Comprehensive energy system scheduling method, device, electronic equipment and storage medium

By constructing a hybrid game model and Shapley value method, the problem of balance between the relationship between the integrated energy system and the active distribution network is solved, energy utilization efficiency is improved, carbon emissions is reduced, and coordinated operation is achieved.

CN118657361BActive Publication Date: 2024-11-15INNER MONGOLIA UNIV OF SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411147472.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-11-15
Estimated Expiration
2044-08-21

AI Technical Summary

Technical Problem

The prior art is difficult to effectively balance the relationship between the integrated energy system and the active distribution network, and it is difficult to ensure the economic low-carbon operation of the integrated energy system in the active distribution network.

Method used

Build a hybrid game model between the target active distribution network and the target integrated energy system, obtain the equilibrium solution of purchase and sale electricity prices and the equilibrium solution of electric power through the Shapley value method, and based on the similarity of the equivalent output curve and total load curve of clean energy Cost sharing is corrected by the scheduling strategy.

Benefits of technology

The energy utilization efficiency of the integrated energy system in the active distribution network has been improved, carbon emissions have been reduced, and the coordinated operation of the integrated energy system and the active distribution network has been achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118657361B_ABST
    Figure CN118657361B_ABST
Patent Text Reader

Abstract

The present invention provides a method, device, electronic device and storage medium for scheduling an integrated energy system, and relates to the field of electric power technology. The method includes: constructing a hybrid game model between a target active distribution network and each target integrated energy system, solving the hybrid game model, obtaining a balanced solution of the purchase and sale price of electricity provided by the target active distribution network and a balanced solution of the purchase and sale power of each target integrated energy system to the target active distribution network, obtaining the original apportioned cost of each target integrated energy system through the Shapley value method, and correcting the original apportioned cost of each target integrated energy system based on target data to obtain the actual apportioned cost of each target integrated energy system. The method, device, electronic device and storage medium for scheduling an integrated energy system provided by the present invention can improve the energy utilization efficiency of the integrated energy system, reduce the carbon emissions of the integrated energy system, and realize the coordinated operation of the integrated energy system and the active distribution network.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electric power technology, and in particular to a comprehensive energy system scheduling method, device, electronic equipment and storage medium. Background Art

[0002] In recent years, with the increasing global energy crisis, climate warming, environmental pollution and other issues, promoting the construction of clean, economical and efficient energy supply has become a top priority for the development of power systems. However, incorporating a high proportion of renewable energy into the active distribution network (ADN) and building a new power system faces a series of challenges.

[0003] Integrated Energy System (IES) refers to an integrated energy production, supply and marketing system formed by organically coordinating and optimizing the generation, transmission and distribution (energy supply network), conversion, storage, consumption and trading of various energy sources during the planning, construction and operation process. As a technology that can achieve the coupling of multiple clean energy sources, it can improve the utilization rate of energy and play an important role in the new power system.

[0004] However, as the number of integrated energy systems connected to active distribution networks increases, it is difficult for relevant technologies to effectively balance the relationship between integrated energy systems and active distribution networks, and it is also difficult to ensure the economical and low-carbon operation of integrated energy systems connected to active distribution networks. Therefore, how to improve the energy utilization efficiency of integrated energy systems in active distribution networks, reduce carbon emissions of integrated energy systems in active distribution networks, and achieve coordinated operation of integrated energy systems and active distribution networks by dispatching integrated energy systems in active distribution networks is a technical problem that needs to be solved in this field. Summary of the invention

[0005] The present invention provides a comprehensive energy system scheduling method, device, electronic device and storage medium, which are used to solve the defects in the prior art that it is difficult to effectively balance the relationship between the comprehensive energy system and the active distribution network, and it is also difficult to ensure the economical and low-carbon operation of the comprehensive energy system connected to the active distribution network. By scheduling the comprehensive energy system in the active distribution network, the energy utilization efficiency of the comprehensive energy system in the active distribution network is improved, the carbon emissions of the comprehensive energy system in the active distribution network are reduced, and the coordinated operation of the comprehensive energy system and the active distribution network is realized.

[0006] The present invention provides a comprehensive energy system scheduling method, comprising the following steps.

[0007] Constructing a hybrid game model between the target active distribution network and each of the target integrated energy systems, in which the target active distribution network is the leader relative to each of the target integrated energy systems, each of the target integrated energy systems is a follower relative to the target active distribution network, and any of the target integrated energy systems is a collaborator relative to another target integrated energy system;

[0008] According to the operation objectives and operation constraints corresponding to the target active distribution network and the target integrated energy system, the hybrid game model is solved to obtain the equilibrium solution of the purchase and sale price of electricity provided by the target active distribution network and the equilibrium solution of the purchase and sale of electricity power by each of the target integrated energy systems to the target active distribution network as the dispatching strategy of each of the target integrated energy systems;

[0009] Based on the equilibrium solution of the time-of-use electricity price provided by the target active distribution network and the equilibrium solution of the power purchased and sold by each target integrated energy system to the target active distribution network, the original allocated cost of each target integrated energy system is obtained by the Shapley value method;

[0010] Based on the target data, the original apportioned cost of each of the target integrated energy systems is corrected to obtain the actual apportioned cost of each of the target integrated energy systems as the scheduling strategy of each of the target integrated energy systems. The target data includes the waveform similarity between the equivalent output curve of the clean energy in each of the target integrated energy systems and the total load curve of each of the target integrated energy systems, the surplus or shortage of electricity in each of the target integrated energy systems, and the average output value and output fluctuation coefficient of the clean energy in each of the target integrated energy systems.

[0011] Each of the target integrated energy systems is scheduled according to its scheduling strategy.

[0012] The present invention also provides a comprehensive energy system scheduling device, comprising the following modules:

[0013] A model building module, used to build a hybrid game model between the target active distribution network and each of the target integrated energy systems, in which the target active distribution network is the leader relative to each of the target integrated energy systems, each of the target integrated energy systems is a follower relative to the target active distribution network, and any of the target integrated energy systems is a collaborator relative to another target integrated energy system;

[0014] A model solving module is used to solve the hybrid game model according to the operation objectives and operation constraints corresponding to the target active distribution network and the target integrated energy system, and obtain the equilibrium solution of the purchase and sale price of electricity provided by the target active distribution network and the equilibrium solution of the purchase and sale power of each target integrated energy system to the target active distribution network as the dispatching strategy of each target integrated energy system;

[0015] A numerical calculation module, for obtaining the original allocated cost of each target integrated energy system by using the Shapley value method based on the equilibrium solution of the time-of-use electricity price provided by the target active distribution network and the equilibrium solution of the power purchased and sold by each target integrated energy system to the target active distribution network;

[0016] A numerical correction module is used to correct the original apportioned cost of each target integrated energy system based on target data, and obtain the actual apportioned cost of each target integrated energy system as the scheduling strategy of each target integrated energy system. The target data includes the waveform similarity between the equivalent output curve of the clean energy in each target integrated energy system and the total load curve of each target integrated energy system, the surplus or shortage of electricity in each target integrated energy system, and the average output value and output fluctuation coefficient of the clean energy in each target integrated energy system.

[0017] The system scheduling module is used to schedule each of the target integrated energy systems according to the scheduling strategy of each of the target integrated energy systems.

[0018] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, an energy system scheduling method as described above is implemented.

[0019] The present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the energy system scheduling method described in any one of the above is implemented.

[0020] The present invention also provides a computer program product, comprising a computer program, wherein when the computer program is executed by a processor, the energy system scheduling method described in any one of the above is implemented.

[0021] The integrated energy system scheduling method, device, electronic device and storage medium provided by the present invention construct a hybrid game model between the target active distribution network and each target integrated energy system in the target active distribution network, and then solve the hybrid game model according to the operation objectives and operation constraints corresponding to the target active distribution network and the target integrated energy system, to obtain the equilibrium solution of the purchase and sale price of electricity provided by the target active distribution network and the equilibrium solution of the purchase and sale power of each target integrated energy system to the target active distribution network, and then based on the equilibrium solution of the time-of-use electricity price provided by the target active distribution network and the equilibrium solution of the purchase and sale power of each target integrated energy system to the target active distribution network, the Shapley value method is used to obtain each target After the original shared cost of the integrated energy system is obtained, the original shared cost of each target integrated energy system is corrected based on the target data to obtain the actual shared cost of each target integrated energy system, so as to dispatch each target integrated energy system according to the equilibrium solution of the purchase and sale price provided by the target active distribution network, the equilibrium solution of the purchase and sale power of each target integrated energy system to the target active distribution network and the original shared cost of each target integrated energy system. By dispatching the integrated energy system in the active distribution network, the energy utilization efficiency of the integrated energy system in the active distribution network can be improved, the carbon emissions of the integrated energy system in the active distribution network can be reduced, and the coordinated operation of the integrated energy system and the active distribution network can be realized. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0023] Figure 1 It is one of the flow charts of the integrated energy system scheduling method provided by the present invention.

[0024] Figure 2 It is an architecture diagram of the target active distribution network in the integrated energy system scheduling method provided by the present invention.

[0025] Figure 3 It is a structural schematic diagram of the hybrid game model in the comprehensive energy system scheduling method provided by the present invention.

[0026] Figure 4 This is the second flow chart of the integrated energy system scheduling method provided by the present invention.

[0027] Figure 5 It is a structural schematic diagram of the comprehensive energy system scheduling device provided by the present invention.

[0028] Figure 6It is a structural schematic diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION

[0029] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] In the description of the present application, the terms "first", "second", etc. are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable under appropriate circumstances, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are usually a class, and the number of objects is not limited. For example, the first object can be one or more. In addition, in the description of the present application, "and / or" represents at least one of the connected objects, and the character " / " generally represents that the front and back associated objects are in an "or" relationship.

[0031] It should be noted that the active distribution network is an intelligent distribution network with the ability to comprehensively control and coordinate multiple distributed power sources. The active distribution network has the ability to autonomously coordinate and control distributed power generation units such as intermittent new energy and energy storage devices, and can actively absorb renewable energy and ensure the safe and economical operation of the network.

[0032] As an energy system that includes multiple energy supplies, the park hydrogen-doped integrated energy system (PHIES) has a high energy utilization rate and plays an important role in the new power system.

[0033] In order to achieve win-win cooperation between PHIES and active distribution network, improve the energy utilization efficiency of PHIES in active distribution network, reduce the carbon emission of PHIES in active distribution network, and realize the coordinated operation of PHIES and active distribution network, the present invention provides a comprehensive energy system scheduling method based on improved Shapely value.

[0034] In the integrated energy system scheduling method provided by the present invention, first, multiple PHIES are constructed to form a PHIES alliance; wherein any PHIES may include multiple types of equipment such as hydrogen-blended gas turbines, hydrogen-blended gas boilers, power-to-gas and carbon capture systems (P2G-CCS), etc.

[0035] Secondly, a hybrid game system model between the active distribution network and the PHIES alliance was constructed, in which the active distribution network and the PHIES alliance constitute a master-slave game, and the PHIES in the PHIES alliance constitute a cooperative game. In the above hybrid game system model, the active distribution network, as the leader, formulates the time-of-use electricity price with the goal of maximizing its own interests. The PHIES alliance, as a follower, implements the coordinated operation of the PHIES in the PHIES alliance and adjusts the output of its own equipment based on the time-of-use electricity price formulated by the active distribution network and the improved Shapley value method, so that the total operating cost of the PHIES alliance is minimized.

[0036] Thirdly, an improved ladder carbon trading model based on dynamic carbon base price is proposed. The carbon emissions in each time period of the active distribution network and the total carbon emissions in a cycle are set as dynamic adjustment factors of the carbon base price, and a pricing mechanism is constructed in which the carbon base price increases with the system carbon emissions, thereby reducing the carbon emissions of the PHIES alliance in the active distribution network.

[0037] Finally, the quadratic interpolation optimization algorithm (QIO) is combined with Gurobi to solve the above-mentioned hybrid game system model, and the rationality and effectiveness of the integrated energy system scheduling method provided by the present invention are verified through examples, realizing the low-carbon economic operation of the active distribution network containing multiple PHIES.

[0038] The integrated energy system scheduling method based on improved Shapely value provided by the present invention provides a way to solve the problem of coordinated operation when PHIES are connected to the same active distribution network. The contributions of the integrated energy system scheduling method provided by the present invention are as follows:

[0039] First, a hybrid game model between the active distribution network and the integrated energy systems in the active distribution network was constructed. Carbon capture devices, hydrogen-blended gas turbines, hydrogen-blended gas boilers and other hydrogen-blended equipment were added to the traditional integrated energy system to further improve the energy utilization efficiency of the integrated energy system and effectively reduce the carbon emissions of the integrated energy system.

[0040] Second, a cooperative game method for improving Shapely values ​​is proposed to achieve a reasonable allocation of internal costs of each integrated energy system, making the allocation results more in line with the actual situation. A hybrid game mechanism between the active distribution network and each integrated energy system is designed. Each integrated energy system has a cooperative game mechanism, and the active distribution network and each integrated energy system have a master-slave game mechanism. The upper active distribution network, as the leader of the system, sets the electricity price according to its own optimization goals. The lower integrated energy systems, as followers of the system, adjust the output of the units within the system according to their own optimization goals and their internal energy characteristics.

[0041] Third, an improved ladder carbon trading model based on a dynamic carbon base price is proposed. The carbon emissions at each time period during the operation of the integrated energy system and the total carbon emissions within a cycle are set as dynamic adjustment factors of the carbon base price, and a pricing mechanism is established in which the carbon base price increases with carbon emissions, thereby more effectively promoting emission reduction behaviors, ensuring the fairness and efficiency of the carbon market, and reducing carbon emissions from system operation.

[0042] Fourth, a hybrid game model solving method combining QIO and Gurobi was designed to solve the hybrid game model of the active distribution network containing multiple integrated energy systems, quickly and reasonably obtain the optimal dispatching solution for each integrated energy system, and realize the economical and low-carbon operation of the system.

[0043] Combine the following Figure 1-Figure 4 The integrated energy system scheduling method of the present invention is described.

[0044] Figure 1 This is one of the flow charts of the integrated energy system scheduling method provided by the present invention, such as Figure 1 As shown, the method includes the following: Step 101, constructing a hybrid game model between the target active distribution network and each target integrated energy system, in which the target active distribution network is the leader relative to each target integrated energy system, each target integrated energy system is a follower relative to the target active distribution network, and any target integrated energy system is a collaborator relative to another target integrated energy system.

[0045] It should be noted that the executor of the embodiment of the present invention is an integrated energy system dispatching device. The integrated energy system dispatching device can be configured in electronic devices such as computers and servers.

[0046] Specifically, in the embodiment of the present invention, each integrated energy system connected to the target active power distribution network is determined as the target integrated energy system, which is the scheduling object of the integrated energy system scheduling method provided by the present invention.

[0047] It should be noted that in the embodiment of the present invention, the number of target integrated energy systems is multiple. The following takes the number of target integrated energy systems as 3 as an example to illustrate the integrated energy system scheduling method provided by the present invention.

[0048] It is understandable that the target active power distribution network may be determined according to actual needs. In the embodiment of the present invention, the target active power distribution network is not specifically limited.

[0049] It should be noted that the target integrated energy system in the embodiment of the present invention may be a park hydrogen-blended integrated energy system.

[0050] As an optional embodiment, the energy types in the target integrated energy system include electrical energy, thermal energy, gas energy and hydrogen energy.

[0051] The target integrated energy system includes at least one of a gas turbine, a gas boiler, an electric boiler, a power-to-gas device, a carbon capture device and an energy storage device. The gas turbine includes a hydrogen-doped gas turbine, the gas boiler includes a hydrogen-doped gas boiler, the power-to-gas device includes an electrolyzer device, and the energy storage device includes an electric energy storage device and a thermal energy storage device.

[0052] Figure 2 This is a diagram of the architecture of the target active distribution network in the integrated energy system scheduling method provided by the present invention. Figure 2 As shown, the target integrated energy system achieves efficient coordination between the active distribution network and the natural gas network through a series of energy conversion equipment.

[0053] It should be noted that the target integrated energy system can also include gas turbines. As the core equipment in the target integrated energy system, gas turbines not only generate electrical energy, but also produce thermal energy simultaneously, effectively improving the energy utilization efficiency of the target integrated energy system.

[0054] The carbon capture equipment in the target integrated energy system becomes a bridge connecting the carbon dioxide produced by electric and gas-fired units and natural gas energy, promoting flexible conversion and complementarity between energy sources.

[0055] The target integrated energy system may also include electric boilers, gas boilers and other equipment, which can efficiently convert electrical energy or natural gas energy into thermal energy to cope with fluctuations in thermal energy demand and achieve effective supplementation of thermal energy supply.

[0056] The target integrated energy system can also include various types of energy storage equipment, including electricity storage equipment and heat storage equipment. When a certain energy source is in surplus or shortage in the target integrated energy system, the energy storage equipment in the target integrated energy system can respond quickly to store the excess energy or release energy when needed, thereby ensuring the dynamic balance and stable supply of energy for the entire system.

[0057] Any target integrated energy system can also interact with other target integrated energy systems to meet daily operation needs.

[0058] It should be noted that when a certain proportion (10% to 20%) of hydrogen is added to natural gas, it can not only ensure the safe and stable combustion of the gas turbine burner, but also reduce the carbon emissions of the gas turbine. The mathematical model of the hydrogen-blended gas turbine in the target integrated energy system is expressed as follows:

[0059] (1)

[0060] in, Indicates Hydrogen-blended gas turbines in a comprehensive energy system The volume of hydrogen consumed during the period; Indicates The power generation efficiency of hydrogen-blended gas turbines in the target integrated energy system; Indicates The heating efficiency of hydrogen-blended gas turbines in a comprehensive energy system; Indicates Hydrogen-blended gas turbines in a comprehensive energy system Power generation during the time period; Indicates Hydrogen-blended gas turbines in a comprehensive energy system The heat generation power during the period; Indicates the lower heating value of natural gas; Indicates the lower heating value of hydrogen; Indicates Hydrogen-blended gas turbines in a comprehensive energy system The hydrogen blending ratio of the time period; Indicates Hydrogen-blended gas turbines in a comprehensive energy system The volume of natural gas consumed during the time period.

[0061] The mathematical model of the hydrogen-blended gas boiler in the target integrated energy system is expressed as follows:

[0062] (2)

[0063] in, Indicates The heating efficiency of hydrogen-blended gas boilers in the target integrated energy system; Indicates The hydrogen-blended gas boiler in the target integrated energy system The heat generation power during the period; Indicates The hydrogen-blended gas boiler in the target integrated energy system The volume of natural gas consumed during the period; Indicates The hydrogen-blended gas boiler in the target integrated energy system The volume of hydrogen consumed during the period; Indicates The hydrogen-blended gas boiler in the target integrated energy system The hydrogen blending ratio during the period.

[0064] The mathematical model of the electric boiler in the target integrated energy system is expressed as follows:

[0065] (3)

[0066] in, Indicates Electric boilers in the target integrated energy system The thermal power generated during the period; Indicates Electric boilers in the target integrated energy system The electrical power consumed during the time period; Indicates The thermal conversion efficiency of electric boilers in a target integrated energy system.

[0067] The carbon capture device in the embodiment of the present invention is divided into two stages: hydrogen production and methanation. The main equipment includes an electrolyzer (EL) device and a methane reactor (MR). When the carbon capture device is working, the electrolyzer device first converts electrical energy into hydrogen energy by electrolyzing water. Part of the hydrogen energy is directly sent to the gas unit, part of it is used to produce natural gas through the methane reactor, and the remaining part is input into the hydrogen storage device for storage; the carbon capture device can capture the CO2 generated by the operation of the gas turbine and the gas boiler and convert it into natural gas, and participate in the operation of the system again, which can effectively reduce carbon emissions. By adding a small amount of hydrogen during the operation of the gas turbine and the gas boiler, carbon emissions can be further reduced.

[0068] The electrolyzer equipment in the carbon capture device converts electrical energy into easily storable hydrogen energy. The specific formula is as follows:

[0069] (4)

[0070] in, Indicates The electrolyzer equipment in the carbon capture device of the target integrated energy system is The hydrogen power output during the period; Indicates The electricity-to-hydrogen conversion efficiency of the electrolyzer equipment in the carbon capture device in the target integrated energy system; Indicates The electrolyzer equipment in the carbon capture device of the target integrated energy system is The electrical power consumed during the time period; Indicates The upper limit of the power consumption of the electrolyzer equipment in the carbon capture device in the target integrated energy system; Indicates The lower limit of the power consumption of the electrolyzer equipment in the carbon capture device in the target integrated energy system.

[0071] Power of natural gas produced by methane reactor in carbon capture plant It can be expressed by the following formula:

[0072] (5)

[0073] Where: Indicates The methane reactor in the carbon capture unit of the target integrated energy system is The natural gas power converted during the period; Indicates The natural gas conversion rate of the methane reactor in the carbon capture unit of the target integrated energy system; Indicated in During the period The hydrogen power input into the methane reactor of the electrolyzer equipment in the carbon capture device in the target integrated energy system.

[0074] Energy consumption of carbon capture devices for CO2 treatment It is mainly related to the quality of CO2 treated by the carbon capture device. The specific formula is as follows:

[0075] (6)

[0076] in, Indicates Energy consumption of carbon capture device in treating CO2 in target integrated energy system; represents the energy consumption of the carbon capture device for processing a unit mass of CO2. In the embodiment of the present invention, it can be determined based on prior knowledge =0.269MW·h / t; Indicates Carbon capture devices in target integrated energy systems The mass of CO2 processed during the period.

[0077] The mathematical model of energy storage equipment in the target integrated energy system is expressed as follows:

[0078] (7)

[0079] in, Indicates The battery in the target integrated energy system Capacity during the time period; Indicates The heat storage tank in the target integrated energy system Capacity during the time period; Indicates The battery in the target integrated energy system Charging power during the time period; Indicates The battery in the target integrated energy system Discharge power during the time period; Indicates The heat storage tank in the target integrated energy system Heating power during the period; Indicates The heat storage tank in the target integrated energy system Heat release power during the period; Indicates The charging efficiency of the battery in the target integrated energy system; Indicates The discharge efficiency of the battery in the target integrated energy system. Indicates The charging efficiency of the heat storage tank in the target integrated energy system; Indicates The charging and discharging efficiency of the heat storage tank in the target integrated energy system.

[0080] Since the target distribution network and each target integrated energy system represent different stakeholders and have the characteristic of pursuing the maximization of their own interests, in the embodiment of the present invention, a hybrid game model between the target active distribution network and each target integrated energy system is constructed based on game theory.

[0081] Figure 3 This is a schematic diagram of the structure of the hybrid game model in the integrated energy system scheduling method provided by the present invention. Figure 3As shown in the figure, a master-slave game is formed between the target active distribution network and each target integrated energy system. The target active distribution network is the leader relative to each target integrated energy system, and each target integrated energy system is a follower relative to the target active distribution network; a cooperative game is formed between each target integrated energy system, and any target integrated energy system is a cooperator relative to another target integrated energy system.

[0082] Mixed game model The formula expression is as follows:

[0083] (8)

[0084] in, represents the set of participants in the hybrid game model, including the target active distribution network and each target integrated energy system; represents the initial purchase and sale electricity price set by the target active distribution network, , represents the initial electricity price set by the target active distribution network, It represents the initial electricity purchase price set by the target active distribution network;

[0085] It represents the amount of electricity purchased and sold by each target integrated energy system from the target active distribution network. , Indicates The amount of electricity purchased by the target integrated energy system from the target active distribution network, Indicates The amount of electricity sold by the target integrated energy system to the target active distribution network, represents the total number of target integrated energy systems;

[0086] represents the cost of the target distribution network; Represents the operating cost of each target comprehensive energy system.

[0087] Cost of target distribution network It can be calculated by the following formula:

[0088] (9)

[0089] in, It represents the power interaction benefit between the target distribution network and each target integrated energy system; Represents the interaction cost between the target distribution network and the upper-level power grid; Indicates The target integrated energy system is The power purchased from the target active distribution network during the period; Indicates The target integrated energy system is The power sold to the target active distribution network during the period;

[0090] Indicates that each target comprehensive energy system The electricity purchase price from the target active distribution network during the time period; Indicates that each target comprehensive energy system The electricity price sold to the target active distribution network during the time period; Indicates the total number of scheduling periods in a day, In the embodiment of the present invention The value of is 24. In all the following formulas The value of is 24; It indicates the electricity purchase price of the target active distribution network from the upper level power grid; Indicates that the target active distribution network is t The interactive power with the upper-level power grid during the period.

[0091] Operating costs of each target integrated energy system It can be calculated by the following formula:

[0092] (10)

[0093] in: Indicates The gas purchase cost of each target integrated energy system; Indicates The electricity purchase cost of each target integrated energy system; Indicates The tiered carbon trading costs of a comprehensive energy system with different objectives; Indicates The cost of carbon sequestration for a target integrated energy system; Indicates the unit price of natural gas per cubic meter; Indicates The target integrated energy system is The volume of natural gas purchased during the period; Indicates the unit price of hydrogen per cubic meter; Indicates The target integrated energy system is The volume of hydrogen purchased during the period; Indicates the unit price of storing a unit mass of carbon dioxide; Indicates The target integrated energy system is The mass of carbon stored over time.

[0094] Step 102: Solve the hybrid game model according to the operation objectives and operation constraints corresponding to the target active distribution network and the target integrated energy system, and obtain the equilibrium solution of the purchase and sale price of electricity provided by the target active distribution network and the equilibrium solution of the purchase and sale of electricity power by each target integrated energy system to the target active distribution network as the dispatching strategy of each target integrated energy system.

[0095] Specifically, after constructing the hybrid game model between the target active distribution network and each target integrated energy system, the hybrid game model can be solved through numerical calculation, mathematical statistics and other methods according to the operating objectives and operating constraints corresponding to the target active distribution network and each target integrated energy system, so as to obtain the equilibrium solution of the time-of-use electricity price provided by the target active distribution network and the equilibrium solution of the power purchased and sold by each target integrated energy system to the target active distribution network.

[0096] It should be noted that the operating objectives and operating constraints corresponding to the target active distribution network and the operating objectives and operating constraints corresponding to each target integrated energy system in the embodiment of the present invention may be determined based on prior knowledge and / or actual conditions. In the embodiment of the present invention, the operating objectives and operating constraints corresponding to the target active distribution network and the operating objectives and operating constraints corresponding to each target integrated energy system are not specifically limited.

[0097] As an optional embodiment, the operation targets corresponding to the target active distribution network and the target integrated energy system include the lowest cost of the target active distribution network and the lowest operation cost of each target integrated energy system.

[0098] The operating constraints corresponding to the target active distribution network include floating constraints on purchase and sale prices, transmission power constraints between the target integrated energy system, transmission power constraints between the upper-level power grid, active distribution network flow constraints, active distribution network line power capacity constraints and node voltage constraints. The operating constraints corresponding to the target integrated energy system include power balance constraints, gas turbine output and climbing constraints, gas boiler output and climbing constraints, electric boiler output and climbing constraints, electrolyzer equipment in carbon capture device output and climbing constraints, methane reactor in carbon capture device output and climbing constraints, carbon capture equipment output constraints and energy storage constraints.

[0099] It should be noted that the operating objectives corresponding to the target active distribution network include the cost of the target distribution network. Minimum, the operation targets corresponding to each target integrated energy system include the operation cost of each target integrated energy system Minimum. Cost of target distribution network and the operating costs of each target integrated energy system The specific calculation method of is shown in formula (9) and formula (10):

[0100] It should be noted that the distribution network flow constraints, line power capacity constraints and node voltage constraints corresponding to the target active distribution network belong to conventional operation constraints and will not be described in detail in the embodiments of the present invention.

[0101] The purchase and sale price fluctuation constraint corresponding to the target active distribution network, the transmission power constraint between the target integrated energy system and the upper-level power grid can be expressed by the following formula:

[0102] (11)

[0103] in, express The lowest electricity price during the period; express The highest electricity sales price during the period; Indicates that the target active distribution network is The electricity price during the period; represents the maximum transmission power between the target active distribution network and the target integrated energy system; express The transmission power between the target active distribution network and the upper-level power grid within the time period; Indicates the maximum transmission power between the target active distribution network and the upper-level power grid.

[0104] It should be noted that since the target active distribution network is in a dominant position in the hybrid game model and has the right to set its own prices for electricity purchase and sale, in order to avoid the target active distribution network always setting the highest electricity price to improve its own interests when setting prices, it is necessary to further constrain the electricity price of the target active distribution network. Therefore, the floating constraints on the electricity purchase and sale prices corresponding to the target active distribution network can be expressed by the following formula:

[0105] (12)

[0106] Where: It represents the average value of the electricity sales price of the target active distribution network.

[0107] It should be noted that the target comprehensive energy system couples four energy types: electricity, heat, gas and hydrogen. In order to ensure the stable operation of the target comprehensive energy system, it is necessary to ensure the balance between energy supply and demand in the target comprehensive energy system. The power balance constraint corresponding to the target comprehensive energy system can be expressed by the following formula:

[0108] (13)

[0109] in, Indicates The target integrated energy system is Receive electric power from other target integrated energy systems during the time period; Indicates The target integrated energy system is Heat load during the time period; Indicates The target integrated energy system is The volume of natural gas required during the time period; Indicates The target integrated energy system is Wind power output during the time period; Indicates The target integrated energy system is Photovoltaic output during the period; Indicates Hydrogen-blended gas turbines in a comprehensive energy system Power generation during the time period; Indicates The battery in the target integrated energy system Discharge power during the time period; Indicates The target integrated energy system is The amount of electricity purchased during the time period; Indicates Electric boilers in the target integrated energy system The amount of electrical power consumed during the time period; Indicates Power-to-gas in an integrated energy system The amount of electrical power consumed during the time period; Indicates The target integrated energy system is Load during the time period; Indicates The battery in the target integrated energy system Charging power during the time period; Indicates The target integrated energy system is The amount of electricity sold during the time period; Indicates Carbon capture devices in integrated energy systems The electrical power consumed during the time period; Indicates The gas turbine in the integrated energy system The thermal power produced during the period; Indicates The gas boiler in the target integrated energy system The thermal power produced during the period; Indicates Electric boilers in the target integrated energy system The thermal power produced during the period; Indicates The heat storage tank in the target integrated energy system Heat release power during the period; Indicates The heat storage tank in the target integrated energy system Heating power during the period; Indicates The gas turbine in the integrated energy system The volume of natural gas consumed during the period; Indicates The hydrogen-blended gas boiler in the target integrated energy system The volume of natural gas consumed during the period; Indicates The target integrated energy system is The volume of natural gas purchased during the period; Indicates The methane reactor in the power-to-gas unit of the target integrated energy system The volume of natural gas produced during the time period; Indicates The electrolyzer in the power-to-gas device of the target integrated energy system The volume of hydrogen produced during the time period; Indicates The hydrogen storage tank in the target integrated energy system is The volume of hydrogen released during the time period; Indicates The target integrated energy system is The volume of hydrogen purchased during the time period; Indicates The methane reactor in the power-to-gas device of the target integrated energy system The volume of hydrogen consumed during the time period; Indicates Gas turbines in a comprehensive energy system The volume of hydrogen consumed during the time period; Indicates Gas boilers in the target integrated energy system The volume of hydrogen consumed during the time period; Indicates The hydrogen storage tank in the target integrated energy system is The volume of hydrogen filled during the period.

[0110] The gas turbine output and ramp constraints corresponding to the target integrated energy system can be expressed by the following formula:

[0111] (14)

[0112] in, Indicates The gas turbine in the integrated energy system Power generation during the time period; Indicates The upper limit of the power generation capacity of the gas turbine in the target integrated energy system; Indicates The lower limit of power generation of gas turbines in the target integrated energy system; Indicates The upper limit of the ramp rate of the gas turbine in the target integrated energy system; Indicates The lower limit of the ramp rate of the gas turbine in the target integrated energy system.

[0113] The gas boiler output and ramp constraints corresponding to the target integrated energy system can be expressed by the following formula:

[0114] (15)

[0115] in, Indicates The maximum value of the heating power of the gas boiler in the target comprehensive energy system; Indicates Gas boilers in the target integrated energy system The heat generation power during the period; Indicates The minimum value of the heating power of the gas boiler in the target comprehensive energy system; Indicates The upper limit of the ramp rate of gas boilers in the target integrated energy system; Indicates The lower limit of the ramp rate of gas boilers in the target integrated energy system.

[0116] The electric boiler output and ramp constraints corresponding to the target integrated energy system can be expressed by the following formula:

[0117] (16)

[0118] in, Indicates The upper limit of the heating power of the electric boiler in the target integrated energy system; Indicates The lower limit of the heating power of the electric boiler in the target integrated energy system; Indicates The upper limit of the ramp rate of electric boilers in the target integrated energy system; Indicates The lower limit of the ramp rate of the electric boiler in the target integrated energy system; Indicates Electric boilers in the target integrated energy system The heat output during the period.

[0119] The output and climbing constraints of the electrolyzer equipment in the power-to-gas device corresponding to the target integrated energy system can be expressed by the following formula:

[0120] (17)

[0121] in, Indicates The upper limit of the power consumption of the electrolyzer equipment in the power-to-gas device of the target integrated energy system; Indicates The lower limit of power consumption of electrolyzer equipment in the power-to-gas device of the target integrated energy system; Indicates The upper limit of the ramp rate of the electrolyzer equipment in the power-to-gas device in the target integrated energy system; Indicates The lower limit of the ramp rate of the electrolyzer equipment in the power-to-gas device in the target integrated energy system; Indicates The electrolyzer equipment in the power-to-gas device of the target integrated energy system The power consumption during the time period.

[0122] The output and ramp constraints of the methane reactor in the power-to-gas equipment corresponding to the target integrated energy system can be expressed by the following formula:

[0123] (18)

[0124] in, Indicates The lower limit of hydrogen power for the methane reactor in the power-to-gas unit of the target integrated energy system; Indicates The upper limit of hydrogen power for the methane reactor in the power-to-gas unit of the target integrated energy system; Indicates The upper limit of the ramp rate of the methane reactor in the power-to-gas unit of the target integrated energy system; Indicates The lower limit of the ramp rate of the methane reactor in the power-to-gas unit of the target integrated energy system; Indicates The methane reactor in the power-to-gas unit of the target integrated energy system Hydrogen power during the period.

[0125] The output constraint of the carbon capture device corresponding to the target integrated energy system can be expressed by the following formula:

[0126] (19)

[0127] in, Indicates The upper limit of the electricity consumption of carbon capture devices in the target integrated energy system; Indicates The lower limit of electricity consumption of carbon capture devices in the target integrated energy system; Indicates Carbon capture devices in target integrated energy systems The amount of electrical energy consumed during a period.

[0128] It should be noted that the constraints of energy storage devices such as heat storage tanks and batteries in the target integrated energy system are the same. Therefore, in the embodiment of the present invention, only the constraints of the batteries are described. The battery constraints corresponding to the target integrated energy system can be expressed by the following formula:

[0129] (20)

[0130] in, Indicates The battery in the target integrated energy system The charging status during the period is a 0-1 variable. Indicates The battery in the target integrated energy system The device is in charging state during the period. Indicates The battery in the target integrated energy system The device is not charged during the period; Indicates The battery in the target integrated energy system Charging power during the time period; Indicates The battery in the target integrated energy system Discharge power during the time period; Indicates The charging efficiency of the battery in the target integrated energy system; Indicates The discharge efficiency of the battery in the target integrated energy system; Indicates The upper limit of the battery charging power in the target integrated energy system; Indicates The lower limit of the battery charging power in the target integrated energy system; Indicates The upper limit of battery discharge power in the target integrated energy system; Indicates The lower limit of battery discharge power in the target integrated energy system; Indicates The maximum battery capacity of the battery in the target integrated energy system; Indicates The minimum battery capacity of the battery in the target integrated energy system; Indicates The battery in the target integrated energy system Battery capacity during the time period; Indicates The battery capacity of the battery in the target integrated energy system during the 0 period; Indicates The battery capacity of the battery in the target integrated energy system within 24 hours.

[0131] Figure 4 This is the second flow chart of the integrated energy system scheduling method provided by the present invention. Figure 4 As shown, as an optional embodiment, according to the operating objectives and operating constraints corresponding to the target active distribution network and the target integrated energy system, the hybrid game model is solved to obtain the equilibrium solution of the purchase and sale price of electricity provided by the target active distribution network and the equilibrium solution of the purchase and sale power of each target integrated energy system to the target active distribution network, including: initializing the model parameters of the hybrid game model, the model parameters including the initial value of the purchase and sale price of electricity provided by the target active distribution network.

[0132] When this iterative calculation is the first iterative calculation, in this iterative calculation, based on the initial value of the purchase and sale electricity price provided by the target active distribution network, according to the operating constraints corresponding to the target active distribution network and the target integrated energy system, the Gurobi solver is used to obtain the alternative solutions for the purchase and sale power of each target integrated energy system to the target active distribution network corresponding to this iteration. When this iterative calculation is not the first iterative calculation, in this iterative calculation, based on the alternative solutions for the purchase and sale electricity price provided by the target active distribution network corresponding to the previous iteration, according to the operating constraints corresponding to the target active distribution network and the target integrated energy system, the Gurobi solver is used to obtain the alternative solutions for the purchase and sale power of each target integrated energy system to the target active distribution network corresponding to this iteration.

[0133] According to the operating constraints corresponding to the target active distribution network and the target integrated energy system, based on the alternative solutions of the purchase and sale power of each target integrated energy system to the target active distribution network corresponding to this iteration, the quadratic interpolation optimization algorithm is used to obtain the alternative solutions of the purchase and sale power price provided by the target active distribution network corresponding to this iteration.

[0134] Based on the alternative solutions of the power purchase and sale from each target integrated energy system to the target active distribution network corresponding to this iteration, the cost of the target active distribution network corresponding to this iteration is calculated.

[0135] When it is determined that the cost of the target active distribution network corresponding to this iteration is lower than the cost of the target active distribution network corresponding to each historical iteration, it is judged whether the alternative solutions of the power purchase and sale of each target integrated energy system corresponding to this iteration to the target active distribution network and the alternative solutions of the power purchase and sale price provided by the target active distribution network corresponding to this iteration meet the equilibrium conditions. When it is determined that the alternative solutions of the power purchase and sale of each target integrated energy system corresponding to this iteration to the target active distribution network and the alternative solutions of the power purchase and sale price provided by the target active distribution network corresponding to this iteration do not meet the equilibrium conditions, the next iterative calculation is performed based on the alternative solutions of the power purchase and sale price provided by the target active distribution network corresponding to this iteration until it is determined that the alternative solutions of the power purchase and sale of each target integrated energy system corresponding to this iteration to the target active distribution network and the alternative solutions of the power purchase and sale price provided by the target active distribution network corresponding to this iteration meet the equilibrium conditions. The equilibrium conditions include the target active distribution network corresponding to this iteration. The cost of the network is not greater than the cost threshold of the target active distribution network corresponding to this iteration, the operating cost of each target comprehensive energy system corresponding to this iteration is not greater than the operating cost threshold of each target comprehensive energy system corresponding to this iteration, the operating cost of each target comprehensive energy system corresponding to this iteration is calculated based on the alternative solutions of the purchase and sale of electricity power from each target comprehensive energy system corresponding to this iteration to the target active distribution network, the operating cost threshold of each target comprehensive energy system corresponding to this iteration is calculated based on the alternative solutions of the purchase and sale electricity price provided by the target active distribution network corresponding to this iteration and the alternative solutions of the purchase and sale of electricity power from each target comprehensive energy system corresponding to the previous iteration to the target active distribution network, the operating cost threshold of each target comprehensive energy system corresponding to this iteration is calculated based on the alternative solutions of the purchase and sale electricity price provided by the target active distribution network corresponding to the previous iteration and the alternative solutions of the purchase and sale of electricity power from each target comprehensive energy system corresponding to this iteration to the target active distribution network.

[0136] When it is determined that the alternative solutions for the purchase and sale of electricity power by each target integrated energy system to the target active distribution network corresponding to this iteration and the alternative solutions for the purchase and sale of electricity prices provided by the target active distribution network corresponding to this iteration meet the equilibrium conditions, the alternative solutions for the purchase and sale of electricity power by each target integrated energy system to the target active distribution network corresponding to this iteration are determined as the equilibrium solutions for the purchase and sale of electricity power by each target integrated energy system to the target active distribution network, and the alternative solutions for the purchase and sale of electricity prices provided by the target active distribution network corresponding to this iteration are determined as the equilibrium solutions for the purchase and sale of electricity prices provided by the target active distribution network. When it is determined that the alternative solutions for the purchase and sale of electricity power by each target integrated energy system to the target active distribution network corresponding to this iteration and the alternative solutions for the purchase and sale of electricity prices provided by the target active distribution network corresponding to this iteration do not meet the equilibrium conditions, it is determined whether the cumulative number of iterations has reached the maximum number of iterations.

[0137] When it is determined that the cumulative number of iterations has reached the maximum number of iterations, the alternative solutions for the purchase and sale of electricity power by each target integrated energy system to the target active distribution network corresponding to this iteration are determined as the equilibrium solution for the purchase and sale of electricity power by each target integrated energy system to the target active distribution network, and the alternative solution for the purchase and sale price of electricity provided by the target active distribution network corresponding to this iteration is determined as the equilibrium solution for the purchase and sale price of electricity provided by the target active distribution network. When it is determined that the cumulative number of iterations has not reached the maximum number of iterations, the next iterative calculation is performed based on the alternative solution for the purchase and sale price of electricity provided by the target active distribution network corresponding to this iteration.

[0138] It should be noted that the Quadratic Interpolation Optimization (QIO) algorithm is a new optimization method combined with generalized quadratic interpolation. The QIO algorithm effectively solves the optimization problem through an improved search strategy and has efficient search and optimization characteristics. It balances exploration and development through adaptive parameters to find the global optimal solution.

[0139] It should be noted that the Gurobi solver is a high-performance mathematical programming solver that can be used to maximize or minimize the objective function of linear programming, mixed integer programming, quadratic programming, constraint programming and other problems. The Gurobi solver has powerful solving capabilities and efficient algorithms, can handle large-scale complex problems, and provides a rich API (application programming interface) that can be integrated with various programming languages ​​(such as Python, C++, Java, etc.).

[0140] The equilibrium condition in the embodiment of the present invention can be expressed by the following formula:

[0141] (twenty one)

[0142] in, represents the equilibrium solution of the purchase and sale price of electricity provided by the target active distribution network; It represents the balanced solution of the power purchased and sold by each target integrated energy system to the target active distribution network;

[0143] It should be noted that, when the alternative solutions for the purchase and sale of electricity power by each target integrated energy system to the target active distribution network corresponding to this iteration and the alternative solutions for the purchase and sale of electricity prices provided by the target active distribution network corresponding to this iteration meet the equilibrium conditions, the alternative solutions for the purchase and sale of electricity power by each target integrated energy system to the target active distribution network corresponding to this iteration can be determined as the equilibrium solution for the purchase and sale of electricity power by each target integrated energy system to the target active distribution network, and the alternative solutions for the purchase and sale of electricity prices provided by the target active distribution network corresponding to this iteration can be determined as the equilibrium solution for the purchase and sale of electricity prices provided by the target active distribution network.

[0144] Accordingly, represents the operating cost of each target comprehensive energy system corresponding to this iteration, Balanced solution of electricity purchase and sale prices provided by target active distribution network and the balanced solution of power purchase and sale from each target integrated energy system to the target active distribution network The calculated cost of the target distribution network;

[0145] represents the operating cost of each target comprehensive energy system corresponding to this iteration, Balanced solution of electricity purchase and sale prices provided by target active distribution network and the balanced solution of power purchase and sale from each target integrated energy system to the target active distribution network The calculated operating costs of each target integrated energy system;

[0146] represents the cost threshold of the target active distribution network corresponding to this iteration, Based on the alternative solutions of the purchase and sale electricity prices provided by the target active distribution network corresponding to the previous iteration and the balanced solutions of the purchase and sale power of each target integrated energy system to the target active distribution network The calculated cost of the target distribution network;

[0147] represents the operating cost threshold of each target comprehensive energy system corresponding to this iteration, Based on the alternative solutions of the power purchase and sale of each target integrated energy system to the target active distribution network corresponding to the previous iteration and the equilibrium solution of the power purchase and sale price provided by the target active distribution network The calculated operating costs of each target integrated energy system.

[0148] Obtain the equilibrium solution of the purchase and sale price of electricity provided by the target active distribution network Balanced solution for the purchase and sale of power from each target integrated energy system to the target active distribution network Afterwards, the equilibrium solution of the purchase and sale electricity price provided by the target active distribution network and the equilibrium solution of the purchase and sale power of each target integrated energy system to the target active distribution network can be determined as the dispatch strategy of each target integrated energy system.

[0149] In the embodiment of the present invention, by using the Gurobi solver and the quadratic interpolation optimization algorithm to solve the hybrid game model, the equilibrium solution of the purchase and sale price of electricity provided by the target active distribution network and the equilibrium solution of the purchase and sale power of each target integrated energy system to the target active distribution network can be obtained more accurately and efficiently, which can improve the dispatch efficiency of the target integrated energy system in the target distribution network.

[0150] Step 103: Based on the equilibrium solution of the time-of-use electricity price provided by the target active distribution network and the equilibrium solution of the power purchased and sold by each target integrated energy system to the target active distribution network, the original allocated cost of each target integrated energy system is obtained by the Shapley value method.

[0151] It should be noted that when some target integrated energy systems have a surplus of electricity, the surplus electricity generated can be provided to the target integrated energy systems with insufficient electricity supply through the interconnection lines between the target integrated energy systems. If some target integrated energy systems still have surplus electricity, the surplus electricity can be sold to the target active distribution network at the electricity sales price.

[0152] On the contrary, if some target integrated energy systems have insufficient electricity supply, they can first obtain electricity from other target integrated energy systems with surplus electricity. If the electricity demand still cannot be met, electricity can be purchased from the target active distribution network at the electricity purchase price.

[0153] In cooperative games, Shapley value is a widely used cost allocation method.

[0154] The Shapley Value Method (also known as the Shapley Value Method) is a method of allocating benefits in cooperative game theory. The Shapley Value Method is mainly used to solve the contradictions caused by the distribution of benefits among multiple players in the process of cooperation. It distributes benefits fairly and reasonably by calculating the marginal contribution rate of each member to the alliance.

[0155] Specifically, Figure 4 As shown in the figure, the equilibrium solution of the purchase and sale price provided by the target active distribution network is obtained. Balanced solution for the purchase and sale of power from each target integrated energy system to the target active distribution network Afterwards, the original amortized cost of each target integrated energy system can be calculated by numerical calculation using the Shapley value method.

[0156] Step 104: Based on the target data, the original shared cost of each target integrated energy system is corrected to obtain the actual shared cost of each target integrated energy system as the scheduling strategy of each target integrated energy system. The target data include the waveform similarity between the equivalent output curve of clean energy in each target integrated energy system and the total load curve of each target integrated energy system, the surplus or shortage of electricity in each target integrated energy system, and the average output value and output fluctuation coefficient of clean energy in each target integrated energy system.

[0157] It should be noted that although the Shapley value method can solve the problem of interest distribution in cooperative games, the original shared cost of each target integrated energy system calculated based on the Shapley value method cannot well reflect the actual situation.

[0158] Therefore, in the embodiment of the present invention, after obtaining the original shared cost of each target integrated energy system, based on the waveform similarity between the equivalent output curve of clean energy in each target integrated energy system and the total load curve of each target integrated energy system, the electricity surplus or shortage of each target integrated energy system, and the average output value and output fluctuation coefficient of clean energy in each target integrated energy system, the original shared cost of each target integrated energy system is corrected through numerical calculation to obtain the actual shared cost of each target integrated energy system as the scheduling strategy for each target integrated energy system.

[0159] As an optional embodiment, based on the target data, the original allocated cost of each target integrated energy system is corrected to obtain the actual allocated cost of each target integrated energy system, including: based on the waveform similarity between the equivalent output curve of clean energy in each target integrated energy system and the total load curve of each target integrated energy system, obtaining the waveform similarity allocation coefficient corresponding to each target integrated energy system; based on the electricity surplus or shortage of each target integrated energy system, obtaining the electricity surplus or shortage allocation coefficient corresponding to each target integrated energy system; based on the average output value and output fluctuation coefficient of clean energy in each target integrated energy system, obtaining the clean energy average output allocation coefficient corresponding to each target integrated energy system.

[0160] It should be noted that for any target integrated energy system, when the clean energy output curve within the target integrated energy system is highly similar to the load curve of the target integrated energy system, it means that the clean energy output within the target integrated energy system can well meet its own electricity demand. Therefore, the demand for external electricity trading within the target integrated energy system will be relatively small, which is more conducive to reducing the operating costs of each target integrated energy system.

[0161] In the embodiment of the present invention, the clean energy equivalent output of the target comprehensive energy system can be calculated by the equal power-following load method, and the specific calculation formula is as follows.

[0162] (twenty two)

[0163] in, Indicates The target integrated energy system is The actual output of photovoltaic power generation during the period; Indicates The target integrated energy system is The actual wind power output during the period; Indicates The target integrated energy system is Load during the time period; Indicates The target integrated energy system is The equivalent output of clean energy during the period.

[0164] After obtaining the clean energy equivalent output of each target integrated energy system, the cosine similarity algorithm can be used to measure the waveform similarity between the clean energy equivalent output curve of each target integrated energy system and the load curve of each target integrated energy system.

[0165] The higher the waveform similarity between the equivalent output curve of any target integrated energy system and the load curve of each target integrated energy system, the greater the contribution of the clean energy output of the above target integrated energy system to the power demand of each target integrated energy system and the reduction of the operating cost of each target integrated energy system can be determined, and the smaller the waveform similarity sharing coefficient corresponding to the above target integrated energy system should be.

[0166] The waveform similarity allocation coefficient corresponding to the target integrated energy system can be calculated by the following formula:

[0167] (twenty three)

[0168] in, Indicates The waveform similarity between the clean energy equivalent output curve of each target integrated energy system and the load curve of each target integrated energy system; Indicates The waveform similarity sharing coefficient corresponding to the target integrated energy system.

[0169] It should be noted that the surplus or shortage of electricity in each target integrated energy system also has a certain impact on the operating cost of each target integrated energy system. If the surplus electricity of any target integrated energy system is used to provide to another target integrated energy system with electricity shortage, the greater the surplus or shortage of electricity in the above-mentioned target integrated energy system, the more beneficial it is to the operating cost of each target integrated energy system.

[0170] Therefore, the more surplus electricity a target integrated energy system has, the smaller the apportionment cost of the target integrated energy system. The electricity surplus and shortage apportionment coefficient corresponding to the target integrated energy system can be calculated by the following formula:

[0171] (twenty four)

[0172] in, Indicates The amount of electricity surplus or shortage in the target integrated energy system; Indicates The electricity surplus or shortage allocation coefficient corresponding to each target comprehensive energy system.

[0173] It should be noted that the average output value of clean energy in each target integrated energy system also has a certain impact on the operating cost of each target integrated energy system. As a multi-energy coordinated operation entity, each target integrated energy system needs to balance the supply and demand relationship of various energy sources to ensure a stable supply of energy. If the average output value of clean energy in any target integrated energy system fluctuates greatly, each target integrated energy system will need to adjust the output of other energy sources more frequently to make up for the insufficient output of clean energy in the target integrated energy system, which will increase the complexity and cost of the operation and scheduling of each target integrated energy system.

[0174] The average clean energy output allocation coefficient corresponding to the target integrated energy system can be calculated by the following formula:

[0175] (25)

[0176] in, Indicates The average output value of clean energy in the target integrated energy system; Indicates Output fluctuation value of clean energy in the target integrated energy system; Indicates The average clean energy output sharing coefficient corresponding to each target integrated energy system.

[0177] Based on the waveform similarity allocation coefficient, electricity surplus and shortage allocation coefficient and clean energy average output allocation coefficient corresponding to each target integrated energy system, the original allocation cost of each target integrated energy system is corrected to obtain the actual allocation cost of each target integrated energy system.

[0178] Specifically, after obtaining the waveform similarity sharing coefficient, electricity surplus / shortage sharing coefficient and clean energy average output sharing coefficient corresponding to each target integrated energy system, the original cost of each target integrated energy system can be corrected through numerical calculation, mathematical statistics and other methods based on the waveform similarity sharing coefficient, electricity surplus / shortage sharing coefficient and clean energy average output sharing coefficient corresponding to each target integrated energy system, so as to obtain the actual sharing cost of each target integrated energy system as the scheduling strategy of each integrated energy system.

[0179] As an optional embodiment, based on the waveform similarity allocation coefficient, electricity surplus / shortage allocation coefficient and clean energy average output allocation coefficient corresponding to each target integrated energy system, the original allocation cost of each target integrated energy system is corrected to obtain the actual allocation cost of each target integrated energy system, including: based on the waveform similarity allocation coefficient, electricity surplus / shortage allocation coefficient and clean energy average output allocation coefficient corresponding to each target integrated energy system, as well as the first weight value corresponding to the waveform similarity allocation coefficient, the second weight value corresponding to the electricity surplus / shortage allocation coefficient and the third weight value corresponding to the clean energy average output allocation coefficient, the correction coefficient corresponding to each target integrated energy system is calculated, and the first weight value, the second weight value and the third weight value are determined based on the hierarchical analysis method.

[0180] Specifically, in the embodiments of the present invention, Indicates The correction coefficient corresponding to each target integrated energy system is: , and Represent the first weight value, the second weight value and the third weight value respectively.

[0181] The first weight value in the embodiment of the present invention , the second weight value and the third weight value It can be obtained through the hierarchical analysis method. Among them, the hierarchical analysis method is based on the nine-level scaling method, which quantifies the importance between any two indicators based on subjective judgment, thereby forming a judgment matrix; the waveform similarity allocation coefficient, the power surplus and shortage allocation coefficient, the clean energy average output allocation coefficient, and the nine-level scale composed of the waveform similarity allocation coefficient are shown in Table 1 below.

[0182] Table 1 Nine-level scale table one

[0183]

[0184] By solving the judgment matrix to obtain the maximum eigenvalue and the corresponding eigenvector, and normalizing the eigenvector, the first weight value can be obtained. , the second weight value and the third weight value .

[0185] By performing consistency check on the judgment matrix, we can get the first weight value The value of is 0.122, the second weight value The value is 0.648 and the third weight value The value of is 0.230.

[0186] (26)

[0187] Based on the correction coefficient corresponding to each target integrated energy system, the original apportioned cost of each target integrated energy system is corrected to obtain the actual apportioned cost of each target integrated energy system.

[0188] Specifically, obtain the Correction coefficients corresponding to target integrated energy systems Afterwards, the following formula can be used to The original amortized cost of the target integrated energy system Make corrections and obtain Actual shared costs of a target integrated energy system :

[0189] (27)

[0190] in, Indicates The original amortized cost of each target integrated energy system; represents the control coefficient, and by adjusting this factor, the cost of cooperation is guaranteed to be better than the cost of competition. The value of is 0.15; Indicates The actual shared costs of the target integrated energy system; represents the operating cost of each target integrated energy system; Represents the total number of target integrated energy systems.

[0191] Step 105: Schedule each target integrated energy system according to its scheduling strategy.

[0192] Specifically, after obtaining the equilibrium solution of the electricity purchase and sales price provided by the target active distribution network, the equilibrium solution of the electricity purchase and sales power of each target integrated energy system to the target active distribution network, and the original allocated cost of each target integrated energy system, each target integrated energy system can be dispatched based on the equilibrium solution of the electricity purchase and sales price provided by the target active distribution network, the equilibrium solution of the electricity purchase and sales power of each target integrated energy system to the target active distribution network, and the original allocated cost of each target integrated energy system.

[0193] After constructing a hybrid game model between the target active distribution network and each target integrated energy system in the target active distribution network, the embodiment of the present invention solves the hybrid game model according to the operation objectives and operation constraints corresponding to the target active distribution network and the target integrated energy system, and obtains the equilibrium solution of the purchase and sale price of electricity provided by the target active distribution network and the equilibrium solution of the purchase and sale power of each target integrated energy system to the target active distribution network. Then, based on the equilibrium solution of the time-of-use electricity price provided by the target active distribution network and the equilibrium solution of the purchase and sale power of each target integrated energy system to the target active distribution network, the original apportioned cost of each target integrated energy system is obtained through the Shapley value method. After this, based on the target data, the original shared cost of each target integrated energy system is corrected to obtain the actual shared cost of each target integrated energy system, so as to dispatch each target integrated energy system according to the equilibrium solution of the purchase and sale price of electricity provided by the target active distribution network, the equilibrium solution of the purchase and sale power of each target integrated energy system to the target active distribution network and the original shared cost of each target integrated energy system. By dispatching the integrated energy system in the active distribution network, the energy utilization efficiency of the integrated energy system in the active distribution network can be improved, the carbon emissions of the integrated energy system in the active distribution network can be reduced, and the coordinated operation of the integrated energy system and the active distribution network can be realized.

[0194] As an optional embodiment, the method also includes: obtaining the dynamic factor of the carbon base price in any time period based on the carbon emissions of each target integrated energy system in any time period and the carbon emissions in the cycle in which any time period is located, wherein any cycle includes multiple time periods, and the duration of each time period in any cycle is equal.

[0195] Based on the dynamic factors of the carbon base price in any period of time, the carbon base price in any period of time is obtained. Based on the carbon base price in any period of time, the carbon trading cost of each target integrated energy system in any period of time is obtained as the scheduling strategy for each target integrated energy system.

[0196] It should be noted that the free allocation method adopted in the embodiment of the present invention realizes the allocation of the initial quota of carbon emissions of the target comprehensive energy system, and uses the baseline method to determine the share of carbon emission rights of the target comprehensive energy system. Among them, the objects with carbon emission rights allocation in the target comprehensive energy system include gas turbines, gas boilers and electricity purchased from the target active distribution network. The specific formula is expressed as follows:

[0197] (28)

[0198] in, Indicates The target integrated energy system is Carbon emission quota within the time period; The coefficient representing the carbon emission quota per unit of electricity purchased from the target active distribution network, The value is 0.2Kg / KW; The coefficient representing the carbon emission quota per unit of electrical power produced by a gas turbine, The value is 0.01Kg / KW; The coefficient representing the carbon emission quota per unit thermal power produced by a gas boiler, The value is 0.01Kg / KW; Indicates The gas turbine in the integrated energy system The electrical power generated during the time period; Indicates The gas turbine in the integrated energy system The thermal power generated during the period; Indicates The gas boiler in the target integrated energy system The heat generation power during the period; Indicates In the integrated energy system The power purchased from the target active distribution network during the period.

[0199] The formula of PHIES actual carbon emissions model is as follows:

[0200] (29)

[0201] Where: Indicates The target integrated energy system is Actual carbon emissions during the period; Indicates The target integrated energy system is Carbon emissions generated by purchasing electricity from the target active distribution network during the period; Indicates The gas turbine in the integrated energy system Carbon emissions during the period; Indicates The gas boiler in the target integrated energy system Carbon emissions during the period; It represents the actual carbon emission coefficient of the unit power purchased from the target active distribution network, The value is 0.1Kg / KW; Indicates the mass of carbon dioxide produced per cubic meter of natural gas. The value is 1.9Kg / m3; Indicates The gas turbine in the integrated energy system The volume of natural gas consumed during the period; Indicates The gas boiler in the target integrated energy system The volume of natural gas consumed during the period; Indicates The capture equipment in the target integrated energy system is The amount of carbon dioxide consumed during the time period.

[0202] It should be noted that traditional carbon-based prices are often set based on fixed standards or formulas, and lack real-time and dynamic responses to the actual carbon emissions of the integrated energy system. This results in the carbon-based price being unable to accurately reflect the actual situation of emission reduction in the integrated energy system, thereby weakening the role of the carbon-based price in promoting emission reduction in the integrated energy system.

[0203] Therefore, in the embodiment of the present invention, the carbon emissions in each time period and the total carbon emissions in a cycle are used as dynamic factors of the carbon base price to ensure that the target integrated energy system takes into account both short-term and long-term carbon emission benefits during operation, thereby reducing the carbon emissions of the target integrated energy system and encouraging the target integrated energy system to more actively participate in carbon emission reduction.

[0204] The calculation model of carbon trading costs with dynamic carbon base price is as follows:

[0205] (30)

[0206] (31)

[0207] (32)

[0208] Where: express The carbon base price during the period; represents the traditional carbon-based price, The value of is 0.2; and They represent the control coefficients, The value of is 0.005. The value of is 0.0002; express The carbon quota required to be purchased within the time period; L represents the length of the carbon emission interval, and the value of L is 50; represents the growth rate of carbon trading price, The value of is 0.25; represents the compensation coefficient, The value of is 0.25; Indicates Carbon trading costs for a comprehensive energy system with a target; Indicates The target integrated energy system is Actual carbon emissions during the period; Indicates The target integrated energy system is The amount of carbon emission quota within the time period; Indicates the weight corresponding to the traditional carbon base price; Indicates The target integrated energy system is The weight corresponding to the carbon emissions within the time period; Indicates The target integrated energy system is The weight corresponding to the carbon emissions in the period, , and The value of is obtained through the hierarchical analysis method.

[0209] According to the analytic hierarchy process, the traditional carbon-based price , No. The target integrated energy system is Carbon emissions during the period and The target integrated energy system is Carbon emissions during the period The nine-level scale is shown in Table 2 below.

[0210] Table 2 Nine-level scale table 2

[0211]

[0212] By solving the judgment matrix to obtain the weight of each indicator, and then performing consistency check on the judgment matrix, we can get The value of is 0.110, The value of is 0.586, The value of is 0.304.

[0213] In the embodiment of the present invention, an improved ladder carbon trading model based on a dynamic carbon base price is used, in which the carbon emissions in each time period during the operation of the target integrated energy system and the total carbon emissions within a cycle are set as dynamic factors of the carbon base price, and a pricing mechanism is constructed in which the carbon base price increases with the carbon emissions, thereby more effectively promoting emission reduction behaviors, ensuring the fairness and efficiency of the carbon market, and reducing the carbon emissions of the target integrated energy system.

[0214] The integrated energy system scheduling method provided by the present invention studies the problem of coordinated operation of multi-objective integrated energy systems after they are connected to the distribution network, and proposes a low-carbon hybrid game coordinated operation strategy for multi-park hydrogen-blended integrated energy systems connected to the active distribution network based on improved Shapely values. The quadratic interpolation algorithm is combined with Gurobi to solve the constructed model, and the low-carbon economic operation of the multi-objective integrated energy system connected to the target active distribution network is realized. The following conclusions are obtained by comparing the three scenarios set in the example:

[0215] First, a master-slave game model of the target active distribution network and the target integrated energy system alliance is constructed. The target active distribution network jointly formulates time-of-use electricity prices based on its own operating objectives and the power purchase and sales strategies of each target integrated energy system. This not only encourages each target integrated energy system to actively participate in peak shaving and valley filling, but also improves the operating efficiency of each target integrated energy system and ensures the coordinated operation of the distribution network and the target integrated energy system.

[0216] Second, for different source-load conflicts among multi-objective integrated energy systems, cooperative games are conducted among the target integrated energy systems. Compared with non-cooperative games, the operating costs of the target integrated energy systems are reduced by 2.84%, 3.91%, and 2.25%, respectively, and the carbon emissions of the target integrated energy systems are reduced by 13.54%, 18.98%, and 8.26%, respectively. This shows that cooperative games among the target integrated energy systems are conducive to reducing both the operating costs of the target integrated energy systems and the carbon emissions of the target integrated energy systems. However, the traditional Shapley value allocation scheme fails to consider factors such as power mutual assistance among various entities, which is not conducive to the cost allocation among various entities. The improved Shapley value allocation scheme adopted in this paper takes into account complex factors such as power mutual assistance among various entities. When the total cost of the target integrated energy system alliance is redistributed, the costs of target integrated energy system 1, target integrated energy system 2, and target integrated energy system 3 are reduced by 3.67%, 0.97%, and 4.91% respectively compared with the non-cooperative game. Since target integrated energy system 1 and target integrated energy system 3 have the largest contribution in the alliance, their costs are reduced again when they are allocated. This allocation method not only ensures that each entity can gain benefits from cooperation, but also ensures that the cost allocation of each entity is more reasonable.

[0217] Third, by setting carbon emissions as a dynamic adjustment factor of the carbon base price, constructing a pricing mechanism in which the carbon base price increases with carbon emissions, and proposing an improved ladder carbon trading model based on a dynamic carbon base price, the overall carbon emissions of the target integrated energy system were reduced by 7.08%. This shows that setting a dynamic carbon base price can help promote the system to reduce carbon emissions.

[0218] Fourth, adding carbon capture devices and other equipment to each target integrated energy system reduces the overall carbon emissions of the target integrated energy system by 73.17% compared to when the target integrated energy system does not add carbon capture devices and other equipment, which indicates that adding carbon capture devices and other equipment to the target integrated energy system can effectively reduce the overall carbon emissions of the target integrated energy system. Adding a small amount of hydrogen to natural gas as fuel for gas turbines and other equipment reduces the overall carbon emissions by 8.05% again compared to directly using natural gas as fuel for gas turbines and other equipment, indicating that adding a small amount of hydrogen to natural gas can also promote low-carbon transformation.

[0219] Figure 5 This is a schematic diagram of the structure of the integrated energy system dispatching device provided by the present invention. Figure 5 The integrated energy system scheduling device provided by the present invention is described. The integrated energy system scheduling device described below and the integrated energy system scheduling method provided by the present invention described above can be referred to each other. Figure 5As shown, the device includes: a model building module 501, a model solving module 502, a numerical calculation module 503, a numerical correction module 504 and a system scheduling module 505.

[0220] The model building module 501 is used to build a hybrid game model between the target active distribution network and each target integrated energy system, in which the target active distribution network is the leader relative to each target integrated energy system, each target integrated energy system is a follower relative to the target active distribution network, and any target integrated energy system is a collaborator relative to another target integrated energy system;

[0221] The model solving module 502 is used to solve the hybrid game model according to the operation objectives and operation constraints corresponding to the target active distribution network and the target integrated energy system, and obtain the equilibrium solution of the purchase and sale price of electricity provided by the target active distribution network and the equilibrium solution of the purchase and sale power of each target integrated energy system to the target active distribution network as the dispatching strategy of each target integrated energy system;

[0222] The numerical calculation module 503 is used to obtain the original allocated cost of each target integrated energy system through the Shapley value method based on the balanced solution of the time-of-use electricity price provided by the target active distribution network and the balanced solution of the power purchased and sold by each target integrated energy system to the target active distribution network;

[0223] The numerical correction module 504 is used to correct the original apportioned cost of each target integrated energy system based on the target data, and obtain the actual apportioned cost of each target integrated energy system as the scheduling strategy of each target integrated energy system. The target data includes the waveform similarity between the equivalent output curve of the clean energy in each target integrated energy system and the total load curve of each target integrated energy system, the surplus or shortage of electricity in each target integrated energy system, and the average output value and output fluctuation coefficient of the clean energy in each target integrated energy system.

[0224] The system scheduling module 505 is used to schedule each target integrated energy system according to the scheduling strategy of each target integrated energy system.

[0225] Specifically, the model building module 501, the model solving module 502, the numerical calculation module 503, the numerical correction module 504 and the system scheduling module 505 are electrically connected.

[0226] Figure 6 An example of a physical structure diagram of an electronic device is shown in FIG. Figure 6As shown, the electronic device may include: a processor 610, a communication interface 620, a memory 630 and a communication bus 640, wherein the processor 610, the communication interface 620 and the memory 630 communicate with each other through the communication bus 640. The processor 610 may call the logic instructions in the memory 630 to execute the integrated energy system scheduling method.

[0227] In addition, the logic instructions in the above-mentioned memory 630 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.

[0228] On the other hand, the present invention also provides a computer program product, which includes a computer program. The computer program can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the integrated energy system scheduling method provided by the above methods.

[0229] On the other hand, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the integrated energy system scheduling method provided by the above-mentioned methods.

[0230] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0231] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0232] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for scheduling an integrated energy system, characterized in that: include: Constructing a hybrid game model between the target active distribution network and each target integrated energy system, in which the target active distribution network is the leader relative to each target integrated energy system, each target integrated energy system is a follower relative to the target active distribution network, and any target integrated energy system is a collaborator relative to another target integrated energy system; According to the operation objectives and operation constraints corresponding to the target active distribution network and the target integrated energy system, the hybrid game model is solved to obtain the equilibrium solution of the purchase and sale price of electricity provided by the target active distribution network and the equilibrium solution of the purchase and sale of electricity power by each of the target integrated energy systems to the target active distribution network as the dispatching strategy of each of the target integrated energy systems; Based on the equilibrium solution of the time-of-use electricity price provided by the target active distribution network and the equilibrium solution of the power purchased and sold by each target integrated energy system to the target active distribution network, the original allocated cost of each target integrated energy system is obtained by the Shapley value method; Based on the target data, the original apportioned cost of each of the target integrated energy systems is corrected to obtain the actual apportioned cost of each of the target integrated energy systems as the scheduling strategy of each of the target integrated energy systems. The target data includes the waveform similarity between the equivalent output curve of the clean energy in each of the target integrated energy systems and the total load curve of each of the target integrated energy systems, the surplus or shortage of electricity in each of the target integrated energy systems, and the average output value and output fluctuation coefficient of the clean energy in each of the target integrated energy systems. Dispatching each of the target integrated energy systems according to the dispatching strategy of each of the target integrated energy systems; The method of modifying the original allocated cost of each target comprehensive energy system based on the target data to obtain the actual allocated cost of each target comprehensive energy system includes: Based on the waveform similarity between the equivalent output curve of clean energy in each of the target comprehensive energy systems and the total load curve of each of the target comprehensive energy systems, the waveform similarity allocation coefficient corresponding to each of the target comprehensive energy systems is obtained; based on the surplus or shortage of electricity in each of the target comprehensive energy systems, the surplus or shortage allocation coefficient corresponding to each of the target comprehensive energy systems is obtained; based on the average output value and output fluctuation coefficient of clean energy in each of the target comprehensive energy systems, the average output allocation coefficient of clean energy corresponding to each of the target comprehensive energy systems is obtained; Based on the waveform similarity allocation coefficient, power surplus and shortage allocation coefficient and clean energy average output allocation coefficient corresponding to each of the target comprehensive energy systems, the original allocation cost of each of the target comprehensive energy systems is corrected to obtain the actual allocation cost of each of the target comprehensive energy systems; The waveform similarity apportionment coefficient corresponding to the target integrated energy system is calculated by the following formula: ; in, Indicates The waveform similarity between the clean energy equivalent output curve of each target integrated energy system and the load curve of each target integrated energy system; Indicates The waveform similarity allocation coefficient corresponding to each target integrated energy system; Indicates The target integrated energy system is The actual output of photovoltaic power generation during the period; Indicates The target integrated energy system is The actual wind power output during the period; Indicates The target integrated energy system is Equivalent output of clean energy during the period; and All represent positive integers; The electricity surplus and shortage allocation coefficient corresponding to the target comprehensive energy system is calculated by the following formula: ; in, Indicates The amount of electricity surplus or shortage in the target integrated energy system; Indicates The electricity surplus and shortage allocation coefficient corresponding to each target comprehensive energy system; The average clean energy output allocation coefficient corresponding to the target comprehensive energy system is calculated by the following formula: ; in, Indicates The average output value of clean energy in the target integrated energy system; Indicates Output fluctuation value of clean energy in the target integrated energy system; Indicates The average clean energy output allocation coefficient corresponding to each target integrated energy system; The method further includes: obtaining a dynamic factor of the carbon base price in any time period based on the carbon emissions of each target integrated energy system in any time period and the carbon emissions in the cycle in which the any time period is located, wherein any cycle includes multiple time periods, and the duration of each time period in any cycle is equal; Based on the dynamic factor of the carbon base price in any period, the carbon base price in any period is obtained, and based on the carbon base price in any period, the carbon trading cost of each target integrated energy system in any period is obtained as a scheduling strategy for each target integrated energy system; The calculation model of carbon trading costs with dynamic carbon base price is as follows: ; Where: express Dynamic carbon base price within the time period; represents the traditional carbon-based price, The value of is 0.2; and They represent the control coefficients, The value of is 0.

005. The value of is 0.0002; Indicates Targeted Integrated Energy System The carbon quota required to be purchased within the time period; L represents the length of the carbon emission interval, and the value of L is 50; represents the growth rate of carbon trading price, The value of is 0.25; represents the compensation coefficient, The value of is 0.25; Indicates Carbon trading costs for a comprehensive energy system with a target; Indicates The target integrated energy system is Actual carbon emissions during the period; Indicates The target integrated energy system is The amount of carbon emission quota within the time period; Indicates the weight corresponding to the traditional carbon base price; Indicates The target integrated energy system is The weight corresponding to the carbon emissions within the time period; Indicates The target integrated energy system is The weight corresponding to the carbon emissions in the period, , and The value of is obtained through the hierarchical analysis method.

2. The integrated energy system scheduling method according to claim 1, characterized in that: The original apportionment cost of each target comprehensive energy system is corrected based on the waveform similarity apportionment coefficient, the power surplus and shortage apportionment coefficient and the clean energy average output apportionment coefficient corresponding to each target comprehensive energy system to obtain the actual apportionment cost of each target comprehensive energy system, including: Based on the waveform similarity allocation coefficient, the power surplus and shortage allocation coefficient and the clean energy average output allocation coefficient corresponding to each of the target comprehensive energy systems, as well as the first weight value corresponding to the waveform similarity allocation coefficient, the second weight value corresponding to the power surplus and shortage allocation coefficient and the third weight value corresponding to the clean energy average output allocation coefficient, the correction coefficient corresponding to each of the target comprehensive energy systems is calculated, and the first weight value, the second weight value and the third weight value are determined based on the hierarchical analysis method; Based on the waveform similarity allocation coefficient, electricity surplus and shortage allocation coefficient and clean energy average output allocation coefficient corresponding to each of the target integrated energy systems, the original allocation cost of each of the target integrated energy systems is corrected to obtain the actual allocation cost of each of the target integrated energy systems.

3. The integrated energy system scheduling method according to claim 1, characterized in that: The hybrid game model is solved according to the operation objectives and operation constraints corresponding to the target active distribution network and the target integrated energy system to obtain the equilibrium solution of the purchase and sale price of electricity provided by the target active distribution network and the equilibrium solution of the purchase and sale power of each target integrated energy system to the target active distribution network as the dispatch strategy of each target integrated energy system, including: Initializing model parameters of the hybrid game model, wherein the model parameters include initial values ​​of the purchase and sale electricity prices provided by the target active distribution network; In the case where this iterative calculation is the first iterative calculation, in this iterative calculation, based on the initial value of the purchase and sale price of electricity provided by the target active distribution network, according to the operating constraints corresponding to the target active distribution network and the target integrated energy system, the Gurobi solver is used to solve and obtain the alternative solutions for the purchase and sale power of each target integrated energy system to the target active distribution network corresponding to this iteration. In the case where this iterative calculation is not the first iterative calculation, in this iterative calculation, based on the alternative solution of the purchase and sale price of electricity provided by the target active distribution network corresponding to the previous iteration, according to the operating constraints corresponding to the target active distribution network and the target integrated energy system, the Gurobi solver is used to solve and obtain the alternative solutions for the purchase and sale power of each target integrated energy system to the target active distribution network corresponding to this iteration. According to the operation constraints corresponding to the target active distribution network and the target integrated energy system, based on the alternative solutions of the purchase and sale power of each target integrated energy system to the target active distribution network corresponding to this iteration, the alternative solution of the purchase and sale power price provided by the target active distribution network corresponding to this iteration is solved by using the quadratic interpolation optimization algorithm; Based on the alternative solutions of the purchase and sale of power from each of the target integrated energy systems corresponding to this iteration to the target active distribution network, the cost of the target active distribution network corresponding to this iteration is calculated; When it is determined that the cost of the target active distribution network corresponding to this iteration is lower than the cost of the target active distribution network corresponding to each historical iteration, it is judged whether the alternative solutions of the purchased and sold electricity power of each target comprehensive energy system corresponding to this iteration to the target active distribution network and the alternative solutions of the purchased and sold electricity price provided by the target active distribution network corresponding to this iteration meet the equilibrium condition. When it is determined that the alternative solutions of the purchased and sold electricity power of each target comprehensive energy system corresponding to this iteration to the target active distribution network and the alternative solutions of the purchased and sold electricity price provided by the target active distribution network corresponding to this iteration do not meet the equilibrium condition, the next iterative calculation is performed based on the alternative solutions of the purchased and sold electricity price provided by the target active distribution network corresponding to this iteration until it is determined that the alternative solutions of the purchased and sold electricity power of each target comprehensive energy system corresponding to this iteration to the target active distribution network and the alternative solutions of the purchased and sold electricity price provided by the target active distribution network corresponding to this iteration meet the equilibrium condition, and the equilibrium condition includes the alternative solutions of the purchased and sold electricity power of each target comprehensive energy system corresponding to this iteration to the target active distribution network and the alternative solutions of the purchased and sold electricity price provided by the target active distribution network corresponding to this iteration. The cost of the distribution network is not greater than the cost threshold of the target active distribution network corresponding to this iteration, the operating cost of each target comprehensive energy system corresponding to this iteration is not greater than the operating cost threshold of each target comprehensive energy system corresponding to this iteration, the operating cost of each target comprehensive energy system corresponding to this iteration is calculated based on the alternative solutions of the purchase and sale of electricity power from each target comprehensive energy system corresponding to this iteration to the target active distribution network, the operating cost threshold of each target comprehensive energy system corresponding to this iteration is calculated based on the alternative solutions of the purchase and sale price of electricity provided by the target active distribution network corresponding to this iteration and the alternative solutions of the purchase and sale of electricity power from each target comprehensive energy system corresponding to the previous iteration to the target active distribution network, the operating cost threshold of each target comprehensive energy system corresponding to this iteration is calculated based on the alternative solutions of the purchase and sale price of electricity provided by the target active distribution network corresponding to the previous iteration and the alternative solutions of the purchase and sale of electricity power from each target comprehensive energy system corresponding to this iteration to the target active distribution network; When it is determined that the alternative solutions for the purchase and sale of electricity power from each of the target integrated energy systems to the target active distribution network corresponding to this iteration and the alternative solutions for the purchase and sale of electricity prices provided by the target active distribution network corresponding to this iteration meet the equilibrium conditions, the alternative solutions for the purchase and sale of electricity power from each of the target integrated energy systems to the target active distribution network corresponding to this iteration are determined as the equilibrium solutions for the purchase and sale of electricity power from each of the target integrated energy systems to the target active distribution network, and the alternative solutions for the purchase and sale of electricity prices provided by the target active distribution network corresponding to this iteration are determined as the equilibrium solutions for the purchase and sale of electricity prices provided by the target active distribution network. When it is determined that the alternative solutions for the purchase and sale of electricity power from each of the target integrated energy systems to the target active distribution network corresponding to this iteration and the alternative solutions for the purchase and sale of electricity prices provided by the target active distribution network corresponding to this iteration do not meet the equilibrium conditions, it is determined whether the cumulative number of iterations has reached the maximum number of iterations; When it is determined that the cumulative number of iterations has reached the maximum number of iterations, the alternative solution of the purchase and sale of electricity power by each of the target integrated energy systems corresponding to this iteration to the target active distribution network is determined as the equilibrium solution of the purchase and sale of electricity power by each of the target integrated energy systems to the target active distribution network, and the alternative solution of the purchase and sale price of electricity provided by the target active distribution network corresponding to this iteration is determined as the equilibrium solution of the purchase and sale price of electricity provided by the target active distribution network. When it is determined that the cumulative number of iterations has not reached the maximum number of iterations, the next iterative calculation is performed based on the alternative solution of the purchase and sale price of electricity provided by the target active distribution network corresponding to this iteration.

4. The integrated energy system scheduling method according to claim 1, characterized in that: The operation targets corresponding to the target active distribution network and the target integrated energy system include the lowest cost of the target active distribution network and the lowest operation cost of each of the target integrated energy systems; The operating constraints corresponding to the target active distribution network include floating constraints on purchase and sale prices, transmission power constraints between the target comprehensive energy system, transmission power constraints between the target power grid and the upper-level power grid, active distribution network flow constraints, active distribution network line power capacity constraints and node voltage constraints. The operating constraints corresponding to the target comprehensive energy system include power balance constraints, gas turbine output and climbing constraints, gas boiler output and climbing constraints, electric boiler output and climbing constraints, electrolyzer equipment in carbon capture devices, methane reactor output and climbing constraints, carbon capture equipment output constraints and energy storage constraints.

5. The integrated energy system scheduling method according to any one of claims 1 to 4, characterized in that: The energy types in the target integrated energy system include electrical energy, thermal energy, gas energy and hydrogen energy; the target integrated energy system includes at least one of a gas turbine, a gas boiler, an electric boiler, a power-to-gas device, a carbon capture device and an energy storage device, the gas turbine includes a hydrogen-blended gas turbine, the gas boiler includes a hydrogen-blended gas boiler, the power-to-gas device includes an electrolyzer device, and the energy storage device includes an electrical energy storage device and a thermal energy storage device.

6. A comprehensive energy system scheduling device, characterized in that: include: A model building module is used to build a hybrid game model between the target active distribution network and each target integrated energy system, in which the target active distribution network is the leader relative to each target integrated energy system, each target integrated energy system is a follower relative to the target active distribution network, and any target integrated energy system is a collaborator relative to another target integrated energy system; A model solving module is used to solve the hybrid game model according to the operation objectives and operation constraints corresponding to the target active distribution network and the target integrated energy system, and obtain the equilibrium solution of the purchase and sale price of electricity provided by the target active distribution network and the equilibrium solution of the purchase and sale power of each target integrated energy system to the target active distribution network as the dispatching strategy of each target integrated energy system; A numerical calculation module, for obtaining the original allocated cost of each target integrated energy system by using the Shapley value method based on the equilibrium solution of the time-of-use electricity price provided by the target active distribution network and the equilibrium solution of the power purchased and sold by each target integrated energy system to the target active distribution network; A numerical correction module is used to correct the original apportioned cost of each target integrated energy system based on target data, and obtain the actual apportioned cost of each target integrated energy system as the scheduling strategy of each target integrated energy system. The target data includes the waveform similarity between the equivalent output curve of the clean energy in each target integrated energy system and the total load curve of each target integrated energy system, the surplus or shortage of electricity in each target integrated energy system, and the average output value and output fluctuation coefficient of the clean energy in each target integrated energy system. A system scheduling module, used for scheduling each of the target integrated energy systems according to a scheduling strategy of each of the target integrated energy systems; The numerical correction module corrects the original allocated cost of each target integrated energy system based on the target data to obtain the actual allocated cost of each target integrated energy system, including: Based on the waveform similarity between the equivalent output curve of clean energy in each of the target comprehensive energy systems and the total load curve of each of the target comprehensive energy systems, the waveform similarity allocation coefficient corresponding to each of the target comprehensive energy systems is obtained; based on the surplus or shortage of electricity in each of the target comprehensive energy systems, the surplus or shortage allocation coefficient corresponding to each of the target comprehensive energy systems is obtained; based on the average output value and output fluctuation coefficient of clean energy in each of the target comprehensive energy systems, the average output allocation coefficient of clean energy corresponding to each of the target comprehensive energy systems is obtained; Based on the waveform similarity allocation coefficient, power surplus and shortage allocation coefficient and clean energy average output allocation coefficient corresponding to each of the target comprehensive energy systems, the original allocation cost of each of the target comprehensive energy systems is corrected to obtain the actual allocation cost of each of the target comprehensive energy systems; The waveform similarity apportionment coefficient corresponding to the target integrated energy system is calculated by the following formula: ; in, Indicates The waveform similarity between the clean energy equivalent output curve of each target integrated energy system and the load curve of each target integrated energy system; Indicates The waveform similarity allocation coefficient corresponding to each target integrated energy system; Indicates The target integrated energy system is The actual output of photovoltaic power generation during the period; Indicates The target integrated energy system is The actual wind power output during the period; Indicates The target integrated energy system is Equivalent output of clean energy during the period; and All represent positive integers; The electricity surplus and shortage allocation coefficient corresponding to the target comprehensive energy system is calculated by the following formula: ; in, Indicates The amount of electricity surplus or shortage in the target integrated energy system; Indicates The electricity surplus and shortage allocation coefficient corresponding to each target comprehensive energy system; The average clean energy output allocation coefficient corresponding to the target comprehensive energy system is calculated by the following formula: ; in, Indicates The average output value of clean energy in the target integrated energy system; Indicates Output fluctuation value of clean energy in the target integrated energy system; Indicates The average clean energy output allocation coefficient corresponding to each target integrated energy system; The device is also used for: Based on the carbon emissions of each of the target comprehensive energy systems in any time period and the carbon emissions in the cycle in which the any time period is located, a dynamic factor of the carbon base price in the any time period is obtained, wherein the any cycle includes multiple time periods, and the duration of each of the time periods in the any cycle is equal; Based on the dynamic factor of the carbon base price in any period, the carbon base price in any period is obtained, and based on the carbon base price in any period, the carbon trading cost of each target integrated energy system in any period is obtained as a scheduling strategy for each target integrated energy system; The calculation model of carbon trading costs with dynamic carbon base price is as follows: ; Where: express Dynamic carbon base price within the time period; represents the traditional carbon-based price, The value of is 0.2; and They represent the control coefficients, The value of is 0.

005. The value of is 0.0002; Indicates Targeted Integrated Energy System The carbon quota required to be purchased within the time period; L represents the length of the carbon emission interval, and the value of L is 50; represents the growth rate of carbon trading price, The value of is 0.25; represents the compensation coefficient, The value of is 0.25; Indicates Carbon trading costs for a comprehensive energy system with a target; Indicates The target integrated energy system is Actual carbon emissions during the period; Indicates The target integrated energy system is The amount of carbon emission quota within the time period; Indicates the weight corresponding to the traditional carbon base price; Indicates The target integrated energy system is The weight corresponding to the carbon emissions within the time period; Indicates The target integrated energy system is The weight corresponding to the carbon emissions in the period, , and The value of is obtained through the hierarchical analysis method.

7. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the integrated energy system scheduling method as described in any one of claims 1 to 5 is implemented.

8. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the integrated energy system scheduling method as described in any one of claims 1 to 5 is implemented.