Intelligent fuel transportation system and method

Through the intelligent fuel transportation system, the fuel transportation path is optimized by using data acquisition and prediction modules, and the problems of low fuel transportation efficiency and high cost in the existing technology are solved, achieving more efficient and economical fuel transportation.

CN118569618BActive Publication Date: 2024-11-05HUANENG INFORMATION TECH CO LTD +1
View PDF 13 Cites 0 Cited by

Patent Information

Application Number
CN202411061331.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-05
Estimated Expiration
2044-08-05

AI Technical Summary

Technical Problem

The existing fuel transportation methods cannot effectively predict and control fuel transportation, resulting in the inability to prepare the coal inventory space, increasing demurrage costs and transportation costs, and causing economic losses.

Method used

A fuel intelligent transportation system was designed, including data acquisition module, transportation prediction module, transportation determination module and transportation adjustment module. By obtaining fuel data and equipment data in real time, a transportation prediction model is constructed, and the transportation path is optimized, and the transportation efficiency and cost-effectiveness are improved. .

Benefits of technology

Through the intelligent transportation system, the fuel transportation efficiency is improved, ineffective transportation is reduced, the transportation cost of transportation equipment is reduced, and the safety and economicality of fuel transportation is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118569618B_ABST
    Figure CN118569618B_ABST
Patent Text Reader

Abstract

The present invention provides a fuel intelligent transportation system and method, which relates to the field of intelligent transportation technology, including: a data acquisition module: used to acquire the first fuel data of the target coal yard and the equipment data for coal transportation in real time and perform data processing; a transportation prediction module: used to input the data processing result of the first fuel data into the transportation prediction model to perform transportation prediction; a transportation determination module: used to determine the first fuel transportation plan based on the transportation prediction result, and determine the comprehensive transportation path of the target coal yard based on the first fuel transportation plan; a transportation adjustment module: used to perform a first optimization on the comprehensive transportation path, so as to perform equipment transportation. By performing data processing on the fuel data and the equipment data of the transportation equipment for fuel transportation, so as to perform transportation prediction in combination with the transportation prediction model, and perform equipment transportation after path optimization, the fuel transportation efficiency can be improved, thereby effectively reducing the transportation cost of the transportation equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of intelligent transportation technology, and in particular to a fuel intelligent transportation system and method. Background Art

[0002] At present, thermal power generation is still the main mode of power generation, so the safe acquisition, transportation and management of fuel for thermal power generation becomes extremely important. Reasonable transportation methods can not only make fuel scheduling safer, but also reduce fuel scheduling costs.

[0003] However, the existing fuel dispatching method cannot predict and control the transportation of fuel well, resulting in problems such as the coal storage space not being ready when the new transportation equipment arrives, resulting in high demurrage fees and increased transportation costs, thus causing more serious economic losses.

[0004] Therefore, the present invention provides a fuel intelligent transportation system and method. Summary of the invention

[0005] The present invention provides a fuel intelligent transportation system and method, which are used to solve the problems of low fuel transportation efficiency and high transportation cost in the prior art.

[0006] The present invention provides a fuel intelligent transportation system, comprising:

[0007] Data acquisition module: used to acquire the first fuel data of the target coal yard and the equipment data of the target equipment for coal transportation in real time and perform data processing;

[0008] Transportation prediction module: used to input the data processing result of the first fuel data into the transportation prediction model, so as to make transportation prediction for the intelligent transportation plan of the target coal yard;

[0009] Transportation determination module: used to determine the first fuel transportation plan based on the transportation prediction result, and determine the comprehensive transportation path of the target coal yard based on the first fuel transportation plan;

[0010] Transportation adjustment module: used to perform a first optimization on the comprehensive transportation path, so as to perform equipment transportation based on the first optimization result.

[0011] The data acquisition module provided by the present invention includes:

[0012] Fuel acquisition unit: used to acquire real-time fuel data of the target coal yard, and make a first judgment on the real-time fuel safety of the target coal yard based on the real-time fuel data;

[0013] A fuel processing unit: used for taking the fuel data of the fuel transfer receiving position corresponding to the real-time fuel of the fuel safety in the first judgment as the first fuel data of the corresponding fuel transfer receiving position, and performing data preprocessing to obtain first processed data;

[0014] Equipment acquisition unit: used to acquire each transport equipment of the target coal yard in the current fuel transport cycle, and acquire the real-time equipment data of the transport equipment;

[0015] Trajectory determination unit: used to obtain the historical equipment trajectory of each transport equipment in the target coal yard during the historical fuel transport cycle, and obtain the equipment trajectory line chart of the current transport equipment based on the historical equipment trajectory and real-time equipment position of the same transport equipment;

[0016] If the current transport equipment does not have a historical equipment track in the target coal yard, it is determined that the current transport equipment does not have an equipment track in the current fuel transport cycle, and the corresponding real-time equipment position is recorded at the same time;

[0017] Trajectory fitting unit: used to perform curve fitting on the equipment trajectory line graph according to the transportation accuracy of the target coal yard, and obtain the first trajectory curve graph of the current transportation equipment;

[0018] The trajectory prediction unit is used to predict the equipment trajectory of the current transportation equipment in the next fuel transportation cycle based on the first trajectory curve diagram, and obtain an initial predicted trajectory diagram based on the prediction result;

[0019] Arrival time unit: used to make an initial judgment on the time when each transport equipment arrives at each fuel transport receiving location based on the initial prediction trajectory diagram to obtain a first time set;

[0020] Equipment sorting unit: used to compare the first moment when the transport equipment in the target coal yard arrives at each fuel receiving location, and to perform initial sorting of the transport equipment based on the comparison result, to obtain an ordered first transport equipment and a first transport equipment set corresponding to real-time equipment data;

[0021] The first transport equipment set includes a plurality of first transport equipment subsets, each of which corresponds to real-time equipment data of transport equipment arriving at the same fuel receiving location;

[0022] Equipment processing unit: used for performing data consistency processing on sub-equipment data of the same data type in the real-time equipment data of the first transport equipment set to obtain the second transport equipment set.

[0023] The arrival time unit provided according to the present invention further includes:

[0024] Determine the carrying capacity T of each fuel transfer receiving location:

[0025] ;

[0026] in, The combined load capacity of the current fuel transfer receiving location; The real-time carrying capacity of the transportation equipment of the i-th coal source at the current fuel transportation location on the j-th transportation path; is the transportation distance of the transportation equipment on the jth transportation path: The unit transportation loss of the transportation equipment for fuel transportation based on the j-th transportation path;

[0027] If the carrying capacity T is less than the maximum carrying capacity of the current transport receiving location, the time when the corresponding transport equipment arrives at the fuel transport location is determined as the first time:

[0028] Otherwise, it is determined that the current fuel transportation receiving location cannot bear the corresponding transportation equipment, and equipment diversion or equipment repair is required.

[0029] The transportation prediction module provided by the present invention includes:

[0030] An initial model determination unit is used to select data with the highest similarity to the current first processed data and fuel quality data and corresponding fuel transportation results from the historical fuel database based on the first processed data and fuel quality data of the target coal yard as an initial transportation prediction model;

[0031] Model optimization unit: used to optimize the model based on the historical fuel data, historical equipment data and fuel transportation results of the target coal yard to obtain a transportation prediction model;

[0032] Model prediction unit: used to input the first processed data and fuel quality data of each fuel transportation receiving position in the target coal yard into the transportation prediction model, so as to predict the transportation result of the current fuel transportation receiving position, thereby obtaining the transportation prediction result of the target coal yard.

[0033] The model optimization unit provided by the present invention includes:

[0034] The first optimization subunit is used to obtain the historical fuel data, historical equipment data and fuel transportation results of the target coal yard in the previous fuel transportation cycle to optimize the initial transportation prediction model and obtain the first optimized prediction model;

[0035] The second optimization subunit is used to select data with the second highest similarity to the current first processed data and fuel quality data and the corresponding fuel transportation results from the historical fuel database of the target coal yard to optimize the first optimization prediction model and obtain a transportation prediction model.

[0036] The transportation determination module provided by the present invention includes:

[0037] The first plan determination unit is used to compare the transportation prediction result of each fuel transportation receiving position in the target coal yard with the first processing data and real-time equipment data of the corresponding position, so as to obtain the first fuel transportation plan of the current fuel transportation receiving position;

[0038] A first path determination unit: used for matching a first transportation device and a first transportation path corresponding to the first transportation device based on the first fuel transportation plan;

[0039] Comprehensive path determination unit: used for obtaining the comprehensive transportation path of the target coal yard based on each first fuel transportation plan in the target coal yard.

[0040] The transportation adjustment module provided by the present invention includes:

[0041] Transportation adjustment unit: used to compare whether there is equipment duplication in the transportation equipment corresponding to the comprehensive transportation path. If there is, the corresponding transportation equipment is extracted to obtain the transportation adjustment equipment;

[0042] A path adjustment unit: used for extracting a first time subset of the transport adjustment equipment arriving at each fuel transport receiving location from the second transport equipment set;

[0043] Path judgment unit: used for judging whether there is a first transfer path in the comprehensive transfer path at each first moment in the first moment subset;

[0044] If it exists, extract the corresponding first transport path, and compare and sort the first transport paths, so as to retain the shortest first transport path as the second transport path of the current transport adjustment device;

[0045] Equipment dispatching unit: used to eliminate the first dispatching path for dispatching and adjusting equipment in the comprehensive dispatching path, obtain the comprehensive optimized dispatching path, and dispatch the dispatching equipment of the target coal yard in combination with the second dispatching path.

[0046] The intelligent fuel transportation method provided by the present invention includes:

[0047] Step 1: Acquire the first fuel data of the target coal yard and the equipment data of the target equipment for coal transportation in real time and perform data processing;

[0048] Step 2: Input the data processing result of the first fuel data into the transportation prediction model, so as to perform transportation prediction on the intelligent transportation plan of the target coal yard;

[0049] Step 3: Determine a first fuel transportation plan based on the transportation forecast result, and determine a comprehensive transportation path of the target coal yard based on the first fuel transportation plan;

[0050] Step 4: Perform a first optimization on the comprehensive transportation path, and then perform equipment transportation based on the first optimization result.

[0051] The intelligent fuel transportation system and method provided by the present invention processes fuel data and equipment data of transportation equipment for fuel transportation, thereby combining transportation prediction models to perform transportation prediction, obtain the transportation path of the target coal yard, and perform equipment transportation after path optimization, which can improve fuel transportation efficiency, reduce ineffective transportation, and thus effectively reduce the transportation cost of transportation equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0053] Figure 1 is a structural diagram of a fuel intelligent transportation system provided by an embodiment of the present invention;

[0054] Figure 2 It is a flow chart of the intelligent fuel transportation method provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0055] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0056] Embodiment 1:

[0057] The embodiment of the present invention provides a fuel intelligent transportation system, such as Figure 1 As shown, including:

[0058] Data acquisition module: used to acquire the first fuel data of the target coal yard and the equipment data of the target equipment for coal transportation in real time and perform data processing;

[0059] Transportation prediction module: used to input the data processing result of the first fuel data into the transportation prediction model, so as to make transportation prediction for the intelligent transportation plan of the target coal yard;

[0060] Transportation determination module: used to determine the first fuel transportation plan based on the transportation prediction result, and determine the comprehensive transportation path of the target coal yard based on the first fuel transportation plan;

[0061] Transportation adjustment module: used to perform a first optimization on the comprehensive transportation path, so as to perform equipment transportation based on the first optimization result.

[0062] In this embodiment, the first fuel data refers to the fuel data of each fuel transfer receiving position in the target coal yard, wherein the first fuel data includes: coal quality, calorific value, ash content, moisture content, sulfur content, particle size and other data.

[0063] In this embodiment, the equipment data refers to the transportation equipment used to transport fuel at the target coal yard, wherein the equipment data includes: equipment operating status data, maintenance data, fault records, baggage parameters, temperature monitoring parameters, energy consumption parameters and other data, wherein the transportation equipment includes: loading equipment, transportation equipment, unloading equipment, storage equipment, screening equipment and the like.

[0064] In this embodiment, the transportation prediction model is a prediction model for predicting transportation results obtained by constructing an initial transportation prediction model based on historical fuel data, historical equipment data and fuel transportation results of the target coal yard in the previous fuel transportation cycle and optimizing the model.

[0065] In this embodiment, the first fuel transportation plan is to input the processed first fuel data and equipment data into the transportation prediction model to perform transportation prediction, and then compare the transportation prediction results with the real-time transportation equipment and first fuel data to determine the fuel transportation plan.

[0066] In this embodiment, the comprehensive transportation path refers to a comprehensive transportation path obtained by combining each transportation path by judging the transportation path of each fuel transportation receiving position in the target coal yard according to the first fuel transportation plan.

[0067] In this embodiment, the first optimization refers to optimizing the transport path of the corresponding transport equipment in the comprehensive transport path according to the time when the transport equipment arrives at different fuel transport receiving locations and the transport path.

[0068] The beneficial effect of the above technical solution is: by processing the fuel data and the equipment data of the transportation equipment for fuel transportation, the transportation prediction is carried out in combination with the transportation prediction model, the transportation path of the target coal yard is obtained, and the equipment is transported after the path is optimized, which can improve the fuel transportation efficiency, reduce ineffective transportation, and effectively reduce the transportation cost of the transportation equipment.

[0069] Embodiment 2:

[0070] Based on Example 1, the data acquisition module includes:

[0071] Fuel acquisition unit: used to acquire real-time fuel data of the target coal yard, and make a first judgment on the real-time fuel safety of the target coal yard based on the real-time fuel data;

[0072] A fuel processing unit: used for taking the fuel data of the fuel transfer receiving position corresponding to the real-time fuel of the fuel safety in the first judgment as the first fuel data of the corresponding fuel transfer receiving position, and performing data preprocessing to obtain first processed data;

[0073] Equipment acquisition unit: used to acquire each transport equipment of the target coal yard in the current fuel transport cycle, and acquire the real-time equipment data of the transport equipment;

[0074] Trajectory determination unit: used to obtain the historical equipment trajectory of each transport equipment in the target coal yard during the historical fuel transport cycle, and obtain the equipment trajectory line chart of the current transport equipment based on the historical equipment trajectory and real-time equipment position of the same transport equipment;

[0075] If the current transport equipment does not have a historical equipment track in the target coal yard, it is determined that the current transport equipment does not have an equipment track in the current fuel transport cycle, and the corresponding real-time equipment position is recorded at the same time;

[0076] Trajectory fitting unit: used to perform curve fitting on the equipment trajectory line graph according to the transportation accuracy of the target coal yard, and obtain the first trajectory curve graph of the current transportation equipment;

[0077] The trajectory prediction unit is used to predict the equipment trajectory of the current transportation equipment in the next fuel transportation cycle based on the first trajectory curve diagram, and obtain an initial predicted trajectory diagram based on the prediction result;

[0078] Arrival time unit: used to make an initial judgment on the time when each transport equipment arrives at each fuel transport receiving location based on the initial prediction trajectory diagram to obtain a first time set;

[0079] Equipment sorting unit: used to compare the first moment when the transport equipment in the target coal yard arrives at each fuel receiving location, and to perform initial sorting of the transport equipment based on the comparison result, to obtain an ordered first transport equipment and a first transport equipment set corresponding to real-time equipment data;

[0080] The first transport equipment set includes a plurality of first transport equipment subsets, each of which corresponds to real-time equipment data of transport equipment arriving at the same fuel receiving location;

[0081] Equipment processing unit: used for performing data consistency processing on sub-equipment data of the same data type in the real-time equipment data of the first transport equipment set to obtain the second transport equipment set.

[0082] In this embodiment, the real-time fuel data refers to the fuel data of each fuel transfer receiving location in the target coal yard, including: coal quality, calorific value, ash content, moisture content, sulfur content, particle size and other data.

[0083] In this embodiment, the first judgment refers to judging the safety of the real-time fuel data, for example, judging whether there are safety hazards such as collapse and landslide in the real-time fuel.

[0084] In this embodiment, the first fuel data refers to real-time fuel data of fuel safety after a first judgment.

[0085] In this embodiment, the fuel transfer receiving location refers to a transfer center location that can carry out fuel transportation, storage, transshipment, and distribution.

[0086] In this embodiment, the first processed data refers to processed data obtained after standardization processing is performed on the first fuel data.

[0087] In this embodiment, real-time equipment data refers to the transportation equipment used to transport fuel at the target coal yard. The real-time equipment data includes: equipment operating status data, maintenance data, fault records, baggage parameters, temperature monitoring parameters, energy consumption parameters and other data. Among them, the transportation equipment includes: loading equipment, transportation equipment, unloading equipment, storage equipment, screening equipment and the like.

[0088] In this embodiment, the historical equipment trajectory refers to the equipment movement trajectory of the target transportation equipment in a continuous historical fuel transportation cycle.

[0089] In this embodiment, the equipment trajectory line graph is constructed based on the movement trajectory of the transportation equipment in the continuous historical fuel transportation cycle, wherein the horizontal axis of the equipment trajectory line graph represents time, and the vertical axis represents the movement direction.

[0090] In this embodiment, the transportation accuracy is determined according to the comprehensive transportation accuracy of the target coal yard, wherein the value range of the transportation accuracy is generally (0.9, 1).

[0091] In this embodiment, the first trajectory curve graph is a trajectory graph obtained by performing curve fitting on the equipment trajectory line graph according to the transportation accuracy.

[0092] In this embodiment, the initial predicted trajectory graph refers to a trajectory curve graph obtained by performing a prediction extension based on the curve trend of the first trajectory curve graph.

[0093] In this embodiment, the first time refers to the arrival time of each transport equipment at each fuel transport receiving location.

[0094] In this embodiment, the first transport equipment set is compared based on the first moment when the transport equipment arrives at each fuel receiving location in the target coal yard, and the transport equipment is initially sorted from large to small according to the comparison result to obtain the ordered first transport equipment, and the transport equipment set obtained by obtaining the corresponding real-time equipment data.

[0095] In this embodiment, each first transfer equipment subset corresponds to real-time equipment data of the transfer equipment arriving at the same fuel receiving location.

[0096] In this embodiment, the second transport equipment set refers to a transport equipment set obtained by performing data consistency processing on data of the same data type in the first transport equipment set.

[0097] The beneficial effect of the above technical solution is: by processing the equipment data of the fuel transportation equipment to obtain the equipment trajectory curve, the transportation path obtained by the transportation prediction model can be optimized, thereby making the transportation path more accurate, greatly improving the fuel transportation efficiency, reducing ineffective transportation, and effectively reducing the transportation cost of the transportation equipment.

[0098] Embodiment 3:

[0099] Based on the second embodiment, the arrival time unit further includes:

[0100] Determine the carrying capacity T of each fuel transfer receiving location:

[0101] ;

[0102] in, The combined load capacity of the current fuel transfer receiving location; The real-time carrying capacity of the transportation equipment of the i-th coal source at the current fuel transportation location on the j-th transportation path; is the transportation distance of the transportation equipment on the jth transportation path: The unit transportation loss of the transportation equipment for fuel transportation based on the j-th transportation path;

[0103] If the carrying capacity T is less than the maximum carrying capacity of the current transport receiving location, the time when the corresponding transport equipment arrives at the fuel transport location is determined as the first time:

[0104] Otherwise, it is determined that the current fuel transportation receiving location cannot bear the corresponding transportation equipment, and equipment diversion or equipment repair is required.

[0105] In this embodiment, the transport paths corresponding to different transport devices may be the same or different.

[0106] In this embodiment, the carrying capacity refers to the comprehensive carrying capacity of the m coal sources at the current fuel transportation receiving location and the transportation equipment in the corresponding n transportation paths.

[0107] In this embodiment, the maximum carrying capacity generally refers to the maximum quantity or maximum flow rate of fuel that can be processed or transported at a fuel transfer receiving location within a specific period of time.

[0108] The beneficial effect of the above technical solution is: by judging the carrying capacity of each fuel transportation receiving position, the transportation equipment that exceeds the maximum carrying capacity can be timely diverted, thereby improving the fuel transportation efficiency and reducing ineffective transportation.

[0109] Embodiment 4:

[0110] Based on Example 2, the transportation prediction module includes:

[0111] An initial model determination unit is used to select data with the highest similarity to the current first processed data and fuel quality data and corresponding fuel transportation results from the historical fuel database based on the first processed data and fuel quality data of the target coal yard as an initial transportation prediction model;

[0112] Model optimization unit: used to optimize the model based on the historical fuel data, historical equipment data and fuel transportation results of the target coal yard to obtain a transportation prediction model;

[0113] Model prediction unit: used to input the first processed data and fuel quality data of each fuel transportation receiving position in the target coal yard into the transportation prediction model, so as to predict the transportation result of the current fuel transportation receiving position, thereby obtaining the transportation prediction result of the target coal yard.

[0114] In this embodiment, the fuel quality data refers to data related to the quality of real-time fuel data, such as fuel viscosity, fuel accumulation data, and the like.

[0115] In this embodiment, the similarity refers to the degree of similarity in data type, data amount, etc.

[0116] In this embodiment, the historical fuel data, historical equipment data, and fuel transportation results refer to corresponding data in the historical transportation process of the target coal yard.

[0117] In this embodiment, the initial transportation prediction model refers to the data with the highest similarity to the current first processing data and fuel quality data and the corresponding fuel transportation results screened from the first processing data and fuel quality data of the target coal yard from the historical fuel database to build the model, and the transportation prediction model refers to the model optimized according to the historical fuel data, historical equipment data and fuel transportation results of the target coal yard.

[0118] The beneficial effect of the above technical solution is that by performing transportation prediction based on the transportation prediction model, a more accurate transportation path can be obtained, which can improve the fuel transportation efficiency and reduce ineffective transportation.

[0119] Embodiment 5:

[0120] Based on Example 4, the model optimization unit includes:

[0121] The first optimization subunit is used to obtain the historical fuel data, historical equipment data and fuel transportation results of the target coal yard in the previous fuel transportation cycle to optimize the initial transportation prediction model and obtain the first optimized prediction model;

[0122] The second optimization subunit is used to select data with the second highest similarity to the current first processed data and fuel quality data and the corresponding fuel transportation results from the historical fuel database of the target coal yard to optimize the first optimization prediction model and obtain a transportation prediction model.

[0123] In this embodiment, the first optimized prediction model is obtained by optimizing the initial transportation prediction model according to the historical fuel data, historical equipment data and fuel transportation results of the previous fuel transportation cycle.

[0124] In this embodiment, the transportation prediction model is obtained by selecting data with the second highest similarity to the current first processing data and fuel quality data from the historical fuel database and optimizing the first optimization prediction model with the corresponding fuel transportation results.

[0125] The beneficial effect of the above technical solution is: by optimizing the initial transportation prediction model multiple times, transportation prediction can be performed based on the transportation prediction model, so as to obtain a more accurate transportation path, improve fuel transportation efficiency, and reduce ineffective transportation.

[0126] Embodiment 6:

[0127] Based on the fourth embodiment, the transportation determination module includes:

[0128] The first plan determination unit is used to compare the transportation prediction result of each fuel transportation receiving position in the target coal yard with the first processing data and real-time equipment data of the corresponding position, so as to obtain the first fuel transportation plan of the current fuel transportation receiving position;

[0129] A first path determination unit: used for matching a first transportation device and a first transportation path corresponding to the first transportation device based on the first fuel transportation plan;

[0130] Comprehensive path determination unit: used for obtaining the comprehensive transportation path of the target coal yard based on each first fuel transportation plan in the target coal yard.

[0131] In this embodiment, the first fuel transportation plan is to input the processed first fuel data and equipment data into the transportation prediction model to perform transportation prediction, and then compare the transportation prediction results with the real-time transportation equipment and first fuel data to determine the fuel transportation plan.

[0132] In this embodiment, the first transportation path refers to the equipment transportation path of the first transportation equipment matching the first fuel transportation plan.

[0133] In this embodiment, the comprehensive transportation path includes all first fuel transportation plans of the target coal yard and corresponding first fuel transportation paths.

[0134] The beneficial effect of the above technical solution is: by making a comprehensive judgment on the transportation path of the target coal yard, equipment transportation can be carried out, which can improve the efficiency of fuel transportation, reduce ineffective transportation, and thus effectively reduce the transportation cost of transportation equipment.

[0135] Embodiment 7:

[0136] Based on Example 6, the transportation adjustment module includes:

[0137] Transportation adjustment unit: used to compare whether there is equipment duplication in the transportation equipment corresponding to the comprehensive transportation path. If there is, the corresponding transportation equipment is extracted to obtain the transportation adjustment equipment;

[0138] A path adjustment unit: used for extracting a first time subset of the transport adjustment equipment arriving at each fuel transport receiving location from the second transport equipment set;

[0139] Path judgment unit: used for judging whether there is a first transfer path in the comprehensive transfer path at each first moment in the first moment subset;

[0140] If it exists, extract the corresponding first transport path, and compare and sort the first transport paths, so as to retain the shortest first transport path as the second transport path of the current transport adjustment device;

[0141] Equipment dispatching unit: used to eliminate the first dispatching path for dispatching and adjusting equipment in the comprehensive dispatching path, obtain the comprehensive optimized dispatching path, and dispatch the dispatching equipment of the target coal yard in combination with the second dispatching path.

[0142] In this embodiment, the transport adjustment equipment refers to the equipment obtained by extracting duplicate transport equipment when there is duplicate transport equipment corresponding to the comprehensive transport path.

[0143] In this embodiment, the second transport path refers to extracting a subset of the first moments when the transport adjustment equipment arrives at each fuel transport receiving location from the second transport equipment set, and determining the corresponding first transport path, thereby extracting the shortest first transport path from the first transport path to obtain the transport path of the current transport adjustment equipment.

[0144] In this embodiment, the comprehensive optimized transportation path refers to the path obtained by eliminating the first transportation path of the transportation adjustment equipment from the comprehensive transportation path.

[0145] The beneficial effect of the above technical solution is that by optimizing the transportation path, a more accurate equipment transportation path can be obtained for equipment transportation, which can improve fuel transportation efficiency, reduce ineffective transportation, and effectively reduce the transportation cost of transportation equipment.

[0146] Embodiment 8:

[0147] The embodiment of the present invention provides a method for intelligent fuel transportation, including:

[0148] Step 1: Acquire the first fuel data of the target coal yard and the equipment data of the target equipment for coal transportation in real time and perform data processing;

[0149] Step 2: Input the data processing result of the first fuel data into the transportation prediction model, so as to perform transportation prediction on the intelligent transportation plan of the target coal yard;

[0150] Step 3: Determine a first fuel transportation plan based on the transportation forecast result, and determine a comprehensive transportation path of the target coal yard based on the first fuel transportation plan;

[0151] Step 4: Perform a first optimization on the comprehensive transportation path, and then perform equipment transportation based on the first optimization result.

[0152] The beneficial effect of the above technical solution is: by processing the fuel data and the equipment data of the transportation equipment for fuel transportation, the transportation prediction is carried out in combination with the transportation prediction model, the transportation path of the target coal yard is obtained, and the equipment is transported after the path is optimized, which can improve the fuel transportation efficiency, reduce ineffective transportation, and effectively reduce the transportation cost of the transportation equipment.

[0153] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. Intelligent fuel transportation system, It is characterized in that include: Data acquisition module: used to acquire the first fuel data of the target coal yard and the equipment data of the target equipment for coal transportation in real time and perform data processing; Transportation prediction module: used to input the data processing result of the first fuel data into the transportation prediction model, so as to make transportation prediction for the intelligent transportation plan of the target coal yard; Transportation determination module: used to determine the first fuel transportation plan based on the transportation prediction result, and determine the comprehensive transportation path of the target coal yard based on the first fuel transportation plan; Transportation adjustment module: used to perform a first optimization on the comprehensive transportation path, so as to perform equipment transportation based on the first optimization result; The data acquisition module includes: Fuel acquisition unit: used to acquire real-time fuel data of the target coal yard, and make a first judgment on the real-time fuel safety of the target coal yard based on the real-time fuel data; A fuel processing unit: used for taking the fuel data of the fuel transfer receiving position corresponding to the real-time fuel of the fuel safety in the first judgment as the first fuel data of the corresponding fuel transfer receiving position, and performing data preprocessing to obtain first processed data; Equipment acquisition unit: used to acquire each transport equipment of the target coal yard in the current fuel transport cycle, and acquire the real-time equipment data of the transport equipment; Trajectory determination unit: used to obtain the historical equipment trajectory of each transport equipment in the target coal yard during the historical fuel transport cycle, and obtain the equipment trajectory line chart of the current transport equipment based on the historical equipment trajectory and real-time equipment position of the same transport equipment; If the current transport equipment does not have a historical equipment track in the target coal yard, it is determined that the current transport equipment does not have an equipment track in the current fuel transport cycle, and the corresponding real-time equipment position is recorded at the same time; Trajectory fitting unit: used to perform curve fitting on the equipment trajectory line graph according to the transportation accuracy of the target coal yard, and obtain the first trajectory curve graph of the current transportation equipment; The trajectory prediction unit is used to predict the equipment trajectory of the current transportation equipment in the next fuel transportation cycle based on the first trajectory curve diagram, and obtain an initial predicted trajectory diagram based on the prediction result; Arrival time unit: used to make an initial judgment on the time when each transport equipment arrives at each fuel transport receiving location based on the initial prediction trajectory diagram to obtain a first time set; Equipment sorting unit: used to compare the first moment when the transport equipment in the target coal yard arrives at each fuel receiving location, and to perform initial sorting of the transport equipment based on the comparison result, to obtain an ordered first transport equipment and a first transport equipment set corresponding to real-time equipment data; The first transport equipment set includes a plurality of first transport equipment subsets, each of which corresponds to real-time equipment data of transport equipment arriving at the same fuel receiving location; Equipment processing unit: used for performing data consistency processing on sub-equipment data of the same data type in the real-time equipment data of the first dispatching equipment set to obtain a second dispatching equipment set; Among them, the transportation forecast module includes: An initial model determination unit is used to select data with the highest similarity to the current first processed data and fuel quality data and corresponding fuel transportation results from the historical fuel database based on the first processed data and fuel quality data of the target coal yard as an initial transportation prediction model; Model optimization unit: used to optimize the model based on the historical fuel data, historical equipment data and fuel transportation results of the target coal yard to obtain a transportation prediction model; Model prediction unit: used for inputting the first processed data and fuel quality data of each fuel transportation receiving position in the target coal yard into the transportation prediction model, so as to predict the transportation result of the current fuel transportation receiving position, thereby obtaining the transportation prediction result of the target coal yard; The model optimization unit includes: The first optimization subunit is used to obtain the historical fuel data, historical equipment data and fuel transportation results of the target coal yard in the previous fuel transportation cycle to optimize the initial transportation prediction model and obtain the first optimized prediction model; The second optimization subunit is used to select data with the second highest similarity to the current first processed data and fuel quality data and the corresponding fuel transportation results from the historical fuel database of the target coal yard to optimize the first optimization prediction model and obtain a transportation prediction model.

2. The intelligent fuel transportation system according to claim 1, It is characterized in that The arrival time unit also includes: Determine the carrying capacity T of each fuel transfer receiving location: ; in, The combined load capacity of the current fuel transfer receiving location; The real-time carrying capacity of the transportation equipment of the i-th coal source at the current fuel transportation location on the j-th transportation path; is the transportation distance of the transportation equipment on the jth transportation path: The unit transportation loss of the transportation equipment for fuel transportation based on the j-th transportation path; If the carrying capacity T is less than the maximum carrying capacity of the current transport receiving location, the time when the corresponding transport equipment arrives at the fuel transport location is determined as the first time: Otherwise, it is determined that the current fuel transportation receiving location cannot bear the corresponding transportation equipment, and equipment diversion or equipment repair is required.

3. The intelligent fuel transportation system according to claim 1, It is characterized in that The transportation confirmation module includes: The first plan determination unit is used to compare the transportation prediction result of each fuel transportation receiving position in the target coal yard with the first processing data and real-time equipment data of the corresponding position, so as to obtain the first fuel transportation plan of the current fuel transportation receiving position; A first path determination unit: used for matching a first transportation device and a first transportation path corresponding to the first transportation device based on the first fuel transportation plan; Comprehensive path determination unit: used for obtaining the comprehensive transportation path of the target coal yard based on each first fuel transportation plan in the target coal yard.

4. The intelligent fuel transportation system according to claim 3, It is characterized in that The transportation adjustment module includes: Transportation adjustment unit: used to compare whether there is equipment duplication in the transportation equipment corresponding to the comprehensive transportation path. If there is, the corresponding transportation equipment is extracted to obtain the transportation adjustment equipment; A path adjustment unit: used for extracting a first time subset of the transport adjustment equipment arriving at each fuel transport receiving location from the second transport equipment set; Path judgment unit: used for judging whether there is a first transfer path in the comprehensive transfer path at each first moment in the first moment subset; If it exists, extract the corresponding first transport path, and compare and sort the first transport paths, so as to retain the shortest first transport path as the second transport path of the current transport adjustment device; Equipment dispatching unit: used to eliminate the first dispatching path for dispatching and adjusting equipment in the comprehensive dispatching path, obtain the comprehensive optimized dispatching path, and dispatch the dispatching equipment of the target coal yard in combination with the second dispatching path.

5. A method for intelligent fuel transportation, applied to the intelligent fuel transportation system as claimed in any one of claims 1 to 4, It is characterized in that include: Step 1: Acquire the first fuel data of the target coal yard and the equipment data of the target equipment for coal transportation in real time and perform data processing; Step 2: Input the data processing result of the first fuel data into the transportation prediction model, so as to perform transportation prediction on the intelligent transportation plan of the target coal yard; Step 3: Determine a first fuel transportation plan based on the transportation forecast result, and determine a comprehensive transportation path of the target coal yard based on the first fuel transportation plan; Step 4: Perform a first optimization on the comprehensive transportation path, and then perform equipment transportation based on the first optimization result.

Citation Information

Patent Citations

  • Novel intelligent coal conveying control system based on FCS on-site bus technology

    CN104483952A

  • Real-time intelligent fuel system for water transport coal-fired power plant

    CN109782726A

  • Coal blending combustion intelligent management method and system

    CN110232497A

  • Multi-cycle coal allocation optimization method based on year-month decomposition

    CN113807781A

  • Fire coal allocation optimization method and system based on intelligent algorithm

    CN115600377A