Method for installing intake and exhaust pipes of marine diesel engine
Through the use of temporary pipe fittings and elastic brackets, the problem of corrugated pipe damage during the installation of marine diesel engine inlet and exhaust pipes is solved, ensuring installation accuracy, reducing production costs, and simplifying the installation process.
Patent Information
- Application Number
- CN202410888910.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-04
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In ship construction, the intake and exhaust bellows are easily damaged during the installation process, and the three-dimensional cross-cutting operations in the engine room area often cause damage to the bellows, affecting the installation progress.
Temporary school pipe tooling is used to replace the bellows in the school pipe operation and three-dimensional crossover operation stages of the intake and exhaust pipelines. After completion, the bellows are removed and replaced, and elastic brackets are used to support the bellows to ensure installation accuracy.
It effectively avoids damage to the bellows during school pipe work and the engine room area, ensures the installation accuracy of the intake and exhaust pipelines and bellows, reduces production costs, and simplifies the installation process.
Smart Images

Figure CN118723006A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of shipbuilding, and in particular to a method for installing intake and exhaust pipes of a ship diesel engine. Background Art
[0002] In shipbuilding, bellows are installed in the main engine intake and exhaust pipe systems. Currently, the intake and exhaust bellows are directly installed in the intake and exhaust systems, and then the subsequent pipes of the bellows are aligned and installed. Due to the large diameter and weight of the intake and exhaust pipes, the bellows are easily damaged during the pipe alignment process, and the bellows will be squeezed and deformed during the installation process, affecting the installation progress. In addition, due to the subsequent three-dimensional cross-operation in the engine room and other areas, the bellows are often damaged. Summary of the invention
[0003] In view of this, the present invention provides a method for installing intake and exhaust pipes of a marine diesel engine, so as to solve the problems existing in the above-mentioned background technology.
[0004] A method for installing an intake and exhaust pipe of a marine diesel engine comprises the following steps:
[0005] S1, install the air intake and exhaust pipes on the air intake and exhaust ports of the main engine:
[0006] Specifically, the air intake pipe and the exhaust pipe are installed from the air intake interface and the exhaust interface of the main engine respectively in an on-site layout manner, and a temporary pipe calibration tool is installed at the position where the bellows is required to be installed between two adjacent sections of the air intake pipe or the exhaust pipe to form the air intake pipeline and the exhaust pipeline;
[0007] The size specification of the temporary calibration pipe tool is equal to the size specification of the corrugated pipe to be installed at the position where it is located. The temporary calibration pipe tool includes a plurality of temporary calibration pipes evenly distributed in the circumferential direction, a first end face flange and a second end face flange fixed at both ends of the temporary calibration pipe, and the flange surfaces of the first end face flange and the second end face flange are both provided with flange holes;
[0008] S2, after the calibration operation of the air intake and exhaust pipes and the subsequent three-dimensional cross-operation in the cabin area are completed, the temporary calibration tooling is removed, and then the bellows is installed at the location of the temporary calibration tooling;
[0009] When installing the bellows, first use its built-in adjustment device to compress its length to the same length as the temporary pipe calibration fixture. Then, place the bellows at the location of the temporary pipe calibration fixture, release the length restriction of its adjustment device, and use high-strength bolts to connect and fix the bellows to the corresponding intake pipe or exhaust pipe.
[0010] Preferably, when two or more bellows are installed on the intake pipe or the exhaust pipe, an elastic bracket is installed at the expansion section of the intake pipe or the exhaust pipe to support it.
[0011] Preferably, the elastic bracket includes a connecting angle bracket, a connecting rod, a connecting screw, a pressure plate, a supporting seat, a connecting angle plate, an elastic pad, a fastening baffle and a fastening nut. The connecting angle bracket is connected to the intake pipe or the exhaust pipe through a web, one end of the connecting rod is fixed to the connecting angle bracket, and the other end is fixed to the connecting screw. A pressure plate and a fastening baffle are provided on the connecting screw. The elastic pad is fixed to the connecting angle plate, the pressure plate is located below the elastic pad, and the fastening baffle is located above the elastic pad. The connecting screw passes through the elastic pad and passes through the fastening nut to make the pressure plate abut against the bottom of the elastic pad and the fastening baffle abut against the top of the elastic pad. A supporting seat is fixed to the bottom of the connecting angle plate and the supporting seat is sleeved outside the elastic pad.
[0012] Preferably, the elastic brackets are symmetrically arranged on both sides of the air inlet pipe or the exhaust pipe, and the connecting angle plates of the elastic brackets are directly welded and fixed to the cabin top plate or connected and fixed to the cabin top plate via connecting pieces.
[0013] Preferably, the installation direction of the temporary pipe calibration tool in step S1 should be consistent with the installation direction of the corrugated pipe.
[0014] The beneficial effects of the present invention are:
[0015] 1. The present invention connects a temporary pipe calibration tool to the air intake pipe or the air exhaust pipe when installing the main engine air intake and air exhaust pipes, and utilizes the temporary pipe calibration tool to replace the bellows that should be installed at this stage. After the calibration operation of the air intake and air exhaust pipes and the subsequent three-dimensional cross operation in the engine room area are completed, the temporary pipe calibration tool is removed, and the bellows is replaced and installed at the location of the temporary pipe calibration tool, so as to avoid damage to the bellows caused by the calibration operation of the air intake and air exhaust pipes and the subsequent operation in the engine room area, and at the same time, the calibration accuracy of the air intake and air exhaust pipes and the installation accuracy of the bellows can be guaranteed.
[0016] 2. The temporary calibration tooling has a simple structure, is made of common materials, is easy to manufacture, has low cost, and can be reused, which greatly reduces the production and construction costs of ships. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0018] Figure 1 It is a structural diagram of temporary school management equipment.
[0019] Figure 2 It is a schematic diagram of the end face of the temporary calibration tooling.
[0020] Figure 3 It is a schematic diagram of the arrangement of the bellows and the elastic support.
[0021] Figure 4 It is a structural schematic diagram of the elastic bracket.
[0022] Figure 5 It is one of the schematic diagrams of the connection of the air intake pipe or the exhaust pipe to the cabin roof or deck through an elastic bracket.
[0023] Figure 6 This is the second schematic diagram of an air intake pipe or an exhaust pipe being connected to a cabin roof or a deck via an elastic bracket.
[0024] The meanings of the numbers in the figure are:
[0025] 1 is the first end face flange, 2 is the second end face flange, 3 is the temporary calibration pipe, 4 is the bellows, 5 is the elastic bracket, 6 is the cabin through-piece, 7 is the air inlet pipe or the exhaust pipe, 8 is the fastening nut, 9 is the fastening baffle, 10 is the elastic pad, 11 is the connecting angle plate, 12 is the supporting seat, 13 is the pressure plate, 14 is the connecting screw, 15 is the connecting head, 16 is the connecting rod, 17 is the connecting angle bracket, 18 is the web plate, 19 is the insulation, and 20 is the cabin top or deck. DETAILED DESCRIPTION
[0026] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is described below by the specific embodiments shown in the accompanying drawings. However, it should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.
[0027] The terms used in this disclosure are for the purpose of describing specific embodiments only and are not intended to limit the disclosure. The singular forms of "a", "said" and "the" used in this disclosure and the appended claims are also intended to include plural forms unless the context clearly indicates otherwise. It should also be understood that the term "and / or" used herein refers to and includes any or all possible combinations of one or more associated listed items.
[0028] In the description of the present invention, unless otherwise specified and limited, it should be noted that the terms "installed", "connected" and "connected" should be understood in a broad sense. For example, it can be a mechanical connection or an electrical connection, or it can be the internal connection between two components. It can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to the specific circumstances.
[0029] The present application is further described in detail below through specific embodiments and in conjunction with the accompanying drawings.
[0030] The present invention provides a method for installing an intake and exhaust pipe of a marine diesel engine, which is characterized by comprising the following steps:
[0031] S1, install the air intake and exhaust pipes on the air intake and exhaust ports of the main engine:
[0032] Specifically, the air intake pipe and the exhaust pipe 7 are installed from the air intake interface and the exhaust interface of the main engine respectively by means of on-site layout, and a temporary pipe calibration tool is installed at the position where the bellows needs to be installed between two adjacent sections of the air intake pipe or the exhaust pipe 7 to form the air intake pipeline and the exhaust pipeline.
[0033] The installation direction of the temporary pipe calibration tool should be consistent with the installation direction of the corrugated pipe 4.
[0034] The size specifications of the temporary pipe calibration tool are equal to the size specifications of the corrugated pipe to be installed at the location where it is located. The temporary pipe calibration tool includes multiple temporary calibration pipes 3 evenly distributed in the circumferential direction, a first end face flange 1 and a second end face flange 2 fixed at both ends of the temporary calibration pipe 3, and the flange surfaces of the first end face flange 1 and the second end face flange 2 are both provided with flange holes.
[0035] In this embodiment, the first end face flange 1 and the second end face flange 2 are both made of a circular flat plate, a through circular hole is opened in the middle of the circular flat plate, and a flange hole is opened near the outer circumference, and the first end face flange 1 and the second end face flange 2 are fixed as a whole through four temporary calibration pipes 3. The dimensions of the first end face flange 1 and the second end face flange 2 (including the flange diameter, the flange hole diameter, and the through circular hole diameter) are consistent with the dimensions of the flanges at the corresponding ends of the bellows. The thickness of the flanges of the first end face flange 1 and the second end face flange 2 is 25mm. The first end face flange 1, the second end face flange 2 and the temporary calibration pipe 3 are all made of Q235A material. The overall length of the temporary calibration pipe tooling is equal to the length of the bellows (the length error between the two does not exceed ±1mm), and the flatness of the outer end faces of the first end face flange 1 and the second end face flange 2 should be ≯1mm, and the concentricity should be no more than 2mm.
[0036] During installation, the intake and exhaust pipes should be kept straight with the minimum number of elbows. If bending is necessary, the bending angle should not be less than 90°. Aramid rubber gaskets should be used for intake pipes, and flexible graphite stainless steel coated gaskets should be used for exhaust pipes. Blackened bolts with strength grade 8.8 and nuts with strength grade 8 should be used for fastening between exhaust pipe flanges. Galvanized parts should not be used.
[0037] Preferably, the outer walls of the air inlet pipe and the exhaust pipe are covered with insulation 19 .
[0038] S2, when the calibration operation of the air intake and exhaust pipes and the subsequent three-dimensional cross-operation in the cabin area are completed, the temporary calibration tooling is removed, and then the bellows 4 is installed at the location of the temporary calibration tooling, that is, the temporary calibration tooling is replaced by the bellows 4.
[0039] When installing the bellows 4, first use its own adjusting device to compress its length to be equal to the length of the temporary pipe calibration tool. Then, place the bellows 4 at the location of the temporary pipe calibration tool. After releasing the length limit of its adjusting device, use high-strength bolts to connect and fix the bellows 4 to the corresponding intake pipe or exhaust pipe 7.
[0040] The bellows 4 is not allowed to be twisted during installation. The bellows with conduits or marked with flow direction marks on the surface must not be installed in the reverse direction. The installed bellows must be protected and must not bear the additional weight of the intake and exhaust pipes. The bellows 4 is not allowed to be installed at the elbow. The exhaust pipe insulation is wrapped first, and the insulation layer of the bellows 4 and the pipe installation flange should be wrapped after the test run to check for leakage.
[0041] When two or more bellows 4 are installed on the intake pipe or exhaust pipe 7, an elastic bracket 5 is installed at the expansion section of the intake pipe or exhaust pipe to support it. The elastic bracket 5 is symmetrically arranged on both sides of the intake pipe or exhaust pipe 7.
[0042] The elastic bracket 5 includes a connecting angle bracket 17, a connecting rod 16, a connecting screw 14, a pressure plate 13, a supporting seat 12, a connecting angle plate 11, an elastic pad 10, a fastening baffle 9 and a fastening nut 8. The connecting angle bracket 17 is connected to the intake pipe or the exhaust pipe through a web 18. One end of the connecting rod 16 is fixed to the connecting angle bracket 17 and the other end is fixed to the connecting screw 14. The connecting screw 14 is provided with a pressure plate 13 and a fastening baffle 9. The elastic pad 10 is fixed on the connecting angle plate 11. The pressure plate 13 is located below the elastic pad 10. The fastening baffle 9 is located above the elastic pad 10. The connecting screw 14 passes through the elastic pad 10 and passes through the fastening nut 8 to make the pressure plate 13 abut against the bottom of the elastic pad 10 and the fastening baffle 9 abut against the top of the elastic pad 10. The bottom of the connecting angle plate 11 is fixed with a supporting seat 12 and the supporting seat 12 is sleeved outside the elastic pad 10.
[0043] The connecting angle plate 11 of the elastic bracket is directly welded and fixed to the cabin top plate or deck 20, or connected to the connecting piece fixed on the cabin top plate or deck 20 by bolts, and is connected and fixed to the cabin top plate through the connecting piece.
[0044] It should be clear that the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
Claims
1. A method for installing a marine diesel engine intake and exhaust pipe, characterized in that: The specific steps include: S1, install the air intake and exhaust pipes on the air intake and exhaust ports of the main engine: Specifically, the air intake pipe and the exhaust pipe are installed from the air intake interface and the exhaust interface of the main engine respectively in an on-site layout manner, and a temporary pipe calibration tool is installed at the position where the bellows is required to be installed between two adjacent sections of the air intake pipe or the exhaust pipe to form the air intake pipeline and the exhaust pipeline; The size specification of the temporary pipe calibration tool is equal to the size specification of the corrugated pipe to be installed at the position where the temporary pipe calibration tool is located. The temporary pipe calibration tool comprises a plurality of temporary pipes (3) evenly distributed in the circumferential direction, a first end face flange (1) and a second end face flange (2) fixed at both ends of the temporary pipes (3), and flange surfaces of the first end face flange (1) and the second end face flange (2) are both provided with flange holes; S2, after the calibration operation of the air intake and exhaust pipes and the subsequent three-dimensional cross-operation in the cabin area are completed, the temporary calibration tooling is removed, and then the bellows is installed at the location of the temporary calibration tooling; When installing the bellows, first use its built-in adjustment device to compress its length to the same length as the temporary pipe calibration fixture. Then, place the bellows at the location of the temporary pipe calibration fixture, release the length restriction of its adjustment device, and use high-strength bolts to connect and fix the bellows to the corresponding intake pipe or exhaust pipe.
2. The method for installing the marine diesel engine intake and exhaust pipes according to claim 1, characterized in that: When two or more bellows are installed on the intake pipe or the exhaust pipe, an elastic bracket is installed at the expansion section of the intake pipe or the exhaust pipe to support it.
3. The method for installing a marine diesel engine intake and exhaust pipe according to claim 2, characterized in that: The elastic bracket comprises a connecting angle bracket (17), a connecting rod (16), a connecting screw (14), a pressure plate (13), a supporting seat (12), a connecting angle plate (11), an elastic pad (10), a fastening baffle (9) and a fastening nut (8); the connecting angle bracket (17) is connected to an air intake pipe or an exhaust pipe via a web; one end of the connecting rod (16) is fixed to the connecting angle bracket (17) and the other end is fixed to the connecting screw (14); the connecting screw (14) is provided with a pressure plate (13) and a fastening baffle (9); The elastic pad (10) is fixed on the connecting angle plate (11), the pressure plate (13) is located below the elastic pad (10), the fastening baffle (9) is located above the elastic pad (10), the connecting screw (14) passes through the elastic pad (10) and passes through the fastening nut (8) so that the pressure plate (13) abuts against the bottom of the elastic pad (10) and the fastening baffle (9) abuts against the top of the elastic pad (10), and a supporting seat (12) is fixed at the bottom of the connecting angle plate (11) and the supporting seat (12) is sleeved outside the elastic pad (10).
4. The method for installing a marine diesel engine intake and exhaust pipe according to claim 3, characterized in that: The elastic brackets are symmetrically arranged on both sides of the air inlet pipe or the exhaust pipe, and the connecting angle plates (11) of the elastic brackets are directly welded and fixed to the cabin top plate or connected and fixed to the cabin top plate via a connecting piece.
5. The method for installing the marine diesel engine intake and exhaust pipes according to claim 1, characterized in that: The installation direction of the temporary pipe calibration tool in step S1 should be consistent with the installation direction of the corrugated pipe.
Citation Information
Patent Citations
Positioning and installing method for marine low speed diesel engine corrugated pipe
CN103753172A
Simple and easy device that cooperates installation of marine host computer oil pump
CN207191317U
A support device for supporting blast pipe
CN208470090U
High-temperature and high-pressure exhaust pipe support assembly of large bulk cargo ship
CN210284574U
Novel exhaust pipe elastic support device
CN215213666U