during the construction of the distribution network project.

[0020] (2) The present invention obtains the relevant information on the completion status of the distribution network project, evaluates the completion degree of the distribution network project, and matches the construction implementation projects, completed projects and unplanned operations in the distribution network project settlement platform. It can timely grasp the completion status of the distribution network project and match a variety of project types. Different project types will adopt corresponding real-time settlement plans, providing accurate data support for the subsequent determination of the real-time settlement management satisfaction of the distribution network project, ensuring that the multiple project types matched by the distribution network project can accurately perform management and settlement operations.

[0021] (3) The present invention comprehensively analyzes the satisfaction with the real-time settlement management of the distribution network project by determining the influence coefficient of the real-time settlement of the construction implementation project, the influence coefficient of the real-time settlement of the completed project, and the influence coefficient of the real-time settlement of the unplanned operation. By optimizing the satisfaction with the real-time settlement management of the distribution network project, it is possible to understand the situations in which the real-time settlement in the distribution network project needs further adjustment, and timely take corresponding measures to optimize the real-time settlement of the distribution network project, thereby improving the management efficiency of the real-time settlement in the distribution network project. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The present invention is further described using the accompanying drawings, but the embodiments in the accompanying drawings do not constitute any limitation to the present invention. A person skilled in the art can obtain other drawings based on the following drawings without creative work.

[0023] Figure 1 The figure is a schematic flow chart of the method steps of the present invention. DETAILED DESCRIPTION

[0024] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0025] Reference Figure 1 As shown, the present invention provides a real-time settlement management method based on distribution network projects, including: obtaining relevant information on the completion status of distribution network projects, evaluating the completion degree of distribution network projects, and matching construction implementation projects, completed projects, and unplanned operations in the distribution network project settlement platform.

[0026] The above-mentioned distribution network engineering settlement platform is the distribution network engineering settlement system.

[0027] Specifically, the distribution network project completion status related information includes distribution network project quality related information and distribution network project benefit related information. By analyzing the distribution network project quality related information and the distribution network project benefit related information, the distribution network project quality impact coefficient and the distribution network project benefit impact coefficient are obtained respectively.

[0028] According to the quality-related information of the distribution network project, the consumption quantity, consumption weight, average consumption speed of various raw materials and the power supply power of the distribution network project within the set detection period are extracted. The consumption quantity, consumption weight and average consumption speed of various raw materials are comprehensively analyzed to obtain the raw material consumption compliance of the distribution network project. The specific analysis formula is as follows:

[0029] ,in It is expressed as the compliance of raw material consumption of distribution network projects. It is expressed as the consumption quantity of various raw materials in the distribution network project. Represents the set consumption reference quantity, It is expressed as the consumption weight of various raw materials in the distribution network project. Expressed as the set consumption reference weight, It is expressed as the average consumption rate of various raw materials in the distribution network project. Indicates the set consumption reference average speed.

[0030] The various raw materials for the above-mentioned distribution network project include but are not limited to conductors, cables, insulators and cable terminals.

[0031] In this embodiment, the power supply power within the set detection period can be measured by using a multimeter to measure the current output to the power-consuming device and the output voltage of the power supply of the distribution network engineering during the detection period. The product of these two parameters is the power supply power.

[0032] From the engineering data service platform, the reference compliance of raw material consumption, the power supply definition power and the power operation definition stability are extracted.

[0033] Comprehensively analyze the distribution network project quality impact coefficient. In a specific embodiment, the quality data of previous distribution network projects, including quality accidents, quality problems, etc., can be collected and analyzed through historical data analysis methods. Through statistical analysis technology, the key factors affecting the quality of distribution network projects can be identified. According to the frequency of occurrence and impact of the key factors, the distribution network project quality impact coefficient can be obtained.

[0034] Furthermore, the distribution network project quality impact coefficient, in this embodiment, is obtained by comprehensive analysis of the raw material consumption compliance of the distribution network project, the power supply power within a set detection cycle, and the power operation stability, so as to determine the value of the distribution network project quality impact. In this embodiment, a more accurate calculation method is used to obtain it, and the specific expression is:

[0035]

[0036] in It is expressed as the coefficient of influence on the quality of the distribution network project. In this embodiment, when the raw material consumption compliance is too small, it may lead to insufficient materials required for the project, thereby affecting the quality of the project. For example, the performance of the equipment may not meet the design requirements; excessive raw material consumption directly increases the project cost, which may lead to project budget overruns and affect the economic benefits of the project; if the power supply is insufficient and cannot meet the actual needs of the distribution network project, it will lead to problems such as insufficient power supply and voltage fluctuations, which will not only affect the normal power consumption of power grid users, but also may cause damage to power-consuming equipment; when the power operation is unstable, it may cause voltage fluctuations, frequency deviations and other problems, which will also affect the normal operation of power-consuming equipment. Unstable power operation may also cause chain failures, expand the scope of failures, and cause greater damage to the distribution network project; In summary, the raw material quality compliance, power supply power and power operation stability have a significant negative impact on the coefficient of influence on the quality of the distribution network project. In order to ensure the quality and reliability of the distribution network project, it is necessary to strictly control the quality of raw materials, optimize the power supply configuration, and improve the stability of power operation, so as to reduce the negative impact of these factors on the coefficient of influence on the quality of the project.

[0037] Expressed as the compliance of raw material consumption of distribution network projects, it refers to the degree to which the raw materials used in distribution network projects comply with relevant standards and regulations in terms of consumption quantity. This involves the consumption quantity, consumption weight, and average consumption rate of raw materials, ensuring that material consumption can meet the design requirements and operating conditions of the distribution network project.

[0038] Expressed as reference compliance of raw material consumption, it refers to the standard compliance of raw material consumption.

[0039] It is expressed as the power supply of the distribution network project within the set detection period. It refers to the rate at which the distribution network power supply provides electric energy to the electrical equipment within the set detection period. The power supply is related to the capacity of the power grid, the rated power of the equipment and the needs of the users.

[0040] Indicates the power supply limit power, which refers to the minimum value allowed for the power supply.

[0041] It is expressed as the power operation stability of the distribution network project within the set detection period. The power operation stability of the distribution network project within the set detection period is obtained by obtaining the load mean value and the output voltage mean value of the distribution network project within the set detection period, and multiplying them with the influence factor of the unit value corresponding to the load mean value and the influence factor of the unit value corresponding to the output voltage mean value preset in the project data service platform, respectively.

[0042] It indicates the defined stability of power operation, which refers to the minimum value allowed for the stability of power operation.

[0043] Expressed as a correction factor corresponding to the predefined raw material consumption compliance, It is expressed as the correction factor corresponding to the predefined power supply power, It is expressed as a correction factor corresponding to the predefined power operation stability, and e is expressed as a natural constant.

[0044] Furthermore, the specific analysis process of the distribution network project benefit impact coefficient is as follows:

[0045] According to the information related to the benefits of the distribution network project, the project progress difference, investment completion difference and project parts consumption rate of the distribution network project within the set detection period are extracted, wherein the project progress difference of the distribution network project within the set detection period is obtained by performing a difference processing on the planned project volume within the detection period and the actually completed project volume within the detection period, so as to obtain the project progress difference of the distribution network project within the detection period; the investment completion difference of the distribution network project within the detection period is obtained by performing a difference processing on the budgeted investment amount within the detection period and the actual investment amount within the detection period, so as to obtain the investment completion difference of the distribution network project within the detection period; the project parts consumption rate is obtained by performing a ratio processing on the number of consumed parts and the time corresponding to the detection period, and the number of consumed parts can be directly extracted from the project inspection report.

[0046] From the engineering data service platform, the engineering progress definition difference, investment completion definition difference and engineering parts consumption reference rate are extracted.

[0047] The distribution network project benefit impact coefficient is comprehensively analyzed. In a specific embodiment, the benefit changes before and after the implementation of the distribution network project can be compared by a comparative analysis method to ensure the consistency of the comparison conditions, so as to obtain the distribution network project benefit impact coefficient.

[0048] The above-mentioned distribution network project benefit impact coefficient, in this embodiment, is obtained by comprehensive analysis of the project progress difference, investment completion difference and project parts consumption rate of the distribution network project within a set detection period. In order to determine the value of the distribution network project benefit impact, a more accurate calculation method is used in this embodiment to obtain the value, and the specific expression is:

[0049]

[0050] in It is expressed as the coefficient of the degree of influence on the benefits of the distribution network project. In this embodiment, a large difference in project progress means that the progress of the distribution network project is lagging behind and cannot be put into operation as planned, resulting in the failure to realize the originally expected benefits in a timely manner; slow project progress may lead to increased costs of the distribution network project during the construction and commissioning stages, such as increased labor costs and increased equipment rental costs; a large difference in investment completion means that there is a large deviation between the actual investment and the planned investment of the distribution network project, which may lead to reduced capital utilization efficiency; it may also lead to higher project risks for the distribution network project, such as broken capital chain, supplier cooperation problems, project quality problems, etc.; excessive consumption of accessories directly increases the material cost of the distribution network project, which may lead to The total cost of the project exceeds the budget; the consumption of accessories is too fast, which may lead to insufficient supply of accessories in the later stage of the project, thus affecting the progress of the project; when the consumption rate of accessories is low, it seems to save costs, but in fact it may lead to waste of other resources such as manpower and time due to the slow progress of the project; the slow progress of the project and the unstable consumption of accessories may increase the difficulty of distribution network project management; in summary, poor project progress, poor investment completion and the consumption rate of project accessories will have a negative impact on the coefficient of influence on the benefit of distribution network projects. In order to ensure that the distribution network project can be smoothly promoted and achieve the expected benefits, it is necessary to strengthen the progress and investment management of the distribution network project to ensure that the distribution network project is carried out as planned and the investment cost is reasonably controlled.

[0051] It is expressed as the difference in progress of the distribution network project within the set inspection period, which refers to the difference between the actual amount of work completed and the expected amount of work to be completed within the inspection period. The progress difference can be affected by many factors, including changes in construction content, environmental conditions, management level of the construction unit, coordination and communication problems, etc.

[0052] Expressed as the engineering progress boundary difference, it refers to the maximum value of the engineering progress difference.

[0053] It is expressed as the investment completion difference of the distribution network project within the set inspection period, which refers to whether the actual investment situation of the project within the inspection period meets expectations. The investment completion difference may be affected by many factors, such as inaccurate project valuation, material price fluctuations, design changes, etc.

[0054] Expressed as the investment completion difference, it refers to the maximum value allowed for the investment completion difference.

[0055] It is expressed as the consumption rate of engineering parts of the distribution network project during the detection period, which refers to the number of parts consumed per unit time in the detection period. The consumption rate of engineering parts is affected by many factors, such as construction technology, material type, and workers' technical level.

[0056] Expressed as the reference rate of engineering parts consumption, it refers to the standard rate of engineering parts consumption.

[0057] It is expressed as the correction factor corresponding to the predefined engineering progress difference, It is expressed as the correction factor corresponding to the predefined investment completion difference, It is expressed as a correction factor corresponding to the predefined consumption rate of engineering parts, and e is a natural constant.

[0058] Specifically, the completion degree of the distribution network project, in a specific embodiment, can be obtained by the bill of quantities method, which counts the completed project quantities according to the bill of quantities of the engineering design, and then compares it with the total project quantities to obtain the completion degree of the distribution network project.

[0059] The above-mentioned distribution network project completion degree, in this embodiment, is obtained by comprehensive analysis of the distribution network project quality influence coefficient and the distribution network project benefit influence coefficient, which is used to determine the distribution network project completion degree. In this embodiment, a more accurate calculation method is used to obtain it, and the specific expression is:

[0060]

[0061] in It is expressed as the completion degree of the distribution network project. In this embodiment, if the coefficient of the degree of influence of the distribution network project quality is too large, in order to ensure that the quality of the distribution network project meets the standards, more time and resources may be required to carry out quality control and correction, which will delay the progress of the project and make it impossible to complete the project according to the scheduled time node; when the benefits of the distribution network project cannot meet expectations, it may lead to the inability to effectively recover the project costs and even face the risk of losses. At the same time, in order to improve the project benefits, additional investment or other measures may be required, which will also increase the cost expenditure of the distribution network project and further affect the completion degree of the project; in summary, excessively large coefficients of the degree of influence of the quality of the distribution network project and the degree of influence of the benefits of the distribution network project will have a negative impact on the completion degree of the distribution network project. Therefore, in the management of the distribution network project, it is necessary to reasonably control the values ​​of these two coefficients to ensure that the project can be completed on time, according to quality and within budget.

[0062] It is expressed as the distribution network project quality impact coefficient, which means that the value of the distribution network project quality impact is obtained through comprehensive analysis of the raw material quality compliance of the distribution network project, the power supply power within the set detection period, and the power operation stability.

[0063] It is expressed as the coefficient of impact on the benefits of distribution network projects, which indicates that the value of the impact on the benefits of distribution network projects is obtained by comprehensively analyzing the poor progress of the distribution network projects, the poor investment completion and the consumption rate of project parts within the set detection period.

[0064] Expressed as a weight factor corresponding to the predefined quality impact coefficient, It is expressed as the weight factor corresponding to the predefined benefit impact coefficient, and e is a natural constant.

[0065] Furthermore, the matching obtains the construction implementation projects, completed projects and unplanned operations in the distribution network project settlement platform. The specific matching process is:

[0066] If the value of the distribution network project completion degree is in the first interval and shows an upward trend, the distribution network project will be matched as a construction implementation project in the distribution network project settlement platform; if the value of the distribution network project completion degree is in the second interval, the distribution network project will be matched as a completed project in the distribution network project settlement platform; otherwise, the distribution network project will be matched as an unplanned operation in the distribution network project settlement platform.

[0067] The above-mentioned first interval includes distribution network project completion values ​​between 0%-98%, and shows an upward trend; the second interval includes distribution network project completion values ​​between 99%-100%; the remaining values ​​are all matched to unplanned operations in the distribution network project settlement platform.

[0068] Obtain the real-time settlement related information of construction implementation projects, the real-time settlement related information of completed projects and the real-time settlement related information of unplanned operations, determine the real-time settlement impact coefficient of construction implementation projects, the real-time settlement impact coefficient of completed projects and the real-time settlement impact coefficient of unplanned operations respectively, and comprehensively analyze the satisfaction with the real-time settlement management of distribution network projects, and finally optimize the real-time settlement management of distribution network projects.

[0069] Specifically, the influence coefficient of the real-time settlement of the construction implementation project, the specific analysis process is as follows:

[0070] According to the real-time settlement related information of the construction implementation project, the average engineering tax rate of the construction implementation project within the set real-time settlement period, the total implementation cost of various soil types and the total transportation cost of various transportation channels are extracted. Among them, the engineering tax rate of the construction implementation project within the set real-time settlement period can be directly obtained in the construction implementation project settlement report, and the ratio processing is performed on the time corresponding to the real-time settlement period to obtain the average engineering tax rate within the real-time settlement period. The construction implementation project settlement report is automatically generated based on the engineering information report, engineering parameter report, engineering quantity verification report and other cost information reports within the real-time settlement period; the total implementation cost of various soil types of the construction implementation project within the set real-time settlement period is obtained by summarizing the implementation cost of each type of soil type extracted from the engineering parameter report. The soil types include ordinary soil, hard soil, frozen soil, etc., and the implementation cost of each soil type is different; the total transportation cost of various transportation channels of the construction implementation project within the set real-time settlement period is obtained by summarizing the implementation cost of each transportation channel extracted from the engineering parameter report. The transportation channels include human transportation, automobile transportation and ship transportation, and the implementation cost of each transportation mode is different.

[0071] From the engineering data service platform, we extract the engineering tax rate reference value, the implementation reference cost of each type of soil, and the transportation reference cost of each transportation channel.

[0072] Comprehensively analyze the influence coefficient of real-time settlement of construction implementation project. In a specific embodiment, the construction project simulation software can be used to simulate the project conditions under different real-time settlement schemes through simulation analysis method. According to the simulation results, the influence coefficient of real-time settlement of construction implementation project can be calculated.

[0073] The above-mentioned construction implementation project real-time settlement influence coefficient is obtained by comprehensive analysis of the average project tax rate of the construction implementation project within the set construction real-time settlement period, the total implementation cost of various types of soil, and the total transportation cost of various transportation channels in this embodiment. This is used to determine the value of the influence degree of the construction implementation project real-time settlement. In this embodiment, a more accurate calculation method is used to obtain it. The specific expression is:

[0074]

[0075] in It is expressed as the influence coefficient of real-time settlement of construction project implementation. In this embodiment, an excessively high average project tax rate will directly increase the tax burden of the construction enterprise, leading to an increase in construction costs; a high tax rate may also lead to tight cash flow of the construction enterprise, so that the construction enterprise tends to delay settlement to reduce the tax burden, thus affecting the promotion and application of real-time settlement; while an excessively low tax rate may cause some enterprises to reduce costs by improper means to gain competitive advantages, and an excessively low tax rate may also be detrimental to the healthy development of the construction engineering industry; when the total implementation cost of various types of soil is too high, it means that the construction unit needs to invest more funds in soil treatment, which may lead to the risk of capital shortage for the construction unit, thereby affecting the smooth progress of real-time settlement; when the total implementation cost of various types of soil is too low, the construction unit may adopt a quality Substandard soil quality will cause problems with project quality and increase the risk of rework and repair; high transportation costs will directly lead to an increase in the total cost of the construction project. High costs may cause the construction unit to face greater financial risks, which in turn affects its ability to perform real-time settlement; low transportation costs may mean that the transportation service provider has reduced the quality of service, such as slower transportation speeds and increased cargo damage rates, which will have an adverse impact on the smooth progress of the construction project and may cause real-time settlement to become more complicated and difficult. In summary, whether it is the average project tax rate, the total soil implementation cost or the total transportation cost, being too high or too low may have a negative impact on the real-time settlement of the construction implementation project. Therefore, in distribution network engineering projects, these factors need to be considered comprehensively to ensure the smooth progress of the project and the safe use of funds.

[0076] It is expressed as the average project tax rate of the construction implementation project within the set real-time construction settlement period, which refers to the average value of the taxes required to be paid for the construction implementation project within the real-time construction settlement period.

[0077] Expressed as the reference value of the engineering tax rate, it refers to the standard value of the engineering tax rate.

[0078] It represents the total implementation cost of the i-th soil type of the construction implementation project within the set real-time construction settlement period. It refers to the total implementation cost of the i-th soil type calculated statistically within the real-time construction settlement period. The total implementation cost of different types of soil may be the same or different.

[0079] i is the number of each type of soil, , m is the type of soil.

[0080] It is expressed as the implementation reference cost for the i-th soil type, which refers to the reference standard for the implementation cost of the i-th soil type.

[0081] It represents the total transportation cost of the j-th transportation channel of the construction implementation project within the set construction real-time settlement period. It refers to the total transportation cost of the j-th transportation channel calculated statistically within the construction real-time settlement period. The total transportation costs for different transportation channels may be the same or different.

[0082] j is the number of each transportation channel, , n is the number of transportation channels.

[0083] It is expressed as the transportation reference cost of the j-th transportation channel, and refers to the reference value of the transportation cost of the j-th transportation channel.

[0084] It is expressed as the correction factor corresponding to the predefined mean project tax rate, Expressed as a correction factor corresponding to the predefined total implementation cost, It is expressed as a correction factor corresponding to the predefined total transportation cost, and e is a natural constant.

[0085] Furthermore, the influence coefficient of the real-time settlement of the completed project is analyzed in detail as follows:

[0086] Based on the real-time settlement related information of completed projects, the total project tax rate, construction fee discount rate and supervision fee discount rate of the completed projects are extracted, among which the total project tax rate of the completed projects can be directly extracted from the completed project settlement report; the construction fee discount rate can be directly obtained from the construction contract signed between the construction unit and the construction unit, and the specific value of the construction fee discount rate can be determined by negotiation between the two parties or in accordance with a specific discount policy; the supervision fee discount rate can be extracted from the supervision contract signed between the supervision unit and the construction unit, and the specific value of the supervision fee discount rate can be determined by negotiation between the two parties or in accordance with a specific discount policy.

[0087] The project definition tax rate, construction fee discount reference rate and supervision fee discount reference rate are extracted from the engineering data service platform.

[0088] Comprehensively analyze the influence coefficient of real-time settlement of completed projects. In a specific embodiment, the factors affecting real-time settlement can be quantitatively analyzed by model analysis method, using mathematical statistical models, combined with relevant data of settlement of completed projects. This method can calculate the influence coefficient of real-time settlement of completed projects.

[0089] The above-mentioned coefficient of influence of real-time settlement of completed projects is obtained in this embodiment through comprehensive analysis of the total project tax rate, construction fee discount rate and supervision fee discount rate of the completed project within the set real-time settlement period of completed projects. In order to determine the value of the influence of real-time settlement of completed projects, a more accurate calculation method is adopted in this embodiment to obtain the value, and the specific expression is:

[0090]

[0091] in It is expressed as the influence coefficient of the real-time settlement of the completed project. In this embodiment, a high tax rate means that the completed project needs to pay more taxes at the time of settlement, thereby increasing the overall cost of the project and affecting the flexibility of fund arrangement; an excessively high construction fee discount rate may cause the construction unit to sacrifice the quality of the project in order to reduce costs, thereby affecting the overall quality and safety of the completed project; an excessively low construction fee discount rate may cause the construction unit to make higher fee requirements at the time of completion settlement, thereby increasing the cost of the entire project; an excessively high supervision fee discount rate may reduce the service quality of the supervision unit and weaken its supervisory role in the project, thereby increasing the risk of problems in the project; an excessively low supervision fee discount rate may cause the amount of real-time settlement to deviate from the actual cost, thereby affecting the accuracy of the settlement; in summary, when determining the influence coefficient of the real-time settlement of the completed project, the negative impact of the total project tax rate, the construction fee discount rate and the supervision fee discount rate of the completed project should be fully considered to ensure the accuracy and compliance of the real-time settlement.

[0092] The total project tax rate for completed projects refers to the comprehensive tax rate calculated for various taxes and fees involved in the project after the completion of the project, including but not limited to value-added tax, corporate income tax, stamp duty, urban construction and maintenance tax, education surcharge, etc.

[0093] Expressed as the project-defined tax rate, it refers to the maximum value of the total project tax rate.

[0094] The construction cost discount rate for completed projects refers to the discount ratio for construction costs at the time of project completion settlement. This discount rate may take into account factors such as project progress, quality, and cost control.

[0095] Expressed as the construction cost discount reference rate, it refers to the standard value of the construction cost discount rate.

[0096] The discount rate of supervision fees for completed projects refers to the discount ratio of supervision fees when the project is settled upon completion. This ratio may be determined based on factors such as the provisions of the supervision contract, the quality of supervision services, and the scale of the project.

[0097] Expressed as the reference rate for supervision fee discount, it refers to the standard value of the supervision fee discount rate.

[0098] It is expressed as a correction factor corresponding to the predefined total project tax rate. It is expressed as the correction factor corresponding to the predefined construction cost discount rate, It is expressed as the correction factor corresponding to the predefined supervision fee discount rate, and e is a natural constant.

[0099] Specifically, the influence coefficient of the real-time settlement of unplanned operations is analyzed in the following process:

[0100] According to the real-time settlement related information of unplanned operations, the engineering quota tax rate and design fee discount rate of unplanned operations within the set real-time settlement period of unplanned operations are extracted, among which the engineering quota tax rate of unplanned operations within the set real-time settlement period of unplanned operations can be directly extracted from the engineering data service platform; the design fee discount rate of unplanned operations can be directly extracted from the engineering design contract signed between the construction unit and the design unit, and the specific value of the design fee discount rate can be determined by negotiation between the two parties or according to a specific discount policy.

[0101] In this embodiment, the engineering quota tax rate for unplanned operations within the set real-time settlement period for unplanned operations is different from the average engineering tax rate of the above-mentioned construction implementation projects within the set real-time settlement period for construction and the total engineering tax rate of completed projects, and they correspond to the engineering tax rates corresponding to different periods respectively.

[0102] The engineering quota tax rate and design fee discount reference rate are extracted from the engineering data service platform.

[0103] Comprehensively analyze the influence coefficient of real-time settlement of unplanned operations. In a specific embodiment, several representative unplanned operation engineering cases can be selected through case comparison method, their real-time settlement situations can be compared, the factors affecting the real-time settlement can be analyzed, and general rules can be summarized to obtain the influence coefficient of real-time settlement of unplanned operations.

[0104] The above-mentioned coefficient of influence degree of real-time settlement of unplanned operations is obtained by comprehensive analysis of the engineering quota tax rate and design fee discount rate of unplanned operations within the set real-time settlement period of unplanned operations in this embodiment, and is used to determine the value of the influence degree of real-time settlement of unplanned operations. In this embodiment, a more accurate calculation method is used to obtain it, and the specific expression is:

[0105] ,in It is expressed as the coefficient of influence of real-time settlement of unplanned operations. In this embodiment, an excessively high engineering quota tax rate means that unplanned operations need to bear higher tax costs, and may also cause the real-time settlement process of unplanned operations to become complicated and cumbersome, affecting the timeliness and efficiency of unplanned operations. If the design fee discount rate is too high, the design unit may reduce the design quality or delay the design progress due to insufficient economic benefits. For unplanned operations, this may lead to design defects or frequent modifications during the implementation of the project, thereby increasing the complexity and uncertainty of real-time settlement. When the design fee discount rate is too low, it may lead to excessive design fees that are inconsistent with the actual costs during the real-time settlement of unplanned operations, affecting the accuracy and reliability of settlement. In summary, the engineering quota tax rate and the design fee discount rate have a significant negative impact on the coefficient of influence of real-time settlement of unplanned operations. In order to reduce these negative impacts, it is necessary to comprehensively consider tax policies, design fees and the actual needs of unplanned operations, and formulate reasonable tax rates and discount rates to promote the smooth progress of unplanned operations and the efficient realization of real-time settlement.

[0106] It is expressed as the engineering quota tax rate for unplanned work within the set real-time settlement period of unplanned work. It refers to the fixed tax rate applicable to unplanned work within the real-time settlement period. This form of tax rate is usually applicable to taxes with standardized specifications and quality, stable prices and balanced income.

[0107] It is expressed as the engineering quota tax rate, which refers to the maximum value allowed by the engineering quota tax rate.

[0108] The design fee discount rate for unplanned work refers to the discount ratio given for design fees during the design phase of an engineering project. This discount rate may be determined by a variety of factors, including but not limited to the complexity of the design solution, the qualifications and experience of the design unit, the budget constraints of the project, the market competition situation, and the results of negotiations between the two parties.

[0109] Expressed as the design fee discount reference rate, it refers to the standard value of the design fee discount rate.

[0110] It is expressed as the correction factor corresponding to the predefined engineering quota tax rate. It is expressed as the correction factor corresponding to the predefined design fee discount rate, and e is a natural constant.

[0111] Furthermore, in a specific embodiment, the satisfaction with the real-time settlement management of the distribution network project can be achieved by designing a questionnaire on the satisfaction with the real-time settlement management of the distribution network project through a questionnaire survey method, covering aspects such as settlement process, efficiency, accuracy, and service attitude. The questionnaires are then distributed to relevant stakeholders, such as construction units, supervision units, owners, etc., to collect their feedback and opinions, and quantify the satisfaction, so as to obtain the satisfaction with the real-time settlement management of the distribution network project.

[0112] The above-mentioned real-time settlement management satisfaction of the distribution network project is obtained in this embodiment through comprehensive analysis of the real-time settlement influence coefficient of the construction implementation project, the real-time settlement influence coefficient of the completed project, and the real-time settlement influence coefficient of the unplanned operation, so as to determine the real-time settlement management satisfaction of the distribution network project. In this embodiment, a more accurate calculation method is used to obtain it, and the specific expression is:

[0113]

[0114] in It is expressed as the satisfaction with the real-time settlement management of the distribution network project. In this embodiment, the influence coefficient of the real-time settlement of the construction implementation project is too large, which means that the cost changes occurring during the construction process have a greater impact on the accuracy and timeliness of the real-time settlement, which may lead to frequent adjustments and revisions in the real-time settlement process, increase the complexity and uncertainty of the real-time settlement, and reduce the construction unit's satisfaction with the real-time settlement management; the influence coefficient of the real-time settlement of the completed project is too large, indicating that there is a large deviation between the settlement result of the completed stage and the actual cost, which may cause the construction unit to be unable to obtain the due amount in time after completion, affecting its capital turnover and operation; the influence coefficient of the real-time settlement of unplanned operations is too large, reflecting that there are often unplanned operations in the distribution network project, and the costs of these operations are difficult to accurately reflect in the real-time settlement, which may lead to a large difference between the real-time settlement and the actual cost, increasing the difficulty and uncertainty of the settlement; in summary, these excessively large influence coefficients may lead to problems such as complex settlement process, increased uncertainty, and trust issues, thereby reducing the satisfaction with the real-time settlement management of the distribution network project.

[0115] It is expressed as the coefficient of influence of real-time settlement of construction implementation project, which is the value of influence of real-time settlement of construction implementation project obtained by comprehensive analysis of the average project tax rate of the construction implementation project within the set real-time settlement period of construction implementation project, the total implementation cost of various soil types and the total transportation cost of various transportation channels.

[0116] It is expressed as the coefficient of impact on real-time settlement of completed projects, which is the numerical value of the impact on real-time settlement of completed projects obtained by comprehensive analysis of the total project tax rate, construction fee discount rate and supervision fee discount rate of the completed projects within the set real-time settlement period of completed projects.

[0117] It is expressed as the coefficient of the impact degree of real-time settlement of unplanned operations, which is the numerical value of the impact degree of real-time settlement of unplanned operations obtained by comprehensive analysis of the engineering quota tax rate and design fee discount rate of unplanned operations within the set real-time settlement period of unplanned operations.

[0118] It is represented by the weight factor corresponding to the predefined construction implementation project real-time settlement impact coefficient, It is represented by the weight factor corresponding to the predefined coefficient of influence on the real-time settlement of completed projects. It is expressed as the weight factor corresponding to the predefined coefficient of influence of real-time settlement of unplanned operations, and e is a natural constant.

[0119] Specifically, the real-time settlement management of the distribution network project is optimized, and the specific analysis process is as follows:

[0120] The real-time settlement management satisfaction of the distribution network project is compared with the real-time settlement management satisfaction threshold defined in the project data service platform.

[0121] In a specific embodiment, the above-mentioned real-time settlement management satisfaction threshold is defined as 80%. If the real-time settlement management satisfaction of the distribution network project is 60%, the real-time settlement management of the distribution network project needs to be optimized; if the real-time settlement management satisfaction of the distribution network project is 90%, there is no need to optimize the real-time settlement management of the distribution network project.

[0122] If the satisfaction with real-time settlement management of distribution network projects is lower than the threshold of satisfaction with real-time settlement management, it may mean that there are problems such as cumbersome settlement process and low efficiency in the real-time settlement management process. Therefore, more manpower and material resources need to be invested in the coordination and correction of real-time settlement management of distribution network projects, which not only increases management costs, but may also cause additional expenses due to improper handling, such as liquidated damages, late payment fees, etc.; it is also possible that due to poor real-time settlement management, the construction unit faces a shortage of funds, which in turn affects material procurement, equipment leasing and other aspects, which may lead to a decline in the quality of distribution network projects.

[0123] The real-time settlement management satisfaction of the distribution network project is processed with the real-time settlement management satisfaction threshold to obtain the real-time settlement management deviation value, and the real-time settlement management deviation value is matched with the degree of optimization required for each real-time settlement management deviation value interval defined in the engineering data service platform to obtain the degree of optimization required for real-time settlement management of the distribution network project. Finally, the real-time settlement management of the distribution network project is optimized. The specific optimization project is as follows: Establish clear and reasonable settlement rules and procedures to ensure the correctness and orderliness of settlement work; strengthen communication and collaboration with stakeholders such as construction units and construction units to ensure timely transmission and accurate understanding of information; use automated review tools to simplify settlement documents and material collection, reduce unnecessary cumbersome processes, and improve work efficiency; establish an effective supervision mechanism to track and monitor the settlement process throughout the process to ensure the compliance and fairness of settlement work; optimize customer service processes and provide personalized service products; regularly train and improve the skills of settlement management personnel to enable them to have professional settlement knowledge and capabilities.

[0124] The above contents are merely examples and explanations of the structure of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the structure of the invention or exceed the scope defined by the claims, they should all fall within the protection scope of the present invention.

Claims

1. A real-time settlement management method based on a distribution network project, characterized in that: include: Obtain relevant information on the completion of distribution network projects, evaluate the completion of distribution network projects, and match the construction implementation projects, completed projects, and unplanned operations in the distribution network project settlement platform; Obtain the real-time settlement related information of the construction implementation project, the real-time settlement related information of the completed project, and the real-time settlement related information of the unplanned operation, respectively determine the real-time settlement impact coefficient of the construction implementation project, the real-time settlement impact coefficient of the completed project, and the real-time settlement impact coefficient of the unplanned operation, and comprehensively analyze the real-time settlement management satisfaction of the distribution network project, and finally optimize the real-time settlement management of the distribution network project; The real-time settlement management satisfaction of the distribution network project is as follows: in It is expressed as the satisfaction of real-time settlement management of distribution network projects. It is expressed as the influence coefficient of real-time settlement of construction implementation project, It is expressed as the influence coefficient of the real-time settlement of completed projects. It is expressed as the coefficient of influence of real-time settlement of unplanned operations. It is represented by the weight factor corresponding to the predefined construction implementation project real-time settlement impact coefficient, It is represented by the weight factor corresponding to the predefined coefficient of influence on the real-time settlement of completed projects. It is represented by the weight factor corresponding to the predefined coefficient of influence of real-time settlement of unplanned operations, and e is a natural constant; The influence coefficient of real-time settlement of construction implementation project, the specific analysis process is as follows: According to the real-time settlement related information of the construction implementation project, the average project tax rate of the construction implementation project within the set real-time settlement period, the total implementation cost of various types of soil, and the total transportation cost of each transportation channel are extracted; From the engineering data service platform, we extract the engineering tax rate reference value, the implementation reference cost of various soil types, and the transportation reference cost of various transportation channels, and comprehensively analyze the influence coefficient of the real-time settlement of the construction implementation project; The specific analysis process of the influence coefficient of the real-time settlement of completed projects is as follows: According to the real-time settlement related information of completed projects, the total project tax rate, construction fee discount rate and supervision fee discount rate of the completed projects are extracted; From the engineering data service platform, we extract the engineering tax rate, construction fee discount reference rate and supervision fee discount reference rate, and comprehensively analyze the impact coefficient of the completed project real-time settlement; The specific analysis process of the influence coefficient of real-time settlement of unplanned operations is as follows: According to the real-time settlement related information of unplanned operations, the engineering quota tax rate and design fee discount rate of unplanned operations within the set real-time settlement period of unplanned operations are extracted; Extract the engineering quota tax rate and design fee discount reference rate from the engineering data service platform, and comprehensively analyze the impact coefficient of real-time settlement of unplanned operations; The specific analysis formula for the completion degree of the distribution network project is as follows: ,in It is expressed as the completion degree of distribution network project. It is expressed as the distribution network engineering quality impact coefficient, It is expressed as the coefficient of influence on the benefits of distribution network engineering, Expressed as a weight factor corresponding to the predefined quality impact coefficient, It is expressed as the weight factor corresponding to the predefined benefit impact coefficient, and e is a natural constant; The specific analysis process of the distribution network project benefit impact coefficient is as follows: According to the distribution network project benefit-related information, the distribution network project progress difference, investment completion difference and project parts consumption rate within the set detection period are extracted; From the engineering data service platform, the engineering progress definition difference, investment completion definition difference and engineering parts consumption reference rate are extracted to comprehensively analyze the distribution network engineering benefit impact coefficient; The specific analysis process of the distribution network engineering quality impact coefficient is as follows: According to the quality-related information of the distribution network project, the consumption quantity, consumption weight, average consumption rate of various raw materials and the power supply power of the distribution network project within the set detection period are extracted; The consumption quantity, consumption weight, and consumption average speed of each type of raw material are respectively processed by ratio with the consumption reference quantity, consumption reference weight, and consumption reference average speed preset in the engineering data service platform to obtain the consumption quantity deviation value, consumption weight deviation value, and consumption average speed deviation value of each type of raw material, and are multiplied by the correction factors corresponding to the consumption quantity deviation value, the consumption weight deviation value, and the consumption average speed deviation value preset in the engineering data service platform, and the sum is obtained to obtain the raw material consumption compliance of the distribution network project; Obtain the load mean value and output voltage mean value of the distribution network project within the set detection period, and multiply them by the influence factor of the unit value corresponding to the load mean value and the influence factor of the unit value corresponding to the output voltage mean value preset in the project data service platform, respectively, to obtain the power operation stability of the distribution network project within the set detection period; The power supply of the comprehensive distribution network project within the set inspection period, the compliance of the raw material consumption of the distribution network project and the power operation stability of the distribution network project within the set inspection period are analyzed to obtain the distribution network project quality impact coefficient.

2. The real-time settlement management method based on the distribution network project according to claim 1 is characterized in that: The above optimization of real-time settlement management of distribution network projects is analyzed in detail as follows: The real-time settlement management satisfaction of the distribution network project is compared with the real-time settlement management satisfaction threshold defined in the engineering data service platform. If the real-time settlement management satisfaction of the distribution network project is lower than the real-time settlement management satisfaction threshold, the real-time settlement management satisfaction of the distribution network project is differenced with the real-time settlement management satisfaction threshold to obtain the real-time settlement management deviation value. The real-time settlement management deviation value is matched with the required optimization degree corresponding to each real-time settlement management deviation value interval defined in the engineering data service platform to obtain the required optimization degree of real-time settlement management of the distribution network project, and finally the real-time settlement management of the distribution network project is optimized.

3. The real-time settlement management method based on the distribution network project according to claim 1 is characterized in that: The matching obtains the construction implementation projects, completed projects and unplanned operations in the distribution network project settlement platform. The specific matching process is: If the value of the distribution network project completion degree is in the first interval, the distribution network project is matched as a construction implementation project in the distribution network project settlement platform; if the value of the distribution network project completion degree is in the second interval, the distribution network project is matched as a completed project in the distribution network project settlement platform; otherwise, the distribution network project is matched as an unplanned operation in the distribution network project settlement platform.