Construction method of tilt-shift seismic isolation mechanical demolition arch bridge

Through the tilt-shift isolation mechanical demolition method, combined with real-time monitoring and automated control, the bridge demolition process is optimized, solving the problems of low bridge demolition efficiency and inconvenient waste disposal in the existing technology, and achieving safe and efficient bridge demolition and resource recovery. .

CN118461494BActive Publication Date: 2024-10-15GUIZHOU HIGHWAY ENG GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410928019.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-10-15
Estimated Expiration
2044-07-11

AI Technical Summary

Technical Problem

Existing bridge demolition technology has problems such as low efficiency, high cost, major safety hazards, and difficulty in effectively recycling and classifying waste.

Method used

The tilt-shift seismic isolation mechanical demolition method is used to monitor the settlement, tilt and displacement data of the bridge in real time, and use PID control algorithms and modular support units to perform precise tilt control of the bridge. Combined with structural analysis software and seismic isolation materials, the demolition path is optimized. and speed, and set up automatic sorting systems and mobile recycling stations on site to achieve rapid classification and recycling of waste.

Benefits of technology

It improves the safety and efficiency of bridge demolition, reduces the impact on the surrounding environment, optimizes waste recycling and utilization, and achieves a more environmentally friendly and efficient construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118461494B_ABST
    Figure CN118461494B_ABST
Patent Text Reader

Abstract

The present invention discloses a construction method for dismantling an arch bridge by means of a tilting and shifting seismic isolation machine. First, the key parameters of the bridge are monitored in real time by sensors and uploaded to a central control system. The system uses a PID algorithm to control a hydraulic jack or an electric push rod to adjust the height of the support point to achieve the tilting and shifting of the bridge. The modular support unit is used to fine-tune the support height, and a stability analysis is performed by a data analysis unit until the bridge is stable. The optimal tilting path and speed are calculated using structural analysis software and measured data. The seismic isolation cushion layer and the low-frequency vibration suppression system are combined with an active control strategy to effectively reduce the demolition vibration. The demolition machine performs the demolition operation according to the planned path. An automatic sorting and mobile recycling and processing station is set up on site to achieve rapid classification and recycling of waste, and a database is established to record detailed information. The present invention can achieve safe and efficient demolition of arch bridges.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge demolition, and in particular to a construction method for dismantling an arch bridge by tilting and shifting seismic isolation machinery. Background Art

[0002] With the acceleration of urbanization and the renewal of infrastructure, the demolition of old bridges has become an important engineering task. As a common bridge structure, the demolition of arch bridges has high technical difficulty and safety risks. Traditional demolition methods have problems such as low efficiency, high cost, and many safety hazards. Therefore, it is of great practical significance to develop a safe, efficient, and environmentally friendly arch bridge demolition method.

[0003] Existing small and medium-sized bridges are mainly demolished by traditional heavy machinery. This method produces large vibrations and noise during operation, posing a threat to the surrounding environment and personnel safety. Static blasting technology is disclosed in professional books such as "Explosive Engineering". It is usually used when demolishing large concrete structures. Although this method reduces noise, the waste generated by blasting is difficult to control and may cause damage to the surrounding environment.

[0004] With the advancement of technology, some emerging technologies have been promoted to a certain extent in bridge demolition. For example, remote-controlled demolition robot technology has applications in both military and civilian fields, as disclosed in journals such as the Journal of Robotics and Automation. In the prior art, Chinese patent document CN117604931A discloses a bridge crash wall replacement method, which uses a water jet crushing robot to cut the side beam bridge deck pavement, hinged joints and continuous joints to be demolished, and then uses gas welding to cut the expansion joint steel. Although these technologies improve safety, the flexibility and adaptability of the robots are limited, and it is difficult to cope with complex and changeable demolition environments.

[0005] In addition, some technologies have proposed modular demolition systems. For example, Chinese patent document CN102561217A discloses a construction control method for old bridge reconstruction based on a modular hydraulic lifting power flatbed truck. This method uses modular box girder transportation equipment to realize the construction process of "replacing the old with the new" of the old bridge and the supporting bridge displacement and installation status monitoring and control system. Although these technologies have improved the flexibility of demolition, the system's integration and automation are not high, and there is still room for improvement in demolition efficiency.

[0006] The issue of waste recycling from bridge demolition is also an important topic. Waste recycling technology has been widely studied in the fields of environmental protection and resource recycling, and has been disclosed in journals such as Resources, Conservation and Recycling. However, existing recycling technologies are mostly manual sorting, which is inefficient and not accurate enough in identifying and classifying recyclable materials. Summary of the invention

[0007] The purpose of the present invention is to provide a construction method for dismantling an arch bridge with tilted displacement and seismic isolation machinery, so as to solve the shortcomings of the existing technology.

[0008] Based on the first main aspect of the present invention, a construction method for a tilted shift seismic isolation mechanical demolition arch bridge is provided, which at least comprises:

[0009] S1. Arrange elevation control points, inclination sensors and displacement sensors at key locations of the bridge to monitor the settlement, inclination angle and horizontal displacement of the bridge in real time; upload the monitoring data to the central control system in real time through the communication module;

[0010] Through the above steps, the settlement, tilt and displacement data of the bridge can be obtained in real time, providing instant feedback on the safety status of the bridge. The collected data can be used to analyze the dynamic behavior of the bridge and provide a scientific decision-making basis for the demolition work. By monitoring the data, abnormal conditions can be discovered in time and potential structural risks can be warned in advance. It provides accurate data support for the subsequent bridge tilt and displacement control to ensure the accuracy of the control process.

[0011] S2. The central control system uses PID control algorithm to control the tilt and displacement of the bridge; hydraulic jacks or electric push rods are used as actuators to adjust the height of the bridge support points according to the control system instructions;

[0012] In the above steps, by controlling the bridge tilt, the center of gravity of the bridge structure can be gradually transferred to the predetermined demolition area, reducing the risk of sudden collapse and ensuring the safety of construction workers and the surrounding environment. Tilt shift can selectively make certain parts of the bridge fall to the ground or touch the ground first according to the predetermined demolition order, thereby optimizing the demolition process and avoiding mutual influence between structures.

[0013] Secondly, after the tilt shift, part of the bridge structure may have collapsed naturally or partially disintegrated, reducing the parts that need to be mechanically demolished, thereby improving the efficiency of the overall demolition work. During the tilt shift process, the stability of the bridge structure can be monitored in real time, providing data support for structural safety analysis during the demolition process.

[0014] On the other hand, tilt shifting can control the direction and scope of bridge collapse, reduce damage to surrounding buildings, roads and facilities, and reduce interference with traffic and the environment during demolition. Controlling the tilt direction helps to concentrate waste in a specific area, facilitating subsequent waste sorting, recycling and transportation. Tilt shifting helps to separate useful materials from waste materials of the bridge, creating conditions for subsequent material recycling and reuse. By controlling tilt shifting, dust and noise generated during demolition can be reduced, reducing pollution to the environment.

[0015] S3. Install the modular support units at the bridge support points and use the adjustment device to adjust the modules to a height close to the target height;

[0016] Modular support units can provide stable support for the bridge before demolition, reduce the risk of accidental collapse due to structural instability, and ensure the safety of construction workers and the surrounding environment. Through modular support units, the tilt direction and angle of the bridge can be precisely controlled, providing an orderly way for demolition work.

[0017] Moreover, the modular support units can be flexibly adjusted according to the demolition progress, so that the demolition work can be carried out in stages, improving the demolition efficiency. By controlling the tilt direction and angle of the bridge, the impact on surrounding buildings and traffic facilities during the demolition process can be reduced. The modular support units can be quickly removed or redeployed after demolition, facilitating the restoration or reuse of the site after the bridge is demolished.

[0018] S4. Collect sensor data and perform stability analysis through the data analysis unit; according to the data analysis results, adjust the heights of all modules synchronously through the control panel; repeat data collection and analysis until the bridge reaches a stable state;

[0019] In the above scheme, stability verification ensures the stability of the bridge during the demolition process, which helps to formulate a more reasonable demolition sequence and method. Stability verification helps to better control the distribution of waste during the demolition process, facilitating subsequent waste sorting, recycling and cleanup.

[0020] The height of the modular support unit is adjustable to adapt to different terrains and demolition site conditions, ensuring the applicability and effectiveness of the support system. During the demolition process, the modular support unit can gradually lower the bridge height to avoid impact and damage to the bridge structure caused by rapid removal of the support. Controlling the demolition process can reduce noise, dust and interference with the surrounding environment, achieving a more environmentally friendly demolition operation.

[0021] S5. Use structural analysis software to build a 3D model of the bridge and input parameters including mass, stiffness, and damping; calculate the optimal tilt path and speed based on the structural model and real-time data;

[0022] In the above steps, the 3D model established by the structural analysis software can accurately reflect the actual geometry and physical properties of the bridge, including parameters such as mass, stiffness and damping. Integrating the measured data into the model improves the accuracy and reliability of the model and ensures the consistency of the analysis results with the actual situation.

[0023] Dynamic response analysis can evaluate the response of the bridge under different tilt paths and speeds, predict possible structural behavior and potential risk points. The process of calculating the optimal tilt path and speed takes into account multiple objectives such as structural stress, vibration and energy consumption, achieving a balance and optimization of multiple performance aspects.

[0024] Moreover, combined with real-time monitoring data, the model can be adaptively adjusted to achieve dynamic optimization and ensure the stability and safety of the bridge during the demolition process. By optimizing the tilt path and speed, structural stress and vibration can be minimized, reducing the risks to the bridge and the surrounding environment during the demolition process. The optimized energy consumption rate helps to improve the energy efficiency of the demolition process, reduce unnecessary energy waste, and improve construction efficiency.

[0025] On the other hand, the 3D model visualization results and decision support system provide operators with intuitive feedback and suggestions, helping them make more scientific decisions.

[0026] This method can adapt to different bridge structures and demolition conditions, and has good versatility and adaptability. The entire analysis process is based on scientific calculations and simulations, providing proof of the rationality and effectiveness of the demolition plan.

[0027] S6. Select isolation materials, design isolation pads, and ensure proper installation and fixing between machinery and bridge structure; design low-frequency vibration suppression system, including sensor array, controller and actuator; combine active control strategy and passive vibration reduction device to reduce vibration during demolition;

[0028] In the above steps, by selecting appropriate seismic isolation materials and designing seismic isolation pads, the vibration transmission between the demolition machinery and the bridge structure can be effectively isolated, reducing the impact on the bridge structure and the surrounding environment. The application of seismic isolation pads can protect the bridge structure from the high vibration impact generated during the demolition process and extend the service life of the structure. Reducing vibration helps reduce safety risks during the construction process and provide a safer working environment for construction workers.

[0029] The designed low-frequency vibration suppression system can specifically reduce the low-frequency vibrations generated by the bridge during the demolition process, which often have a great impact on the stability and safety of the structure. The active control strategy can dynamically adjust the actuator response based on real-time monitoring data to provide more accurate and timely vibration control. Combined with passive damping devices such as TMD or TLD, it can further absorb and consume vibration energy and improve the overall damping effect.

[0030] The integration of sensors, controllers and actuators provides a comprehensive vibration control solution that enables real-time monitoring and response. The intelligent control system can automatically adjust the control strategy according to the real-time response of the bridge, realizing a more intelligent and automated construction process.

[0031] The seismic isolation materials and system designs take into account different environmental conditions, ensuring efficient performance in all environments. By optimizing energy consumption and using energy recovery technology, hybrid vibration isolation systems help improve the energy efficiency and sustainability of the construction process.

[0032] S7. Use demolition machinery to carry out demolition according to the path planning;

[0033] Specifically, according to the structural characteristics and safety requirements of the bridge, the order of demolition should be clearly defined, such as first demolishing the auxiliary facilities on the bridge deck and then demolishing the main beam slab. Select suitable demolition machinery, such as excavators, chain saws, crushers, etc., and determine their operating positions on the bridge. Ensure that the demolition machinery is stable and take necessary safety protection measures to prevent accidents during construction.

[0034] Use chain saws to cut beams and slabs into blocks, and use cranes to lift the cut beams and slabs to a safe place for crushing. Remove the bridge piers step by step from top to bottom and from the inside to the outside, and then chisel out the main arch ring after the piers are removed. Use winches to apply tension at key locations to control the direction of the bridge's collapse and ensure safety. Classify and crush the waste generated by the demolition, and transport it to a designated location for environmentally friendly treatment.

[0035] In addition, during the demolition process, structural changes and mechanical operating status are monitored in real time, and the demolition plan is adjusted if necessary.

[0036] S8. Set up an automatic sorting system at the demolition site to quickly classify waste; deploy mobile recycling stations to handle and recycle waste generated by demolition on site; establish a recycling database to record the type, quantity and potential use of waste.

[0037] Specifically, corresponding automatic sorting equipment, such as magnetic separators, vibrating screens, air separators, etc., are configured at the construction site to achieve automatic separation of different types of waste. The operation process and standards for automatic sorting are established to ensure sorting efficiency and accuracy.

[0038] Plan and deploy mobile recycling stations at the demolition site to ensure that they cover the main waste generation areas. Select mobile recycling equipment with appropriate processing capacity based on the amount and type of waste generated. Effectively manage the mobile recycling stations to ensure their efficient operation and timely processing of on-site waste.

[0039] The automatically sorted waste is stored separately by category for subsequent recycling. Large waste is crushed on site to reduce the volume for transportation and further processing. Valuable materials such as metals and concrete are recycled and sent to professional recycling agencies.

[0040] Build a recycling database to record the types, quantities, locations and potential uses of waste. Enter the waste data collected on site into the database in real time to ensure the accuracy and completeness of the data. Analyze the data in the database regularly to evaluate the recycling efficiency of waste and guide subsequent work.

[0041] Take necessary environmental protection measures, such as dust control and noise control, to reduce the impact on the environment during waste treatment. Promote the resource utilization of waste, such as using concrete waste as roadbed materials and sending metal waste back to smelters. Ensure that waste treatment and recycling activities comply with local environmental regulations and circular economy policies.

[0042] As a further preferred solution, in step S2, the PID control algorithm calculation process includes the following steps:

[0043] The tilt sensors and displacement sensors placed at key locations on the bridge are used to collect the bridge's tilt information in real time. and horizontal displacement data;

[0044] Filter the collected data to remove noise and outliers;

[0045] Set the target angle for the bridge's tilt shift and target displacement ;

[0046] The following PID control algorithm formula is used:

[0047] ;

[0048] Where: It's in time The control input at the time, that is, the adjustment amount of the hydraulic jack or electric push rod;

[0049] , , They are proportional gain, integral gain and differential gain respectively;

[0050] is the error, including the angular error Or displacement error ;

[0051] is the integral term of the error, used to eliminate the steady-state error;

[0052] It is the derivative of the error, which is used to improve the response speed and stability of the system;

[0053] Adjust the parameters of the PID controller through experiments and simulations , , ;

[0054] The PID algorithm is integrated into the central control system, which calculates the control input based on real-time data and sends instructions to the hydraulic jacks or electric push rods to achieve automatic tilt and shift of the bridge.

[0055] As a further preferred solution, in step S3, the modular support unit at least includes:

[0056] At least one base: as the bottom of the support unit, in contact with the ground and providing a stable support foundation;

[0057] Several columns: connecting the base and the top platform;

[0058] Several adjustment devices: used to adjust the height of the column;

[0059] A top platform: the part that is in direct contact with the bridge structure;

[0060] Several locking devices: used to fix the adjusted column height;

[0061] Several interface components: used for quick connection and fixation between units or with other structural parts.

[0062] As a further preferred solution, in step S4, the stability analysis performed by the data analysis unit comprises the following steps:

[0063] The central control system collects data including the bridge's tilt speed, horizontal displacement rate, stress change, vibration frequency and settlement in real time, and imports the original parameters of the bridge design and monitoring data under historical stable conditions;

[0064] Clean the collected raw data to remove outliers and noise; perform data conversion to calculate the changes in tilt velocity and displacement rate;

[0065] Determine the reference state value of each monitoring parameter based on the design parameters of the bridge and the monitoring data under the historical stable state;

[0066] The Bridge Stability Index (BSI) is calculated using the following formula:

[0067] ;

[0068] The calculated BSI value is analyzed to determine the current stability status of the bridge; if the BSI value is close to 1, it means that the bridge is in a stable state; if the BSI value deviates significantly from 1, it means that the bridge may have stability problems.

[0069] In the formula, the meaning and acquisition methods of each parameter are as follows:

[0070] Tilt speed : The rate of change of the bridge structure's tilt angle over time. The real-time tilt angle of the bridge is measured by a tilt sensor, and then its rate of change is calculated. It is the reference state value of the tilt velocity under the stable state of the bridge, which is obtained by querying the monitoring data of the bridge under the historical stable state.

[0071] Horizontal displacement rate : The speed at which the bridge moves in the horizontal direction. The horizontal displacement of the bridge is monitored by a displacement sensor and its rate of change is calculated. It is the reference state value of the horizontal displacement rate under the stable state of the bridge, which is obtained by querying the monitoring data of the bridge under the historical stable state.

[0072] Stress changes :The change in stress at the key parts of the bridge structure. Use stress / strain gauges to measure the real-time stress at the key parts of the bridge, and then calculate its change. It is the reference state value of stress change under the stable state of the bridge, which is obtained by querying the monitoring data of the bridge under the historical stable state.

[0073] Vibration frequency : The frequency of bridge vibration. The vibration of the bridge is monitored by vibration accelerometers or displacement sensors, and its frequency components are analyzed. The reference state value of the vibration frequency under the stable state of the bridge is obtained by querying the monitoring data of the historical stable state of the bridge.

[0074] Sedimentation :Vertical displacement of the bridge structure. The vertical displacement of the bridge is measured by settlement monitoring equipment.

[0075] Overall height of bridge : The total height of the bridge structure. Obtained directly from the bridge design drawings or on-site measurements.

[0076] Bridge deadweight : The weight of the bridge structure. Calculated based on the bridge design drawings and material properties, or measured by on-site weighing equipment.

[0077] Design weight : The deadweight of the bridge considered during design. Obtained from the bridge design documentation.

[0078] The BSI calculation formula is constructed by comparing each monitored parameter to its reference state or design value to achieve parameter normalization so that parameters of different dimensions can be compared on a unified scale. The sum of squared deviations is used to quantify the degree to which the parameter deviates from the reference state, which helps to emphasize the impact of larger deviations. The square root of the sum of squared deviations is taken to reduce the impact of extreme values ​​and make the index smoother. The reciprocal operation is used to ensure that the BSI value is between 0 and 1, where 1 represents a perfectly stable state and 0 represents complete instability. By taking into account multiple parameters, the BSI provides a comprehensive assessment of bridge stability rather than relying on a single indicator, which helps to quickly issue early warnings through the central control system.

[0079] As a further preferred solution, step S5 comprises the following steps:

[0080] Use structural analysis software (such as SAP2000, ANSYS or ABAQUS) to create an accurate 3D model of the bridge;

[0081] Input the actual geometric parameters and material properties of the bridge (including mass, stiffness, damping, etc.);

[0082] The measured data (settlement, tilt angle, horizontal displacement, etc.) collected in steps S1 to S4 are integrated into the model.

[0083] Calibrate the model to reflect the actual current state of the bridge. Perform dynamic response analysis to determine how the bridge structure responds under different tilt paths and speeds.

[0084] The analysis includes modal analysis, harmonic response analysis or nonlinear time history analysis.

[0085] The stress coefficient, vibration coefficient, and energy coefficient are constructed separately and converted into the same dimensionless units;

[0086] The optimal tilt path and speed calculation formula is used to find the optimal tilt path and speed:

[0087] ;

[0088] Where: It means to find the inclined path that minimizes the integral function. and are the start and end time of the tilting process respectively. It's time Stress distribution of the bridge structure. It's time The vibration acceleration of the bridge structure. It's time The energy consumption rate. , , It is a coefficient derived from physical units to ensure that the dimensions of each item are consistent.

[0089] The formula is mainly divided into three parts: stress term, vibration term and energy term. The stress term reflects the cumulative effect of the stress of the bridge structure during the tilting process. The vibration term takes into account the influence of structural vibration during the tilting process. The energy term represents the energy consumed during the tilting process and reflects the energy consumption of the actuator (such as the hydraulic jack).

[0090] The formulation is based on minimizing the combined effects of structural stress, vibration, and energy consumption during the tilting process. By integrating the entire tilting process, changes in the time dimension are taken into account, rather than evaluating only at a certain moment. The problem of finding the optimal path is transformed into finding a path that minimizes the above integral function, which is a typical optimal control problem.

[0091] Structural stress and vibration acceleration It can be measured in real time by sensors installed on the bridge. It can be calculated by monitoring the power input and output of the actuator.

[0092] On the above basis, numerical optimization methods (such as finite difference method, finite element analysis, etc.) are used to approximate the above integrals, and optimization algorithms (such as gradient descent method, Newton's method, etc.) are used to search for the optimal path.

[0093] In the above formula, , , These are coefficients introduced to ensure that the dimensions of different terms are consistent. These coefficients are derived based on the units of the various physical quantities.

[0094] In order to make these items comparable in calculation, they can be converted to the same dimensionless units, or ensure that their units can cancel each other out in calculation. The present invention achieves dimensionlessness by introducing reference values ​​or benchmark values.

[0095] As a further preferred solution, in step S6, the low-frequency vibration suppression system is an integration of a sensor array, a controller, an actuator, and active and passive damping devices.

[0096] As a further preferred solution, the active control strategy is as follows:

[0097] Filter, denoise and amplify sensor data. Analyze vibration frequency and amplitude using methods such as Fast Fourier Transform (FFT). Generate control signals based on vibration characteristics using PID control, optimal control or adaptive control algorithms. Actuators adjust based on control signals, such as changing the damping force of a TMD or the fluid dynamics conditions of a TLD. The system dynamically adjusts control strategies based on feedback data to achieve adaptive control.

[0098] Working principle of passive shock absorption device:

[0099] A tuned mass damper (TMD) consists of a mass, springs and dampers tuned to the dominant vibration frequency of the bridge. When the structure vibrates, the TMD produces an opposite vibration, thereby reducing the vibration of the primary structure. A tuned liquid damper (TLD) uses the oscillation of a liquid in a container to absorb energy. The vibration frequency of a TLD can be controlled by adjusting the depth of the liquid, the shape of the container or by attaching devices.

[0100] Through this design, the low-frequency vibration suppression system can effectively reduce vibration during the demolition process, improving construction safety and efficiency. The combination of active control strategy and passive shock absorption device provides a flexible and effective vibration control solution.

[0101] Compared with the prior art, the present invention adopts the construction method of arch bridge demolition by tilt-shift seismic isolation machinery. First, through the real-time monitoring system, the construction team can accurately control the tilt and displacement of the bridge, ensuring the stability and predictability during the construction process. The use of modular support units provides flexible adjustment capabilities to meet the needs of different bridge structures. In addition, the stability analysis performed by the data analysis unit further ensures the safety of the bridge during the demolition process.

[0102] Secondly, the application of structural analysis software and seismic isolation materials in the solution not only improved the vibration control ability during the demolition process, but also optimized the construction speed and path. The combination of active control strategy and passive shock absorption device effectively reduced the vibration during the demolition process and protected the surrounding environment and the safety of construction workers.

[0103] Third, the demolition machinery carried out demolition according to the path planning, ensuring the orderliness and efficiency of the construction process. Through the precise calculation of the optimal tilting path and speed, the uncertainty and potential risks in the construction were reduced, and the construction efficiency was improved.

[0104] Finally, the waste treatment and resource recycling measures in the plan reflect the importance attached to environmental protection. The application of automatic sorting systems and mobile recycling stations has improved the efficiency of waste treatment and the recycling rate of resources. The establishment of a recycling database provides data support for waste management and reuse, and promotes sustainable development. BRIEF DESCRIPTION OF THE DRAWINGS

[0105] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, without paying creative labor, other drawings obtained based on these drawings still belong to the scope of the present invention.

[0106] Figure 1 A flowchart of an embodiment of the present invention is shown. DETAILED DESCRIPTION

[0107] The preferred embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings so that the purpose, features and advantages of the present invention can be more clearly understood. It should be understood that the embodiments shown in the accompanying drawings are not intended to limit the scope of the present invention, but are only intended to illustrate the essential spirit of the technical solution of the present invention.

[0108] In the following description, certain specific details are set forth for the purpose of illustrating the various disclosed embodiments to provide a thorough understanding of the various disclosed embodiments. However, those skilled in the relevant art will recognize that the embodiments may be practiced without one or more of these specific details. In other cases, well-known devices, structures, and techniques associated with the present application may not be shown or described in detail to avoid unnecessarily obscuring the description of the embodiments.

[0109] References throughout the specification to "one embodiment" or "an embodiment" indicate that a particular feature, structure, or characteristic described in connection with the embodiment is included in at least one embodiment. Thus, the appearances of "in one embodiment" or "in an embodiment" in various places throughout the specification are not necessarily all referring to the same embodiment. Furthermore, the particular features, structures, or characteristics may be combined in any manner in one or more embodiments.

[0110] like Figure 1 As shown, the present invention takes the demolition of the old Caijiawan Bridge as an example, and adopts the construction method of the inclined shift seismic isolation machinery to demolish the arch bridge of the present invention, including the following steps:

[0111] S1. Arrange elevation control points, inclination sensors and displacement sensors at key locations of the bridge to monitor the settlement, inclination angle and horizontal displacement of the bridge in real time; upload the monitoring data to the central control system in real time through the communication module;

[0112] In order to ensure the safety and accuracy of the bridge demolition process, the present invention has made a comprehensive and detailed arrangement of the monitoring system. At the top of each pier and the center of the arch, the present invention installed high-precision elevation control points, which are equipped with precise sensors that can detect tiny settlement changes.

[0113] At the same time, the inclination sensor installed at the center of the arch can monitor the inclination angle of the bridge in real time to ensure stability during the tilting and shifting process. At both ends of the bridge, displacement sensors are used to monitor the horizontal displacement of the bridge to avoid unexpected horizontal movement during the demolition process.

[0114] All sensors are connected to the central control system through wireless communication modules, which enables real-time data transmission. The real-time nature of the data is crucial for quickly responding to any minor changes in the bridge structure. In addition, the present invention also provides a data storage unit for subsequent analysis and auditing.

[0115] For example, three elevation control points are installed on top of each pier to ensure the accuracy and redundancy of settlement data. The inclination sensor at the center of the arch has a measurement accuracy of ±0.01 degrees, which can capture tiny tilt changes. The displacement sensors at both ends of the bridge can measure displacement changes at the millimeter level, ensuring precise control of horizontal displacement.

[0116] S2. The central control system uses PID control algorithm to control the tilt and displacement of the bridge; hydraulic jacks or electric push rods are used as actuators to adjust the height of the bridge support points according to the control system instructions;

[0117] The PID control algorithm of the central control system is the core of the bridge tilt and shift control. The algorithm can dynamically adjust the force and displacement of the hydraulic jack or electric push rod according to the real-time data sent back by the sensor to ensure that the bridge tilts and shifts safely and smoothly according to the predetermined path.

[0118] In the implementation of the algorithm, the present invention first conducted a series of experiments and simulations to determine the initial control parameters. Subsequently, through on-site debugging, the present invention fine-tuned these parameters to adapt to various variables that may appear in the actual construction environment. The adjustment of proportional gain, integral gain and differential gain enables the control system to respond quickly while avoiding excessive oscillation, ensuring the stability of the bridge tilt displacement process.

[0119] The control system has millisecond-level data feedback capabilities to ensure timely control. The control system can adaptively adjust control parameters according to the changing trends of monitoring data. The central control system is equipped with an intuitive user interface, allowing operators to monitor the control status in real time and perform manual intervention when necessary.

[0120] S3. Install the modular support units at the bridge support points and use the adjustment device to adjust the modules to a height close to the target height;

[0121] The design and installation of modular support units are key to ensuring structural stability during bridge demolition. Each support unit is made of high-strength materials with excellent load-bearing capacity and durability. The contact surface between the base and the ground is designed with an anti-slip structure to ensure the stability of the support unit in various terrains.

[0122] The design of the columns and adjustment devices allows for quick adjustment of the support height to accommodate height changes in different parts of the bridge. The top platform uses a special friction material that increases the friction when in contact with the bridge structure, preventing the support unit from sliding.

[0123] The design of the locking device and interface components takes into account the needs of rapid installation and removal, making the deployment and retrieval of the entire support system extremely efficient.

[0124] The bottom of the base is equipped with adjustable support feet to adapt to uneven ground. The column adopts a spiral structure to achieve precise height adjustment. The top platform is designed with adjustment mechanisms in multiple directions to adapt to bridge structures at different angles. The locking device adopts a mechanical locking and quick release design, and the interface components are standardized for easy connection and fixing.

[0125] S4. Collect sensor data and perform stability analysis through the data analysis unit; according to the data analysis results, adjust the heights of all modules synchronously through the control panel; repeat data collection and analysis until the bridge reaches a stable state;

[0126] Data Collection and Analysis: During the bridge demolition process, stability analysis is key. Data was collected through sensors installed on the bridge.

[0127] The data analysis unit receives real-time data and performs the following processing: Remove noise and outliers through data filtering. Calculate the rate of change, such as tilt speed and displacement rate.

[0128] The bridge stability index (BSI) is calculated. Based on the BSI value and data analysis results, the operator adjusts the height of all modules synchronously through the control panel. The adjustment goal is to make the BSI value reach or approach 1, indicating that the bridge is in a stable state.

[0129] S5. Use structural analysis software to build a 3D model of the bridge and input parameters including mass, stiffness, and damping; calculate the optimal tilt path and speed based on the structural model and real-time data;

[0130] Using structural analysis software, an accurate 3D model was created based on the design parameters and actual geometric dimensions of the bridge.

[0131] Modal analysis and harmonic response analysis were then performed to determine the structural response of the bridge under different inclination paths and speeds.

[0132] The optimal tilting path and speed were calculated using a formula. Through the optimization algorithm, the optimal tilting path and speed were obtained, ensuring the minimum stress and vibration of the bridge structure during the demolition process.

[0133] S6. Select isolation materials, design isolation pads, and ensure proper installation and fixing between machinery and bridge structure; design low-frequency vibration suppression system, including sensor array, controller and actuator; combine active control strategy and passive vibration reduction device to reduce vibration during demolition;

[0134] High-performance rubber is selected as the seismic isolation cushion material because of its excellent elasticity and durability.

[0135] The seismic isolation pad is designed as a multi-layer structure to accommodate different loads and vibration frequencies. The arrangement includes a sensor array of accelerometers and displacement sensors, and a controller based on a real-time operating system.

[0136] Adopting an adaptive control algorithm based on machine learning, it is able to adjust the actuator response in real time.

[0137] S7. Use demolition machinery to carry out demolition according to the path planning;

[0138] Based on the demolition path planning, suitable excavators and breakers were selected. A detailed demolition sequence and mechanical movement path were developed to minimize the impact on the structure.

[0139] S8. Set up an automatic sorting system at the demolition site to quickly sort the waste; deploy mobile recycling stations to process and recycle the waste generated by demolition on site; establish a recycling database to record the types, quantities and potential uses of waste;

[0140] In specific implementation, an automatic sorting system was set up on site to quickly sort waste into categories such as metal, concrete and asphalt. Mobile recycling stations were deployed to process different types of waste on site, and a recycling database was established to record the types, quantities and potential uses of waste.

[0141] The modular support unit includes at least: at least one base: serving as the bottom of the support unit, in contact with the ground, and providing a stable support foundation; a number of columns: connecting the base and the top platform; a number of adjustment devices: used to adjust the height of the columns; a top platform: serving as the part in direct contact with the bridge structure; a number of locking devices: used to fix the adjusted height of the columns; and a number of interface components: used for quick connection and fixation between units or with other structural members.

[0142] In step S2, the PID control algorithm calculation process includes the following steps:

[0143] The tilt angle of the bridge is collected in real time by using inclination sensors and displacement sensors placed at key locations on the bridge. and horizontal displacement data;

[0144] Filter the collected data to remove noise and outliers;

[0145] Set the target angle for the bridge's tilt shift and target displacement ;

[0146] The following PID control algorithm formula is used:

[0147] ;

[0148] Where: It's in time The control input at the time, that is, the adjustment amount of the hydraulic jack or electric push rod;

[0149] , , They are proportional gain, integral gain and differential gain respectively; is the error, including the angular error Or displacement error ; is the integral term of the error, used to eliminate the steady-state error; It is the derivative of the error, which is used to improve the response speed and stability of the system;

[0150] Adjust the parameters of the PID controller through experiments and simulations , , ;

[0151] The PID algorithm is integrated into the central control system, which calculates the control input based on real-time data and sends instructions to the hydraulic jacks or electric push rods to achieve automatic tilt and shift of the bridge.

[0152] In step S4, the stability analysis performed by the data analysis unit includes the following steps:

[0153] The central control system collects data including the bridge's tilt speed, horizontal displacement rate, stress change, vibration frequency and settlement in real time, and imports the original parameters of the bridge design and monitoring data under historical stable conditions;

[0154] Clean the collected raw data to remove outliers and noise; perform data conversion to calculate the changes in tilt velocity and displacement rate;

[0155] Determine the reference state value of each monitoring parameter based on the design parameters of the bridge and the monitoring data under the historical stable state;

[0156] The Bridge Stability Index (BSI) is calculated using the following formula:

[0157] ;

[0158] Analyze the calculated BSI values ​​to determine the current stability state of the bridge.

[0159] Step S5 includes the following steps:

[0160] Use structural analysis software to build an accurate 3D model of the bridge; input the actual geometric parameters and material properties of the bridge;

[0161] Integrate the measured data collected in steps S1 to S4 into the model; calibrate the model to reflect the actual current state of the bridge;

[0162] Perform dynamic response analysis to determine the response of the bridge structure under different inclination paths and speeds; the analysis may include modal analysis, harmonic response analysis, or nonlinear time history analysis.

[0163] In some embodiments, stress coefficients, vibration coefficients, and energy coefficients are constructed separately and converted to the same dimensionless units;

[0164] The optimal tilt path and speed calculation formula is used to find the optimal tilt path and speed:

[0165] ;

[0166] Where: It means to find the inclined path that minimizes the integral function. and are the start and end time of the tilting process respectively. It's time Stress distribution of the bridge structure. It's time The vibration acceleration of the bridge structure. It's time The energy consumption rate. , , It is a coefficient derived from physical units to ensure that the dimensions of each item are consistent.

[0167] The coefficients derived from physical units are dimensionless by introducing reference values ​​or benchmark values. : Its reference value or benchmark value is defined as , which is the reference value of stress or the maximum allowable stress value (determined by the allowable stress of the material). The unit is Pascal (Pa).

[0168] Vibration coefficient : Its reference value is defined as , which is the reference value or safety limit of vibration acceleration (determined by ergonomics or structural safety standards). The unit is meter per second squared (m / s²).

[0169] Energy coefficient : Its reference value is defined as , which is the reference value of energy consumption (based on standard operation or expected operation). The unit is joule (J).

[0170] To convert the stress term to the same units as the energy term (joules), the stress coefficient can be derived as follows:

[0171] Assumptions is the reference area in square meters (m²).

[0172] but , the unit is joule (J).

[0173] Thus, the stress term The unit of is joule, which is consistent with the unit of energy consumption. The calculation of other coefficients is similar.

[0174] In the low-frequency vibration suppression system, the sensor array is connected to the controller to provide real-time data input; the controller analyzes the data and generates a control signal and sends it to the actuator; the actuator adjusts according to the control signal to achieve active shock absorption; the passive shock absorption device includes a tuned mass damper TMD for absorbing vibration energy of a specific frequency; and also includes a tuned liquid damper TLD for absorbing energy using the inertia of the liquid and the principles of fluid dynamics.

[0175] The following is the detailed design of the system:

[0176] The system includes a sensor array: the sensor array includes accelerometers, displacement sensors, and strain gauges.

[0177] The controller includes a real-time data processing unit and a control algorithm. The data processing unit is used to analyze sensor data and determine vibration characteristics. The control algorithm implements active control strategies based on real-time data.

[0178] The actuator is a servomotor or hydraulic actuator that adjusts the position of the structure or added mass damper in response to a control signal.

[0179] Passive vibration damping devices include tuned mass dampers (TMDs) and tuned liquid dampers (TLDs). Tuned mass dampers (TMDs) absorb vibration energy at specific frequencies. Tuned liquid dampers (TLDs) use the inertia of liquids and the principles of fluid dynamics to absorb energy.

[0180] The sensor array is connected to the controller to provide real-time data input. The controller analyzes the data and generates control signals, which are sent to the actuators. The actuators adjust according to the control signals to achieve active vibration reduction. Passive vibration reduction devices (TMD / TLD) respond naturally according to the vibration characteristics without external energy input.

[0181] In some embodiments, the active control strategy includes the following steps: filtering, denoising and signal amplification of sensor data; analyzing vibration frequency and amplitude through methods including fast Fourier transform; generating a control signal based on vibration characteristics; the actuator is adjusted according to the control signal; the system dynamically adjusts the control strategy according to feedback data to achieve adaptive control.

[0182] The specific implementation process is as follows:

[0183] Use a bandpass filter to remove high-frequency noise and low-frequency drift from the sensor signal. Apply a signal amplifier to enhance the strength of the signal and ensure the signal-to-noise ratio of the signal in subsequent processing. Use Fast Fourier Transform (FFT) to convert the time domain signal into a frequency domain signal. Analyze the frequency domain signal to identify the main vibration frequency and amplitude and determine the modal characteristics of the structure. Based on the vibration frequency and amplitude, design control signals with opposite phases to offset or reduce structural vibration. Generate control instructions using an appropriate control algorithm (such as PID control, optimal control, or adaptive control).

[0184] The control signal is converted into an operating instruction for a hydraulic jack, electric push rod or other actuator. The actuator is adjusted in real time according to the control instruction, such as changing the thrust or displacement, to achieve the tilt or vibration control of the bridge.

[0185] Collect real-time response data after actuator adjustment, such as the tilt angle, displacement, and vibration state of the bridge. Compare the feedback data with the preset target state to evaluate the control effect. Based on the evaluation results, dynamically adjust the control parameters and strategies, such as adjusting the proportional, integral, and differential gains of the PID controller.

[0186] In some embodiments, the tuned mass damper TMD consists of a mass block, a spring and a damper, and is tuned to the main vibration frequency of the bridge; when the structure vibrates, the TMD produces opposite vibrations, thereby reducing the vibration of the main structure; the tuned liquid damper TLD utilizes the oscillation of the liquid in the container to absorb energy, and the vibration frequency of the TLD is controlled by adjusting the depth of the liquid, the shape of the container or additional devices.

[0187] First, determine the main vibration frequency of the bridge through vibration testing. According to the vibration characteristics of the bridge, design the mass block (m), spring stiffness (k) and damping coefficient (c) of the TMD. Select a material with high density and small volume (such as steel or concrete) to manufacture the mass block. Select a suitable spring whose stiffness matches the design parameters. Design and manufacture the damper to provide the appropriate damping force.

[0188] The parameters of the TMD are then adjusted so that its natural frequency is consistent with the dominant vibration frequencies of the bridge. The TMD is installed at critical locations on the bridge, such as high points or vibration nodes of the bridge. The installation quality and static load-bearing capacity of the TMD assembly are checked. The response of the TMD is tested when the bridge vibrates to ensure that it works as expected.

[0189] Design the shape and size of the TLD container according to the amount of energy to be absorbed. Select a suitable liquid medium, such as water or oil of a special viscosity. Manufacture a TLD container with the required shape and size. Fill the container with the designed liquid medium. Adjust the depth of the liquid to change the vibration frequency of the TLD. Optimize the energy absorption effect of the TLD by changing the shape of the container.

[0190] Finally, the TLD container is checked for leaks and liquid filling. The dynamic response of the TLD is tested under simulated vibration conditions to ensure that it absorbs energy effectively.

[0191] The present invention also provides a computer program product, which includes a storage medium and computer-readable instructions stored on the medium, and the instructions are configured to perform the aforementioned tilt-shift seismic isolation mechanical demolition arch bridge construction method when executed. The storage medium can be any physical device that can be read by a computer, such as a CD-ROM, DVD, USB drive, hard disk or solid-state drive. The storage medium stores a computer-executable instruction set, which includes a software application for executing the bridge demolition construction method.

[0192] The software architecture includes a user interface (UI), which provides an intuitive graphical user interface that allows users to input parameters, view real-time data, and control system status. The core algorithm module integrates core functions such as PID control algorithm, structural analysis, and vibration suppression strategy. The data management module is responsible for data collection, storage, processing, and analysis. The communication module realizes data exchange with sensors, actuators, and other external devices.

[0193] The software receives and processes data from sensors placed at key locations on the bridge. Based on input parameters and real-time data, the software automatically executes the PID control algorithm and outputs control instructions. The software provides an interface for adjusting modular support units to meet the needs of different bridge support points. The software analyzes sensor data, calculates the bridge stability index (BSI), and provides stability status feedback. The software uses structural analysis software to build a three-dimensional model of the bridge and perform dynamic response analysis. The software integrates the control logic of the low-frequency vibration suppression system, including the tuning and control of TMD and TLD.

[0194] Through these implementation steps, the present invention not only improves the safety and efficiency of the demolition process, but also realizes the resource utilization of waste, which is in line with the concept of sustainable development.

[0195] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A construction method for a tilted shift seismic isolation mechanical demolition arch bridge, characterized in that: The steps include: S1. Arrange elevation control points, inclination sensors and displacement sensors at key locations of the bridge to monitor the settlement, inclination angle and horizontal displacement of the bridge in real time; upload the monitoring data to the central control system in real time through the communication module; S2. The central control system uses PID control algorithm to control the tilt and displacement of the bridge; hydraulic jacks or electric push rods are used as actuators to adjust the height of the bridge support points according to the control system instructions; S3. Install the modular support unit at the bridge support point, and use the adjustment device to adjust the modular support unit to a height close to the target height; S4. Collect sensor data and perform stability analysis through the data analysis unit; according to the data analysis results, synchronously adjust the heights of all modular support units through the control panel; repeat data collection and analysis until the bridge reaches a stable state; S5. Use structural analysis software to build a 3D model of the bridge and input parameters including mass, stiffness, and damping; calculate the optimal tilt path and speed based on the structural model and real-time data; S6. Select isolation materials, design isolation pads, ensure proper installation and fixation between demolition machinery and bridge structure; design low-frequency vibration suppression system, including sensor array, controller and actuator; Combining active control strategies and passive vibration reduction devices to reduce vibration during demolition; S7. Use demolition machinery to carry out demolition according to the path planning; S8. Set up an automatic sorting system at the demolition site to quickly sort the waste; deploy mobile recycling stations to process and recycle the waste generated by the demolition on site; Establish a recycling database to record the types, quantities and potential uses of waste; The modular support unit comprises at least: At least one base: as the bottom of the support unit, in contact with the ground and providing a stable support foundation; Several columns: connecting the base and the top platform; Several adjustment devices: used to adjust the height of the column; A top platform: the part that is in direct contact with the bridge structure; Several locking devices: used to fix the adjusted column height; Several interface components: used for quick connection and fixation between units or with other structural parts.

2. The construction method of tilted shift seismic isolation mechanical demolition arch bridge according to claim 1 is characterized in that: The PID control algorithm calculation process includes the following steps: The tilt angle of the bridge is collected in real time by using inclination sensors and displacement sensors placed at key locations on the bridge. and horizontal displacement data; Filter the collected data to remove noise and outliers; Set the target angle for the bridge's tilt shift and target displacement ; The following PID control algorithm formula is used: ; Where: It's in time The control input at the time, that is, the adjustment amount of the hydraulic jack or electric push rod; , , They are proportional gain, integral gain and differential gain respectively; is the error, including the angular error Or displacement error ; is the integral term of the error, used to eliminate the steady-state error; It is the derivative of the error, which is used to improve the response speed and stability of the system; Adjust the parameters of the PID controller through experiments and simulations , , ; The PID algorithm is integrated into the central control system, which calculates the control input based on real-time data and sends instructions to the hydraulic jacks or electric push rods to achieve automatic tilt and shift of the bridge.

3. The construction method of tilted shift seismic isolation mechanical demolition arch bridge according to claim 1 is characterized in that: In step S4, the stability analysis performed by the data analysis unit includes the following steps: The central control system collects data including the bridge's tilt speed, horizontal displacement rate, stress change, vibration frequency and settlement in real time, and imports the original parameters of the bridge design and monitoring data under historical stable conditions; Clean the collected raw data to remove outliers and noise; And perform data conversion to calculate the change of tilt speed and displacement rate; Determine the reference state value of each monitoring parameter based on the design parameters of the bridge and the monitoring data under the historical stable state; The Bridge Stability Index (BSI) is calculated using the following formula: ; Analyze the calculated BSI values ​​to determine the current stability state of the bridge.

4. The tilt-shift seismic isolation mechanical demolition arch bridge construction method according to claim 1 is characterized in that: Step S5 includes the following steps: Use structural analysis software to build an accurate 3D model of the bridge; input the actual geometric parameters and material properties of the bridge; Integrate the measured data collected in steps S1 to S4 into the model; calibrate the model to reflect the actual current state of the bridge; Perform dynamic response analysis to determine the response of the bridge structure under different inclination paths and speeds; the analysis may include modal analysis, harmonic response analysis, or nonlinear time history analysis; The stress coefficient, vibration coefficient, and energy coefficient are constructed separately and converted into the same dimensionless units; The optimal tilt path and speed calculation formula is used to find the optimal tilt path and speed: ; Where: represents finding the inclined path that minimizes the integral function; and are the start and end time of the tilting process, respectively; It's time Stress distribution of bridge structure when It's time The vibration acceleration of the bridge structure when It's time Energy consumption rate when , , It is a coefficient derived from physical units to ensure that the dimensions of each item are consistent.

5. The construction method of tilted shift seismic isolation mechanical demolition arch bridge according to claim 4 is characterized in that: The coefficients derived from the physical units are dimensionless by introducing reference values ​​or base values.

6. The construction method of tilted shift seismic isolation mechanical demolition arch bridge according to claim 1 is characterized in that: In the low-frequency vibration suppression system, the sensor array is connected to the controller to provide real-time data input; the controller analyzes the data and generates a control signal and sends it to the actuator; the actuator is adjusted according to the control signal to achieve active shock absorption; the passive shock absorption device includes a tuned mass damper TMD for absorbing vibration energy; and also includes a tuned liquid damper TLD for absorbing energy using the inertia of the liquid and the principles of fluid dynamics.

7. The construction method of tilted shift seismic isolation mechanical demolition arch bridge according to claim 6 is characterized in that: The active control strategy includes the following steps: filtering, denoising and signal amplification of sensor data; analyzing vibration frequency and amplitude through methods including fast Fourier transform; generating control signals based on vibration characteristics; adjusting the actuator based on the control signal; and dynamically adjusting the control strategy based on feedback data to achieve adaptive control.

8. The construction method of tilted shift seismic isolation mechanical demolition arch bridge according to claim 6 is characterized in that: The tuned mass damper TMD consists of a mass block, springs and dampers, and is tuned to the main vibration frequency of the bridge; when the structure vibrates, the TMD produces opposite vibrations, thereby reducing the vibration of the main structure; the tuned liquid damper TLD uses the oscillation of liquid in a container to absorb energy, and the vibration frequency of the TLD is controlled by adjusting the depth of the liquid, the shape of the container or additional devices.

9. A computer program product, characterized in that The product comprises a storage medium and computer-readable instructions stored on the medium, wherein the instructions are configured to perform the method of any one of claims 1 to 8 when executed.