A reconstruction method for restoring the appearance of a severely damaged old building and changing its function

By building temporary support structures and reconstructing the load-bearing structure, the problem of missing components and drawings in old buildings is solved, and the appearance and functions of the old buildings are effectively renovated, ensuring the aesthetics and functional adaptability of the building.

CN118582084BActive Publication Date: 2024-11-12BEIJING FOURTH CONSTR & ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411049924.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-11-12
Estimated Expiration
2044-08-01

AI Technical Summary

Technical Problem

The old building was seriously damaged and the original drawings could not be found, the missing components could not be built, and the components should not be assembled, making it difficult to restore the appearance.

Method used

In the absence of old building drawings, single-story old buildings with irreparable defects in roofs and/or exterior walls are renovated. By building temporary support structures, non-load-bearing components are removed, foundations are excavated, foundations are reinforced, and edges are set. Position the columns and ground beams, reconstruct the load-bearing structure of the roof, and lay roof panels and glass curtain walls on the roof.

Benefits of technology

The appearance and function of the old building were successfully restored, ensuring the beautiful and transparent nature of the building. The large span of the internal continuous space can adapt to the needs of new functions without any load-bearing walls. The decorative panels are filled in the skeleton to complete the closure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118582084B_ABST
    Figure CN118582084B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of construction measures for existing buildings, and discloses a reconstruction method for restoring the appearance of severely damaged old buildings and changing their functions. By analyzing the relatively intact parts of the severely damaged old buildings, a small amount of size and coordinate data of the buildings when they were not damaged is extracted, and then a new set of building skeletons is constructed, wherein the peripheral skeleton composed of ground beams, edge positioning columns, and edge positioning beams only needs the horizontal outline of the outer wall of the old building and a complete outer wall to restore the facade structure of the entire old building; the internal skeleton composed of multiple radially arranged plane trusses and central positioning columns only needs one coordinate and a complete vertical section of the original roof to restore the roof structure of the entire building; at the same time, only one core tube is needed to meet the horizontal bearing capacity standard, and no load-bearing walls are required. The skeleton can be closed by filling decorative panels, so that the building is beautiful and transparent, and there is a large-span continuous space inside, which can be competent for more new functions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction measures for existing buildings, and in particular to a reconstruction method for restoring the appearance of a severely damaged old building and changing its function. Background Art

[0002] The fate of most old buildings is to be demolished to make way for the construction of new buildings, but there are some old buildings with special significance that need to be changed in use while retaining their original appearance, which requires in-depth renovation of the buildings.

[0003] Considering that the old building itself has been seriously aged, its structural strength has seriously declined, and its appearance has become very dilapidated. These problems are difficult to solve without deep transformation of the building itself. Therefore, the transformation of old buildings often needs to be carried out in the form of dismantling into parts and reassembling. During the dismantling process, the building parts can be tested separately and the parts that do not meet the strength standards or are seriously damaged can be replaced. The internal reinforcement treatment can be carried out or the internal layout of the building can be changed to adapt to the changes in the use of the building.

[0004] However, this reconstruction method is not suitable for severely damaged old buildings, because such buildings are missing a large number of components and their appearance is very different from that before the damage. At the same time, the old building drawings are often not found, resulting in the inability to rebuild the missing components and the inability to assemble the components. This phenomenon is very common for shorter old buildings, because shorter buildings have fewer components left after being abandoned for a long time, and the problem of component theft is more serious (shorter buildings make it easier for components to be taken away).

[0005] Take the Jinyu Xingfa Science Park project in the northern area of ​​Huairou Science City, Beijing, as an example. The site of the project is the Xingfa Cement Factory, which was built in the early 1990s and contributed a large amount of building materials to Beijing's urban construction. It is an important industrial heritage site. Therefore, the buildings there need to be transformed into scientific research facilities for nearby universities and research institutes while retaining their appearance. The tent warehouse is a single-story small warehouse (converted into a service hall, which requires a relatively continuous large space inside, a good view, and a large number of doors and windows). There are many collapses and defects in the exterior walls and roofs, a large number of components are missing, and the appearance has changed.

[0006] During actual construction, it was found that for old buildings that were severely damaged, the most intact part to be preserved was the exterior wall, because the exterior wall was made of materials that have good weather resistance and cannot be sold as scrap (bricks and concrete). The second most intact part was the load-bearing structure in the roof, which was protected by the roof panels and was difficult to reach from the ground. Summary of the invention

[0007] The invention provides a reconstruction method for restoring the appearance of a severely damaged old building and changing its function.

[0008] The technical problem to be solved is: when an old building is severely damaged and the original drawings cannot be found, it is impossible to build the missing components and it is not known how to assemble the components, making it difficult to restore the appearance.

[0009] In order to solve the above technical problems, the present invention adopts the following technical solutions: a reconstruction method for restoring the appearance of a severely damaged old building and changing its function, which is used to reconstruct a single-story old building with irreparable defects in the roof and / or exterior wall in the absence of old building drawings, wherein the roof of the old building is gradually lowered from the highest point to the surrounding areas, and the reconstruction method comprises the following steps:

[0010] Step 1: Build a temporary support structure to support the roof of the old building so that the coordinates of the highest point of the roof are consistent with those when it was not damaged;

[0011] Step 2: Remove all components above the ground level of the old building that are neither load-bearing components nor walls;

[0012] Step 3: Remove the building surface of the old building and dig down to expose the foundation, reinforce the foundation to meet the needs of the renovated building, and then backfill and level the ground;

[0013] Step 4: construct edge positioning columns in the outer wall of the old building, and construct ground beams between the edge positioning columns to connect adjacent edge positioning columns. The edge positioning columns are arranged at intervals around the old building, and if the outer wall of the old building has edges, an edge positioning column is additionally arranged at the position of each edge;

[0014] Construct the center positioning column below the highest point of the roof of the old building;

[0015] Step 5: Remove the outer wall of the old building and construct ground beams between the edge positioning columns to connect adjacent edge positioning columns;

[0016] Construct edge positioning beams at the junction of the outer wall and the roof of the old building, wherein the edge positioning beams are arranged close to the bottom of the roof and are fixedly connected to the edge positioning columns respectively;

[0017] Step 6: construct a core tube around the central positioning column, and the top of the core tube is supported on the bottom of the roof;

[0018] Step 7: Check the integrity of the load-bearing structure of the roof. If the load-bearing structure of the roof is missing and the missing load-bearing components cannot be deduced from the load-bearing components around the missing part, the entire roof is dismantled, and then the load-bearing structure of the roof is reconstructed using the central positioning column and the edge positioning beam as positioning components; otherwise, the load-bearing structure of the roof is repaired and rust-removed;

[0019] Step 8: Lay the roof panels on the load-bearing structure of the roof and install the glass curtain wall between adjacent edge positioning columns.

[0020] Furthermore, in step 1, if the coordinates of the highest point of the roof when it is not damaged are unknown, the roof is reversed to meet all the following conditions:

[0021] Condition 1.1: The edges of the roof have no defects and are at the same height;

[0022] Condition 1.2: The top of the intact exterior wall of the old building is in contact with the roof;

[0023] Condition 1.3: The continuous area from the highest point of the roof to the edge does not deflect downward;

[0024] The coordinates of the highest point of the roof after inversion are considered to be consistent with those when it was not damaged.

[0025] Furthermore, during the excavation process of step three, check whether there is an underground cavern. If there is an underground cavern, the interior of the underground cavern is cleaned, and during the backfilling process after the foundation reinforcement, the underground cavern is sealed or backfilled.

[0026] Further, the edge positioning column includes a prefabricated column inserted into a slot in the outer wall of the old building, and an outer casing column wrapped around the outer surface of the prefabricated column after the outer wall of the old building is demolished, and the outer casing column is a cast-in-place reinforced concrete column that wraps the prefabricated column;

[0027] The total vertical bearing capacity of each prefabricated column shall not be less than the deadweight of the load-bearing structure of the roof, and the total vertical bearing capacity of each edge positioning column shall not be less than the deadweight of the roof after the reconstruction is completed.

[0028] Furthermore, the specifications and materials of the prefabricated columns are determined in the following manner:

[0029] If there are complete hidden columns in the exterior wall of the old building, the specifications and materials of the prefabricated columns are consistent with those of the complete hidden columns, and in the construction process of step 4, edge positioning columns are set at the positions of each complete hidden column, and the complete hidden columns replace the prefabricated columns in the edge positioning columns after flaw detection and repair;

[0030] If there are no hidden columns in the exterior wall of the old building or the hidden columns are incomplete, the cross-section of the prefabricated column shall be square and the side length of the cross-section shall not be less than the thickness of the exterior wall of the old building. The height of the prefabricated column shall be the same as the complete exterior wall of the old building, and the material of the prefabricated column shall be reinforced concrete.

[0031] Furthermore, if there is a ring beam at the top of the outer wall of the old building, when the outer wall between two adjacent edge positioning columns remains intact, the ring beam segment above it is recorded as a usable segment. In step 4, the usable segment can be connected to the edge positioning columns at both ends after flaw detection and repair;

[0032] In step 5, at the position where there is an available segment, the edge positioning beam includes the available segment and cast-in-place concrete beams respectively arranged on the left and right sides of the available segment, and the left and right sides of the available segment are roughened and reinforced, so that the available segment and the cast-in-place concrete beams on both sides are connected as a whole to form a three-in-one beam;

[0033] In locations where there are no available segments, the edge positioning beam is a cast-in-place reinforced concrete beam whose end faces are connected to the three-in-one beam.

[0034] Furthermore, in step seven, the process of reconstructing the load-bearing structure of the roof using the central positioning column and the edge positioning beam as positioning components includes the following sub-steps:

[0035] Step 7.1: Select the vertical section of the continuous part from the highest point to the edge of the roof for surveying;

[0036] Step 7.2: Build a plane truss that is consistent with the vertical section shape according to the surveying results;

[0037] Step 7.3: Install plane trusses between each edge positioning column and the center positioning column, respectively, with the plate surface of the plane trusses being arranged vertically;

[0038] Step 7.4: Draw a cross line in the plane with the highest point of the roof as the center, select eight plane trusses close to the cross line, and connect them into four truss beams in pairs with web bars;

[0039] Step 7.5: Use connecting rods to connect all the plane trusses together. The connecting rods are divided into two layers, the upper and lower layers, and the connecting rods in each layer are arranged into multiple concentric circles.

[0040] Furthermore, if there are iconic auxiliary components on the outer surface of the old building, they will be removed in step 2, repaired and derusted, and installed back in place in step 8.

[0041] Compared with the prior art, the reconstruction method of the present invention for restoring the appearance of a severely damaged old building and changing its function has the following beneficial effects:

[0042] In the present invention, by analyzing the relatively intact parts of the severely damaged old buildings, a small amount of size and coordinate data of the buildings when they were not damaged is extracted, and then a new set of building skeletons is constructed, wherein the peripheral skeleton composed of ground beams, edge positioning columns, and edge positioning beams only needs the horizontal outline of the old building's outer wall and a complete outer wall to restore the facade structure of the entire old building; the internal skeleton composed of multiple radially arranged plane trusses and central positioning columns only needs one coordinate and a complete vertical section of the original roof to restore the roof structure of the entire building; the new building skeleton structure belongs to a central beam-column grid, and adding a core tube can ensure that the bearing capacity of the horizontal load is qualified. After the transformation, the building does not need any load-bearing walls, and the decorative panels can be filled in the skeleton to complete the closure, so that the building is beautiful, more transparent, and there is a large-span continuous space inside, which can be competent for more new functions. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 This is the elevation drawing after the renovation;

[0044] Figure 2 This is a schematic diagram of the beams and columns in the renovated building, with the outline of the exterior wall of the old building marked with dotted lines;

[0045] Figure 3 A plan view of the load-bearing structure of the roof of the renovated building, with the outline of the exterior wall of the old building marked with dotted lines;

[0046] In the figure, 1- old building, 21- edge positioning column, 22- center positioning column, 31- ground beam, 32- edge positioning beam, 4- core tube, 5- plane truss, 6- iconic auxiliary component. DETAILED DESCRIPTION

[0047] In this embodiment, the intact columns and walls refer to the columns and walls having the same height as when the old building 1 was not damaged.

[0048] Take the tent warehouse of the Jinyuxingfa Science Park project in the northern area of ​​Huairou Science City, Beijing, as an example. Figure 1-2 As shown, a reconstruction method for restoring the appearance of a severely damaged old building and changing its function is used to reconstruct a single-story old building 1 with irreparable defects in the roof and / or exterior wall in the absence of a drawing of the old building 1, wherein the roof of the old building 1 is gradually lowered from the highest point to the surrounding areas.

[0049] The severely damaged single-story old building 1 encountered during construction is either the structure in this embodiment or a structure similar to a vegetable greenhouse. The latter is very easy to repair even without a drawing, because it only needs the shape of a cross section to know the structure of the entire old building 1. However, there is no ready-made repair solution for the former in the prior art.

[0050] The reconstruction method includes the following steps:

[0051] Step 1: Build a temporary support structure to support the roof of the old building 1 so that the coordinates of the highest point of the roof are consistent with those before the damage;

[0052] If the roof of the old building 1 is generally intact, it only needs to be straightened. If it is severely damaged and misaligned, it is necessary to find the coordinates with the help of other components remaining from the old building 1. At the same time, the support of the old building 1 also facilitates various subsequent constructions and avoids danger.

[0053] Step 2: Remove all components above the ground level of the old building 1 that are neither load-bearing components nor walls;

[0054] The components dismantled here include roof panels, decorative panels, pipelines, etc.

[0055] Step 3: demolish the building surface of the old building 1 and dig down to expose the foundation, reinforce the foundation to meet the requirements of the rebuilt building, and then backfill and level the ground;

[0056] Step 4: construct edge positioning columns 21 in the outer wall of the old building 1, and construct ground beams 31 between the edge positioning columns 21 to connect adjacent edge positioning columns 21. The edge positioning columns 21 are arranged at intervals around the old building 1. If the outer wall of the old building 1 has edges, an edge positioning column 21 is additionally arranged at the position of each edge.

[0057] like Figure 2 As shown, the edge positioning column 21 here fits the outer wall contour of the old building 1 with multiple points. If the cross section of the old building 1 is a polygon, it can perfectly fit the outer wall contour of the old building 1. If the cross section of the old building 1 is a circle, the final construction is a regular polygon similar to that formed by the circle cutting method, and there is no obvious difference in appearance. The reason for doing this is, firstly, to integrate the main load-bearing components of the rebuilt building into the old building 1 in advance without demolishing the outer wall of the old building 1, and secondly, to minimize the reliance on the size and coordinate data of the building when it was not damaged.

[0058] Construct a center positioning column 22 below the highest point of the roof of the old building 1;

[0059] The top of the center positioning column 22 is the coordinate of the highest point of the roof of the old building 1 when it is not damaged. This coordinate has been obtained by supporting the roof of the old building 1 in step 1, and it is fixed here. The center positioning column 22 in this embodiment is a pipe column to match the structure above the roof.

[0060] Step 5: demolish the outer wall of the old building 1, and construct a ground beam 31 between the edge positioning columns 21 to connect adjacent edge positioning columns 21;

[0061] An edge positioning beam 32 is constructed at the junction of the outer wall and the roof of the old building 1. The edge positioning beam 32 is arranged close to the bottom of the roof and is fixedly connected to each edge positioning column 21;

[0062] This structure of two layers of ring beams and a circle of columns is self-sustaining and can be stable even if it is not connected to the foundation, thereby overcoming the problem that a deep foundation cannot be set due to the existence of an underground cavern in the old building 1. Here, the ground beam 31 and the edge positioning beam 32 are both set on the side of the column, rather than the top or bottom of the column, so as to avoid interference. The edge positioning beam 32 is connected to the edge positioning column 21 by means of a corbel. At the same time, the edge positioning beam 32 can also be used as a positioning member when the roof is installed.

[0063] Step 6: construct the core tube 4 around the central positioning column 22, and the core tube 4 is supported on the bottom of the roof;

[0064] The horizontal bearing capacity of the structure built in the first few steps is relatively poor, but since the structure is a beam-column grid with a center, adding a core tube 4 at its center can increase and enhance the horizontal bearing capacity of the entire building. The core tube 4 is a cylindrical structure surrounded by shear walls, and a beam grid is arranged inside it.

[0065] Step 7: Check the integrity of the load-bearing structure of the roof. If the load-bearing structure of the roof is missing and the missing load-bearing component cannot be deduced from the load-bearing components around the missing part, the entire roof is dismantled, and then the load-bearing structure of the roof is reconstructed using the center positioning column 22 and the edge positioning beam 32 as positioning components; otherwise, the load-bearing structure of the roof is repaired and rust-removed;

[0066] The "inference" here means to infer the missing components based on similar structures in the surrounding area. For example, if there is a hole in the roof and the components in the hole are missing, but it is possible to see what the missing components are from the surrounding area, then the missing components can be remade and welded in place for repair. After the repair, strength verification is required. If it does not meet the standard, the components need to be reinforced.

[0067] Step 8: Lay the roof panels on the load-bearing structure of the roof, and install the glass curtain wall between adjacent edge positioning columns 21 .

[0068] Since the purpose of the building needs to be changed, the exterior walls of the old building 1 were replaced with glass curtain walls, making it transparent on all sides, allowing it to function as a service hall.

[0069] In step 1, if the coordinates of the highest point of the roof when it is intact are unknown, the roof is reversed to meet all the following conditions:

[0070] Condition 1.1: The edges of the roof have no defects and are at the same height;

[0071] This constraint makes the roof's posture consistent with when it was not damaged;

[0072] Condition 1.2: The top of the intact exterior wall of the old building 1 is in contact with the roof;

[0073] This constraint makes the position of the roof consistent with when it was not damaged;

[0074] Condition 1.3: The continuous area from the highest point of the roof to the edge does not deflect downward;

[0075] The continuity here refers to the absence of fractures. This constraint condition makes the shape of the relatively intact parts of the roof consistent with that when they were not damaged.

[0076] The above three constraints make the coordinates of the highest point of the roof consistent with when it was not damaged.

[0077] During the excavation process of step three, check whether there are underground caverns. If there are underground caverns, clean the inside of the underground caverns, and seal or backfill the underground caverns during the backfill process after the foundation reinforcement.

[0078] The underground cavern of old building 1 has no impact on the appearance of old building 1, but it is very dangerous and difficult to repair it because its structural reliability cannot be guaranteed and there is a whole ground building on it to interfere with its construction. Therefore, it is simply abandoned. Whether to close or backfill should be determined according to the structural integrity of the underground cavern. If the structure of the underground cavern is obviously damaged, it should be treated by backfilling. Low-grade concrete or flowable sand should be used for backfilling.

[0079] The edge positioning columns 21 include precast columns slotted and inserted into the outer wall of the old building 1, and outer covering columns wrapped around the outer surface of the precast columns after the outer wall of the old building 1 is removed, and the outer covering columns are cast-in-place reinforced concrete columns that wrap around the precast columns;

[0080] The total vertical bearing capacity of each prefabricated column is not less than the deadweight of the load-bearing structure of the roof, and the total vertical bearing capacity of each edge positioning column 21 is not less than the deadweight of the roof after the reconstruction is completed.

[0081] The edge positioning column 21 here is the main load-bearing component after the building reconstruction, so its cross-sectional area is relatively large. If it is inserted into the outer wall at one time, the groove opened will be too large, which will have a significant impact on the old building 1 and may cause safety problems. At the same time, the construction is carried out in two times. If the construction is carried out in two times, the relatively intact hidden columns in the old building 1 can also be used. The specific utilization method is as follows:

[0082] The specifications and materials of prefabricated columns are determined in the following way:

[0083] If there are complete hidden columns in the exterior wall of the old building 1, the specifications and materials of the prefabricated columns are consistent with those of the complete hidden columns, and in the construction process of step 4, edge positioning columns 21 are set at each complete hidden column position, and the complete hidden columns replace the prefabricated columns in the edge positioning columns 21 after flaw detection and repair;

[0084] If there are no hidden columns in the outer wall of the old building 1 or the hidden columns are incomplete, the cross-section of the prefabricated column is square and the side length of the cross-section is not less than the thickness of the outer wall of the old building 1. The height of the prefabricated column is the same as the complete outer wall of the old building 1, and the material of the prefabricated column is reinforced concrete.

[0085] At the same time, the edge positioning beam 32 can also utilize some existing components in the old building 1:

[0086] If there is a ring beam at the top of the outer wall of the old building 1, when the outer wall between two adjacent edge positioning columns 21 remains intact, the ring beam segment above it is recorded as a usable segment. In step 4, the segment can be repaired by flaw detection and connected to the edge positioning columns 21 at both ends as a whole;

[0087] In step 5, at the position where there is an available segment, the edge positioning beam 32 includes the available segment and cast-in-place concrete beams respectively arranged on the left and right sides of the available segment, and the left and right sides of the available segment are roughened and reinforced, so that the available segment and the cast-in-place concrete beams on both sides are connected as a whole to form a three-in-one beam;

[0088] In the position where there is no available segment, the edge positioning beam 32 is a cast-in-place reinforced concrete beam whose end face is connected to the three-in-one beam as a whole.

[0089] like Figure 3 As shown, in step seven, the process of reconstructing the load-bearing structure of the roof using the central positioning column 22 and the edge positioning beam 32 as positioning components includes the following sub-steps:

[0090] Step 7.1: Select the vertical section of the continuous part from the highest point to the edge of the roof for surveying;

[0091] Step 7.2: Build a plane truss 5 that is consistent with the vertical section shape according to the surveying results;

[0092] Step 7.3: Install the plane trusses 5 between each edge positioning column 21 and the center positioning column 22, respectively, and the plate surface of the plane trusses 5 is arranged vertically;

[0093] Step 7.4: Draw a cross line in the plane with the highest point of the roof as the center, select eight plane trusses 5 close to the cross line, and connect them into four truss beams in pairs with web bars;

[0094] These trusses are used to maintain the rigidity of the roof, and two of them have additional chords in the middle.

[0095] Step 7.5: Use connecting rods to connect all the plane trusses 5 together. The connecting rods are divided into two layers, the upper and lower layers, and the connecting rods in each layer are arranged into multiple concentric circles.

[0096] The load-bearing structure constructed here only requires one vertex, one edge and one section to be constructed. It may be different from the original load-bearing structure of the roof, but it cannot be seen from the outside and will not affect the appearance.

[0097] If there is a landmark accessory component 6 on the outer surface of the old building 1, it is removed in step 2, repaired and derusted, and then installed back in place in step 8.

[0098] In this embodiment, there are some industrial equipment on the roof, which are subsequently installed back in place to maintain the appearance of the old building 1.

[0099] The embodiments described above are merely descriptions of preferred implementation modes of the present invention and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims

1. A reconstruction method for restoring the appearance of a severely damaged old building and changing its function, which is used to reconstruct a single-story old building (1) with irreparable defects in the roof and / or exterior wall in the absence of drawings of the old building (1), wherein the roof of the old building (1) gradually decreases from the highest point to the surrounding areas, and is characterized in that: The reconstruction method comprises the following steps: Step 1: Build a temporary support structure to support the roof of the old building (1) so that the coordinates of the highest point of the roof are consistent with those before the damage; Step 2: Demolish the old building (1) All components above ground level that are neither load-bearing components nor walls; Step 3: demolish the building surface of the old building (1) and dig down to expose the foundation, reinforce the foundation to meet the requirements of the renovated building, and then backfill and level the ground; Step 4: construct edge positioning columns (21) in the outer wall of the old building (1), and construct ground beams (31) between the edge positioning columns (21) to connect adjacent edge positioning columns (21), wherein the edge positioning columns (21) are arranged at intervals around the old building (1), and if the outer wall of the old building (1) has edges, an edge positioning column (21) is additionally arranged at the position of each edge; Constructing a center positioning column (22) below the highest point of the roof of the old building (1); Step 5: demolish the outer wall of the old building (1), and construct a ground beam (31) between the edge positioning columns (21) to connect adjacent edge positioning columns (21); Constructing an edge positioning beam (32) at the junction of the outer wall and the roof of the old building (1), wherein the edge positioning beam (32) is arranged close to the bottom of the roof and is fixedly connected to each edge positioning column (21); Step 6: constructing a core tube (4) around the central positioning column (22), wherein the core tube (4) is supported on the bottom of the roof; Step 7: Check the integrity of the load-bearing structure of the roof. If the load-bearing structure of the roof is missing and the missing load-bearing component cannot be deduced from the load-bearing components around the missing part, the entire roof is dismantled, and then the load-bearing structure of the roof is reconstructed using the center positioning column (22) and the edge positioning beam (32) as positioning components; otherwise, the load-bearing structure of the roof is repaired and rust-removed; Step 8: Lay the roof panels on the load-bearing structure of the roof, and install the glass curtain wall between adjacent edge positioning columns (21); In step 1, if the coordinates of the highest point of the roof when it is intact are unknown, the roof is reversed to meet all the following conditions: Condition 1.1: The edges of the roof are at the same height without any defects; Condition 1.2: In the old building (1), the top of the complete exterior wall is in contact with the roof; Condition 1.3: The continuous area from the highest point of the roof to the edge does not deflect downward; The coordinates of the highest point of the roof after the roof is reversed are considered to be consistent with those when it was not damaged; The edge positioning column (21) includes a prefabricated column slotted and inserted into the outer wall of the old building (1), and an outer casing column wrapped around the outer surface of the prefabricated column after the outer wall of the old building (1) is removed, wherein the outer casing column is a cast-in-place reinforced concrete column that wraps around the prefabricated column; The total vertical bearing capacity of each prefabricated column is not less than the deadweight of the load-bearing structure of the roof, and the total vertical bearing capacity of each edge positioning column (21) is not less than the deadweight of the roof after the reconstruction is completed; The specifications and materials of the prefabricated columns are determined in the following manner: If there are complete hidden columns in the exterior wall of the old building (1), the specifications and materials of the prefabricated columns are consistent with those of the complete hidden columns, and during the construction process of step 4, an edge positioning column (21) is set at each complete hidden column position, and the complete hidden column replaces the prefabricated column in the edge positioning column (21) after flaw detection and repair; If there are no hidden columns in the exterior wall of the old building (1) or the hidden columns are incomplete, the cross-section of the prefabricated column is square and the side length of the cross-section is not less than the thickness of the exterior wall of the old building (1). The height of the prefabricated column is the same as the complete exterior wall of the old building (1), and the material of the prefabricated column is reinforced concrete.

2. A reconstruction method for restoring the appearance of a severely damaged old building and changing its function according to claim 1, characterized in that: During the excavation process of step three, check whether there are underground caverns. If there are underground caverns, clean the inside of the underground caverns, and seal or backfill the underground caverns during the backfill process after the foundation reinforcement.

3. The reconstruction method for restoring the appearance of a severely damaged old building and changing its function according to claim 1, characterized in that: If there is a ring beam at the top of the outer wall of the old building (1), when the outer wall between two adjacent edge positioning columns (21) remains intact, the ring beam segment above it is recorded as a usable segment. In step 4, the usable segment is repaired by flaw detection and then connected to the edge positioning columns (21) at both ends; In step 5, at the position where the available segment exists, the edge positioning beam (32) includes the available segment and cast-in-place concrete beams respectively arranged on the left and right sides of the available segment, and the left and right sides of the available segment are roughened and reinforced, so that the available segment and the cast-in-place concrete beams on both sides are connected as a whole to form a three-in-one beam; At a position where no available segment exists, the edge positioning beam (32) is a cast-in-place reinforced concrete beam whose end surface is connected to the three-in-one beam as a whole.

4. The reconstruction method for restoring the appearance of a severely damaged old building and changing its function according to claim 1, characterized in that: In step seven, the process of reconstructing the load-bearing structure of the roof using the central positioning column (22) and the edge positioning beam (32) as positioning components includes the following sub-steps: Step 7.1: Select the vertical section of the continuous part from the highest point to the edge of the roof for surveying; Step 7.2: Build a plane truss (5) that is consistent with the vertical section shape according to the surveying results; Step 7.3: Install the plane trusses (5) between each edge positioning column (21) and the center positioning column (22), respectively, wherein the plate surface of the plane trusses (5) is arranged vertically; Step 7.4: Draw a cross line in the plane with the highest point of the roof as the center, select eight plane trusses (5) close to the cross line, and connect them in groups of two using web bars to form four truss beams; Step 7.5: Use connecting rods to connect all the plane trusses (5) together. The connecting rods are divided into two layers, the upper and lower layers, and the connecting rods in each layer are arranged into multiple concentric circles.

5. The reconstruction method for restoring the appearance of a severely damaged old building and changing its function according to claim 1, characterized in that: If there is a landmark accessory component (6) on the outer surface of the old building (1), it is removed in step 2, repaired and derusted, and then installed back in place in step 8.