A source-grid-vehicle-storage integrated rail transit coordinated energy supply method

By constructing a photovoltaic power generation, lighting and air conditioning energy consumption model, combined with the improved vulture search algorithm, the power supply sequence of the rail transit system is optimized, and the traditional power supply strategy does not consider the exchange and time-sharing electricity price of photovoltaic power generation and power grid, and the system operation is achieved The goal of lowest cost and least energy loss improves energy utilization efficiency and environmental friendliness.

CN118523329BActive Publication Date: 2024-11-22CHINA RAILWAY TENTH BUREAU GRP ELECTRIC ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410532234.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-29
Publication Date
2024-11-22
Estimated Expiration
2044-04-29

AI Technical Summary

Technical Problem

The traditional rail transit power supply strategy does not consider the impact of energy exchange between the photovoltaic power generation device and the power grid on electricity cost, and does not fully consider the power consumption of train auxiliary facilities such as air conditioning and lighting.

Method used

Using photovoltaic power generation model, lighting system energy consumption model and air conditioning system energy consumption model, the objective function is built based on the total cost and energy loss of the system operation, and the photovoltaic power generation device, external power grid and energy storage device are optimized through the improved vulture search algorithm. The power supply sequence is considered, and the time-sharing electricity price mechanism is achieved to achieve the goal of the lowest system operation cost and the least energy loss.

Benefits of technology

It reduces the total operating cost and energy loss of the rail transit system, improves energy utilization efficiency, reduces carbon emissions and environmental pollution, and ensures the economic and reliability of train operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118523329B_ABST
    Figure CN118523329B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of electric power supply technology, and specifically relates to a source-grid-vehicle-storage integrated rail transit coordinated energy supply method. The method comprises: step 1: using the constructed photovoltaic power generation model, lighting system energy consumption model and air conditioning system energy consumption model to obtain the total energy P generated by the photovoltaic power generation device zpv,t , Energy consumption of lighting system during train operation P LGT and air conditioning system energy consumption P A.C. ; Construct an objective function, the objective function includes the total cost of system operation and the amount of energy loss; establish the constraint conditions of the objective function: perform normalization preprocessing on each objective function; process the multi-objective function into a single objective function; use the improved vulture search algorithm to solve the single objective function; according to the photovoltaic output time and the time-of-use electricity price mechanism, determine the scheduling strategy of source, network, vehicle and storage under the optimal solution of the single objective function. The energy supply method proposed in the present invention can improve the utilization rate of new energy, reduce carbon emissions, optimize the allocation of power resources, and has good economic performance and application prospects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of electric power supply, and specifically relates to a source-grid-vehicle-storage integrated rail transit collaborative energy supply method. Background Art

[0002] In recent years, my country's rail transit has developed rapidly, the railway operating mileage has continued to increase, and the energy loss generated has also been growing. In order to achieve the "dual carbon" goal and realize energy conservation and emission reduction, it is necessary to use greener and cleaner energy while ensuring the safe operation of the railway. On the one hand, as a representative of clean and green energy, renewable energy (such as wind energy, solar energy, etc.) can effectively reduce the dependence of the traction power system on traditional fossil energy, reduce operating costs, and reduce the impact on the environment by connecting it to the traction network. By combining renewable energy with the traction network, it can not only reduce carbon emissions, but also feed excess electricity back to the power grid to improve energy utilization efficiency. On the other hand, adding energy storage devices to the traction power supply system can more flexibly adjust the load of the traction power system, alleviate peak-valley differences, improve energy utilization, and reduce the operating costs of the rail transit system. Therefore, it is of great significance to study the coordinated energy supply of the integration of "source-grid-vehicle-storage" in rail transit.

[0003] Scholars have conducted relevant research on the coordinated energy supply method for rail transit. The patent (CN115528681A, Real-time energy control method for coordinated "grid-source-storage-vehicle" for rail transit) provides a real-time energy control method. According to the current working state and working mode of the system, the output power of each unit is determined, and a coordinated power supply sequence is provided to power the train in the order of renewable energy, energy storage device and power grid. The patent (CN117634702A, Virtual power plant scheduling optimization method for hydrogen energy storage power station) provides a virtual power plant scheduling optimization method for hydrogen energy storage power station. The power generation unit includes renewable energy, thermal power units and energy storage devices, and takes into account the impact of time-of-use electricity prices and carbon trading costs on the system. Literature (Ma Huihai, Song Jinpeng, Kang Jiayu. Capacity configuration of user-side photovoltaic energy storage system based on time-of-use electricity price [J]. Science Technology and Engineering, 2023, 23 (31): 13387-13393.) discusses the capacity configuration problem of the photovoltaic system energy storage link from the perspective of time-of-use electricity price, and uses quantum particle swarm optimization algorithm to solve the model, and obtains the photovoltaic capacity and energy storage capacity when the daily cost is the lowest. Literature (Liao Haizhu, Hu Haitao, Huang Yi, etc. Day-ahead energy optimization and scheduling strategy of electrified railway "source-grid-vehicle-storage" coordinated energy supply system [J]. Locomotive Electric Drive, 2022, (03): 1-9.) proposes a day-ahead scheduling strategy for the "source-grid-vehicle-storage" energy supply system, which realizes the efficient utilization of regenerative braking energy and photovoltaic power generation and reduces traction costs. The literature (Gao Shibin, Luo Jiaming, Chen Weirong, etc. Rail Transit "Grid-Source-Storage-Vehicle" Cooperative Energy Supply Technology System [J / OL]. Journal of Southwest Jiaotong University, 1-18 [2024-03-18].) proposed a cooperative energy supply system to reduce rail transit energy consumption and carbon emissions through the local consumption of renewable energy. The above research provides a certain reference for this patent, but there are still some shortcomings: 1. For the power supply system of rail transit, most of them only consider the access of a single unit such as new energy or energy storage device to the power supply system; 2. Very few studies explore the impact of the time-of-use electricity price mechanism on the electricity cost of rail transit; 3. At the current stage, research rarely considers the power consumption generated by auxiliary facilities such as air conditioning and lighting in the train and the power consumed when the power grid and photovoltaic power generation devices exchange energy. Summary of the invention

[0004] The purpose of the present invention is to solve the practical problem that the traditional power supply strategy only considers the energy exchange between the power grid, new energy, energy storage device and the train, but does not consider the energy exchange between the photovoltaic power generation device and the power grid, and the time-of-use electricity price mechanism is not considered in the train operation power supply strategy. It provides a reasonable energy power supply method that reasonably arranges the priority of photovoltaic power generation devices, external power grids and energy storage devices to power the traction network on the basis of considering the time-of-use electricity price.

[0005] In order to achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a source-grid-vehicle-storage integrated rail transit coordinated energy supply method, comprising the following steps:

[0006] Step 1: Use the constructed photovoltaic power generation model, lighting system energy consumption model and air conditioning system energy consumption model to obtain the total energy P generated by the photovoltaic power generation device zpv,t , Energy consumption of lighting system during train operation P LGT and air conditioning system energy consumption P A.C. ;

[0007] Step 2: Construct an objective function, which includes the total system operation cost and energy loss:

[0008] F1=F T +F OM +F WPV -F SPV ;

[0009] F2=P trans +P loss +P p,ex ;

[0010] Among them, F1 is the total cost of system operation, F T is the train consumption cost, F OM is the operation and maintenance cost of the system operation process, F WPV is the penalty cost for abandoning light, F SPV The cost of selling electricity from the photovoltaic power generation device to the grid;

[0011] F2 is the energy loss, P trans is the loss caused by the transmission line, P loss is the energy loss generated by electrical equipment, P p,ex Losses caused by energy exchange;

[0012] Step 3: Establish the constraints of the objective function:

[0013] (1) Power balance constraint: P grid +P pv +P ess =P train +F2;

[0014] P grid is the grid output power, P pv is the power output from the photovoltaic power generation device to the train, P ess is the power output of the energy storage device to the train, P train is the power consumed by the train during operation, P train =P T +P LGT +P A.C. +Pelse ;P T is the train traction energy consumption, P else It refers to other energy consumption during train operation except lighting, air conditioning system, etc. (such as energy consumption generated by the control system in the train, etc.);

[0015] (2) Photovoltaic output constraints:

[0016] 0≤P pv ≤P pv,max ;

[0017] Where P pv,max is the maximum value of photovoltaic output;

[0018] (3) Energy storage device constraints:

[0019] SOC min ≤SOC≤SOC max ;

[0020] P ess,min ≤P ess ≤P ess,max ;

[0021] In the formula, SOC is the state of charge of the energy storage battery, SOC min and SOC max are the maximum and minimum values ​​of the energy storage battery charge respectively; P ess,min and P ess,max are the maximum and minimum values ​​of the charging and discharging power of the energy storage device, respectively;

[0022] (4) Train operation cost constraints:

[0023] F1≤F0;

[0024] In the formula, F1 is the cost of train operation after adopting the time-of-use electricity price strategy, and F0 is the cost of train operation before adopting the time-of-use electricity price strategy;

[0025] (5) Grid output power constraints:

[0026] P grid,min ≤P grid,t ≤P grid,max ;

[0027] Where P grid,min and P grid,max are the maximum and minimum values ​​of the external power grid output power at time t respectively;

[0028] Step 4: Perform normalization preprocessing on each objective function; process the multi-objective function into a single objective function;

[0029] Step 5: Use the improved vulture search algorithm to solve the single objective function to achieve the goal of minimizing system operating cost and energy loss.

[0030] Step 6: According to the photovoltaic output time and the time-of-use electricity price mechanism, determine the scheduling strategy of source, grid, vehicle and storage under the optimal solution of the single objective function.

[0031] Preferably, in step 1, the energy consumption model of the air conditioning system is:

[0032]

[0033] Where, is the power consumed by the air conditioner, are the temperature outside the i-th compartment and the optimal temperature inside the compartment at time t, N2 is the total number of train compartments, ξ is the air conditioning energy efficiency ratio, R i is the equivalent thermal resistance of the ith compartment, T A.C. The total operation time of the air conditioner;

[0034] Using the threshold coefficient model, the temperature threshold in the car is adjusted according to the current passenger capacity:

[0035]

[0036] θ t+1,in =θ t,in +ξPR i +(1-ε)θ t+1,out ;

[0037] Where ζ is the threshold coefficient;

[0038] The constraints for the optimal temperature threshold in the cabin are:

[0039] ζ·θ in,min ≤θ best ≤θ in,max ·ζ,K i <25%;

[0040] θ in,min ≤θ best ≤θ in,max , 25%≤K i ≤75%;

[0041] K i >75%;

[0042] In the formula, θ in,min ,θ in,max are the minimum and maximum temperatures that passengers in the car can withstand; K i is the current density of people in the carriage.

[0043] Preferably, in step 2, the calculation formula of the train consumption cost is:

[0044]

[0045] In the formula, c T,t is the unit price of electricity at time t, P T,t is the train traction energy consumption at time t, P LGT,t is the energy consumption of train lighting at time t, P A.C.,t is the energy consumption of train air conditioning at time t, P else,t is the energy consumption of the train except lighting and air-conditioning systems during operation at time t, and T is the total operation time of the train.

[0046] Preferably, in step 2, the operation and maintenance cost calculation formula of the system operation process is:

[0047]

[0048] In the formula, N1 is the number of equipment that needs to be maintained, c j is the unit price of operation and maintenance of the jth equipment, P j is the power emitted by the jth device.

[0049] Preferably, in step 2, the calculation formula for the penalty cost of abandoned light is:

[0050] In the formula, c pv is the light abandonment penalty coefficient, P wpv is the power abandoned by the photovoltaic power generation device at time t, T PV is the duration of photovoltaic power generation.

[0051] Preferably, in step 2, the formula for calculating the cost of electricity sold by the photovoltaic power generation device to the power grid is:

[0052]

[0053] In the formula, c spv,t is the unit price of electricity sold by the photovoltaic power generation device to the grid at time t, P spv,t is the power sold by the photovoltaic power generation device to the grid at time t, T spv The total duration of power sold.

[0054] Preferably, in step 2, the loss calculation formula generated by energy exchange is:

[0055]

[0056] Where P grid,t is the energy exchanged between the grid and the train at time t, η grid is the power exchange efficiency between the grid and the train, Ppv,t is the energy exchanged between the photovoltaic power generation device and the train at time t, η pv is the power exchange efficiency between the photovoltaic power generation device and the train, P ess,t is the energy exchanged between the energy storage device and the train at time t, η ess For energy storage

[0057] The energy exchange efficiency between the device and the train, η spv It is the energy exchange efficiency between the power grid and the photovoltaic power generation device.

[0058] Preferably, the step 4 specifically includes:

[0059] (1) Use the maximum and minimum normalization method to preprocess each objective function:

[0060]

[0061] In the formula, F i,max 、F i,min F i The maximum and minimum values ​​in F i is the i-th objective function before normalization, is the i-th objective function after normalization, and its value range is [0,1];

[0062] (2) Use the linear weighting method to process the multi-objective function into a single objective function:

[0063]

[0064] In the formula, ω i is the weight of the i-th objective function;

[0065] (3)ω i Determined by each objective function:

[0066]

[0067] Preferably, in step 5, the improved vulture search algorithm includes using an exponentially decreasing adaptive weight in the search phase:

[0068]

[0069] In the formula, k is the current iteration number, k max is the maximum number of iterations, α(k) is a variable that changes with the number of iterations and is greater than 0;

[0070] The position formula in the search phase is updated as follows:

[0071] P new,i =ω(k)·P i+x(i)·[ω(k)·P i -P mean ]+y(i)·[ω(k)·P i -P i+1 ];

[0072] Where P new,i is the new position chosen by the i-th vulture, P is the position of the i-th vulture, P mean is the current average position of the vultures, P i+1 is the next position of the i-th vulture, and x(i) and y(i) are the positions of the i-th vulture in polar coordinates.

[0073] Preferably, in step 5, the improved vulture search algorithm further comprises adopting the Levy flight strategy to perform a global search:

[0074]

[0075] Where μ and n are random numbers that conform to the normal distribution, and β is the Levy flight control parameter, which takes values ​​in [0,2].

[0076] The position update formula is:

[0077]

[0078] Where l is the Levy flight step length.

[0079] Compared with the prior art, the present invention has the following beneficial effects:

[0080] (1) The present invention provides a coordinated power supply strategy for the integration of "source-grid-vehicle-storage" in rail transit, establishes the system operation cost and energy exchange loss as the objective function, and conducts coordinated power supply with the goal of minimizing system operation cost and energy loss. The practical problem of time-of-use electricity price is taken into consideration. Under the condition of time-of-use electricity price, by comparing the power supply cost of each power supply device, the power supply sequence of the power supply system is reasonably arranged, the total system operation cost is reduced, and the economy and reliability of train operation are achieved.

[0081] (2) The present invention takes into account the energy consumed by train auxiliary equipment such as lighting and air conditioning, establishes a mathematical model of the energy consumption of lighting and air conditioning, establishes a dynamic threshold coefficient for the air-conditioning system, and appropriately adjusts the temperature threshold in the car according to the current passenger capacity to improve the passenger comfort. At the same time, the energy loss in the energy exchange process between the power grid and the photovoltaic power generation device is taken into account. Through a reasonable collaborative power supply optimization strategy, the energy consumption in the system is further optimized, carbon emissions are reduced, energy loss is reduced, and environmental pollution is reduced.

[0082] (3) The present invention adopts the maximum and minimum method and the linear weighted method to normalize the objective function. The normalization can eliminate the dimensional differences between different objective functions, avoid the weight of a certain objective function being too large or too small, and improve the accuracy and stability of the model; the adaptive weight and Levy flight strategy are introduced into the vulture optimization algorithm to improve it. The improvement of the algorithm can improve the global and local search capabilities, jump out of the local optimum and further expand the search space, and can quickly and accurately find the optimal solution of the objective function. BRIEF DESCRIPTION OF THE DRAWINGS

[0083] Figure 1 It is a topological diagram of the source-grid-vehicle-storage integrated rail transit collaborative energy supply method in an embodiment of the present invention;

[0084] Figure 2 is a flow chart of the improved vulture search algorithm solution in an embodiment of the present invention;

[0085] Figure 3 is a graph of photovoltaic output and time-of-use electricity price in an embodiment of the present invention;

[0086] Figure 4 It is the scheduling strategy of "source-grid-vehicle-storage" coordinated power supply in the embodiment of the present invention. DETAILED DESCRIPTION

[0087] Embodiments of the present invention are described in detail below, and examples of specific implementations are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0088] The source-grid-vehicle-storage integrated rail transit coordinated energy supply method provided by the present invention is as follows: Figure 1 As shown, "source" refers to units such as new energy sources and external power grids that provide traction power for trains; "grid" refers to electrical equipment such as back-to-back converters and contact networks, which transmit electrical energy from the power supply system to the train to drive the train; "vehicle" refers to a traction train with an on-board energy storage device, which absorbs electrical energy when the train is in traction condition and releases electrical energy when it is in braking condition; "storage" refers to an energy storage device, which stores energy when energy supply is in excess and releases energy when energy demand peaks, thereby balancing energy supply and demand and maintaining the stability and reliability of energy supply. The present invention uses typical photovoltaic output curves and combines time-of-use electricity prices to design a system output scheduling strategy on the premise of meeting stable train operation, minimizing total system operation cost, and minimizing energy loss. The specific steps and processes are as follows:

[0089] 1. Establishing a mathematical model

[0090] 1. Photovoltaic power generation model

[0091] The power generation of photovoltaic devices is affected by factors such as light intensity, temperature, effective area of ​​light, and photoelectric conversion efficiency. The mathematical model of photovoltaic power generation is established as follows:

[0092] P zpv,t =ηSG t [1+a(T t -T ref )]; (1)

[0093] Where P zpv,t is the total energy generated by the photovoltaic power generation device, η is the photoelectric conversion efficiency of the photovoltaic cell, S is the surface area of ​​the photovoltaic cell module, G t is the light intensity at time t, α is the temperature coefficient, T t is the photovoltaic cell temperature at time t, T ref is the reference temperature of the photovoltaic cell.

[0094] 2. Lighting system energy consumption model

[0095] During the operation of the train, the light intensity in the carriage is affected by factors such as natural lighting and the train running section. When the natural light intensity is lower than a certain value, the train will produce lighting loss and the energy consumption is relatively stable. The mathematical model of the energy consumption of the lighting system in the train is established as follows:

[0096]

[0097] Where P LGT is the power consumed by the lighting system in the train, is the power consumed by the constant lighting system (such as safety lighting system) in the i-th compartment during train operation, P l,i is the lighting density in the i-th compartment, A i is the lighting area in the i-th compartment, τ l,i is the lighting operation time, L i is the natural light illumination in the car, L min is the minimum light intensity in the carriage, and N2 is the total number of train carriages.

[0098] 3. Air conditioning system energy consumption model

[0099] The power consumed by the air conditioning in the carriage is affected by factors such as the temperature in the carriage, the ambient temperature, and the number of passengers. The mathematical model for the energy consumption of the air conditioning system in the train is established as follows:

[0100]

[0101] Where P A.C. is the power consumed by the air conditioner, are the temperature outside the i-th compartment and the optimal temperature inside the compartment at time t, ξ is the air conditioning energy efficiency ratio, R i is the equivalent thermal resistance of the ith compartment, T A.C. The total operation time of the air conditioner.

[0102] Establish a threshold model for the above air conditioning system, and the current temperature in the car is θ t,in , the optimal temperature in the car is θ best , the temperature in the car at the next moment after air conditioning is θ t+1,in , the air conditioner is turned on for h on , the total system operation time is h, the air conditioner rated power is P, the heat dissipation coefficient is ε, and the temperature outside the car at the next moment is θ t+1,out , the threshold coefficient model is established as follows:

[0103]

[0104] θ t+1,in =θ t,in +ξPR i +(1-ε)θ t+1,out ; (5)

[0105] In the formula, ζ is the threshold coefficient. It can be seen from formula (4) that it is affected by the temperature inside and outside the car.

[0106] Determine the number of people in the current carriage based on the traffic card swiping data, obtain the current density of people in the carriage, and divide the density of people in the carriage. The formula for the density of people and its classification are shown in the following formula:

[0107]

[0108] In the formula, K i is the current passenger density in the carriage, Q i is the number of people in the current carriage, Q z The total number of people in the carriage when it is fully loaded.

[0109] When K i When the density is less than 25%, that is, the population density is sparse, there are few passengers in the train compartment and the temperature in the compartment is lower. Therefore, the temperature threshold in the compartment needs to be increased. At this time, the constraints of the optimal temperature threshold in the compartment are as follows:

[0110] ζ·θ in,min ≤θ best ≤θ in,max ·ζ; (8)

[0111] In the formula, θ in,min ,θ in,max They are respectively the minimum and maximum temperatures that passengers in the car can withstand.

[0112] When 25%≤K i When the density is normal, the number of passengers in the train compartment is normal, and the temperature in the compartment is normal. At this time, the constraints of the optimal temperature threshold in the compartment are as follows:

[0113] θ in,min ≤θ best ≤θ in,max (9)

[0114] When K i When the density is >75%, that is, the passenger density is dense, there are many passengers in the train compartment, and the temperature in the compartment increases. Therefore, the temperature threshold in the compartment should be lowered. At this time, the constraints of the optimal temperature threshold in the compartment are as follows:

[0115]

[0116] 2. Objective Function and Constraints

[0117] 1. Objective Function

[0118] (1) Total system operating cost:

[0119] F1=F T +F OM +F WPV -F SPV ; (11)

[0120] Among them, F1 is the total cost of system operation, F T Train consumption cost, F OM is the operation and maintenance cost of the system operation process, F WPV is the penalty cost for abandoning light, F SPV The cost of selling electricity from photovoltaic power generation equipment to the grid.

[0121] The calculation formulas for each parameter are as follows:

[0122]

[0123] In the formula, c T,t is the unit price of electricity at time t, P T,t is the train traction energy consumption at time t, P LGT,t is the energy consumption of train lighting at time t, P A.C.,t is the energy consumption of train air conditioning at time t, P else,t is the energy consumption of the train at time t except for lighting, air conditioning and other systems (such as the energy consumption generated by the control system in the train), and T is the total running time of the train.

[0124]

[0125] In the formula, N1 is the number of equipment that needs to be maintained, cj is the unit price of operation and maintenance of the jth equipment, P j is the power emitted by the jth device.

[0126]

[0127] In the formula, c pv is the light abandonment penalty coefficient, P wpv is the power abandoned by the photovoltaic power generation device at time t, T PV is the duration of photovoltaic power generation.

[0128]

[0129] In the formula, c spv,t is the unit price of electricity sold by the photovoltaic power generation device to the grid at time t, P spv,t is the power sold by the photovoltaic power generation device to the grid at time t, T spv The total duration of power sold.

[0130] (2) Energy loss:

[0131] F2=P trans +P loss +P p,ex ; (16)

[0132] Where F2 is the energy loss, P trans is the loss caused by the transmission line, P loss is the energy loss of electrical equipment such as back-to-back converters, P p,ex is the loss caused by energy exchange, and its calculation formula is:

[0133]

[0134] Where P grid,t is the energy exchanged between the grid and the train at time t, η grid is the power exchange efficiency between the grid and the train, P pv,t is the energy exchanged between the photovoltaic power generation device and the train at time t, η pv is the power exchange efficiency between the photovoltaic power generation device and the train, P ess,t is the energy exchanged between the energy storage device and the train at time t, η ess is the energy exchange efficiency between the energy storage device and the train, η spv It is the energy exchange efficiency between the power grid and the photovoltaic power generation device.

[0135] 2. Constraints of the objective function

[0136] (1) Power balance constraints:

[0137] P grid +Ppv +P ess =P train +F2; (18)

[0138] Where P grid is the grid output power, P pv is the power output from the photovoltaic power generation device to the train, P ess is the power output of the energy storage device to the train, P train is the power consumed by the train during operation, P train =P T +P LGT +P A.C. +P else .

[0139] (2) Photovoltaic output constraints:

[0140] 0≤Ppv≤Ppv,max; (19)

[0141] Where P pv,max is the maximum value of photovoltaic output.

[0142] (3) Energy storage device constraints:

[0143] SOC min ≤SOC≤SOC max ; (20)

[0144] P ess,min ≤P ess ≤P ess,max ; (twenty one)

[0145] In the formula, SOC is the state of charge of the energy storage battery, SOC min and SOC max are the maximum and minimum values ​​of the energy storage battery charge respectively; P ess,min and P ess,max are the maximum and minimum values ​​of the charging and discharging power of the energy storage device, respectively.

[0146] (4) The adoption of a time-of-use electricity price strategy should reduce train operating costs, so the following requirements are required:

[0147] F1≤F0; (22)

[0148] In the formula, F1 is the cost of train operation after adopting the time-of-use electricity price strategy, and F0 is the cost of train operation before adopting the time-of-use electricity price strategy.

[0149] (5) Grid output power constraints

[0150] P grid,min ≤P grid,t ≤P grid,max ; (twenty three)

[0151] Where P grid,min and P grid,max are the maximum and minimum values ​​of the external power grid output power at time t respectively.

[0152] 3. Model Solution

[0153] 1. Normalization of multi-objective functions

[0154] The objective function of the present invention is to minimize the system operation cost and energy loss, without a maximum value. The maximum and minimum value normalization method is used to preprocess each objective function, and the normalized data falls between [0,1], as shown in the following formula:

[0155]

[0156] In the formula, F i,max 、F i,min F i The maximum and minimum values ​​in F i is the i-th objective function before normalization, F i * is the i-th objective function after normalization.

[0157] Then the linear weighted method is used to process the multi-objective function into a single objective function, as shown in the following formula:

[0158]

[0159] In the formula, ω i is the weight of the i-th objective function.

[0160] ω i Determined by the single objective function itself, it can be expressed as:

[0161]

[0162] 2. Solution Algorithm

[0163] The improved vulture search algorithm is used to optimize the above objectives to achieve the goal of minimizing system operation cost and minimizing energy loss. BES has fast convergence speed and high flexibility, but it is easy to fall into local optimum. Therefore, the present invention improves BES and improves its optimization ability. The process is as follows: Figure 2 As shown, specifically including:

[0164] (1) An exponentially changing adaptive weight is introduced in the search phase. This weight gradually decreases during the search process, which can improve the global search capability and extensive search in the early stage, and improve the search accuracy and optimization capability in the later stage.

[0165]

[0166] In the formula, k is the current iteration number, k max is the maximum number of iterations, α(k) is a variable that changes with the number of iterations and is greater than 0.

[0167] The position formula in the search phase is updated to:

[0168] P new,i =ω(k)·P i +x(i)·[ω(k)·P i -P mean ]+y(i)·[ω(k)·P i -P i+1 ]; (28)

[0169] Where P new,i is the new position chosen by the i-th vulture, P is the position of the i-th vulture, P mean is the current average position of the vultures, P i+1 is the next position of the i-th vulture, and x(i) and y(i) are the positions of the i-th vulture in polar coordinates.

[0170] (2) In order to improve the global search capability, the Levy flight strategy is added. The specific calculation of Levy flight is shown in formula (29). Levy flight can improve the search efficiency and jump out of the local optimal area.

[0171]

[0172] Where μ and n are random numbers that conform to the normal distribution and are Levy flight control parameters, with values ​​in the range of [0,2].

[0173] After adding the Levy flight strategy, the position is updated as follows:

[0174]

[0175] Where l is the Levy flight step length.

[0176] 4. Dispatch strategy (coordinated energy supply plan)

[0177] Through the typical photovoltaic output curve, combined with the time-of-use electricity price, under the premise of meeting the stable operation of the train, the system output dispatch strategy is designed to establish an economic dispatch model. The peak and valley periods of large industrial electricity price users and general industrial and commercial electricity price users are shown in Table 1 below. The 24 hours of a day are divided into three periods, namely the valley period, the flat period and the peak period. Figure 3 This is a comparison chart of photovoltaic output and time-of-use electricity price. Figure 3It can be seen that the daytime peak electricity consumption and the flat period basically coincide with the photovoltaic output time. Therefore, the daytime peak period is mainly powered by photovoltaics, and the night peak electricity consumption is powered by energy storage devices; the electricity trough period is mainly concentrated at night, so the trough period is mainly powered by energy storage devices; the flat period coincides with the photovoltaic output time, so the photovoltaic electricity is consumed first during the flat period, and then the discharge of the energy storage device is considered.

[0178] Table 1 Time-of-use electricity price division

[0179]

[0180] According to the photovoltaic output time and the time-of-use electricity price mechanism, under the premise of comprehensively considering the lowest total system operation cost and the smallest energy loss, the power supply system power supply during train operation is divided into the following ten working conditions, as shown in Table 2. The specific power supply strategies are as follows: Figure 4 As shown, the following options are included:

[0181] (1) Low power consumption period: If SOC<SOC min , the grid supplies power to the train and charges the energy storage device at the same time; otherwise, the energy storage device discharges and the grid supplies power at the same time;

[0182] (2) Level period: P pv ≥P train In this case, if SOC>SOC max , the excess energy is sold to the grid and the energy storage device is in standby mode; otherwise, the excess energy is sold to the grid and the energy storage device is charged; P pv <P train In this case, if SOC<SOC min , the grid supplies power to the train and the energy storage device is in standby state; otherwise, the energy storage device discharges and the grid supplies power to the train;

[0183] (3) Peak electricity consumption period: P pv ≥P train In this case, the excess energy is sold to the grid and the energy storage device is in standby mode; pv <P train In this case, if SOC<SOC min , the grid supplies power to the train and the energy storage device is in standby state; otherwise, the energy storage device discharges and the grid supplies power to the train.

[0184] Table 2 Power supply conditions

[0185]

[0186] Note: In the table, P pv is the power output of the photovoltaic power generation device to the train, SOC is the state of charge of the energy storage battery, SOC min and SOCmax are the maximum and minimum values ​​of the energy storage battery charge, P ess is the power output of the energy storage device to the train, P train It is the power consumed by the train during operation.

Claims

1. A source-grid-vehicle-storage integrated rail transit coordinated energy supply method, characterized in that: The following steps are involved: Step 1: Use the constructed photovoltaic power generation model, lighting system energy consumption model and air conditioning system energy consumption model to obtain the total energy generated by the photovoltaic power generation device , Energy consumption of lighting system during train operation and air conditioning system energy consumption ; The photovoltaic power generation model is: ; In the formula, is the total energy generated by the photovoltaic power generation device, is the photoelectric conversion efficiency of the photovoltaic cell, is the surface area of ​​the photovoltaic cell module, is the light intensity at time t, is the temperature coefficient, is the photovoltaic cell temperature at time t, is the reference temperature of the photovoltaic cell; The energy consumption model of the lighting system is: ; In the formula, is the power consumed by the lighting system in the train, For the train running The power consumed by the constant lighting system in each car, For the The lighting density in the car compartment is For the The lighting area in the car compartment, is the lighting operating time, is the natural light brightness in the car. is the minimum light intensity in the car. is the total number of train carriages; The energy consumption model of the air conditioning system is: ; In the formula, is the power consumed by the air conditioner, They are Moment The temperature outside the car and the best temperature inside the car, is the air conditioning energy efficiency ratio, For the The equivalent thermal resistance of a car compartment is is the total operation time of the air conditioner, is the total number of train carriages; Using the threshold coefficient model, the temperature threshold in the car is adjusted according to the current passenger capacity: ; ; In the formula, is the threshold coefficient; The constraints for the optimal temperature threshold in the cabin are: , ; , ; , ; In the formula, They are the minimum and maximum temperatures that passengers in the car can withstand respectively; is the current density of people in the carriage; Step 2: Construct an objective function, which includes the total system operation cost and energy loss: ; ; in, is the total system operating cost, is the train consumption cost, For operation and maintenance costs, The penalty cost for abandoning light, The cost of selling electricity from the photovoltaic power generation device to the grid; is the energy loss, is the loss caused by the transmission line, Energy loss caused by electrical equipment, Losses caused by energy exchange; Step 3: Establish the constraints of the objective function: (1) Power balance constraints: ; is the grid output power, is the power output from the photovoltaic power generation device to the train. is the power output from the energy storage device to the train, is the power consumed by the train during operation, ; is the train traction energy consumption, It refers to other energy consumption during train operation except lighting and air conditioning systems; (2) Photovoltaic output constraints: ; In the formula, is the maximum value of photovoltaic output; (3) Energy storage device constraints: ; ; In the formula, is the state of charge of the energy storage battery, and are the maximum and minimum values ​​of the energy storage battery charge respectively; and are the maximum and minimum values ​​of the charging and discharging power of the energy storage device, respectively; (4) Train operation cost constraints: ; In the formula, The cost of train operation after adopting the time-of-use electricity price strategy. The cost of train operation before the time-of-use electricity price strategy is adopted; (5) Grid output power constraints: ; In the formula, and are the maximum and minimum values ​​of the external power grid output power at time t respectively; Step 4: Perform normalization preprocessing on each objective function; process the multi-objective function into a single objective function; specifically: (1) Use the maximum and minimum value normalization method to preprocess each objective function: ; In the formula, They are The maximum and minimum values ​​in is the first The objective function, After normalization, objective function; (2) Use the linear weighting method to process the multi-objective function into a single objective function: ; In the formula, For the The weight of the objective function, It is objective function; The value range of is [0,1]; (3) Determined by each objective function: ; Step 5: Solve the single objective function using the improved vulture search algorithm to achieve the goal of minimizing system operation cost and energy loss; the improved vulture search algorithm includes using exponentially decreasing adaptive weights during the search phase: ; In the formula, is the current iteration number, is the maximum number of iterations, is a variable that changes with the number of iterations and is greater than 0; The position formula in the search phase is updated as follows: ; In the formula, For the A new location chosen by a vulture, For the The location of the vulture, is the current average position of the vultures, For the The next location of the vulture, , For the The location of the vultures in polar coordinates; Use Levy flight strategy for global search: ; In the formula, is a random number that conforms to the normal distribution. is the Levy flight control parameter, which takes values ​​in [0,2]; The position update formula is: ; In the formula, is the Levy flight step length; Step 6: According to the photovoltaic output time and the time-of-use electricity price mechanism, determine the scheduling strategy of source, grid, vehicle and storage under the optimal solution of the single objective function.

2. The source-grid-vehicle-storage integrated rail transit coordinated energy supply method according to claim 1 is characterized in that: In step 2, the calculation formula of train consumption cost is: ; In the formula, for The unit price of electricity at the moment, for Train traction energy consumption at the time, for Energy consumption of train lighting at all times, for Energy consumption of train air conditioning at all times, for In addition to the energy consumption of lighting and air conditioning systems during train operation, is the total running time of the train.

3. The source-grid-vehicle-storage integrated rail transit coordinated energy supply method according to claim 1 is characterized in that: In step 2, the calculation formula for the operation and maintenance cost of the system operation process is: ; In the formula, is the number of equipment that needs to be maintained. For the The unit price of equipment operation and maintenance, For the The power generated by a device.

4. The source-grid-vehicle-storage integrated rail transit coordinated energy supply method according to claim 1 is characterized in that: In step 2, the calculation formula for the penalty cost of abandoned light is: ; In the formula, is the light abandonment penalty coefficient, for The power of photovoltaic power generation device abandoned at any moment, is the duration of photovoltaic power generation.

5. The source-grid-vehicle-storage integrated rail transit coordinated energy supply method according to claim 1 is characterized in that: In step 2, the formula for calculating the cost of electricity sold by the photovoltaic power generation device to the power grid is: ; In the formula, for The unit price of electricity sold by the photovoltaic power generation device to the power grid at that moment, for The power sold to the grid by the photovoltaic power generation device at any given moment. The total duration of power sold.

6. The source-grid-vehicle-storage integrated rail transit coordinated energy supply method according to claim 1 is characterized in that: In step 2, the loss calculation formula generated by energy exchange is: ; In the formula, for The energy exchanged between the power grid and the train at any given moment, is the efficiency of power exchange between the grid and the train, for The energy exchanged between the photovoltaic power generation device and the train at all times, The efficiency of power exchange between the photovoltaic power generation device and the train. for The energy exchanged between the energy storage device and the train at any given moment, is the energy exchange efficiency between the energy storage device and the train, It is the energy exchange efficiency between the power grid and the photovoltaic power generation device.