Environmental assessment method for artificial mountain afforestation construction based on digital twin

By collecting data through technologies such as GPS positioning and drone aerial photography, a digital twin model was constructed, which solved the problem of low construction efficiency in artificial mountain afforestation, enabled the rapid formulation and optimization of construction plans, and improved construction efficiency and ecological environmental protection.

CN118484868BActive Publication Date: 2024-11-19长岛阳光园林绿化有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410930847.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-11-19
Estimated Expiration
2044-07-12

AI Technical Summary

Technical Problem

In existing technologies, the construction efficiency of artificial mountain afforestation is low, it cannot fully simulate all situations, and the experimental cycle is long.

Method used

Environmental data is collected through GPS positioning, drone aerial photography, remote sensing technology, and soil sampler equipment. After data preprocessing, a digital twin model is constructed, and the model is verified and adjusted to assess the feasibility of construction.

Benefits of technology

It enables the rapid formulation and optimization of construction plans, improves construction efficiency, ensures the accuracy and real-time nature of data, and allows for timely implementation of necessary protection and restoration measures, thereby enhancing the level of ecological and environmental protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118484868B_ABST
    Figure CN118484868B_ABST
Patent Text Reader

Abstract

The present invention discloses an artificial mountain afforestation construction environment assessment method based on digital twins, which belongs to the technical field of infrastructure construction, and includes the following steps: conducting field surveys on the artificial mountain afforestation construction environment through GPS positioning, unmanned aerial vehicles, remote sensing technology and soil sampler equipment, and collecting environmental data of artificial mountain afforestation construction; preprocessing the environmental data of artificial mountain afforestation construction; constructing a digital twin model using the preprocessed environmental data; verifying and adjusting the digital twin model; and evaluating the adjusted digital twin model. The present invention collects the artificial mountain afforestation construction environment data to construct a digital twin model to simulate and predict the potential impact of construction on the environment, thereby achieving rapid formulation and optimization of construction plans and solving the problem of low construction efficiency in the prior art.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of infrastructure technology, and in particular to an artificial mountain afforestation construction environment assessment method based on digital twins. Background Art

[0002] With the development of human society and the growing demand for natural resources, forestry, as an important part of natural resources, is regarded as one of the key areas for achieving sustainable development. Against this background, the digital twin technology of smart forestry has emerged and has become an important tool for promoting forestry ecological protection. The digital twin technology of smart forestry is a technical means to accurately present the forestry system in the real world with a digital model, and simulate, analyze and optimize it through real-time data. This technology realizes the digital simulation and management of artificial mountain afforestation construction through technical means such as sensors, monitoring equipment and artificial intelligence.

[0003] The existing environmental simulation system is achieved by artificially simulating vegetation growth through the implementation of slope cutting, hazard removal, netting, spraying substrate, soil covering, drainage, and vegetation restoration.

[0004] For example, the invention patent with the publication number CN103422509B discloses a method for the environmental management of a mine, including: (1) slope cutting; (2) risk elimination; (3) net hanging; (4) net fixing; (5) spraying substrate; (6) net covering; (7) maintenance: after one and a half years, the plants grow naturally and the mine is regreened. For example, the invention patent with the publication number CN108532580B discloses a comprehensive method for the restoration of the ecological environment of a waste rock mountain, including: waste rock mountain slope cutting and shaping and fire extinguishing engineering, closed isolation engineering, soil covering engineering, semi-flexible rapid drainage system engineering, nutrient soil construction engineering, anti-erosion vegetation restoration engineering and vegetation maintenance system engineering. The present invention ensures the safety and stability of the waste rock mountain through reasonable waste rock mountain slope cutting and semi-flexible rapid drainage system; completely eliminates the hazards of the waste rock mountain through fire extinguishing and closed isolation of the waste rock mountain; enables vegetation to grow rapidly and permanently through scientific and reasonable improvement of imported soil; resists erosion of the slope by wind and rain through anti-erosion vegetation restoration technology; solves the problem of vegetation irrigation and fertilization on the slope of the waste rock mountain through the design of a reasonable vegetation maintenance system, and prevents soil and water loss on the slope of the waste rock mountain.

[0005] The above technology has at least the following technical problems:

[0006] In the existing technology, the steps of slope cutting, risk elimination, netting, substrate spraying, soil covering, drainage, vegetation restoration, etc. cannot fully simulate all the conditions in artificial mountain afforestation, and the experimental cycle is long and there is a problem of low construction efficiency. Summary of the invention

[0007] This application solves the problem of low construction efficiency in the prior art by providing an artificial mountain afforestation construction environment assessment method based on digital twins, and realizes the rapid formulation and optimization of construction plans.

[0008] The present application provides an artificial mountain afforestation construction environment assessment method based on digital twins, comprising the following steps: conducting on-site surveys of the artificial mountain afforestation construction environment through GPS positioning, drones, remote sensing technology and soil sampler equipment to collect environmental data for the artificial mountain afforestation construction; performing data preprocessing on the environmental data for the artificial mountain afforestation construction; constructing a digital twin model using the preprocessed environmental data; performing model verification and adjustment on the digital twin model; and performing environmental assessment on the adjusted digital twin model to determine the feasibility of the artificial mountain afforestation construction.

[0009] Furthermore, the steps of collecting environmental data for artificial mountain afforestation construction are: using GPS to locate the mountain; obtaining the overall topographic image and three-dimensional data of the mountain through drone aerial photography; using a soil sampler to take soil samples, and sending the samples to the laboratory for analysis of soil texture, pH value, and nutrient content; real-time monitoring and recording of climate data; recording vegetation information on the mountain through on-site observation; using remote sensing technology: obtaining vegetation coverage through satellite remote sensing images.

[0010] Furthermore, the steps of data preprocessing are: using GPS positioning to obtain mountain location data; converting the mountain location data into CSV format; using GPS to locate the mountain location coordinates; converting the mountain location coordinates into local coordinates; cleaning, screening, deleting erroneous or duplicated coordinate points, integrating and standardizing the environmental data, removing noise, filling missing values, and unifying data formats and units.

[0011] Furthermore, the digital twin model includes a geometric model, a physical model and a vegetation model. The geometric model is used to calculate a comprehensive environmental impact score and evaluate the impact of the environment on artificial mountain afforestation; the physical model is used to calculate the safety factor and evaluate the feasibility of the artificial mountain afforestation project; the vegetation model is used to calculate the vegetation density and evaluate the impact of vegetation factors on the construction environment of artificial mountain afforestation.

[0012] Furthermore, the steps of model verification and adjustment of the digital twin model include: comparing the comprehensive environmental impact score obtained by the geometric model with the actual observed environmental impact to verify its accuracy in simulating geographical phenomena; comparing the safety factor calculated by the physical model with the safety results of actual investigations to evaluate the accuracy of the physical model in mechanical calculations; comparing the vegetation density calculated by the vegetation model with the vegetation density obtained by actual observations to evaluate the accuracy of the vegetation model; testing the stability of the digital twin model under different conditions by simulating uncertainty factors in different scenarios; and testing the stability of the digital twin model under long-term operation.

[0013] Furthermore, the steps of constructing the geometric model include: using the local coordinate system to obtain the geometric properties of the geometric structure, spatial movement, and geometric association of each object in the mountain; using drone aerial photography to obtain terrain images and three-dimensional data; using three-dimensional modeling software to establish a reference surface; applying oblique photography three-dimensional modeling technology, using a drone equipped with a camera to take pictures of ground objects at four vertical angles at the same time, to obtain the appearance, position, height, and slope properties of the ground objects, and to obtain the number of biological species and the total number of individuals; using BIM technology to construct a geometric model; and generating a geometric model after scene data scheduling optimization by constructing a multi-level and multi-layer instantiated and non-instantiated cache.

[0014] Furthermore, the formula for constructing the geometric model is:

[0015] ;

[0016] Where: represents the comprehensive environmental impact score, represents the influence coefficient of geological stability, Indicates the anti-slip force, represents the sliding force, represents the influence coefficient of vegetation cover potential, represents vegetation coverage, M represents the number of species in the community, N represents the total number of individuals observed, P represents the net primary productivity of vegetation, K represents soil erosion resistance, and F represents slope.

[0017] Furthermore, the steps of constructing the physical model are: collecting mountain data related to the physical characteristics of the mountain; using geological exploration methods to obtain data on the internal structure of the mountain and the mechanical properties of the rocks; using three-dimensional geological modeling software to construct a mountain structure model based on the mountain data; based on the mountain structure model, using the Bernoulli equation to establish a physical model of the mountain and analyze external loads; simulating the construction process of artificial mountain afforestation and predicting the mountain safety factor.

[0018] Furthermore, the mechanical formula of the physical model is:

[0019] ;

[0020] Where: represents the safety factor, represents the drag coefficient, It represents the projected area of ​​the mountain exposed to the wind. represents the air density, Wind speed, e represents a constant.

[0021] Furthermore, the steps of constructing the vegetation model include: setting the initial conditions of the model according to the preprocessed environmental data; setting the vegetation model parameters, including growth rate, mortality rate, migration rate, and vegetation coverage; defining the growth, death, and migration rules of vegetation based on ecological principles; constructing a vegetation model based on geographic data and ecological data; the vegetation model simulates the spatial distribution of vegetation in the target area; using an independent data set to verify the vegetation model and evaluate the accuracy of the vegetation model; running the model to simulate the growth and dynamic changes of vegetation in the target area; and outputting the model simulation results.

[0022] One or more technical solutions provided by this application have at least the following technical effects or advantages:

[0023] 1. By using advanced technologies such as GPS positioning and drone aerial photography to collect data on the construction environment of artificial mountain afforestation, the accuracy and real-time nature of the data are ensured, thereby achieving the rapid formulation and optimization of construction plans, effectively solving the problem of low construction efficiency in existing technologies.

[0024] 2. Through data preprocessing and the construction of digital twin models, the potential impact of construction on the environment can be accurately simulated and predicted, so that necessary protection and restoration measures can be taken in a timely manner to reduce environmental risks and improve the level of ecological environmental protection.

[0025] 3. Through construction environment assessment based on digital twins, we can more accurately predict resource requirements during the construction process, rationally allocate human, material and financial resources, and thus achieve optimal allocation and efficient utilization of resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 A flow chart of the method for evaluating the construction environment of artificial mountain afforestation based on digital twins provided in an embodiment of the present application;

[0027] Figure 2 A bar chart of comprehensive environmental impact scores provided in an embodiment of the present application. DETAILED DESCRIPTION

[0028] The embodiment of the present application solves the problem of low construction efficiency in the prior art by providing an artificial mountain afforestation construction environment assessment method based on digital twins. It collects artificial mountain afforestation construction environment data by utilizing advanced technologies such as GPS positioning and drone aerial photography, thereby ensuring the accuracy and real-time nature of the data and realizing the rapid formulation and optimization of construction plans.

[0029] The technical solution in the embodiment of the present application is to solve the above-mentioned problem of low construction efficiency. The overall idea is as follows: conduct on-site surveys of the artificial mountain afforestation construction environment through GPS positioning, drones, remote sensing technology and soil sampler equipment, and collect environmental data for artificial mountain afforestation construction; perform data preprocessing on the environmental data for artificial mountain afforestation construction; use the preprocessed environmental data to build a digital twin model; perform model verification and adjustment on the digital twin model; and perform model evaluation on the adjusted digital twin model to determine the feasibility of artificial mountain afforestation construction.

[0030] By utilizing advanced technologies such as GPS positioning and drone aerial photography to collect construction environmental data for artificial mountain afforestation, preprocess the data and establish a digital twin model to simulate and predict the potential impact of construction on the environment, the construction plan can be quickly formulated and optimized.

[0031] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0032] like Figure 1 As shown, it is a flow chart of the method for environmental assessment of artificial mountain afforestation construction based on digital twins provided in an embodiment of the present application, and the method includes the following steps: conducting on-site surveys of the artificial mountain afforestation construction environment through GPS positioning, drones, remote sensing technology and soil sampler equipment, and collecting environmental data for artificial mountain afforestation construction; performing data preprocessing on the environmental data for artificial mountain afforestation construction; constructing a digital twin model using the preprocessed environmental data; performing model verification and adjustment on the digital twin model; and performing environmental assessment on the adjusted digital twin model to determine the feasibility of artificial mountain afforestation construction.

[0033] In this embodiment, by combining GPS positioning, drones, remote sensing technology and soil sampler equipment, the method can collect a variety of data on the artificial mountain afforestation construction environment, including geographical location, topography, vegetation conditions, and soil conditions, which provide a rich data source for subsequent model construction and evaluation. The collected raw data may contain noise, redundant or inconsistent information, so it is necessary to clean, integrate and standardize through data preprocessing steps to ensure the accuracy and reliability of the data, provide a high-quality data foundation for subsequent model construction, and reflect the importance of data preprocessing. The digital twin model is a virtual mapping of the actual physical system, which can simulate and predict the behavior and performance of the system. The 3D map of artificial mountain afforestation construction is calculated and drawn through the geometric model and the vegetation model. The geometric model provides a basic spatial framework for the digital twin model. The vegetation model simulates the growth distribution state of the vegetation, and then the vegetation growth distribution state simulated by the vegetation model is embedded in the geometric model. Finally, the internal relationship between the geometric model, the vegetation model, and the physical model is calculated through the mechanical formula of the physical model to obtain the digital twin model. In the environmental assessment of artificial mountain afforestation construction, the digital twin model can reflect the changes in the construction environment in real time and provide timely and accurate information support for decision makers. The constructed digital twin model needs to be verified and adjusted to ensure its accuracy and reliability. By comparing and verifying with the actual construction environment, the deficiencies in the model can be found and adjusted to improve the prediction accuracy and practical value of the model. The verified and adjusted digital twin model can be used for model evaluation. The evaluation results can provide a scientific basis for the formulation, optimization and decision-making of artificial mountain afforestation construction plans, which will help improve construction efficiency, reduce construction costs and protect the environment.

[0034] Furthermore, the steps for collecting environmental data for artificial mountain afforestation construction are as follows: using GPS to locate the mountain; obtaining the overall topographic image and three-dimensional data of the mountain through drone aerial photography; using a soil sampler to take soil samples, and sending the samples to the laboratory for analysis of soil texture, pH value, and nutrient content; real-time monitoring and recording of climate data; recording vegetation information on the mountain through on-site observation; using remote sensing technology: obtaining vegetation coverage through satellite remote sensing images.

[0035] In this embodiment, GPS locates the mountain position: GPS technology can accurately determine the latitude and longitude coordinates of the mountain, ensuring that subsequent data collection and analysis can be carried out for a specific geographical location. By collecting multiple GPS points, the outline and range of the mountain can be depicted, providing basic data for overall evaluation. UAV aerial photography to obtain mountain information: UAV aerial photography can quickly obtain large-area mountain topography images and provide high-resolution three-dimensional data. Aerial images can be used to generate a three-dimensional model of the mountain, which helps to analyze the slope, height difference and other characteristics of the mountain. Combined with image analysis technology, information such as the landform type and water system distribution of the mountain can be further extracted. Soil sampling and analysis: The soil sampler can go deep into the mountain to obtain representative soil samples. Laboratory analysis can accurately determine key indicators such as soil texture, pH value, nutrient content, etc., providing a basis for evaluating the soil quality and fertility of the mountain. Real-time monitoring of climate data helps to determine the climate characteristics of the area where the mountain is located. These data are of great significance for evaluating the vegetation growth conditions and soil erosion risks of the mountain. On-site observation and recording of vegetation information: On-site observation can directly understand the type, distribution and growth status of vegetation on the mountain. Recording vegetation information helps to evaluate the ecological status, biodiversity and adaptability of vegetation to the environment of the mountain. Use remote sensing technology to obtain vegetation coverage: Remote sensing technology can quickly obtain vegetation coverage information over a large area through satellite images. Vegetation coverage is one of the important indicators for evaluating the ecological status of the mountain, which can reflect the greening degree and ecological environment quality of the mountain.

[0036] Furthermore, the steps of data preprocessing are: using GPS positioning to obtain mountain location data; converting the mountain location data into CSV format; using GPS to locate the mountain location coordinates; converting the mountain location coordinates into local coordinates; cleaning, filtering, deleting erroneous or duplicated coordinate points, integrating and standardizing the environmental data, removing noise, filling missing values, and unifying data formats and units.

[0037] In this embodiment, data format conversion: converting GPS positioning data into CSV format is to facilitate subsequent data processing and analysis. CSV format is a universal, easy-to-read and write file format that is compatible with a variety of data processing software and analysis tools. Coordinate system conversion: Different coordinate systems may be used in different geographic research projects. In order to unify the data format and improve the availability of data, it is necessary to convert the coordinate system of GPS positioning data into a local coordinate system. The local coordinate system is usually determined according to the specific project requirements or geographical location, and can better reflect the actual geographical location of the research area. Data cleaning, screening and integration: Data cleaning is to remove noise, errors or duplicate coordinate points in the original data to ensure the accuracy and reliability of the data. Data screening is to select a subset of qualified data according to research needs to reduce unnecessary data redundancy. Data integration is to merge data from multiple data sources into a unified data set for subsequent analysis and modeling. Missing value filling and standardization processing: In actual data collection, there may be some missing data. Through reasonable missing value filling methods (such as interpolation, average value filling, etc.), the integrity of the data can be ensured. Standardization is to convert data into a unified scale, eliminate the dimensional differences between different indicators, and make the data comparable and analytical. Through data preprocessing, noise, errors and redundant information in the original data can be removed to improve the accuracy and reliability of the data. Enhance data availability: Converting GPS positioning data into CSV format and local coordinate system can make data easier to read, write and process. At the same time, through data integration and standardization, data from different sources can be compared and analyzed on the same platform. Support scientific decision-making: Preprocessed data can provide accurate and reliable data support for the environmental assessment of artificial mountain afforestation construction. This helps decision makers understand the actual situation of the construction environment and formulate scientific and reasonable construction plans and environmental protection measures.

[0038] Furthermore, the digital twin model includes a geometric model, a physical model and a vegetation model. The geometric model is used to calculate the comprehensive environmental impact score and evaluate the impact of the environment on artificial mountain afforestation; the physical model is used to calculate the safety factor and evaluate the feasibility of the artificial mountain afforestation project; the vegetation model is used to calculate the vegetation density and evaluate the impact of vegetation factors on the construction environment of artificial mountain afforestation.

[0039] In this embodiment, building a digital twin model includes building a geometric model, and building a geometric model is used to draw a 3D image to assist in viewing and analyzing the mountain situation, and obtain various objects in the mountain, including: rocks, plants and other natural environment scenery. The benefits of optimizing the geometric model after scene data scheduling by building a multi-level, multi-level instantiation and non-instantiation cache are: improving rendering performance, by managing geometric data and material data, the amount of data transmission between the CPU and GPU can be reduced, thereby reducing rendering delays and increasing frame rates. Reduce memory usage, the instantiation cache allows the same geometric data and material data to be reused, thereby reducing overall memory usage. Multi-level, multi-level cache strategies can further ensure that only the most important data is stored in memory. Enhance user experience, faster rendering speeds and lower latency mean that users can get a smoother and more responsive experience. Flexibility, multi-level, multi-level cache strategies allow the system to adjust as needed to balance performance and memory usage. For example, in scenarios that require more memory, lower-level cache data can be released. Scalability and optimized resource usage. Table 1 is an example table of the relationship between each environmental impact factor and the comprehensive environmental impact score, as shown in Table 1:

[0040]

[0041] The data in the slope F in the table are obtained by measuring the angle, and then the unit is adjusted after normalization. For example, in the data slope of sequence number 1, the original slope data is 10, and the original slope data is divided by 90 to obtain the normalized data 0.11 in Table 1, where 90 degrees is a right angle, so 0 degrees corresponds to 0 for completely flat, and 90 degrees corresponds to 1 for vertical. The comprehensive environmental impact score C is obtained by Z-score normalization to obtain data with a value range of 0-100, where the larger the value, the more suitable the data is for artificial mountain afforestation construction. It can be seen from Table 1 that the comprehensive environmental impact score is affected by geological stability, vegetation coverage potential, anti-sliding force, sliding force, vegetation coverage, the number of species in the community, the total number of individuals observed, the net primary productivity factor of long-term vegetation, soil anti-erosion force, and slope. The comprehensive environmental impact score increases with the increase of vegetation coverage potential, anti-sliding force, vegetation coverage, the number of species in the community, and the net primary productivity factor of long-term vegetation. The comprehensive environmental impact score can comprehensively reflect the feasibility of the artificial afforestation construction environment. Figure 2 As shown in the figure, the relationship between the comprehensive environmental impact factors and the comprehensive environmental impact score is shown. It can be seen from the figure that the factor No. 3 has the highest impact score, which proves that it is the safest and most suitable for artificial afforestation environmental construction, and the factor No. 4 has the smallest impact score and is the least suitable for artificial afforestation environmental construction.

[0042] Furthermore, the steps of model verification and adjustment of the digital twin model include: comparing the comprehensive environmental impact score obtained by the geometric model with the actual observed environmental impact to verify its accuracy in simulating geographical phenomena; comparing the safety factor calculated by the physical model with the safety results of actual investigations to evaluate the accuracy of the physical model in mechanical calculations; comparing the vegetation density calculated by the vegetation model with the vegetation density obtained by actual observations to evaluate the accuracy of the vegetation model; testing the stability of the digital twin model under different conditions by simulating uncertainty factors in different scenarios; and testing the stability of the digital twin model under long-term operation.

[0043] In this embodiment, by simulating the uncertainty factors in different scenarios, such as disconnection, no signal, excessive GPU consumption, etc., the digital twin model is tested to be stable. Test whether the digital twin model will freeze or lose data when running for a long time to determine stability. The initial condition setting is the starting point of the simulation. It provides a basic environmental background for the vegetation model based on pre-processed environmental data such as climate, soil, terrain, etc. The parameter settings include growth rate, mortality rate, and migration rate. These parameters reflect the basic biological characteristics of vegetation in the natural environment. Reasonable parameter settings can more accurately simulate the growth, death and migration process of vegetation, and improve the accuracy and credibility of the simulation. Defining the growth, death and migration rules of vegetation based on ecological principles is the core part of the simulation. These rules describe the dynamic change process of vegetation under different environmental conditions. Clear rule definitions can ensure the scientificity and rationality of the simulation process and help reveal the internal mechanism of vegetation change. According to geographic data and ecological data, simulating the spatial distribution of vegetation in the target area can show the distribution law and change characteristics of vegetation in geographic space. Using independent data sets to verify the vegetation model and evaluate its accuracy and reliability is an important step to ensure the effectiveness of the model. Running the model to simulate the growth and dynamic changes of vegetation in the target area can obtain a series of simulation results.

[0044] Furthermore, the steps for constructing the geometric model are: using the local coordinate system to obtain the geometric properties of the geometric structure, spatial movement, and geometric association of each object in the mountain; using drone aerial photography to obtain terrain images and three-dimensional data; using three-dimensional modeling software to establish a reference surface; applying oblique photography three-dimensional modeling technology, using a drone equipped with a camera to take pictures of ground objects at four vertical angles at the same time, to obtain the appearance, position, height, and slope properties of ground objects, and to obtain the number of biological species and the total number of individuals; using BIM technology to construct a geometric model; and generating a geometric model after scene data scheduling optimization by constructing a multi-level and multi-layer instantiated and non-instantiated cache.

[0045] In this embodiment, BIM technology refers to building information modeling technology. The geometric structure, spatial movement, geometric properties of geometric associations, topographic images and three-dimensional data of each object in the mountain, the appearance, position, height, slope properties, number of biological species, and total number of individuals of ground objects are obtained to construct a 3D image of the geometric model. The scene data is generated by constructing a multi-level, multi-level instantiation and non-instantiation cache, and the optimized geometric model is scheduled. By managing geometric data and material data, the amount of data transmission between the CPU and GPU is reduced, thereby reducing rendering delays and increasing frame rates. Reduce memory usage, allow the same geometric data and material data to be reused through instantiation caching, reduce overall memory usage, and schedule optimized geometric models. The physical model is used to mechanically analyze the feasibility of the artificial mountain afforestation construction environment through specific mechanical calculations. By analyzing external loads through physical models, the response and changes of the mountain under different conditions can be predicted. This is of great significance for evaluating the stability of the mountain and predicting potential natural disasters. Simulating the construction process of artificial mountain afforestation can help understand the impact of afforestation activities on mountain stability. Through simulation, the potential impact of different afforestation schemes on mountain stability can be predicted, thereby optimizing afforestation plans and ensuring the long-term stability of the mountain.

[0046] Furthermore, the formula for constructing the geometric model is:

[0047] ;

[0048] Where: represents the comprehensive environmental impact score, represents the influence coefficient of geological stability, Indicates the anti-slip force, represents the sliding force, represents the influence coefficient of vegetation cover potential, represents vegetation coverage, M represents The number of species, N is the total number of individuals observed, P represents the net primary productivity of vegetation, K represents the soil erosion resistance, Indicates slope.

[0049] In this embodiment, It can also be obtained by calculating life cycle assessment and environmental risk assessment models. The formula of the geometric model can assist in drawing the 3D image of the digital twin model by calculating the comprehensive environmental impact score, which is used to assist users in analyzing the impact of the environment on the environmental assessment of artificial mountain afforestation. It can be obtained through feature selection algorithms in machine learning algorithms, or by using sensitivity analysis or optimization algorithms. It can be obtained through experimental measurement, or alternatively through model prediction, interpolation or approximation. It can be obtained through experimental measurement, or alternatively through model prediction, interpolation or approximation. It can be obtained through feature selection algorithms in machine learning algorithms, or by using sensitivity analysis or optimization algorithms. It can be obtained through experimental data or by using the least squares method. It can be obtained through measurement or data fitting. It can be obtained through measurement or data fitting. It can be obtained through field observations or by setting up soil erosion model simulations. It can be obtained through field measurement and topographic map data. P can be obtained by consulting materials and experiments.

[0050] Further, the steps of constructing the physical model are: collecting mountain data related to the physical characteristics of the mountain; using geological exploration methods to obtain data on the internal structure of the mountain and the mechanical properties of the rock. Using 3D geological modeling software, construct a mountain structure model based on the mountain data; on the basis of the mountain structure model, use the Bernoulli equation to establish a physical model of the mountain and analyze the external load; simulate the construction process of artificial mountain afforestation and predict the safety factor of the mountain.

[0051] In this embodiment, the mountain data related to the physical characteristics of the mountain include the drag coefficient, the external load includes the wind speed, and the mountain data related to the physical characteristics of the mountain include the projected area of ​​the mountain exposed to the wind. The safety factor in the physical model reflects that the higher the safety level of artificial mountain afforestation, the higher the comprehensive environmental impact score in the geometric model, the greater the feasibility of artificial mountain afforestation, and the time step in the vegetation model. The higher the vegetation density under the condition, the greater the feasibility of artificial mountain afforestation. The mechanical formula of the physical model plays an important role in engineering design, structural analysis and risk assessment. By comparing with experimental results and actual measurement data, the accuracy of the mechanical formula of the physical model in mechanical calculation can be guaranteed, thereby ensuring the safety and reliability of the project. Accurate mechanical formulas of physical models can provide engineers with reliable data support, help optimize design solutions, and reduce material costs and energy consumption. By evaluating the accuracy of mechanical formulas of physical models, the development of mechanical research can be promoted and the level of scientific research can be improved. Vegetation models play an important role in ecological protection and restoration. By comparing with actual observations, the accuracy of vegetation models in simulating vegetation coverage can be evaluated, providing a scientific basis for ecological protection. Vegetation is an important part of the earth's ecosystem, and its changes have an important impact on climate change. By evaluating the accuracy of vegetation models, in-depth research on climate change can be promoted. By simulating uncertainty factors in different scenarios, the stability and reliability of digital twin models under different conditions can be evaluated, which helps to discover potential risks of the system and take preventive measures in advance to improve the robustness of the system. Stable digital twin models can provide reliable data support for decision makers and help them make more informed decisions. By comprehensively evaluating the stability and reliability of digital twin models, enterprises can pay more attention to data quality and model performance during the digital transformation process and improve the effectiveness of digital transformation. Digital twin models that run for a long time need to maintain good performance to ensure their long-term effectiveness. By examining the performance of the model under long-term operation, potential problems can be discovered and solved in a timely manner to ensure that the model remains stable and reliable in the long run. Understanding the performance of the model under long-term operation can help enterprises better allocate resources and ensure that the model can play the greatest role in key tasks. Long-running digital twin models provide enterprises with rich opportunities for data accumulation and experience summary.

[0052] Furthermore, the mechanical formula of the physical model is:

[0053] ;

[0054] Where: represents the safety factor, represents the drag coefficient, It represents the projected area of ​​the mountain exposed to the wind. represents the air density, Wind speed, e represents a natural constant.

[0055] In this embodiment, It can also be obtained through wind tunnel tests. It can be used as a basis for judging the construction environment of artificial mountain afforestation. It can be obtained through experimental measurement or by estimating the drag coefficient by simulating the flow of fluid around an object using computational fluid dynamics software. It can be obtained by measuring and calculating the geometric dimensions of the object, or by using 3D scanning technology or image processing technology. It can be obtained by measuring with a density meter or by measuring with a mass flow meter. It can be obtained through measurements with anemometers and flow meters, and wind speed can also be obtained through satellite remote sensing data. The mechanical formula of the physical model can help users analyze the safety of the artificial mountain afforestation construction environment.

[0056] Furthermore, the steps of constructing the vegetation model are as follows: setting the initial conditions of the model according to the preprocessed environmental data; setting the vegetation model parameters, including growth rate, mortality rate, migration rate, and vegetation coverage; defining the growth, death, and migration rules of vegetation based on ecological principles; constructing the vegetation model according to geographic data and ecological data; the vegetation model simulates the spatial distribution of vegetation in the target area; using an independent data set to verify the vegetation model and evaluate its accuracy; running the model to simulate the growth and dynamic changes of vegetation in the target area; and outputting the model simulation results.

[0057] In this embodiment, the mathematical formula of the vegetation model is:

[0058]

[0059] Where: Indicates the time step The vegetation density under is used to record the initial state of vegetation, t represents the time step, represents the initial position of the vegetation, represents the position of the vegetation after it moves, where for Neighbors, represents the growth term of vegetation, which is used to describe the growth of vegetation at position (i, j) and time step t, r represents the growth rate, represents the vegetation density in the initial state, represents the environmental carrying capacity, It represents the death term of vegetation, which is used to describe the death amount of vegetation at position (i, j) and time step t. m represents the mortality rate. Represents the vegetation immigration term, used to describe the location Neighbors Migrate to location The amount of vegetation, Indicates that vegetation from arrive The migration rate, Indicates at location The vegetation density on Represents the amount of vegetation migration, used to describe the migration from location Migrate to its neighbors The amount of vegetation, Indicates that vegetation from arrive The migration rate of vegetation. i represents the horizontal coordinate of the initial position of vegetation, j represents the vertical coordinate of the initial position of vegetation, k represents the horizontal coordinate of the position of the neighbor of vegetation, and l represents the vertical coordinate of the position of the neighbor of vegetation. It can be obtained through field measurements and remote sensing data, or estimated through model prediction and interpolation. It can be obtained through ecological research, experimental data, or estimated through climate models, soil conditions, or other ecological factors. It can be obtained through the research results of soil type data, and can also be estimated through ecological models. m is obtained by the ratio of the number of dead vegetation to the total number of vegetation, and can also be obtained by calculating the average mortality rate under historical periods. It can be obtained through field observation of animal behavior and can also be obtained by estimating migration rates through water flow models. It can be obtained through field measurements and remote sensing data, or estimated through model prediction and interpolation. It can be obtained through field observations of animal behavior and by estimating migration rates using water flow models.

[0060] To sum up, the embodiments of the present application collect artificial mountain afforestation construction environment data by utilizing advanced technologies such as GPS positioning and drone aerial photography, thereby ensuring the accuracy and real-time nature of the data, and further realizing the rapid formulation and optimization of construction plans.

[0061] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0062] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0063] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0064] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0065] Although the preferred embodiments of the present invention have been described, those skilled in the art may make additional changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.

[0066] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. The method for evaluating the construction environment of artificial mountain afforestation based on digital twin is characterized by: The following steps are involved: Conduct field surveys of the artificial mountain afforestation construction environment through GPS positioning, drones, remote sensing technology, and soil sampler equipment to collect environmental data on artificial mountain afforestation construction; Preprocess the environmental data of artificial mountain afforestation construction; Build a digital twin model using preprocessed environmental data; Verify and adjust the digital twin model; Conduct environmental assessment on the adjusted digital twin model to determine the feasibility of artificial mountain afforestation construction; The word twin model includes geometric model, physical model and vegetation model; The geometric model is used to calculate the comprehensive environmental impact score and evaluate the impact of the environment on artificial mountain afforestation; The physical model is used to calculate the safety factor and evaluate the feasibility of artificial mountain afforestation projects; The vegetation model is used to calculate vegetation density and evaluate the impact of vegetation factors on the construction environment of artificial mountain afforestation; The steps for model verification and adjustment of the digital twin model include: The composite environmental impact scores obtained by the geometric model were compared with the actual observed environmental impacts to verify its accuracy in simulating geographical phenomena; The safety factor calculated by the physical model is compared with the safety results of the actual investigation to evaluate the accuracy of the physical model in mechanical calculation; Compare the vegetation density calculated by the vegetation model with the vegetation density obtained from actual observations to evaluate the accuracy of the vegetation model; Test the stability of the digital twin model under different conditions by simulating uncertainty factors in different scenarios; Test the stability of digital twin models under long-term operation; The steps of constructing the geometric model are: Use the local coordinate system to obtain the geometric properties of the geometric structure, spatial motion, and geometric association of each object in the mountain; Use drones to obtain topographic images and three-dimensional data; Use 3D modeling software to establish reference surfaces; Apply oblique photography 3D modeling technology, use drones equipped with cameras to take photos of ground objects at four vertical angles at the same time, obtain the appearance, location, height, and slope attributes of ground objects, and obtain the number of species and total number of individuals in the biological community; Use BIM technology to build geometric models; Generate a geometric model optimized for scene data scheduling by building multi-level, multi-layer instantiation and non-instantiation caches; The formula for constructing the geometric model is: ; Where: represents the comprehensive environmental impact score, represents the influence coefficient of geological stability, Indicates the anti-slip force, represents the sliding force, represents the influence coefficient of vegetation cover potential, represents vegetation coverage, M represents the number of species in the community, N represents the total number of individuals observed, P represents the net primary productivity of vegetation, K represents the soil erosion resistance, and F represents the slope; The steps of constructing the physical model are: Collect mountain data related to the physical characteristics of the mountain; Use geological exploration methods to obtain data on the internal structure of the mountain and the mechanical properties of the rocks; Use 3D geological modeling software to build a mountain structure model based on mountain data; Based on the mountain structure model, the physical model of the mountain is established using the Bernoulli equation to analyze the external loads; Simulate the construction process of artificial mountain afforestation and predict the safety factor of the mountain; The mechanical formula of the physical model is: ; Where: represents the safety factor, represents the drag coefficient, It represents the projected area of ​​the mountain exposed to the wind. represents the air density, represents wind speed, e represents a natural constant; The steps of constructing the vegetation model are as follows: Setting the initial conditions of the model based on the preprocessed environmental data; Set vegetation model parameters, including growth rate, mortality rate, migration rate, and vegetation coverage; Define the growth, death, and migration rules of vegetation based on ecological principles; Construct vegetation models based on geographic and ecological data; The vegetation model simulates the spatial distribution of vegetation in the target area; Validate the vegetation model using an independent dataset to assess the accuracy of the vegetation model; Run the model to simulate the growth and dynamic changes of vegetation in the target area; Output model simulation results.

2. The method for evaluating the construction environment of artificial mountain afforestation based on digital twins as claimed in claim 1, characterized in that: The steps of collecting environmental data of artificial mountain afforestation construction are: Use GPS to locate the mountain; Obtain the overall topographic images and three-dimensional data of the mountain through drone aerial photography; Use a soil sampler to take soil samples and send the samples to the laboratory for analysis of soil texture, pH, and nutrient content; Monitor and record climate data in real time; Record vegetation information on the mountain through on-site observation; Use remote sensing technology to obtain vegetation coverage through satellite remote sensing images.

3. The method for evaluating the construction environment of artificial mountain afforestation based on digital twins as claimed in claim 1 is characterized by: The steps of data preprocessing are: Use GPS positioning to obtain data on the location of the mountain; Convert the data of mountain location into CSV format; Use GPS to locate the mountain's location coordinates; Convert the mountain location coordinates into local coordinates; The environmental data is cleaned, screened, erroneous or duplicated coordinate points are deleted, integrated and standardized to remove noise, fill missing values, and unify data formats and units.