A grooving method for pre-buried pipelines in roads and bridges

By combining the use of the basic linkage mechanism and the grinding drive mechanism, the problems of uneven pipe grooves and a lot of impurities after grooves in the prior art are solved, efficient grooves and cleaning are achieved, and labor and dust generation are reduced.

CN118704551BActive Publication Date: 2024-12-10LIAOCHENG HOUDE DEV & CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411172881.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-12-10
Estimated Expiration
2044-08-26

AI Technical Summary

Technical Problem

The existing trenching equipment for pre-embedding of road and bridge pipelines has a single function. The pipe groove after the trench is uneven and there are many internal impurities, which requires secondary treatment, which increases the labor volume.

Method used

The basic linkage mechanism and grinding drive mechanism are used in combination. The cutting wheel is cut and polished by grinding the grinding disc, combined with water mist spraying, and the power connection drives the mist to remove impurities to reduce subsequent treatment.

Benefits of technology

Improves groove quality and flatness, reduces dust generation, reduces labor volume, and simplifies work flow.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118704551B_ABST
    Figure CN118704551B_ABST
Patent Text Reader

Abstract

The present invention discloses a grooving method for pre-buried pipelines of roads and bridges, S1, position movement: before use, push the moving carriage in the basic linkage mechanism to the construction point, and then adjust the direction; S2, descending start: after the movement of the equipment is completed, start the cylinder in the grinding drive mechanism to lower the grooving wheel and the cutting wheel to contact the ground, and the present invention relates to the technical field of pre-buried pipelines. The grooving method for pre-buried pipelines of roads and bridges, by combining the basic linkage mechanism and the grinding drive mechanism, the arrangement of these two mechanisms can spray water mist to reduce dust during grooving, and can also use the cutting wheel to cut in advance to improve the flatness. After grooving a certain distance, the power docking and linkage between the structures can be used to drive the grinding disc and the impurity removal frame to drive synchronously, so as to grind and remove impurities inside the pipe groove, improve the internal environment of the pipe groove, avoid secondary construction, reduce labor, and facilitate the use of staff.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pipeline pre-embedding, and in particular to a grooving method for pre-embedding pipelines of roads and bridges. Background Art

[0002] After the road is paved, it is sometimes necessary to groove the asphalt or cement road surface to discharge water pipes, gas pipes and other pipelines. Therefore, a grooving device is needed. When the grooving device grooves the road surface, a large amount of dust will be generated. The flying dust will pollute the environment around the workplace. The existing grooving device cannot reduce dust, which will affect the health of people after inhalation. Patent documents have been made to improve this.

[0003] For example, Chinese patent CN212128799U discloses a grooving device for pre-buried pipelines of roads and bridges, comprising a base box, the inner cavity of the base box is fixedly connected to a battery, the four corners of the bottom of the base box are fixedly connected to wheels, the left side of the top of the base box is fixedly connected to a water tank, the top of the water tank is connected to a water injection funnel, the bottom of the right side of the water tank is connected to a water pump, the water outlet of the water pump is connected to a water pipe, the right side of the top of the base box is fixedly connected to a vertical plate, and the top of the right side of the vertical plate is fixedly connected to a fixed plate. The utility model has the advantages of being able to reduce dust on the road surface during grooving, which is beneficial to the health of personnel, by providing a base box, wheels, a water tank, a water injection funnel, a water pump, a water pipe, a vertical plate, a fixed plate, an electric telescopic rod, a protective cover, a grooved wheel, a nozzle, a battery, a motor, a movable rod, a slide, a fixed rod, a threaded rod, a slider and a turning handle for coordinated use.

[0004] Although the equipment in the above document reduces dust generated by the equipment during slotting by spraying water mist, its overall functionality is single and also has defects, such as:

[0005] When the equipment is used, it only relies on the slotting wheel to make slots. However, the surface of the slotting wheel is generally attached with raised grinding blocks, so the side wall of the pipe groove will be uneven during the slotting. At the same time, a large number of impurities such as stones will be left inside the pipe groove, and the staff will need to perform secondary processing later, which increases the labor and the process is cumbersome.

[0006] Therefore, a kind of pre-buried grooving equipment for road and bridge pipelines capable of grinding and cleaning the pipe groove is now designed to solve such defects. Summary of the invention

[0007] In view of the deficiencies in the prior art, the present invention provides a grooving method for pre-buried road and bridge pipelines, which solves the problem that the existing grooving equipment has a single function, and the internal unevenness after grooving has many impurities and requires secondary processing, which increases the labor workload.

[0008] To achieve the above objectives, the present invention is implemented through the following technical solutions: a method for pre-embedded grooving of road and bridge pipelines, specifically comprising the following steps:

[0009] S1. Position movement: Before use, push the moving carriage in the basic linkage mechanism to the construction point and then adjust the direction;

[0010] S2, descending start: after the equipment is moved, the cylinder in the grinding drive mechanism is started to lower the slotting wheel and the cutting wheel to contact the ground;

[0011] S3, Spraying and grooving: After contacting the ground, start the water pump and the motor, the motor drives the cutting wheel and the grooving wheel to rotate to groove the ground, and at the same time the nozzle sprays water mist to reduce dust;

[0012] S4, power docking: after the slotting wheel has slotted a certain distance, the threaded rod is rotated to lower the debris removal frame and the grinding disc into the slotted groove through the lifting and pressing plate, and after the lifting and pressing plate is lowered, the first gear and the second gear are docked;

[0013] S5, side wall grinding: after the first gear and the second gear are connected, two grinding discs grind the inner wall of the pipe groove to make it flat and neat;

[0014] S6. Impurity discharge: At the same time, the bottom shovel plate contacts the bottom of the pipe groove, and the rotating transmission of the conveyor belt and the lifting plate transfers the impurities after the groove is opened to the inner side of the impurity discharge frame. After the impurities reach the inside of the impurity discharge frame, they are discharged on the surface of the road through the material guide inclined pipe.

[0015] Preferably, the basic linkage mechanism includes a moving carriage, and the grinding drive mechanism includes two second slide plates, the two second slide plates are respectively fixedly installed on the front and rear of the left side of the moving carriage, and a second slider is slidably installed on the inner side of the second slide plate, and a load-bearing frame is fixedly connected between the two second sliders through a bracket, and a motor is fixedly connected to the front side of the bottom of the load-bearing frame through a bracket, and the output shaft of the motor is fixedly connected to a driven rod through a coupling, and the rear end of the driven rod is connected to the load-bearing frame through a bearing member, and a slotted wheel is fixedly connected to the surface of the driven rod, and cutting wheels that cooperate with each other are installed on the surface and rear of the slotted wheel.

[0016] Preferably, a cylinder is fixedly connected to the left side of the movable carriage via a fixed seat, and the top of the cylinder is fixedly connected to the load-bearing frame via a fixed plate, the top of the load-bearing frame is fixedly connected to the main water pipe via a fixed block, and the front and rear parts of the left side of the main water pipe are fixedly connected to a water pipe rack via openings, and a nozzle is provided on one side of the water pipe rack, and a third slide plate is fixedly installed on the left side of the front and rear parts of the inner cavity of the movable carriage, a third slider is slidably installed on the inner side of the third slide plate, and a fourth rotating rod is rotatably connected between the two third sliders via a bearing member.

[0017] Preferably, a synchronous plate is rotatably connected between the fourth rotating rod and the driven rod, the fourth rotating rod and the driven rod are connected via a third pulley and a third belt transmission, the two third pulleys are rotatably connected to the synchronous plate via bearings, a second gear is fixedly connected to the surface of the fourth rotating rod, and a lifting port for use with the third belt is opened on the left side of the mobile carriage.

[0018] Preferably, a water tank is fixedly installed on the top of the mobile carriage through a fixing plate, a water pump is installed on the left side of the water tank through an opening, and a water pipe is fixedly installed on the left side of the water pump through an opening, and one end of the water pipe is connected to the main water pipe.

[0019] Preferably, the front and rear sides of the inner cavity of the moving carriage are fixedly installed with a first slide plate, the right side of the inner cavity of the moving carriage is rotatably connected with a threaded rod through a bearing member, and the top of the threaded rod penetrates the moving carriage and extends to the upper part of the moving carriage, the surface of the threaded rod and the inner side of the moving carriage are threadedly connected with a lifting and lowering plate, the inner side of the first slide plate is slidably installed with a first slider, the two first sliders are fixedly connected to the lifting and lowering plate through a bracket, the bottom of the lifting and lowering plate is fixedly connected with a rotating groove seat through a bracket, and the inner side of the rotating groove seat is rotatably connected with a first rotating rod, and the surface of the first rotating rod and the front and rear parts of the rotating groove seat are fixedly connected with a grinding disc.

[0020] Preferably, the left side of the lifting and pressing plate is fixedly connected to a bearing sleeve via a bracket, the inner side of the bearing sleeve is rotatably connected to a second rotating rod, the rear end of the second rotating rod is fixedly connected to a first gear used in conjunction with the second gear, and the first rotating rod and the second rotating rod are connected to the first belt transmission via a first pulley.

[0021] Preferably, the right side of the bottom of the lifting and pressing plate is fixedly connected to a debris removal frame through a bracket, and the upper and lower sides between the front and rear parts of the inner cavity of the debris removal frame are rotatably connected to a third rotating rod through a bearing member, and the surface of the third rotating rod is fixedly connected to a transmission wheel, and the two transmission wheels are connected by a transmission belt, and a lifting plate is arranged on the surface of the transmission belt.

[0022] Preferably, the front end of the upper third rotating rod passes through the impurity discharge frame and extends to the front of the impurity discharge frame, the upper third rotating rod is connected to the first rotating rod through a second pulley and a second belt transmission, and the bottom of the impurity discharge frame is fixedly connected with a bottom shovel plate.

[0023] Preferably, the front and rear parts of the right side of the bottom of the impurity removal frame are fixedly connected with a material guiding inclined pipe through an opening, the surface and the rear part of the movable carriage are provided with a movable opening, and one end of the material guiding inclined pipe passes through the movable opening and extends to the outside of the movable carriage. Beneficial Effects

[0024] The present invention provides a grooving method for pre-embedded pipelines in roads and bridges. Compared with the existing technology, it has the following beneficial effects:

[0025] (1) The grooving method for pre-buried pipelines of roads and bridges is achieved by combining a basic linkage mechanism and a grinding drive mechanism. The two mechanisms can spray water mist to reduce dust during grooving, and can also use a cutting wheel to cut in advance to improve flatness. After grooving a certain distance, the power connection and linkage between the structures can be used to drive the grinding disc and the debris removal frame to be driven synchronously, so as to grind and remove debris from the inside of the pipe groove, improve the internal environment of the pipe groove, avoid secondary construction, reduce labor, and facilitate the use of staff.

[0026] (2) The grooving method for pre-buried pipelines of road bridges is characterized by arranging two grinding discs on the inner side of the mobile carriage and connecting them to the debris removal frame through a first pulley. After the power connection is completed, the two grinding discs can be driven to rotate and the inner wall of the pipe groove can be polished to improve the flatness of the inside of the pipe groove, thereby improving the grooving quality and satisfying the current use.

[0027] (3) The grooving method for pre-buried pipelines of road bridges is to install a debris removal frame at the bottom of the lifting and pressure plate using a bracket, and to set a conveyor belt and a lifting plate inside the debris removal frame, which is used in conjunction with a material guide inclined pipe. The arrangement of these structures can use the bottom shovel plate to shovel together impurities during movement, and then use the material guide inclined pipe to discharge the impurities on the top of the road surface through transmission, thereby avoiding subsequent cleaning by staff and reducing workload.

[0028] (4) The grooving method for pre-buried road and bridge pipelines is characterized by installing water pipe racks at the front and rear of the cutting wheel, and providing nozzles at opposite angles on one side of the water pipe racks. The arrangement of these structures can spray the grooved area in a concentrated manner during grooving, effectively reducing the amount of dust, and can also be moistened for subsequent grinding, effectively improving the overall functionality of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a schematic diagram of the process of the present invention;

[0030] Figure 2 It is a structural schematic diagram of the present invention;

[0031] Figure 3 is a cross-sectional view of the mobile carriage structure of the present invention;

[0032] Figure 4 It is a schematic diagram of the first gear, the first pulley and the impurity removal frame structure of the present invention;

[0033] Figure 5 It is a cross-sectional view of the impurity removal frame structure of the present invention;

[0034] Figure 6 It is a schematic diagram of the structure of the rotating groove seat, the first rotating rod and the grinding disc of the present invention;

[0035] Figure 7 It is a schematic diagram of the structure of the movable carriage, the first slide plate and the threaded rod of the present invention;

[0036] Figure 8 It is a schematic diagram of the basic linkage mechanism structure of the present invention;

[0037] Fig. 9 It is a schematic diagram of the third slider, the fourth rotating rod and the third pulley structure of the present invention;

[0038] Fig.10 It is a schematic diagram of the water storage tank, water pump and water pipe structure of the present invention.

[0039] In the figure: 1, basic linkage mechanism; 2, grinding drive mechanism; 101, moving carriage; 102, first slide plate; 103, threaded rod; 104, lifting and pressing plate; 105, first slider; 106, rotating groove seat; 107, first rotating rod; 108, grinding disc; 109, bearing sleeve seat; 110, second rotating rod; 111, first gear; 112, first pulley; 113, debris removal frame; 114, third rotating rod; 115, second pulley; 116, second belt; 117, transmission wheel; 118, transmission belt; 119, lifting plate; 120, material guide inclined pipe; 121, moving mouth; 122, bottom shovel plate; 123, first belt; 201, second slide plate; 202, second slider; 203, load-bearing frame; 204, motor; 205, driven rod; 206, slotted wheel; 207, cutting wheel; 208, cylinder; 209, main water pipe; 210, water pipe rack; 211, nozzle; 212, third slide plate; 213, synchronous plate; 214, third slider; 215, fourth rotating rod; 216, third pulley; 217, third belt; 218, second gear; 219, lifting port; 220, water tank; 221, water pump; 222, water pipe. DETAILED DESCRIPTION

[0040] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0041] See also Figure 1-10 The present invention provides a technical solution: a grooving method for pre-embedded pipelines in roads and bridges, which specifically comprises the following steps:

[0042] S1. Position movement: Before use, push the moving carriage 101 in the basic linkage mechanism 1 to the construction point, and then adjust the direction in which the groove needs to be cut;

[0043] S2, start the descent: after the equipment is moved, the cylinder 208 in the grinding drive mechanism 2 is started, and the load-bearing frame 203 is pushed under the limit of the second slide plate 201 to drive the slotted wheel 206 and the cutting wheel 207 to descend to the ground, and at the same time, the synchronous plate 213 also drives the fourth rotating rod 215 and the second gear 218 to descend to the same height under the limit of the third slider 214 under the limit of the lifting port 219;

[0044] S3, spraying and grooving: after the grooved wheel 206 and the cutting wheel 207 are in contact with the ground, the water pump 221 and the motor 204 are started, and the motor 204 drives the cutting wheel 207 and the grooved wheel 206 to rotate and groove the ground. First, the cutting wheel 207 cuts at the edge to ensure the flatness, and then the grooved wheel 206 grooves in the middle. At the same time, when the nozzle 211 is started, the water in the water storage tank 220 is pumped out and injected into the inner side of the main water pipe 209, and then the nozzle 211 sprays water mist on the grooves of the cutting wheel 207 and the grooved wheel 206 to reduce dust;

[0045] S4, power docking: after the moving carriage 101 is pushed to move the slot for a certain distance, the threaded rod 103 is manually rotated, and the lifting and pressing plate 104 is driven to push the grinding disc 108, the impurity removal frame 113 and the first gear 111 to descend synchronously under the limiting action of the first slider 105. Since the slotting wheel 206 and the second gear 218 descend to the height that touches the bottom of the slot, the distance that the lifting and pressing plate 104 descends is the same as that of the slotting wheel 206. After the lifting and pressing plate 104 descends, the first gear 111 is meshed with the second gear 218, and at the same time, the grinding disc 108 descends to the bottom of the pipe groove and fits the side wall, and the bottom of the bottom shovel plate 122 is also in contact with the bottom of the inner cavity of the pipe groove. At this time, the power docking is completed;

[0046] S5, side wall grinding: after the first gear 111 and the second gear 218 are connected, the first gear 111 will use the first pulley 112, the first belt 123, the second pulley 115 and the second belt 116 to drive the first rotating rod 107 and the third rotating rod 114 to rotate at the same time. The rotation of the first rotating rod 107 will drive the two grinding discs 108 to grind the inner wall of the pipe groove to make it flat and neat when moving, and because the water mist is sprayed in advance, the generation of dust will be reduced;

[0047] S6. Impurity discharge: At the same time, the bottom shovel plate 122 contacts the bottom of the pipe groove. When following the movement of the moving carriage 101, the bottom shovel plate 122 will shovel impurities, dust and other stones to the bottom of the inner cavity of the impurity discharge frame 113, and the conveyor belt 118 is driven and rotated by the two transmission wheels 117. After the lifting plate 119 contacts the impurities, it rotates and transmits the impurities to the top of the impurity discharge frame 113. After the impurities reach the top of the impurity discharge frame 113, they are discharged on the surface of the road through two inclined material guide inclined pipes 120.

[0048] Please refer to Figure 7 , Figure 8 , Fig. 9 and Fig.10, showing the overall structure of the grinding drive mechanism 2, the basic linkage mechanism 1 includes a mobile carriage 101, the grinding drive mechanism 2 includes two second slide slot plates 201, the two second slide slot plates 201 are respectively fixedly installed at the front and rear of the left side of the mobile carriage 101, the second slider 202 is slidably installed on the inner side of the second slide slot plate 201, a load-bearing frame 203 is fixedly connected between the two second sliders 202 through a bracket, the front side of the bottom of the load-bearing frame 203 is fixedly connected to a motor 204 through a bracket, the motor 204 is a servo motor, and the output shaft of the motor 204 is fixedly connected to the motor 204 through a coupling. The driving rod 205 is provided with a driving rod 205, and the rear end of the driven rod 205 is connected to the load-bearing frame 203 through a bearing member, a slotted wheel 206 is fixedly connected to the surface of the driven rod 205, and a cutting wheel 207 which cooperates with each other is installed on the surface and rear of the slotted wheel 206, a cylinder 208 is fixedly connected to the left side of the moving carriage 101 through a fixed seat, and the top of the cylinder 208 is fixedly connected to the load-bearing frame 203 through a fixed plate, the top of the load-bearing frame 203 is fixedly connected to the main water pipe 209 through a fixed block, and the front and rear of the left side of the main water pipe 209 are fixedly connected to the water pipe frame 210 through openings, A nozzle 211 is provided on one side of the water pipe rack 210, and a third slide plate 212 is fixedly installed on the left side of the front and rear inner cavity of the mobile carriage 101, and a third slider 214 is slidably installed on the inner side of the third slide plate 212. A fourth rotating rod 215 is rotatably connected between the two third sliders 214 through a bearing member, and a synchronous plate 213 is rotatably connected between the fourth rotating rod 215 and the driven rod 205. The fourth rotating rod 215 and the driven rod 205 are connected by a third pulley 216 and a third belt 217. The two third pulleys 216 rotate with the synchronous plate 213 through the bearing member. The synchronous plate 213 can simultaneously drive the two third pulleys 216 to rise and fall synchronously without causing deviation. The surface of the fourth rotating rod 215 is fixedly connected with the second gear 218. A lifting port 219 for use with the third belt 217 is provided on the left side of the mobile carriage 101. A water tank 220 is fixedly installed on the top of the mobile carriage 101 through a fixed plate. A water pump 221 is installed on the left side of the water tank 220 through an opening. A water pipe 222 is fixedly installed on the left side of the water pump 221 through an opening, and one end of the water pipe 222 is connected to the main water pipe 209.

[0049] Please refer to Figure 3 , Figure 4 , Figure 5 and Figure 6, showing the overall structure of the basic linkage mechanism 1, the front and rear sides of the inner cavity of the moving carriage 101 are fixedly installed with a first slide plate 102, the right side of the inner cavity of the moving carriage 101 is rotatably connected with a threaded rod 103 through a bearing, and the top of the threaded rod 103 penetrates the moving carriage 101 and extends to the upper part of the moving carriage 101, the surface of the threaded rod 103 and the inner side of the moving carriage 101 are threadedly connected with a lifting and lowering plate 104, the inner side of the first slide plate 102 is slidably installed with a first slider 105, and the two first sliders 105 are fixedly connected to the lifting and lowering plates 104 through brackets The bottom of the lifting and pressing plate 104 is fixedly connected to a rotating groove seat 106 through a bracket, and the inner side of the rotating groove seat 106 is rotatably connected to a first rotating rod 107, and the surface of the first rotating rod 107 and the front and rear parts of the rotating groove seat 106 are fixedly connected to a grinding disc 108, and the left side of the lifting and pressing plate 104 is fixedly connected to a bearing sleeve 109 through a bracket, and the inner side of the bearing sleeve 109 is rotatably connected to a second rotating rod 110, and the rear end of the second rotating rod 110 is fixedly connected to a first gear 111 used in conjunction with a second gear 218, and the second gear 218 and the first gear 111 descend to the opposite side. When connecting, first turn off the motor 204 to close the second gear 218 for easy docking. The first rotating rod 107 and the second rotating rod 110 are connected to each other through the first pulley 112 and the first belt 123. The right side of the bottom of the lifting and pressing plate 104 is fixedly connected to the impurity removal frame 113 through a bracket. The upper and lower sides of the front and rear parts of the inner cavity of the impurity removal frame 113 are rotatably connected to the third rotating rod 114 through a bearing. The surface of the third rotating rod 114 is fixedly connected to a transmission wheel 117. The two transmission wheels 117 are connected to each other through a transmission belt 118. A lifting plate is provided on the surface of the transmission belt 118. 119, the front end of the upper third rotating rod 114 penetrates the impurity discharge frame 113 and extends to the front of the impurity discharge frame 113, the upper third rotating rod 114 is connected to the first rotating rod 107 through the second pulley 115 and the second belt 116, the bottom of the impurity discharge frame 113 is fixedly connected with a bottom shovel plate 122, the front and rear of the right side of the bottom of the impurity discharge frame 113 are fixedly connected with a material guiding inclined pipe 120 through an opening, the surface and the rear of the moving carriage 101 are provided with a moving opening 121, and one end of the material guiding inclined pipe 120 passes through the moving opening 121 and extends to the outside of the moving carriage 101.

Claims

1. A grooving method for pre-embedded pipelines in roads and bridges, characterized by: The specific steps include: S1. Position movement: Before use, the moving carriage (101) in the basic linkage mechanism (1) is pushed to the construction point and then adjusted in the right direction; S2, lowering and starting: after the movement of the equipment is completed, the cylinder (208) in the grinding drive mechanism (2) is started to lower the slotting wheel (206) and the cutting wheel (207) to contact the ground; S3, spraying and grooving: after the surface contacts the ground, the water pump (221) and the motor (204) are started, the motor (204) drives the cutting wheel (207) and the grooving wheel (206) to rotate and groove the ground, and at the same time, the spray head (211) sprays water mist to reduce dust; S4, power docking: after the slotting wheel (206) slots a certain distance, the threaded rod (103) is rotated to lower the debris removal frame (113) and the grinding disc (108) into the slotted groove through the lifting and pressing plate (104), and after the lifting and pressing plate (104) is lowered, the first gear (111) and the second gear (218) are docked; S5, side wall grinding: after the first gear (111) and the second gear (218) are connected, two grinding discs (108) grind the inner wall of the pipe groove to make it flat and neat; S6, impurity discharge: at the same time, the bottom shovel plate (122) contacts the bottom of the pipe groove, and the conveyor belt (118) and the lifting plate (119) rotate to transmit the impurities after the groove is opened to the inner side of the impurity discharge frame (113). After the impurities reach the inside of the impurity discharge frame (113), they are discharged on the surface of the road through the material guide inclined pipe (120); The basic linkage mechanism (1) comprises a moving carriage (101), and the grinding drive mechanism (2) comprises two second slide plates (201), the two second slide plates (201) are respectively fixedly mounted on the front and rear of the left side of the moving carriage (101), a second slider (202) is slidably mounted on the inner side of the second slide plate (201), a load-bearing frame (203) is fixedly connected between the two second sliders (202) via a bracket, a motor (204) is fixedly connected to the front side of the bottom of the load-bearing frame (203) via a bracket, and the output shaft of the motor (204) is fixedly connected to a driven rod (205) via a coupling, and the rear end of the driven rod (205) is connected to the load-bearing frame (203) via a bearing member, a slotted wheel (206) is fixedly connected to the surface of the driven rod (205), and a cutting wheel (207) that cooperates with each other is mounted on the surface and rear of the slotted wheel (206); The left side of the movable carriage (101) is fixedly connected to a cylinder (208) via a fixing seat, and the top of the cylinder (208) is fixedly connected to a load-bearing frame (203) via a fixing plate, the top of the load-bearing frame (203) is fixedly connected to a main water pipe (209) via a fixing block, and the front and rear parts of the left side of the main water pipe (209) are fixedly connected to a water pipe rack (210) via openings, and a nozzle (211) is provided on one side of the water pipe rack (210), and the left side of the front and rear parts of the inner cavity of the movable carriage (101) are fixedly installed with a third slide plate (212), and a third slider (214) is slidably installed on the inner side of the third slide plate (212), and a fourth rotating rod (215) is rotatably connected between the two third sliders (214) via a bearing member.

2. A grooving method for pre-embedded pipelines in roads and bridges according to claim 1, characterized in that: A synchronous plate (213) is rotatably connected between the fourth rotating rod (215) and the driven rod (205); the fourth rotating rod (215) and the driven rod (205) are transmission-connected via a third belt pulley (216) and a third belt (217); the two third belt pulleys (216) are rotatably connected to the synchronous plate (213) via bearings; a second gear (218) is fixedly connected to the surface of the fourth rotating rod (215); and a lifting port (219) for use in conjunction with the third belt (217) is provided on the left side of the movable carriage (101).

3. A grooving method for pre-embedded pipelines in roads and bridges according to claim 2, characterized in that: A water tank (220) is fixedly mounted on the top of the mobile carriage (101) via a fixing plate, a water pump (221) is installed on the left side of the water tank (220) via an opening, and a water pipe (222) is fixedly mounted on the left side of the water pump (221) via an opening, and one end of the water pipe (222) is connected to the main water pipe (209).

4. A grooving method for pre-embedded pipelines in roads and bridges according to claim 3, characterized in that: A first slide plate (102) is fixedly mounted on the front and rear sides of the inner cavity of the moving carriage (101); a threaded rod (103) is rotatably connected to the right side of the inner cavity of the moving carriage (101) via a bearing member; the top end of the threaded rod (103) penetrates the moving carriage (101) and extends to the upper part of the moving carriage (101); a lifting and lowering plate (104) is threadedly connected to the surface of the threaded rod (103) and located on the inner side of the moving carriage (101); the first slide plate (102) is fixedly mounted on the front and rear sides of the inner cavity of the moving carriage (101); a threaded rod (103) is rotatably connected to the right side of the inner cavity of the moving carriage (101) via a bearing member; the top end of the threaded rod (103) penetrates the moving carriage (101) and extends to the upper part of the moving carriage (101); a lifting and lowering plate (104) is threadedly connected to the surface of the threaded rod (103) and located on the inner side of the moving carriage (101); A first sliding block (105) is slidably mounted on the inner side of the plate (102); the two first sliding blocks (105) are fixedly connected to the lifting and pressing plate (104) via a bracket; the bottom of the lifting and pressing plate (104) is fixedly connected to a rotating groove seat (106) via a bracket; the inner side of the rotating groove seat (106) is rotatably connected to a first rotating rod (107); a grinding disc (108) is fixedly connected to the surface of the first rotating rod (107) and located at the front and rear of the rotating groove seat (106).

5. A grooving method for pre-embedded pipelines in roads and bridges according to claim 4, characterized in that: The left side of the lifting and pressing plate (104) is fixedly connected to a bearing sleeve (109) via a bracket, the inner side of the bearing sleeve (109) is rotatably connected to a second rotating rod (110), the rear end of the second rotating rod (110) is fixedly connected to a first gear (111) used in conjunction with a second gear (218), and the first rotating rod (107) and the second rotating rod (110) are connected to each other via a first pulley (112) and a first belt (123).

6. A grooving method for pre-embedded pipelines in roads and bridges according to claim 5, characterized in that: The right side of the bottom of the lifting and pressing plate (104) is fixedly connected to a debris removal frame (113) via a bracket, and the upper side and the lower side between the front and rear parts of the inner cavity of the debris removal frame (113) are rotatably connected to a third rotating rod (114) via a bearing member, and a transmission wheel (117) is fixedly connected to the surface of the third rotating rod (114), and the two transmission wheels (117) are connected to each other via a transmission belt (118), and a lifting plate (119) is provided on the surface of the transmission belt (118).

7. A grooving method for pre-embedded pipelines in roads and bridges according to claim 6, characterized in that: The front end of the third rotating rod (114) at the upper part passes through the impurity discharging frame (113) and extends to the front of the impurity discharging frame (113); the third rotating rod (114) at the upper part is connected to the first rotating rod (107) by a second pulley (115) and a second belt (116); and a bottom shovel plate (122) is fixedly connected to the bottom of the impurity discharging frame (113).

8. A grooving method for pre-embedded pipelines in roads and bridges according to claim 7, characterized in that: The front and rear portions of the bottom right side of the impurity discharge frame (113) are fixedly connected to a material guiding inclined tube (120) through openings, and a moving opening (121) is formed on the surface and rear portion of the moving carriage (101), and one end of the material guiding inclined tube (120) passes through the moving opening (121) and extends to the outside of the moving carriage (101).