A soil remediation process based on organic pollution control

By using shovel head pieces and external pressure plates to form multi-layer structural reinforcement during soil repair, combined with adsorbent and plant planting, the problems of large energy consumption of soil repair and pollutant migration are solved, and efficient soil pollution repair is achieved.

CN118492041BActive Publication Date: 2024-11-22SHANGHAI FANLING ENVIRONMENTAL ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410979147.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-11-22
Estimated Expiration
2044-07-22

AI Technical Summary

Technical Problem

The existing soil repair technology consumes a lot of energy and takes a long time to phytorepair. Rain during the phytorepair process will lead to pollutant migration, reducing the repair effect.

Method used

A soil repair process based on organic pollution control is adopted. The vehicle body drives the restoration unit to move in the soil. The shovel head piece pushes and shovels and divides ridges, and adds adsorbent materials during the process. The soil ridge side is beaten by the external pressure plate. and top, forming multi-layered structure reinforcement, reducing pollutant migration, and forming partition grooves on the soil surface to prevent rainwater from erosion.

Benefits of technology

It improves the soil structure strength, reduces pollutant migration, enhances the adsorption effect, prevents pollutant aggregation, and achieves more efficient pollution repair by planting adsorbed plants.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118492041B_ABST
    Figure CN118492041B_ABST
Patent Text Reader

Abstract

The present invention discloses a soil remediation process based on organic pollution control, which relates to the technical field of soil remediation, including: S1, ridge formation and block division; S2, side reinforcement; S3, segmented covering; S4, synchronous pit digging. The multi-layer soil structure shoveled by the first-level shovel head, the second-level shovel head and the third-level shovel head is combined with the reinforcement and beating of the mixed adsorbent of the outer pressure plate, so that the side of the soil ridge is reinforced by multiple layers to improve the structural strength of the soil ridge, and the adsorbent is beaten to the side of the soil ridge by multiple layers, so that the multi-layer structure on the side of the soil ridge is mixed with the adsorbent, so that the side of the soil ridge can be isolated by the adsorbent, thereby reducing the migration of pollutants inside the soil ridge, and the lower pressure plate compacts the mixed adsorbent at the bottom of the dividing ditch, which also reduces the accumulation of pollutants accidentally flowing into the dividing ditch, and then the adsorbent plant is planted in the pit dug by the shovel, so that the adsorbent plant can adsorb the pollutants inside the soil ridge isolated by the adsorbent and reinforced by the multi-layer structure on the side.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of soil remediation, and in particular to a soil remediation process based on organic pollution control. Background Art

[0002] Organic pollution refers to the pollution of ecosystems and human health caused by various organic compounds entering the environment (such as soil, water and atmosphere) due to human activities. The remediation of organic pollution in the soil often adopts bioremediation, chemical oxidation, adsorption and solidification methods, etc., to prevent the pollution from affecting the human body in the natural cycle.

[0003] Chinese patent CN201710857167.3 discloses an integrated organic contaminated soil remediation device. Large-volume block organic contaminated soil first passes through a soil crusher to be broken into loose small-volume granular soil, and then enters the integrated soil remediation device for remediation. After remediation, the soil enters a soil recovery box. The above device realizes closed integrated treatment and recycling of soil.

[0004] The above patents and prior art have the following problems:

[0005] Existing soil remediation uses crushing, mixing and then mixing with drugs, which consumes a lot of energy. However, plant planting can reduce energy consumption and repair the soil through plant absorption and decomposition. However, it takes a relatively long time for plants to repair the soil. If it rains during the plant repair process, pollutants will migrate relative to each other, resulting in poor plant repair effects. Summary of the invention

[0006] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.

[0007] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0008] A soil remediation process based on organic pollution control, comprising:

[0009] S1. Ridging and Blocking: The vehicle body drives the repair unit to move in the soil to be repaired, so that the repair unit pushes and ditches the repaired soil, and divides the soil to be repaired into blocks by the ridges generated by pushing and ditches;

[0010] S2. Side reinforcement: When the repair unit pushes and digs the soil into trenches and ridges, the shovel head will continuously beat the side of the soil ridge through the outer pressure plate, so that the side of the soil ridge is beaten and reinforced;

[0011] S3, segmented covering: During the ridge reinforcement process, the shovel head uses the first-stage shovel head, the second-stage shovel head and the third-stage shovel head of different widths to push and shovel the soil outward and stack it in layers. Before the soil is turned outward, the storage cavity disperses the adsorbent stored inside into the soil on the surface of the outer pressure plate, so that the adsorbent is fixed to the inside of the turned outward and layered soil along with the outer pressure plate;

[0012] S4. Synchronous digging: When the outer pressure plate is beating and reinforcing the side of the soil ridge, the beating of the outer pressure plate will simultaneously drive the digging shovel to shovel the top of the soil ridge, so that the planting pit is dug out on the surface of the soil ridge.

[0013] As a preferred solution of the soil remediation process based on organic pollution control described in the present invention, wherein:

[0014] The vehicle body involved in S1 is located at the side of the repair unit and is used to push the repair unit forward;

[0015] The shovel head member involved in S2 is located at the forward end of the vehicle body and is used for shoveling soil, forming furrows and ridges, and the outer pressure plate involved in S2 is movably located at the side of the shovel head member;

[0016] The first-stage shovel head, the second-stage shovel head and the third-stage shovel head involved in S3 are sequentially distributed along the forward end of the shovel head member, and the storage cavity involved in S3 is installed on the top of the reinforcement frame;

[0017] The digging shovel involved in S4 is located between adjacent shovel head members and is used for synchronously digging holes in the soil ridges.

[0018] As a preferred solution of the soil remediation process based on organic pollution control described in the present invention, wherein:

[0019] The vehicle body comprises a mechanical arm and a mounting plate, one end of the mechanical arm is mounted on the side of the vehicle body, the other side of the mechanical arm is mounted on the side of the mounting plate, and the mechanical arm is fixedly connected to the repair unit via the mounting plate.

[0020] As a preferred solution of the soil remediation process based on organic pollution control described in the present invention, wherein:

[0021] The repair unit comprises a reinforcement frame, which is fixedly mounted on the side of the mounting plate, and a plurality of lower extension rods are arranged at the bottom of the reinforcement frame, and the reinforcement frame is fixedly connected to the shovel head member through the lower extension rods;

[0022] A transverse arc plate is fixedly installed between adjacent reinforcement frames, and a telescopic control source is fixedly installed on the top of the transverse arc plate.

[0023] As a preferred solution of the soil remediation process based on organic pollution control described in the present invention, wherein:

[0024] The output shaft of the telescopic control source passes through the transverse arc plate, the special-shaped plate and the digging shovel and is fixedly connected. The special-shaped plate is in an "H" shape, and a plurality of shovel heads are distributed laterally at the bottom of the digging shovel.

[0025] A telescopic rod is fixedly installed at the bottom of the outer side of the special-shaped plate, and the telescopic rod movably penetrates the reinforcement frame and is fixedly connected with the lower pressing plate.

[0026] As a preferred solution of the soil remediation process based on organic pollution control described in the present invention, wherein:

[0027] The shovel head also includes a primary processing chamber and a secondary processing chamber, and the primary shovel head and the secondary shovel head, and the secondary shovel head and the tertiary shovel head are fixedly connected through the bottom plate at the bottom;

[0028] The widths of the first-stage shovel head, the second-stage shovel head and the third-stage shovel head increase successively, and the sides of the first-stage shovel head, the second-stage shovel head and the third-stage shovel head are all inclined and turned outward.

[0029] As a preferred solution of the soil remediation process based on organic pollution control described in the present invention, wherein:

[0030] A primary processing chamber is provided between the primary shovel head and the secondary shovel head, a secondary processing chamber is provided between the secondary shovel head and the tertiary shovel head, the primary processing chamber and the secondary processing chamber are separated by a partition plate, a side loading chamber is fixedly installed on the side of the secondary processing chamber opposite to the partition plate, and the primary shovel head, the partition plate and the side loading chamber are all fixedly connected by a lower extension rod and a reinforcement frame;

[0031] The upper and lower ends and the front and rear ends of the primary processing chamber and the secondary processing chamber are all provided with openings, and a lower pressing plate is movably provided inside the primary processing chamber and the secondary processing chamber.

[0032] As a preferred solution of the soil remediation process based on organic pollution control described in the present invention, wherein:

[0033] A cross frame is symmetrically fixedly installed on the side top of the primary processing chamber and the secondary processing chamber, a sliding rod is movably arranged in the middle of the cross frame, a movable rod is movably connected to one side of the sliding rod, and an outer pressure plate is movably connected to the other side of the sliding rod;

[0034] The outer surface of the outer pressure plate is provided with corrugated strips.

[0035] As a preferred solution of the soil remediation process based on organic pollution control described in the present invention, wherein:

[0036] The slide rod is movably connected to the side of the movable rod and the telescopic rod, and a through shaft is fixedly installed between the first-level shovel head and the second-level shovel head and between the second-level shovel head and the third-level shovel head, and the through shaft is rotatably arranged at the bottom of the outer pressure plate;

[0037] The front and rear ends of the top of the lower pressing plate are provided with a middle inclined plate, and the left and right ends of the lower pressing plate are provided with side inclined plates.

[0038] As a preferred solution of the soil remediation process based on organic pollution control described in the present invention, wherein:

[0039] The bottom of the storage cavity is connected to a control pipe, and the side of the reinforcement frame is inclined outwardly to be provided with a material discharge inclined plate, and the middle of the material discharge inclined plate is divided into a middle block;

[0040] A guide plate is obliquely arranged between the middle block and the outer side of the material discharge inclined plate, a side plate is fixedly installed on the outer surface of the guide plate, and conductive rows of holes are evenly distributed on the bottom of the guide plate. The material discharge inclined plate is arranged on the top of the outer pressure plate that is inclined inward.

[0041] Beneficial effects of the present invention:

[0042] The multi-layer soil structure shoveled by the first-level shovel head, the second-level shovel head and the third-level shovel head is combined with the reinforcement and beating of the mixed adsorbent material of the outer pressure plate, so that the side of the ridge is reinforced with multiple layers to improve the structural strength of the ridge, and the adsorbent material is beaten to the side of the ridge by multiple layers, so that the multi-layer structure on the side of the ridge is mixed with the adsorbent material, so that the side of the ridge can be isolated by the adsorbent material, thereby reducing the migration of pollutants inside the ridge, and the lower pressure plate compacts the mixed adsorbent material at the bottom of the dividing ditch, which also reduces the accumulation of pollutants that accidentally flow into the dividing ditch. Finally, the adsorption plants are planted in the pit dug by the shovel, so that the adsorption plants can adsorb the pollutants inside the ridge isolated by the adsorption material and reinforced by the multi-layer structure on the side, thereby improving the effect of polymerization adsorption.

[0043] The vehicle body is driven on the surface of the soil to be repaired, and the mechanical arm controls the repair unit to move down to dig trenches and ridges on the soil to be repaired. When the repair unit digs trenches and ridges the soil, the first shovel head will contact the soil first. After the first shovel head moves, the second and third shovel heads will contact the dividing trench dug by the first shovel head in turn. Then, under the pushing of the second and third shovel heads, the first dividing trench can be expanded, and the soil on the side surface of the dividing trench before expansion can be pushed outward and flipped. The first, second and third shovel heads can complete the layered flipping of the soil on the surface of the dividing trench. The multi-layer soil structure can effectively prevent rainwater erosion, reduce soil loss and reduce surface runoff. The pushing of the first, second and third shovel heads will form soil ridges for adsorbing plant planting between adjacent dividing trenches.

[0044] When the first-level shovel head, the second-level shovel head and the third-level shovel head are used to dig trenches and ridges for the soil to be repaired, the telescopic control source will be activated, so that the output shaft of the telescopic control source drives the special-shaped plate and the shovel to reciprocate up and down, and the reciprocating motion of the shovel is coordinated with the forward push of the shovel head part, so that the shovel is pushed on the surface of the ridge created by the shovel head part to form soil pits required for adsorbing plant planting.

[0045] When the special-shaped plate reciprocates up and down, it will drive the telescopic rod to reciprocate up and down inside the primary processing chamber and the secondary processing chamber, and the reciprocating movement of the telescopic rod inside the primary processing chamber and the secondary processing chamber will pull the sliding rod through the movable rod to slide back and forth left and right in the middle of the cross frame, so that during the reciprocating sliding of the sliding rod, the outer pressure plate will be pulled to continuously hit the trenching surface of the primary shovel head and the secondary shovel head as well as the outer side of the secondary shovel head and the tertiary shovel head, so that the multiple layers of soil produced by the expansion of the primary shovel head, the secondary shovel head and the tertiary shovel head are beaten and reinforced, thereby increasing the height of the side of the soil ridge and the strength of the soil structure.

[0046] The valve in the middle of the control drain pipe is opened to discharge the adsorbent from the storage chamber through the control drain pipe to the top of the guide plate, and guided by the guide plate, the adsorbent placed on the surface of the guide plate is scattered through the discharge holes to the surface of the discharge inclined plate, and is discharged to the outside of the primary treatment chamber and the secondary treatment chamber through the discharge inclined plate. Then, when the sliding rod pulls the outer pressure plate to tilt to the inside of the primary treatment chamber and the secondary treatment chamber, the scattered adsorbent will fall into the soil on the surface of the outer pressure plate with the top tilted inward, and in the subsequent beating, the soil on the surface of the outer pressure plate that has fallen into the adsorbent will be beaten to the side surface of the soil ridge, that is, the side of the ditch as the top of the outer pressure plate tilts outward. Combined with the multi-level width structure of the first-level shovel head, the second-level shovel head and the third-level shovel head, the interior of the multi-layer structure shoveled over by the first-level shovel head, the second-level shovel head and the third-level shovel head can be beaten with adsorbent.

[0047] When the top of the outer pressure plate is tilted and slapped outward, the adsorbent material discharged by the lower material inclined plate will fall onto the surface of the middle inclined plate and the side inclined plate. The outer pressure plate slaps outward, which will cause a certain interval between the outer pressure plate and the primary and secondary processing chambers, so that the excess soil will also fall onto the surface of the side inclined plates of the middle inclined plate. Then, in the up and down reciprocating motion of the lower pressure plate driven by the telescopic rod, up and down vibrations will be generated. Combined with the inclined guidance of the middle and side inclined plates, the adsorbent material and soil on the surface of the middle and side inclined plates are pressed down in turn by the lower pressure plate inside the primary and secondary processing chambers, so that the bottom of the dividing ditch formed by the expansion of the shovel head is mixed with the adsorbent material for reinforcement, thereby fully reinforcing the soil ridges. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] In order to more clearly illustrate the technical solution of the embodiment of the present invention, the following is a brief introduction to the drawings required for describing the embodiment, wherein:

[0049] Figure 1 It is a schematic diagram of the process structure of the present invention;

[0050] Figure 2 It is a schematic diagram of the overall structural connection of the present invention;

[0051] Figure 3 This is a schematic diagram of the structural connection of the repair unit of the present invention;

[0052] Figure 4 This is a schematic diagram of the bottom structure connection of the transverse arc plate of the present invention;

[0053] Figure 5 It is a schematic diagram of the shovel head structure from a side view of the present invention;

[0054] Figure 6 for Figure 5 A schematic diagram of the enlarged structure of part A;

[0055] Figure 7 This is a schematic diagram of the connection of the lower extension rod of the present invention;

[0056] Figure 8 This is a schematic diagram of the internal structure connection between the primary processing chamber and the secondary processing chamber of the present invention;

[0057] Fig. 9 It is a schematic diagram of the connection between the lower pressing plate and the through-shaft structure of the present invention;

[0058] Fig.10 It is a schematic diagram of the connection between the telescopic rod and the lower pressing plate structure of the present invention.

[0059] In the figure:

[0060] 1. Vehicle body; 101. Mechanical arm; 102. Mounting plate;

[0061] 2. Repair unit; 201. Reinforcement frame; 2011. Lower extension rod; 202. Horizontal arc plate; 2021. Telescopic control source; 2022. Special-shaped plate; 20221. Telescopic rod; 2023. Digging shovel; 203. Shovel head; 2031. First-level shovel head; 2032. Second-level shovel head; 2033. Third-level shovel head; 2034. First-level processing chamber; 20341. Partition plate; 2035. Second-level processing chamber; 20351. Bottom Plate; 20352, side cavity; 2036, cross frame; 2037, outer pressure plate; 20371, through shaft; 2038, slide bar; 2039, movable rod; 204, storage cavity; 2041, control pipe; 2042, unloading inclined plate; 20421, middle dividing block; 20422, guide plate; 20423, side plate; 20424, row hole; 205, lower pressure plate; 2051, middle inclined plate; 2052, side inclined plate. DETAILED DESCRIPTION

[0062] Embodiment 1

[0063] like Figure 1-5 As shown, a soil remediation process based on organic pollution control includes:

[0064] S1, ridge formation and block division: the vehicle body 1 drives the repair unit 2 to move in the soil to be repaired, so that the repair unit 2 pushes and ditches the repaired soil, and the soil ridges generated by pushing and ditches divide the soil to be repaired into blocks;

[0065] S2, side reinforcement: When the repair unit 2 pushes and digs the soil into furrows and ridges, the shovel head 203 will continuously beat the side of the soil ridge through the outer pressure plate 2037, so that the side of the soil ridge is beaten and reinforced;

[0066] S3, segmented covering: During the ridge reinforcement process, the shovel head 203 pushes and shovels the soil outwards and stacks it in layers through the first-stage shovel head 2031, the second-stage shovel head 2032 and the third-stage shovel head 2033 of different widths, and before the soil is turned outwards, the storage cavity 204 disperses the adsorbent stored inside into the soil on the surface of the outer pressure plate 2037, so that the adsorbent is fixed to the inside of the turned outwards and layered soil along with the outer pressure plate 2037;

[0067] S4. Synchronous digging: When the outer pressure plate 2037 is beating and reinforcing the side of the soil ridge, the beating of the outer pressure plate 2037 will synchronously drive the shovel 2023 to shovel the top of the soil ridge, so that a planting pit is dug out on the surface of the soil ridge.

[0068] The vehicle body 1 involved in S1 is located at the side of the repair unit 2 and is used to push the repair unit 2 forward. The lateral spacing between the wheels of the vehicle body 1 is the same as the width of the shovel head 203. The height of the wheels is higher than the height of the soil ridge, and the width of the wheels is smaller than the width of the shovel head 203.

[0069] The shovel head member 203 involved in S2 is located at the forward end of the vehicle body 1 and is used for shoveling soil, forming furrows and ridges. The outer pressure plate 2037 involved in S2 is movably located at the side of the shovel head member 203.

[0070] The first-stage shovel head 2031, the second-stage shovel head 2032 and the third-stage shovel head 2033 involved in S3 are sequentially distributed along the forward end of the shovel head member 203, and the storage cavity 204 involved in S3 is installed on the top of the reinforcement frame 201;

[0071] The shovel 2023 involved in S4 is located between adjacent shovel heads 203 and is used for synchronously digging holes in the soil ridges.

[0072] It should be noted that the adsorbent for organic pollution can be a mixture of activated carbon, humic acid and clay minerals. The pollutants can be solidified and their migration can be reduced through the selection of adsorbents, while sunflowers and alfalfa can be selected as adsorbent plants.

[0073] Embodiment 2

[0074] Reference Figure 2-10 As shown, this embodiment is different from the first embodiment in that:

[0075] The vehicle body 1 includes a robotic arm 101 and a mounting plate 102 , one end of the robotic arm 101 is mounted on the side of the vehicle body 1 , and the other side of the robotic arm 101 is mounted on the side of the mounting plate 102 , and the robotic arm 101 is fixedly connected to the repair unit 2 via the mounting plate 102 .

[0076] Specifically, the repair unit 2 includes a reinforcement frame 201, which is fixedly mounted on the side of the mounting plate 102, and a plurality of lower extension rods 2011 are arranged at the bottom of the reinforcement frame 201, and the reinforcement frame 201 is fixedly connected to the shovel head member 203 through the lower extension rods 2011;

[0077] A transverse arc plate 202 is fixedly installed between adjacent reinforcement frames 201, and a telescopic control source 2021 is fixedly installed on the top of the transverse arc plate 202. The telescopic control source 2021 is preferably an electric telescopic cylinder, and the telescopic control source 2021 is powered by an external power supply and controlled by a PLC circuit board.

[0078] Specifically, the output shaft of the telescopic control source 2021 passes through the transverse arc plate 202, the special-shaped plate 2022 and the shovel 2023 and is fixedly connected. The special-shaped plate 2022 is in an "H" shape, and a plurality of shovel heads are laterally distributed at the bottom of the shovel 2023.

[0079] A telescopic rod 20221 is fixedly installed at the bottom of the outer side of the special-shaped plate 2022 , and the telescopic rod 20221 movably penetrates the reinforcement frame 201 and is fixedly connected with the lower pressing plate 205 .

[0080] Specifically, the shovel head 203 also includes a primary processing chamber 2034 and a secondary processing chamber 2035, and the primary shovel head 2031 and the secondary shovel head 2032 and the secondary shovel head 2032 and the tertiary shovel head 2033 are fixedly connected via a bottom plate 20351 at the bottom thereof;

[0081] The widths of the first-stage shovel head 2031, the second-stage shovel head 2032 and the third-stage shovel head 2033 increase sequentially, and the sides of the first-stage shovel head 2031, the second-stage shovel head 2032 and the third-stage shovel head 2033 are all inclined and turned outward, that is, the top ends of the sides of the first-stage shovel head 2031, the second-stage shovel head 2032 and the third-stage shovel head 2033 protrude relative to the bottom ends of the sides, and combined with the sequential widening of the rear ends of the first-stage shovel head 2031, the second-stage shovel head 2032 and the third-stage shovel head 2033 relative to the front end, a plow-shaped curved surface is formed.

[0082] Specifically, a primary processing chamber 2034 is provided between the primary shovel head 2031 and the secondary shovel head 2032, a secondary processing chamber 2035 is provided between the secondary shovel head 2032 and the tertiary shovel head 2033, the primary processing chamber 2034 and the secondary processing chamber 2035 are separated by a partition plate 20341, a side loading chamber 20352 is fixedly installed on the side of the secondary processing chamber 2035 opposite to the partition plate 20341, and the primary shovel head 2031, the partition plate 20341 and the side loading chamber 20352 are all fixedly connected by the lower extension rod 2011 and the reinforcement frame 201;

[0083] The upper and lower ends and the front and rear ends of the primary processing chamber 2034 and the secondary processing chamber 2035 are all provided with openings, and a lower pressing plate 205 is movably provided inside the primary processing chamber 2034 and the secondary processing chamber 2035.

[0084] Specifically, a cross frame 2036 is symmetrically fixedly installed on the side top of the primary processing chamber 2034 and the secondary processing chamber 2035, a sliding rod 2038 is movably provided in the middle of the cross frame 2036, one side of the sliding rod 2038 is movably connected to a movable rod 2039, and the other side of the sliding rod 2038 is movably connected to an outer pressure plate 2037;

[0085] The outer surface of the outer pressure plate 2037 is provided with corrugated strips.

[0086] Specifically, the slide bar 2038 is movably connected to the side of the telescopic rod 20221 through the movable rod 2039, and a through shaft 20371 is fixedly installed between the first-stage shovel head 2031 and the second-stage shovel head 2032 and between the second-stage shovel head 2032 and the third-stage shovel head 2033, and the through shaft 20371 is rotatably arranged at the bottom of the outer pressure plate 2037;

[0087] The front and rear ends of the top of the lower pressing plate 205 are provided with a middle inclined plate 2051 , and the left and right ends of the lower pressing plate 205 are provided with side inclined plates 2052 .

[0088] Specifically, the bottom of the storage chamber 204 is connected to a control pipe 2041, a solenoid valve is installed in the middle of the control pipe 2041, and the solenoid valve is powered by an external power supply and controlled by a PLC circuit board. The side of the reinforcement frame 201 is tilted outward to provide a material discharge inclined plate 2042, and the middle of the material discharge inclined plate 2042 is separated by a middle block 20421;

[0089] A guide plate 20422 is obliquely arranged between the outer sides of the middle block 20421 and the unloading inclined plate 2042, a side plate 20423 is fixedly installed on the outer surface of the guide plate 20422, and conductive rows of holes 20424 are evenly distributed on the bottom of the guide plate 20422. The unloading inclined plate 2042 is arranged on the top of the outer pressure plate 2037 that is inclined inward.

[0090] The rest of the structure is the same as that of the first embodiment.

[0091] Operation process:

[0092] The vehicle body 1 is driven on the surface of the soil to be repaired, and the mechanical arm 101 controls the repair unit 2 to move downward to dig trenches and ridges on the soil to be repaired. When the repair unit 2 digs trenches and ridges the soil, the first-stage shovel head 2031 will first contact the soil, so that the first-stage shovel head 2031 will open the first separation groove on the surface of the soil, which is convenient for the subsequent expansion of the width of the groove. After the first-stage shovel head 2031 moves, the second-stage shovel head 2032 and the third-stage shovel head 2033 contact the separation groove opened by the first-stage shovel head 2031 in turn, and then under the pushing of the second-stage shovel head 2032 and the third-stage shovel head 2033, the first separation groove can be opened. The dividing ditch is expanded, and the soil on the side surface of the dividing ditch before the expansion is pushed outward by a shovel to cover it, so as to form a new side surface of the dividing ditch. The soil on the side surface of the dividing ditch before is covered to the bottom of the new dividing ditch to form a layered stack of soil, so that the first-level shovel head 2031, the second-level shovel head 2032 and the third-level shovel head 2033 can complete the layered covering of the soil on the surface of the dividing ditch, and the multi-layer soil structure can effectively prevent rainwater erosion, reduce soil loss and reduce surface runoff, and the first-level shovel head 2031, the second-level shovel head 2032 and the third-level shovel head 2033 push and shovel to form soil ridges between adjacent dividing ditches for adsorbing plant planting;

[0093] When the first-stage shovel head 2031, the second-stage shovel head 2032 and the third-stage shovel head 2033 dig trenches and ridges in the soil to be repaired, the telescopic control source 2021 is activated, so that the output shaft of the telescopic control source 2021 drives the special-shaped plate 2022 and the shovel 2023 to reciprocate up and down, wherein the reciprocating motion of the shovel 2023 cooperates with the forward push of the shovel head 203, so that the shovel 2023 pushes the shovel on the surface of the soil ridge created by the shovel head 203 to form soil pits required for adsorbing plant planting;

[0094] When the special-shaped plate 2022 reciprocates up and down, it will drive the telescopic rod 20221 to reciprocate up and down inside the primary processing chamber 2034 and the secondary processing chamber 2035, and the reciprocating movement of the telescopic rod 20221 inside the primary processing chamber 2034 and the secondary processing chamber 2035 will pull the sliding rod 2038 to slide back and forth in the middle of the cross frame 2036 through the movable rod 2039, so that during the reciprocating sliding of the sliding rod 2038, the outer pressure plate 2037 will be pulled to continuously slap the trenching surface outside the primary shovel head 2031 and the secondary shovel head 2032 as well as the secondary shovel head 2032 and the tertiary shovel head 2033, so that the multi-layer soil produced by the primary shovel head 2031, the secondary shovel head 2032 and the tertiary shovel head 2033 is slapped and reinforced, thereby increasing the height of the side of the soil ridge and the strength of the soil structure.

[0095] When the outer pressure plate 2037 hits the side of the soil ridge, the valve in the middle of the control pipe 2041 is opened, so that the adsorbent is discharged from the storage chamber 204 through the control pipe 2041 to the top of the guide plate 20422, and the adsorbent placed on the surface of the guide plate 20422 is scattered to the surface of the material discharge inclined plate 2042 through the discharge hole 20424, and is discharged to the outside of the primary processing chamber 2034 and the secondary processing chamber 2035 through the material discharge inclined plate 2042. Then, when the slide bar 2038 pulls the outer pressure plate 2037 to tilt to the primary processing chamber, the adsorbent is discharged to the top of the guide plate 20422 through the control pipe 2041. When the first-stage shovel head 2031, the second-stage shovel head 2032 and the third-stage shovel head 2033 are used to shovel the first-stage shovel head 2031, the second-stage shovel head 2032 and the third-stage shovel head 2033, the multi-layer structure shoveled by the first-stage shovel head 2031, the second-stage shovel head 2032 and the third-stage shovel head 2033 can be slapped with adsorbents.

[0096] When the top of the outer pressure plate 2037 is tilted and slapped outward, the adsorbent discharged by the material discharging inclined plate 2042 will fall onto the surfaces of the middle inclined plate 2051 and the side inclined plate 2052. The outer pressure plate 2037 slaps outward, which will cause a certain gap between the outer pressure plate 2037 and the primary processing chamber 2034 and the secondary processing chamber 2035, so that the excess soil will also fall onto the surfaces of the side inclined plates 2052 of the middle inclined plate 2051, and then on the telescopic rod 2022. 1 drives the lower pressing plate 205 to move up and down, which will generate up and down vibrations. Combined with the inclination guidance of the middle inclined plate 2051 and the side inclined plate 2052, the adsorbent and soil on the surface of the middle inclined plate 2051 and the side inclined plate 2052 are pressed down in sequence by the lower pressing plate 205 inside the primary processing chamber 2034 and the secondary processing chamber 2035, so that the bottom of the separation groove formed by the shovel head 203 is mixed with the adsorbent and reinforced, so that the soil ridges are fully reinforced;

[0097] The multi-layer soil structure shoveled by the first-stage shovel head 2031, the second-stage shovel head 2032 and the third-stage shovel head 2033 is combined with the reinforcement and beating of the mixed adsorbent of the outer pressure plate 2037, so that the side of the soil ridge is reinforced by multiple layers to improve the structural strength of the soil ridge, and the adsorbent is beaten to the side of the soil ridge by multiple layers, so that the multi-layer structure on the side of the soil ridge is mixed with the adsorbent, so that the side of the soil ridge can be isolated by the adsorbent, thereby reducing the migration of pollutants inside the soil ridge, and the lower pressure plate 205 compacts the mixed adsorbent at the bottom of the dividing ditch, which also reduces the accumulation of pollutants accidentally flowing into the dividing ditch, and then the adsorbent plants are planted in the pit dug by the shovel 2023, so that the adsorbent plants can adsorb the pollutants inside the soil ridge isolated by the adsorbent and reinforced by the multi-layer structure on the side, thereby improving the effect of polymer adsorption;

[0098] It should be noted that, by designing the length of the sliding rod 2038 inside the primary processing chamber 2034 and the secondary processing chamber 2035, the range of the top of the external pressure plate 2037 on the side of the primary processing chamber 2034 beating outward is smaller than the surface distance of the secondary shovel head 2032 protruding from the shovel head part 203, and the range of the top of the external pressure plate 2037 on the surface of the secondary processing chamber 2035 beating outward is smaller than the distance of the tertiary shovel head 2033 protruding from the shovel head part 203.

Claims

1. A soil remediation process based on organic pollution control, characterized in that: include: S1, ridge formation and block division: the vehicle body (1) drives the repair unit (2) to move in the soil to be repaired, so that the repair unit (2) pushes and ditches the repaired soil, and divides the soil to be repaired into blocks by the ridges formed by the pushing and ditches; S2, side reinforcement: when the repair unit (2) pushes and digs the soil into trenches and ridges, the shovel head (203) will continuously beat the side of the soil ridge through the outer pressure plate (2037), so that the side of the soil ridge is beaten and reinforced; S3, segmented covering: during the ridge reinforcement process, the shovel head member (203) pushes and shovels the soil outwards and stacks it in layers through the first-stage shovel head (2031), the second-stage shovel head (2032) and the third-stage shovel head (2033) of different widths, and before the soil is turned outwards, the storage cavity (204) disperses the adsorbent stored inside into the soil on the surface of the outer pressure plate (2037), so that the adsorbent is fixed to the inside of the soil that is turned outwards and stacked in layers along with the outer pressure plate (2037); S4, synchronous pit digging: When the outer pressure plate (2037) beats and reinforces the side of the soil ridge, the beating of the outer pressure plate (2037) will synchronously drive the shovel (223) to shovel the top of the soil ridge, so that the planting pit is dug out on the surface of the soil ridge; The vehicle body (1) involved in S1 is located at the side of the repair unit (2) and is used to push the repair unit (2) forward; The shovel head member (203) involved in S2 is located at the forward end of the vehicle body (1) and is used for shoveling soil to form furrows and ridges, and the outer pressure plate (2037) involved in S2 is movably located on the side of the shovel head member (203); The first-stage shovel head (2031), the second-stage shovel head (2032), and the third-stage shovel head (2033) involved in S3 are sequentially distributed along the forward end of the shovel head member (203), and the storage cavity (204) involved in S3 is installed on the top of the reinforcement frame (201); The digging shovel (2023) involved in S4 is located between adjacent shovel head members (203) and is used to synchronously dig holes in the soil ridges; The vehicle body (1) comprises a mechanical arm (101) and a mounting plate (102); one end of the mechanical arm (101) is mounted on a side of the vehicle body (1), and the other side of the mechanical arm (101) is mounted on a side of the mounting plate (102); the mechanical arm (101) is fixedly connected to the repair unit (2) via the mounting plate (102); The repair unit (2) comprises a reinforcement frame (201), the reinforcement frame (201) being fixedly mounted on the side of the mounting plate (102), a plurality of lower extension rods (2011) being arranged at the bottom of the reinforcement frame (201), and the reinforcement frame (201) being fixedly connected to the shovel head member (203) via the lower extension rods (2011); A transverse arc plate (202) is fixedly installed between adjacent reinforcement frames (201), and a telescopic control source (221) is fixedly installed on the top of the transverse arc plate (202); an output shaft of the telescopic control source (221) passes through the transverse arc plate (202), the special-shaped plate (222) and the shovel (223) for fixed connection, the special-shaped plate (222) is in an "H" shape, and a plurality of shovel heads are laterally distributed on the bottom of the shovel (223); A telescopic rod (20221) is fixedly installed at the bottom of the outer side of the special-shaped plate (2022), and the telescopic rod (20221) movably penetrates the reinforcement frame (201) and is fixedly connected to the lower pressure plate (205); the shovel head member (203) further comprises a primary processing chamber (2034) and a secondary processing chamber (2035), and the primary shovel head (2031) and the secondary shovel head (2032) and the secondary shovel head (2032) and the tertiary shovel head (2033) are fixedly connected via the bottom plate (20351) at the bottom thereof; The widths of the first-stage shovel head (2031), the second-stage shovel head (2032) and the third-stage shovel head (2033) increase sequentially, and the sides of the first-stage shovel head (2031), the second-stage shovel head (2032) and the third-stage shovel head (2033) are all inclined and turned outward.

2. The soil remediation process based on organic pollution control according to claim 1, characterized in that: A primary processing chamber (2034) is provided between the primary shovel head (2031) and the secondary shovel head (2032); a secondary processing chamber (2035) is provided between the secondary shovel head (2032) and the tertiary shovel head (2033); the primary processing chamber (2034) and the secondary processing chamber (2035) are separated by a partition plate (20341); a side-mounting chamber (20352) is fixedly installed on the side of the secondary processing chamber (2035) opposite to the partition plate (20341); the primary shovel head (2031), the partition plate (20341) and the side-mounting chamber (20352) are all fixedly connected via a lower extension rod (2011) and a reinforcement frame (201); The upper and lower ends and the front and rear ends of the primary processing chamber (2034) and the secondary processing chamber (2035) are all provided with openings, and lower pressing plates (205) are movably provided inside the primary processing chamber (2034) and the secondary processing chamber (2035).

3. The soil remediation process based on organic pollution control according to claim 2, characterized in that: A cross frame (2036) is symmetrically fixedly installed on the side top of the primary processing chamber (2034) and the secondary processing chamber (2035); a sliding rod (2038) is movably provided in the middle of the cross frame (2036); a movable rod (2039) is movably connected to one side of the sliding rod (2038); and an external pressure plate (2037) is movably connected to the other side of the sliding rod (2038); The outer surface of the outer pressure plate (2037) is provided with corrugated strips.

4. The soil remediation process based on organic pollution control according to claim 3 is characterized in that: The sliding rod (2038) is movably connected to the side of the movable rod (2039) and the telescopic rod (20221); a through shaft (20371) is fixedly installed between the first-stage shovel head (2031) and the second-stage shovel head (2032) and between the second-stage shovel head (2032) and the third-stage shovel head (2033); the through shaft (20371) is rotatably arranged at the bottom of the outer pressure plate (2037); A middle inclined plate (2051) is provided at the front and rear ends of the top of the lower pressing plate (205), and side inclined plates (2052) are provided at the left and right ends of the lower pressing plate (205).

5. The soil remediation process based on organic pollution control according to claim 4, characterized in that: The bottom of the storage chamber (204) is conductively connected to a control pipe (2041); the side of the reinforcement frame (201) is inclined outwardly and provided with a material discharge inclined plate (2042); the middle of the material discharge inclined plate (2042) is divided into a middle block (20421); A guide plate (20422) is obliquely arranged between the outer sides of the middle block (20421) and the material discharge inclined plate (2042); a side plate (20423) is fixedly mounted on the outer surface of the guide plate (20422); conductive rows of holes (20424) are evenly distributed on the bottom of the guide plate (20422); and the material discharge inclined plate (2042) is arranged on the inwardly inclined top of the outer pressure plate (2037).