A bridge high pile cap device type cofferdam structure
By designing a combined structure of rectangular bottom piles, rotating retaining walls and plug-in boards during the construction of the high pile cap of the bridge, the leakage problem of the cofferdam structure was solved by using pre-designed grooves and anti-seepage grooves, and the construction efficiency and environment were improved. Safety, ensuring dry construction conditions.
Patent Information
- Application Number
- CN202410914553.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the construction of the high pile cap for the bridge, the temporary nature and simplicity of the cofferdam structure caused cement to easily leak along the structural gaps during pouring, causing river water pollution and poor construction environment.
A bridge high pile cap device-type cofferdam structure is designed, which uses a combination of rectangular bottom piles, rotating retaining walls and insert plates. An anti-seepage groove is formed through pre-designed grooves and grooves to ensure cement pouring and insert plate fixation. , enhance structural stability and prevent water penetration.
It improves the construction efficiency of the cofferdam structure, reduces river water pollution, provides a safe and stable construction environment, reduces the risk of structural loosening and collapse, and ensures dry conditions in the construction area.
Smart Images

Figure CN118461643B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of cofferdam structures, in particular to a bridge high pile cap device type cofferdam structure. Background Art
[0002] A bridge high pile cap device type cofferdam structure is a temporary water retaining structure used in the construction of bridge high pile caps. The main purpose of this cofferdam structure is to provide a water-free dry construction environment for the cap construction, so as to ensure that the hydraulic structure can work in a dry environment. It usually includes a plurality of baffles, which are combined into a cubic structure to form the main body of the cofferdam. The outer wall of the baffle is installed with a supporting mechanism to enhance the stability of the structure. A through hole is opened in the middle of the baffle, and a partition or other structure may be arranged inside the through hole to meet different construction requirements.
[0003] During the construction of the bridge high pile foundation, the device-type cofferdam structure, as a temporary water retaining facility, plays a vital role in ensuring that the foundation construction is carried out in a dry environment. However, due to the temporary and simple nature of the cofferdam structure itself, as well as the complexity of on-site construction, cement sometimes leaks out through the gaps in the structure during pouring. Summary of the invention
[0004] The present invention provides a bridge high pile cap device type cofferdam structure, which overcomes the shortcomings described in the background technology.
[0005] The technical solution adopted by the present invention to solve its technical problem is:
[0006] A bridge high pile cap device type cofferdam structure, comprising a bottom pile, a retaining wall and a plug plate, wherein the bottom pile is rectangular in shape, and the retaining wall is arranged in a rotation array outside the bottom pile, each retaining wall is embedded in the side of the bottom pile, and every two adjacent retaining walls are tightly abutted against each other, and a plug plate is inserted at the abutting end of each two retaining walls;
[0007] The bottom pile includes a base, a plurality of positioning grooves are arranged on the side of the base, and a limiting protrusion is arranged at a corresponding position of each positioning groove on the retaining wall installed around the base. When the retaining wall is installed around the base, the limiting protrusion is embedded in the positioning groove;
[0008] Groove 1 and Groove 2 are provided on the side of the retaining wall. The Groove 1 on the two retaining walls is connected to form a limit groove for inserting the plug plate, and the Groove 2 on the two retaining walls is connected to form an anti-seepage groove for pouring cement. The anti-seepage groove is arranged closer to the base than the limit groove, and the height of the upper end of the retaining wall is higher than the horizontal plane height of the installation site at high tide.
[0009] A preferred technical solution is that a step edge and an open groove that sink inward layer by layer are provided in the middle of the base, a closing block is installed in the open groove, and a closing plate is provided on the upper cover of the closing block, and the closing plate is simultaneously against the closing block and the step edge.
[0010] A preferred technical solution is that the side of the opening groove has a plurality of inwardly recessed positioning parts, and the side of the closing block corresponding to the positioning parts are respectively provided with a plurality of positioning protrusions, and when the closing block is installed in the opening groove, the positioning protrusions are embedded in the positioning parts;
[0011] The height of the closing block is lower than the height of the opening groove. When the closing plate cover is arranged on the closing block, the lower end of the closing plate is embedded in the opening groove and abuts against the surface of the closing block.
[0012] A preferred technical solution is that the lower end of the closing plate has a protruding portion protruding outward, the contour of the protruding portion is the same as the contour of the inner edge of the opening groove, and when the closing plate cover is arranged on the closing block, the protruding portion at the lower end of the closing plate is embedded in the opening groove.
[0013] A preferred technical solution is that the edge of the base is convex, and the positioning groove is arranged on the surface of the convex edge of the base, the lower end height of the limiting groove is lower than the upper end surface of the convex edge of the base, and the lower end of the anti-seepage groove extends to the upper surface of the convex edge of the base.
[0014] Compared with the prior art, this technical solution has the following advantages:
[0015] The present invention aims to improve the benefits obtained during the construction process. Through the pre-designed grooves 1 and 2, the insertion of the plug plate and the pouring of cement become simple and quick, which greatly improves the construction efficiency of the cofferdam structure. Through effective anti-seepage measures, the pollution of river water to the construction area is reduced, and the working environment of the staff is improved. Therefore, the design of grooves 1 and 2 of the technical solution, while providing stability and anti-seepage effects, also brings significant benefits to the construction, use and maintenance of the cofferdam structure.
[0016] The side of the retaining wall in the present invention is provided with a groove 1 and a groove 2, and the grooves 1 on the two retaining walls are connected to form a limit groove for inserting the plug plate. This design not only provides a precise insertion position for the plug plate, but also tightly connects the adjacent retaining walls together through the plug plate, thereby significantly enhancing the stability of the entire cofferdam structure. The stable cofferdam structure can provide a safe and stable working environment for bridge construction, reduce the safety risks caused by structural loosening or collapse, and the connection between the retaining walls becomes simple and reliable through the fixing method of the plug plate, which is convenient for later maintenance and management; and the grooves 2 on the two retaining walls are connected to form an anti-seepage groove for pouring cement. Compared with the limit groove, the anti-seepage groove is arranged closer to the base, and the groove 2 forms an anti-seepage groove between the two adjacent retaining walls. By pouring cement, a continuous anti-seepage barrier can be created, which effectively prevents river water from penetrating into the cofferdam structure through the gap between the retaining walls. The design of the anti-seepage groove ensures a dry environment inside the cofferdam structure, providing the necessary conditions for construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0018] Figure 1 This is an overall diagram of the present invention.
[0019] Figure 2 for Figure 1 Schematic diagram of the decomposition.
[0020] Figure 3 A schematic diagram of the base.
[0021] Figure 4 This is a half-section diagram of the base and retaining wall.
[0022] Figure 5 for Figure 4 Schematic diagram from another angle.
[0023] Figure 6 It is a three-dimensional schematic diagram of the closing block and the closing plate.
[0024] Figure 7 for Figure 6 Schematic diagram from another perspective.
[0025] In the figure: bottom pile 1, retaining wall 2 and plug board 3;
[0026] Base 11, closing block 12, closing plate 13, groove 1 21, groove 2 22, limiting protrusion 23;
[0027] The positioning groove 111 , the first hooking groove 112 , the opening groove 113 , the step edge 114 , the positioning column 115 , the positioning protrusion 121 , the second hooking groove 122 , and the third hooking groove 131 . DETAILED DESCRIPTION
[0028] like Figure 1-Figure 7 As shown, the present invention proposes a bridge high pile foundation device type cofferdam structure, including a bottom pile 1, a retaining wall 2 and an insert plate 3. The bottom pile 1 is rectangular in shape, and the retaining wall 2 is rotated and arrayed on the outside of the bottom pile 1. Each retaining wall 2 is embedded in the side of the bottom pile 1, and every two adjacent retaining walls 2 are tightly abutted against each other, and an insert plate 3 is inserted at the abutting end of every two retaining walls 2. When installed, the bottom pile 1, the retaining wall 2 and the insert plate 3 cooperate with each other to form a space to isolate the river water, so that the river water inside and outside the cofferdam structure is not interfered by the tide and the flow. When the water in the cofferdam structure is pumped out, the space in the cofferdam structure is used to provide a dry environment required for construction.
[0029] The bottom pile 1 includes a base 11, and the side surface of the base 11 is provided with a plurality of positioning grooves 111. The retaining wall 2 installed around the base 11 is provided with a limiting protrusion 23 at the corresponding position of each positioning groove 111. When the retaining wall 2 is installed around the base 11, the limiting protrusion 23 is embedded in the positioning groove 111; when the adjacent retaining walls 2 are fixed by the plug plate 3, the stability can be increased by embedding the limiting protrusion 23 into the positioning groove 111. In this way, there are many possibilities for the construction method, such as first hoisting the base 11 to the river bottom, and then successively building the retaining wall 2, and fixing the retaining walls 2 by the plug plate 3. When the bottom pile 11 and the retaining wall 2 sink to the bottom, the retaining wall 2 is used to block the water flow, cut off the mutual influence between the water flows, and then the water in the retaining wall 2 is pumped out, and the closing block 12 and the closing plate 13 are successively installed in the opening groove 113 and the step edge 114 to prevent the water at the lower end of the base 11 from entering the cofferdam structure;
[0030] And if Figure 3 As shown, a plurality of first hook grooves are provided on the side of the base 11, a second hook groove 122 is provided on the surface of the closing block 12, and a third hook groove 131 is provided on the surface of the closing plate 13. When installing the cofferdam structure of the present invention, the base 11, the closing block 12 and the closing plate 13 can be directly lifted by a crane in cooperation with the first, second and third hook grooves for construction. The purpose of separating the closing block 12 and the closing plate 13 from the base 11 and then sequentially constructing them in the present invention is to reduce the influence of the buoyancy of the water flow on the base 11 when the base 11 sinks to the bottom. In the process of rapid sinking, the open groove 113 can guide the water flow to reduce the influence of the water flow on the base, and avoid the base 11 from being skewed due to the flow of water.
[0031] The working principle of the high pile cap device type cofferdam structure of the bridge is mainly reflected in its structural design and construction process; first, the bottom pile 1 is sunk into the river bottom through its base 11, and a plurality of positioning grooves 111 are provided on the side of the base 11, and these positioning grooves are used to cooperate with the limiting protrusions 23 on the retaining wall 2 to ensure that the retaining wall 2 can be accurately and firmly installed around the base 11;
[0032] Next, the retaining wall 2 is installed on the outside of the bottom pile 1 in a rotating array, and every two adjacent retaining walls 2 are tightly abutted against each other, and the plug plate 3 is inserted at the abutting end for fixing; this structural design not only enhances the stability of the cofferdam structure, but also effectively prevents river water from penetrating from the gap; at the same time, the insertion of the plug plate 3 also increases the connection strength between adjacent retaining walls, further improving the stability of the entire cofferdam structure;
[0033] During the construction process, the base 11 is first hoisted to the river bottom, and then the retaining wall 2 is built in sequence and fixed by the plug plate 3; when the bottom pile 1 and the retaining wall 2 sink to the bottom, the retaining wall 2 plays a role in blocking the water flow, effectively isolating the mutual influence between the water flows; at this time, by extracting the water in the cofferdam structure, a dry environment required for construction can be created;
[0034] In order to further enhance the sealing and stability of the cofferdam structure, the closing block 12 and the closing plate 13 are sequentially installed in the opening groove 113 and the step edge 114 of the base 11; these closing components can prevent the water at the lower end of the base 11 from entering the cofferdam structure, thereby ensuring the overall sealing of the cofferdam structure;
[0035] In addition, a plurality of first hook grooves are provided on the side of the base 11, and a second hook groove 122 and a third hook groove 131 are provided on the surface of the closing block 12 and the closing plate 13, respectively; these hook groove designs enable the base 11, the closing block 12 and the closing plate 13 to be directly lifted by the cooperation of the crane and the hook grooves during the construction process, thereby greatly improving the efficiency and safety of the construction;
[0036] And if Figure 5 As shown, a plurality of positioning columns 115 are further provided at the lower end of the base 11 , and the positioning columns 115 are used to enhance the anti-slip effect of the base 11 on the riverbed when the base 11 is installed on the riverbed and enhance the connectivity between the two.
[0037] Furthermore, a groove 1 21 and a groove 22 are provided on the side of the retaining wall 2. The grooves 1 21 on the two retaining walls 2 are connected to form a limiting groove for inserting the plug plate 3. This design not only provides a precise insertion position for the plug plate 3, but also tightly connects the adjacent retaining walls 2 together through the plug plate 3, thereby significantly enhancing the stability of the entire cofferdam structure. The stable cofferdam structure can provide a safe and stable working environment for bridge construction, reduce the safety risks caused by structural loosening or collapse, and the connection between the retaining walls 2 becomes simple and reliable through the fixing method of the plug plate 3, which is convenient for later maintenance and management; and the grooves 22 on the two retaining walls 2 are connected to form an anti-seepage groove for pouring cement. Compared with the limiting groove The position groove is arranged close to the base 11, and the second groove 22 forms an impermeable groove between two adjacent retaining walls 2. By pouring cement, a continuous impermeable barrier can be created to effectively prevent river water from penetrating into the cofferdam structure through the gaps between the retaining walls 2. The design of the impermeable groove ensures a dry environment inside the cofferdam structure, provides necessary conditions for construction, and prevents the construction progress and quality from being affected by river water penetration. The upper end height of the retaining wall 2 is higher than the horizontal plane height of the installation site at high tide; and, the middle part of the base 11 is provided with a step edge 114 and an open groove 113 that sink inward layer by layer, and a closing block 12 is installed in the open groove 113, and a closing plate 13 is provided on the upper cover of the closing block 12, and the closing plate 13 is simultaneously against the closing block 12 and the step edge 114;
[0038] And through the above design, it is intended to improve the benefits obtained during the construction process. Through the pre-designed groove 1 21 and groove 2 22, the insertion of the plug plate 3 and the pouring of cement become simple and quick, which greatly improves the construction efficiency of the cofferdam structure. Through effective anti-seepage measures, the pollution of river water to the construction area is reduced, and the working environment of the staff is improved. Therefore, the design of groove 1 21 and groove 2 22 of the technical solution, while providing stability and anti-seepage effect, also brings significant benefits to the construction, use and maintenance of the cofferdam structure.
[0039] Furthermore, the side surface of the opening groove 113 has a plurality of inwardly recessed positioning portions, and the side surface of the closing block 12 corresponding to the positioning portions is respectively provided with a plurality of positioning protrusions 121, and when the closing block 12 is installed in the opening groove 113, the positioning protrusions 121 are embedded in the positioning portions; the height of the closing block 12 is lower than the height of the opening groove 113, and when the closing plate 13 is covered on the closing block 12, the lower end of the closing plate 13 is embedded in the opening groove 113 and abuts against the surface of the closing block 12;
[0040] When the positioning protrusion 121 is tightly embedded in the positioning part of the opening groove 113, the interaction between them significantly enhances the overall stability of the cofferdam structure. This design ensures a firm connection between the various components, thereby reducing the shaking or displacement that may occur in the structure during use; and the lower end of the closing plate 13 has a protruding portion protruding outward, and the contour of the protruding portion is the same as the contour of the inner edge of the opening groove 113. When the closing plate 13 is covered on the closing block 12, the protruding portion at the lower end of the closing plate 13 is embedded in the opening groove 113; and the edge of the base 11 is convex, and the positioning groove 111 is provided on the surface of the convex edge of the base 11, the lower end height of the limiting groove is lower than the upper end surface of the convex edge of the base 11, and the lower end of the anti-seepage groove extends to the upper surface of the convex edge of the base 11. The good sealing effect means that the cofferdam structure can better withstand external water pressure, thereby reducing the risk of structural failure caused by water infiltration. This provides a safer working environment for construction workers and reduces potential safety hazards, while good sealing effect means that the cofferdam structure can better withstand external water pressure, thereby reducing the risk of structural failure caused by water penetration. This provides a safer working environment for construction workers and reduces potential safety hazards.
[0041] The above description is only a preferred embodiment of the present invention, and therefore cannot be used to limit the scope of the present invention. That is, equivalent changes and modifications made according to the patent scope of the present invention and the contents of the specification should still fall within the scope of the present invention.
Claims
1. A bridge high pile cap device type cofferdam structure, comprising a bottom pile (1), a retaining wall (2) and an inserting plate (3), wherein the bottom pile (1) is rectangular in shape, and the retaining wall (2) is arranged in a rotation array outside the bottom pile (1), each retaining wall (2) is embedded in the side surface of the bottom pile (1), and every two adjacent retaining walls (2) are tightly abutted against each other, and an inserting plate (3) is inserted at the abutting end of every two retaining walls (2); The bottom pile (1) comprises a base (11), a plurality of positioning grooves (111) are provided on the side of the base (11), and a limiting protrusion (23) is provided at a position corresponding to each positioning groove (111) of a retaining wall (2) installed around the base (11), and when the retaining wall (2) is installed around the base (11), the limiting protrusion (23) is embedded in the positioning groove (111); A groove 1 (21) and a groove 2 (22) are provided on the side of the retaining wall (2); the grooves 1 (21) on the two retaining walls (2) are connected to form a limit groove for inserting the plug plate (3); and the grooves 2 (22) on the two retaining walls (2) are connected to form an anti-seepage groove for pouring cement; the anti-seepage groove is arranged closer to the base (11) than the limit groove; and the height of the upper end of the retaining wall (2) is higher than the horizontal plane height of the installation site at high tide; The middle part of the base (11) is provided with a step edge (114) and an opening groove (113) which are gradually sunken inwards, and a closing block (12) is installed in the opening groove (113). A closing plate (13) is provided on the upper cover of the closing block (12), and the closing plate (13) abuts against the closing block (12) and the step edge (114) at the same time. The side surface of the opening groove (113) has a plurality of inwardly recessed positioning portions, and the side surface of the closing block (12) corresponding to the positioning portions is provided with a plurality of positioning protrusions (121), and when the closing block (12) is installed in the opening groove (113), the positioning protrusions (121) are embedded in the positioning portions; The height of the closing block (12) is lower than the height of the opening groove (113), and when the closing plate (13) is covered on the closing block (12), the lower end of the closing plate (13) is embedded in the opening groove (113) and abuts against the surface of the closing block (12); The lower end of the closing plate (13) has a protruding portion protruding outward, the contour of the protruding portion is the same as the contour of the inner edge of the opening groove (113), and when the closing plate (13) is covered on the closing block (12), the protruding portion at the lower end of the closing plate (13) is embedded in the opening groove (113); The edge of the base (11) is convex, and the positioning groove (111) is provided on the surface of the convex edge of the base (11), the lower end of the limiting groove is lower than the upper end surface of the convex edge of the base (11), and the lower end of the anti-seepage groove extends to the upper surface of the convex edge of the base (11); The installation method of the cofferdam structure based on the bridge high pile cap is as follows: During the construction process, the base (11) is first hoisted to the riverbed, and then the retaining wall (2) is sequentially constructed and fixed by means of the plug plate (3); when the bottom pile (1) and the retaining wall (2) sink to the bottom, the retaining wall (2) plays a role in blocking the water flow, effectively isolating the mutual influence between the water flows; at this time, by extracting the water in the cofferdam structure, a dry environment required for construction is created. In order to further enhance the sealing and stability of the cofferdam structure, the closing block (12) and the closing plate (13) are sequentially installed in the opening groove (113) and the step edge (114) of the base (11); these closing components can prevent the water at the lower end of the base (11) from entering the cofferdam structure, thereby ensuring the overall sealing of the cofferdam structure.