Automatic dispatching method and system for property management work orders
By monitoring the real-time data of elevators to predict abnormalities and automatically dispatch orders, it solves the problem of low efficiency in handling elevator exceptions in traditional property management and improves trust and safety.
Patent Information
- Application Number
- CN202411074425.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-08-07
AI Technical Summary
In traditional property management, elevator exception handling has problems such as low efficiency, slow response, and inability to ensure the safe operation of elevators, resulting in a decrease in trust between residents and property owners.
By monitoring the real-time power consumption, vibration amplitude and noise decibels of the elevator, intelligent models are used to predict abnormalities and automatically dispatch orders, and dispatch orders to the elevator maintenance unit in advance to prevent failures and shorten the dispatch time.
It realizes maintenance before the elevator fails, shortens the order dispatch time, improves the trust between residents and the property management, and ensures the safe operation of the elevator.
Smart Images

Figure CN118586687B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of work order dispatching, and in particular to a method and system for automatically dispatching property management work orders. Background Art
[0002] Property management refers to the repair, maintenance and management of buildings and their equipment and facilities to ensure their normal operation and use. Traditional property management relies on manual processing, which has problems such as low efficiency, slow response and difficulty in ensuring service quality. With the acceleration of urbanization and the improvement of residents' requirements for living environment, the service quality and efficiency of property management have become the focus of owners' attention.
[0003] Elevator management is an important part of property management, involving daily maintenance, regular inspections, safety management and other aspects of elevators. As an indispensable vertical transportation tool in high-rise buildings, the quality of elevator management directly affects the quality of life and safety of residents.
[0004] When an elevator has an abnormality, residents usually report it to the property management, which then sorts out the abnormal information and reports it to the elevator maintenance unit. This method has the following defects:
[0005] When an elevator malfunctions, it may stop during operation. This may cause people inside the elevator to be trapped and high-rise residents to wait too long. However, if the elevator malfunctions and then the property management company reports it, it will not only take too long to repair the elevator, reducing the trust between residents and the property management company, but also fail to guarantee the safe operation of the elevator.
[0006] Based on this, the present invention proposes a method and system for automatically dispatching property management work orders, which can predict abnormalities in elevator operation and automatically dispatch orders to elevator maintenance units when it is predicted that the elevator may have abnormalities. First, it can carry out maintenance before the elevator fails, and second, it can effectively shorten the dispatch time, which is conducive to improving the trust between residents and property and ensuring the safe operation of elevators. Summary of the invention
[0007] The purpose of the present invention is to provide a method and system for automatically dispatching property management work orders to overcome the deficiencies in the background technology.
[0008] In order to achieve the above object, the present invention provides the following technical solution: a method for automatically dispatching property management work orders, the method comprising the following steps:
[0009] The monitoring end obtains the real-time power consumption of the elevator under different load conditions, and obtains the real-time vibration amplitude and noise decibel through multiple monitoring points set on the elevator. The processing end compares the real-time power consumption under the same load condition with the standard power consumption, and calculates the consumption deviation value of each elevator operation;
[0010] Separately analyze the consumption deviation value, vibration amplitude and noise decibel to determine whether the elevator has abnormalities. If there are abnormalities, automatically send an order to the elevator maintenance unit;
[0011] If there is no abnormality, the consumption deviation values are accumulated to generate a consumption deviation index, and the overall vibration assignment and the overall noise assignment are generated by combining the results of multiple monitoring points. The overall vibration assignment and the overall noise assignment are summed to obtain the mechanical stability assignment of the elevator. After comprehensive analysis of the consumption deviation index and the mechanical stability assignment by the intelligent model, it is predicted whether there will be abnormalities in the operation of the elevator. Based on the prediction results, warning signals and corresponding emergency work orders are automatically generated and distributed to the elevator maintenance unit.
[0012] In a preferred embodiment, the monitoring terminal obtains the real-time power consumption of the elevator under different load conditions, including the following steps:
[0013] The monitoring end monitors each time the elevator goes down or up a floor. When the elevator goes up one floor or down one floor from the current floor, it records the elevator load when the elevator door is closed at the current floor, and records the elevator power consumption when the elevator door is opened when it goes up one floor or down one floor from the current floor. The elevator load, single-floor operation mode and power consumption are recorded as a data set.
[0014] In a preferred embodiment, the processing end compares the real-time power consumption with the standard power consumption under the same load condition, and calculates the consumption deviation value of each elevator operation, including the following steps:
[0015] When the monitoring end generates each data set, the processing end uses the load and single-floor operation mode of the elevator in the data set as the benchmark data, and matches the benchmark data in the database. When a data set with the same single-floor operation mode and a load difference of less than or equal to 0.5kg is matched in the database, the standard power consumption in the data set is obtained, and the consumption deviation value is obtained by subtracting the standard power consumption from the real-time power consumption. Within a time period, the number of times the elevator door is closed at the current floor and the number of times the elevator door is opened to ascend one floor from the current floor or descend one floor from the current floor is counted, and the consumption deviation value is calculated for each operation of the elevator.
[0016] In a preferred embodiment, the consumption deviation value, vibration amplitude and noise decibel are analyzed separately to determine whether there is an abnormality in the elevator, including the following steps:
[0017] Multiple consumption deviation values, vibration amplitudes and noise decibels are obtained within a time period. If at least one of the multiple consumption deviation values is greater than the deviation threshold, it is determined that the elevator is abnormal. If at least one of the multiple vibration amplitudes is greater than the amplitude threshold, it is determined that the elevator is abnormal. If at least one of the multiple noise decibels is greater than the decibel threshold, it is determined that the elevator is abnormal. When it is determined that the elevator is abnormal, an order is automatically dispatched to the elevator maintenance unit.
[0018] In a preferred embodiment, if there is no abnormality, the consumption deviation values are accumulated to generate a consumption deviation index, including the following steps:
[0019] Multiple consumption deviation values are obtained within a time period. If the multiple consumption deviation values are all less than or equal to the deviation threshold, the consumption deviation values are accumulated to generate a consumption deviation index. The function expression is: , where is the consumption deviation index, is the time interval, is a discrete time point, Represents a discrete function In time The consumption deviation value at represents the time interval between adjacent time points, and , In each time interval The average value of the consumption deviation on .
[0020] In a preferred embodiment, the overall vibration assignment and the overall noise assignment are generated by combining the results of multiple monitoring points, including the following steps:
[0021] The generation logic of the overall vibration value is as follows: obtain the vibration amplitudes of multiple monitoring points at the same time point, establish a vibration amplitude data set, calculate the average vibration amplitude and amplitude standard deviation in the vibration amplitude data set, and generate the overall vibration value by combining the average vibration amplitude and amplitude standard deviation;
[0022] The generation logic of the overall noise value is as follows: obtain the noise decibels of multiple monitoring points at the same time point, establish a noise decibel data set, calculate the average noise decibel and decibel standard deviation in the noise decibel data set, and generate the overall noise value by combining the average noise decibel and decibel standard deviation;
[0023] The mechanical stability value of the elevator is obtained by summing the overall vibration value and the overall noise value.
[0024] In a preferred embodiment, after comprehensively analyzing the consumption deviation index and the mechanical stability assignment by the intelligent model, predicting whether the elevator operation will be abnormal includes the following steps:
[0025] The consumption deviation index and mechanical stability assignment are calculated comprehensively to obtain the elevator amplitude. The function expression is: , where is the elevator amplitude, is the consumption deviation index, Assign a value to the mechanical stability, , are the consumption deviation index and the proportional coefficient of mechanical stability assignment, respectively, and , All are greater than 0;
[0026] Compare the acquired intelligent model with the first abnormal threshold and the second abnormal threshold to complete the establishment of the intelligent model;
[0027] After obtaining the real-time consumption deviation index and mechanical stability assignment, substitute them into the function expression of the intelligent model to calculate the elevator amplitude. If the elevator amplitude is less than or equal to the first abnormal threshold, it is predicted that the elevator operation will not be abnormal. If the elevator amplitude is greater than the first abnormal threshold and the elevator amplitude is less than or equal to the second abnormal threshold, it is predicted that the elevator operation will have a slight abnormality. If the elevator amplitude is greater than the second abnormal threshold, it is predicted that the elevator operation will have a serious abnormality.
[0028] In a preferred embodiment, the overall vibration value is generated by combining the average vibration amplitude and the amplitude standard deviation, and the overall noise value is generated by combining the average noise decibel and the decibel standard deviation, including the following steps:
[0029] If the average vibration amplitude is less than or equal to the amplitude threshold, and the amplitude standard deviation is less than or equal to the amplitude standard deviation threshold, the overall vibration is assigned If the average vibration amplitude is less than or equal to the amplitude threshold, and the amplitude standard deviation is greater than the amplitude standard deviation threshold, the overall vibration is assigned If the average vibration amplitude is greater than the amplitude threshold, and the amplitude standard deviation is greater than the amplitude standard deviation threshold, the overall vibration is assigned , if the average vibration amplitude is greater than the amplitude threshold, and the amplitude standard deviation is less than or equal to the amplitude standard deviation threshold, the overall vibration value is ZL=1.6;
[0030] If the average noise decibel is less than or equal to the decibel threshold, and the decibel standard deviation is less than or equal to the decibel standard deviation threshold, the overall noise is assigned If the average noise decibel is less than or equal to the decibel threshold, and the decibel standard deviation is greater than the decibel standard deviation threshold, the overall noise is assigned If the average noise decibel is greater than the decibel threshold and the decibel standard deviation is greater than the decibel standard deviation threshold, the overall noise is assigned , if the average noise decibel is greater than the decibel threshold and the decibel standard deviation is less than or equal to the decibel standard deviation threshold, the overall noise is assigned ZL=1.6.
[0031] In a preferred embodiment, obtaining the real-time vibration amplitude and noise decibel through multiple monitoring points set on the elevator includes the following steps:
[0032] Monitoring points are set up on the main operating equipment of the elevator. A vibration sensor and a decibel meter are set up at each monitoring point. The real-time vibration amplitude is obtained by the vibration sensor set up at each monitoring point, and the real-time noise decibel is obtained by the decibel meter set up at each monitoring point.
[0033] The automatic dispatching system for property management work orders includes data monitoring module, abnormality judgment module, abnormality prediction module, and work order dispatching module;
[0034] Data monitoring module: obtains the real-time power consumption of the elevator under different load conditions, and obtains the real-time vibration amplitude and noise decibel through multiple monitoring points set on the elevator;
[0035] Abnormality judgment module: After comparing the real-time power consumption with the standard power consumption under the same load condition, the consumption deviation value of each elevator operation is calculated, and the consumption deviation value, vibration amplitude and noise decibel are analyzed separately to determine whether there is any abnormality in the elevator;
[0036] Abnormal prediction module: If there is no abnormality, the consumption deviation value is accumulated to generate the consumption deviation index, and the overall vibration assignment and the overall noise assignment are generated by combining the results of multiple monitoring points. The overall vibration assignment and the overall noise assignment are summed to obtain the mechanical stability assignment of the elevator. After the consumption deviation index and the mechanical stability assignment are comprehensively analyzed by the intelligent model, it is predicted whether the elevator operation will be abnormal;
[0037] Work order dispatching module: If there is an abnormality, the work order will be automatically dispatched to the elevator maintenance unit. Based on the prediction results, the warning signal and the corresponding emergency work order will be automatically generated and dispatched to the elevator maintenance unit.
[0038] In the above technical solution, the technical effects and advantages provided by the present invention are:
[0039] The present invention determines whether there is an abnormality in the elevator by analyzing the consumption deviation value, vibration amplitude and noise decibel separately. If there is an abnormality, it automatically dispatches an order to the elevator maintenance unit. If there is no abnormality, the consumption deviation value is accumulated to generate a consumption deviation index, and the overall vibration assignment and the overall noise assignment are generated by combining the results of multiple monitoring points. The mechanical stability assignment of the elevator is obtained by summing the overall vibration assignment and the overall noise assignment. After the consumption deviation index and the mechanical stability assignment are comprehensively analyzed by the intelligent model, it is predicted whether the elevator operation will be abnormal. According to the prediction results, a warning signal and a corresponding emergency work order are automatically generated and dispatched to the elevator maintenance unit. The dispatching system can predict the abnormality of the elevator operation, and when it predicts that the elevator may be abnormal, it automatically dispatches the order to the elevator maintenance unit. First, it can perform maintenance before the elevator fails, and second, it effectively shortens the dispatching time, which is conducive to improving the trust between residents and property and ensuring the safe operation of the elevator. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0041] Figure 1 The figure is a flow chart of the method of the present invention. DETAILED DESCRIPTION
[0042] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0043] Example 1: Please refer to Figure 1 As shown, the automatic dispatching method for property management work orders in this embodiment includes the following steps:
[0044] The monitoring end obtains the real-time power consumption of the elevator under different load conditions, and obtains the real-time vibration amplitude and noise decibel through multiple monitoring points set on the elevator. The processing end compares the real-time power consumption under the same load condition with the standard power consumption, calculates the consumption deviation value of each elevator operation, and analyzes the consumption deviation value, vibration amplitude and noise decibel separately to determine whether there is an abnormality in the elevator. If there is an abnormality, it will automatically send an order to the elevator maintenance unit. If there is no abnormality, the consumption deviation value is accumulated to generate a consumption deviation index, and the overall vibration assignment and the overall noise assignment are generated by combining the results of multiple monitoring points. The overall vibration assignment and the overall noise assignment are summed to obtain the mechanical stability assignment of the elevator. After comprehensively analyzing the consumption deviation index and the mechanical stability assignment through the intelligent model, it is predicted whether the elevator operation will be abnormal. According to the prediction results, warning signals and corresponding emergency work orders are automatically generated and dispatched to the elevator maintenance unit.
[0045] This application determines whether there is an abnormality in the elevator by analyzing the consumption deviation value, vibration amplitude and noise decibel separately. If there is an abnormality, it will automatically dispatch an order to the elevator maintenance unit. If there is no abnormality, the consumption deviation value will be accumulated to generate a consumption deviation index, and the overall vibration assignment and the overall noise assignment will be generated by combining the results of multiple monitoring points. The mechanical stability assignment of the elevator is obtained by summing the overall vibration assignment and the overall noise assignment. After the intelligent model comprehensively analyzes the consumption deviation index and the mechanical stability assignment, it predicts whether the elevator operation will be abnormal. According to the prediction results, a warning signal and a corresponding emergency work order are automatically generated and dispatched to the elevator maintenance unit. The dispatch system can predict the abnormality of the elevator operation, and when it predicts that the elevator may be abnormal, it will automatically dispatch an order to the elevator maintenance unit. First, it can perform maintenance before the elevator fails, and second, it effectively shortens the dispatch time, which is conducive to improving the trust between residents and property and ensuring the safe operation of the elevator.
[0046] Embodiment 2: The monitoring terminal obtains the real-time power consumption of the elevator under different load conditions, including the following steps:
[0047] 1) The monitoring end monitors each time the elevator goes down or up a floor. When the elevator goes up one floor or down one floor from the current floor, the elevator load is recorded when the elevator door is closed at the current floor, and the elevator power consumption is recorded when the elevator door is opened when it goes up one floor or down one floor from the current floor. The elevator load, single-floor operation mode and power consumption are recorded as a data set;
[0048] Since the above method requires the monitoring terminal to have a large monitoring frequency and data storage capacity, in this embodiment, obtaining the real-time power consumption of the elevator under different load conditions may also include the following steps:
[0049] 2) The monitoring end records the elevator load when the elevator door of the current floor is closed. When the elevator runs (ascending or descending) to any floor and the elevator door is opened, the total number of floors the elevator runs and the power consumption are recorded. The elevator load, total number of floors the elevator runs and the power consumption are recorded as a data set.
[0050] Step 1) has the advantage of more detailed data monitoring, which makes the subsequent elevator abnormality prediction and judgment more accurate, but it has the disadvantage of requiring the monitoring end to have a higher monitoring frequency and data storage capacity (that is, higher cost), while step 2) has lower requirements on the monitoring frequency and data storage capacity of the monitoring end, but the data monitoring is relatively rough, which can easily affect the accuracy of subsequent calculation tasks. In summary, in this application, step 1) is preferred to obtain the real-time power consumption of the elevator under different load conditions.
[0051] The real-time vibration amplitude and noise decibel are obtained through multiple monitoring points set up on the elevator, including the following steps:
[0052] Monitoring points are set up on the main operating equipment of the elevator, such as the drive system, elevator car, traction machine, etc. (in practice, there are more than these three main operating equipment, which will not be elaborated here). A vibration sensor and a decibel meter are set at each monitoring point. The real-time vibration amplitude is obtained by the vibration sensor set at each monitoring point, and the real-time noise decibel is obtained by the decibel meter set at each monitoring point.
[0053] The processing end compares the real-time power consumption with the standard power consumption under the same load condition and calculates the consumption deviation value of each elevator operation, including the following steps:
[0054] When the monitoring end generates each data set, the processing end uses the load and single-floor operation mode of the elevator in the data set as the benchmark data, and matches the benchmark data in the database. When a data set with the same single-floor operation mode and a load difference of less than or equal to 0.5kg is matched in the database, the standard power consumption in the data set is obtained (usually set by the elevator operation management department based on actual tests), and the consumption deviation value is obtained by subtracting the standard power consumption from the real-time power consumption. Within a time period, the number of times the elevator door is closed at the current floor and the elevator door is opened one floor up or one floor down from the current floor is counted, and the consumption deviation value is calculated for each elevator operation;
[0055] It should be noted that the elevator runs once when the elevator door is closed at the current floor and the elevator door is opened when it goes up one floor or down one floor.
[0056] In addition, the database matches a data set with the same single-layer operation mode and a load difference of less than or equal to 0.5 kg. In actual applications, there may be multiple data sets with a load difference less than or equal to 0.5 kg. Therefore, we select the data set with the smallest load difference among multiple data sets for comparison.
[0057] The consumption deviation value, vibration amplitude and noise decibel are analyzed separately to determine whether there is any abnormality in the elevator. If there is any abnormality, an order is automatically sent to the elevator maintenance unit, including the following steps:
[0058] In order to monitor the elevator for abnormalities in real time, multiple parameters of the elevator are usually monitored, and corresponding thresholds are set for each parameter, so as to automatically determine whether the elevator has abnormalities by comparing the thresholds. The specific scheme is as follows:
[0059] Acquire multiple consumption deviation values, vibration amplitudes, and noise decibels within a time period. If at least one of the multiple consumption deviation values is greater than the deviation threshold, it is determined that the elevator is abnormal. If at least one of the multiple vibration amplitudes is greater than the amplitude threshold, it is determined that the elevator is abnormal. If at least one of the multiple noise decibels is greater than the decibel threshold, it is determined that the elevator is abnormal. When it is determined that the elevator is abnormal, an order is automatically dispatched to the elevator maintenance unit.
[0060] Through the above solution, the dispatching system can automatically determine whether there is any abnormality during the operation of the elevator.
[0061] If there is no abnormality, the consumption deviation values are accumulated to generate a consumption deviation index, including the following steps:
[0062] If there is no abnormality, it means that the multiple consumption deviation values are less than or equal to the deviation threshold. In order to improve the comprehensiveness of the analysis of elevator power consumption, we make the following plan:
[0063] Multiple consumption deviation values are obtained within a time period. If the multiple consumption deviation values are all less than or equal to the deviation threshold, the consumption deviation values are accumulated to generate a consumption deviation index. The function expression is: , where is the consumption deviation index, is the time interval, is a discrete time point, Represents a discrete function In time The consumption deviation value at represents the time interval between adjacent time points, and , In each time interval The average value of the consumption deviation value on ;
[0064] When the multiple consumption deviation values are less than or equal to the deviation threshold, although it can be judged that there is no abnormality in the elevator, The multiple consumption deviation values within are accumulated and calculated. The larger the consumption deviation index is, the more likely it is that the elevator will be abnormal if it continues to run.
[0065] Combining the results of multiple monitoring points to generate an overall vibration assignment and an overall noise assignment, and summing the overall vibration assignment and the overall noise assignment to obtain the mechanical stability assignment of the elevator, including the following steps:
[0066] The generation logic of the overall vibration value is as follows: obtain the vibration amplitudes of multiple monitoring points at the same time point, establish a vibration amplitude data set, calculate the average vibration amplitude and amplitude standard deviation in the vibration amplitude data set, and generate the overall vibration value by combining the average vibration amplitude and amplitude standard deviation;
[0067] The generation logic of the overall noise value is as follows: obtain the noise decibels of multiple monitoring points at the same time point, establish a noise decibel data set, calculate the average noise decibel and decibel standard deviation in the noise decibel data set, and generate the overall noise value by combining the average noise decibel and decibel standard deviation;
[0068] The mechanical stability value of the elevator is obtained by summing the overall vibration value and the overall noise value.
[0069] The steps to generate an overall vibration value by combining the mean vibration amplitude and the amplitude standard deviation include:
[0070] If the average vibration amplitude is less than or equal to the amplitude threshold, and the amplitude standard deviation is less than or equal to the amplitude standard deviation threshold, the overall vibration amplitude of the elevator is small, and the overall vibration is assigned If the average vibration amplitude is less than or equal to the amplitude threshold, and the amplitude standard deviation is greater than the amplitude standard deviation threshold, the vibration amplitude of the elevator is small (that is, the vibration amplitude at some monitoring points is greater than the amplitude threshold), then the overall vibration is assigned If the average vibration amplitude is greater than the amplitude threshold, and the amplitude standard deviation is greater than the amplitude standard deviation threshold, the vibration amplitude of the elevator is large (that is, the vibration amplitude at some monitoring points is less than or equal to the amplitude threshold), then the overall vibration is assigned If the average vibration amplitude is greater than the amplitude threshold, and the amplitude standard deviation is less than or equal to the amplitude standard deviation threshold, the overall vibration amplitude of the elevator is large, and the overall vibration is assigned 6.
[0071] Combining the average noise decibel and the decibel standard deviation to generate an overall noise assignment involves the following steps:
[0072] If the average noise decibel is less than or equal to the decibel threshold, and the decibel standard deviation is less than or equal to the decibel standard deviation threshold, the overall noise decibel of the elevator is small, then the overall noise is assigned If the average noise decibel is less than or equal to the decibel threshold, and the decibel standard deviation is greater than the decibel standard deviation threshold, the vibration amplitude of the elevator is small (that is, the vibration amplitude at some monitoring points is greater than the decibel threshold), then the overall noise is assigned If the average noise decibel is greater than the decibel threshold, and the decibel standard deviation is greater than the decibel standard deviation threshold, the vibration amplitude of the elevator is large (that is, the vibration amplitude at some monitoring points is less than or equal to the decibel threshold), then the overall noise is assigned If the average noise decibel is greater than the decibel threshold, and the decibel standard deviation is less than or equal to the decibel standard deviation threshold, the overall noise decibel of the elevator is large, and the overall noise is assigned 6.
[0073] Specifically, the average vibration amplitude and the average noise decibel are calculated using the general mean calculation formula, and the decibel standard deviation and the amplitude standard deviation are calculated using the general standard deviation calculation formula, and the expressions are: , where is the mean, represents the standard deviation, Indicates The original data of each monitoring point, It indicates the number of monitoring points. The calculation methods of average vibration amplitude, average noise decibel, decibel standard deviation and amplitude standard deviation are the same as above and will not be elaborated here.
[0074] Specifically, Mean: The mean provides the central location of the data, a measure of the trend in the data set. It tells us the typical or average value in the data set;
[0075] Standard Deviation: Standard Deviation provides the dispersion of the data, that is, the degree of deviation of the data points from the mean. It tells us the variability or dispersion of the data;
[0076] If the mean is large and the standard deviation is small, it means that most of the data points are concentrated near the mean, and the data is relatively concentrated and consistent. If the mean is large but the standard deviation is also large, it means that although the data points are around a higher mean, the degree of dispersion is large and the data variability is high, and so on.
[0077] After comprehensively analyzing the consumption deviation index and mechanical stability assignment through the intelligent model, it is predicted whether the elevator operation will be abnormal. The establishment of the intelligent model includes the following steps:
[0078] The consumption deviation index and mechanical stability assignment are calculated comprehensively to obtain the elevator amplitude. The function expression is: , where is the elevator amplitude, is the consumption deviation index, Assign a value to the mechanical stability, , are the consumption deviation index and the proportional coefficient of mechanical stability assignment, respectively, and , All are greater than 0;
[0079] Compare the acquired intelligent model with the first abnormal threshold and the second abnormal threshold to complete the establishment of the intelligent model;
[0080] After obtaining the real-time consumption deviation index and mechanical stability assignment, substitute them into the function expression of the intelligent model to calculate the elevator amplitude. If the elevator amplitude is less than or equal to the first abnormal threshold, it is predicted that the elevator operation will not be abnormal. If the elevator amplitude is greater than the first abnormal threshold and the elevator amplitude is less than or equal to the second abnormal threshold, it is predicted that the elevator operation will have a slight abnormality (but the elevator can still support operation). If the elevator amplitude is greater than the second abnormal threshold, it is predicted that the elevator operation will have a serious abnormality.
[0081] Automatically generate warning signals and corresponding emergency work orders based on the prediction results and send them to the elevator maintenance unit, including the following steps:
[0082] When it is predicted that there will be no abnormalities in the elevator operation, no warning signal and corresponding emergency work order will be automatically generated. When it is predicted that there will be slight abnormalities in the elevator operation, the maximum load of the elevator will be reduced by half. For example, the maximum load of the elevator is 1,000 kg. When it is predicted that there will be slight abnormalities in the elevator operation, the maximum load of the elevator is limited to 500 kg. However, a mild maintenance work order is generated and sent to the elevator maintenance unit. When it is predicted that there will be serious abnormalities in the elevator operation, it is judged that the elevator cannot continue to operate, a warning signal for stopping use is generated, and an emergency maintenance work order is generated and sent to the elevator maintenance unit.
[0083] Embodiment 3: The property management work order automatic dispatching system described in this embodiment includes a data monitoring module, an abnormality judgment module, an abnormality prediction module, and a work order dispatching module;
[0084] Data monitoring module: obtains the real-time power consumption of the elevator under different load conditions, obtains the real-time vibration amplitude and noise decibel through multiple monitoring points set on the elevator, and sends the real-time power consumption, vibration amplitude and noise decibel to the abnormal judgment module and the abnormal prediction module;
[0085] Abnormal judgment module: After comparing the real-time power consumption with the standard power consumption under the same load condition, the consumption deviation value of each elevator operation is calculated, and the consumption deviation value, vibration amplitude and noise decibel are analyzed separately to determine whether the elevator has abnormalities. The abnormal judgment results are sent to the abnormal prediction module and the work order dispatching module;
[0086] Abnormal prediction module: If there is no abnormality, the consumption deviation value is accumulated to generate the consumption deviation index, and the overall vibration assignment and the overall noise assignment are generated by combining the results of multiple monitoring points. The overall vibration assignment and the overall noise assignment are summed to obtain the mechanical stability assignment of the elevator. After the consumption deviation index and the mechanical stability assignment are comprehensively analyzed by the intelligent model, it is predicted whether the elevator operation will be abnormal, and the prediction result is sent to the work order dispatching module;
[0087] Work order dispatching module: If there is an abnormality, the work order will be automatically dispatched to the elevator maintenance unit. Based on the prediction results, the warning signal and the corresponding emergency work order will be automatically generated and dispatched to the elevator maintenance unit.
[0088] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.
[0089] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0090] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well.
Claims
1. A method for automatically dispatching property management work orders, characterized by: The dispatching method comprises the following steps: The monitoring end obtains the real-time power consumption of the elevator under different load conditions, and obtains the real-time vibration amplitude and noise decibel through multiple monitoring points set on the elevator. The processing end compares the real-time power consumption under the same load condition with the standard power consumption, and calculates the consumption deviation value of each elevator operation; Separately analyze the consumption deviation value, vibration amplitude and noise decibel to determine whether the elevator has abnormalities. If there are abnormalities, automatically send an order to the elevator maintenance unit; If there is no abnormality, the consumption deviation value is accumulated to generate a consumption deviation index, and the overall vibration assignment and the overall noise assignment are generated by combining the results of multiple monitoring points. The overall vibration assignment and the overall noise assignment are summed to obtain the mechanical stability assignment of the elevator. After the consumption deviation index and the mechanical stability assignment are comprehensively analyzed by the intelligent model, it is predicted whether the elevator operation will be abnormal. According to the prediction results, warning signals and corresponding emergency work orders are automatically generated and dispatched to the elevator maintenance unit; If there is no abnormality, the consumption deviation values are accumulated to generate a consumption deviation index, including the following steps: Multiple consumption deviation values are obtained within a time period. If the multiple consumption deviation values are all less than or equal to the deviation threshold, the consumption deviation values are accumulated to generate a consumption deviation index. The function expression is: , where is the consumption deviation index, is the time interval, is a discrete time point, Represents a discrete function In time The consumption deviation value at represents the time interval between adjacent time points, and , In each time interval The average value of the consumption deviation value on ; Combining the results of multiple monitoring points to generate an overall vibration value and an overall noise value includes the following steps: The generation logic of the overall vibration value is as follows: obtain the vibration amplitudes of multiple monitoring points at the same time point, establish a vibration amplitude data set, calculate the average vibration amplitude and amplitude standard deviation in the vibration amplitude data set, and generate the overall vibration value by combining the average vibration amplitude and amplitude standard deviation; The generation logic of the overall noise value is as follows: obtain the noise decibels of multiple monitoring points at the same time point, establish a noise decibel data set, calculate the average noise decibel and decibel standard deviation in the noise decibel data set, and generate the overall noise value by combining the average noise decibel and decibel standard deviation; The mechanical stability value of the elevator is obtained by summing the overall vibration value and the overall noise value; After comprehensively analyzing the consumption deviation index and mechanical stability assignment through the intelligent model, it is predicted whether the elevator operation will be abnormal, including the following steps: The consumption deviation index and mechanical stability assignment are calculated comprehensively to obtain the elevator amplitude. The function expression is: , where is the elevator amplitude, is the consumption deviation index, Assign a value to the mechanical stability, , are the consumption deviation index and the proportional coefficient of mechanical stability assignment, respectively, and , All are greater than 0; Compare the acquired intelligent model with the first abnormal threshold and the second abnormal threshold to complete the establishment of the intelligent model; After obtaining the real-time consumption deviation index and mechanical stability assignment, substitute them into the function expression of the intelligent model to calculate the elevator amplitude. If the elevator amplitude is less than or equal to the first abnormal threshold, it is predicted that the elevator operation will not be abnormal. If the elevator amplitude is greater than the first abnormal threshold and the elevator amplitude is less than or equal to the second abnormal threshold, it is predicted that the elevator operation will have a slight abnormality. If the elevator amplitude is greater than the second abnormal threshold, it is predicted that the elevator operation will have a serious abnormality.
2. The method for automatically dispatching property management work orders according to claim 1, characterized in that: The monitoring end obtains the real-time power consumption of the elevator under different load conditions, including the following steps: The monitoring end monitors each time the elevator goes down or up a floor. When the elevator goes up one floor or down one floor from the current floor, it records the elevator load when the elevator door is closed at the current floor, and records the elevator power consumption when the elevator door is opened when it goes up one floor or down one floor from the current floor. The elevator load, single-floor operation mode and power consumption are recorded as a data set.
3. The automatic dispatching method for property management work orders according to claim 2 is characterized by: The processing end compares the real-time power consumption with the standard power consumption under the same load condition and calculates the consumption deviation value of each elevator operation, including the following steps: When the monitoring end generates each data set, the processing end uses the load and single-floor operation mode of the elevator in the data set as the benchmark data, and matches the benchmark data in the database. When a data set with the same single-floor operation mode and a load difference of less than or equal to 0.5kg is matched in the database, the standard power consumption in the data set is obtained, and the consumption deviation value is obtained by subtracting the standard power consumption from the real-time power consumption. Within a time period, the number of times the elevator door is closed at the current floor and the number of times the elevator door is opened to ascend one floor from the current floor or descend one floor from the current floor is counted, and the consumption deviation value is calculated for each operation of the elevator.
4. The automatic dispatching method for property management work orders according to claim 3 is characterized by: Separately analyzing the consumption deviation value, vibration amplitude, and noise decibel to determine whether the elevator is abnormal includes the following steps: Multiple consumption deviation values, vibration amplitudes and noise decibels are obtained within a time period. If at least one of the multiple consumption deviation values is greater than the deviation threshold, it is determined that the elevator is abnormal. If at least one of the multiple vibration amplitudes is greater than the amplitude threshold, it is determined that the elevator is abnormal. If at least one of the multiple noise decibels is greater than the decibel threshold, it is determined that the elevator is abnormal. When it is determined that the elevator is abnormal, an order is automatically dispatched to the elevator maintenance unit.
5. The method for automatically dispatching property management work orders according to claim 4, characterized in that: The overall vibration value is generated by combining the average vibration amplitude and the amplitude standard deviation, and the overall noise value is generated by combining the average noise decibel and the decibel standard deviation, including the following steps: If the average vibration amplitude is less than or equal to the amplitude threshold, and the amplitude standard deviation is less than or equal to the amplitude standard deviation threshold, the overall vibration is assigned If the average vibration amplitude is less than or equal to the amplitude threshold, and the amplitude standard deviation is greater than the amplitude standard deviation threshold, the overall vibration is assigned If the average vibration amplitude is greater than the amplitude threshold, and the amplitude standard deviation is greater than the amplitude standard deviation threshold, the overall vibration is assigned , if the average vibration amplitude is greater than the amplitude threshold, and the amplitude standard deviation is less than or equal to the amplitude standard deviation threshold, the overall vibration value is ZL=1.6; If the average noise decibel is less than or equal to the decibel threshold, and the decibel standard deviation is less than or equal to the decibel standard deviation threshold, the overall noise is assigned If the average noise decibel is less than or equal to the decibel threshold, and the decibel standard deviation is greater than the decibel standard deviation threshold, the overall noise is assigned If the average noise decibel is greater than the decibel threshold and the decibel standard deviation is greater than the decibel standard deviation threshold, the overall noise is assigned , if the average noise decibel is greater than the decibel threshold and the decibel standard deviation is less than or equal to the decibel standard deviation threshold, the overall noise is assigned ZL=1.
6.
6. The method for automatically dispatching property management work orders according to claim 5, characterized in that: The real-time vibration amplitude and noise decibel are obtained through multiple monitoring points set up on the elevator, including the following steps: Monitoring points are set up on the main operating equipment of the elevator. A vibration sensor and a decibel meter are set up at each monitoring point. The real-time vibration amplitude is obtained by the vibration sensor set up at each monitoring point, and the real-time noise decibel is obtained by the decibel meter set up at each monitoring point.
7. A property management work order automatic dispatching system, used to implement the dispatching method according to any one of claims 1 to 6, characterized in that: Including data monitoring module, abnormality judgment module, abnormality prediction module, and work order dispatching module; Data monitoring module: obtains the real-time power consumption of the elevator under different load conditions, and obtains the real-time vibration amplitude and noise decibel through multiple monitoring points set on the elevator; Abnormality judgment module: After comparing the real-time power consumption with the standard power consumption under the same load condition, the consumption deviation value of each elevator operation is calculated, and the consumption deviation value, vibration amplitude and noise decibel are analyzed separately to determine whether there is any abnormality in the elevator; Abnormal prediction module: If there is no abnormality, the consumption deviation value is accumulated to generate the consumption deviation index, and the overall vibration assignment and the overall noise assignment are generated by combining the results of multiple monitoring points. The overall vibration assignment and the overall noise assignment are summed to obtain the mechanical stability assignment of the elevator. After the consumption deviation index and the mechanical stability assignment are comprehensively analyzed by the intelligent model, it is predicted whether the elevator operation will be abnormal; Work order dispatching module: If there is an abnormality, the work order will be automatically dispatched to the elevator maintenance unit. Based on the prediction results, the warning signal and the corresponding emergency work order will be automatically generated and dispatched to the elevator maintenance unit.