A construction method for a communication channel in an intermediate ventilation shaft in a highly permeable stratum

Through the construction method of combining underwater excavation and backfilling with low-grade concrete, the problem of difficult, high-cost and high-risk construction of communication channels in the air shaft has been solved, and the effects of reduced construction difficulty, cost saving and safety guarantee have been achieved.

CN118462180BActive Publication Date: 2024-10-01CCCC SECOND HARBOR ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410921111.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-10-01
Estimated Expiration
2044-07-10

AI Technical Summary

Technical Problem

In the construction of urban rail transit, the communication channels in the wind shaft are located in highly permeable strata and are deeply buried, which makes the construction difficult, costly, and risky. The traditional freezing method construction has problems such as safety hazards, multiple processes, long construction period, and large consumption of materials. .

Method used

The construction method is a combination of underwater excavation and backfilling with underwater low-grade concrete and the mining method, which includes constructing the enclosure structure in the wind shaft area, digging the foundation pit after dewatering and draining, and refilling the water until the water level in the foundation pit is higher than the groundwater level. , use underwater excavation and pouring of low-grade concrete to form a low-grade concrete layer, install tunnel segments simultaneously, and seal the outer ring joints of the segments through pressure relief grouting to reduce the use of frozen pipes.

Benefits of technology

It effectively reduces the construction difficulty and cost, reduces the amount of steel and electricity consumption, reduces construction deformation and safety hazards, shortens the construction period, ensures construction quality and safety, and realizes the simultaneous construction of the communication channel and the main structure of the air shaft.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118462180B_ABST
    Figure CN118462180B_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for a communication channel in a middle wind shaft in a highly permeable stratum, including: S1, constructing a retaining structure in the wind shaft area; S2, excavating the upper area of ​​the foundation pit after precipitation and drainage; S3, recharging water into the foundation pit until the water level is higher than the groundwater level; S4, excavating the lower area of ​​the foundation pit to below the bottom of the communication channel; S5, pouring underwater low-grade concrete in the foundation pit to form a low-grade concrete layer; S6, a shield machine excavates through the wind shaft area in the low-grade concrete layer, and simultaneously installs the tunnel segments; S7, sealing the outer annular seams of the segments in the wind shaft area and outside the communication channel; S8, detecting the sealing quality of the outer annular seams of each segment; S9, removing the segments in the communication channel area, and chiseling out the low-grade concrete layers in the communication channel area and the wind duct area; S10, constructing the main structure of the communication channel and the wind duct and the main structure of the wind shaft. The invention can save construction time, reduce construction costs, and ensure construction safety.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of communication channel construction, and more particularly to a communication channel construction method suitable for use in an intermediate ventilation shaft in a highly permeable stratum. Background Art

[0002] In the construction of connecting channels within interval ventilation shafts in urban rail transit, air ducts are often installed on the top of the connecting channels as ventilation ducts. Since the connecting channels within interval ventilation shafts are often located at the lowest elevation of the tunnel, the air ducts are relatively long. When the connecting channel is located in a highly permeable and water-rich stratum, due to its deep burial depth, the bottom of the tunnel and the connecting channel need to withstand large water and soil pressures. The construction of the connecting channel (including the air duct) is difficult and risky. Existing construction technology conventionally adopts the freezing method. Its construction principle is: construct a number of freezing pipes around the excavation surface of the connecting channel, fill the freezing pipes with circulating brine as a coolant, and use the cooling capacity of the refrigeration unit to freeze the soil outside the excavation surface of the connecting channel into a solid frozen wall with a certain strength, thereby forming an overall frozen curtain to resist water and soil pressure, prevent the water and soil outside the excavation surface from flowing into the excavation surface, and ensure the safety of earth excavation within the frozen wall. However, the structure of the communication channel in the ventilation shaft is different from that of the communication channels in other areas. The communication channel in the ventilation shaft is located within the inter-tunnel area at the bottom of the ventilation shaft, with multiple buildings above it. An air duct is installed between the communication channel and the building. As the ventilation duct for the inter-tunnel, the communication channel and the air duct are integrated into one. Therefore, the communication channel structure in the ventilation shaft has an additional air duct structure compared to other communication channels. Due to the influence of the air duct and the buildings above the air duct, the traditional freezing method has the following limitations when the communication channel in the ventilation shaft is located in a water-rich stratum:

[0003] 1. Large frozen volume and high construction cost: The soil around the air duct and the connecting channel needs to be frozen. The frozen volume is large, the freezing time is long, the construction power consumption is high, and the freezing cost is high;

[0004] 2. The constructed tunnel has safety hazards: first constructing the tunnel, then excavating the soil above the tunnel and constructing the main structure of the ventilation shaft. Due to the large amount of soil unloading above the tunnel, the tunnel will float up and cause serious deformation, which will cause leakage or even cracking in the tunnel.

[0005] 3. High construction risk: In addition to the risks of deformation, leakage, and cracking caused by tunnel floating, the current domestic construction safety issues of the connecting channel freezing method are frequent, such as damage to the refrigeration unit, failure of the freezing wall, or sudden surge during freezing pipe construction, causing huge losses and impacts;

[0006] 4. There are many processes and the operation is difficult: it requires freezing pipe drilling, freezing pipe installation, soil freezing, freezing wall acceptance, earth excavation, primary lining skeleton installation, primary lining concrete spraying, waterproof membrane and main structure construction, freezing pipe removal, construction monitoring, melting and sinking grouting, etc.

[0007] 5. Long construction period: The construction of frozen pipes, the formation of frozen curtains and the melting and grouting take a long time, resulting in a long construction period;

[0008] 6. Great impact on the quality of the main structure: freezing pipes need to be drilled on the main structure of the tunnel segments and ventilation shafts, which will cause great damage to the main structure and affect the durability and waterproofing effect of the main structure;

[0009] 7. Large amount of steel used: freezing pipes need to be installed, and there are many freezing pipes; in addition, the primary lining rigid frame and primary lining concrete need to be installed, which requires a lot of materials and is costly. Summary of the Invention

[0010] An object of the present invention is to solve at least the above problems and to provide at least the advantages which will be described hereinafter.

[0011] In order to achieve these purposes and other advantages according to the present invention, a method for constructing a communication channel in an air shaft in a highly permeable stratum is provided, comprising the following steps:

[0012] S1. Construct a circle of enclosure structure in the ventilation shaft area;

[0013] S2. After draining the retaining structure, excavate the upper area of ​​the foundation pit and construct concrete supports while excavating;

[0014] S3. Refill water into the foundation pit until the water level in the foundation pit is higher than the groundwater level;

[0015] S4. Continue excavating the lower area of ​​the foundation pit using underwater excavation until it reaches below the bottom of the connecting passage;

[0016] S5. Use underwater pouring method to pour underwater low-grade concrete to the bottom of the main structure of the ventilation shaft in the foundation pit to form a low-grade concrete layer;

[0017] S6: The shield machine excavates through the ventilation shaft area in the low-grade concrete layer and installs the tunnel segments simultaneously;

[0018] S7. Seal the outer annular seams of the pipe segments in the ventilation shaft area and outside the communication channel;

[0019] S8, inspecting the sealing quality of the outer annular seams of each segment in step S7 to ensure that the sealing quality is qualified;

[0020] S9. Remove the pipe segments in the communication channel area and chisel away the low-grade concrete layer in the communication channel area and the air duct area;

[0021] S10. Construction of waterproof structure, main structure of communication channel and air duct, and main structure of air shaft.

[0022] Preferably, in step S1, a circle of closed underground continuous walls is constructed in the ventilation shaft area as a retaining structure, and the underground continuous walls are constructed from the ground to below the bottom of the communication channel.

[0023] Preferably, in step S2, a drainage well is first constructed in the retaining structure for drainage. After drainage, the upper area of ​​the foundation pit is excavated, and concrete supports are constructed simultaneously. After the construction of all concrete supports is completed, the drainage well is removed; the upper area of ​​the foundation pit is from the ground to the bottom of the designed lowest layer of concrete supports.

[0024] Preferably, in step S3, water is recharged into the foundation pit until the water level in the foundation pit is 2 to 2.5 m higher than the groundwater level.

[0025] Preferably, in step S4, the foundation pit is further excavated by underwater excavation until it reaches 3.5 to 4 meters below the bottom of the communication channel.

[0026] Preferably, in step S7, the outer annular seams of the segments within the ventilation shaft area and outside the communication channel are sealed by secondary grouting, and the grouting is performed by a pressure relief grouting method, and the slurry is a single-liquid cement mortar.

[0027] Preferably, in step S8, the sealing quality of the outer annular seams of each segment in step S7 is detected by drilling holes to ensure that all outer annular seams are leak-proof; a circle of drilling holes is provided on each segment, and the drilling holes of two adjacent segments are staggered.

[0028] The present invention has at least the following beneficial effects:

[0029] 1. The present invention provides a construction method for connecting channels in middle ventilation shafts in highly permeable strata. The method adopts a method of combining underwater excavation with backfilling of underwater concrete and mining methods to construct connecting channels in middle ventilation shafts in highly permeable and water-rich strata. This method can not only simplify the working procedures and save construction time, but also reduce the amount of steel and electricity used, thereby reducing construction costs, and can effectively reduce construction difficulty and ensure construction quality and safety.

[0030] 2. The present invention provides a construction method for a connecting channel in an air shaft in a highly permeable stratum. Since underwater excavation is adopted in the lower area of ​​the foundation pit, the dewatering excavation depth only needs to meet the needs of concrete support construction, instead of ensuring that the dewatering excavation reaches the bottom of the bottom plate of the main structure of the air shaft as in traditional construction methods. This greatly reduces the depth of the dewatering excavation and effectively reduces the deformation, sudden surge risk, and construction period and cost caused by the foundation pit excavation.

[0031] 3. The present invention provides a construction method for a connecting channel in an intermediate ventilation shaft in a highly permeable stratum. The method first excavates the tunnel area and the ventilation shaft area and then backfills with low-grade underwater concrete. The water-rich stratum is replaced with low-grade concrete with a certain strength that can seal water. Under the effective protection of the concrete, a construction tunnel is excavated in the concrete, which effectively solves the quality and safety hazards such as tunnel deformation, cracking, and leakage caused by the unloading of the tunnel top soil when constructing a connecting channel in the traditional freezing method, which requires constructing the tunnel first and then excavating the ventilation shaft.

[0032] 4. The method for constructing a connecting channel in an air shaft in a highly permeable stratum provided by the present invention can realize the simultaneous construction of the connecting channel and the main structure of the air shaft due to the effective protection of the low-grade concrete layer. Alternatively, the connecting channel and the air duct can be constructed first, and then the main structure of the air shaft can be constructed. Compared with the traditional freezing method for constructing the connecting channel, the main structure of the air shaft must be constructed before the connecting channel is constructed, which can effectively save construction time.

[0033] Other advantages, objectives and features of the present invention will be reflected in part from the following description and will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is a structural schematic diagram of the enclosure structure of the present invention;

[0035] Figure 2 This is a schematic diagram of the structure of the foundation pit after step S2 is completed in the method for constructing a communication channel in an intermediate ventilation shaft in a highly permeable stratum according to the present invention;

[0036] Figure 3 This is a schematic diagram of the structure of the foundation pit after step S4 is completed in the method for constructing a communication channel in an intermediate ventilation shaft in a highly permeable stratum according to the present invention;

[0037] Figure 4 This is a schematic diagram of the structure of the foundation pit after step S5 is completed in the method for constructing a communication channel in an intermediate ventilation shaft in a highly permeable stratum according to the present invention;

[0038] Figure 5 This is a schematic diagram of the structure of the foundation pit after step S7 is completed in the method for constructing a communication channel in an intermediate ventilation shaft in a highly permeable stratum according to the present invention;

[0039] Figure 6 This is a schematic diagram of the structure of the communication channel and the air duct after step S9 is completed in the method for constructing a communication channel in an intermediate air shaft in a highly permeable formation according to the present invention;

[0040] Figure 7 This is a schematic diagram of the main structure of the communication channel and the ventilation shaft after step S10 is completed in the method for constructing a communication channel in a ventilation shaft in a highly permeable formation according to the present invention; DETAILED DESCRIPTION

[0041] The present invention will be described in further detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.

[0042] It should be noted that the experimental methods described in the following embodiments are conventional methods unless otherwise specified, and the reagents and materials are commercially available unless otherwise specified; in the description of the present invention, the terms "horizontal", "longitudinal", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation to the present invention.

[0043] like Figures 1 to 7 As shown, the present invention provides a method for constructing a communication channel in an air shaft in a highly permeable stratum, comprising the following steps:

[0044] S1. Construct a circle of enclosure structure 2 in the ventilation shaft area;

[0045] S2, after dewatering the retaining structure 2, excavate the upper area of ​​the foundation pit, and simultaneously construct the concrete support 4;

[0046] S3. Refill water into the foundation pit until the water level in the foundation pit is higher than the groundwater level;

[0047] S4. Continue excavating the lower area of ​​the foundation pit using underwater excavation until it reaches below the bottom of the communication channel 10;

[0048] S5. Pouring underwater low-grade concrete to the bottom of the ventilation shaft main structure 8 in the foundation pit using an underwater pouring method to form a low-grade concrete layer 5;

[0049] S6, the shield machine excavates through the ventilation shaft area in the low-grade concrete layer 5 and simultaneously installs the tunnel segment 7;

[0050] S7, sealing the outer annular seams of the pipe segments in the air shaft area and outside the communication channel 10;

[0051] S8, inspecting the sealing quality of the outer annular seams of each segment in step S7 to ensure that the sealing quality is qualified;

[0052] S9, dismantling the pipe segments in the area of ​​the communication channel 10, and chiseling away the low-grade concrete layer 5 in the area of ​​the communication channel 10 and the low-grade concrete layer 5 in the area of ​​the air duct 9;

[0053] S10, the waterproof structure, main structure and main structure of the construction communication channel 10 and the air duct 9 as well as the air shaft main structure 8.

[0054] In this technical solution, the ventilation shaft is located in a highly permeable stratum 1. In view of the limitations of the traditional freezing method for constructing the connecting channel in the ventilation shaft, a method combining underwater excavation and backfilling with underwater concrete with the mining method is adopted to construct the connecting channel in the middle of the ventilation shaft in a highly permeable and water-rich stratum.

[0055] In step S1, Figure 1 As shown, first, a circle of enclosure structure 2 is constructed in the ventilation shaft area. Specifically, a circle of closed underground continuous wall is constructed in the ventilation shaft area as the enclosure structure 2, and the underground continuous wall is constructed from the ground to below the bottom of the communication channel 10.

[0056] Then, the foundation pit is excavated in the enclosure structure 2. The foundation pit is excavated in two parts. In step S2, the first excavation of the foundation pit is carried out, that is, the excavation of the upper area. Figure 2 As shown, first, a drainage well 3 for drainage is constructed in the retaining structure 2. After drainage, the foundation pit is excavated, and concrete supports 4 are constructed simultaneously. After all the concrete supports 4 are constructed, the drainage well 3 is removed. In the ventilation shaft area, multiple layers of concrete supports are arranged at intervals in the height direction according to the depth of the ventilation shaft. The upper area of ​​the foundation pit is from the ground to the bottom of the designed lowest layer of concrete supports. That is, the first foundation pit excavation does not need to be excavated to the bottom of the ventilation shaft main structure 8. Dewatering is carried out through the drainage well 3, and the drainage depth only needs to meet the needs of foundation pit excavation and concrete support 4 construction. Considering the large depth of the foundation pit, water is recharged into the foundation pit to balance the water and soil pressure inside and outside the foundation pit, reduce the deformation of the retaining structure 2 after excavation, and prevent the retaining structure from cracking and base surge. Specifically, in step S3, water is recharged into the foundation pit until the water level in the foundation pit is 2~2.5m higher than the groundwater level.

[0057] In step S4, Figure 3 As shown, the lower area of ​​the foundation pit is further excavated by underwater excavation until it reaches 3.5-4 m below the bottom of the communication channel 10. The lower area of ​​the foundation pit is from the bottom of the upper area to the bottom of the communication channel 10.

[0058] In step S5, Figure 4 As shown, underwater low-grade concrete is poured into the bottom of the main structure 8 of the wind shaft in the foundation pit by underwater pouring to form a low-grade concrete layer 5; then in step S6, as shown in FIG. Figure 5As shown, the shield machine excavates through the middle ventilation shaft in the backfilled low-grade concrete layer 5 and simultaneously installs the tunnel segments 7; the water-rich stratum is replaced with low-grade concrete with a certain strength that can seal water, and under the effective protection of the concrete, the construction tunnel is excavated in the concrete, which effectively solves the quality and safety hazards such as tunnel deformation, cracking, and leakage caused by the unloading of the tunnel top soil due to the traditional freezing method of constructing a connecting channel, which requires constructing the tunnel first and then excavating the ventilation shaft.

[0059] In step S7, the outer annular seams of the pipe segments in the air shaft area and outside the communication channel 10 are sealed. Figure 5 The outer annular joints of the pipe segments within the ventilation shaft area and outside the communication channel 10 are sealed by secondary grouting. The grouting is carried out using the pressure relief grouting method, and the pressure relief grouting is guided by the circumferential grouting holes of the pipe segments and the grouting pipe 6. The slurry is a single-liquid cement mortar. The sealing quality of the outer annular joints of each pipe segment in step S7 is then tested to ensure that the sealing quality is qualified. Specifically, in step S8, the sealing quality of the outer annular joints of each pipe segment in step S7 is tested by exploration holes to ensure that all outer annular joints are leak-proof. A circle of exploration holes is set on each pipe segment, and the exploration holes of two adjacent pipe segments are staggered to ensure the detection effect. The exploration holes can be made of steel pipes with an outer diameter of 48mm and an inner diameter of 41mm. The exploration hole steel pipes also serve as spare grouting pipes.

[0060] Before step S9, the recharge water in the foundation pit can be drained in a conventional manner. Figure 6 As shown, the pipe segments 7 in the area of ​​the connecting channel 10 are removed, and the low-grade concrete layer 5 in the area of ​​the connecting channel 10 and the low-grade concrete layer 5 in the area of ​​the air duct 9 are manually chiseled out in the tunnel using a jackhammer. In step S10, as shown in FIG. Figure 7 As shown, due to the protection of the low-grade concrete layer 5, the communication channel 10 and the main structure of the ventilation shaft 8 can be constructed simultaneously, or the communication channel 10 and the ventilation duct 9 can be constructed first, and then the main structure of the ventilation shaft 8 can be constructed. Figure 6 and Figure 7 The middle is a schematic diagram of the cross-sectional structure of the foundation pit along the tunnel transverse direction. Figures 1 to 5 The figure is a cross-sectional view of the foundation pit along the longitudinal direction of the tunnel. When constructing the main structure 8 of the ventilation shaft, the concrete supports 4 are removed simultaneously. The waterproof structure is the main structure of the connecting channel 10 and the air duct 9, as well as the waterproof membrane laid before the construction of the main structure 8 of the ventilation shaft.

[0061] Although the embodiments of the present invention have been disclosed above, they are not limited to the applications listed in the description and implementation methods. They can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and illustrations shown and described herein.

Claims

1. A method for constructing a communication channel in an air shaft in a highly permeable stratum, characterized in that: The following steps are involved: S1. Construct a circle of enclosure structure in the ventilation shaft area; S2. After draining the surrounding structure, excavate the upper area of ​​the foundation pit and construct concrete supports while excavating; S3. Refill water into the foundation pit until the water level in the foundation pit is higher than the groundwater level; S4. Continue to excavate the lower area of ​​the foundation pit by underwater excavation until it reaches below the bottom of the communication channel; S5. Use underwater pouring method to pour underwater low-grade concrete to the bottom of the main structure of the wind shaft in the foundation pit to form a low-grade concrete layer; S6, the shield machine excavates through the ventilation shaft area in the low-grade concrete layer and installs the tunnel segments simultaneously; S7, sealing the outer annular seams of the pipe segments in the air shaft area and outside the communication channel; sealing the outer annular seams of the pipe segments in the air shaft area and outside the communication channel by secondary grouting, the grouting adopts the pressure relief grouting method, and the slurry is a single-liquid cement mortar; S8, inspect the sealing quality of the outer annular seams of each segment in step S7 to ensure that the sealing quality is qualified; inspect the sealing quality of the outer annular seams of each segment in step S7 by drilling holes to ensure that all outer annular seams are watertight; each segment is provided with a circle of drilling holes, and the drilling holes of two adjacent segments are arranged in a staggered manner; the drilling hole steel pipe also serves as a spare grouting pipe; S9. Remove the pipe segments in the communication channel area, and chisel away the low-grade concrete layers in the communication channel area and the air duct area; S10. Waterproof structure, main structure of construction communication channel and air duct, and main structure of air shaft.

2. The method for constructing a communication channel in an air shaft in a highly permeable stratum as claimed in claim 1, characterized in that: In step S1, a circle of closed underground continuous walls is constructed in the ventilation shaft area as a retaining structure, and the underground continuous walls are constructed from the ground to below the bottom of the communication channel.

3. The method for constructing a communication channel in an air shaft in a highly permeable stratum as claimed in claim 1, characterized in that: In step S2, first, a drainage well is constructed in the retaining structure for drainage. After drainage, the upper area of ​​the foundation pit is excavated, and concrete supports are constructed simultaneously. After all concrete supports are constructed, the drainage well is removed; the upper area of ​​the foundation pit is from the ground to the bottom of the designed lowest layer of concrete supports.

4. The method for constructing a communication channel in an air shaft in a highly permeable stratum as claimed in claim 1, characterized in that: In step S3, water is refilled into the foundation pit until the water level in the foundation pit is 2-2.5 m higher than the groundwater level.

5. The method for constructing a communication channel in an air shaft in a highly permeable stratum as claimed in claim 1, characterized in that: In step S4, the foundation pit is further excavated by underwater excavation until it reaches 3.5 to 4 m below the bottom of the communication channel.