A method for generating infiltration lines based on cross-medium propagation principle

By using the cross-media propagation principle, the Fermat principle and the law of refraction are used to optimize the propagation path of water bodies in the dam, combined with the gradient descent method and actual observation data, the problem of complex and inaccurate calculation of infiltration line generation in the existing technology is solved. Efficient and accurate wetting line generation is achieved.

CN118569108BActive Publication Date: 2024-12-03奥维数字科技有限公司
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411053535.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-12-03
Estimated Expiration
2044-08-02

AI Technical Summary

Technical Problem

The existing cross-die infiltration line generation algorithm has high computational complexity and low efficiency, which leads to large calculations and inaccurate predictions during the infiltration line generation calculation process, especially when geological conditions are complex and changeable.

Method used

Using a method based on the cross-media propagation principle, the key points of the hierarchical interface of different media in the dam are determined by measuring the media density and elastic modulus parameters, the propagation path is optimized using the Fermat principle and the refractive law, and iteratively optimized the position with the gradient descent method. Generate smooth theoretical wetting lines and correct them with actual observed data.

Benefits of technology

The calculation efficiency and accuracy of the infiltration line generation are improved, and the key points of the infiltration line can be accurately determined and the accurate smooth theoretical infiltration line can be generated.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118569108B_ABST
    Figure CN118569108B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of infiltration line generation, and in particular to a method for generating infiltration lines based on the principle of cross-medium propagation. The method comprises the following steps: S1, determining the starting point A of the water level in front of the dam and the overflow point B behind the dam, and calculating the key point P according to the principle of the shortest propagation path; S2, determining the stratified interface point C by solving the shortest path formula, and constructing a theoretical infiltration line in the form of a broken line; S3, determining the boundary line ef of the medium interface, and using the law of refraction to narrow the calculation range of point C; S4, connecting the stratified interface point C to form a broken line, and using a quadratic curve to perform smooth curve fitting according to different situations to generate a smooth theoretical infiltration line; S5, optimizing the theoretical infiltration line to obtain the final infiltration line.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of infiltration line generation, and in particular to a method for generating infiltration lines based on the cross-medium propagation principle. Background Art

[0002] A method for generating seepage lines based on the principle of cross-medium propagation aims to optimize the seepage path of water inside the dam through Fermat's principle and the law of refraction, generate more accurate theoretical seepage lines, and achieve accurate assessment and management of dam safety. The gradient descent method is used to iteratively optimize the position of each key point to ensure the shortest total propagation time, and corrections are made based on actual observation data to ultimately generate a smooth theoretical seepage line.

[0003] The existing cross-medium infiltration line generation algorithm has high computational complexity and low efficiency. In addition, due to the complex and changeable geological conditions, the amount of calculation involved in the infiltration line generation calculation process is large and the infiltration line prediction is inaccurate. Therefore, a method for generating infiltration lines based on the cross-medium propagation principle is provided. Summary of the invention

[0004] The purpose of the present invention is to provide a method for generating an infiltration line based on the principle of cross-medium propagation, so as to solve the problem raised in the above background technology that the calculation amount involved in the calculation process of infiltration line generation is large and the infiltration line prediction is inaccurate due to the complex and changeable geological conditions.

[0005] To achieve the above object, the present invention provides a method for generating an infiltration line based on the cross-medium propagation principle, comprising the following steps:

[0006] S1. Measure the density and elastic modulus parameters of each medium, determine the starting point A of the water level in front of the dam and the overflow point B behind the dam, and calculate the key point P of the interface between different media layers of the dam based on the principle of the shortest propagation path;

[0007] S2. Assume that the propagation speed from the starting point A of the water level in front of the dam to the overflow point B behind the dam is inversely proportional to the medium density. By solving the shortest path formula, the stratified interface point C of each stratified interface is determined, and the stratified interface points C are connected in sequence to preliminarily construct a theoretical infiltration line in the form of a broken line.

[0008] S3. Determine the boundary line ef of the medium interface through geological survey, and when the densities of the two media are different, use the law of refraction to narrow the calculation range of the ordinate of the layered interface point C, calculate and compare a part of the points of the medium boundary line ef to obtain the minimum propagation time;

[0009] S4, connecting each stratified interface point C to form a broken line, and using different quadratic curves to perform smooth curve fitting according to two situations: the water body enters the high-density medium from the low-density medium and the water body enters the low-density medium from the high-density medium, and finally generating a smooth theoretical infiltration line;

[0010] S5. Combined with the actual observation data of the dam production system, the theoretical infiltration line is corrected to obtain the final infiltration line.

[0011] In S1, the density of each medium is measured by geological survey and experimental data. And the elastic modulus parameters ;

[0012] The water level starting point A in front of the dam and the overflow point B behind the dam are confirmed by the on-site measuring equipment water level gauge and pressure measurement to confirm the actual water level. The coordinates of the water level starting point A in front of the dam are recorded as and the coordinates of the overflow point B behind the dam ;

[0013] According to the principle of shortest propagation path, the specific steps involved in calculating the key point P of the interface between different media layers of the dam are as follows:

[0014] S1.1. Set the medium parameters for each medium layer. , with density and elastic modulus parameters , starting point of water level in front of dam Overflow point behind Hehe Dam ;

[0015] S1.2, for Different dielectric layers, determine the interface of each dielectric layer, The boundary line of the interface between the dielectric layers is ;

[0016] S1.3. Establish a propagation path based on density and elastic modulus parameters Set the propagation speed , establish the shortest path formula ;

[0017] S1.4. Propagation speed Substitute the shortest path formula , the propagation time formula is obtained , using the propagation time formula Minimize each key point location;

[0018] S1.5. Starting from the starting point A of the water level in front of the dam, use the gradient descent method to iteratively optimize each key point Location.

[0019] As a further improvement of this technical solution, the propagation speed is set in S1.3 , establish the shortest path formula The math involved is as follows:

[0020] Propagation speed :

[0021] ;

[0022] Shortest Path Formula :

[0023] ;

[0024] in, The dielectric layer The propagation distance in is the total number of dielectric layers; The dielectric layer The propagation speed in .

[0025] As a further improvement of this technical solution, the propagation speed in S1.4 is Substitute the shortest path formula , the propagation time formula is obtained The math involved is as follows:

[0026] Propagation time formula :

[0027] .

[0028] As a further improvement of the technical solution, the specific steps involved in determining the stratified interface point C of each stratified interface by solving the shortest path formula in S2 are as follows:

[0029] S2.1, Path division, from the starting point A to the layer interface point C, and then from the layer interface point C to the end point B, the path is divided into two sections: from A to C, the distance is ; From C to B, the distance is ;

[0030] S2.2. Total propagation time is the sum of two periods of time:

[0031] ;

[0032] in, is the propagation speed in medium A; is the propagation speed in medium B;

[0033] S2.3. Calculate the distance from the starting point A to the delamination interface point C :

[0034] ;

[0035] Calculate the distance from the delamination interface point C to the end point B :

[0036] ;

[0037] The initial delamination interface point position is :

[0038] ;

[0039] S2.4. Minimize total propagation time , and use the gradient descent method to iteratively optimize the delamination interface points Location;

[0040] Among them, minimize the total propagation time The math involved is as follows:

[0041] ;

[0042] in, is the total propagation time after minimization;

[0043] S2.5. For each dielectric layer Repeat the gradient descent method in S2.4 above to determine the delamination interface point of each delamination interface , all layered interface points Connect them one by one to form a preliminary theoretical infiltration line in the form of a broken line.

[0044] As a further improvement of the technical solution, the gradient descent method is used in S2.4 to iteratively optimize the layered interface points. The specific steps and mathematical formulas involved in the position are as follows:

[0045] S2.4.1. Calculation of propagation time layer interface points Gradient of position:

[0046] for :

[0047] ;

[0048] for :

[0049] ;

[0050] in, and Represent the layer interface points The horizontal and vertical coordinates of;

[0051] S2.4.2. Using learning rate Update layered interface points The position is updated iteratively until the total propagation time convergence.

[0052] As a further improvement of this technical solution, the learning rate used in S2.4.2 Update layered interface points The mathematical formulas involved in the position are as follows:

[0053] ;

[0054] in, is the index of the iteration number; and Indicated in Layer interface point The horizontal and vertical coordinates of For the next iteration; and Indicated in Layer interface point The horizontal and vertical coordinates of is the learning rate; and The total propagation time Layered interface points Horizontal axis and the vertical coordinate gradient.

[0055] As a further improvement of the present technical solution, S3 uses the law of refraction to reduce the delamination interface point The specific steps involved in calculating the range of the vertical axis are as follows:

[0056] S3.1. Determine the boundary lines of different dielectric layers within the dam through on-site geological surveys ;

[0057] S3.2. Predicting the delamination interface point by the law of refraction and the density difference of the medium On the dividing line The position on the surface is determined according to the density difference of the medium. The vertical coordinate range of

[0058] S3.3. Determine the calculation scope based on two situations:

[0059] Case 1: Water enters a high-density medium from a low-density medium , the refraction angle is less than the incident angle, then the vertical coordinate of the predicted delamination interface point C is and The calculation range is ;

[0060] Case 2: Water enters low-density medium from high-density medium , the refraction angle is greater than the incident angle, then the vertical coordinate of the predicted delamination interface point C is and The calculation range is .

[0061] As a further improvement of the technical solution, the specific steps involved in connecting the stratified interface points C in S4 to form a broken line, and using different quadratic curves for smooth curve fitting according to the two situations of water entering the high-density medium from the low-density medium and water entering the low-density medium from the high-density medium, and finally generating a smooth theoretical infiltration line are as follows:

[0062] S4.1, connect the delamination interface points C in sequence to form a preliminary theoretical wetting line in the form of a broken line;

[0063] S4.2. When water enters a high-density medium from a low-density medium, use a quadratic curve Fitting; when water enters a low-density medium from a high-density medium, a quadratic curve is used Perform fitting;

[0064] S4.3. Combine the smooth curves of the two cases to form the final smooth theoretical infiltration line, and finally use spline interpolation to further smooth it.

[0065] As a further improvement of the technical solution, the theoretical infiltration line is corrected in S5 in combination with the actual observation data of the dam production system, and the specific steps involved in obtaining the final infiltration line are as follows:

[0066] S5.1. Obtain the coordinates of key points on the theoretical infiltration line generated in step S4, and match the actual observed data points with the points on the theoretical infiltration line;

[0067] S5.2. For each matched observation point and theoretical point, calculate its deviation value, apply the calculated correction value to the theoretical infiltration line, and adjust the position of each key point.

[0068] Compared with the prior art, the present invention has the following beneficial effects:

[0069] 1. In this infiltration line generation method based on the cross-medium propagation principle, the shortest time of the water body propagation path in different media is calculated by the Fermat principle, and the key point position of the infiltration line can be accurately determined.

[0070] 2. In this method for generating infiltration lines based on the principle of cross-medium propagation, the positions of key points are optimized by using polynomial curve approximation to achieve accurate fitting and generation of infiltration lines. BRIEF DESCRIPTION OF THE DRAWINGS

[0071] Figure 1 A line diagram for solving point positions of different medium layer interfaces of the dam of the present invention;

[0072] Figure 2 It is a schematic diagram of the decomposition of the boundary line L of different media in the dam of the present invention;

[0073] Figure 3 A quadratic curve fitting diagram is used for the boundary lines of different media in the dam of the present invention;

[0074] Figure 4 The figure is a flow chart of the overall method of the present invention. DETAILED DESCRIPTION

[0075] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0076] See also Figure 1-4 As shown, this embodiment provides a method for generating a wetting line based on the cross-medium propagation principle, comprising the following steps:

[0077] S1. Measure the density and elastic modulus parameters of each medium, determine the starting point A of the water level in front of the dam and the overflow point B behind the dam, and calculate the key point P of the interface between different media layers of the dam based on the principle of the shortest propagation path;

[0078] In S1, the density of each medium is measured by geological survey and experimental data. And the elastic modulus parameters ;

[0079] The water level starting point A in front of the dam and the overflow point B behind the dam are confirmed by the on-site measuring equipment water level gauge and pressure measurement to confirm the actual water level. The coordinates of the water level starting point A in front of the dam are recorded as and the coordinates of the overflow point B behind the dam ;

[0080] According to the principle of shortest propagation path, the specific steps involved in calculating the key point P of the interface between different media layers of the dam are as follows:

[0081] S1.1. Set the medium parameters for each medium layer. , with density and elastic modulus parameters , starting point of water level in front of dam Overflow point behind Hehe Dam ;

[0082] S1.2, for Different dielectric layers, determine the interface of each dielectric layer, The boundary line of the interface between the dielectric layers is ;

[0083] S1.3. Establish a propagation path based on density and elastic modulus parameters Set the propagation speed , establish the shortest path formula ;

[0084] S1.4. Propagation speed Substitute the shortest path formula , the propagation time formula is obtained , using the propagation time formula Minimize each key point location;

[0085] S1.5. Starting from the starting point A of the water level in front of the dam, use the gradient descent method to iteratively optimize each key point Location.

[0086] As a further improvement of this technical solution, the propagation speed is set in S1.3 , establish the shortest path formula The math involved is as follows:

[0087] Propagation speed :

[0088] ;

[0089] Shortest Path Formula :

[0090] ;

[0091] in, The dielectric layer The propagation distance in is the total number of dielectric layers; The dielectric layer The propagation speed in .

[0092] The S1.4 will propagate speed Substitute the shortest path formula , the propagation time formula is obtained The math involved is as follows:

[0093] Propagation time formula :

[0094] .

[0095] S2. Assume that the propagation speed from the starting point A of the water level in front of the dam to the overflow point B behind the dam is inversely proportional to the medium density. By solving the shortest path formula, the stratified interface point C of each stratified interface is determined, and the stratified interface points C are connected in sequence to preliminarily construct a theoretical infiltration line in the form of a broken line.

[0096] The specific steps involved in determining the stratified interface point C of each stratified interface by solving the shortest path formula in S2 are as follows:

[0097] S2.1, Path division, from the starting point A to the layer interface point C, and then from the layer interface point C to the end point B, the path is divided into two sections: from A to C, the distance is ; From C to B, the distance is ;

[0098] S2.2. Total propagation time is the sum of two periods of time:

[0099] ;

[0100] in, is the propagation speed in medium A; is the propagation speed in medium B;

[0101] S2.3. Calculate the distance from the starting point A to the delamination interface point C :

[0102] ;

[0103] Calculate the distance from the delamination interface point C to the end point B :

[0104] ;

[0105] The initial delamination interface point position is :

[0106] ;

[0107] S2.4. Minimize total propagation time , and use the gradient descent method to iteratively optimize the delamination interface points Location;

[0108] Among them, minimize the total propagation time The math involved is as follows:

[0109] ;

[0110] in, is the total propagation time after minimization;

[0111] S2.5. For each dielectric layer Repeat the gradient descent method in S2.4 above to determine the delamination interface point of each delamination interface , all layered interface points Connect them one by one to form a preliminary theoretical infiltration line in the form of a broken line.

[0112] The gradient descent method is used to iteratively optimize the delamination interface points in S2.4 The specific steps and mathematical formulas involved in the position are as follows:

[0113] S2.4.1. Calculation of propagation time layer interface points Gradient of position:

[0114] for :

[0115] ;

[0116] for :

[0117] ;

[0118] in, and Represent the layer interface points The horizontal and vertical coordinates of;

[0119] S2.4.2. Using learning rate Update layered interface points The position is updated iteratively until the total propagation time convergence.

[0120] The learning rate used in S2.4.2 Update layered interface points The mathematical formulas involved in the position are as follows:

[0121] ;

[0122] in, is the index of the iteration number; and Indicated in Layer interface point The horizontal and vertical coordinates of For the next iteration; and Indicated in Layer interface point The horizontal and vertical coordinates of is the learning rate; and The total propagation time Layered interface points Horizontal axis and the vertical coordinate The gradient of

[0123] like Figure 1 As shown in the figure, the point location problem of the interface between different media layers in the dam becomes the shortest path problem from point a to point b (where point b is the overflow point or the actual measurement point of the pressure measuring tube). The propagation speed of water in media A and B is used as the weight of the path. According to propagation theory, the propagation speed of water in the medium is inversely proportional to the density of the medium. The shortest path from point A to point B is The solution can be expressed as:

[0124] ;

[0125] The meaning of the above formula is to find the point c on the line segment L so that the time taken to complete acb is the shortest. In order to reduce the amount of calculation;

[0126] In the actual construction process of the dam, the boundary line L of different media will not be a straight line. Generally, L will be like Figure 2 As shown, it is decomposed into a line segment group L(n), and the problem becomes to solve the point c on the line segment group L(n) so that T acb Minimum.

[0127] The simplest way to solve point c is to calculate and compare Figure 1 All points on the midline segment ef are calculated to obtain the minimum value, but the amount of calculation is relatively large. According to the refraction theory, when light is incident obliquely from a low-density medium to a high-density medium, the angle of refraction is smaller than the angle of incidence; when light is incident obliquely from a high-density medium to a low-density medium, the angle of refraction is larger than the angle of incidence. We can simplify the problem to:

[0128] ab intersects ef at c', when ρ A < B When c is above c', the ordinate y of point c is c ∈(y a,y c’ ); when ρ A >ρ B , c must be below c', that is, the ordinate of point c, yc∈(yc',yb); so we only need to calculate and compare some points in line segment ef. In practical applications, due to the interference of various factors such as human, equipment or geology, the density of the medium in different layers of the dam cannot be uniform. At the same time, the drawing accuracy of the dam infiltration line is affected by the measurement accuracy of the pressure tube sensor and cannot reach the centimeter or even millimeter level. Therefore, in the actual calculation process, we can set the comparison step length to 2cm or larger, and the calculation efficiency of the entire algorithm model will be higher.

[0129] S3. Determine the boundary line ef of the medium interface through geological survey, and when the densities of the two media are different, use the law of refraction to narrow the calculation range of the ordinate of the layered interface point C, calculate and compare a part of the points of the medium boundary line ef to obtain the minimum propagation time;

[0130] The specific steps involved in S3 using the law of refraction to narrow the calculation range of the vertical coordinate of the delamination interface point C are as follows:

[0131] S3.1. Determine the boundary lines of different dielectric layers within the dam through on-site geological surveys ;

[0132] S3.2. Predicting the delamination interface point by the law of refraction and the density difference of the medium On the dividing line The position on the surface is determined according to the density difference of the medium. The vertical coordinate range of

[0133] S3.3. Determine the calculation scope based on two situations:

[0134] Case 1: Water enters a high-density medium from a low-density medium , the refraction angle is less than the incident angle, then the vertical coordinate of the predicted delamination interface point C is and The calculation range is ;

[0135] Case 2: Water enters low-density medium from high-density medium , the refraction angle is greater than the incident angle, then the vertical coordinate of the predicted delamination interface point C is and The calculation range is .

[0136] S4, connecting each stratified interface point C to form a broken line, and using different quadratic curves to perform smooth curve fitting according to two situations: the water body enters the high-density medium from the low-density medium and the water body enters the low-density medium from the high-density medium, and finally generating a smooth theoretical infiltration line;

[0137] In S4, each stratified interface point C is connected to form a broken line, and different quadratic curves are used to perform smooth curve fitting according to the two situations of water entering a high-density medium from a low-density medium and water entering a low-density medium from a high-density medium. The specific steps involved in finally generating a smooth theoretical infiltration line are as follows:

[0138] S4.1, connect the delamination interface points C in sequence to form a preliminary theoretical wetting line in the form of a broken line;

[0139] S4.2. When water enters a high-density medium from a low-density medium, use a quadratic curve Fitting; when water enters a low-density medium from a high-density medium, a quadratic curve is used Perform fitting;

[0140] S4.3, combining the smooth curves of the two cases to form the final smooth theoretical infiltration line, and finally further smoothing it using spline interpolation;

[0141] After solving the points of the interface of different media layers in the dam, connecting each point in order will get a broken line, but the actual infiltration line should be a smooth curve. How to choose a polynomial for approximation becomes the difficulty of drawing the infiltration line. We know that the infiltration of water is a slow process, and its speed is far from being comparable to the speed of light or sound; at the same time, due to the influence of its own weight, the water body will be affected by gravity and cause slight changes in the infiltration direction. After repeated experiments, under the same conditions, we compared the results of the finite element analysis system and found that the quadratic curve F(Y)=aX 2 +bX+c or F(X)=aY 2 +bY+c fitting can relatively perfectly approximate the results of the finite element analysis system, such as Figure 3 As shown;

[0142] When water enters a high-density medium from a low-density medium, the quadratic curve F(Y)=aX 2 +bX+c to fit. By simplifying the calculation, we can use point a as the vertex, X a As the axis of symmetry, the parabola passing through point c is used as the fitting curve to fit the line segment ac. At this time, the calculation formula can be simplified to F(Y)=aX 2 .

[0143] When water obliquely enters a low-density medium from a high-density medium, the quadratic curve F(X)=aY 2 +bY+c to fit. By simplifying the calculation, we can use point c as the vertex, Y c As the axis of symmetry, the parabola passing through point b' is used as the fitting curve to fit the line segment cb'. At this time, the calculation formula can be simplified to F(X)=aY 2 .

[0144] S5. Based on the actual observation data of the dam production system, the theoretical infiltration line is corrected to obtain the final infiltration line;

[0145] In S5, the theoretical infiltration line is corrected in combination with the actual observation data of the dam production system to obtain the final infiltration line. The specific steps involved are as follows:

[0146] S5.1. Obtain the coordinates of key points on the theoretical infiltration line generated in step S4, and match the actual observed data points with the points on the theoretical infiltration line;

[0147] S5.2. For each matched observation point and theoretical point, calculate its deviation value, apply the calculated correction value to the theoretical infiltration line, and adjust the position of each key point.

[0148] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the present invention and are not intended to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A method for generating a wetting line based on the cross-medium propagation principle, characterized in that: The following steps are involved: S1. Measure the density and elastic modulus parameters of each medium, determine the starting point A of the water level in front of the dam and the overflow point B behind the dam, and calculate the key point P of the interface between different media layers of the dam based on the principle of the shortest propagation path; In S1, the density of each medium is measured by geological survey and experimental data. And the elastic modulus parameters ; The water level starting point A in front of the dam and the overflow point B behind the dam are used to confirm the actual water level through the on-site measuring equipment water level gauge and pressure measurement, and the coordinates of the water level starting point A in front of the dam are recorded as and the coordinates of the overflow point B behind the dam ; According to the principle of shortest propagation path, the specific steps involved in calculating the key point P of the interface between different media layers of the dam are as follows: S1.

1. Set the medium parameters for each medium layer. , with density and elastic modulus parameters , starting point of water level in front of dam and overflow point behind the dam ; S1.2, for Different dielectric layers, determine the interface of each dielectric layer, The boundary line of the interface between the dielectric layers is ; S1.

3. Establish a propagation path based on density and elastic modulus parameters Set the propagation speed , establish the shortest path formula ; S1.

4. Propagation speed Substitute the shortest path formula , the propagation time formula is obtained , using the propagation time formula Minimize each key point location; S1.

5. Starting from the starting point A of the water level in front of the dam, use the gradient descent method to iteratively optimize each key point Location; The propagation speed is set in S1.3 , establish the shortest path formula The math involved is as follows: Propagation speed : ; Shortest Path Formula : ; in, The dielectric layer The propagation distance in is the total number of dielectric layers; The dielectric layer The propagation speed in The S1.4 will propagate speed Substitute the shortest path formula , the propagation time formula is obtained The math involved is as follows: Propagation time formula : ; S2. Assume that the propagation speed from the starting point A of the water level in front of the dam to the overflow point B behind the dam is inversely proportional to the medium density. By solving the shortest path formula, the stratified interface point C of each stratified interface is determined, and the stratified interface points C are connected in sequence to preliminarily construct a theoretical infiltration line in the form of a broken line. The specific steps involved in determining the stratified interface point C of each stratified interface by solving the shortest path formula in S2 are as follows: S2.1, Path division, from the starting point A to the layer interface point C, and then from the layer interface point C to the end point B, the path is divided into two sections: from A to C, the distance is ; From C to B, the distance is ; S2.

2. Total propagation time is the sum of two periods of time: ; in, is the propagation speed in medium A; is the propagation speed in medium B; S2.

3. Calculate the distance from the starting point A to the delamination interface point C : ; Calculate the distance from the delamination interface point C to the end point B : ; The initial delamination interface point position is : ; S2.

4. Minimize total propagation time , and use the gradient descent method to iteratively optimize the delamination interface points Location; Among them, minimize the total propagation time The math involved is as follows: ; in, is the total propagation time after minimization; S2.

5. For each dielectric layer Repeat the gradient descent method in S2.4 above to determine the delamination interface point of each delamination interface , all layered interface points Connect them in sequence to form a preliminary theoretical infiltration line in the form of a broken line; S3. Determine the boundary line ef of the medium interface through geological survey, and when the densities of the two media are different, use the law of refraction to narrow the calculation range of the ordinate of the layered interface point C, calculate and compare a part of the points of the medium boundary line ef to obtain the minimum propagation time; S4, connecting each stratified interface point C to form a broken line, and using different quadratic curves to perform smooth curve fitting according to two situations: the water body enters the high-density medium from the low-density medium and the water body enters the low-density medium from the high-density medium, and finally generating a smooth theoretical infiltration line; S5. Combined with the actual observation data of the dam production system, the theoretical infiltration line is corrected to obtain the final infiltration line.

2. The method for generating a wetting line based on the cross-medium propagation principle according to claim 1, characterized in that: The gradient descent method is used in S2.4 to iteratively optimize the delamination interface points The specific steps and mathematical formulas involved in the position are as follows: S2.4.

1. Calculation of propagation time layer interface points Gradient of position: for : ; for : ; in, and Represent the layer interface points The horizontal and vertical coordinates of; S2.4.

2. Using learning rate Update layered interface points The position is updated iteratively until the total propagation time convergence.

3. The method for generating a wetting line based on the cross-medium propagation principle according to claim 2, characterized in that: The learning rate used in S2.4.2 Update layered interface points The mathematical formulas involved in the position are as follows: ; in, is the index of the iteration number; and Indicated in Layer interface point The horizontal and vertical coordinates of For the next iteration; and Indicated in Layer interface point The horizontal and vertical coordinates of is the learning rate; and The total propagation time Layered interface points Horizontal axis and the vertical coordinate gradient.

4. The method for generating a wetting line based on the cross-medium propagation principle according to claim 1, characterized in that: The specific steps involved in S3 using the law of refraction to narrow the calculation range of the vertical coordinate of the delamination interface point C are as follows: S3.

1. Determine the boundary lines of different dielectric layers within the dam through on-site geological surveys ; S3.

2. Predicting the delamination interface point by the law of refraction and the density difference of the medium On the dividing line The position on the surface is determined according to the density difference of the medium. The vertical coordinate range of S3.

3. Determine the calculation scope based on two situations: Case 1: Water enters a high-density medium from a low-density medium , the refraction angle is less than the incident angle, then the vertical coordinate of the predicted delamination interface point C is and The calculation range is ; Case 2: Water enters low-density medium from high-density medium , the refraction angle is greater than the incident angle, then the vertical coordinate of the predicted delamination interface point C is and The calculation range is .

5. The method for generating a wetting line based on the cross-medium propagation principle according to claim 1, characterized in that: In S4, each stratified interface point C is connected to form a broken line, and different quadratic curves are used to perform smooth curve fitting according to the two situations of water entering a high-density medium from a low-density medium and water entering a low-density medium from a high-density medium. The specific steps involved in finally generating a smooth theoretical infiltration line are as follows: S4.1, connect the delamination interface points C in sequence to form a preliminary theoretical wetting line in the form of a broken line; S4.

2. When water enters a high-density medium from a low-density medium, use a quadratic curve Fitting; when water enters a low-density medium from a high-density medium, a quadratic curve is used Perform fitting; S4.

3. Combine the smooth curves of the two cases to form the final smooth theoretical infiltration line, and finally use spline interpolation to further smooth it.

6. The method for generating a wetting line based on the cross-medium propagation principle according to claim 1, characterized in that: In S5, the theoretical infiltration line is corrected in combination with the actual observation data of the dam production system to obtain the final infiltration line. The specific steps involved are as follows: S5.

1. Obtain the coordinates of key points on the theoretical infiltration line generated in step S4, and match the actual observed data points with the points on the theoretical infiltration line; S5.

2. For each matched observation point and theoretical point, calculate its deviation value, apply the calculated correction value to the theoretical infiltration line, and adjust the position of each key point.

Citation Information

Patent Citations

  • Earth-rock dam seepage line monitoring method based on distributed type fiber temperature detecting system

    CN103353322A

  • Method and device for calculating position of bank slope infiltration line under reservoir water level change condition

    CN113221334A