A geological survey device and method for tunnel design

By controlling the height of the ground-penetrating radar through tilt sensing and lifting mechanisms, the problem of ground-penetrating radar collisions due to tilting in tunnel design has been solved, and stable ground-penetrating radar surveys have been achieved.

CN118688722BActive Publication Date: 2024-11-08四川省亚通工程咨询有限公司
View PDF 11 Cites 0 Cited by

Patent Information

Application Number
CN202411170044.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-11-08
Estimated Expiration
2044-08-26

AI Technical Summary

Technical Problem

In existing technologies, when the moving roller encounters a ground protrusion on one side during tunnel design, the elastic component of the ground-penetrating radar tilts, resulting in insufficient compression and inability to effectively raise the height, leading to collision damage.

Method used

A tilt sensing mechanism is used to detect the tilt angle of the vehicle frame, and a lifting mechanism controls the rising height of the ground-penetrating radar. Combined with clamping and negative pressure components, the stability and fixation of the ground-penetrating radar are ensured.

Benefits of technology

This effectively avoids collision damage caused by tilting of the ground-penetrating radar, ensuring its stability and safety during tunnel exploration and enabling it to accurately overcome obstacles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118688722B_ABST
    Figure CN118688722B_ABST
Patent Text Reader

Abstract

The present invention provides a geological survey device and method for tunnel design, which relates to the field of radio wave detection technology. The method applies the device. The device includes: a frame, including a pallet, and four moving wheels are arranged in groups of two on the left and right sides below the pallet; a geological radar for surveying geology; a supporting mechanism for supporting the geological radar; a lifting mechanism for connecting the pallet and the supporting mechanism; and a tilt sensing mechanism for sensing the tilt angle of the pallet. The frame tilt angles detected by the tilt sensing mechanism can truly reflect the tilt degree of the frame at that time. The value obtained by subtracting a predetermined threshold from the frame tilt angle detected by the tilt sensing mechanism is the tilt overflow value. When the tilt overflow value is ≥0, the lifting mechanism causes the supporting mechanism to drive the geological radar to rise, so as to increase the distance between the geological radar and the ground, so as to facilitate crossing obstacles and avoid the geological radar from being damaged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of radio wave detection, and in particular to a geological survey device and method for tunnel design. Background Art

[0002] The preliminary work of tunnel design includes geological survey of the target area, which is generally carried out using geological radar. Geological radar, also known as ground penetrating radar, is an electronic device that uses high-frequency electromagnetic wave technology to detect underground objects. The geological radar transmits high-frequency electromagnetic waves to the underground through the transmitting antenna. When the electromagnetic waves encounter the detection target in the rock layer, a reflected signal will be generated. This reflected signal is received by the receiving antenna and input into the receiver, and is displayed by the oscilloscope after amplification. By analyzing the reflected signal on the oscilloscope, it can be determined whether there is a target to be measured underground, and the distance to the detection target can be roughly calculated based on the lag time of the reflected signal arrival and the average reflected wave velocity of the target object.

[0003] When the geological radar is detecting geology, the transmitting antenna is close to the ground. In the process of moving the geological radar, the transmitting antenna is easily damaged by collision with obstacles due to the uneven ground.

[0004] The Chinese patent document with application number 202311331413.3 proposes a solution, which uses a solution to measure the change in the height of the front moving roller from the ground to control the rising height of the geological radar. However, when only one side (or one end) of the front moving roller encounters a protrusion on the ground, the front moving roller tilts, and the compression amount of the elastic component is less than the actual height of the protrusion, resulting in the problem that the geological radar is not raised high enough and is still hit. Summary of the invention

[0005] In view of the above situation, the present invention provides a geological survey equipment and method for tunnel design, aiming to solve the technical problem in the prior art that when only one side (or one end) of the front moving roller encounters a protrusion on the ground, the front moving roller tilts, and the compression amount of the elastic component is less than the actual height of the protrusion, resulting in the geological radar not rising high enough and still being hit.

[0006] To achieve the above object, the present invention provides the following technical solutions:

[0007] In a first aspect, the present invention provides a geological survey device for tunnel design, comprising:

[0008] The frame includes a support plate, and four moving wheels are arranged in groups of two on the left and right sides below the support plate;

[0009] Geological radar, used for geological surveys;

[0010] A supporting mechanism, used for supporting the geological radar;

[0011] A lifting mechanism, used to connect the support plate and the supporting mechanism;

[0012] A tilt sensing mechanism, used for sensing the tilt angle of the support plate;

[0013] Among them, the value obtained by subtracting a predetermined threshold from the frame inclination angle detected by the inclination sensing mechanism is the inclination overflow; when the inclination overflow is ≥0, the lifting mechanism enables the supporting mechanism to drive the geological radar to rise.

[0014] In some embodiments of the present invention, the lifting mechanism comprises:

[0015] A guide rod, vertically fixed on the support plate;

[0016] A magnet is longitudinally slidably sleeved on the guide rod; the magnet is connected to the supporting mechanism;

[0017] An electromagnet, disposed on the support plate and located below the magnet;

[0018] The limit block is arranged on the guide rod and is located between the magnet and the electromagnet.

[0019] In some embodiments of the present invention, the tilt sensing mechanism comprises:

[0020] A fixing column made of conductive material is fixedly arranged above the supporting plate;

[0021] A lifting sleeve with a closed lower end and a longitudinal sliding sleeve arranged at the lower end of the fixed column;

[0022] An elastic member, connected between the lifting sleeve and the fixing column, and used to keep the sensing rod in a vertical state when the support plate is horizontal;

[0023] The sensing rod has a spherical portion at the upper end and a counterweight ball connected to the lower end; more than half of the spherical portion is located in the lower end of the lifting sleeve and can rotate 360 ​​degrees; the counterweight ball is in active contact with the upper side of the support plate;

[0024] A conductive member is arranged on the lifting sleeve and is in sliding contact with the side wall of the fixing column; the lower end of the fixing column and the conductive member are both connected to the power supply circuit where the electromagnet is located.

[0025] In some embodiments of the present invention, the supporting mechanism includes a vertical plate and a horizontal plate connected to each other to form an L-shape; the upper part of the vertical plate passes through the supporting plate and is connected to the magnet; the horizontal plate is used to support the geological radar.

[0026] In some embodiments of the present invention, the supporting mechanism also includes a clamping assembly for clamping the geological radar.

[0027] In some embodiments of the present invention, the clamping assembly comprises:

[0028] A clamping plate, with its right side facing the geological radar and its left side facing the vertical plate and having a connecting pipe; there is at least one clamping plate on the left and right sides of the geological radar respectively;

[0029] A connecting column, one end of which is connected to the vertical plate and the other end of which is plugged into the interior of the connecting pipe;

[0030] A compression spring is used to keep the clamping plate away from the vertical plate.

[0031] In some embodiments of the present invention, the right side of the splint has a groove connected to the connecting pipe, the interior of the connecting column has a connecting channel connected to the groove, and the connecting channel is connected to a negative pressure component.

[0032] In some embodiments of the present invention, the negative pressure component comprises:

[0033] A guide tube, vertically arranged on the support plate;

[0034] A sealing block slidingly fitted in the guide tube;

[0035] An extension rod, one end of which is connected to the sealing block and the other end of which extends outside the guide tube;

[0036] A telescopic conduit is connected to the connecting column at one end and connected to the guide tube at the other end and is located below the sealing block.

[0037] In some embodiments of the present invention, the negative pressure assembly further includes a tension spring, one end of which is connected to the magnet, and the other end of which is connected to the extension rod.

[0038] In a second aspect, the present invention provides a geological survey method for tunnel design, comprising:

[0039] Step S1, determining a moving path of the geological survey equipment for tunnel design, where a plurality of positions to be measured are distributed on the moving path;

[0040] Step S2, transporting the geological survey equipment for tunnel design to the first position to be measured on the moving path;

[0041] Step S3, detecting the geology of the location to be measured by geological radar;

[0042] Step S4: Move the geological survey equipment for tunnel design to detect other locations to be measured one by one.

[0043] The embodiments of the present invention have at least the following advantages or beneficial effects:

[0044] 1. The lifting mechanism is associated with the tilt sensing mechanism. The value obtained by subtracting the corresponding predetermined threshold from the frame tilt angle detected by the tilt sensing mechanism is the tilt overflow value. When the tilt overflow value is ≥ 0, the lifting mechanism causes the supporting mechanism to drive the geological radar to rise a certain distance to increase the distance between the geological radar and the ground, making it easier to cross obstacles and avoid the geological radar from being damaged.

[0045] Second, when the frame moves to the left, one or two moving wheels on the front side of the frame encounter a depression or protrusion on the ground, and the frame tilt angle detected by the tilt sensing mechanism can truly reflect the tilt degree of the frame at that time.

[0046] Compared with the prior art method of controlling the rising height of the geological radar by measuring the change in the height of the front moving roller from the ground, this embodiment uses the method of measuring the inclination angle to control the rising height of the geological radar, so that the lifting mechanism can accurately execute the action of raising the geological radar, so as to avoid the problem in the prior art that when only one side of the front moving roller encounters a protrusion on the ground, the compression amount of the elastic component is less than the actual height of the protrusion due to the inclination of the front moving roller, resulting in the geological radar not rising high enough and still being hit.

[0047] Other features and advantages of the present invention will be set forth in the description which follows, and in part will be apparent from the description, or may be learned by practicing the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0049] Figure 1 Schematic diagram of the structure of geological survey equipment for tunnel design;

[0050] Figure 2 for Figure 1 A partial enlarged view of position A in the middle;

[0051] Figure 3 is a structural schematic diagram of a tilt sensing mechanism;

[0052] Figure 4 for Figure 1 A partial enlarged view of position B in the middle.

[0053] icon:

[0054] 11- pallet, 12- moving wheel, 13- push handle,

[0055] 2- Geological radar,

[0056] 31-vertical plate, 32-horizontal plate, 33-support arm, 34-clamp, 341-connecting tube, 342-groove, 35-connecting column, 351-bump, 352-connecting channel, 36-compression spring, 371-guide tube, 372-sealing block, 373-extension rod, 374-telescopic guide tube, 375-tension spring,

[0057] 41-guide rod, 42-magnet, 43-electromagnet, 44-limit block,

[0058] 5-tilt sensing mechanism, 51-fixed column, 52-lifting sleeve, 54-sensing rod, 541-spherical part, 542-weight ball, 55-conductive part. DETAILED DESCRIPTION

[0059] In the following, only some exemplary embodiments are briefly described. As those skilled in the art can realize, the described embodiments can be modified in various different ways without departing from the spirit or scope of the embodiments of the present invention.

[0060] In the description of the embodiments of the present invention, it should be understood that the terms "longitudinal", "up", "down", "left", "right", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the embodiments of the present invention and simplifying the description. They do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they should not be understood as limitations on the embodiments of the present invention.

[0061] In addition, the term "plurality" means two or more than two, unless clearly and specifically defined otherwise.

[0062] In the embodiments of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be directly connected, or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the embodiments of the present invention can be understood according to specific circumstances.

[0063] The embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0064] Embodiment, first aspect, see Figure 1~Figure 4 This embodiment provides a geological survey equipment for tunnel design, including a frame, a geological radar 2, a supporting mechanism, a lifting mechanism and a tilt sensing mechanism 5.

[0065] The frame includes a support plate 11 and moving wheels 12. Two moving wheels 12 are arranged in pairs on the left and right sides below the support plate 11 to realize the mobility of the frame. The wheel width of the moving wheels 12 is not limited, and the spacing between the two moving wheels 12 is not limited. Preferably, the two moving wheels 12 are arranged close to each other. A push handle 13 for the user to push the frame is installed on the support plate 11; the push handle 13 can be telescopically adjusted in length.

[0066] Geological radar 2 is used for geological survey, and the survey results serve as one of the basic data for tunnel design.

[0067] The supporting structure is used for supporting the geological radar 2.

[0068] The lifting mechanism is used to connect the support plate 11 of the frame and the supporting mechanism to achieve the lifting and lowering of the supporting mechanism and the geological radar 2.

[0069] The tilt sensing mechanism 5 is used to detect and sense the tilt angle of the support plate 11 .

[0070] In the process of the frame moving to the left, if the two moving wheels 12 on the left side of the frame encounter a protrusion on the ground, the tilt sensing mechanism 5 can detect the tilt angle of the frame; if the two moving wheels 12 on the front side of the frame encounter a depression on the ground, the tilt sensing mechanism 5 can also detect the tilt angle of the frame; in addition, if only one moving wheel 12 on the front side of the frame encounters a protrusion on the ground, the tilt sensing mechanism 5 can detect the tilt angle of the frame; if only one moving wheel 12 on the front side of the frame encounters a depression on the ground, the tilt sensing mechanism 5 can also detect the tilt angle of the frame. That is, in the process of the frame moving to the left, if one or two moving wheels 12 on the front side of the frame encounter a depression or protrusion on the ground, the tilt angle of the frame detected by the tilt sensing mechanism 5 can truly reflect the tilt degree of the frame at that time.

[0071] The lifting mechanism is associated with the tilt sensing mechanism 5. The value obtained by subtracting the corresponding predetermined threshold from the frame tilt angle detected by the tilt sensing mechanism 5 is the tilt overflow value. When the tilt overflow value is ≥0, the lifting mechanism causes the supporting mechanism to drive the geological radar 2 to rise a certain distance to increase the distance between the geological radar 2 and the ground, so as to facilitate crossing obstacles; when the tilt overflow value is <0, the lifting mechanism causes the supporting mechanism to drive the geological radar 2 to move down and reset.

[0072] The lifting mechanism includes a guide rod 41 , a magnet 42 , an electromagnet 43 and a limit block 44 .

[0073] The guide rod 41 is vertically fixed on the support plate 11 .

[0074] The magnet 42 is longitudinally slidably sleeved on the guide rod 41; the magnet 42 is connected to the supporting mechanism.

[0075] The electromagnet 43 is arranged on the support plate 11 and is located below the magnet 42. The electromagnet 43 is connected to a power supply circuit (not shown in the figure) for supplying power to the electromagnet 43 so as to generate magnetism.

[0076] The limit block 44 is disposed on the guide rod 41 and is located between the magnet 42 and the electromagnet 43 . The limit block 44 is used to limit the downward movement of the magnet 42 .

[0077] The working principle of the lifting mechanism is: when the electromagnet 43 is energized, the magnet 42 moves upward due to the repulsion of the magnetic force, thereby driving the supporting mechanism and the geological radar 2 to move upward; when the electromagnet 43 is powered off or the current decreases, the magnet 42 moves downward with the supporting mechanism and the geological radar 2.

[0078] The tilt sensing mechanism 5 includes a fixing column 51 , a lifting sleeve 52 , an elastic member (not shown in the figure), a sensing rod 54 and a conductive member 55 .

[0079] The fixing column 51 is fixedly disposed above the support plate 11 ; the fixing column 51 is made of conductive material.

[0080] The lifting sleeve 52 is longitudinally slidably sleeved on the lower end of the fixed column 51; the lower end of the lifting sleeve 52 is closed.

[0081] The elastic member is connected between the lifting sleeve 52 and the fixing column 51 , and is used to move the lifting sleeve 52 upward relative to the fixing column 51 , so that the sensing rod 54 is in a vertical state when the support plate 11 of the frame is horizontal.

[0082] The upper end of the sensing rod 54 has a spherical portion 541 and the lower end is connected to a weighted ball 542 ; more than half of the spherical portion 541 is located in the lower end of the lifting sleeve 52 and can rotate 360°; the weighted ball 542 is in active contact with the upper side of the support plate 11 .

[0083] The conductive member 55 is disposed on the lifting sleeve 52 and is in sliding contact with the side wall of the fixed column 51. The lower end of the fixed column 51 and the conductive member 55 are both connected to the power supply circuit where the electromagnet 43 is located.

[0084] The working principle of the tilt sensing mechanism 5 is: when the support plate 11 of the frame is horizontal, under the action of the elastic member, the sensing rod 54 is in a vertical state; when the support plate 11 of the frame is tilted in any direction, the counterweight ball 542 moves under the action of the oblique downward component force generated by its own gravity and drives the sensing rod 54 to tilt, so that the lifting sleeve 52 moves downward, the vertical distance between the lower end of the fixed column 51 and the conductive member 55 is reduced, and the length of the fixed column 51 connected to the power supply circuit is reduced, the resistance value of the fixed column 51 in the power supply circuit is also reduced, and the current supplied by the power supply circuit to the electromagnet 43 is also increased, and the repulsive force of the electromagnet 43 on the magnet 42 is increased, so that the magnet 42 drives the supporting mechanism and the geological radar 2 to move upward to meet the obstacle avoidance requirements.

[0085] It can be understood that the greater the inclination of the support plate 11, the greater the downward component of the force generated by the weight ball 542 due to its own gravity, the greater the inclination of the sensing rod 54 driven by the weight ball 542, the greater the downward distance of the lifting sleeve 52, the shorter the length of the fixed column 51 connected to the power supply circuit, the greater the repulsive force of the electromagnet 43 on the magnet 42, and the greater the distance that the magnet 42 drives the supporting mechanism and the geological radar 2 to move upward, thereby effectively avoiding collision.

[0086] The supporting mechanism includes a vertical plate 31 and a horizontal plate 32 which are connected to each other to form an L shape.

[0087] The upper portion of the vertical plate 31 passes through the support plate 11 and is connected to the magnet 42 through the support arm 33 .

[0088] The transverse plate 32 is used to support the edge of the geological radar 2 , and two transverse plates 32 are respectively arranged on the left and right sides of the geological radar 2 .

[0089] The geological radar 2 can be placed on the horizontal plate 32 to support the geological radar 2, so that the geological radar 2 can be moved by moving the frame to change the detection position.

[0090] The supporting mechanism further comprises a clamping assembly for clamping the geological radar 2. The clamping assembly comprises a clamping plate 34, a connecting column 35 and a compression spring 36.

[0091] The right side of the clamping plate 34 faces the geological radar 2, and the left side faces the vertical plate 31 and has a connecting pipe 341. There is at least one clamping plate 34 on the left and right sides of the geological radar 2, respectively.

[0092] One end of the connecting column 35 is connected to the vertical plate 31 , and the other end is plugged into the interior of the connecting pipe 341 .

[0093] The compression spring 36 is sleeved on the connecting pipe 341 , one end of the compression spring 36 is connected to the vertical plate 31 , and the other end is connected to the clamping plate 34 . The compression spring 36 is used to keep the clamping plate 34 away from the vertical plate 31 .

[0094] In the process of placing the geological radar 2 on the horizontal plate 32, the clamping plate 34 contacts the side wall of the geological radar 2 under the action of the restoring force of the compression spring 36, and the multiple clamping plates 34 cooperate with each other to clamp the geological radar 2 together, thereby cooperating with the horizontal plate 32 to better fix and limit the geological radar 2. In addition, through the setting of the compression spring 36, the clamping assembly also meets the needs of clamping geological radars 2 of various sizes.

[0095] A protrusion 351 is provided on the outer wall of the connecting column 35, and a sliding groove slidably connected to the protrusion 351 is provided on the inner wall of the connecting tube 341. The sliding groove does not extend to the end of the connecting tube 341 to prevent the connecting column 35 from detaching from the connecting column 35 under the action of the compression spring 36.

[0096] Furthermore, in order to better fix and limit the geological radar 2, the right side of the clamping plate 34 has a groove 342 connected to the connecting pipe 341, and the interior of the connecting column 35 has a connecting channel 352 connected to the groove 342, and the connecting channel 352 is connected to the negative pressure component. After the clamping plate 34 contacts the geological radar 2, the negative pressure component can be used to make the groove 342 generate suction on the geological radar 2, so as to better fix and limit the geological radar 2.

[0097] The negative pressure assembly includes a guide tube 371 , a sealing block 372 , an extension rod 373 and a telescopic catheter 374 .

[0098] The guide tube 371 is vertically arranged on the support plate 11 .

[0099] The sealing block 372 is slidably fitted in the guide tube 371 .

[0100] One end of the extension rod 373 is connected to the sealing block 372 , and the other end extends to the outside of the guide tube 371 .

[0101] One end of the telescopic guide tube 374 is connected to the connecting column 35 , and the other end is connected to the guide tube 371 and is located below the sealing block 372 .

[0102] The sealing block 372 can be moved upward by pulling the extension rod 373 upward. When the sealing block 372 moves upward, the groove 342 will generate suction on the geological radar 2 like a syringe, thereby better fixing and limiting the geological radar 2.

[0103] The negative pressure assembly also includes a tension spring 375, one end of which is connected to the magnet 42 or the arm 33, and the other end is connected to the extension rod 373. When the magnet 42 and the arm 33 move upward, the tension spring 375 is stretched, and the sealing block 372 is subjected to an upward pulling force and tends to move upward, so that the groove 342 generates suction force on the geological radar 2, thereby better fixing and limiting the geological radar 2.

[0104] Second, see Figure 1~Figure 4 This embodiment provides a geological survey method for tunnel design, comprising the following steps:

[0105] Step S1, determining a moving path of the geological survey equipment for tunnel design, where a plurality of positions to be measured are distributed on the moving path;

[0106] Step S2, transporting the geological survey equipment for tunnel design to the first position to be measured on the moving path;

[0107] Step S3, detecting the geology of the location to be measured by using the geological radar 2;

[0108] Step S4: Move the geological survey equipment for tunnel design to detect other locations to be measured one by one.

[0109] In combination with the above content, this embodiment has at least the following beneficial effects:

[0110] 1. The lifting mechanism is associated with the tilt sensing mechanism 5. The value obtained by subtracting the corresponding predetermined threshold from the frame tilt angle detected by the tilt sensing mechanism 5 is the tilt overflow value. When the tilt overflow value is ≥ 0, the lifting mechanism causes the supporting mechanism to drive the geological radar 2 to rise a certain distance to increase the distance between the geological radar 2 and the ground, so as to facilitate crossing obstacles and avoid the geological radar 2 from being damaged.

[0111] Second, when the frame moves to the left, one or two moving wheels 12 on the front side of the frame encounter a depression or protrusion on the ground, and the frame tilt angle detected by the tilt sensing mechanism 5 can truly reflect the tilt degree of the frame at that time.

[0112] Compared with the prior art method of controlling the rising height of the geological radar 2 by measuring the change in the height of the front moving roller from the ground, this embodiment uses the method of measuring the inclination angle to control the rising height of the geological radar 2, so that the lifting mechanism can accurately execute the action of raising the geological radar 2, so as to avoid the problem in the prior art that when only one side of the front moving roller encounters a protrusion on the ground, the compression amount of the elastic component is less than the actual height of the protrusion due to the inclination of the front moving roller, resulting in the geological radar 2 not rising enough and still being hit.

[0113] 3. This embodiment can increase the distance between the geological radar 2 and the ground when the support plate 11 is tilted in all directions due to depressions or protrusions, thereby better avoiding obstacles.

[0114] Fourth, in the process of placing the geological radar 2 on the horizontal plate 32, the clamping plate 34 contacts the side wall of the geological radar 2 under the action of the restoring force of the compression spring 36, and the multiple clamping plates 34 cooperate with each other to clamp the geological radar 2 together, thereby cooperating with the horizontal plate 32 to better fix and limit the geological radar 2. In addition, through the setting of the compression spring 36, the clamping assembly also meets the needs of clamping geological radars 2 of various sizes.

[0115] 5. The negative pressure component is linked to the lifting mechanism so that the groove 342 can easily generate suction on the geological radar 2 through the negative pressure component, thereby better fixing and limiting the geological radar 2.

[0116] Finally, it should be noted that the above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. In the absence of conflicts, the embodiments of the present application and the features in the embodiments may be arbitrarily combined with each other. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A geological survey equipment for tunnel design, characterized in that: include: The frame includes a support plate, and four moving wheels are arranged in groups of two on the left and right sides below the support plate; A retractable push handle is installed on the support plate; Geological radar, used for geological surveys; A supporting mechanism, used for supporting the geological radar; A lifting mechanism, used to connect the support plate and the supporting mechanism; A tilt sensing mechanism, used for sensing the tilt angle of the support plate; The value obtained by subtracting a predetermined threshold from the frame inclination angle detected by the inclination sensing mechanism is the inclination overflow value; when the inclination overflow value is ≥0, the lifting mechanism enables the supporting mechanism to drive the geological radar to rise; The lifting mechanism comprises: A guide rod, vertically fixed on the support plate; A magnet is longitudinally slidably sleeved on the guide rod; the magnet is connected to the supporting mechanism; An electromagnet, disposed on the support plate and located below the magnet; A limit block, arranged on the guide rod and located between the magnet and the electromagnet; The tilt sensing mechanism comprises: A fixing column made of conductive material is fixedly arranged above the supporting plate; A lifting sleeve with a closed lower end and a longitudinal sliding sleeve arranged at the lower end of the fixed column; An elastic member, connected between the lifting sleeve and the fixing column, and used to keep the sensing rod in a vertical state when the support plate is horizontal; The sensing rod has a spherical portion at the upper end and a counterweight ball connected to the lower end; more than half of the spherical portion is located in the lower end of the lifting sleeve and can rotate 360 ​​degrees; the counterweight ball is in active contact with the upper side of the support plate; A conductive member is arranged on the lifting sleeve and is in sliding contact with the side wall of the fixing column; the lower end of the fixing column and the conductive member are both connected to the power supply circuit where the electromagnet is located.

2. The geological survey equipment for tunnel design according to claim 1, characterized in that: The supporting mechanism includes a vertical plate and a horizontal plate which are connected to each other to form an L shape; the upper part of the vertical plate passes through the supporting plate and is connected to the magnet; the horizontal plate is used to support the geological radar.

3. The geological survey equipment for tunnel design according to claim 2, characterized in that: The supporting mechanism also includes a clamping assembly for clamping the geological radar.

4. The geological survey equipment for tunnel design according to claim 3, characterized in that: The clamping assembly comprises: A clamping plate, with its right side facing the geological radar and its left side facing the vertical plate and having a connecting pipe; there is at least one clamping plate on the left and right sides of the geological radar respectively; A connecting column, one end of which is connected to the vertical plate and the other end of which is plugged into the interior of the connecting pipe; A compression spring is used to keep the clamping plate away from the vertical plate.

5. The geological survey equipment for tunnel design according to claim 4, characterized in that: The right side of the clamping plate is provided with a groove connected to the connecting pipe, the interior of the connecting column is provided with a connecting channel connected to the groove, and the connecting channel is connected to a negative pressure component.

6. The geological survey equipment for tunnel design according to claim 5, characterized in that: The negative pressure component comprises: A guide tube, vertically arranged on the support plate; A sealing block slidingly fitted in the guide tube; An extension rod, one end of which is connected to the sealing block and the other end of which extends outside the guide tube; A telescopic conduit is connected to the connecting column at one end and connected to the guide tube at the other end and is located below the sealing block.

7. The geological survey equipment for tunnel design according to claim 6, characterized in that: The negative pressure assembly also includes a tension spring, one end of which is connected to the magnet, and the other end of which is connected to the extension rod.

8. A geological survey method for tunnel design, characterized in that: include: Step S1, determining a moving path of the geological survey equipment for tunnel design according to any one of claims 1 to 7, wherein a plurality of positions to be measured are distributed on the moving path; Step S2, transporting the geological survey equipment for tunnel design to the first position to be measured on the moving path; Step S3, detecting the geology of the location to be measured by geological radar; Step S4: Move the geological survey equipment for tunnel design to detect other locations to be measured one by one.

Citation Information

Patent Citations

  • Tunnel geological radar mobile intelligent detection equipment

    CN117075104A

  • Bracket equipment suitable for moving and transporting geological radar in complex terrain

    CN115257902A

  • Auxiliary driving lifting device for three-dimensional geological radar detection

    CN117022125A

  • Pipeline burial depth precision detection device

    CN117386939A

  • Geological survey instrument convenient to move for civil engineering

    CN118112561A