Through the combination technology of electric vibrator and diffuser of calcium sand extrusion and vibration pile forming equipment, the problems of low density and easy breakability of calcium sand are solved, and the effective compression and bearing capacity of calcium sand are achieved to ensure that The verticality of construction and soil protection.

CN118481110BActive Publication Date: 2024-11-05HUAIYIN INSTITUTE OF TECHNOLOGY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410902906.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2024-11-05
Estimated Expiration
2044-07-08

AI Technical Summary

Technical Problem

In civil engineering applications, calcium sand has low foundation sinking and pile-driving side friction resistance due to its low density and easy to breakage. Existing treatment methods such as DDC method and glueing are high, making it difficult to effectively improve the bearing capacity.

Method used

Calcium sand extrusion and vibration pile forming equipment is adopted, and the diffuser is driven to vibrate up and down on the slide rail of the track drill rod through an electric vibrator. Combined with the mutual cooperation between the hollow cutting pipe and the diffuser, the absolute verticality of the diffuser is ensured. and protect the soil through a small disturbance through an electric vibrator to achieve the extrusion and filling of calcium sand.

Benefits of technology

It effectively improves the compactness and bearing capacity of calcium sand, ensures the vertical extrusion of the diffuser, reduces disturbance to the soil, and reduces construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118481110B_ABST
    Figure CN118481110B_ABST
Patent Text Reader

Abstract

A calcareous sand compaction and vibration pile forming equipment and construction method, the equipment includes a vertical track drill rod, the vertical track drill rod is a hollow feed pipe; the upper part of the track drill rod is connected to a driving device that drives the track drill rod to rotate, and an electric vibrator and a diffuser are installed at the bottom of the track drill rod. The vibration of the electric vibrator drives the diffuser to move up and down on the track drill rod; the diffuser is composed of a plurality of fan-shaped valves with outer edges bent upward by 90 degrees, and the inner side of the bent part is connected to the outer surface of the track drill rod through a piston device. The construction method includes drilling a hole, expanding the surrounding soil with the diffuser, backfilling the feed pipe with calcareous sand materials, and vibrating and compacting the calcareous sand and the soil around the pile. In the pile forming method of the present invention, the rise and fall of the diffuser are all operated along the vertical track drill rod, which can ensure the absolute verticality of the squeezed hole of the diffuser; in addition, when the electric vibrator is driven downward, the disturbance to the soil around the pile is small, which is conducive to the protection of the original structure of the soil around the pile.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of civil engineering, and mainly relates to a calcareous sand compaction and vibration pile-forming device and a construction method. Background Art

[0002] Most of the beaches in China's Nansha Islands, Xisha Islands and other places are composed of coral sand, which is formed by the long-term accumulation of skeletons of coral polyps and other marine organisms after their death. It is calcareous sand mainly composed of coral debris and also contains lime baths, foraminifera and echinoderm fragments.

[0003] Calcareous sand is a granular material containing more than 50% CaCO3 and 90% calcium. Its special structural characteristics lead to unique mechanical and engineering properties. Compared with quartz sand of mountain rocks on land, which is composed of calcium silicate, calcareous sand has the characteristics of low particle density, easy to break, and many pores inside, whether it is cemented agglomerated sand blocks or small particles of sand. When used in engineering, particle crushing, shear expansion and particle rearrangement must be comprehensively considered.

[0004] In civil engineering applications, the foundation will sink, and the friction resistance on the pile side is very small, so it must be treated before use. There are two ways to deal with it:

[0005] First, a hole is made, and then an olive-shaped heavy hammer is freely dropped into the hole (DDC method), which compacts the soil forward and squeezes it laterally to increase its density and thus improve its bearing capacity. However, the hole made during construction cannot be absolutely vertical, which will cause the heavy hammer to fail to freely drop into the soil. In addition, due to the huge energy during the hammering, the soil outside the hammering and squeezing area is also affected.

[0006] It is solidified by injecting cementitious materials; however, the cost of applying cement to a large area is too high. Summary of the invention

[0007] In view of the above-mentioned technical problems, the present technical scheme provides a calcareous sand compaction vibration pile-forming equipment and construction method, in which an electric vibrator is used to drive the expander to vibrate up and down with a small amplitude on the slide rail of the track drill rod, and the track drill rod is a hollow feed pipe and cooperates with the expander, so that material can be added and compacted at the same time; in this pile-forming method, the rise and fall of the expander are both carried out along the vertical track drill rod, which can ensure the absolute verticality of the squeezed hole of the expander; in addition, when the electric vibrator is driven downward, the disturbance to the soil around the pile is small, which is beneficial to the protection of the original structure of the soil around the pile; it can effectively solve the above-mentioned problems.

[0008] The present invention is achieved through the following technical solutions:

[0009] A calcareous sand compaction and vibration pile forming device comprises a vertical track drill rod, which is a hollow feed pipe; the upper part of the track drill rod is connected to a driving device for driving the track drill rod to rotate, and an electric vibrator and a pressure diffuser are installed at the bottom of the track drill rod, and the vibration of the electric vibrator drives the pressure diffuser to move up and down on the track drill rod; the pressure diffuser is composed of a plurality of fan-shaped valves with outer edges bent upward by 90 degrees, and the inner side surface of the bent part is connected to the outer surface of the track drill rod through a piston device.

[0010] Furthermore, a detachable feeding funnel is provided on the top of the track drill rod.

[0011] Furthermore, a power / signal line tube is arranged on one side of the outer wall of the track drill rod from top to bottom along the track drill rod; the power line and signal line of the electric vibrator and the piston device are arranged from the power / signal line tube to the lower side of the track drill rod and connected to the electric vibrator and the piston device.

[0012] Furthermore, the bottom of the power / signal line tube adopts a flexible spring line tube.

[0013] Furthermore, the diffuser is composed of three fan-shaped valves whose outer edges are bent 90 degrees upward. On the rail drill rod, an annular hydraulic oil tank is arranged between the electric vibrator and the diffuser and at a position corresponding to the 90-degree bending portion. Hydraulic cylinders are respectively arranged between the annular hydraulic oil tank and the inner sides of the bending portions of the three outer edges. The piston rods of the hydraulic cylinders are connected to the inner sides of the bending portions. The piston rods of the hydraulic cylinders are controlled to expand outwards or retract inwards through the annular hydraulic oil tank, thereby realizing the outward expansion or inward retraction of the fan-shaped valve.

[0014] Furthermore, a strip-shaped protrusion is provided on the outer wall at the bottom of the track drill rod to form a slide rail, and limit blocks are provided at the top and bottom ends of the slide rail; matching grooves are provided at the positions of the electric vibrator and the annular hydraulic oil tank corresponding to the protrusion to form a slide groove; the electric vibrator and the annular hydraulic oil tank are fixed as a whole by a fixing part, and a gap is provided between the bottom surface of the track drill rod and the fan-shaped valve, and the gap is greater than / equal to the distance between the electric vibrator and the upper limit block; when the electric vibrator is working, the vibration of the electric vibrator drives the annular hydraulic oil tank, the hydraulic device, the diffuser and the electric vibrator to move up and down between the limit blocks.

[0015] A calcareous sand compaction and vibration pile construction method, the construction method needs to be carried out in conjunction with the above-mentioned calcareous sand compaction and vibration pile equipment, and the specific construction method includes the following steps:

[0016] Step 1: Construction preparation: Conduct geological survey before construction, design the layout of compaction piles, and determine the diameter, length and spacing of the piles;

[0017] Step 2: Drilling: Use drilling equipment to dig pile holes at the predetermined location. The diameter and depth of the pile holes must meet the design requirements.

[0018] Step 3: Compacting, using the expansion piece to compact the side wall of the original pile hole and expand the diameter of the pile hole; the specific operation steps are:

[0019] Step 3.1: Insert the track drill rod deep into the bottom of the original pile hole excavated in step 2 and start the equipment;

[0020] Step 3.2: The annular hydraulic oil tank works to drive the piston rod of the hydraulic cylinder to extend, thereby driving the diffuser to extend outward, and the bent portion of the diffuser acts on the side wall of the original pile hole;

[0021] Step 3.3: After the piston rod is extended to the maximum distance, it is retracted inwards, driving the bent portion of the diffuser to retract;

[0022] Step 3.4: The driving device works according to the set value, driving the track drill rod to rotate to the set angle;

[0023] Step 3.5: Repeat the operations from step 3.2 to step 3.4;

[0024] Step 3.6: Turn on the track drill rod lifting device to drive the track drill rod to rise, and the rising height is less than the height of the bending part in the pressure diffuser;

[0025] Step 3.7: Repeat the operations from step 3.2 to step 3.4;

[0026] Step 4: Material filling: initially pour in the calcareous sand obtained locally through the filling funnel; the specific operation method is:

[0027] Step 4.1: Control the piston rod of the hydraulic cylinder to expand outward through the annular hydraulic oil tank, so that the bottom of the track drill rod remains unobstructed;

[0028] Step 4.2: Input the amount of calcium sand to be filled each time into the controller of the filling funnel. After the filling amount of calcium sand is accurately controlled by the filling funnel, the filling funnel fills the calcium sand into the track drill pipe, so that the calcium sand falls to the compaction section formed after compaction in step 3. When the calcium sand is filled below the bottom surface of the diffuser and reaches about one-half of the compaction section, stop filling the calcium sand;

[0029] Step 5: Compact the filled calcium sand;

[0030] Step 5.1: Control the piston rod of the hydraulic cylinder to retract inwards through the annular hydraulic oil tank;

[0031] Step 5.2: Turn on the track drill rod lifting device to drive the track drill rod 4 to descend to a set height, the descending height being half of the height of the compaction section; release the hydraulic clamping component of the track drill rod lifting device, so that the track drill rod freely falls along the clamping hole to the surface of the newly filled calcareous sand;

[0032] Step 5.3: The electric vibrator works, driving the expansion piece to move up and down along the slide rail on the track drill rod, and compacting the center of the pile hole. During the compaction process, the calcareous sand gradually changes from a fluffy state to a compact state, and the height of the calcareous sand gradually decreases. The track drill rod will drop with the descent of the calcareous sand under the influence of gravity until the sinking height obtained in the experiment. It can be judged that the calcareous sand has reached the density required by the experiment.

[0033] Step 5.4: Control the hydraulic clamping components of the track drill rod lifting equipment to clamp the track drill rod, and drive the track drill rod to rise to the height before the lowering in step 5.2; control the piston rod of the hydraulic cylinder to squeeze outward through the annular hydraulic oil tank; after the squeezing and expansion is completed, release the hydraulic clamping components of the track drill rod lifting equipment again, so that the track drill rod is affected by its own gravity and pressed on the top surface of the calcareous sand;

[0034] Step 5.5: The electric vibrator works to drive the diffuser to move up and down along the slide rail on the track drill rod, and compacts the lower side of the fan-shaped valve to the density required by the experiment;

[0035] Step 5.6: Control the hydraulic clamping component of the track drill rod lifting device again to clamp the track drill rod, and drive the track drill rod to rise to the height before it was lowered in step 5.2; the driving device works according to the set value, driving the track drill rod to rotate the set angle;

[0036] Step 5.7: After the rotation is completed, the hydraulic clamping component of the track drill rod lifting device is released for the third time, so that the track drill rod is pressed on the top surface of the calcareous sand under the influence of its own gravity; the electric vibrator works to drive the pressure diffuser to move up and down along the slide rail on the track drill rod, and the position of the lower side of the fan-shaped flap is vibrated to the density required by the experiment;

[0037] Step 5.8: Control the piston rod of the hydraulic cylinder to retract inwards through the annular hydraulic oil tank, thereby driving the fan-shaped flap of the diffuser to retract;

[0038] Step 5.9: Control the hydraulic clamping component of the track drill rod lifting device again to clamp the track drill rod, and drive the track drill rod to rise, the rising height being less than the height of the bent portion in the diffuser;

[0039] Step 6: Pile formation, repeat steps 3 to 5 until the constructed calcareous sand compaction piles reach the density requirements of the experiment.

[0040] Furthermore, during the construction preparation described in step 1, it is necessary to lay out the lines at the construction site to ensure that each compaction pile is accurately positioned to avoid conflicts with existing underground facilities.

[0041] Furthermore, after driving the track drill rod to rotate clockwise for 6 times, the driving device described in step three needs to rotate counterclockwise for another 6 times to reset; during the rotation process, the expansion or retraction action of the expander can be adjusted according to the actual construction situation; after resetting, the operation of filling calcium sand into the compaction section is performed.

[0042] Furthermore, the driving device rotates by 60 degrees each time. Beneficial Effects

[0043] The calcareous sand compaction vibration pile forming equipment and construction method proposed in the present invention have the following beneficial effects compared with the prior art:

[0044] The present invention drives the pressure diffuser to vibrate up and down with a small amplitude on the slide rail of the track drill rod through an electric vibrator, and the track drill rod is a hollow feed pipe and cooperates with the pressure diffuser, so that material can be added and compacted at the same time; in this pile-forming method, the rise and fall of the pressure diffuser both run along the vertical track drill rod, which can ensure the absolute verticality of the squeezed hole of the pressure diffuser; in addition, when the electric vibrator is driven downward, the disturbance to the soil around the pile is small, which is beneficial to the protection of the original structure of the soil around the pile.

[0045] When vibrating, the electric vibrator in the present invention can drive the annular hydraulic oil tank and the diffuser fixed thereto to move up and down between the limit blocks along the slide rail, realize the up and down vibration of the diffuser, and drive the diffuser to vibrate and compact the filling material below the diffuser; the annular hydraulic oil tank controls the piston rod of the hydraulic cylinder to extend or retract, driving the fan-shaped flap to push outward, and can compact the side wall of the pile hole. During the compaction process, the track drill rod is driven by the rotary drive device to rotate 60° clockwise or 60° counterclockwise, which can realize compaction while rotating, and can make the compaction more comprehensive. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 It is a three-dimensional cross-sectional view of the compression expansion member of the present invention in a retracted state.

[0047] Figure 2 It is a three-dimensional cross-sectional view of the compression expansion member of the present invention in the extended state.

[0048] Figure 3 It is a horizontal cross-sectional view of the bottom of the track drill rod in the present invention.

[0049] Figure 4 It is a top view of the medium-pressure expansion member of the present invention in a retracted state.

[0050] Figure 5It is a bottom view of the medium-pressure expansion member of the present invention in the extended state.

[0051] The numbers in the accompanying drawings are: 1-original drill hole, 2-pile hole after extrusion and expansion, 3-filling material, 4-track drill rod, 41-slide rail, 42-limit block, 43-bottom sliding ring, 5-diffuser, 51-fan-shaped valve, 52-bending part, 53-side rib, 6-electric vibrator, 7-annular hydraulic oil tank, 71-hydraulic cylinder, 72-piston rod, 73-oil pump, 8-power / signal line pipe, 81-wiring outlet, 9-flexible spring line pipe. DETAILED DESCRIPTION

[0052] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. The described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Under the premise of not departing from the design concept of the present invention, various modifications and improvements made by ordinary persons in the art to the technical solutions of the present invention should all fall within the protection scope of the present invention. Example 1

[0053] A calcareous sand compaction and vibration pile forming device comprises a vertical track drill rod 4, which is a hollow feeding pipe; a detachable feeding funnel is arranged on the top of the track drill rod 4. Feed can be added to the hollow pipe of the track drill rod 4 according to demand. A feeding port is formed at the bottom of the track drill rod 4, and the feeding is controlled by a pressure expander 5.

[0054] The upper part of the track drill rod 4 is connected to a rotary drilling rig that drives the track drill rod to rotate. The rotary drilling rig fixes the track drill rod through a hydraulic clamping component, and the rotary drilling rig can also control the rotation frequency and rotation angle of the track drill rod 4 according to needs. The rotary driving device adopts conventional equipment in the field.

[0055] An electric vibrator 6 and an annular hydraulic oil tank 7 are installed at the bottom of the track drill rod 4. A power / signal line tube 8 is arranged along the track drill rod 4 from top to bottom on one side of the outer wall of the track drill rod 4. The power lines and signal lines of the electric vibrator 6, the annular hydraulic oil tank 7 and the hydraulic cylinder 71 are arranged from the power / signal line tube 8 to the lower side of the track drill rod and connected to the electric vibrator 6 and the piston device. A flexible spring line tube 9 is used at the bottom of the power / signal line tube 8 to provide space for the electric vibrator 6 and the annular hydraulic oil tank 7 to stretch when they move up and down.

[0056] A strip-shaped protrusion is provided on the outer wall at the bottom of the track drill rod 4 to form a slide rail 41, and a limit block 42 is provided at the top and bottom of the slide rail 41; matching grooves are provided at the positions of the electric vibrator 6 and the annular hydraulic oil tank 7 corresponding to the protrusion to form a slide groove. The electric vibrator 6 and the annular hydraulic oil tank 7 are installed on the track drill rod 4 to move up and down, and can rotate with the rotation of the track drill rod 4.

[0057] The electric vibrator 6 and the annular hydraulic oil tank 7 are fixed as a whole by a fixing member. A gap is provided between the bottom surface of the track drill rod 4 and the fan-shaped flap 51, and the gap is greater than / equal to the distance between the electric vibrator 6 and the upper limit block 42; it is also possible that the gap is smaller than the distance between the electric vibrator 6 and the upper limit block 42, but the vibration range becomes the gap distance between the bottom surface of the track drill rod 4 and the fan-shaped flap 51. In this embodiment, the gap is equal to the distance between the electric vibrator 6 and the upper limit block 42; this is the best state.

[0058] When the electric vibrator 6 is working, the vibration of the electric vibrator 6 drives the annular hydraulic oil tank 7 , the hydraulic cylinder 71 , the piston rod 72 , the diffuser 5 and the electric vibrator 6 to move up and down between the limit blocks 42 .

[0059] The pressure diffuser 5 is composed of a plurality of fan-shaped flaps with outer edges bent upward by 90 degrees, and the inner side surface of the bent portion 52 is connected to the outer surface of the track drill rod 4 through a piston device. Specifically:

[0060] The diffuser 5 is composed of three fan-shaped valves 51 whose outer edges are bent upward by 90 degrees. On the track drill rod 4, an annular hydraulic oil tank 7 is arranged between the electric vibrator 6 and the diffuser 5 and at a position corresponding to the 90-degree bent portion 52. Hydraulic cylinders 71 are respectively arranged between the annular hydraulic oil tank 7 and the inner sides of the three outer edge bent portions 52. The piston rod 72 of the hydraulic cylinder 71 is connected to the inner side of the bent portion 52. The piston rod 72 of the hydraulic cylinder 71 is controlled by the annular hydraulic oil tank 7 to expand outward or retract inward, so that the fan-shaped valve 51 can be squeezed outward or retracted inward. Example 2

[0061] A calcareous sand compaction and vibration pile construction method, the construction method needs to be carried out in conjunction with the calcareous sand compaction and vibration pile construction equipment described in Example 1, and the specific construction method includes the following steps:

[0062] Step 1: Construction preparation: Conduct geological surveys before construction, design the layout of compaction piles, and determine the diameter, length, and spacing of the piles. During construction preparation, lay out the lines at the construction site to ensure that each compaction pile is accurately positioned to avoid conflicts with existing underground facilities.

[0063] Step 2: Drilling: Use drilling equipment to dig pile holes at the predetermined locations. The diameter and depth of the pile holes must meet the design requirements.

[0064] Step 3: compaction, using the expansion member 5 to compact the side wall of the original pile hole to expand the diameter of the pile hole; the specific operation steps are:

[0065] Step 3.1: Insert the track drill rod 4 deep into the bottom of the original pile hole excavated in step 2 and start the equipment;

[0066] Step 3.2: The annular hydraulic oil tank 7 works, driving the piston rod 72 of the hydraulic cylinder 71 to extend, thereby driving the diffuser 5 to extend outward, and the bent portion 52 of the diffuser 5 acts on the side wall of the original pile hole;

[0067] Step 3.3: After the piston rod 72 is extended to the maximum distance, it is retracted inwards, driving the bent portion 52 of the diffuser 5 to retract;

[0068] Step 3.4: The driving device works according to the set value, driving the track drill rod 4 to rotate at the set angle;

[0069] In actual operation, the driving device rotates at an angle of 60 degrees each time. After driving the track drill rod 4 to rotate clockwise 6 times, it needs to rotate counterclockwise 6 times to reset. During the rotation process, the expansion or retraction action of the expansion piece can be adjusted according to the actual construction situation. After resetting, the operation of filling calcium sand into the compaction section is performed.

[0070] Step 3.5: Repeat the operations from step 3.2 to step 3.4;

[0071] Step 3.6: Turn on the track drill rod lifting device to drive the track drill rod 4 to rise, and the rising height is less than the height of the bending portion 52 in the diffuser 5;

[0072] Step 3.7: Repeat the operations from step 3.2 to step 3.4;

[0073] Step 4: Material filling: initially pour in the calcareous sand obtained locally through the filling funnel; the specific operation method is:

[0074] Step 4.1: Control the piston rod 72 of the hydraulic cylinder 71 to expand outward through the annular hydraulic oil tank 7, so that the bottom of the track drill rod 4 remains unobstructed;

[0075] Step 4.2: Input the amount of calcium sand to be filled each time into the controller of the filling funnel. After the filling amount of calcium sand is accurately controlled by the filling funnel, the filling funnel fills the calcium sand into the track drill rod 4, so that the calcium sand falls to the compaction section formed after compaction in step 3. When the calcium sand is filled below the bottom surface of the expansion member to about one-half of the compaction section, stop filling the calcium sand;

[0076] Step 5: Compact the filled calcium sand;

[0077] Step 5.1: Control the piston rod 72 of the hydraulic cylinder 71 to be retracted inwards through the annular hydraulic oil tank 7;

[0078] Step 5.2: Turn on the track drill rod lifting device to drive the track drill rod 4 to descend to a set height, the descending height being half of the height of the compaction section, so that the bottom surface of the expansion member 5 contacts the filled calcareous sand; release the hydraulic clamping component of the track drill rod lifting device, so that the track drill rod freely falls along the clamping hole to the surface of the newly filled calcareous sand;

[0079] Step 5.3: The electric vibrator 6 works, driving the pressure expander 5 to move up and down along the slide rail on the track drill rod 4, and compacting the center of the pile hole. During the compaction process, the calcareous sand gradually changes from a fluffy state to a compact state, and the height of the calcareous sand gradually decreases. The track drill rod 4 is affected by gravity and decreases with the decrease of the calcareous sand until the sinking height obtained in the experiment. It can be judged that the calcareous sand has reached the density required by the experiment.

[0080] Step 5.4: Control the hydraulic clamping components of the track drill rod lifting equipment to clamp the track drill rod 4, and drive the track drill rod 4 to rise to the height before the lowering in step 5.2; control the piston rod 72 of the hydraulic cylinder 71 to squeeze outward through the annular hydraulic oil tank 7; after the squeezing and expansion is completed, release the hydraulic clamping components of the track drill rod lifting equipment again, so that the track drill rod 4 is affected by its own gravity and pressed on the top surface of the calcareous sand;

[0081] Step 5.5: The electric vibrator 6 works to drive the diffuser 5 to move up and down along the slide rail on the track drill rod 4, and compacts the lower side of the fan-shaped flap 51 to the density required by the experiment;

[0082] Step 5.6: Control the clamping component of the track drill rod lifting device again to clamp the track drill rod 4, and drive the track drill rod 4 to rise to the height before the descending in step 5.2, and then the driving device works according to the set value to drive the track drill rod 4 to rotate the set angle;

[0083] Step 5.7: After the rotation is completed, the hydraulic clamping component of the track drill rod lifting device is released for the third time, so that the track drill rod 4 is pressed on the top surface of the calcareous sand under the influence of its own gravity; the electric vibrator 6 works to drive the pressure diffuser 5 to move up and down along the slide rail on the track drill rod 4, and vibrates the lower side of the fan-shaped flap 51 to the density required by the experiment;

[0084] Step 5.8: The piston rod 72 of the hydraulic cylinder 71 is controlled to retract inwards through the annular hydraulic oil tank 7, thereby driving the fan-shaped flap 51 of the diffuser to retract;

[0085] Step 5.9: Control the hydraulic clamping component of the track drill rod lifting device to clamp the track drill rod 4 again, and drive the track drill rod 4 to rise, the rising height being less than the height of the bent portion 52 in the diffuser 5;

[0086] Step 6: Pile formation, repeat steps 3 to 5 until the constructed calcareous sand compaction piles reach the density requirements of the experiment.

[0087] In this embodiment, the track drill rod lifting device is a machine-locked rod rotary drilling rig of model LD-5150 on the market. When implementing this solution, those skilled in the art may also use other track drill rod lifting devices that can achieve the above functions.

[0088] The above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable people familiar with the technology to understand the content of the present invention and implement it accordingly, and they cannot be used to limit the protection scope of the present invention. Any equivalent transformation or modification made according to the spirit of the present invention should be included in the present invention.

Claims

1. A calcareous sand compaction and vibration pile forming equipment, characterized in that: The invention comprises a vertical track drill rod (4), which is a hollow feed pipe; the upper part of the track drill rod (4) is connected to a driving device for driving the track drill rod (4) to rotate; the bottom of the track drill rod (4) is provided with an electric vibrator (6) and a pressure diffuser (5); the vibration of the electric vibrator (6) drives the pressure diffuser (5) to move up and down on the track drill rod (4); the pressure diffuser (5) is composed of a plurality of fan-shaped flaps (51) whose outer edges are bent upward by 90 degrees; the inner side surface of the bent portion (52) is connected to the outer surface of the track drill rod (4) via a piston device; The pressure diffuser (5) is composed of three fan-shaped flaps (51) whose outer edges are bent upward at 90 degrees. An annular hydraulic oil tank (7) is provided on the rail drill rod (4) between the electric vibrator (6) and the pressure diffuser (5) and at a position corresponding to the 90-degree bent portion (52). Hydraulic cylinders (71) are provided between the annular hydraulic oil tank (7) and the inner side surfaces of the three outer edge bent portions (52). The piston rod (72) of the hydraulic cylinder (71) is connected to the inner side surface of the bent portion (52). The piston rod (72) of the hydraulic cylinder (71) is controlled to expand outward or retract inward by the annular hydraulic oil tank (7), thereby achieving the expansion outward or retraction of the fan-shaped flap (51). A strip-shaped protrusion is provided on the outer wall of the bottom of the track drill rod (4) to form a slide rail (41), and limit blocks (42) are provided at the top and bottom of the slide rail (41); matching grooves are provided at positions of the electric vibrator (6) and the annular hydraulic oil tank (7) corresponding to the protrusion to form a slide groove; the electric vibrator (6) and the annular hydraulic oil tank (7) are fixed as a whole by a fixing member, and a gap is provided between the bottom surface of the track drill rod (4) and the fan-shaped valve (51); when the electric vibrator (6) is working, the vibration of the electric vibrator (6) drives the annular hydraulic oil tank (7), the hydraulic cylinder (71), the piston rod (72), the diffuser (5) and the electric vibrator (6) to move up and down between the limit blocks (42).

2. The calcareous sand compaction and vibration pile-forming equipment according to claim 1, characterized in that: A detachable feeding funnel is provided on the top of the track drill rod (4).

3. The calcareous sand compaction and vibration pile-forming equipment according to claim 1, characterized in that: A power / signal line tube (8) is arranged on one side of the outer wall of the track drill rod (4) from top to bottom along the track drill rod (4); power lines and signal lines of the electric vibrator (6) and the piston device are arranged from the power / signal line tube (8) to the bottom side of the track drill rod (4) and connected to the electric vibrator (6) and the piston device.

4. The calcareous sand compaction and vibration pile-forming equipment according to claim 3, characterized in that: A flexible spring wire tube (9) is provided on the lower side of the power / signal wire tube (8).

5. A calcareous sand compaction and vibration pile construction method, the construction method needs to be carried out in conjunction with a calcareous sand compaction and vibration pile construction device as claimed in any one of claims 1 to 4, and the specific construction method comprises the following steps: Step 1: Construction preparation: Conduct geological survey before construction, design the layout of compaction piles, and determine the diameter, length and spacing of the piles; Step 2: Drilling: Use drilling equipment to dig pile holes at the predetermined location. The diameter and depth of the pile holes must meet the design requirements. Step 3: compaction, using the expansion member (5) to compact the side wall of the original pile hole to expand the diameter of the pile hole; the specific operation steps are: Step 3.1: Insert the track drill rod (4) deep into the bottom of the original pile hole excavated in step 2 and start the equipment; Step 3.2: The annular hydraulic oil tank (7) works to drive the piston rod (72) of the hydraulic cylinder (71) to extend, thereby driving the diffuser (5) to extend outward, and the bent portion (52) of the diffuser (5) acts on the side wall of the original pile hole; Step 3.3: After the piston rod (72) is extended to the maximum distance, it is retracted inwards, driving the bending portion (52) of the diffuser (5) to retract; Step 3.4: The driving device operates according to the set value, driving the track drill rod (4) to rotate to a set angle; Step 3.5: Repeat the operations from step 3.2 to step 3.4; Step 3.6: Turn on the track drill rod lifting device to drive the track drill rod (4) to rise, and the rising height is less than the height of the bent portion (52) in the diffuser (5); Step 3.7: Repeat the operations from step 3.2 to step 3.4; Step 4: Material filling: initially pour in the calcareous sand obtained locally through the filling funnel; the specific operation method is: Step 4.1: The piston rod (72) of the hydraulic cylinder (71) is controlled to expand outwards through the annular hydraulic oil tank (7), so that the bottom of the track drill rod (4) remains unobstructed; Step 4.2: The amount of calcium sand to be filled each time is input into the controller of the filling funnel. After the amount of calcium sand filled each time is accurately controlled by the filling funnel, the calcium sand is poured into the track drill rod (4) by the filling funnel, so that the calcium sand falls to the compaction section formed after compaction in step 3; when the calcium sand is filled below the bottom surface of the expansion member to about one-half of the compaction section, the filling of the calcium sand is stopped; Step 5: Compact the filled calcium sand; Step 5.1: Control the piston rod (72) of the hydraulic cylinder (71) to be retracted inwardly through the annular hydraulic oil tank (7); Step 5.2: Start the track drill rod lifting device to drive the track drill rod (4) to descend to a set height, the descending height being half of the height of the compaction section; release the hydraulic clamping component of the track drill rod lifting device, so that the track drill rod (4) freely falls along the clamping hole to the surface of the newly filled calcareous sand; Step 5.3: The electric vibrator (6) works, driving the pressure expander (5) to move up and down along the slide rail on the track drill rod (4), and vibrating the center of the pile hole. During the vibration and compaction process, the calcareous sand gradually changes from a fluffy state to a compact state, and the height of the calcareous sand gradually decreases. The track drill rod (4) is affected by gravity and descends with the calcareous sand until the sinking height obtained in the experiment is reached. It can be judged that the calcareous sand has reached the density required by the experiment. Step 5.4: Control the hydraulic clamping components of the track drill rod lifting device to clamp the track drill rod (4), and drive the track drill rod (4) to rise to the height before it is lowered in step 5.2; control the piston rod (72) of the hydraulic cylinder (71) to squeeze and expand outward through the annular hydraulic oil tank (7); after the squeezing and expansion is completed, release the hydraulic clamping components of the track drill rod lifting device again, so that the track drill rod (4) is affected by its own gravity and pressed on the top surface of the calcareous sand; Step 5.5: The electric vibrator (6) operates to drive the diffuser (5) to move up and down along the slide rail on the track drill rod (4), and vibrates the lower side of the fan-shaped flap (51) to a density required by the experiment; Step 5.6: Control the clamping component of the track drill rod lifting device again to clamp the track drill rod (4), and drive the track drill rod (4) to rise to the height before it was lowered in step 5.

2. The driving device works according to the set value, driving the track drill rod (4) to rotate at the set angle; Step 5.7: After the rotation is completed, the hydraulic clamping component of the track drill rod lifting device is released for the third time, so that the track drill rod (4) is pressed on the top surface of the calcareous sand under the influence of its own gravity; the electric vibrator (6) works to drive the pressure diffuser (5) to move up and down along the slide rail on the track drill rod (4), and vibrates the lower side of the fan-shaped flap (51) to the density required by the experiment; Step 5.8: The piston rod (72) of the hydraulic cylinder (71) is controlled to retract inwards through the annular hydraulic oil tank (7), thereby driving the fan-shaped flap (51) of the diffuser to retract; Step 5.9: controlling the hydraulic clamping component of the track drill rod lifting device to clamp the track drill rod (4) again, and driving the track drill rod (4) to rise, the rising height being less than the height of the bent portion (52) in the diffuser (5); Step 6: Pile formation, repeat steps 3 to 5 until the constructed calcareous sand compaction piles reach the density requirements of the experiment.

6. The calcareous sand compaction and vibration pile construction method according to claim 5, characterized in that: During the construction preparation described in step 1, it is necessary to lay out the lines at the construction site to ensure that each compaction pile is positioned accurately to avoid conflicts with existing underground facilities.

7. The calcareous sand compaction and vibration pile construction method according to claim 5, characterized in that: After the driving device in step 3 drives the track drill rod (4) to rotate clockwise for 6 times, it needs to rotate counterclockwise for another 6 times to reset. During the rotation process, the expansion or retraction action of the expansion member can be adjusted according to the actual construction situation. After resetting, the operation of filling calcium sand into the compaction section is performed.

8. A calcareous sand compaction and vibration pile construction method according to claim 5 or 7, characterized in that: The driving device rotates by 60 degrees each time.