A heat network remote monitoring management system and method based on GPRS network

By using drone lifting mechanism and internal monitoring system in thermal network pipelines, the problems of limited internal monitoring perspective and complex environment are solved, and all-round clear image information collection and data transmission are achieved, reducing personnel risks and improving Check for convenience.

CN118714268BActive Publication Date: 2024-11-19LINYI SUNSHINE DETECTION TECH CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411204100.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-11-19
Estimated Expiration
2044-08-30

AI Technical Summary

Technical Problem

In the prior art, it is difficult to achieve full coverage of thermal network pipeline monitoring in the pipeline corridor, the camera perspective is limited, and the image quality is poor in complex and narrow environments, and it is impossible to close the shooting of the accident scene, which increases the cost and complexity, and the personnel enter a dangerous environment. Higher risk.

Method used

Adopt a thermal network remote monitoring and management system based on GPRS network, and the monitoring drone is stably lifted into the pipe corridor through the drone lifting mechanism, and the internal monitoring mechanism and motor drive system are used to lower the drone in the pipeline to realize pipe control. Detailed image information collection and data transmission inside the gallery expands the monitoring range and provides a clear perspective.

Benefits of technology

It realizes the collection of close-range image information of drones in complex and narrow environments, expands the monitoring range, reduces the risk of personnel entering dangerous environments, and improves the convenience of inspection and the clarity of image information.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118714268B_ABST
    Figure CN118714268B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of drone hoisting equipment, and specifically discloses a heat network remote monitoring management system and method based on a GPRS network, including: a pipe gallery body, a control terminal, a monitoring alarm device, a maintenance channel mechanism and a drone hoisting mechanism; the pipe gallery body is pre-buried at a position below the ground; the monitoring alarm device is installed at the internal top of the pipe gallery body; the maintenance channel mechanism is arranged at the external top of the pipe gallery body; the drone hoisting mechanism is arranged at the ground position outside the maintenance channel mechanism. The present invention uses external equipment to stably hoist the drone into the pipe gallery to collect close-range image information along the heat network pipeline, reach areas that cannot be reached by cameras, expand the monitoring range, provide a full range of viewing angles, and operate in a complex and narrow pipe gallery environment, and can provide clear image information at close range, reducing the risk of personnel entering a dangerous environment, while improving the convenience of inspection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of unmanned aerial vehicle hoisting equipment, and in particular to a heating network remote monitoring management system and method based on a GPRS network. Background Art

[0002] GPRS (General Packet Radio Service) is a data communication service based on the GSM network. It uses packet switching technology to achieve more efficient data transmission and supports always-on connections. GPRS provides a theoretical transmission rate of up to 171.2 kbps and supports a variety of data applications, such as mobile Internet access, mobile commerce, location services, and remote monitoring. The heating network remote monitoring system based on the GPRS network is a modern monitoring solution that uses GPRS technology for data transmission. It collects parameters such as temperature, pressure, and flow by installing sensors and instruments at key nodes of the heating network, and converts and sends these data to the remote monitoring center through the data acquisition unit (RTU). The system realizes real-time data transmission through the GPRS module, allowing operators and managers to view real-time data, perform data analysis, manage alarms, and perform remote control when necessary through the user interface. The advantages of this system are its flexibility, cost-effectiveness, real-time nature, and easy maintenance, which helps heating companies improve operational efficiency, reduce energy waste, and increase user satisfaction;

[0003] In the prior art, the heat network pipelines inside the tunnel are monitored by GPRS network cameras. Although they can provide intuitive visual information, since the viewing angle of the camera is between 60 and 90 degrees, a single camera cannot cover the entire area inside the tunnel. In order to achieve comprehensive monitoring, multiple cameras may need to be installed, which increases costs and complexity. In addition, since the space inside the tunnel is usually narrow and the internal light is insufficient, the image quality of the camera is affected in the absence of an external light source, and it is impossible to shoot and analyze the accident scene and the accident situation at close range, and further processing is required after manual observation. Summary of the invention

[0004] The object of the present invention is to provide a heating network remote monitoring management system and method based on a GPRS network to solve the problems mentioned in the above background technology.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a GPRS network-based heat network remote monitoring and management system, comprising: a pipe gallery main body, a control terminal, a monitoring and alarm device, a maintenance channel mechanism and a drone lifting mechanism; the pipe gallery main body is pre-buried at a position below the ground; the control terminal is arranged at the inner bottom end of the pipe gallery main body; the monitoring and alarm device is installed at the inner top end of the pipe gallery main body, and the monitoring and alarm device and the control terminal are electrically connected; the maintenance channel mechanism is arranged at the outer top end of the pipe gallery main body, and the top of the maintenance channel mechanism extends to the surface position; the drone lifting mechanism is arranged at the outer ground position of the maintenance channel mechanism.

[0006] Preferably, the UAV lifting mechanism includes: an electric engineering vehicle, a driving console, a lifting platform, a lifting platform and an internal monitoring mechanism; the electric engineering vehicle is located at the ground position outside the maintenance channel mechanism; the driving console is arranged on the top of the electric engineering vehicle, and the driving console and the electric engineering vehicle are electrically connected; the lifting platform is arranged on the top front side of the electric engineering vehicle in the up and down directions, and the lifting platform and the driving console are electrically connected; the lifting platform is installed at the mobile end of the lifting platform, and the lifting platform and the driving console are electrically connected; the internal monitoring mechanism is arranged at the bottom of the lifting position of the lifting platform.

[0007] Preferably, the inspection channel mechanism comprises: a pipeline body, a frame, a vertical ladder, a top cover, a sub-control module, a lock, a first mounting frame, a connecting frame and a first electric telescopic rod; the pipeline body is arranged at the top of the pipe gallery body in the up-down direction, and the bottom end of the pipeline body extends into the interior of the pipe gallery body; the frame is arranged at the top opening of the pipeline body; the vertical ladder is arranged on the right side of the inner cavity of the pipeline body in the up-down direction, and the bottom of the vertical ladder extends to the inner bottom end of the pipe gallery body; the top cover is hinged on the left side of the frame; the sub-control module is arranged on the inner side of the top cover, and the sub-control module is electrically connected to the control terminal; one end of the lock is installed on the inner side of the top cover, and the other end of the lock is installed on the top of the frame, and the lock is electrically connected to the sub-control module; the first mounting frame is installed on the left side of the top end of the inner cavity of the pipeline body; the connecting frame is arranged at the inner bottom of the top cover; the first electric telescopic rod is rotatably connected to the inner side of the first mounting frame through a pin shaft, the telescopic end of the first electric telescopic rod is rotatably connected to the bottom end of the connecting frame through a pin shaft seat, and the first electric telescopic rod is electrically connected to the sub-control module.

[0008] Preferably, the internal monitoring mechanism includes: a trough box, a bottom plate, a fixed seat, a first limit guide rail assembly, a connecting seat, a cross folding frame, a second mounting frame, a screw assembly, a first motor, a third mounting frame, a second limit guide rail assembly, a bracket, a second electric telescopic rod, a first mounting plate, a fixing module and a monitoring drone; the trough box is installed at the bottom of the hoisting position of the hoisting platform; the bottom plate is arranged below the inner cavity of the trough box; the number of the fixed seats is two groups, and the number of the fixed seats in each group is two, and the two groups of the fixed seats are respectively arranged on the rear side of the top of the inner cavity of the trough box and on the left and right ends of the rear side of the top of the bottom plate; the first limit guide rail assembly There are two groups, each group has two first limit guide rail assemblies, and the two groups of the first limit guide rail assemblies are respectively arranged on the front side of the top of the inner cavity of the trough box and the left and right ends of the front side of the top end of the bottom plate; there are two groups of connecting seats, each group has two connecting seats, and the two groups of connecting seats are respectively arranged on the inner sides of the limit ends of the two groups of first limit guide rail assemblies; there are two cross folding frames, and the two cross folding frames are respectively connected to the upper and lower fixed seats and the outer sides of the connecting seats by pin shafts; the second mounting frame is arranged on the front side of the middle part of the top end of the inner cavity of the trough box; the screw assembly is rotatably connected to the second mounting frame by a bearing The inner side of the screw nut in the screw assembly is rotatably connected to the inner side of the top front side of the cross folding frame through a pin shaft; the first motor is arranged on the rear side of the second mounting frame, the rotating end of the first motor is connected to the rear end of the screw shaft of the screw assembly, and the first motor is electrically connected to the driving console; the third mounting frame is arranged in the middle of the top front side of the base plate; the second limiting guide rail assembly is arranged at the inner bottom of the third mounting frame; the bracket is installed on the top of the limiting end of the second limiting guide rail assembly; the second electric telescopic rod is installed in the middle of the inner rear end of the third mounting frame along the front-back direction, and the telescopic The end is connected to the inner side of the bracket, and the second electric telescopic rod is electrically connected to the driving console; the first mounting plate is arranged on the top of the bracket; the number of the fixing modules is two, and the two fixing modules are respectively installed on the front and rear sides of the top of the first mounting plate, and the fixing modules are electrically connected to the driving console; the monitoring drone is detachably installed on the inner sides of the front and rear fixing modules, and the monitoring drone is remotely connected to the driving console through a network; wherein, a lateral auxiliary support unit is arranged on the left side of the trough box, a forward auxiliary support unit is arranged on the front and rear sides of the trough box, and a vertical ladder auxiliary support unit is arranged on the right side of the trough box.

[0009] Preferably, the lateral auxiliary support unit includes: a trough body shell, a rotating rod, a third electric telescopic rod, a cross and a first roller; the number of the trough body shells is two, and the two trough body shells are respectively installed at the front and rear ends of the left side of the trough body box; the number of the rotating rods is two, and one end of the two rotating rods is respectively rotatably connected to the lower left corner of the inner side of the front and rear trough body shells through pins; the number of the third electric telescopic rods is two, and one end of the two third electric telescopic rods is respectively rotatably connected to the upper right corner of the inner side of the front and rear trough body shells through pins, and the other ends of the two third electric telescopic rods are respectively rotatably connected to the top ends of the front and rear rotating rods through pins, and the third electric telescopic rod is electrically connected to the driving console; the cross is rotatably connected to the inner side of the other end of the front and rear rotating rods through a pin; the number of the first rollers is two, and the two first rollers are respectively installed on the upper and lower sides of the outer end of the cross.

[0010] Preferably, the forward auxiliary support unit includes: a first mounting seat, a fourth electric telescopic rod, a second mounting seat, a first rotating frame, a third mounting seat and a roller frame; the number of the first mounting seats is two, and the two first mounting seats are respectively mounted on the left and right sides of the top of the outer wall of the trough box; the number of the fourth electric telescopic rods is two, and one end of the two fourth electric telescopic rods is respectively rotatably connected to the inner sides of the two first mounting seats by pin shafts, and the fourth electric telescopic rod is electrically connected to the driving operating console; the second mounting seat is mounted on the outer wall of the trough box and is located below the two left and right first mounting seats; one end of the first rotating frame is rotatably connected to the outer side of the second mounting seat by a pin shaft, the shape of the first rotating frame is L-shaped, and the other ends of the two fourth electric telescopic rods are respectively rotatably connected to the outer side of the other end of the first rotating frame by pin shafts; the third mounting seat is rotatably connected to the inner side of the first rotating frame by a pin shaft; the roller frame is arranged at the outer end of the third mounting seat.

[0011] Preferably, the vertical ladder auxiliary support unit includes: a slot frame, a plug rod, a fourth mounting frame, a connecting plate, a rack rod, a groove wheel, a gear, a second motor, a transmission belt assembly, a roller shaft, a second mounting plate, a third mounting seat, a fifth electric telescopic rod, a fourth mounting seat, a second rotating frame, a cross bar and a second roller; the slot frame is installed at the right bottom of the outer wall of the slot body box; the number of the plug rods is two, and the two plug rods are respectively inserted at the front and rear sides of the slot frame; the number of the fourth mounting frames is two, and the two fourth mounting frames are respectively arranged at the right outer ends of the front and rear slot frames in the up and down directions; the number of the connecting plates is two, and the two connecting plates are respectively arranged at the front and rear directions The middle part of the right side of the rear two fourth mounting frames; the number of the rack rods is two, and the two rack rods are respectively arranged at the right inner ends of the front and rear connecting plates along the front and rear directions; the number of the groove wheels is two, and the two groove wheels are respectively rotatably connected to the upper and lower ends of the middle part of the right side of the slot frame through a pin shaft, and the outer walls of the two groove wheels are respectively clamped with the outer sides of the two rack rods; the gear is rotatably connected to the middle part of the right side of the slot frame through a pin shaft, and the gear is meshed with the upper and lower rack rods; the second motor is installed on the outer wall of the slot box and is located above the slot frame, and the second motor is electrically connected to the driving console; one end of the transmission belt assembly is keyed to the rotating end of the second motor, and the transmission belt The other end of the component is fixedly connected to the right side of the axis of the gear; the number of the roller shafts is two groups, the number of the roller shafts in each group is two, and the two groups of roller shafts are rotatably connected to the upper and lower sides of the right ends of the front and rear fourth mounting frames through pins; the number of the second mounting plates is two, and the two second mounting plates are respectively arranged on the outsides of the front and rear fourth mounting frames; the number of the third mounting seats is two, and the two third mounting seats are respectively arranged on the upper right sides of the front and rear second mounting plates; the number of the fifth electric telescopic rods is two, and the two fifth electric telescopic rods are respectively rotatably connected to the inner sides of the front and rear third mounting seats through pins, and the fifth electric telescopic rod and the driving control The working table is electrically connected; the number of the fourth mounting seats is two, and the two fourth mounting seats are respectively arranged at the lower right side of the front and rear second mounting plates; the number of the second rotating frames is two, and the two second rotating frames are respectively rotatably connected to the inner sides of the front and rear fourth mounting seats through pins, and the telescopic ends of the two fifth electric telescopic rods are rotatably connected to the inner top ends of the two second rotating frames through pins; the number of the cross bars is two, and the two cross bars are respectively arranged at the inner bottom ends of the two second rotating frames along the left and right directions; the number of the second rollers is two groups, and the number of the second rollers in each group is two, and the two groups of cross bars are respectively arranged on the outer sides of the left and right ends of the two cross bars.

[0012] Compared with the prior art, the present invention has the following beneficial effects:

[0013] 1. Drive the hoisting platform downward through the lifting platform, and with the cooperation of the hoisting platform, the internal monitoring mechanism passes through the frame and enters the inside of the pipeline body. The hoisting platform drives the internal monitoring mechanism to descend inside the pipeline body through the drive of its own hoisting equipment. During the descent of the internal monitoring mechanism, the third electric telescopic rod drives the rotating rod to rotate upward or downward in the inner cavity of the tank shell, so that the rotating rods on the front and rear sides drive the first roller to fit with the left side of the inner wall of the pipeline body under the cooperation of the cross, and the second mounting seats in the front and rear sides of the positive auxiliary support units drive the first rotating frame to rotate upward or downward. The first rotating frame in the positive auxiliary support units on both sides cooperates with the third mounting seats to make the roller frame fit with the front or rear side of the inner wall of the pipeline body. The second motor drives the gear to rotate under the transmission of the transmission belt assembly, and the rack rods on both sides drive the connecting plates on both sides to move outward or inward under the action of the rotating force of the gear, and the connecting plates on both sides drive the fourth mounting frame to move inward or outward synchronously under the limiting action of the insertion rod, and the fourth mounting frames on both sides drive their own upper and lower rollers to fit with the outer side of the vertical ladder, and the fifth electric telescopic rods on the front and rear sides drive the second rotating frame to flip to a horizontal direction on the inner side of the fourth mounting seat through their own extension, and the second rotating frame drives the second rollers on both sides to fit with the right side of the inner wall of the pipeline main body with the cooperation of the cross bar, and the first roller, the roller frame and the second roller roll along the inner wall of the pipeline main body, so that the internal monitoring mechanism remains stable during the descent.

[0014] 2. The first motor drives the internal lead screw of the lead screw assembly to drive the lead screw nut to move backward, so that the lead screw nut in the lead screw assembly drives the front side of the top end of the cross folding frame to move backward, and the cross folding frame folds downward by itself under the cooperation of the fixed seat and the first limit guide rail assembly to drive the bottom plate to move downward to release the seal on the bottom of the inner cavity of the slot box. The second electric telescopic rod extends and drives the bracket to move forward under the limiting action of the second limit guide rail assembly, so that the bracket drives the first mounting plate to move forward to the position below the slot box. The fixing module releases the fixed state of the monitoring drone, and the monitoring drone is started inside the main body of the corridor and performs a detailed flight inspection of the alarm position of the pipeline inside the main body of the corridor, and sends the collected image information data to the inside of the driving console, so that the staff can observe the scene more intuitively and conduct situation analysis and subsequent processing.

[0015] In summary, the present invention uses external equipment to stably hoist the drone into the interior of the pipe gallery to collect close-range image information along the heat network pipeline, reach areas that the camera cannot reach, expand the monitoring range, provide a full range of viewing angles, and operate in complex and narrow pipe gallery environments. It can provide clear image information at close range, reduce the risk of personnel entering dangerous environments, and improve the convenience of inspection. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the structure of the present invention;

[0017] Figure 2 for Figure 1 Exploded diagram of the maintenance channel mechanism;

[0018] Figure 3 for Figure 2 A magnified image of point A;

[0019] Figure 4 for Figure 1 A magnified view of the UAV lifting mechanism;

[0020] Figure 5 for Figure 4 An exploded diagram of the internal monitoring organization;

[0021] Figure 6 for Figure 5 The enlarged view of point B;

[0022] Figure 7 for Figure 5 Enlarged view of point C;

[0023] Figure 8 for Figure 5 Enlarged view of point D.

[0024] In the figure: 1. Pipe gallery body, 2. Control terminal, 3. Monitoring and alarm equipment, 4. Inspection channel mechanism, 41. Pipeline body, 42. Frame, 43. Vertical ladder, 44. Top cover, 45. Sub-control module, 46. Lock, 47. First mounting frame, 48. Connecting frame, 49. First electric telescopic rod, 5. UAV lifting mechanism, 51. Electric engineering vehicle, 52. Driving console, 53. Lifting platform, 54. Lifting platform, 6. Internal monitoring mechanism, 61. Trough box, 62. Bottom plate, 63. Fixed seat, 64. First limit guide rail assembly, 65. Connecting seat, 66. Cross folding frame, 67. Second mounting frame, 68. Screw assembly, 69. First motor, 610. Third mounting frame, 611. Second limit guide rail assembly, 612. Bracket, 613. Second electric telescopic rod, 614. First installation Mounting plate, 615, fixing module, 616, monitoring drone, 617, slot housing, 618, rotating rod, 619, third electric telescopic rod, 620, cross, 621, first roller, 622, first mounting seat, 623, fourth electric telescopic rod, 624, second mounting seat, 625, first rotating frame, 626, third mounting seat, 627, roller frame, 628, slot frame, 629, plug rod, 630, fourth mounting frame, 631, connecting plate, 632, rack rod, 633, groove wheel, 634, gear, 635, second motor, 636, transmission belt assembly, 637, roller shaft, 638, second mounting plate, 639, third mounting seat, 640, fifth electric telescopic rod, 641, fourth mounting seat, 642, second rotating frame, 643, cross bar, 644, second roller. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0026] See also Figure 1-Figure 8 The present invention provides a technical solution: a heat network remote monitoring and management system based on GPRS network, comprising: a pipe gallery body 1, a control terminal 2, a monitoring and alarm device 3, a maintenance channel mechanism 4 and a drone hoisting mechanism 5; the pipe gallery body 1 is pre-buried below the ground, and the interior of the pipe gallery body 1 is divided into a front and a rear part. The front part is a heat network pipeline and equipment installation space, and the rear part is a maintenance space. Temperature, pressure, flow and other sensors are installed at designated positions inside the heat network pipeline and equipment; the control terminal 2 is arranged at the bottom of the pipe gallery body 1, and a GPRS module is arranged inside the control terminal 2 to be able to communicate with the remote monitoring The center establishes a network connection, and a prefabricated program is set inside the control terminal 2 to automatically control the specified electrical components inside the device; the monitoring and alarm equipment 3 is installed at the internal top of the corridor body 1, and the monitoring and alarm equipment 3 and the control terminal 2 are electrically connected. The monitoring and alarm equipment 3 can collect image information of important nodes of the heat network pipeline inside the corridor body 1, and send the collected image information data to the control terminal 2; the maintenance channel mechanism 4 is set at the external top of the corridor body 1, and the top of the maintenance channel mechanism 4 extends to the surface; the drone hoisting mechanism 5 is set at the outer ground position of the maintenance channel mechanism 4.

[0027] As a preferred solution, further, Figure 2 and Figure 3As shown, the inspection channel mechanism 4 includes: a pipeline body 41, a frame 42, a vertical ladder 43, a top cover 44, a sub-control module 45, a lock 46, a first mounting frame 47, a connecting frame 48 and a first electric telescopic rod 49; the pipeline body 41 is arranged at the top of the pipeline gallery body 1 in the up-down direction, and the bottom end of the pipeline body 41 extends into the interior of the pipeline gallery body 1; the frame 42 is arranged at the top opening of the pipeline body 41; the vertical ladder 43 is arranged on the right side of the inner cavity of the pipeline body 41 in the up-down direction, and the bottom of the vertical ladder 43 extends to the inner bottom end of the pipeline gallery body 1; the top cover 44 is hinged on the left side of the frame 42, and the top cover 44 can be turned up or down on the outside of the frame 42; the sub-control module 45 is arranged on the inner side of the top cover 44, the sub-control module 45 is electrically connected to the control terminal 2, and a GPRS module is arranged inside the sub-control module 45 to establish a network connection with the driving console 52, and the sub-control module A prefabricated program is provided inside 45 to automatically control the designated electrical components inside the device; one end of the lock 46 is installed on the inner side of the top cover 44, and the other end of the lock 46 is installed on the top of the frame 42. The lock 46 is electrically connected to the sub-control module 45, and the lock 46 can be automatically switched and locked; the first mounting frame 47 is installed on the left side of the top end of the inner cavity of the pipeline body 41; the connecting frame 48 is arranged at the inner bottom of the top cover 44; the first electric telescopic rod 49 is rotatably connected to the inner side of the first mounting frame 47 through a pin shaft, and the telescopic end of the first electric telescopic rod 49 is rotatably connected to the bottom end of the connecting frame 48 through a pin shaft seat, the first electric telescopic rod 49 is electrically connected to the sub-control module 45, and the first electric telescopic rod 49 drives the connecting frame 48 to rotate upward or downward by its own extension and contraction. During the process of its own extension and contraction, the first electric telescopic rod 49 can rotate around the connection point with the pin shaft of the connecting frame 48.

[0028] As a preferred solution, further, Figure 4 As shown, the UAV hoisting mechanism 5 includes: an electric engineering vehicle 51, a driving console 52, a lifting platform 53, a lifting platform 54 and an internal monitoring mechanism 6; the electric engineering vehicle 51 is located at the ground position outside the maintenance channel mechanism 4; the driving console 52 is arranged on the top of the electric engineering vehicle 51, the driving console 52 and the electric engineering vehicle 51 are electrically connected, a GPRS module is arranged inside the driving console 52, which can establish a network connection with the control terminal 2, and a prefabricated program is arranged inside the driving console 52 to automatically control the specified electrical components inside the device; the lifting platform 53 is arranged on the top front side of the electric engineering vehicle 51 in the up and down direction, the lifting platform 53 and the driving console 52 are electrically connected, and the lifting platform 53 can drive the lifting platform 54 to rise and fall to a specified height position; the lifting platform 54 is installed at the mobile end of the lifting platform 53, the lifting platform 54 and the driving console 52 are electrically connected, and the lifting platform 54 can lift the internal monitoring mechanism 6 to a specified height position; the internal monitoring mechanism 6 is arranged at the bottom of the lifting position of the lifting platform 54.

[0029] As a preferred solution, further, Figure 5 , Figure 6 , Figure 7 and Figure 8As shown, the internal monitoring mechanism 6 includes: a tank box 61, a bottom plate 62, a fixing seat 63, a first limit guide rail assembly 64, a connecting seat 65, a cross folding frame 66, a second mounting frame 67, a screw assembly 68, a first motor 69, a third mounting frame 610, a second limit guide rail assembly 611, a bracket 612, a second electric telescopic rod 613, a first mounting plate 614, a fixing module 615 and a monitoring drone 616; the tank box 61 is installed at the bottom of the hoisting position of the hoisting platform 54; the bottom plate 62 is arranged below the inner cavity of the tank box 61; the number of fixing seats 63 is two groups, and the number of fixing seats 63 in each group is two, and the two groups of fixing seats 63 are respectively arranged on the rear side of the inner cavity top of the tank box 61 and the bottom plate 6 2; the number of first limit guide rail components 64 is two groups, the number of each group of first limit guide rail components 64 is two, the two groups of first limit guide rail components 64 are respectively arranged on the front side of the top of the inner cavity of the slot box 61 and the left and right ends of the front side of the top of the bottom plate 62, and the guide rails in the first limit guide rail components 64 are sleeved with sliders as limit ends; the number of connecting seats 65 is two groups, the number of each group of connecting seats 65 is two, and the two groups of connecting seats 65 are respectively arranged on the inner sides of the limit ends of the two groups of first limit guide rail components 64; the number of cross folding frames 66 is two, and the two cross folding frames 66 are respectively connected to the upper and lower fixed seats 63 and the outer sides of the connecting seats 65 by pin shafts. The body can be folded upward or downward; the second mounting frame 67 is arranged on the front side of the middle part of the inner cavity top of the slot box 61; the screw assembly 68 is rotatably connected to the inner side of the second mounting frame 67 through a bearing, and the left and right sides of the screw nut in the screw assembly 68 are rotatably connected to the inner side of the top front side of the cross folding frame 66 through a pin shaft, and the outer side of the screw in the screw assembly 68 is screwed with a screw nut as a moving end; the first motor 69 is arranged on the rear side of the second mounting frame 67, and the rotating end of the first motor 69 is connected to the rear end of the screw axis of the screw assembly 68, and the first motor 69 is electrically connected to the driving console 52, and the first motor 69 can drive the screw in the screw assembly 68 to rotate clockwise or counterclockwise; the third mounting frame 61 0 is arranged at the middle of the front side of the top end of the bottom plate 62; the second limiting guide rail assembly 611 is arranged at the inner bottom of the third mounting frame 610, and the outer side of the guide rail in the second limiting guide rail assembly 611 is sleeved with a slider as a limiting end; the bracket 612 is installed at the top of the limiting end of the second limiting guide rail assembly 611; the second electric telescopic rod 613 is installed at the middle of the inner rear end of the third mounting frame 610 along the front-back direction, the telescopic end of the second electric telescopic rod 613 is connected to the inner side of the bracket 612, the second electric telescopic rod 613 is electrically connected to the driving console 52, and the second electric telescopic rod 613 drives the bracket 612 to move forward or backward by its own extension and shortening; the first mounting plate 614 is arranged at the top of the bracket 612;There are two fixing modules 615, which are respectively installed on the front and rear sides of the top of the first mounting plate 614. The fixing modules 615 are electrically connected to the driving console 52. The fixing modules 615 can be docked with the monitoring drone 616 to fix the monitoring drone 616. The monitoring drone 616 is detachably installed on the inner side of the front and rear fixing modules 615. The monitoring drone 616 is remotely connected to the driving console 52 through a network. The monitoring drone 616 can be inside the main body 1 of the pipe gallery and at the alarm position of the internal pipeline of the main body 1 of the pipe gallery, and the collected image information data is sent to the inside of the driving console 52. Among them, a lateral auxiliary support unit is provided on the left side of the tank box 61. The auxiliary support unit includes: a slot body shell 617, a rotating rod 618, a third electric telescopic rod 619, a cross 620 and a first roller 621; there are two slot body shells 617, which are respectively installed at the front and rear ends of the left side of the slot body box 61; there are two rotating rods 618, one end of the two rotating rods 618 is respectively rotatably connected to the lower left corner of the inner side of the front and rear slot body shells 617 through pins; there are two third electric telescopic rods 619, one end of the two third electric telescopic rods 619 is respectively rotatably connected to the upper right corner of the inner side of the front and rear slot body shells 617 through pins, and the other ends of the two third electric telescopic rods 619 are respectively rotatably connected to the top of the front and rear rotating rods 618 through pins. The third electric telescopic rod 619 is electrically connected to the driving console 52. The third electric telescopic rod 619 drives the third electric telescopic rod 619 to rotate upward or downward by extending and shortening itself. During the extension and shortening process of the third electric telescopic rod 619 itself, it can rotate around the connection point with the inner cavity pin shaft of the slot shell 617; the cross 620 is rotatably connected to the inner side of the other end of the front and rear rotating rods 618 through the pin shaft; the number of the first rollers 621 is two, and the two first rollers 621 are respectively installed on the upper and lower sides of the outer end of the cross 620, and the first rollers 621 can roll on the outside of the cross 620; the front and rear sides of the slot box 61 are provided with positive auxiliary support units, and the positive auxiliary support units include: a first mounting seat 622, a fourth electric The telescopic rod 623, the second mounting seat 624, the first rotating frame 625, the third mounting seat 626 and the roller frame 627; the number of the first mounting seats 622 is two, and the two first mounting seats 622 are respectively mounted on the left and right sides of the top of the outer wall of the tank box 61; the number of the fourth electric telescopic rod 623 is two, and one end of the two fourth electric telescopic rods 623 is respectively connected to the inner side of the two first mounting seats 622 by a pin shaft, and the fourth electric telescopic rod 623 is electrically connected to the driving console 52. The fourth electric telescopic rod 623 drives the first rotating frame 625 to rotate upward or downward by its own extension and contraction. During the process of its own extension and contraction, the fourth electric telescopic rod 623 can rotate around the connection point with the inner pin shaft of the first mounting seat 622;The second mounting seat 624 is mounted on the outer wall of the slot box 61 and is located below the two first mounting seats 622 on the left and right; one end of the first rotating frame 625 is rotatably connected to the outer side of the second mounting seat 624 through a pin shaft, and the shape of the first rotating frame 625 is L-shaped, and the other ends of the two fourth electric telescopic rods 623 are respectively rotatably connected to the outer side of the other end of the first rotating frame 625 through a pin shaft; the third mounting seat 626 is rotatably connected to the inner side of the first rotating frame 625 through a pin shaft; the roller frame 627 is arranged at the outer end of the third mounting seat 626, and a plurality of rollers are arranged on the outside of the roller frame 627; a vertical ladder auxiliary support unit is arranged on the right side of the slot box 61, and the vertical ladder auxiliary support unit includes: a slot frame 628, a plug rod 629, and a fourth mounting frame 630, connecting plate 631, rack rod 632, groove wheel 633, gear 634, second motor 635, transmission belt assembly 636, roller 637, second mounting plate 638, third mounting seat 639, fifth electric telescopic rod 640, fourth mounting seat 641, second rotating frame 642, cross bar 643 and second roller 644; slot frame 628 is installed at the bottom right side of the outer wall of slot box 61; the number of plug rods 629 is two, and the two plug rods 629 are respectively plugged into the front and rear sides of the slot frame 628; the number of fourth mounting frames 630 is two, and the two fourth mounting frames 630 are respectively arranged at the right outer ends of the front and rear slot frames 628 in the up and down direction; the number of connecting plates 631 is two, and the two connecting plates 631 is respectively arranged at the middle of the right side of the front and rear fourth mounting frames 630 along the front-to-back direction; there are two rack rods 632, and the two rack rods 632 are respectively arranged at the right inner ends of the front and rear connecting plates 631 along the front-to-back direction; there are two groove wheels 633, and the two groove wheels 633 are respectively rotatably connected to the upper and lower ends of the middle of the right side of the slot frame 628 through a pin shaft, and the outer walls of the two groove wheels 633 are respectively engaged with the outer sides of the two rack rods 632, and the groove wheels 633 can play a role in limiting the rack rod 632; the gear 634 is rotatably connected to the middle of the right side of the slot frame 628 through a pin shaft, and the gear 634 is meshed with the upper and lower rack rods 632; the second motor 635 is installed on the outer wall of the slot box 61 and is located on the slot frame 628, the second motor 635 is electrically connected to the driving console 52, and the second motor 635 can drive the pulley at one end of the transmission belt assembly 636 to rotate clockwise or counterclockwise; one end of the transmission belt assembly 636 is keyed to the rotating end of the second motor 635, and the other end of the transmission belt assembly 636 is fixedly connected to the right side of the axis of the gear 634. The transmission belt assembly 636 adopts a transmission belt structure with pulleys at both ends, and the transmission belt assembly 636 can play a transmission role between the gear 634 and the second motor 635; the number of roller shafts 637 is two groups, and the number of roller shafts 637 in each group is two. The two groups of roller shafts 637 are respectively rotatably connected to the upper and lower sides of the right ends of the front and rear fourth mounting frames 630 through pins;There are two second mounting plates 638, which are respectively arranged on the outer sides of the front and rear fourth mounting frames 630; there are two third mounting seats 639, which are respectively arranged on the upper right sides of the front and rear second mounting plates 638; there are two fifth electric telescopic rods 640, which are respectively connected to the inner sides of the front and rear third mounting seats 639 by means of pin shafts, the fifth electric telescopic rod 640 is electrically connected to the driving console 52, the fifth electric telescopic rod 640 drives the second rotating frame 642 to rotate upward or downward by its own extension and contraction, and the fifth electric telescopic rod 640 can rotate with the inner pin shaft of the third mounting seat 639 during its own extension and contraction. The fourth mounting seat 641 is two in number, and the two fourth mounting seats 641 are respectively arranged at the lower right side of the front and rear second mounting plates 638; the second rotating frames 642 are two in number, and the two second rotating frames 642 are respectively connected to the inner side of the front and rear fourth mounting seats 641 by means of pins, and the telescopic ends of the two fifth electric telescopic rods 640 are connected to the inner top ends of the two second rotating frames 642 by means of pins; the cross bars 643 are two in number, and the two cross bars 643 are respectively arranged at the inner bottom ends of the two second rotating frames 642 in the left and right directions; the second rollers 644 are two in number, and the two cross bars 643 are respectively arranged at the outer sides of the left and right ends of the two cross bars 643. ;

[0030] Here’s how it works:

[0031] Step 1: The control terminal 2 collects data on the heat network pipeline nodes inside the pipe gallery body 1 for real-time monitoring of the operation status of the pipeline, and the built-in GPRS module inside the control terminal 2 sends the processed data to the remote monitoring center. Through the wide coverage and stable transmission characteristics of the GPRS network, the external monitoring center can synchronously receive data from each node for real-time analysis and processing. The operator can view the data, set the alarm threshold, and receive the alarm information through the interface of the monitoring center;

[0032] Step 2: The monitoring alarm device 3 collects image information of important nodes of the heat network pipeline inside the pipe gallery body 1, and sends the collected image information data to the control terminal 2 in real time. The control terminal 2 remotely sends the image information data to the external monitoring center through the GPRS module. The external monitoring center performs real-time analysis and processing through image analysis software to determine whether there is a leak in the heat network pipeline and send an alarm signal;

[0033] Step 3: The external staff drives the electric engineering vehicle 51 to the designated position outside the maintenance channel mechanism 4 by operating the driving console 52 according to the alarm signal. The staff establishes a network connection with the sub-control module 45 through the GPRS module built into the driving console 52. The lock 46 is unlocked. The first electric telescopic rod 49 extends and drives the top cover 44 to flip upward with the cooperation of the connecting frame 48, so that the top cover 44 releases the seal on the top of the frame 42.

[0034] Step 4: The staff operates the driving console 52 to control the lifting platform 53 and the hoisting platform 54 to start. The electric engineering vehicle 51 moves the internal monitoring mechanism 6 to the top of the frame 42 with the cooperation of the lifting platform 53 and the hoisting platform 54. The lifting platform 53 drives the hoisting platform 54 to move downward, and with the cooperation of the hoisting platform 54, the internal monitoring mechanism 6 passes through the frame 42 and enters the interior of the pipeline body 41. The hoisting platform 54 drives the internal monitoring mechanism 6 to descend inside the pipeline body 41 through the driving of its own hoisting equipment.

[0035] Step 5: The third electric telescopic rod 619 is extended and shortened to drive the rotating rod 618 to rotate upward or downward in the inner cavity of the tank shell 617, so that the front and rear rotating rods 618 drive the first roller 621 to fit the left side of the inner wall of the pipeline body 41 in cooperation with the cross 620;

[0036] Step 6: The second mounting seat 624 in the front and rear positive auxiliary support units drives the first rotating frame 625 by extending and shortening itself, so that the first rotating frame 625 rotates upward or downward inside the second mounting seat 624, and the first rotating frame 625 in the front and rear positive auxiliary support units cooperates with the third mounting seat 626 to make the roller frame 627 fit the front side or the rear side of the inner wall of the pipeline body 41;

[0037] Step 7: The second motor 635 drives the gear 634 to rotate under the transmission of the transmission belt assembly 636, and the rack rods 632 on both sides drive the connecting plates 631 on both sides to move outward or inward under the action of the rotation force of the gear 634, and the connecting plates 631 on both sides drive the fourth mounting frame 630 to move inward or outward synchronously under the limiting action of the insertion rod 629, and the fourth mounting frames 630 on both sides drive their own upper and lower rollers 637 to fit the outer side of the vertical ladder 43, and the fifth electric telescopic rods 640 on the front and rear sides drive the second rotating frame 642 to flip to the horizontal direction inside the fourth mounting seat 641 through their own extension, so that the second rotating frame 642 drives the second rollers 644 on both sides to fit the right side of the inner wall of the pipeline body 41 with the cooperation of the cross bar 643;

[0038] Step 8: During the descent of the internal monitoring mechanism 6, the first roller 621, the roller frame 627 and the second roller 644 roll along the inner wall of the pipeline body 41, so that the internal monitoring mechanism 6 remains stable during the descent;

[0039] Step nine: After the internal monitoring mechanism 6 passes through the pipeline body 41 and enters the interior of the pipe gallery body 1, the first motor 69 drives the lead screw assembly 68 to move the front side of the top of the cross folding frame 66 backward, and the cross folding frame 66 folds downward by itself under the cooperation of the fixed seat 63 and the first limiting guide rail assembly 64, so as to drive the bottom plate 62 to move downward to release the seal on the bottom of the inner cavity of the tank box 61;

[0040] Step ten: The second electric telescopic rod 613 extends and drives the bracket 612 to move forward under the limiting action of the second limiting guide rail assembly 611, so that the bracket 612 drives the first mounting plate 614 to move forward to the position below the slot box 61, and the fixing module 615 releases the fixed state of the monitoring drone 616. The monitoring drone 616 is started inside the corridor body 1 and performs a detailed flight inspection on the alarm position of the pipeline inside the corridor body 1, and sends the collected image information data to the driving console 52, so that the staff can observe the scene more intuitively and conduct situation analysis and subsequent processing.

[0041] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A heat network remote monitoring and management system based on GPRS network, characterized in that: include: The main body of the pipe gallery (1) is pre-buried below the ground; A control terminal (2) is arranged at the inner bottom end of the pipe gallery body (1); A monitoring and alarm device (3) is installed at the top of the interior of the pipe gallery body (1), and the monitoring and alarm device (3) is electrically connected to the control terminal (2); An inspection channel mechanism (4) is arranged at the external top end of the pipe gallery body (1), and the top of the inspection channel mechanism (4) extends to the ground surface; A drone hoisting mechanism (5) is arranged at a ground position outside the maintenance passage mechanism (4); The drone hoisting mechanism (5) comprises: An electric engineering vehicle (51) is located on the ground outside the maintenance passage mechanism (4); A driving operation platform (52) is arranged on the top of the electric engineering vehicle (51), and the driving operation platform (52) and the electric engineering vehicle (51) are electrically connected; A lifting platform (53) is arranged on the top front side of the electric engineering vehicle (51) in the up-down direction, and the lifting platform (53) is electrically connected to the driving operation console (52); A hoisting platform (54) is installed at the moving end of the lifting platform (53), and the hoisting platform (54) is electrically connected to the driving operation console (52); An internal monitoring mechanism (6) is arranged at the bottom of the hoisting position of the hoisting platform (54); The internal monitoring mechanism (6) includes: A tank box (61) is installed at the bottom of the hoisting position of the hoisting platform (54); A bottom plate (62) is arranged below the inner cavity of the tank box (61); A fixing seat (63), wherein the fixing seats (63) are provided in two groups, each group of the fixing seats (63) having two fixing seats, and the two groups of the fixing seats (63) are respectively arranged at the rear side of the top of the inner cavity of the tank box (61) and at the left and right ends of the rear side of the top of the bottom plate (62); First position-limiting guide rail assemblies (64), the number of the first position-limiting guide rail assemblies (64) being two groups, the number of the first position-limiting guide rail assemblies (64) in each group being two, the two groups of the first position-limiting guide rail assemblies (64) being respectively arranged at the front side of the top of the inner cavity of the tank box (61) and at the left and right ends of the front side of the top end of the bottom plate (62); Connecting seats (65), the connecting seats (65) being provided in two groups, each group of connecting seats (65) being provided with two connecting seats, the two groups of connecting seats (65) being provided at the inner sides of the limiting ends of the two groups of first limiting guide rail assemblies (64); A cross folding frame (66), wherein the number of the cross folding frames (66) is two, and the two cross folding frames (66) are rotatably connected to the outer sides of the upper and lower fixing seats (63) and the connecting seat (65) respectively through pin shafts; A second mounting frame (67) is arranged at the front side of the middle portion of the top end of the inner cavity of the tank box (61); A lead screw assembly (68) is rotatably connected to the inner side of the second mounting frame (67) via a bearing, and the left and right sides of the lead screw nut in the lead screw assembly (68) are rotatably connected to the inner side of the top front side of the cross folding frame (66) via a pin shaft; A first motor (69) is arranged on the rear side of the second mounting frame (67), a rotating end of the first motor (69) is connected to the rear end of the lead screw shaft of the lead screw assembly (68), and the first motor (69) is electrically connected to the driving console (52); A third mounting frame (610) is arranged at the middle of the front side of the top end of the bottom plate (62); A second limiting guide rail assembly (611), arranged at the inner bottom of the third mounting frame (610); A bracket (612) is mounted on the top of the limiting end of the second limiting guide rail assembly (611); A second electric telescopic rod (613) is mounted in the middle of the inner rear end of the third mounting frame (610) along the front-to-rear direction, the telescopic end of the second electric telescopic rod (613) is connected to the inner side of the bracket (612), and the second electric telescopic rod (613) is electrically connected to the driving console (52); A first mounting plate (614) is arranged on the top of the bracket (612); A fixing module (615), wherein the number of the fixing modules (615) is two, and the two fixing modules (615) are respectively mounted on the front and rear sides of the top of the first mounting plate (614), and the fixing modules (615) are electrically connected to the driving console (52); A monitoring drone (616) is detachably mounted on the inner sides of the two front and rear fixed modules (615), and the monitoring drone (616) is remotely connected to the driving console (52) via a network; Wherein, a lateral auxiliary support unit is arranged on the left side of the tank box (61), forward auxiliary support units are arranged on the front and rear sides of the tank box (61), and a vertical ladder auxiliary support unit is arranged on the right side of the tank box (61).

2. A heating network remote monitoring and management system based on GPRS network according to claim 1, characterized in that: The inspection channel mechanism (4) comprises: A pipeline body (41) is arranged on the top of the pipe gallery body (1) in the up-down direction, and the bottom end of the pipeline body (41) extends into the interior of the pipe gallery body (1); A frame (42) is arranged at the top opening of the pipeline body (41); A vertical ladder (43) is arranged on the right side of the inner cavity of the pipeline body (41) in the up-down direction, and the bottom of the vertical ladder (43) extends to the inner bottom end of the pipeline gallery body (1); A top cover (44) hingedly connected to the left side of the frame (42); A sub-control module (45) is arranged on the inner side of the top cover (44), and the sub-control module (45) is electrically connected to the control terminal (2); A lock (46), one end of which is mounted on the inner side of the top cover (44), and the other end of which is mounted on the top of the frame (42), and the lock (46) is electrically connected to the sub-control module (45); A first mounting frame (47) mounted on the left side of the top end of the inner cavity of the pipeline body (41); A connecting frame (48) is arranged on the inner bottom of the top cover (44); The first electric telescopic rod (49) is rotatably connected to the inner side of the first mounting frame (47) via a pin shaft, the telescopic end of the first electric telescopic rod (49) is rotatably connected to the bottom end of the connecting frame (48) via a pin shaft seat, and the first electric telescopic rod (49) is electrically connected to the sub-control module (45).

3. A heating network remote monitoring and management system based on GPRS network according to claim 2, characterized in that: The lateral auxiliary support unit comprises: A tank body outer shell (617), wherein the number of the tank body outer shells (617) is two, and the two tank body outer shells (617) are respectively mounted at the front and rear ends of the left side of the tank body box (61); Rotating rods (618), the number of the rotating rods (618) being two, one end of the two rotating rods (618) being rotatably connected to the inner lower left corners of the front and rear tank shells (617) respectively via pins; A third electric telescopic rod (619), wherein the number of the third electric telescopic rods (619) is two, one end of the two third electric telescopic rods (619) is rotatably connected to the inner upper right corners of the front and rear trough shells (617) respectively through a pin shaft, and the other end of the two third electric telescopic rods (619) is rotatably connected to the top ends of the front and rear rotating rods (618) respectively through a pin shaft, and the third electric telescopic rods (619) are electrically connected to the driving console (52); A cross (620) is rotatably connected to the inner sides of the other ends of the front and rear rotating rods (618) via a pin; The first rollers (621) are two in number, and the two first rollers (621) are respectively mounted on the upper and lower sides of the outer end of the cross (620).

4. A heating network remote monitoring and management system based on GPRS network according to claim 3, characterized in that: The forward auxiliary support unit comprises: A first mounting seat (622), the number of the first mounting seats (622) being two, and the two first mounting seats (622) being respectively mounted on the left and right sides of the top of the outer wall of the tank box (61); a fourth electric telescopic rod (623), wherein the number of the fourth electric telescopic rods (623) is two, one end of the two fourth electric telescopic rods (623) being rotatably connected to the inner sides of the two first mounting seats (622) via pin shafts, respectively, and the fourth electric telescopic rods (623) are electrically connected to the driving operating console (52); A second mounting seat (624) is mounted on the outer wall of the tank box (61) and is located below the left and right first mounting seats (622); A first rotating frame (625), one end of which is rotatably connected to the outer side of the second mounting seat (624) via a pin shaft, the first rotating frame (625) is L-shaped, and the other ends of the two fourth electric telescopic rods (623) are respectively rotatably connected to the outer side of the other end of the first rotating frame (625) via a pin shaft; A third mounting seat (626) is rotatably connected to the inner side of the first rotating frame (625) via a pin shaft; The roller frame (627) is arranged at the outer end of the third mounting seat (626).

5. A heating network remote monitoring and management system based on GPRS network according to claim 4, characterized in that: The vertical ladder auxiliary support unit comprises: A slot frame (628) is installed at the right bottom of the outer wall of the slot box (61); Insertion rods (629), the number of the insertion rods (629) is two, and the two insertion rods (629) are respectively inserted into the front and rear sides of the slot frame (628); A fourth mounting frame (630), wherein the number of the fourth mounting frames (630) is two, and the two fourth mounting frames (630) are respectively arranged at the right outer ends of the front and rear slot frames (628) in the up-down direction; A connecting plate (631), the number of the connecting plates (631) being two, and the two connecting plates (631) being respectively arranged in the middle of the right sides of the front and rear fourth mounting frames (630) along the front-rear direction; A rack rod (632), wherein the number of the rack rods (632) is two, and the two rack rods (632) are respectively arranged at the right inner ends of the two front and rear connecting plates (631) along the front-to-rear direction; Grooved wheels (633), the number of the grooved wheels (633) is two, the two grooved wheels (633) are rotatably connected to the upper and lower ends of the middle part of the right side of the slot frame (628) through pins, and the outer walls of the two grooved wheels (633) are respectively clamped with the outer sides of the two rack rods (632); A gear (634) is rotatably connected to the middle portion of the right side of the slot frame (628) via a pin shaft, and the gear (634) is meshed with the upper and lower rack rods (632); a second motor (635) mounted on the outer wall of the slot box (61) and located above the slot frame (628), the second motor (635) being electrically connected to the driving console (52); A transmission belt assembly (636), one end of which is keyed to the rotating end of the second motor (635), and the other end of which is fixedly connected to the right side of the axis of the gear (634); Roller shafts (637), the number of the roller shafts (637) being two groups, the number of the roller shafts (637) in each group being two, and the two groups of roller shafts (637) being rotatably connected to upper and lower sides of the right ends of the front and rear fourth mounting frames (630) respectively through pin shafts; A second mounting plate (638), the number of the second mounting plates (638) being two, and the two second mounting plates (638) being respectively arranged on the outsides of the front and rear fourth mounting frames (630); A third mounting seat (639), the number of the third mounting seats (639) being two, and the two third mounting seats (639) being respectively arranged above the right sides of the front and rear second mounting plates (638); a fifth electric telescopic rod (640), wherein the number of the fifth electric telescopic rods (640) is two, and the two fifth electric telescopic rods (640) are respectively rotatably connected to the inner sides of the two front and rear third mounting seats (639) via pin shafts, and the fifth electric telescopic rods (640) are electrically connected to the driving console (52); A fourth mounting seat (641), wherein the number of the fourth mounting seats (641) is two, and the two fourth mounting seats (641) are respectively arranged below the right sides of the front and rear second mounting plates (638); a second rotating frame (642), wherein the number of the second rotating frames (642) is two, and the two second rotating frames (642) are respectively rotatably connected to the inner sides of the two front and rear fourth mounting seats (641) via pins, and the telescopic ends of the two fifth electric telescopic rods (640) are rotatably connected to the inner top ends of the two second rotating frames (642) via pins; A crossbar (643), wherein the number of the crossbars (643) is two, and the two crossbars (643) are respectively arranged at the inner bottom ends of the two second rotating frames (642) along the left-right direction; The second rollers (644) are provided in two groups, each group of the second rollers (644) is provided with two second rollers, and the two groups of the cross bars (643) are respectively arranged on the outer sides of the left and right ends of the two cross bars (643).

6. A method for remote monitoring and management of a heating network based on a GPRS network, which is applied to a method for remote monitoring and management of a heating network based on a GPRS network as claimed in claim 5, characterized in that: The steps include: Step 1: The control terminal (2) collects data on the heat network pipeline nodes inside the main body of the pipe gallery (1) for real-time monitoring of the operation status of the pipeline, and the built-in GPRS module inside the control terminal (2) sends the processed data to the remote monitoring center. Due to the wide coverage and stable transmission characteristics of the GPRS network, the external monitoring center can synchronously receive data from various nodes and perform real-time analysis and processing. The operator can view the data, set the alarm threshold, and receive alarm information through the interface of the monitoring center; Step 2: The monitoring alarm device (3) collects image information of important nodes of the heat network pipeline inside the pipe gallery body (1), and sends the collected image information data to the control terminal (2) in real time. The control terminal (2) remotely sends the image information data to an external monitoring center through a GPRS module. The external monitoring center performs real-time analysis and processing through image analysis software to determine whether there is a leak in the heat network pipeline and sends an alarm signal. Step 3: The external staff drives the electric engineering vehicle (51) to the designated position outside the inspection channel mechanism (4) by operating the driving console (52) according to the alarm signal. The staff establishes a network connection with the sub-control module (45) through the GPRS module built into the driving console (52). The lock (46) is unlocked. The first electric telescopic rod (49) is extended and drives the top cover (44) to flip upward with the cooperation of the connecting frame (48), so that the top cover (44) releases the seal on the top of the frame (42). Step 4: The staff operates the driving operation platform (52) to control the lifting platform (53) and the hoisting platform (54) to start, and the electric engineering vehicle (51) moves the internal monitoring mechanism (6) to the top of the frame (42) with the cooperation of the lifting platform (53) and the hoisting platform (54). The lifting platform (53) drives the hoisting platform (54) to move downward, and with the cooperation of the hoisting platform (54), the internal monitoring mechanism (6) passes through the frame (42) and enters the interior of the pipeline body (41). The hoisting platform (54) drives the internal monitoring mechanism (6) to descend inside the pipeline body (41) through the driving of its own hoisting equipment; Step 5: The third electric telescopic rod (619) is extended or shortened to drive the rotating rod (618) to rotate upward or downward in the inner cavity of the tank shell (617), so that the rotating rods (618) on both sides, in cooperation with the cross (620), drive the first roller (621) to fit the left side of the inner wall of the pipe body (41); Step 6: The second mounting seat (624) in the front and rear positive auxiliary support units drives the first rotating frame (625) by extending and shortening itself, so that the first rotating frame (625) rotates upward or downward inside the second mounting seat (624), and the first rotating frame (625) in the front and rear positive auxiliary support units cooperates with the third mounting seat (626) to make the roller frame (627) fit the front side or the rear side of the inner wall of the pipeline body (41); Step 7: The second motor (635) drives the gear (634) to rotate under the transmission of the transmission belt assembly (636), and the rack rods (632) on both sides drive the connecting plates (631) on both sides to move outward or inward under the action of the rotational force of the gear (634), and the connecting plates (631) on both sides drive the fourth mounting frame (630) to move inward or outward synchronously under the limiting action of the insertion rod (629), and the fourth mounting frames (630) on both sides drive their own upper and lower rollers (637) to fit with the outer side of the vertical ladder (43), and the fifth electric telescopic rods (640) on the front and rear sides drive the second rotating frame (642) to flip to the horizontal direction on the inner side of the fourth mounting seat (641) through their own extension, so that the second rotating frame (642) drives the second rollers (644) on both sides to fit with the right side of the inner wall of the pipeline body (41) with the cooperation of the cross bar (643); Step 8: During the descent of the internal monitoring mechanism (6), the first roller (621), the roller frame (627) and the second roller (644) roll along the inner wall of the pipeline body (41), so that the internal monitoring mechanism (6) remains stable during the descent; Step nine: After the internal monitoring mechanism (6) passes through the pipeline body (41) and enters the interior of the pipe gallery body (1), the first motor (69) drives the lead screw assembly (68) to move the front side of the top end of the cross folding frame (66) backward, and the cross folding frame (66) folds downward with the cooperation of the fixed seat (63) and the first limit guide rail assembly (64), so as to drive the bottom plate (62) to move downward to release the seal on the bottom of the inner cavity of the tank box (61); Step 10: The second electric telescopic rod (613) is extended to drive the bracket (612) to move forward under the limiting action of the second limiting guide rail assembly (611), so that the bracket (612) drives the first mounting plate (614) to move forward to the position below the slot box (61), and the fixing module (615) releases the fixed state of the monitoring drone (616). The monitoring drone (616) is started inside the pipe gallery body (1) and performs a detailed flight inspection of the pipe alarm position inside the pipe gallery body (1), and sends the collected image information data to the inside of the driving console (52), so that the staff can observe the scene more intuitively and conduct situation analysis and subsequent processing.

Citation Information

Patent Citations

  • Multifunctional unmanned aerial vehicle intelligent mobile platform for underground pipe gallery

    CN111806712A

  • Intelligent monitoring management system and method for urban comprehensive pipe gallery

    CN116760956A

  • High-floor intelligent vertical distribution system

    CN218402353U

  • Underground facility survey system for monitoring position change of underground facility and survey method therefor

    KR102503510B1