A tunnel drainage trench design method based on multi-factor and mutual matching analysis
The tunnel drainage trench design method, which utilizes multi-factor and mutual matching analysis, optimizes the parameters of transverse drainage pipes and longitudinal drainage ditches, solving the problem of mismatched drainage capacity in existing technologies and improving the safety, economy, and durability of the tunnel drainage system.
Patent Information
- Application Number
- CN202410713426.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-04
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-06-04
AI Technical Summary
In the existing tunnel drainage system design, the design of transverse drainage pipes and longitudinal drainage ditches has not fully considered factors such as groundwater pretreatment measures, water crystallization and construction quality, resulting in a mismatch in drainage capacity and affecting the structural safety and economy of the tunnel.
A design method based on multi-factor and mutual matching analysis was adopted. By calculating the inflow reduction coefficient Z1, the water quality crystallization reduction coefficient Z2, and the construction blockage and layout deviation reduction coefficients Z3 and Z4, and combining the hydraulic calculation formula of the pipe trench, the parameters of the transverse drainage pipe and the longitudinal drainage ditch were optimized to ensure the matching of their drainage capacity.
It improves the safety, economy, and durability of the tunnel drainage system, reduces project investment, and ensures the safe operation and structural integrity of the tunnel.
Smart Images

Figure CN118607053B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of underground engineering, and in particular relates to a tunnel drainage trench design method based on multi-factor and mutual matching analysis. Background Art
[0002] With the acceleration of the construction of a strong transportation country, the focus will be on strengthening the construction of modern comprehensive transportation infrastructure. As an important part of transportation infrastructure, tunnel projects are being built in increasing numbers. Tunnels are the main type of underground projects and are built in the strata below the surface. The complexity of the strata, especially the complexity of the underground rock strata and groundwater environment, will significantly increase the difficulty of tunnel construction on the one hand. On the other hand, after the construction of the tunnel, the original water system balance of the mountain will be affected, and the tunnel will interact with the groundwater. Inevitably, the tunnel will face the problem of groundwater prevention and drainage, as well as the disease problems that may be caused by improper groundwater drainage measures. Therefore, the drainage system is an indispensable and important part of the tunnel project.
[0003] At present, tunnel drainage systems are generally set up in the manner of "taking surveyed water inflow before design, verifying that it can be drained, unblocking after completion if blocked, and treating tunnel diseases". The horizontal drainage pipes and longitudinal drainage ditches, the main components of the tunnel drainage system, are designed based on the surveyed water inflow, empirical methods and a large surplus coefficient. During the implementation of the tunnel project and after completion, the actual water inflow is related to the groundwater pre-treatment measures, and the actual drainage capacity of the drainage pipe ditch is related to the influence of groundwater crystallization and the quality of pipe ditch construction. Insufficient consideration of related factors leads to the following unfavorable situations in the tunnel drainage system:
[0004] (1) The large amount of redundant space in the transverse drainage pipes and / or longitudinal drainage ditches results in poor economic efficiency and adverse effects on the stress of the tunnel structure;
[0005] (2) Insufficient drainage space in transverse drainage pipes and / or longitudinal drainage ditches causes water damage to the tunnel arch wall and road surface, which in turn affects operational safety and structural durability, and the subsequent investment in water damage control surges;
[0006] (3) The overall design water inflow of the drainage system trench does not match the actual water inflow;
[0007] (4) The drainage capacity of the horizontal drainage pipe of the drainage system does not match the drainage capacity of the longitudinal drainage ditch.
[0008] Therefore, how to overcome the shortcomings of the existing technology is an urgent problem to be solved in the field of underground engineering technology. Summary of the invention
[0009] The purpose of the present invention is to solve the shortcomings of the prior art and provide a tunnel drainage trench design method based on multi-factor and mutual matching analysis, which solves the practical drainage capacity and setting rationality problems of the tunnel drainage system that have long been ignored. The method of the present invention has the advantages of safety, economy, durability, etc. for tunnel engineering, and has strong practicality and promotion and application significance.
[0010] To achieve the above purpose, the technical solution adopted by the present invention is as follows:
[0011] A tunnel drainage trench design method based on multi-factor and mutual matching analysis, wherein the tunnel drainage trench comprises a plurality of transverse drainage pipes and 1 to 3 longitudinal drainage trenches, comprising the following steps:
[0012] Step (1): Collect basic information on the tunnel, hydrogeological conditions and water inflow, and calculate the actual water inflow reduction factor Z 1 ;
[0013] Step (2): Analyze the crystallization blockage of the drainage ditch according to the groundwater quality of the tunnel site, and calculate the water quality crystallization drainage reduction coefficient Z 2 ;
[0014] Step (3): Analyze the tunnel construction party’s previous tunnel project drainage system implementation performance and calculate the construction blockage drainage reduction coefficient Z 3 and the drainage reduction factor Z of the layout deviation 4 ;
[0015] Step (4), according to the water quality crystallization drainage reduction coefficient Z obtained in step (2) 2 , the construction blockage drainage reduction coefficient Z obtained in step (3) 3 , Stakeout deviation drainage reduction factor Z 4 , as well as the roughness coefficient, hydraulic radius, set-out slope and water flow cross-sectional area of the pre-constructed transverse drainage pipes and longitudinal drainage ditches, and use the pipe ditch hydraulic calculation formula to calculate the drainage capacity of each transverse drainage pipe and each longitudinal drainage ditch;
[0016] Step (5), respectively verifying and analyzing the matching of the overall drainage capacity of the tunnel trench and the matching of the drainage capacity of the transverse drainage pipe and the longitudinal drainage ditch;
[0017] Step (6), if the matching verification result of step (5) is satisfied, the construction is carried out according to the parameters of the pre-constructed transverse drainage pipes and longitudinal drainage ditches; if the matching verification result of step (5) is not satisfied, the parameters of the pre-constructed transverse drainage pipes and longitudinal drainage ditches are adjusted, and steps (4) to (5) are repeated until the matching verification result is satisfied.
[0018] Further, preferably, in step (1):
[0019] The basic conditions of the tunnel include tunnel length, cross-section size, and longitudinal slope; the number of longitudinal drainage ditches in the tunnel is determined according to the cross-section size of the tunnel and is not greater than 80m. 2 1 or 2 lines are set up when the length is greater than 80m 2 2 or 3 drainage ditches are set up; the slope of the longitudinal drainage ditch should be consistent with the longitudinal slope of the tunnel;
[0020] The hydrogeological profile is obtained from the tunnel geological survey report, including groundwater types; the groundwater types include hard water and non-hard water;
[0021] For hard water, the effect of water crystallization on the blockage of the drainage ditch is considered according to step (2); the water inflow information is obtained from the tunnel geological survey report, including the predicted groundwater inflow and outflow ratio; the actual tunnel inflow calculation takes into account the 20% over-inflow degree and the actual inflow reduction factor Z 1 The calculation formula is: 1 =(1+20%)×outflow ratio; the actual water inflow calculation formula for the tunnel is: Q sj =Z 1 × Predicted water inflow;
[0022] For non-hard water, the actual water inflow reduction factor Z is not considered, and the effect of water crystallization on the blockage of drainage ditches is 1 Take 1.
[0023] The water inflow information is obtained from the tunnel geological survey report, including the predicted groundwater inflow and outflow ratio; the actual tunnel inflow calculation takes into account the 20% over-inflow and the actual inflow reduction factor Z 1 The calculation formula is: 1 =(1+20%)×outflow ratio; the actual water inflow calculation formula for the tunnel is: Q sj =Z 1 ×Predicted water inflow.
[0024] Further, preferably, the specific method of step (2) is:
[0025] Analyze the crystallization blockage of drainage ditches in the vicinity of the proposed tunnel and / or in no less than 5 existing tunnels in the same area; consult the special maintenance inspection report of the drainage ditches of the existing tunnels every three years, and statistically average the proportion of the crystallization blockage area of the drainage ditches of each tunnel during the previous inspections to the cross-sectional area of the ditches to obtain the crystallization blockage ratio of the drainage ditches of each tunnel; the crystallization blockage ratio of the drainage ditches of the proposed tunnel is the average value of the crystallization blockage ratios of the drainage ditches of each existing tunnel, and the water quality crystallization drainage reduction coefficient Z is 2 The calculation formula is: 2 =1-crystallization blockage ratio of drainage pipes in the proposed tunnel;
[0026] The area adjacent to the proposed tunnel refers to the area with a radius of 60km with the midpoint of the tunnel as the center; the similar area refers to the area with the same hydrogeological type as the area where the proposed tunnel is located.
[0027] Further, preferably, the specific method of step (3) is:
[0028] The construction performance of the drainage system of no less than 5 existing tunnels of the proposed tunnel construction party was analyzed, and the data on the two types of defects of slag block and garbage blockage and construction layout deviation in the tunnel drainage system quality inspection report were reviewed; the ratio of the length of the drainage ditch with slag block and garbage blockage and the length of the section with construction layout deviation in each existing tunnel drainage ditch was calculated to obtain the ratio of slag block and garbage blockage and construction layout deviation in the drainage ditch of each existing tunnel;
[0029] The ratio of slag-block garbage blocking in the drainage ditch of the proposed tunnel is the average ratio of slag-block garbage blocking in the drainage ditch of each existing tunnel. The ratio of no slag-block garbage blocking = 1-the ratio of slag-block garbage blocking. Considering the remaining 30% of the slag-block garbage blocking in the drainage ditch of the proposed tunnel after rectification, the construction blockage drainage reduction coefficient Z is calculated. 3 , the specific calculation formula is: Z 3 = No slag block garbage blocking ratio + 30% × slag block garbage blocking ratio;
[0030] The construction layout deviation ratio of the drainage ditch of the proposed tunnel is the average of the construction layout deviation ratios of the drainage ditch of each existing tunnel. The deviation ratio without construction layout = 1-the deviation ratio with construction layout. Considering the remaining 30% of the construction layout deviation of the drainage ditch of the proposed tunnel after rectification, the layout deviation drainage reduction coefficient Z is calculated. 4 , the specific calculation formula is: Z 4 = Deviation ratio without construction layout + 30% × Deviation ratio with construction layout.
[0031] Further, preferably, in step (4), the trench hydraulic calculation formula is as follows:
[0032]
[0033] Where: Q gg —The drainage capacity of a single pipe of a horizontal drainage pipe or a single ditch of a longitudinal drainage ditch, in m 3 / s; n—roughness coefficient of transverse drainage pipe or longitudinal drainage ditch; R—hydraulic radius, unit m, hydraulic radius is the ratio of water flow cross-sectional area to the length of wetted boundary of water flow cross-sectional area; i—slope of transverse drainage pipe or longitudinal drainage ditch; A—water flow cross-sectional area of transverse drainage pipe or longitudinal drainage ditch, unit m 2 .
[0034] Further, preferably, in step (5), the drainage capacity matching verification is analyzed in different ways according to the number of longitudinal drainage ditches provided, specifically including:
[0035] (1) When there are one or two longitudinal drainage ditches:
[0036] The transverse drainage pipes are flow passages connecting the longitudinal drainage ditch and the longitudinal water storage grooves on both sides, and there are 2 groups in total; when there is 1 longitudinal drainage ditch, the left side of the drainage ditch axis is the first group, and the right side of the drainage ditch axis is the second group; when there are 2 longitudinal drainage ditches, the left side of the tunnel axis is the first group, and the right side of the tunnel axis is the second group; the transverse drainage pipes are arranged at equal intervals along the length direction of the tunnel according to the spacing of each group;
[0037] The calculation formula for the drainage capacity of each group of horizontal drainage pipes is as follows:
[0038] Qgroup = (L + d) × Qgg
[0039] Where: Q 组 —Drainage capacity of the horizontal drainage pipe group, unit: m 3 / day; L—tunnel length, unit: m; d—spacing of transverse drainage pipes along the tunnel length, unit: m- 1 ; Qgg—the drainage capacity of a single lateral drainage pipe calculated in step (4), in m 3 / sky;
[0040] Total drainage capacity of lateral drainage pipes = drainage capacity of the first group + drainage capacity of the second group;
[0041] The total drainage capacity of the longitudinal drainage ditch is the sum of the single ditch Qgg of all longitudinal drainage ditches;
[0042] The matching verification of the overall drainage capacity of the tunnel trench requires comparing the minimum value of the total drainage capacity of the lateral drainage pipe and the total drainage capacity of the longitudinal drainage ditch with the actual water inflow of the tunnel. If 1.1≤min(total drainage capacity of the lateral drainage pipe, total drainage capacity of the longitudinal drainage ditch) / Qs j If ≤1.3, the matching is satisfied, otherwise it is not satisfied;
[0043] The matching verification of the drainage capacity of the horizontal drainage pipe and the vertical drainage ditch requires comparing the total drainage capacity of the horizontal drainage pipe with the total drainage capacity of the vertical drainage ditch. If 0.85≤total drainage capacity of the horizontal drainage pipe / total drainage capacity of the vertical drainage ditch≤1.15, the matching is satisfied, otherwise it is not satisfied;
[0044] (2) When there are three longitudinal drainage ditches:
[0045] The longitudinal drainage ditch includes 2 side ditches and 1 middle ditch;
[0046] There are 4 groups of transverse drainage pipes: 2 groups on the side are flow channels connecting the longitudinal water storage grooves on both sides and the 2 side ditches. The left side of the side is the first group, and the right side of the side is the second group. They are arranged at equal intervals along the length of the tunnel; 2 groups on the middle side are flow channels connecting the side ditches and the middle ditch. The left side of the middle side is the third group, and the right side of the middle side is the fourth group. They are arranged at equal intervals along the length of the tunnel.
[0047] The calculation formula for the drainage capacity of each group of horizontal drainage pipes is as follows:
[0048] Qgroup = (L + d) × Qgg
[0049] Where: Q 组 —Drainage capacity of the horizontal drainage pipe group, unit: m 3 / day; L—tunnel length, unit: m; d—spacing of transverse drainage pipes along the tunnel length, unit: m- 1 ; Qgg—the drainage capacity of a single lateral drainage pipe calculated in step (4), in m 3 / sky;
[0050] The total drainage capacity of the side transverse drainage pipes = the drainage capacity of the first group + the drainage capacity of the second group.
[0051] The total drainage capacity of the middle side transverse drainage pipe = the drainage capacity of the third group + the drainage capacity of the fourth group;
[0052] The total drainage capacity of the three longitudinal drainage ditches is the sum of the Qgg of the three longitudinal drainage ditches; the total drainage capacity of the middle ditch of the longitudinal drainage ditch is the Qgg of the middle ditch of the longitudinal drainage ditch;
[0053] The matching verification of the overall drainage capacity of the tunnel trench requires comparing the minimum value of the total drainage capacity of the side lateral drainage pipes and the total drainage capacity of the three longitudinal drainage ditches with the actual water inflow of the tunnel. If 1.1≤min(total drainage capacity of the side lateral drainage pipes, total drainage capacity of the three longitudinal drainage ditches) / Qs j If ≤1.3, the matching is satisfied, otherwise it is not satisfied;
[0054] The verification of the matching of drainage capacity of the transverse drainage pipe and the longitudinal drainage ditch includes two items, and both items should be satisfied: the first item is to compare the total drainage capacity of the side transverse drainage pipe with the total drainage capacity of the three longitudinal drainage ditches. If 0.85≤total drainage capacity of the side transverse drainage pipe / total drainage capacity of the three longitudinal drainage ditches≤1.15, then the matching is satisfied, otherwise it is not satisfied; the second item is to compare the total drainage capacity of the middle transverse drainage pipe with the total drainage capacity of the middle ditch of the longitudinal drainage ditch. If 0.85≤total drainage capacity of the middle transverse drainage pipe / total drainage capacity of the middle ditch of the longitudinal drainage ditch≤1.15, then the matching is satisfied, otherwise it is not satisfied.
[0055] Compared with the prior art, the present invention has the following beneficial effects:
[0056] The present invention provides a tunnel drainage ditch design method based on multi-factor and mutual matching analysis. Under the premise of ensuring the safety, economy and durability of the tunnel project, various relevant influencing factors are comprehensively considered, and according to the matching requirements, the setting parameters of the drainage ditch are reasonably formulated, which are directly used to guide the design and implementation of the tunnel drainage system, filling the relevant technical gap in this aspect. By comparing with the existing engineering technology, it is expected that more than 30% of the project investment can be saved. The tunnel drainage ditch design method based on multi-factor and mutual matching analysis of the present invention has strong practicality and promotion significance. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0058] Figure 1 It is a schematic elevation view of a tunnel in the ground;
[0059] Figure 2 Assemble a plan view of the tunnel drainage system;
[0060] Figure 3 compose a plan for the tunnel drainage system;
[0061] Figure 4 Provide detailed drawings of the tunnel drainage trench;
[0062] Figure 5 Elevation drawing of transverse drainage pipe arrangement when one longitudinal drainage ditch is provided;
[0063] Figure 6 This is the elevation view of the horizontal drainage pipe layout when two longitudinal drainage ditches are set up.
[0064] In each figure:
[0065] 1. Strata;
[0066] 2. Tunnel;
[0067] 21. Primary ring support;
[0068] 22. Second ring support;
[0069] 221, arch wall surface;
[0070] 23. Under-road filling structure;
[0071] 231. Road surface;
[0072] 3. Tunnel underground water channel;
[0073] 4. Waterproof board between the primary ring and the second ring support;
[0074] 5. Longitudinal water collection tank;
[0075] 51. The first longitudinal water collection tank;
[0076] 52. Second longitudinal water collection tank;
[0077] 6. Horizontal drainage pipe;
[0078] 61. The first set of transverse drain pipes;
[0079] 62. The second set of transverse drain pipes;
[0080] 63. The third set of transverse drain pipes;
[0081] 64. The fourth set of horizontal drain pipes;
[0082] 7. Longitudinal drainage ditch;
[0083] 71. First side ditch;
[0084] 72. Second side ditch;
[0085] 73. Middle ditch. DETAILED DESCRIPTION
[0086] The present invention is further described in detail below in conjunction with embodiments.
[0087] Those skilled in the art will appreciate that the following examples are only used to illustrate the present invention and should not be considered to limit the scope of the present invention. If no specific techniques or conditions are specified in the examples, the techniques or conditions described in the literature in the art or the product specifications are used. If the manufacturer of the materials or equipment used is not specified, they are all conventional products that can be purchased.
[0088] A tunnel drainage trench design method based on multi-factor and mutual matching analysis, wherein the tunnel drainage trench comprises a plurality of transverse drainage pipes and 1 to 3 longitudinal drainage trenches, comprising the following steps:
[0089] Step (1): Collect basic information on the tunnel, hydrogeological conditions and water inflow, and calculate the actual water inflow reduction factor Z 1 ;
[0090] Step (2): Analyze the crystallization blockage of the drainage ditch according to the groundwater quality of the tunnel site, and calculate the water quality crystallization drainage reduction coefficient Z 2 ;
[0091] Step (3): Analyze the tunnel construction party’s previous tunnel project drainage system implementation performance and calculate the construction blockage drainage reduction coefficient Z 3 and the drainage reduction factor Z of the layout deviation 4 ;
[0092] Step (4), according to the water quality crystallization drainage reduction coefficient Z obtained in step (2) 2 , the construction blockage drainage reduction coefficient Z obtained in step (3) 3 , Stakeout deviation drainage reduction factor Z 4 , as well as the roughness coefficient, hydraulic radius, set-out slope and water flow cross-sectional area of the pre-constructed transverse drainage pipes and longitudinal drainage ditches, and use the pipe ditch hydraulic calculation formula to calculate the drainage capacity of each transverse drainage pipe and each longitudinal drainage ditch;
[0093] Step (5), respectively verifying and analyzing the matching of the overall drainage capacity of the tunnel trench and the matching of the drainage capacity of the transverse drainage pipe and the longitudinal drainage ditch;
[0094] Step (6), if the matching verification result of step (5) is satisfied, the construction is carried out according to the parameters of the pre-constructed transverse drainage pipes and longitudinal drainage ditches; if the matching verification result of step (5) is not satisfied, the parameters of the pre-constructed transverse drainage pipes and longitudinal drainage ditches are adjusted, and steps (4) to (5) are repeated until the matching verification result is satisfied.
[0095] Specifically, in step (1):
[0096] The basic conditions of the tunnel include tunnel length, cross-section size, and longitudinal slope; the number of longitudinal drainage ditches in the tunnel is determined according to the cross-section size of the tunnel and is not greater than 80m. 2 1 or 2 lines are set up when the length is greater than 80m 2 2 or 3 drainage ditches are set up; the slope of the longitudinal drainage ditch should be consistent with the longitudinal slope of the tunnel;
[0097] The hydrogeological profile is obtained from the tunnel geological survey report, including groundwater types; the groundwater types include hard water and non-hard water;
[0098] For hard water, the effect of water crystallization on the blockage of the drainage ditch is considered according to step (2); the water inflow information is obtained from the tunnel geological survey report, including the predicted groundwater inflow and outflow ratio; the actual tunnel inflow calculation takes into account the 20% over-inflow degree and the actual inflow reduction factor Z 1 The calculation formula is: 1 =(1+20%)×outflow ratio; the actual water inflow calculation formula for the tunnel is: Q sj =Z 1 × Predicted water inflow;
[0099] For non-hard water, the actual water inflow reduction factor Z is not considered, and the effect of water crystallization on the blockage of drainage ditches is 1 Take 1.
[0100] Specifically, the specific method of step (2) is:
[0101] Analyze the crystallization blockage of drainage ditches in the vicinity of the proposed tunnel and / or in no less than 5 existing tunnels in the same area; consult the special maintenance inspection report of the drainage ditches of the existing tunnels every three years, and statistically average the proportion of the crystallization blockage area of the drainage ditches of each tunnel during the previous inspections to the cross-sectional area of the ditches to obtain the crystallization blockage ratio of the drainage ditches of each tunnel; the crystallization blockage ratio of the drainage ditches of the proposed tunnel is the average value of the crystallization blockage ratios of the drainage ditches of each existing tunnel, and the water quality crystallization drainage reduction coefficient Z is 2 The calculation formula is: 2 =1-crystallization blockage ratio of drainage pipes in the proposed tunnel;
[0102] The area adjacent to the proposed tunnel refers to the area with a radius of 60km with the midpoint of the tunnel as the center; the similar area refers to the area with the same hydrogeological type as the area where the proposed tunnel is located.
[0103] Specifically, the specific method of step (3) is:
[0104] The construction performance of the drainage system of no less than 5 existing tunnels of the proposed tunnel construction party was analyzed, and the data on the two types of defects of slag block and garbage blockage and construction layout deviation in the tunnel drainage system quality inspection report were reviewed; the ratio of the length of the drainage ditch with slag block and garbage blockage and the length of the section with construction layout deviation in each existing tunnel drainage ditch was calculated to obtain the ratio of slag block and garbage blockage and construction layout deviation in the drainage ditch of each existing tunnel;
[0105] The ratio of slag-block garbage blocking in the drainage ditch of the proposed tunnel is the average ratio of slag-block garbage blocking in the drainage ditch of each existing tunnel. The ratio of no slag-block garbage blocking = 1-the ratio of slag-block garbage blocking. Considering the remaining 30% of the slag-block garbage blocking in the drainage ditch of the proposed tunnel after rectification, the construction blockage drainage reduction coefficient Z is calculated. 3 , the specific calculation formula is: Z 3 = No slag block garbage blocking ratio + 30% × slag block garbage blocking ratio;
[0106] The construction layout deviation ratio of the drainage ditch of the proposed tunnel is the average of the construction layout deviation ratios of the drainage ditch of each existing tunnel. The deviation ratio without construction layout = 1-the deviation ratio with construction layout. Considering the remaining 30% of the construction layout deviation of the drainage ditch of the proposed tunnel after rectification, the layout deviation drainage reduction coefficient Z is calculated. 4 , the specific calculation formula is: Z 4= Deviation ratio without construction layout + 30% × Deviation ratio with construction layout.
[0107] Specifically, in step (4), the trench hydraulic calculation formula is as follows:
[0108]
[0109] Where: Q gg —The drainage capacity of a single pipe of a horizontal drainage pipe or a single ditch of a longitudinal drainage ditch, in m 3 / s; n—roughness coefficient of transverse drainage pipe or longitudinal drainage ditch; R—hydraulic radius, unit m, hydraulic radius is the ratio of water flow cross-sectional area to the length of wetted boundary of water flow cross-sectional area; i—slope of transverse drainage pipe or longitudinal drainage ditch; A—water flow cross-sectional area of transverse drainage pipe or longitudinal drainage ditch, unit m 2 .
[0110] Specifically, in step (5), the drainage capacity matching verification is analyzed in different ways according to the number of longitudinal drainage ditches set, specifically including:
[0111] (1) When there are one or two longitudinal drainage ditches:
[0112] The transverse drainage pipes are flow passages connecting the longitudinal drainage ditch and the longitudinal water storage grooves on both sides, and there are 2 groups in total; when there is 1 longitudinal drainage ditch, the left side of the drainage ditch axis is the first group, and the right side of the drainage ditch axis is the second group; when there are 2 longitudinal drainage ditches, the left side of the tunnel axis is the first group, and the right side of the tunnel axis is the second group; the transverse drainage pipes are arranged at equal intervals along the length direction of the tunnel according to the spacing of each group;
[0113] The calculation formula for the drainage capacity of each group of horizontal drainage pipes is as follows:
[0114] Qgroup = (L + d) × Qgg
[0115] Where: Q 组 —Drainage capacity of the horizontal drainage pipe group, unit: m 3 / day; L—tunnel length, unit: m; d—spacing of transverse drainage pipes along the tunnel length, unit: m- 1 ; Qgg—the drainage capacity of a single lateral drainage pipe calculated in step (4), in m 3 / sky;
[0116] Total drainage capacity of lateral drainage pipes = drainage capacity of the first group + drainage capacity of the second group;
[0117] The total drainage capacity of the longitudinal drainage ditch is the sum of the single ditch Qgg of all longitudinal drainage ditches;
[0118] The matching verification of the overall drainage capacity of the tunnel trench requires comparing the minimum value of the total drainage capacity of the lateral drainage pipe and the total drainage capacity of the longitudinal drainage ditch with the actual water inflow of the tunnel. If 1.1≤min(total drainage capacity of the lateral drainage pipe, total drainage capacity of the longitudinal drainage ditch) / Qs j If ≤1.3, the matching is satisfied, otherwise it is not satisfied;
[0119] The matching verification of the drainage capacity of the horizontal drainage pipe and the vertical drainage ditch requires comparing the total drainage capacity of the horizontal drainage pipe with the total drainage capacity of the vertical drainage ditch. If 0.85≤total drainage capacity of the horizontal drainage pipe / total drainage capacity of the vertical drainage ditch≤1.15, the matching is satisfied, otherwise it is not satisfied;
[0120] (2) When there are three longitudinal drainage ditches:
[0121] The longitudinal drainage ditch includes 2 side ditches and 1 middle ditch;
[0122] There are 4 groups of transverse drainage pipes: 2 groups on the side are flow channels connecting the longitudinal water storage grooves on both sides and the 2 side ditches. The left side of the side is the first group, and the right side of the side is the second group. They are arranged at equal intervals along the length of the tunnel; 2 groups on the middle side are flow channels connecting the side ditches and the middle ditch. The left side of the middle side is the third group, and the right side of the middle side is the fourth group. They are arranged at equal intervals along the length of the tunnel.
[0123] The calculation formula for the drainage capacity of each group of horizontal drainage pipes is as follows:
[0124] Qgroup = (L + d) × Qgg
[0125] Where: Q 组 —Drainage capacity of the horizontal drainage pipe group, unit: m 3 / day; L—tunnel length, unit: m; d—spacing of transverse drainage pipes along the tunnel length, unit: m- 1 ; Qgg—the drainage capacity of a single lateral drainage pipe calculated in step (4), in m 3 / sky;
[0126] The total drainage capacity of the side transverse drainage pipes = the drainage capacity of the first group + the drainage capacity of the second group.
[0127] The total drainage capacity of the middle side transverse drainage pipe = the drainage capacity of the third group + the drainage capacity of the fourth group;
[0128] The total drainage capacity of the three longitudinal drainage ditches is the sum of the Qgg of the three longitudinal drainage ditches; the total drainage capacity of the middle ditch of the longitudinal drainage ditch is the Qgg of the middle ditch of the longitudinal drainage ditch;
[0129] The matching verification of the overall drainage capacity of the tunnel trench requires comparing the minimum value of the total drainage capacity of the side lateral drainage pipes and the total drainage capacity of the three longitudinal drainage ditches with the actual water inflow of the tunnel. If 1.1≤min(total drainage capacity of the side lateral drainage pipes, total drainage capacity of the three longitudinal drainage ditches) / Qs j If ≤1.3, the matching is satisfied, otherwise it is not satisfied;
[0130] The verification of the matching of drainage capacity of the transverse drainage pipe and the longitudinal drainage ditch includes two items, and both items should be satisfied: the first item is to compare the total drainage capacity of the side transverse drainage pipe with the total drainage capacity of the three longitudinal drainage ditches. If 0.85≤total drainage capacity of the side transverse drainage pipe / total drainage capacity of the three longitudinal drainage ditches≤1.15, then the matching is satisfied, otherwise it is not satisfied; the second item is to compare the total drainage capacity of the middle transverse drainage pipe with the total drainage capacity of the middle ditch of the longitudinal drainage ditch. If 0.85≤total drainage capacity of the middle transverse drainage pipe / total drainage capacity of the middle ditch of the longitudinal drainage ditch≤1.15, then the matching is satisfied, otherwise it is not satisfied.
[0131] Application Examples
[0132] like Figure 1 As shown, for a proposed tunnel 2 in the stratum 1, the groundwater in the tunnel site is relatively abundant and can flow to the tunnel 2 along the tunnel groundwater channel 3. If the drainage system is not properly set up, the groundwater can seep out from the arch wall surface 221 of the tunnel 2, and / or flow from the underground filling structure 23 of the tunnel 2 to the road surface 231 and emerge from the road surface 231, which will cause harm to the operation and structural safety and durability of the tunnel 2. Therefore, it is necessary to establish a complete drainage system, especially to effectively drain the groundwater.
[0133] The specific way in which the drainage system drains groundwater is that after the groundwater flows from the tunnel groundwater channel 3 to the primary ring support 21, in order to prevent it from further flowing to the secondary ring support 22, a waterproof plate 4 is set between the primary ring support 21 and the secondary ring support 22. The groundwater flows from the waterproof plate 4 between the primary ring and the secondary ring support to the longitudinal water storage grooves 5 on both sides of the tunnel 2, and then flows from the longitudinal water storage grooves 5 through the transverse drainage pipes 6 to the longitudinal drainage ditch 7, and finally is discharged to the outside of the tunnel through the longitudinal drainage ditch 7.
[0134] The transverse drainage pipe 6 and the longitudinal drainage ditch 7 are the most important components of the tunnel drainage system. The tunnel drainage pipe ditch design method based on multi-factor and mutual matching analysis of the present invention is used for analysis, which is specifically implemented in the following steps:
[0135] (1) Collect information on the basic conditions of the tunnel, hydrogeological conditions, and water inflow, and calculate the actual water inflow reduction factor Z 1 .
[0136] The proposed Tunnel 2 is a two-lane tunnel with a length of 5,300m and a cross-section of 100m. 2 The longitudinal slope of the road section is 1.90% one-way slope; the longitudinal drainage ditch 7 is arranged as 3 rectangular trenches, and the setting slope of the longitudinal drainage ditch 7 should be the same as the longitudinal slope of the tunnel 2, which is 1.9%;
[0137] The hydrogeological profile and water inflow information of Tunnel 2 were obtained from the geological survey report. The stratum 1 where Tunnel 2 is located is located in the limestone area, and the groundwater is hard water. The predicted water inflow is 1.2×10 5 m 3 / day, after adopting measures such as grouting to block water, the outflow ratio is 0.75;
[0138] The actual water inflow calculation of Tunnel 2 takes into account 20% over-inflow and the actual water inflow reduction factor Z 1 =(1+20%)×0.75=0.9, actual water inflow Q sj =Z 1 ×1.2×10 5 m 3 / day = 1.08 × 10 5 m 3 / sky.
[0139] (2) According to the groundwater quality of the tunnel site, the crystallization blockage of the drainage ditch is analyzed and the water quality crystallization drainage reduction coefficient Z is calculated. 2 .
[0140] The groundwater in stratum 1 is hard water. When the groundwater is discharged from the longitudinal water storage trough 5 through the transverse drainage pipe 6 and the longitudinal drainage ditch 7, crystal blockage is easy to occur in the cross-section of the pipe trench. The engineering analogy method is adopted to analyze the crystal blockage of the drainage pipe trenches of 5 tunnels in the adjacent areas of tunnel 2 and 2 tunnels in the same area. The special maintenance inspection report data of the drainage pipe trenches of the 5 tunnels every three years is consulted. The proportion of the crystal blockage area of the drainage pipe trench to the cross-sectional area of the pipe trench during the previous inspections of each tunnel is shown in Table 1.
[0141] Table 1 Statistics of the percentage of crystallization blockage area during the inspection of drainage trenches in built tunnels
[0142]
[0143] The proportion of crystallization blockage area of drainage trenches in each tunnel during previous inspections to the cross-sectional area of the trenches was statistically averaged to obtain the crystallization blockage ratio of drainage trenches in each tunnel. The results are shown in Table 2:
[0144] Table 2 Statistics of crystallization blockage ratio of drainage trenches in built tunnels
[0145]
[0146] The crystallization blockage ratio of the drainage ditch of Tunnel 2 is the average value of the crystallization blockage ratios of the drainage ditch of 5 existing tunnels. The water quality crystallization drainage reduction coefficient Z of the drainage ditch of Tunnel 2 is 2 =1-drainage pipe crystallization blockage ratio=1-(31%+28%+33%+31%+27%)÷5=0.7.
[0147] (3) Analyze the tunnel construction party’s previous tunnel project drainage system implementation performance and calculate the construction blockage drainage reduction factor Z 3 and the drainage reduction factor Z of the layout deviation 4 .
[0148] The past construction performance of the tunnel drainage system of the construction party of Tunnel 2 was analyzed. Five built tunnels were selected. The data on the two types of defects of slag block and garbage block in the drainage ditch and construction layout deviation in the quality inspection report of each tunnel drainage system were reviewed. The length of the slag block and garbage block section and the length of the construction layout deviation section of the drainage ditch of each tunnel were counted respectively. The statistical results are shown in Table 3:
[0149] Table 3 Statistics of defective length of tunnel drainage trench of the construction party
[0150]
[0151] The ratio of slag-block garbage blockage in the drainage trenches of the five built tunnels is the ratio of the length of the slag-block garbage blockage section to the tunnel length, and the ratio of the construction layout deviation in the drainage trench is the ratio of the length of the construction layout deviation section to the tunnel length. The calculation results are shown in Table 4:
[0152] Table 4 The length ratio of defective section of the tunnel drainage trench of the construction party
[0153]
[0154] The ratio of slag-block garbage blocking in the drainage ditch of Tunnel 2 is the average ratio of slag-block garbage blocking in the drainage ditch of the 5 existing tunnels built by the construction party, specifically: (15%+18%+14%+19%+17%)÷5=0.17, the ratio of no slag-block garbage blocking=1-the ratio of slag-block garbage blocking=0.83, the drainage ditch of Tunnel 2 is blocked by slag-block garbage and the construction blockage drainage reduction coefficient is calculated based on the remaining 30% after rectification, Z 3 =0.83+0.17×0.3=0.881;
[0155] The construction layout deviation ratio of the drainage trench of Tunnel 2 is the average of the construction layout deviation ratios of the drainage trenches of the 5 existing tunnels built by the construction party, specifically: (10% + 12% + 9% + 14% + 11%) ÷ 5 = 0.11, the non-construction layout deviation ratio = 1-construction layout deviation ratio = 0.89, the construction layout deviation of the drainage trench of Tunnel 2 is calculated according to the remaining 30% after rectification to calculate the layout deviation drainage reduction coefficient, Z 4 =0.89+0.11×0.3=0.923.
[0156] (4) Establish a three-discharge reduction factor Z 2 , Z 3 , Z 4 The hydraulic calculation formula for the trench is used to preliminarily propose the cross-sectional dimensions, slope, spacing and other parameters of the transverse drainage pipes and longitudinal drainage ditches, and calculate the drainage capacity of each transverse drainage pipe and longitudinal drainage ditch.
[0157] Considering the drainage reduction factor Z 2 , Z 3 , Z 4 The pipe and ditch hydraulic calculation formula is:
[0158]
[0159] Where: Qgg - drainage capacity of a single horizontal drainage pipe or a single vertical drainage ditch (m 3 / sky);
[0160] n—roughness coefficient of horizontal drainage pipe or longitudinal drainage ditch;
[0161] R—hydraulic radius (m), the ratio of the cross-sectional area of the water flow to the length of the wetted boundary of the water flow in the cross-sectional area;
[0162] i—slope of trench setting out;
[0163] A - trench water flow cross-sectional area (m 2 ).
[0164] The calculation formula for the drainage capacity of each group of horizontal drainage pipes is:
[0165] QQ group = (L ÷ d) × Qgg……………………………………(2)
[0166] Where: Q 组 —Drainage capacity of horizontal drainage pipe group (m 3 / sky);
[0167] L—tunnel length (m);
[0168] d—spacing of transverse drainage pipes along the tunnel length (m -1 );
[0169] Q gg — The drainage capacity of a single horizontal drainage pipe calculated by formula (1) (m 3 / sky).
[0170] The preliminary proposed setting method and relevant parameters of the horizontal drainage pipes and longitudinal drainage ditches are as follows:
[0171] The transverse drainage pipe 6 adopts a double-wall corrugated pipe with a diameter of d=0.11m, and the longitudinal drainage ditch 7 adopts a rectangular cast-in-place concrete ditch; the longitudinal drainage ditch 7 includes three ditches, namely the first side ditch 71, the second side ditch 72 and the middle ditch 73, and the transverse drainage pipe 6 includes four groups of pipes, namely the first group of transverse drainage pipes 61, the second group of transverse drainage pipes 62, the third group of transverse drainage pipes 63 and the fourth group of transverse drainage pipes 64; the first group of transverse drainage pipes 61 connects the first longitudinal water collection trough 51 and the first side ditch 71, the second group of transverse drainage pipes 62 connects the second longitudinal water collection trough 52 and the second side ditch 72, the third group of transverse drainage pipes 63 connects the first side ditch 71 and the middle ditch 73, and the fourth group of transverse drainage pipes 64 connects the second side ditch 72 and the middle ditch 73; a part of the groundwater is discharged through the first side ditch 71 and the second side ditch 72, and the other part flows from the first side ditch 71 and the second side ditch 72 through the third group of transverse drainage pipes 63 and the fourth group of transverse drainage pipes 64 to the middle ditch 73 for discharge.
[0172] The water flow in the horizontal drainage pipe 6 is considered to be full cross-sectional flow, n 6 =0.027, R 6 =d / 4, A 6 =πd 2 / 4, the slope and spacing of each transverse drainage pipe are: the first group of transverse drainage pipes 61 has a slope of i 61 = 5%, one pipe is laid every 28m along the longitudinal direction of the tunnel; the second set of transverse drainage pipes 62 is laid out with a slope of i 62 = 5%, one pipe is laid every 28m along the longitudinal direction of the tunnel; the third group of transverse drainage pipes 63 are laid out with a slope of i 63 = 8%, one pipe is laid every 120m along the longitudinal direction of the tunnel; the fourth group of transverse drainage pipes 64 are laid out with a slope of i 64 =6%, one is laid every 60m along the longitudinal direction of the tunnel.
[0173] The water flow in the longitudinal drainage ditch 7 is a non-full cross-sectional flow. Considering a certain degree of fullness, the slope of the layout is the same as the longitudinal slope i of the tunnel. 7 =1.9%, n 7 =0.012, hydraulic radius R 7 The width, height and fullness of each ditch are calculated as follows: the first side ditch 71 is 0.4m wide, 0.75m high, and has a fullness of 0.8; the second side ditch 72 is 0.4m wide, 0.55m high, and has a fullness of 0.8; the middle ditch 73 is 0.60m wide, 0.70m high, and has a fullness of 0.9.
[0174] Substituting each parameter into formula (1) and formula (2), the drainage capacity of each group of transverse drainage pipes 6 and each longitudinal drainage ditch 7 is calculated:
[0175] The drainage capacity Q of the first set of transverse drainage pipes 61 61 =66751(m 3 / sky);
[0176] The drainage capacity Q of the second set of transverse drainage pipes 62 62 =66751(m 3 / sky);
[0177] The drainage capacity Q of the third set of transverse drainage pipes 63 63 =19701(m 3 / sky);
[0178] The drainage capacity Q of the fourth set of transverse drainage pipes 64 is 64 =34124(m 3 / sky);
[0179] Drainage capacity Q of the first side ditch 71 71 =38276(m 3 / sky);
[0180] Drainage capacity Q of the second side ditch 72 72 =26487(m 3 / sky);
[0181] Drainage capacity Q of the middle ditch 73 73 =73812(m 3 / sky);
[0182] (5) Establish matching verification standards, and conduct verification and analysis on the matching between the overall drainage capacity of the tunnel trench and the actual water inflow, and the matching between the drainage capacity of the transverse drainage pipe and the longitudinal drainage ditch.
[0183] The matching verification standards include the matching verification standards for the drainage capacity of the entire trench and the matching verification standards for the drainage capacity between the pipe and the trench. Among them, the matching verification of the drainage capacity of the entire trench is to compare the smaller value of the drainage capacity of the horizontal drainage pipe and the vertical drainage ditch with the actual water inflow. If 1.1≤the smaller value of the drainage capacity of the horizontal drainage pipe and the vertical drainage ditch / the actual water inflow≤1.3, then the matching is satisfied, otherwise it is not satisfied.
[0184] The matching verification of drainage capacity between the horizontal drainage pipe and the vertical drainage ditch is to compare the drainage capacity of the horizontal drainage pipe with the drainage capacity of the vertical drainage ditch. If 0.85≤the drainage capacity of the horizontal drainage pipe / the drainage capacity of the vertical drainage ditch≤1.15, the matching is satisfied, otherwise it is not satisfied. According to the above standards, the matching verification of the initial trench parameters is carried out:
[0185] ①. Verification of matching of overall drainage capacity of trench:
[0186] The groundwater flows from the longitudinal water storage tank 5 through the first set of transverse drainage pipes 61 and the second set of transverse drainage pipes 62 to the longitudinal drainage ditch 7. First, the total drainage capacity of the first set of transverse drainage pipes 61 and the second set of transverse drainage pipes 62 is compared with the total drainage capacity of the first side ditch 71, the second side ditch 72, and the middle ditch 73: Q 61 +Q 62 =133502(m 3 / day), Q 71 +Q 72 +Q 73 =138575(m 3 / day), Q 61 +Q 62 71 +Q 72 +Q 73 , Q 61 +Q 62 For a small value, further increase Q 61 +Q 62 The actual water inflow Q sj For comparison: (Q 61 +Q 62 ) / Q sj =1.236, satisfying 1.1≤(Q 61 +Q 62 ) / Q s ≤1.3, so the overall drainage capacity of the trench matches the actual water inflow of the tunnel.
[0187] ②. Verification of the matching of drainage capacity between the horizontal drainage pipe 6 and the longitudinal drainage ditch 7, including two items:
[0188] In the first item, as mentioned above, groundwater flows from the longitudinal water storage tank 5 through the first set of transverse drainage pipes 61 and the second set of transverse drainage pipes 62 to the longitudinal drainage ditch 7. Therefore, the total drainage capacity of the first set of transverse drainage pipes 61 and the second set of transverse drainage pipes 62 is compared with the total drainage capacity of the first side ditch 71, the second side ditch 72, and the middle ditch 73: Q 61 +Q 62 =133502(m 3 / day), Q 71 +Q 72 +Q 73 =138575(m 3 / day), (Q 61 +Q 62 ) / (Q 71 +Q 72 +Q 73 )=0.963, satisfying 0.85≤(Q 61 +Q 62 ) / (Q 71 +Q 72 +Q 73 )≤1.15, so the drainage capacity of the first group of transverse drainage pipes 61, the second group of transverse drainage pipes 62 and the longitudinal drainage ditch 7 match.
[0189] Second, after the groundwater is partially drained from the first side ditch 71 and the second side ditch 72, the remaining part is led to the middle ditch 73 through the third group of transverse drainage pipes 63 and the fourth group of transverse drainage pipes 64 for drainage. Therefore, the total drainage capacity of the third group of transverse drainage pipes 63 and the fourth group of transverse drainage pipes 64 is compared with the drainage capacity of the middle ditch 73: Q 63 +Q 64 =53825(m 3 / day), Q 73 =73812(m 3 / day), (Q 63 +Q 64 ) / Q 73 =0.729, does not satisfy 0.85≤(Q 63 +Q 64 ) / Q 73 ≤1.15, so the drainage capacities of the third group of transverse drainage pipes 63, the fourth group of transverse drainage pipes 64 and the middle ditch 73 do not match.
[0190] In summary, the cross-sectional dimensions, longitudinal slope, spacing and other parameters of the transverse drainage pipe 6 and the longitudinal drainage ditch 7 initially designed in step (5) do not meet the matching requirements and cannot be used for design.
[0191] (6) If the matching check in step (5) is not satisfied, the drainage trench parameters are modified, and the calculation and verification are repeated until the matching is satisfied. The trench parameters that meet the matching are then used for the design.
[0192] According to the verification in step (5), the overall drainage capacity matching of the pipe trench meets the requirements, and the drainage capacity matching between the pipe and the trench partially meets and partially does not meet, so it is necessary to partially adjust the parameters of the initially proposed transverse drainage pipe and longitudinal drainage ditch. According to the analysis of the verification process in step (6), do not adjust the parameters of the transverse drainage pipe 6, the first side ditch 71, and the second side ditch 72 first, and try to adjust the cross-sectional size of the middle ditch 73 (reduce it), calculate and verify, and if it still does not meet the matching requirements, adjust it again.
[0193] The height of the middle ditch 73 is adjusted from 0.7m to 0.6m, and the other parameters remain unchanged. Substitute the parameters into formula (1) to calculate the drainage capacity Q' of the middle ditch 73 73 =61097(m 3 / day), Q 71 +Q 72 +Q' 73=125860 (m3 / day).
[0194] Q 61 +Q 62 >Q 71 +Q 72 +Q' 73 , and further Q 71 +Q 72 +Q' 73 The actual water inflow Q sj Compare: (Q 71 +Q 72 +Q' 73 ) / Q sj =1.17, satisfying 1.1≤(Q 71 +Q 72 +Q' 73 ) / Q sj ≤1.3, so the overall drainage capacity of the trench after adjustment matches the actual water inflow of the tunnel.
[0195] (Q 61 +Q 62 ) / (Q 71 +Q 72 +Q' 73 )=1.06, satisfying 0.85≤(Q 61 +Q 62 ) / (Q 71 +Q 72 +Q' 73 )≤1.15, so the drainage capacity of the first group of transverse drainage pipes 61, the second group of transverse drainage pipes 62 and the longitudinal drainage ditch 7 are matched.
[0196] (Q 63 +Q 64 ) / Q' 73 =0.881, satisfying 0.85≤(Q 63 +Q 64 ) / Q' 73 ≤1.15, so the drainage capacities of the third group of transverse drainage pipes 63, the fourth group of transverse drainage pipes 64 and the middle ditch 73 match.
[0197] Based on the above analysis, after the cross-sectional parameters of the middle ditch 73 are adjusted, the matching of the overall drainage capacity of the tunnel trench and the actual water inflow, as well as the matching of the drainage capacity between the transverse drainage pipe and the longitudinal drainage ditch, all meet the requirements. Therefore, the cross-sectional parameters of the adjusted middle ditch 73 and other trench parameters that have not been adjusted after the initial design can be used for design.
[0198] The existing tunnel drainage system is generally set up in the manner of "taking the surveyed water gushing volume before design, and draining it after verification; after completion, if it is blocked, it will be reopened; if tunnel defects occur, they will be treated". The horizontal drainage pipes and longitudinal drainage ditches, which are the main components of the drainage system, are designed according to the surveyed water gushing volume, empirical methods and a large surplus coefficient. The influence of groundwater pre-treatment measures on the surveyed water gushing volume, and the influence of factors such as groundwater quality and trench construction quality on the trench drainage capacity are not considered. This often leads to unfavorable structural stress of the tunnel due to excessive surplus drainage space in the drainage trench, or water defects due to insufficient drainage space in the drainage trench, which in turn affects the operational safety and structural durability of the tunnel, and significantly increases the operating and maintenance costs of the tunnel.
[0199] Compared with the existing technology for tunnel drainage design, the tunnel drainage trench design method based on multi-factor and mutual matching analysis of the present invention is used to guide this application example. The actual water inflow used in the drainage calculation is reduced by the reduction factor Z. 1 After the revision, it is closer to reality; the design of the horizontal drainage pipes and longitudinal drainage ditches of the drainage system is based on survey statistics, and the hydraulic calculation introduces the reduction factor Z 2 , Z 3 , Z 4 The drainage capacity of the trench is corrected, and the matching of the overall drainage capacity of the tunnel trench with the actual water inflow, and the matching of the drainage capacity between the transverse drainage pipe and the longitudinal drainage ditch are verified and analyzed respectively. According to the verification results, the trench design parameters are further adjusted to achieve the matching and optimal design purpose, which solves the practical drainage capacity and setting rationality problems of the tunnel drainage system that have long been ignored. It has the advantages of safety, economy, durability, etc. By comparing with the existing engineering technology, it is expected to save more than 30% of the project investment. The present invention has strong practicality and significance for promotion and application.
[0200] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A tunnel drainage ditch design method based on multi-factor and mutual matching analysis, wherein the tunnel drainage ditch comprises a plurality of transverse drainage pipes and 1 to 3 longitudinal drainage ditches, characterized in that: The steps include: Step (1), collecting basic information of the tunnel, hydrogeological profile and water inflow, and calculating the actual water inflow reduction coefficient Z1; Step (2), analyzing the crystallization blockage of the drainage ditch according to the groundwater quality of the tunnel site, and calculating the water quality crystallization drainage reduction coefficient Z2; Step (3), analyzing the tunnel construction party's previous tunnel project drainage system implementation performance, and calculating the construction blockage drainage reduction coefficient Z3 and the layout deviation drainage reduction coefficient Z4; Step (4), according to the water quality crystallization drainage reduction coefficient Z2 obtained in step (2), the construction blockage drainage reduction coefficient Z3 obtained in step (3), the layout deviation drainage reduction coefficient Z4, and the roughness coefficient, hydraulic radius, layout slope and water flow cross-sectional area of the pre-constructed transverse drainage pipes and longitudinal drainage ditches, the drainage capacity of each transverse drainage pipe and each longitudinal drainage ditch is calculated using the pipe ditch hydraulic calculation formula; Step (5), respectively verifying and analyzing the matching of the overall drainage capacity of the tunnel trench and the matching of the drainage capacity of the transverse drainage pipe and the longitudinal drainage ditch; Step (6), if the matching verification result of step (5) is satisfied, the construction is carried out according to the parameters of the pre-constructed transverse drainage pipes and longitudinal drainage ditches; if the matching verification result of step (5) is not satisfied, the parameters of the pre-constructed transverse drainage pipes and longitudinal drainage ditches are adjusted, and steps (4) to (5) are repeated until the matching verification result is satisfied.
2. The tunnel drainage trench design method based on multi-factor and mutual matching analysis according to claim 1 is characterized in that: In step (1): The basic conditions of the tunnel include tunnel length, cross-section size, and longitudinal slope; the number of longitudinal drainage ditches in the tunnel is determined according to the cross-section size of the tunnel and is not greater than 80m. 2 1 or 2 lines are set up when the length is greater than 80m 2 2 or 3 drainage ditches are set up; the slope of the longitudinal drainage ditch should be consistent with the longitudinal slope of the tunnel; The hydrogeological profile is obtained from the tunnel geological survey report, including groundwater types; the groundwater types include hard water and non-hard water; For hard water, the effect of water crystallization on the blockage of the drainage ditch is considered according to step (2); the water inflow information is obtained from the tunnel geological survey report, including the predicted groundwater inflow and outflow ratio; the actual tunnel inflow calculation considers 20% over-inflow, and the calculation formula of the actual inflow reduction coefficient Z1 is: Z1 = (1 + 20%) × outflow ratio; the calculation formula of the actual tunnel inflow is: Q sj =Z1×predicted water inflow; For non-hard water, the effect of water crystallization on the blockage of drainage pipes is not considered, and the actual water inflow reduction coefficient Z1 is taken as 1.
3. The tunnel drainage trench design method based on multi-factor and mutual matching analysis according to claim 1 is characterized in that: The specific method of step (2) is: Analyze the crystallization blockage of drainage ditches in the vicinity of the proposed tunnel and / or in no less than 5 existing tunnels in the same area; consult the special maintenance inspection report of the drainage ditches of the existing tunnels every three years, and statistically average the proportion of the crystallization blockage area of the drainage ditches of each tunnel during the previous inspections to the cross-sectional area of the ditches to obtain the crystallization blockage ratio of the drainage ditches of each tunnel; the crystallization blockage ratio of the drainage ditches of the proposed tunnel is the average value of the crystallization blockage ratios of the drainage ditches of each existing tunnel, and the water quality crystallization drainage reduction coefficient Z2 is calculated as: Z2 = 1-crystalization blockage ratio of the drainage ditches of the proposed tunnel; The area adjacent to the proposed tunnel refers to the area with a radius of 60km with the midpoint of the tunnel as the center; the similar area refers to the area with the same hydrogeological type as the area where the proposed tunnel is located.
4. The tunnel drainage trench design method based on multi-factor and mutual matching analysis according to claim 1 is characterized in that: The specific method of step (3) is: The construction performance of the drainage system of no less than 5 existing tunnels of the proposed tunnel construction party was analyzed, and the data on the two types of defects of slag block and garbage blockage and construction layout deviation in the tunnel drainage system quality inspection report were reviewed; the ratio of the length of the drainage ditch with slag block and garbage blockage and the length of the section with construction layout deviation in each existing tunnel drainage ditch was calculated to obtain the ratio of slag block and garbage blockage and construction layout deviation in the drainage ditch of each existing tunnel; The ratio of slag-block garbage blocking in the drainage ditch of the proposed tunnel is the average ratio of slag-block garbage blocking in the drainage ditch of each existing tunnel, and the ratio of no slag-block garbage blocking = 1-the ratio of slag-block garbage blocking; considering the remaining 30% of the slag-block garbage blocking in the drainage ditch of the proposed tunnel after rectification, calculate the construction blockage drainage reduction coefficient Z3, the specific calculation formula is: Z3 = ratio of no slag-block garbage blocking + 30% × ratio of slag-block garbage blocking; The construction layout deviation ratio of the drainage trench of the proposed tunnel is the average value of the construction layout deviation ratios of the drainage trenches of all built tunnels, and the non-construction layout deviation ratio = 1-construction layout deviation ratio; considering the remaining 30% of the construction layout deviation of the drainage trench of the proposed tunnel after rectification, calculate the layout deviation drainage reduction coefficient Z4, and the specific calculation formula is: Z4 = non-construction layout deviation ratio + 30% × construction layout deviation ratio.
5. The tunnel drainage trench design method based on multi-factor and mutual matching analysis according to claim 1 is characterized in that: In step (4), the trench hydraulic calculation formula is as follows: Where: Q gg —The drainage capacity of a single pipe of a horizontal drainage pipe or a single ditch of a longitudinal drainage ditch, in m 3 / s; n—roughness coefficient of transverse drainage pipe or longitudinal drainage ditch; R—hydraulic radius, unit m, hydraulic radius is the ratio of water flow cross-sectional area to the length of wetted boundary of water flow cross-sectional area; i—slope of transverse drainage pipe or longitudinal drainage ditch; A—water flow cross-sectional area of transverse drainage pipe or longitudinal drainage ditch, unit m 2 .
6. The tunnel drainage trench design method based on multi-factor and mutual matching analysis according to claim 1 is characterized in that: In step (5), the drainage capacity matching verification is analyzed in different ways according to the number of longitudinal drainage ditches, specifically including: (1) When there are one or two longitudinal drainage ditches: The transverse drainage pipes are flow passages connecting the longitudinal drainage ditch and the longitudinal water storage grooves on both sides, and there are 2 groups in total; when there is 1 longitudinal drainage ditch, the left side of the drainage ditch axis is the first group, and the right side of the drainage ditch axis is the second group; when there are 2 longitudinal drainage ditches, the left side of the tunnel axis is the first group, and the right side of the tunnel axis is the second group; the transverse drainage pipes are arranged at equal intervals along the length direction of the tunnel according to the spacing of each group; The calculation formula for the drainage capacity of each group of horizontal drainage pipes is as follows: Q 组 =(L÷d)×Q gg Where: Q 组 —Drainage capacity of the horizontal drainage pipe group, unit: m 3 / day; L—tunnel length, unit: m; d—spacing of transverse drainage pipes along the tunnel length, unit: m -1 ;Q gg —The drainage capacity of a single transverse drainage pipe calculated in step (4), in m 3 / sky; Total drainage capacity of lateral drainage pipes = drainage capacity of the first group + drainage capacity of the second group; The total drainage capacity of the longitudinal drainage ditch is Q of all longitudinal drainage ditches. gg sum; The matching verification of the overall drainage capacity of the tunnel trench requires comparing the minimum value of the total drainage capacity of the lateral drainage pipe and the total drainage capacity of the longitudinal drainage ditch with the actual water inflow of the tunnel. If 1.1≤min(total drainage capacity of the lateral drainage pipe, total drainage capacity of the longitudinal drainage ditch) / Q sj If ≤1.3, the matching is satisfied, otherwise it is not satisfied; The matching verification of the drainage capacity of the horizontal drainage pipe and the vertical drainage ditch requires comparing the total drainage capacity of the horizontal drainage pipe with the total drainage capacity of the vertical drainage ditch. If 0.85≤total drainage capacity of the horizontal drainage pipe / total drainage capacity of the vertical drainage ditch≤1.15, the matching is satisfied, otherwise it is not satisfied; (2) When there are three longitudinal drainage ditches: The longitudinal drainage ditch includes 2 side ditches and 1 middle ditch; There are 4 groups of transverse drainage pipes: 2 groups on the side are flow channels connecting the longitudinal water storage grooves on both sides and the 2 side ditches. The left side of the side is the first group, and the right side of the side is the second group. They are arranged at equal intervals along the length of the tunnel; 2 groups on the middle side are flow channels connecting the side ditches and the middle ditch. The left side of the middle side is the third group, and the right side of the middle side is the fourth group. They are arranged at equal intervals along the length of the tunnel. The calculation formula for the drainage capacity of each group of horizontal drainage pipes is as follows: Q 组 =(L÷d)×Q gg Where: Q 组 —Drainage capacity of the horizontal drainage pipe group, unit: m 3 / day; L—tunnel length, unit: m; d—spacing of transverse drainage pipes along the tunnel length, unit: m -1 ;Q gg —The drainage capacity of a single transverse drainage pipe calculated in step (4), in m 3 / sky; The total drainage capacity of the side transverse drainage pipes = the drainage capacity of the first group + the drainage capacity of the second group. The total drainage capacity of the middle side transverse drainage pipe = the drainage capacity of the third group + the drainage capacity of the fourth group; The total drainage capacity of three longitudinal drainage ditches is Q gg The total drainage capacity of the longitudinal drainage ditch is Q gg ; The matching verification of the overall drainage capacity of the tunnel trench requires comparing the minimum value of the total drainage capacity of the side lateral drainage pipes and the total drainage capacity of the three longitudinal drainage ditches with the actual water inflow of the tunnel. If 1.1≤min(total drainage capacity of the side lateral drainage pipes, total drainage capacity of the three longitudinal drainage ditches) / Q sj If ≤1.3, the matching is satisfied, otherwise it is not satisfied; The verification of the matching of drainage capacity of the transverse drainage pipe and the longitudinal drainage ditch includes two items, and both items should be satisfied: the first item is to compare the total drainage capacity of the side transverse drainage pipe with the total drainage capacity of the three longitudinal drainage ditches. If 0.85≤total drainage capacity of the side transverse drainage pipe / total drainage capacity of the three longitudinal drainage ditches≤1.15, then the matching is satisfied, otherwise it is not satisfied; the second item is to compare the total drainage capacity of the middle transverse drainage pipe with the total drainage capacity of the middle ditch of the longitudinal drainage ditch. If 0.85≤total drainage capacity of the middle transverse drainage pipe / total drainage capacity of the middle ditch of the longitudinal drainage ditch≤1.15, then the matching is satisfied, otherwise it is not satisfied.
Citation Information
Patent Citations
V-shaped gully high-fill temporary drainage system and construction method thereof
CN113152628A
Intelligent drainage and pressure reduction system for tunnel
CN117888955A
Drainage structure in tunnel and method constructing thereof
KR1020130114904A
